CH326084A - Process for producing a composite structure from concrete, in particular reinforced concrete, and structure produced according to this process - Google Patents

Process for producing a composite structure from concrete, in particular reinforced concrete, and structure produced according to this process

Info

Publication number
CH326084A
CH326084A CH326084DA CH326084A CH 326084 A CH326084 A CH 326084A CH 326084D A CH326084D A CH 326084DA CH 326084 A CH326084 A CH 326084A
Authority
CH
Switzerland
Prior art keywords
concrete
steel
elements
another
concrete elements
Prior art date
Application number
Other languages
German (de)
Inventor
Birkenmaier Max
Brandestini Antonio
Robin Ros Mirko
Original Assignee
Birkenmaier Max
Brandestini Antonio
Robin Ros Mirko
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Birkenmaier Max, Brandestini Antonio, Robin Ros Mirko filed Critical Birkenmaier Max
Publication of CH326084A publication Critical patent/CH326084A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/16Prestressed structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/29Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures
    • E04C3/293Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being steel and concrete

Description

  

  Verfahren zur Herstellung eines zusammengesetzten Baukörpers aus Beton,  insbesondere Stahlbeton, und nach diesem Verfahren hergestellter Baukörper    Die vorliegende Erfindung betrifft ein  Verfahren zur Herstellung eines zusammen  gesetzten Baukörpers aus Beton, insbesondere  Stahlbeton sowie einen nach diesem Verfahren       hergestellten        Baukörper.     



  In den letzten     Jahren    konnte im Bau  wesen die Tendenz zur verwehrten     Verwen-          (hin        ,;    von vorfabrizierten Bauteilen aus Beton,  insbesondere Stahlbeton (Träger, Platten,  Masten     usw.    ) festgestellt werden.     Solehe          Fertigbaukörper    aus Beton besitzen oft.     wesent-          lielie        teehnisehe    und wirtschaftliche Vorteile       gr-enüber    den am Bau hergestellten Baufor  men.     Naehteilig    wirkt sieh aber aus, dass       #:

  olelie    massive Fertigbaukörper aus Beton ein  grosses     Clewieht    haben und daher den Einsatz       besonderer    Transport- und     Montage-Einrieh-          tun:;en    notwendig machen.

   -Man war daher       bestrebt,    die Baukörper so leicht wie     möglich          zii        gestalten,    das heisst statisch     möglichst        gün-          sthgc    Bauformen mit einem     Minimum    an Beton       mid    Stahl zu     entwickeln.    Bei der     fIerstellung     von     vorfabrizierten    Trägern hielt man sieh       daher        möglielist    an die vom Stahlbau her be  kannten     @Doppel-T-Balken.    Die gefundenen  Lösungen waren aber 

  trotzdem nicht     befriedi-          z@end,    denn der Baustoff Beton erlaubt es  eben nicht,     Doppel-T-Balken    mit dünnen.  Stegen herzustellen. Wohl wurden durch die       Einführung    der     Vorspannung    der Armierun  g     #,        11        Verbesserun-en    erzielt, doch war man von  e<B>C</B>    der idealen Bauform noch weit entfernt.

       Aueh     die Fabrikation solcher Träger war mit be  te     ächtliehen        Schwierigkeiten    verbunden, denn  für jedes Trägerprofil     mussten    besondere kost  spielige Schalungen hergestellt. werden.     Dazu     kam die Unmöglichkeit, statisch besonders  günstige Bauformen, wie zum Beispiel Hohl  träger und Hohlplatten, aus     vorgespanntem     Beton zu fabrizieren.  



  Die vorliegende Erfindung bezweckt, ein  Verfahren vorzusehen zur Herstellung eines       zusammengesetzten    Baukörpers aus Beton,  bei welchem die vorgenannten Nachteile ver  mieden sind.  



  Das erfindungsgemässe Verfahren ist da  durch     gekennzeichnet,    dass zunächst minde  stens zwei Elemente aus Beton unter gleich  zeitiger Einlagerung von Stahlankern herge  stellt werden, worauf diese Betonelemente       mittels    der genannten Stahlanker zu einem  Baukörper fest miteinander verbunden wer  den.  



  Die Verbindung der     vorfabrizierten        Ele-          inente    zur Herstellung des fertigen Baukör  pers kann auf dem Bauplatz erfolgen.  



  Der ebenfalls     Erfindungsgegenstand    bil  dende, nach diesem Verfahren hergestellte  Baukörper besitzt mindestens zwei Beton  elemente, die mittels in die Elemente einge  betteter Stahlanker fest miteinander     verbun-          d    en sind.

        Das erfindungsgemässe Verfahren ist im  folgenden an Hand der beiliegenden     Zeieh-          nung    beispielsweise näher erläutert, in welcher  Zeichnung Ausführungsbeispiele des ebenfalls       Erfindungsgegenstand    bildenden Baukörpers  dargestellt. sind; es zeigt       Fig.    1 und 2 einen     biegesteifen        CTittert.rä-          ger    nach der Erfindung in Seitenansicht bzw.

    im Querschnitt,       Fig.    3 und 4 eine Seiten- bzw. eine Front  ansicht eines Gittermastes nach der     Erfin--          clung,          Fig.    5 und 6 einen vierteiligen Hohlkör  per nach der Erfindung im Querschnitt bzw.

    im     Längsschnitt,          Fig.    7 und 8 einen Baukörper mit zwei  Betonplatten nach der Erfindung im Quer  schnitt bzw. in Ansieht,       Fig.    9, 10 und 11 einen Querschnitt     bzw.     in grösserem Massstab eine Einzelheit im Quer  schnitt bzw. eine Seitenansicht einer Hohl  platte nach der Erfindung und       Fig.    12 und 13 einen biegesteifen Träger  nach der Erfindung in Seitenansicht, bzw. im.  Querschnitt.  



  Der in den     Fig.    1 und 2 gezeigte biege  steife Gitterträger besitzt zwei im Querschnitt  rechteckige Gurten 1 aus Beton mit eingeleg  ten vorgespannten Armierungen z. Bei der  Herstellung der Gurten 1 werden Stahlanker  3 in geeigneten Abständen voneinander in den.  Beton eingebettet. Nach dein Erhärten des       Betons    werden die bei den Gurten durch ein  Gitterwerk aus     Flaeheisenstä.ben    4, welche an  die Stahlanker 3 angeschweisst werden, fest       miteinander    verbunden. Das Verbinden der  Gurten zum fertigen Baukörper kann zum Bei  spiel erst, auf der Baustelle erfolgen; dies er  leielitert den Transport der Baukörper zur  Baustelle.

   Ausserdem gestattet diese Herstel  lungsart Gurten gleicher Abmessungen in grö  sserer Zahl auf Lager zu halten, und sie bei  Gebrauch durch Verwendung verschieden gro  sser Gitterwerke zu Trägern verschiedener  Höhe zu verbinden. Der obere Druckgurt ist  schwächer armiert als der untere zur Auf  nahme grosser Zugkräfte bestimmte Zuggurt.    Da der Steg des Trägers ein Stahlgitterwerk  ist, ist sein Gewicht und somit das Gewicht.  des ganzen Trägers verglichen mit der erreich  baren     Steifigkeit    relativ klein.  



  In analoger Weise ist der in     Fig.    3 und 1  dargestellte Mast hergestellt. Hier sind die  vorfabrizierten Betonelemente 5, in welche  nichtgezeichnete Hohlanker     eingebettet.    sind,  derart miteinander verbunden,     da.ss    ein sich  nach oben verjüngender Mast gebildet ist.     Zn     diesem Zweck ist im untern Teil des Mastes  ein     geeignetes    Gitterwerk 6 aus Stahl vor  gesehen, während im obern Mastteil Querstäbe  7 zur Verbindung der Betonelemente 5 ver  wendet sind. Gitterwerk 6 und Querstäbe 7  sind an den Stahlankern der Elemente 5 fest  geschweisst.

   Auch die     Herstellung    dieses  Mastes kann so erfolgen, dass in der Fabrik  vorerst nur die Elemente 5 mit eingebetteten  Stahlankern hergestellt werden, während das  Verbinden dieser Elemente zum fertigen Mast.  erst auf der Baustelle vorgenommen werden  kann. Durch     Verwendung    verschieden grosser  Gitterwerke bzw. Querstäbe lassen sieh mittels  der Elemente 5     Masten        verschiedener    Quer  sehnittsgrössen herstellen.  



  Die     Fig.    5 und 6 zeigen einen Hohlkasten.  der aus vier rechtwinklig     aneinanderstossen-          den    Betonplatten 8 gebildet ist. Beim Herstel  len der Platten 8 werden in die eine Platten  seite an den Plattenenden     plattenförmi-e     Stahlanker 9 so     ein-ebettet,    dass deren freie  Stirnfläche mit der Stirnfläche der Beton  platte 8 bündig ist. Nach.     deni    Erhärten des  Betons werden die Platten 8 winklig     anein-          andergefügtund    durch Verschweissen der auf  einanderstossenden Stahlanker 9 fest mitein  ander verbunden. Die Schweissnähte werden  anschliessend mit. Mörtel 7 0 zugedeckt.

   Der so  geschaffene Baukörper kann zum Beispiel  als Stütze verwendet. werden, wobei dessen       Hohlraum    mit Beton gefüllt werden kann.  



  Die     Fig.    7 und 8 zeigen einen Betonbau  körper, der aus zwei separat, hergestellten und  mit eingebetteten Stahlankern 11 versehenen  Betonbrettern 12 gebildet ist. Die beiden Bret  ter 12 sind parallel und in geeignetem Ab-      stand voneinander durch Stahlglieder 13 mit  einander fest verbunden. Die Stahlglieder 13  werden auch hier erst nach dem Erhärten  des Betons der Bretter 12 an den Stahlankern  11     angesehweisst.    Baukörper dieser     Ausbil-          dun-@    können zum Beispiel horizontal     über-          chiander    versetzt als     Sehalung    dienen, die  anschliessend mit Beton gefüllt werden kann.  



  Die     Fig.    9 bis 11 zeigen eine aus zwei     sepa-          ral    hergestellten Betonbrettern     1.1    mit. an den       Längsrändern    vorstehenden     Flansehen        1-1a-        zu-          samnieng,esetzte    Hohlplatte. Bei der Herstel  lung     der    Bretter 14 werden in die Flanschen       14a    Stahlanker 15 eingebettet. Nach dein Er  liärten des Betons bzw. auf der Baustelle wer  den die beiden Bretter 14 durch Zusammen  schweissen der Stahlanker 15     (Fig.    10) fest  miteinander verbunden.

   Es versteht sich,     da.ss          auch    in diesem Fall die beiden Platten durch  an den Stahlankern     angeschweisste    Zwischen  glieder aus Stahl miteinander verbunden wer  den können.  



  Die     Fig.    12 und 13 zeigen einen biege  steifen Träger, der analog dem in     Fig.    1 und       'gezeigten    Träger hergestellt wird. Bei der  Herstellung der     Gurten    1 aus Spannbeton.  werden in die letzteren durch     [J-Profile    gebil  dete Stahlanker 16 eingebettet. Als Steg wird  hier ein Stahlblech 17 verwendet, das an den  Stahlankern 16 festgeschweisst wird und das  mit Versteifungsrippen     17a    versehen ist. An  Stelle des     Stahlbleehes    17 könnte auch ein       Zwisehenglied    aus einem andern Material,  z.

   B. eine Eternit- oder Betonplatte, verwen  det     werden;    diese Platte ist in diesem Fall       ebenfalls    mit Stahlankern zu versehen, welche  zwecks fester Verbindung der drei Elemente  1, 17 an den     Stahlankern    16 der Garten 1       aneschweisst    werden.  



  Es versteht sich, dass bei allen nach     dein          lmsehriebenen    Verfahren hergestellten Bau  körpern je nach Verwendungszweck armierte  (mit oder ohne     Vorspannung)    oder nicht  armierte Betonelemente verwendet     werden.          können,    obwohl natürlich     Stalilbetonelemente     in den meisten Fällen geeigneter sein dürften       als    nicht armierte Elemente.



  Method for producing a composite structure made of concrete, in particular reinforced concrete, and a structure produced by this method. The present invention relates to a method for producing a composite structure made of concrete, in particular reinforced concrete, and a structure produced by this method.



  In recent years, there has been a tendency in the building sector to refuse to use prefabricated concrete components, in particular reinforced concrete (beams, slabs, masts, etc.). Sole prefabricated concrete structures often have essential parts Economic advantages are greater than the types of construction produced on site.But it has a negative effect that #:

  olelie massive prefabricated concrete structures have a lot of clews and therefore make the use of special transport and assembly devices necessary.

   The aim was therefore to make the structure as light as possible, that is, to develop structurally as favorable as possible structural forms with a minimum of concrete and steel. When producing prefabricated girders, it was therefore possible to use the double-T-beams known from steel construction. The solutions found were

  nevertheless not satisfactory, because the building material concrete does not allow double T-bars with thin. To produce bars. The introduction of the pre-tensioning of the reinforcement #, 11 made improvements, but the ideal design was still a long way off.

       The manufacture of such girders was also associated with real difficulties, as special, expensive formwork had to be made for each girder profile. will. In addition, there was the impossibility of constructing structurally particularly favorable structural forms, such as hollow girders and hollow slabs, from prestressed concrete.



  The present invention aims to provide a method for producing a composite structure from concrete in which the aforementioned disadvantages are avoided.



  The method according to the invention is characterized in that initially at least two elements made of concrete are produced with simultaneous storage of steel anchors, whereupon these concrete elements are firmly connected to one another by means of the steel anchors mentioned to form a structure.



  The connection of the prefabricated elements for the production of the finished structure can take place on the building site.



  The structure, which is also the subject of the invention and manufactured by this method, has at least two concrete elements that are firmly connected to one another by means of steel anchors embedded in the elements.

        The method according to the invention is explained in more detail below with reference to the accompanying drawing, for example, which shows exemplary embodiments of the structure, which is also the subject of the invention. are; 1 and 2 show a rigid CTittert.räger according to the invention in side view or

    3 and 4 a side and a front view of a lattice mast according to the invention, FIGS. 5 and 6 a four-part hollow body according to the invention in cross section or

    in longitudinal section, Fig. 7 and 8 a structure with two concrete slabs according to the invention in cross section or in view, Fig. 9, 10 and 11 a cross section or on a larger scale a detail in the cross section or a side view of a hollow plate according to the invention and FIGS. 12 and 13 show a rigid support according to the invention in side view and in. Cross-section.



  The flexurally rigid lattice girder shown in Figs. 1 and 2 has two rectangular cross-section belts 1 made of concrete with inlaid th prestressed reinforcements z. In the manufacture of the belts 1, steel anchors 3 are at suitable distances from one another in the. Embedded in concrete. After the concrete has hardened, the belts are firmly connected to one another by a lattice made of flake iron bars 4, which are welded to the steel anchors 3. The connection of the belts to the finished structure can, for example, only take place on the construction site; this facilitates the transport of the structure to the construction site.

   In addition, this type of manufacture allows belts of the same dimensions to be kept in larger numbers in stock and, when in use, to connect them to girders of different heights by using different sized latticework. The upper compression chord is more weakly armored than the lower tension chord which is intended to absorb large tensile forces. Since the web of the girder is a steel latticework, its weight and therefore the weight. of the entire beam compared to the achievable stiffness relatively small.



  The mast shown in FIGS. 3 and 1 is produced in an analogous manner. Here are the prefabricated concrete elements 5, in which hollow anchors, not shown, are embedded. are connected to one another in such a way that an upwardly tapering mast is formed. For this purpose, a suitable latticework 6 made of steel is seen in the lower part of the mast, while in the upper mast part transverse rods 7 for connecting the concrete elements 5 are used ver. Lattice work 6 and cross bars 7 are firmly welded to the steel anchors of the elements 5.

   This mast can also be manufactured in such a way that initially only the elements 5 with embedded steel anchors are manufactured in the factory, while these elements are connected to form the finished mast. can only be carried out on the construction site. By using different sized latticework or cross bars, you can use the elements 5 to produce masts of different cross-sectional sizes.



  5 and 6 show a box girder. which is formed from four concrete slabs 8 abutting one another at right angles. During the manufacture of the plates 8, steel anchors 9 in the form of plates are embedded in one side of the plate at the plate ends in such a way that their free end face is flush with the end face of the concrete slab 8. To. As the concrete hardens, the plates 8 are joined together at an angle and firmly connected to one another by welding the steel anchors 9 that abut one another. The weld seams are then with. Mortar 7 0 covered.

   The structure created in this way can be used as a support, for example. the cavity can be filled with concrete.



  7 and 8 show a concrete building body, which is formed from two separately, manufactured and provided with embedded steel anchors 11 concrete boards 12. The two boards 12 are firmly connected to one another in parallel and at a suitable distance from one another by steel links 13. Here, too, the steel members 13 are welded to the steel anchors 11 only after the concrete of the boards 12 has hardened. Structures of this type of training can, for example, be offset horizontally above the one another and serve as a sehalung that can then be filled with concrete.



  FIGS. 9 to 11 show one with two separately produced concrete boards 1.1. on the longitudinal edges protruding flanges 1-1a together, etched hollow plate. During the manufacture of the boards 14 steel anchors 15 are embedded in the flanges 14a. After your He liared the concrete or on the construction site who the two boards 14 by welding together the steel anchors 15 (Fig. 10) firmly connected.

   It goes without saying that in this case too, the two plates can be connected to one another by means of steel intermediate links welded to the steel anchors.



  FIGS. 12 and 13 show a flexurally rigid carrier which is produced analogously to the carrier shown in FIGS. 1 and 1. When producing the belts 1 from prestressed concrete. are embedded in the latter by [J-profiles gebil Dete steel anchors 16. A steel sheet 17 is used here as the web, which is welded to the steel anchors 16 and which is provided with stiffening ribs 17a. Instead of the steel sheet 17, a connecting link made of a different material, e.g.

   B. an Eternit- or concrete slab, are used; In this case, this plate is also to be provided with steel anchors, which are welded to the steel anchors 16 of the garden 1 for the purpose of firmly connecting the three elements 1, 17.



  It goes without saying that, depending on the intended use, reinforced (with or without prestress) or non-reinforced concrete elements are used in all of the structures produced according to the inscribed process. can, although of course, in most cases, concrete elements are more suitable than non-reinforced elements.

 

Claims (1)

PATENTANSPRUCH I Verfahren zur Herstellung eines zusam mengesetzten Baukörpers aus Beton, insbeson dere Stahlbeton, dadurch gekennzeichnet, da ss zunächst mindestens zwei Elemente aus Beton unter gleichzeitiger Einlagerung von Stahl ankern hergestellt werden, worauf diese Beton elemente mittels der genannten Stahlanker zu einem Baukörper fest miteinander verbunden werden. <B>UNTERANSPRÜCHE</B> 1. Verfahren nach Patentanspruch I, da- durcli gekennzeichnet, dass die Betonelemente ans Spannbeton hergestellt werden. 2. Verfahren nach Patentanspruch I und Unteranspruch 1, dadurch gekennzeichnet, dass die Betonelemente durch Schweissen mitein ander verbunden werden. 3. PATENT CLAIM I Process for the production of a composite structure made of concrete, in particular reinforced concrete, characterized in that at least two elements are first made of concrete with steel anchors being stored at the same time, whereupon these concrete elements are firmly connected to one another by means of the steel anchors mentioned to form a structure will. <B> SUBClaims </B> 1. Method according to patent claim I, characterized in that the concrete elements are produced on prestressed concrete. 2. The method according to claim I and dependent claim 1, characterized in that the concrete elements are connected to each other by welding. 3. Verfahren nach Patentanspruch I und Unteransprüchen 1 und 2, dadurch gekenn zeichnet, dass die Betonelemente im Abstand voneinander unter Verwendung von Zwischen gliedern aus Stahl miteinander verbunden werden. PATENTANSPRUCH II Zusammengesetzter Baukörper hergestellt gemäss dem Verfahren nach Patentanspruch I, gekennzeichnet durch mindestens zwei Beton elemente, die mittels in die Elemente einge betteter Stahlanker fest miteinander verbun den sind. UNTERANSPRÜCHE 4. Method according to claim 1 and dependent claims 1 and 2, characterized in that the concrete elements are connected to one another at a distance from one another using intermediate members made of steel. PATENT CLAIM II Assembled structure produced according to the method according to patent claim I, characterized by at least two concrete elements which are firmly connected to one another by means of steel anchors embedded in the elements. SUBClaims 4. Baukörper nach Patentanspruch II, da durch gekennzeichnet, dass die Betonelemente durch ein Gitterwerk bildende, an den Stahl ankern befestigte Zwischenglieder aus Stahl miteinander verbunden sind. 5. Baukörper nach Patentanspruch II, da durch gekennzeichnet, dass die Betonelemente durch ein an den Stahlankern befestigtes Zwi schenglied aus Stahlblech miteinander verbun den sind. 6. Baukörper nach Patentanspruch II, da durch gekennzeichnet, dass die Betonelemente durch ein ebenfalls mit Stahlankern ver- sehenes Zwischenglied miteinander verbunden sind. 7. Building structure according to patent claim II, characterized in that the concrete elements are connected to one another by intermediate steel members which are anchored to the steel and which form a latticework. 5. Structure according to claim II, characterized in that the concrete elements are verbun together by an inter mediate member attached to the steel anchors made of sheet steel. 6. Structure according to claim II, characterized in that the concrete elements are connected to one another by an intermediate member also provided with steel anchors. 7th Baukörper nach Patentanspruch<B>11,</B> da durch gekennzeichnet, dass die Betonelemente brettförmige Elemente mit in der einen Ele mentfläche eingebetteten Stahlankern sind. B. Baukörper nach Patentanspruch II, da durch gekennzeichnet, dass die Betonelemente mit an zwei zueinander parallelen Längsrän dern aus der Plattenebene vorstehenden Rip- pen versehen sind, in welche Rippen die Stahl anker eingebettet sind. 9. Building structure according to claim 11, characterized in that the concrete elements are board-shaped elements with steel anchors embedded in one element surface. B. Building structure according to claim II, characterized in that the concrete elements are provided with ribs protruding from the plane of the plate on two parallel longitudinal edges, in which ribs the steel anchors are embedded. 9. Baukörper nach Patentanspruch II, da durch gekennzeichnet, der er ein aus mehreren winklig aneinanderstossenclen plattenförmigen Elementen mit an den Stossstellen eingebette ten Stahlankern zusammengesetzter Hohlkör per ist. Building structure according to patent claim II, characterized in that it is a hollow body composed of several angularly abutting plate-shaped elements with steel anchors embedded at the joints.
CH326084D 1955-01-31 1955-01-31 Process for producing a composite structure from concrete, in particular reinforced concrete, and structure produced according to this process CH326084A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH326084T 1955-01-31

Publications (1)

Publication Number Publication Date
CH326084A true CH326084A (en) 1957-12-15

Family

ID=4500114

Family Applications (1)

Application Number Title Priority Date Filing Date
CH326084D CH326084A (en) 1955-01-31 1955-01-31 Process for producing a composite structure from concrete, in particular reinforced concrete, and structure produced according to this process

Country Status (1)

Country Link
CH (1) CH326084A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4912794A (en) * 1987-03-11 1990-04-03 Campenon Bernard Btp Bridge having chords connected to each other by means of pleated steel sheets

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4912794A (en) * 1987-03-11 1990-04-03 Campenon Bernard Btp Bridge having chords connected to each other by means of pleated steel sheets

Similar Documents

Publication Publication Date Title
DE2101084A1 (en) Procedure for erecting a structure
DE2058638A1 (en) Reinforcement for reinforced concrete structures
DE102008056649A1 (en) Demountable latticed framework construction for centering and roofing of e.g. building, has rods whose end areas are clamped with form fit connector between press rings, where connector acts in rod longitudinal direction
CH326084A (en) Process for producing a composite structure from concrete, in particular reinforced concrete, and structure produced according to this process
DE2262242A1 (en) WALL ELEMENT
DE2802032A1 (en) FLOOR OR BUILDING PLATE
DE2007292A1 (en) Reinforced concrete slab
DE822899C (en) Steel frame construction
DE2153495A1 (en) PREFABRICATED CEILING PANEL FOR ASSEMBLY CONSTRUCTION
DE811686C (en) Apparatus and method for producing reinforced concrete beams
DE2234941A1 (en) REINFORCEMENT FOR PRE-FABRICATED REINFORCED CONCRETE WALLS OR SLABS
AT270962B (en) Prefabricated, large-format, thin-walled reinforced concrete panel element
DE1434057A1 (en) Composite construction
DE1954905A1 (en) Method of building an internal concrete formwork
AT200778B (en) Slab formwork and process for its manufacture
CH201557A (en) Procedure for the creation of a reinforced concrete structure.
AT303336B (en) Composite component or component and method for its production
DE3515052A1 (en) Design method for prestressed cast-steel mainplanes
DE823785C (en) Reinforced concrete ceiling with mountable reinforcement framework for the ceiling support
DE1459969A1 (en) Reinforced ceiling slab which, as a prefabricated component of a floor slab, also serves as a formwork sheet
AT164326B (en) Planar component and method of using the same
AT301823B (en) Connection arrangement for precast reinforced concrete beams
DE2142188A1 (en) Process for the production of shell structures and wall components for such structures
CH278218A (en) Process for the production of girder bridges from reinforced concrete and girder bridge produced by the process.