CH304849A - Fast-acting distance protection arrangement for three-phase networks. - Google Patents

Fast-acting distance protection arrangement for three-phase networks.

Info

Publication number
CH304849A
CH304849A CH304849DA CH304849A CH 304849 A CH304849 A CH 304849A CH 304849D A CH304849D A CH 304849DA CH 304849 A CH304849 A CH 304849A
Authority
CH
Switzerland
Prior art keywords
relay
fast
conductor
protection arrangement
phase networks
Prior art date
Application number
Other languages
German (de)
Inventor
Patent-Verwaltungs-Gm Licentia
Original Assignee
Licentia Gmbh
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Licentia Gmbh filed Critical Licentia Gmbh
Publication of CH304849A publication Critical patent/CH304849A/en

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H1/00Details of emergency protective circuit arrangements
    • H02H1/0038Details of emergency protective circuit arrangements concerning the connection of the detecting means, e.g. for reducing their number
    • H02H1/0046Commutating the detecting means in dependance of the fault, e.g. for reducing their number

Landscapes

  • Emergency Protection Circuit Devices (AREA)

Description

  

  Schnellwirkende     Distanzschutzanordnung    für Drehstromnetze.    <U>Für</U> den Distanzschutz in     Drelistromlioch-          spannungsnetzen    benutzte man ursprünglich       Dreirelaisschaltungen,    bei denen jeder Leiter  ein eigenes Distanzrelais erhielt. Zur Ver  ringerung des Aufwandes ging man dann zur  Zwei- und     Einrelaissehaltung    über     (Spar-          sehaltungen),    bei denen<B>je D</B>     rehstromleitungs-          ende    nur zwei     bzw.    ein     Distanzrelaissystem     vorhanden sind.

   Diese Anordnungen erfor  dern dafür aber bestimmte Auswahlschaltun  gen, die in Abhängigkeit von den     Anrege-          bedingungen    in den einzelnen Leitern die für  den jeweiligen Fehlerfall massgebenden elek  trischen     Messgrössen    des Stromes und der  ,Spannung (meist über     Hilfsrelaisanordnun-          gen)    auf die     Distanzrelaissysteme    schalten.  



  Diese Auswahlschaltungen erfordern na  türlich infolge der Eigenzeiten der vor     das     eigentliche     Distanzrelaissystem    geschalteten  Anrege- und Hilfsrelais bestimmte     Mindest-          auslösezeiten,    die heute     fÜr        Höchstspannungs-          netze,    insbesondere bei starrer     Nullpunkts-          ürdung,    als     niel-it    mehr tragbar angesehen wer  den.

   Man verwendet daher neuerdings wieder       Mehrrelaissehalt-tuigen,        um    die für die     Mess-          grössenauswahl    erforderliche Zeit einzusparen.  Hierzu ist eigentlich eine     SechsreIaisschaltung     erforderlich, von denen drei Relais so geschal  tet sind,     dass    sie die drei Schleifen     Leiter/Erde     überwachen, während drei weitere Relais für  die     überwachung    der Schleifen     Leiter/Leiter     vorgesehen sein     müssten.       Der Aufwand von sechs Distanzrelais ist  aber natürlich gegenüber den bisherigen Schal  tungen sehr erheblich,

   und man bemüht sich  daher, wenigstens mit     ni'ir    drei Relais eine  wirtschaftlich wie technisch vertretbare Lö  sung zu finden. Eine exakte Ausmessung der  Fehlerstelle bedingt dann aber wieder be  stimmte Umschaltungen und diese bringen  wieder eine gewisse Erhöhung der     Auslösezeit     mit sich.

   Die bisher bekannten     Dreirelaisschal-          tungen    arbeiten alle so,     dass    die Relais nor  malerweise die drei Schleifen zwischen den  Leitern überwachen     und    erst bei zusätzlichem  Auftreten von     Erdfehlerkriterien    die     Mess-          kreise    der Relais<B>-</B> entweder sämtlich oder  mit einer bestimmten Phasenbevorzugung<B>-</B>  auf die Schleifen     Leiter/Erde        iunschalten.     



  Da nun aber nach allgemeiner praktischer  Erfahrung Kurzschlüsse über Erde<B>-</B> insbe  sondere in starr geerdeten Netzen<B>-</B> weit häu  figer auftreten als solche ohne Erdbeteiligung,  sollen die     Messkreise    der drei Relais entgegen  dem bisherigen Brauch erfindungsgemäss so  angeordnet werden,     dass    sie von Haus aus die  Schleifen     Leiter/Erde    überwachen.

   Diese er  findungsgemässe Anordnung bringt den Vor  teil,     dass    die Relais in den am häufigsten auf  tretenden Fehlerfällen, nämlich einpoligen       Erdgehüssen,    bereits von vornherein mit den  hierfür massgebenden Strom- und     Spannungs-          messgrössen        beaufsehlagt    werden und somit  ohne jede Verzögerung für eine vorherige       Messgrössenwahl    schnellstens auslösen können.

        Für die Erfassung von zwei- oder     drei-          poligen    Fehlern kann die Anordnung nach  einem Ausführungsbeispiel der Erfindung so  getroffen sein,     dass    in allen Fällen bei Feh  lern ohne     Erdbeteilig-Lmg        bzw.    zwischen zwei  oder mehreren Phasenleitern eine Umschal  tung     auf    die Schleifen zwischen den Leitern  <B>.</B> erfolgt. Für diese selteneren Fehler tritt dann  eine gewisse zusätzliche Verzögerung für die  Auswahl     auf;    dafür ist aber der Umfang der       Schutzanordnung    von sechs     auf    drei Relais  sehr stark reduziert.  



  Nach einem besonders vorteilhaften, in       Fig.   <B>1</B> bis<B>3</B> dargestellten Ausführungsbeispiel  kann überdies diese etwas erhöhte     Auslösezeit     bei     zwelpoligen    Fehlern mit     Erdbeteiligung     dadurch vermieden werden,     dass    auch im     Un-          symmetriestromkreis    der Stromwandler ein       Anregeglied        (Unsymmetrierelais)    vorgesehen  ist, das beim Auftreten von Summenströmen,

    anspricht und entweder direkt oder über nach  geschaltete Hilfsrelais eine Umschaltung der       Messglieder    auf -verkettete     Messwerte        verliin-          dert.     



  Gemäss     Fig.   <B>1</B> liegen in den Phasen<I>R,</I>     S          und        T    des zu überwachenden Netzes die Strom  wandler<B>81,<I>S2,</I></B>     Ss.    Die Sekundärströme dieser  Stromwandler     durchiliessen    die     überstroin-          anregerelais   <B>A"</B> A"     At        und        das-zusätzlich    vor  gesehene     Summenstromrelais   <B>A".</B> Die     Mess-          widerstände        R,

      bis R4 dienen zur Erzeugung  definierter     Spann-umgsabfälle.    Während bei  einpoligen Fehlern in bekannter Weise<B>je-</B>  weils eines der     überstromanregeglieder   <B><I>A" A,</I></B>  oder<B>A,</B> anspricht, wird das     Überstromanrege-          glied    A., das sog.     Unsymmetrierelais,    nur bei  zweipoligen Fehlern mit     Erdbetei-lig-LLug    durch  den     S-Lunmenstrom    angeregt.  



  Die Schaltungsanordnung für die Relais  kontakte nach     Fig.   <B>1</B> ist aus dem     Gleichstrom-          plad    der     SeliLitzanordn-Lmg    gemäss     Fig.    2 zu  ersehen. Während jedes der     überstromanrege-          relais   <B><I>A, A,</I></B> und     At    nur<B>je</B> einen Kontakt be  sitzt     (a"        a"        at),    hat das     Unsymmetrierelais   <B>A.</B>  drei Kontakte     (a.',        a"2,        a"3).     



  Die Relais<I>B" B,</I>     -und        Bt    sind Hilfsrelais,  die bei     überstroin        im    Leiter<I>R,<B>S</B></I> oder     T    durch  Schliessung der Kontakte     a"   <I>a.,</I> oder     at    zum    Ansprechen gebracht werden.

   Diese     Hills-          relais    bringen die hier nicht dargestellten und  die Abschaltung einleitenden Zeitrelais zum  Ablauf und besitzen ferner die in     Fig.    2 dar  gestellten Kontakte<B>b" b,</B> und     bt,    die in zykli  scher Vertauschung den Stromkreisen für die  Kontakte     at,    a, -und a, zugeordnet sind.

   Sobald  in einem dieser Stromkreise sämtliche Relais  kontakte geschlossen sind, spricht eines der       zusätzlichen        Hilfsrelais        (B""        B,        .t        oder        Bt,)        an.     



  Tritt beispielsweise im Leiter R ein Über  strom auf, so spricht das     Überstromanrege-          glied   <B>A,</B> an und schliesst den Kontakt a,. Da  mit spricht das Hilfsrelais B, an und bringt  das hier nicht dargestellte Zeitrelais für die       Abschaltung    des fehlerhaften Leiters zum<B>Ab-</B>  lauf. Ausserdem wird der     IEI.illsrelaiskontakt          br    geschlossen, was aber für diesen Fehlerfall  ohne Bedeutung ist, da der Kontakt     at    offen  ist.  



  Bei einem zweipoligen     Kurzsehluss    ohne  Erdbeteiligung, der beispielsweise die Phasen       R    und     S    betrifft, werden die Kontakte     ar    und  a, geschlossen. Durch das Ansprechen der  Hilfsrelais B, und     B"    werden die Zeitrelais  zum Ablauf gebracht und die Kontakte     br    und  <B>b,</B> geschlossen.

   Da in diesem Falle kein     Un-          symmetriestrom    auftritt, bleiben die Kontakte       a,'    bis a,3 geschlossen, so     dass    also zusätzlich,  das Hilfsrelais     Br,    anspricht und die Umschal  tung des in     Fig.   <B>3</B> dargestellten     Messgliedes     vom Leiter R auf die Schleife RS     bewirkL     Tritt dagegen     ein    zweipoliger Fehler mit     Erd-          beteiligung        auf,

      so wird durch den     Unsymme-          triestrom    das     Unsymmetrierelais   <B>A.</B> erregt  und öffnet seine Kontakte     aJ    bis     a"3.    Die  Stromkreise für die Hilfsrelais B",     B,t    und       Bt,    können nunmehr nicht geschlossen werden,  so     dass    eine     Umsellaltung    der     Messglieder    auf  die verketteten Spannungen und Ströme ver  hindert wird.

   Das in     Fig.   <B>3</B> dargestellte,     Mess-          glied    für den Leiter R und die Schleife RS  wird mit seinen Leitern (r), (o) und (s) an  die entsprechend bezeichneten Potential  punkte der Schaltung nach     Fig.   <B>1</B> angeschlos  sen. Die Leitungen u, v und e werden an die  entsprechenden Spannungsleiter     bzw.    an Erde  gelegt.

   Eine dem Strom proportionale Grösse      wird über den     Vorwiderstand        Ri,    den Strom  wandler     Üi    und die     Gleiehrichter        Gl    auf die       Stronispule    des     Impedanzmessgliedes    Z, ge  geben.

   Ganz analog wird die Spannungsspule  des     Impedanzmessgliedes    über den     Vorwider-          stand        R",    den Übertrager     ü"    und die     Gleich-          richteranordnung        G.    von der Spannung     be-          aufschlagt.    Normalerweise nehmen die Kon  takte     b"'    und     bJ    die gezeichnete Lage ein.

    Beim Ansprechen des Hilfsrelais B" werden  die Kontakte     br,11    und     b",2    umgelegt, so     dass     in diesem Fall vom     Impedanzmessglied    die ver  ketteten Spannungen und Ströme     erfasst    wer  den.  



  Da beim Auftreten von     Unsymmetrieströ-          men    diese Umschaltung durch das     Unsymme-          trierelais   <B>A,</B> verhindert wird, werden durch  die Einsparung der     Umschaltezeit    zweipolige  P     ehler    mit Erdberührung in der     sehnellst-          möglichen    Weise     erfasst.     



  Ein weiterer Vorteil dieser beschriebenen  Anordnung besteht darin,     dass    einpolige     Erd-          schlüsse    auch bei Auftreten von     überstrom    in  den gesunden Leitern     (Bauchsehes    Paradoxon)  auf alle Fälle einwandfrei     erfasst    werden.  Ohne diese Anordnung würde in diesen Fäl  len eine     Umsehaltung    auf verkettete Werte  erfolgen, was zu falschen     Impedanzmessungen     führen würde.  



  Eine zusätzliche Einsparung an     Auslöse-          zeit        lässt    sich für die weitaus am häufigsten  vorkommenden einpoligen Erdschlüsse gemäss  einer weiteren Ausführung der Erfindung  noch dadurch erreichen,     dass    man für die  Schnellstufe der Distanzrelais auf jede be  sondere Anregung     durcli    Überstrom,

   Unter  schreiten der Betriebsimpedanz     usw.        ver-          9"iehtet.    Da die     Messglieder    und     Energierich-          tungsglieder    dauernd an Strom und     Span-          ni.ing    liegen, kann die Schnellstufe der       Distanzrelais        auf        Kurzsehlüsse    im. Netz sofort  reagieren.  



  Die     Auslösezeit        lässt    sich auch dadurch ver  kürzen,     dass    gemäss     Fig.    4     Überstromkontakt     a.,     Euergierichtungskontakt    n und     Impedanz-          kontakt    z mit der Spule des Ausschaltschützes  in Reihe liegen. Beim Auftreten irgendwelcher    Fehler beginnt also für jeden dieser Kontakte  die Schliesszeit abzulaufen, so     dass    die Aus  lösung erfolgt, wenn der letzte dieser drei  Kontakte geschlossen wird. Zeitlich arbeiten  diese Kontakte also parallel.

   Normalerweise  werden die Kontakte n und z zuerst geschlos  sen sein, so     dass    der     Auslösebefehl    durch den       Anregekontakt    a freigegeben wird.



  Fast-acting distance protection arrangement for three-phase networks. <U> For </U> distance protection in three-phase high-voltage networks, three-relay circuits were originally used, in which each conductor received its own distance relay. To reduce the effort, a switch was then made to two and one relay settings (economy settings), in which there are only two or one distance relay system for each end of the current line.

   However, these arrangements require certain selection circuits which, depending on the excitation conditions in the individual conductors, switch the electrical measured values of the current and voltage (mostly via auxiliary relay arrangements) to the distance relay systems.



  These selection circuits naturally require certain minimum tripping times due to the intrinsic times of the excitation and auxiliary relays connected in front of the actual distance relay system, which are now considered to be niel-it more acceptable for high-voltage networks, especially with rigid zero-point ürdung.

   For this reason, multiple relays have recently been used again in order to save the time required for selecting the measured variables. This actually requires a six-relay circuit, of which three relays are switched in such a way that they monitor the three conductor / earth loops, while three further relays would have to be provided for monitoring the conductor / conductor loops. The cost of six distance relays is of course very considerable compared to the previous circuits.

   and efforts are therefore made to find an economically and technically justifiable solution with at least three relays. An exact measurement of the fault location then again requires certain switchings and these again bring about a certain increase in the tripping time.

   The three-relay circuits known so far all work in such a way that the relays normally monitor the three loops between the conductors and only when earth-fault criteria also occur do the relays' measuring circuits either all or with a certain phase preference <B> - </B> switch to the loop conductor / earth.



  Since, however, according to general practical experience, short circuits to earth <B> - </B>, in particular in rigidly earthed networks <B> - </B>, occur far more frequently than those without earth involvement, the measuring circuits of the three relays should, contrary to the previous one According to the invention, they can be arranged in such a way that they monitor the conductor / earth loops by default.

   This inventive arrangement has the advantage that the relays in the most common fault cases, namely single-pole earth housings, are loaded with the relevant current and voltage measured values from the outset and thus trigger as quickly as possible without any delay for a previous measured value selection can.

        For the detection of two- or three-pole faults, the arrangement according to an embodiment of the invention can be made so that in all cases of faults without Erdbeteilig-Lmg or between two or more phase conductors switching to the loops between the conductors <B>. </B> takes place. For these rarer errors there is then a certain additional delay for the selection; however, the scope of the protective arrangement has been greatly reduced from six to three relays.



  According to a particularly advantageous embodiment shown in FIGS. 1 to 3, this somewhat increased tripping time in the case of two-pole faults with earth involvement can also be avoided in that the current transformer is also in the unbalanced circuit an excitation element (unbalancing relay) is provided, which, if total currents occur,

    responds and either directly or via downstream auxiliary relays, the switching of the measuring elements to chained measured values is reduced.



  According to Fig. 1, there are current transformers <B> 81, <I> S2, </I> </ in phases <I> R, </I> S and T of the network to be monitored. B> Ss. The secondary currents of these current transformers pass through the overcurrent excitation relay <B> A "</B> A" At and the - additionally provided summation current relay <B> A ". </B> The measuring resistors R,

      to R4 are used to generate defined voltage drops. While with single-pole faults <B> each </B> because one of the overcurrent exciter <B> <I> A "A, </I> </B> or <B> A, </B> responds, the overcurrent exciter A., the so-called unbalance relay, is only excited by the S-Lunmenstrom in the event of two-pole faults with earth-part LLug.



  The circuit arrangement for the relay contacts according to FIG. 1 can be seen from the DC plug of the SeliLitzanordn-Lmg according to FIG. While each of the overcurrent relays <B> <I> A, </I> </B> and At only <B> each </B> has one contact (a "a" at), the unbalance relay has <B> A. </B> three contacts (a. ', A "2, a" 3).



  The relays <I> B "B, </I> -and Bt are auxiliary relays, which in the event of excessive currents in the conductor <I> R, <B> S </B> </I> or T by closing the contacts a" < I> a., </I> or at can be addressed.

   These hill relays cause the timing relays, not shown here, which initiate the shutdown, and also have the contacts b, b and bt shown in FIG. 2, which cyclically interchange the circuits for the Contacts at, a, and a, are assigned.

   As soon as all relay contacts are closed in one of these circuits, one of the additional auxiliary relays (B "" B, .t or Bt,) responds.



  If, for example, an overcurrent occurs in conductor R, the overcurrent exciter <B> A, </B> responds and closes contact a. Then the auxiliary relay B, responds and brings the timing relay (not shown here) for disconnecting the faulty conductor to the <B> run </B>. In addition, the IEI.ills relay contact br is closed, but this is irrelevant for this error case because the contact at is open.



  In the event of a two-pole short circuit without earth involvement, which affects phases R and S, for example, contacts ar and a are closed. The response of the auxiliary relays B and B "causes the timing relays to expire and contacts br and <B> b, </B> closed.

   Since no unbalance current occurs in this case, the contacts a, 'to a, 3 remain closed, so that the auxiliary relay Br also responds and the switching of the measuring element shown in FIG. 3 from conductor R to loop RS If, on the other hand, a two-pole fault occurs with earth participation,

      the unbalance relay <B> A. </B> is excited by the unbalance current and opens its contacts aJ to a "3. The circuits for the auxiliary relays B", B, t and Bt can now not be closed, see above that a switchover of the measuring elements to the linked voltages and currents is prevented.

   The measuring element shown in FIG. 3 for the conductor R and the loop RS is connected with its conductors (r), (o) and (s) to the correspondingly designated potential points of the circuit according to FIG . <B> 1 </B> connected. The lines u, v and e are connected to the corresponding voltage conductors or to earth.

   A variable proportional to the current is applied to the current coil of the impedance measuring element Z, ge via the series resistor Ri, the current converter Ui and the rectifier Gl.

   Analogously, the voltage coil of the impedance measuring element is acted upon by the voltage via the series resistor R ", the transformer U" and the rectifier arrangement G. Normally the contacts b '' and bJ take the position shown.

    When the auxiliary relay B "responds, the contacts br, 11 and b", 2 are switched over, so that in this case the linked voltages and currents are recorded by the impedance measuring element.



  As this switchover is prevented by the unbalance relay <B> A, </B> when unbalance currents occur, two-pole switches with earth contact are detected as quickly as possible by saving the switching time.



  A further advantage of this described arrangement is that single-pole earth faults are always correctly detected even if an overcurrent occurs in the healthy conductors (abdominal paradox). Without this arrangement, there would be a switch to chained values in these cases, which would lead to incorrect impedance measurements.



  An additional saving in tripping time can be achieved for the by far most common single-pole earth faults, according to a further embodiment of the invention, by reacting to each special excitation by overcurrent, for the high-speed stage of the distance relay.

   If the operating impedance falls below the operating impedance etc., the measuring elements and energy directors are constantly connected to current and voltage, so the high-speed stage of the distance relay can react immediately to short circuits in the network.



  The tripping time can also be shortened by the fact that, according to FIG. 4, overcurrent contact a., Euergierrichtung contact n and impedance contact z are in series with the coil of the switch-off contactor. If any errors occur, the closing time begins to run down for each of these contacts, so that the trigger occurs when the last of these three contacts is closed. In terms of time, these contacts work in parallel.

   Normally, the contacts n and z will be closed first, so that the tripping command is released by the pickup contact a.

 

Claims (1)

<B>PATENTANSPRUCH:</B> Schnellwirkende Distanzse,hutzanordnung für Drehstromnetze mit<B>je</B> einem Relais pro Phasenleiter, dadurch gekennzeichnet, dass die Messkreise der Relais so angeordnet sind, dass sie von Haus aus die Schleifen Leiter/Erde überwaehen. UNTERANSPRÜCHE: <B> PATENT CLAIM: </B> Fast-acting spacer, protective arrangement for three-phase networks with <B> each </B> one relay per phase conductor, characterized in that the measuring circuits of the relays are arranged in such a way that they inherit the loop conductors / Overlook the earth. SUBCLAIMS: <B>1.</B> Schnell-wirkende Distanzschutzanord- nung für Drehstromnetze nach Patentan spruch, dadurch gekennzeichnet, dass beim zusätzlichen Auftreten von Fehlerkriterien in einem oder mehreren Nachbarleitern eine Ilm- schaltung auf die Messgrössen für die Schleife Leiter/Leiter erfolgt. <B> 1. </B> Fast-acting distance protection arrangement for three-phase networks according to patent claim, characterized in that if additional error criteria occur in one or more neighboring conductors, an Ilm circuit is made to the measured variables for the conductor / conductor loop. 2. Sehnellwirkende Distanzsc'hutzanord- nung für Drehstromnetze nach Patentan spruch, dadurch gekennzeichnet, dass beim Auftreten von S-Lunmenstrom mittels eines Unsymmetrierelais eine Umschaltung der Messkreise auf die Schleife Leiter/Leiter ver hindert wird. 2. Sehnell-acting distance protection arrangement for three-phase networks according to patent claim, characterized in that when S-Lunmenstrom occurs, a switchover of the measuring circuits to the conductor / conductor loop is prevented by means of an asymmetry relay. <B>3.</B> Schnellwirkende Distanzschutzanord- nung für Drehstromnetze nach Patentan- -spruch, -Lmd Unteransprüchen <B>1</B> und 2, da durch gekennzeichnet, dass für die Schnell stufe -der Distanzrelais auf besondere Anrege- glieder verzichtet wird. <B> 3. </B> Fast-acting distance protection arrangement for three-phase networks according to patent claim, -Lmd subclaims <B> 1 </B> and 2, as characterized in that for the high-speed stage the distance relay responds to special stimuli - members are waived. 4. Schnellwirkende Distanzschutzanord- nimg für Drehstromnetze nach, Patentan spruch und Unteransprüchen<B>1</B> und 2, da durch gekennzeichnet<B>'</B> dass die Anregeglieder für die Schnellstufe der Distanzrelais so an geordnet sind, dass sie zeitlich parallel zu den Messgliedern arbeiten. 4. Fast-acting distance protection arrangement for three-phase networks according to, claim and subclaims <B> 1 </B> and 2, characterized by <B> '</B> that the excitation members for the high speed stage of the distance relay are arranged so that they work in parallel to the measuring elements.
CH304849D 1951-07-20 1952-07-15 Fast-acting distance protection arrangement for three-phase networks. CH304849A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE304849X 1951-07-20
DE201251X 1951-12-20

Publications (1)

Publication Number Publication Date
CH304849A true CH304849A (en) 1955-01-31

Family

ID=25758830

Family Applications (1)

Application Number Title Priority Date Filing Date
CH304849D CH304849A (en) 1951-07-20 1952-07-15 Fast-acting distance protection arrangement for three-phase networks.

Country Status (1)

Country Link
CH (1) CH304849A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012059136A1 (en) * 2010-11-05 2012-05-10 Siemens Aktiengesellschaft Monitoring a power supply line supplied at one end for earth faults

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012059136A1 (en) * 2010-11-05 2012-05-10 Siemens Aktiengesellschaft Monitoring a power supply line supplied at one end for earth faults
CN103261900A (en) * 2010-11-05 2013-08-21 西门子公司 Monitoring a power supply line supplied at one end for earth faults
CN103261900B (en) * 2010-11-05 2015-08-05 西门子公司 The method that the ground short circuit of the supply lines of the one-sided power supply of three phase supply net is monitored and electrical protection apparatus

Similar Documents

Publication Publication Date Title
EP0255659B1 (en) Electronic overcurrent tripping relay
DE3885531T2 (en) Switch with adjustable long-term delay.
DE2531707A1 (en) PROCEDURE FOR DISCONNECTING A SHORT-CIRCUITED POWER SUPPLY FROM A CLOSED ELECTRIC RING MAINS AND SWITCH FOR PERFORMING THE PROCEDURE
CH304849A (en) Fast-acting distance protection arrangement for three-phase networks.
DE2037390C3 (en) Distance protection for meshed electrical networks
DE959664C (en) Earth fault protection arrangement
DE599892C (en) Arrangement for the protection of electrical power networks
DE2708844B2 (en) Protection device for a generator-turbine unit against overloading of the WeUe
AT236487B (en) Circuit arrangement for distance protection devices in solidly earthed networks
AT123332B (en) Arrangement for the protection of electrical power networks.
DE2648357C3 (en) Circuit arrangement for the detection of earth faults in compensated high-voltage networks
DE1956526B2 (en) IMPEDANCE PROTECTION DEVICE FOR AN ELECTRICAL SYSTEM
AT128203B (en) Device for protecting parallel line sections, especially in AC rail networks.
AT338361B (en) PROTECTIVE DEVICE FOR SWITCHGEAR, IN PARTICULAR HIGH VOLTAGE SYSTEM FOR RAILWAY POWER SUPPLY
CH680319A5 (en)
DE904309C (en) Distance protection device
CH350032A (en) Distance relay arrangement for switching off double earth faults in high voltage systems
DE926800C (en) Length differential protection device
DE616482C (en) Overcurrent protection device for at least three line systems colliding at a junction with transformers in the junction
AT203083B (en) Protective device for locating and disconnecting AC power lines in the event of fault currents
AT155570B (en) Device for the excitation of protective relay arrangements and for switching them over to the electrical quantities characteristic of the various fault cases in multi-phase systems.
DE2415448C3 (en) Protection device for a turbo set against overload when switching off mains short-circuits
DE751690C (en) Distance protection device
AT160061B (en) Protection circuit for n-phase systems.
DE1062328B (en) Device for error detection in the excitation circuit of synchronous machines