CH291449A - Installation for the maintenance of railway tracks. - Google Patents

Installation for the maintenance of railway tracks.

Info

Publication number
CH291449A
CH291449A CH291449DA CH291449A CH 291449 A CH291449 A CH 291449A CH 291449D A CH291449D A CH 291449DA CH 291449 A CH291449 A CH 291449A
Authority
CH
Switzerland
Prior art keywords
track
ballast
installation according
sub
excavator
Prior art date
Application number
Other languages
French (fr)
Inventor
Lemaire Maurice-Henri
Original Assignee
Lemaire Maurice Henri
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lemaire Maurice Henri filed Critical Lemaire Maurice Henri
Publication of CH291449A publication Critical patent/CH291449A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/06Renewing or cleaning the ballast in situ, with or without concurrent work on the track
    • E01B27/10Renewing or cleaning the ballast in situ, with or without concurrent work on the track without taking-up track
    • E01B27/105Renewing or cleaning the ballast in situ, with or without concurrent work on the track without taking-up track the track having been lifted
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/01Devices for working the railway-superstructure with track
    • E01B2203/015Devices for working the railway-superstructure with track present but lifted
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/10Track-lifting or-lining devices or methods

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Description

  

      Installation        pour    l'entretien des voies ferrées.    La présente invention a pour objet une  installation pour l'entretien des voies ferrées,       caractérisée    en ce qu'elle comprend, montés  sur divers véhicules d'in train de     service    et  en combinaison avec des moyens, d'une part,  pour soulever et maintenir soulevée une por  tion de voie, d'autre part, pour piocher le  ballast, sous la portion de voie soulevée, des  moyens pour le criblage du ballast et sa sépa  ration en diverses catégories,     des    moyens pour  ramener sur la voie lesdites diverses catégo  ries de ballast épuré, des moyens pour l'éva  cuation des détritus,

   des moyens pour l'égali  sation du ballast répandu après     épuration.     Les moyens pour l'évacuation des détritus et  pour la remise en place du ballast épuré peu  vent également servir pour la mise en cor  dons ou en tas des petits ballasts épurés et,  au besoin, d'une partie du gros ballast.  



  Le dessin annexé représente, à titre  d'exemple, deux formes d'exécution et des       variantes    de l'installation faisant l'objet de  la présente invention.  



  La     fig.    1 est la vue en élévation d'une  première forme d'exécution du train de ser  vice de l'installation sur lequel sont montés  une dégarnisseuse et ses accessoires.  



  Les     fig.    2, 3 et 4 sont des vues de détail  de certains organes représentés à la     fig.    1.  Les     fig.    5 et 6 sont des     vues    de détail mon  trant la disposition de cribles, de goulottes et  de transporteurs de ballast.    La     fig.    7 est une     vue    partielle en élévation  d'une seconde forme d'exécution du train de       service.     



  Les     fig.    8 et 9 sont des vues, respective  ment en élévation et en plan, d'un dispositif  régulateur de ballast de la seconde forme  d'exécution.  



  Les     fig.    10 et 11 sont des vues, respective  ment en élévation et en plan, d'une variante  du dispositif représenté à la     fig.    3.  



  Les     fig.    12, 13 et 14 sont des     mies    en coupe  et     élévation-coupe    du châssis d'un excavateur  que comprennent     chacune    des deux     formes     d'exécution représentées, les     fig.    13 et 14  étant prises à 90  l'une de l'autre.  



  La     fig.    15 est une     vue    en perspective d'un  dispositif d'accrochage d'un     guide-chaîne    à  des bras de l'excavateur.  



  Les     fig.    16 et 17 illustrent la     manoeuvre     d'un dispositif auxiliaire.  



  Les     fig.    18, 19 et 20 montrent des     détails     de certains organes     d'une    chaîne de l'excava  teur, la     fig.    19 étant     une    vue en coupe selon  19-19 de la.     fig.    18.  



  Les     fig.    21, 22 et 23 sont, respectivement,  des vues en coupe et une vue en plan d'un  dispositif de guidage de la voie au niveau de  l'excavateur.  



  Les     fig.    24, 25 et 26 montrent des détails  d'accessoires du guide-chaîne.  



  La     fig.    27 est une     vue    schématique, en élé  vation latérale, d'un wagon-trémie pour l'éva  cuation des détritus.      La     fig.    28 est une vite en élévation laté  rale d'une variante du wagon-trémie.  



  Les     fig.    29 et. 30 sont des vues, respective  ment en plan et en élévation de face, du wa  gon-trémie de la     fig.    28.  



  La     fig.    31 est une vue perspective d'une       régaleuse    vibrante.  



  La     fig.    31, est une     vite    de détail de la       fig.    31.  



  La     fig.    32 est une vite schématique, en élé  vation de côté, d'un dispositif de damage vi  bratoire, monté sur véhicule.  



  La     fig.    33 représente un détail de la       fig.    32.  



  La     fig.    34 est une vue en coupe suivant       -I-A    de la fi-.<B>Ô3.</B>  



  La     fig.    35 est une vue schématique en élé  vation de face, correspondant à la     fig.    32,  niais ne représentant. que les organes vibrants  et leur commande.  



  La fi,-. 36 est une vue en plan d'un outil       dameur    que comprend le dispositif représenté  aux fi,-. 32 à 35.  



  La     fig.    37 est une vue schématique, en  élévation de face, d'un dispositif à vibrations  horizontales.  



  Les     fig.    38 et 39 sont des vites en plan,  correspondant à la     fig.    37 et représentant  deux variantes de ce dispositif.  



  La     fig.    40 est une vue perspective d'une  partie d'un appareillage comportant un dis  positif à vibrations horizontales, combiné  avec une     régaleuse.     



  Les deux     formes    d'exécution     (fig.    1 et 7 )  de l'installation, ne diffèrent l'une de l'autre  que par la     répartition    des organes et des  masses et par les dispositions prévues pour le  criblage et la     répartition    du ballast criblé.  



  L'installation représentée à la fi-. 1 com  prend l'équipement d'un     train-parc    qui se  compose de trois unités:  1  Une dégarnisseuse, dont le châssis,  constitué par     tune    longue poutre rigide, d'envi  ron 30 mètres de longueur, est supporté à  chacune de ses deux extrémités par un bogie  et muni, dans sa partie médiane, d'un exca-         vateur.    Cette unité     assure    le     dégarnissage    et  le relevage du ballast épuré.  



  2  Un     wagon-crible,    attelé à l'arrière de la       dégarnisseuse,    qui assure le criblage et l'épu  ration dit ballast, ainsi que     l'évacuation    des       détritus.     



  3  Un wagon  moteur  attelé à l'avant,  qui comporte un groupe électrogène et un  treuil pour le halage de l'ensemble.  



  Sur la     fig.    1, il a été représenté en 1 le  wagon sur lequel sont installés: le groupe élec  trogène 2 qui alimente différents moteurs  électriques de la.     dégarnisseuse    et un treuil 3  qui assure le halage de la     dégarnisseuse    pen  dant le travail. Le     câble    du     ,treuil    est. ancré  à l'avant.  



  Dans la partie médiane d'un     chîtssis    3 de  la     dégarnisseuse    est monté un     excavateur    5  comportant une chaîne à godets qui se déplace  dans un plan perpendiculaire à l'axe de la  voie et travaille sous les traverses, soulevées  ait passage     par    l'action     d'un    dispositif servant  aussi au     guidage    de la chaîne.  



  Un tapis transporteur 6 entraîne vers  l'arrière le ballast.     déversé    par les     godets,    tan  dis qu'un autre transporteur 7 ramène le bal  last épuré derrière l'excavateur; ce ballast  vient alors, avec la vitesse relativement im  portante qu'il a acquise sur le     transporteur    7,  heurter le bec d'une pièce     7a        (fig.    6) en       forme    d'étrave de     navire    qui assure sa dis  persion sur toute la largeur de la voie, prépa  rant ainsi le travail.

   d'égalisation qui est exé  cuté au moyen d'une      régaleuse     8, entraînée  par la     dégarnisseuse    et qui travaille     sorts    les  traverses à. la. manière d'un     ehasse-nei-e.     



  Comme représenté sur la fi-. 3. le trans  porteur 6 de reprise sous l'excavateur peut  pivoter autour d'un axe vertical 6n, situé non  loin d'un rouleau     arrière    6b     (fig.    3). Ce       transport.etir    est.     solidaire    du châssis dudit  excavateur, lequel,     comme    il sera décrit ci  après, petit se déplacer perpendiculairement  à l'axe de la, voie. Ce     transporteur    6 est. sup  porté par un châssis :53 (voir     fig.    4, coupe  transversale du transporteur) (lui est muni,  en certains points de sa longueur, de galets  54 roulant sur des traverses 55 solidaires      d'une poutre maîtresse du     chassls    4.

   Le tapis  du     transporteur    est supporté, d'une part, sur  son brin montant, alternativement par des  rouleaux droits 56 sur sa partie centrale et  (les galets latéraux inclinés 57, sur sa partie  latérale,     d'autre    part, sur son brin descen  dant, par des rouleaux droits 58.  



  Le wagon-crible 9 comprend (voir     fig.    1)  1  Un tapis horizontal 10 (fi-.<B>1)</B> dit        distributeur     dont la marche est réversible  et qui reçoit le ballast amené de l'excavateur  par le     transporteur    6, par l'intermédiaire d'un  transporteur 11.  



  2  Des cribles 12 et. 13     (fig.    1 et. 5)     qui     sont constitués par des tôles perforées, mon  tées sur des tables à secousses inclinées vers  l'avant et superposées. Ces cribles     recoivent,     en     fonctionnement    normal, le ballast du distri  buteur et     distribuent    vers l'avant, séparément  et à deux étages différents, d'une part, le       (Yros    ballast épuré en 14 et, d'antre part, le  petit, ballast épuré en 15.  



  3  Une gouttière 16 qui assure la réparti  tion (lu gros ballast épuré, en toutes propor  tions désirées, en une partie à l'avant vers  le transporteur? pour le relevage immédiat de  la voie, et une autre sur les côtés pour être soit  répandue entre les traverses, soit disposée en  cordons ou en tas le long de la. voie.  



       4     Un tapis 17 qui reprend les détritus       sous    les cribles et les élève vers l'arrière.  



  5  Un tapis évacuateur orientable 1.8, qui  revoit les détritus provenant ainsi des cribles  et qui, suivant son orientation     (fig.    2) les  rejette, soit, à l'arrière, sur des wagons spé  cialement aménagés avec un ensemble de  transporteurs, soit, sur le côté, à faible dis  tance du rail, pour former une piste ou être       repris,    soit, encore sur le côté, niais à une  grande distance, pour être incorporés au rem  blai.  



  Le rôle du tapis distributeur 10 est de  permettre     d'éviter    l'accès du ballast, aux cri  bles, par inversion de sa marche; la totalité  du ballast dégarni est, dans ce cas, évacuée  par les tapis 17 puis 18. La dégarnisseuse     mé-          eanique    fonctionne alors comme outil de ter  rassement.

      Les     fig.    5 et 6 montrent comment le gros  ballast, à partir du ballast à épurer     arrivant     en 19, s'achemine sous l'effet de son poids et  l'action des tables à secousses, vers la gout  tière 16, afin d'y être réparti au moyen d'un  volet triangulaire mobile 20, et     suivant    la  hauteur de celui-ci, c'est-à-dire     suivant    la dis  tance restée libre entre ce volet et le fond  de la gouttière, entre le transporteur 7 et des  goulottes latérales 21; de son côté, le petit  ballast reste sur le crible 13 à petites perfo  rations qui le sépare des détritus.

   Ceux-ci sont  évacués par le tapis 17, tandis que le petit  ballast tombe dans les     goulottes    15 pour être,  à son tour, suivant les besoins, soit répandu  entre les traverses, soit mis en tas le long de  la voie. Dans ce dernier cas, les. goulottes 15  sont plus longues et munies de volets mobiles  (tels que     15a)    dont l'ouverture périodique  assure la mise en tas     dli    petit ballast.  



  Dans la forme d'exécution de la     fig.    7, la  dégarnisseuse est encore déplacée à l'aide d'un       wagon-treuil    attelé à l'avant, ce qui     offre     l'avantage d'isoler la génératrice d'énergie, ce  qui permet, à la condition d'avoir en réserve  une unité semblable, de s'affranchir des dé  faillances du moteur ou de la génératrice.  



  Par contre, les cribles et l'évacuateur de  détritus sont. aménagés sur la dégarnisseuse  elle-même, c'est-à-dire sur la poutre qui sup  porte l'excavateur et la     régaleuse;    en outre,  le parcours du ballast a été notablement ré  duit, en raison de la réduction au     minimiun     du nombre et de la longueur des tapis trans  porteurs.  



  La dégarnisseuse     comporte    exclusivement  un transporteur de reprise qui va de l'excava  teur aux cribles, un premier transporteur, de  détritus qui va de la     partie    inférieure des  cribles à un évacuateur de détritus, enfin cet  évacuateur de détritus lui-même. Le ballast  tombe directement des cribles sous la voie, par  l'intermédiaire des goulottes.  



  Dans ce cas, l'augmentation de charge  peut conduire à l'utilisation de bogies à trois  essieux.  



  Dans la dégarnisseuse de cette seconde  forme d'exécution, l'excavateur a été disposé,      non au centre du châssis, mais plus avant. En  outre, le dispositif de     solièvement    de la voie  a été modifié pour permettre à ce soulève  ment de garder une valeur constante. On  obtient ainsi des avantages qui seront exposés  ci-après.  



  Comme représenté sur la     fig.    7, l'excava  teur 34 est installé en avant par rapport au  milieu du châssis. Cette disposition permet de  répartir     plus    uniformément la     charge    sur les  deux bogies, puisque la plus grande partie  des organes lourds est située à la partie  arrière du châssis. A cet effet, on a prévu,  comme représenté sur le dessin, un bogie  arrière à trois     essieux,    le bogie avant repré  senté étant à deux essieux.

   Cette position choi  sie pour l'excavateur offre, en outre, l'avan  tage de donner à l'onde de soulèvement de la  voie une propagation plus rationnelle, et sur  tout de ménager à l'arrière un espace plus  grand pour la mise en place et l'égalisation  du ballast, aussi bien en hauteur qu'en lar  geur, puisque le sommet. de l'arc que forme  la, partie de voie soulevée se trouve à l'arrière  de l'excavateur. Ce résultat est encore amé  lioré par le fait que, quelle que soit la pro  fondeur de dégarnissage, le soulèvement de  la voie est maintenu constamment à son maxi  mum, comme décrit ci-après.  



  L'installation représentée à la     fig.    7 com  prend un ensemble de cribles à trois étages  35,     35a.,    35b, de manière à séparer l'un de  l'autre le gros ballast, le ballast moyen et le  gravillon ou menu ballast. Les détritus sont  repris par un transporteur 36, établi au-des  sous du crible inférieur.  



  Les différentes goulottes 37,     37a,        37b,    qui       partent    de chacun des étages de crible sont  soumises à. un mouvement vibratoire qui leur  est imprimé par les     cribles    auxquels ces     gou-          lottes    sont reliées, mais qui pourrait aussi leur  être imprimé par un moyen indépendant.  Cette vibration     faeilite    le     cheminement    du bal  last vers l'avant, accroissant ainsi l'action de  la seule pesanteur.  



  Le gros ballast tombe sous la voie soule  vée, immédiatement à l'arrière de l'excava  teur, pour y être attaqué par une     régaleuse       double, c'est-à-dire à deux étages superposés.  Les deux étages de cette     régaleuse    sont. indé  pendants l'un de l'autre, mais pourraient. aussi  être combinés. Le ballast moyen, déversé     au-          delà    de l'étage inférieur, tombe sur la pre  mière couche de gros ballast pour être régalé  à son tour par le deuxième étage. Le petit  ballast peut, soit être répandu au-dessus des  couches précédentes, soit. être déposé le long  de la voie, dans l'entrevoie, en cordon ou en  tas.

   Des moyens analogues à. ceux décrits ci  dessus et représentés sur les     fig.    5 et. 6, pour  raient être interposés dans les goulottes qui  prolongent. les étages des cribles, de manière  à permettre un choix et. à déposer dans l'entre  voie, ou entre les traverses sur les couches  déjà égalisées, une     partie    de     ehacune    des ca  tégories du ballast. Cette possibilité de répan  dre le ballast par couches successives de gros  seurs différentes facilite le drainage de la  voie et certains travaux d'entretien et consti  tue l'une des caractéristiques importantes de  cette forme d'exécution.  



  Les     fig.    8 et 9 représentent la     régaleuse     double. Celle-ci comprend deux étages en  forme de<B>V.</B> Un châssis 38, suspendu à une  poutre 39 par des bras verticaux 40, supporte  deux étages de barres     régaleuses        4lJ11a    et.       42-42a.    Le premier     41---11a    de ces étages  constitue     urne        régaleuse    de gros ballast et le  deuxième     42--12a    est surélevé par     rapport    au  premier et constitue une     régaleuse    de ballast  moyen.

   A la pointe de ce deuxième étage sont  fixées deux plaques     43-.13a,    en<B>V,</B> qui jouent  le rôle de soc et creusent un sillon dans le  ballast, le long de l'axe de la voie, afin que  les charges roulantes exercent leur effort sur  les parties de traverse sous rail et non sur la  partie médiane de ces traverses.  



  Les diverses parties constitutives de la     ré-          galeuse    sont articulées l'une sur l'autre, de  façon à pouvoir être repliées ou, inversement,  être mises en place d'une façon simple, lors  qu'on arrête ou lorsque l'on reprend le chan  tier. Un dispositif de réglage 44 est prévu  pour modifier à volonté la longueur des bras  40 de support du châssis 38.

   Tout dispositif  approprié peut être utilisé pour régler à vo-           lonté    la     hauteur    relative des deux étages de  la     ré--galeuse.    On pourrait aussi adjoindre à la       réraleuse    des dispositifs vibreurs appropriés,       disposés    en des points convenables de la ré  galeuse, on encore utiliser, au-delà de la     ré-          galeuse,        nu    dispositif     danieur    indépendant, le  but clé ces adjonctions étant de tasser le bal  last épuré sur la plate-forme, ce qui permet  d'obtenir plus rapidement la stabilisation de  la voie et, par conséquent,

   d'y circuler à  grande vitesse dans des délais moins longs.  



  Le ballast, délivré par l'excavateur 31 est  enlevé par le transporteur de reprise 45       (fig.    7) et déversé dans une trémie 46 qui  comporte un volet articulé 47, dont la     maneeu-          vre    permet de diriger à volonté le ballast, soit       vers    les cribles 35, soit, par une goulotte 48,  sur le transporteur de détritus 36, dans le cas  où l'on désire évacuer la totalité du vieux  ballast.  



  Ce     transporteur    36 déverse les détritus sur  mi transporteur évacuateur 18 monté à la  partie postérieure du     châssis    et orientable  dans toutes positions, comme dans la première       forme    d'exécution.  



       Toujours    comme dans la première forme       d'exécution,    et comme représenté sur les       fig.    10 et 11, le transporteur 45 solidaire, à  soie extrémité     inférieure,    du châssis de l'exca  vateur, peut pivoter, à sa partie supérieure,  autour d'un axe 51 situé non loin du rouleau  arrière 52, Il comporte des supports intermé  diaires,     comme    ceux représentés à la fi-. 4.  



  L'excavateur des formes d'exécution qu'on       ;vient    de décrire de Façon générale est repré  senté aux fie. 12 à 14.     Comme    dans des ins  tallations connues, il comprend une     chaîne    à       -odets    59 qui passe sous la voie soulevée et.

    (lui est guidée sous celle-ci par un     guide-          chaîne    60, supporté de chaque côté de la voie  par des bras     61-61a..    Ce     guide-chaîne    sert  aussi à maintenir la voie soulevée au moyen  (le     patins,        décrits    ci-après, qui sont solidaires  (le sa face supérieure, et qui sont destinés à  ;lisser sous les traverses. Dans les excavateurs  connus, les bras de l'excavateur, au nombre  de quatre, sont solidaires d'un même châssis,  mobile horizontalement et perpendiculaire-    ment à l'axe de la voie.

   Ce mouvement s'opère  par rapport à     un.    deuxième châssis porté par  quatre vérins susceptibles de donner à l'en  semble un mouvement vertical permettant de  régler la     profondeur    du     dégarnissage.    Le pas  sage de la position de travail à la position de  roulage s'opère en repliant les bras vers le  haut. Un grave inconvénient de ce dispositif  consiste en ce que, au cours de cette     manoeu-          vre,    le gabarit de la voie voisine était momen  tanément engagé.  



  On a imaginé d'insérer, entre les bras de  l'excavateur et le châssis qui les supporte, un  dispositif constitué par quatre vérins,     manoeu-          v    gables à la main par l'intermédiaire de chaî  nes et. qui permettent de replier les bras en  remontant leur partie supérieure, tandis que  leur partie inférieure s'applique contre la pou  tre. Le gabarit de la voie voisine reste     ainsi     libre pendant. la     manoeuvre.     



  Une solution préférée consiste à     soiunettre     les bras de     l'exca        :#ateur    à un mouvement ver  tical d'ensemble par rapport à un     châssis    mo  bile horizontalement, par l'intermédiaire de  galets roulant sur des traverses solidaires de  la poutre maîtresse du châssis.  



  Comme représenté sur les     fig.    12, 13 et 14,  les bras     61-61a    de l'excavateur, respective  ment articulés en     62-62a    sont susceptibles  d'un coulissement vertical le long de montants       63-63a    du châssis, ce dernier étant lui-même  susceptible de déplacements horizontaux,  comme indiqué ci-dessus. Ces bras d'excava  teur sont, de part et d'autre de la poutre,  rendus solidaires par une traverse 64.     Ils    sont  au nombre de quatre, mus respectivement par  quatre vérins     65-65a    actionnés     ensemble    par       un    moteur 66 et.     agissant    sur des écrous 49.

    Les bras arrière sont légèrement plus courts  que les bras avant de manière à donner au       guide-chaîne,    engagé sous la voie et suppor  tant cette dernière, une inclinaison correspon  dant à celle de la voie, en avant du sommet  de l'arc qu'elle forme dans l'intervalle com  pris entre les bogies. En outre, les bras situés  d'un même côté de la poutre sont, de préfé  rence, plus courts     que    ceux situés de l'autre  côté, afin de permettre de donner à la plate-      forme une certaine inclinaison favorable à  l'écoulement des eaux.  



  Cette disposition du châssis de l'excava  teur assure un allégement     important    de l'en  semble de l'installation. D'autre part, elle per  met d'effectuer simplement - ce qui consti  tue un perfectionnement important - les     ma-          noeuvres    d'accrochage des bras au     guide-          chaîne    et de décrochage des bras de ceux-ci,  sans jamais engager le gabarit de la voie voi  sine, la position de roulage avec bras repliés  représentée sur la     fig.    12 correspondant à la  position la plus haute des traverses 64.  



  La     fig.   <B>15</B> montre, en perspective, le dis  positif utilisé pour opérer l'accrochage et le  décrochage des bras, respectivement du     guide-          chaîne.    Cet accrochage s'effectue à l'aide  d'un tenon 67 formé à la partie inférieure  du bras 61 et     d'tune    mortaise 68 pratiquée  dans le guide-chaîne 60. Pour réaliser l'accro  chage, on fait descendre les bras 61, tout en  les écartant de la verticale, après les avoir  déverrouillés en 69-69a, jusqu'à ce que le  tenon 67 vienne se présenter, par en dessous,  en face de la mortaise 68 correspondante du       guide-ehaîne    déjà en place sous la voie et dans  lequel se trouve déjà engagée une section de  la chaîne à godets coupée.

   Il suffit alors  d'opérer le remontage des bras pour que l'ac  crochage s'effectue automatiquement; ces bras  sont alors verrouillés en 69-69b et     69a-69c     et peuvent entraîner le     guide-chaîne    qui en  traîne lui-même la voie. On termine la mise  en chantier en raccordant la chaîne.  



  Il est. évident que si l'on rencontre un  obstacle sur la voie (aiguille,     coisement,        ete.),     il est nécessaire de laisser le     guide-chaîne     sous la voie et d'effectuer l'accrochage à un  autre guide-chaîne préparé à l'avance.  



  On peut utiliser pour la pose du guide  chaîne, la dégarnisseuse elle-même.     Comme     représenté     sur    les     fig.    16 et 17, il suffit de  prévoir, à cet effet, sur le châssis de la     dé-          garnisseuse,    une potence 22 destinée à la sus  pension du     guide-chaîne    60. Cette potence est,  par exemple, installée à proximité de l'un des  bogies. D'autre part, deux appareils de levage    24 et     21a    sont disposés de part et d'autre de  l'excavateur.  



  Après exécution de la fouille 25 destinée  à recevoir le     guide-ehaîne    et accrochage aux  appareils de levage 24 et     2.1a    du rail 26       (fig.    16), il suffit de déplacer la     dégarnis-          seuse    pour l'amener dans la position repré  sentée sur la.     fig.    17 et descendre le guide  chaîne 60 dans la fouille     2:5.    La     manoeuvre    de       tirefonds    est.     excutée    au moyen d'une     tirefon-          neuse    électrique alimentée par le groupe élec  trogène.  



  Quand le chantier est arrêté pour être re  pris ultérieurement, on enfonce le     guide-          chaîne    sous la voie, en     dégarnissant    sur place  jusqu'à la profondeur maximum, on sectionne  la chaîne de part et d'autre du guide-chaîne  et on décroche celui-ci des bras de l'excava  teur, afin que l'installation puisse être ame  née à la gare voisine. En calant la voie de  part et d'autre du     guide-chaîne,    ce dernier  peut rester en place.  



  Pour éviter l'enfouissement du     guide-          chaîne    pendant une interruption du     dégarnis-          sage,    on peut utiliser, comme représenté sur  les     fig.    18 et 19, une chaîne d'excavateur dont  un certain nombre de godets successifs - par  exemple six - sont démontables en deux par  ties 27 et 28     ajnstables    l'une à l'autre par des  moyens simples, de telle manière qu'en enle  vant l'une de ces parties, 27, la partie res  tante ne fasse plus que faiblement saillie en  dessous du     guide-chaîne.    Il est.

   ainsi possible  de réduire très notablement - c'est-à-dire de  la hauteur     jz    - la profondeur d'enfouissement  du guide-chaîne. Un assemblage robuste des  deux parties 27 et 28 est obtenu au moyen de  deux tétons d'articulation 29 formés l'un sur la  face interne de l'un     desflasquesdelapartie28,     l'autre sur la face externe de l'autre flasque  de cette même partie et qui s'engagent dans  des trous 30 percés dans des appendices 30a  des flasques de la partie 27. D'autre part,  deux oreilles     3la    et 31b, solidaires respective  ment de la partie 27 et de la partie 28, sont  percées d'un trou pour recevoir une che  ville 31.

        L'assemblage des deux pièces s'effectue  par déplacement latéral de la pièce 27, enga  gement des tétons 29 dans les trous 30, pivo  tement de la pièce 27 autour de l'axe fictif  <B>29-29</B> et engagement de la cheville 31 dans  les trous des oreilles     31R,    et 31b.    Selon une variante représentée sur la.

         fig.    20, la chaîne comporte une section 33 de  faible épaisseur, dite      fausse    chaîne , ne com  portant pas de godets et destinée à venir sous  le guide-chaîne pendant les interruptions du       dégarnissage.       Chacune des formes d'exécution décri  tes ci-dessus de façon générale comprend éga  lement un dispositif pour le travail en courbe,  auquel cas le châssis 63 de l'excavateur est  déplacé latéralement au moyen d'un ensemble  à crémaillère de type connu mentionné ci-des  sus en regard des     fig.    12 à 14. Ce dispositif  pour le travail en courbe est représenté aux       fig.    21 à 23 et sert à maintenir la voie laté  ralement.

   Il comprend des galets de guidage  70-7l, montés sur le châssis de l'excavateur,  qui viennent s'appliquer sur les faces laté  rales des     champignons    des rails de chacune  des files. Pour tenir compte des légères va  riations d'écartement, ces galets sont inclinés  vers l'avant d'un petit angle a     (fig.    21). Des  ressorts 72 permettent d'assurer le contact  permanent des joues supérieures des galets  sur les tables de roulement des deux files  de rails.

   Ces galets sont, en outre, munis d'un  dispositif de réglage en hauteur 73-74       (fig.    22) actionné par un moteur     (fig.    21) et  qui     permet    de suivre les mouvements de mon  tée et de descente de la voie, le cas échéant,  suivant la profondeur de     dégarnissage.        Comme     on peut le voir notamment. à la     fig.    23, les  galets 70-71 sont     déealés    l'un par rapport  à l'autre dans le sens de l'axe de la voie, de  faon que l'on puisse utiliser des galets dont  le diamètre est supérieur à la moitié de l'écar  tement entre les deux files de rail de la voie.

    On a, en effet, intérêt à utiliser des galets  de grand diamètre et à pouvoir les remplacer  par des galets de diamètre encore plus grand  pour exécuter un travail sur des voies à grand    écartement, telles que, par exemple, la voie  espagnole.  



  Dans chacune desdites formes d'exécution       également,    lors du travail en courbe, la voie  est ramenée dans son axe avant le passage du  bogie arrière par un dispositif à galet 75       (fig.    7), analogue au précédent. Une ba  layeuse de traverses 76, rotative ou non, est  montée sur le châssis de la     dégarnisseuse    de  la     deuxième    forme d'exécution     (fig.    7), en  avant du bogie arrière.  



  Les     fig.    24, 25 et 26 représentent le     guide-          chaîne    60 qui assure, outre le guidage de la  chaîne à godets de l'excavateur, le soulève  ment de la voie.  



  A cet effet, ce     guide-chaine    comprend des  patins 77, qui supportent la voie. Dans les  dispositifs actuellement existants, le soulève  ment varie avec la profondeur du     dégarnis-          sage,    la voie étant d'autant moins soulevée  que le dégarnissage a été effectué plus pro  fondément.  



  Les installation décrites comprennent cha  cune un dispositif qui permet de soulever  constamment la voie au maximum possible,  eu égard à l'effort subi par les rails. Il est en  effet     avantageux    de disposer d'un large espace  entre la voie et la     plate-forme    dégarnie, afin  de pouvoir introduire et régaler sous la voie  la     plus    grande quantité possible de ballast  récupéré.  



  A cet effet, ce dispositif représenté sur la       fig.    24 comporte des patins 77 mobiles verti  calement par rapport au     guide-chaîne,    au  moyen d'un mécanisme à pignon 78 et cré  maillère 79. La hauteur des patins peut être  ainsi réglée suivant les     besoins.    Selon des va  riantes, tout autre moyen de commande, par  exemple par vis et écrou, pourrait d'ailleurs  être envisagé. On pourrait également utiliser  des cales d'épaisseur dont on aurait un jeu  complet, du type représenté en 80 sur les       fig.    25 et 26 et épousant la forme exacte des  patins 77.

   Une application particulière de ce  dispositif ou de l'une quelconque de ses va  riantes est le travail sur une voie montée sur  traverses métalliques (voir     fig.    26).      Spécialement dans le travail en tranchée,  il peut être     avantageux    d'atteler au train à  deux unités qui constitue la dégarnisseuse dé  crite, un certain nombre de     wagons-trémie    de  l'un des typés représentés sur les     fig.    27 à 30.  



  Selon la variante de la     fig.    27, chacun de  ces wagons comporte un réceptacle à détritus  81, au-dessus duquel est disposée     mie        goulotte     82 ouverte en     83-84,    au droit de ce récep  tacle, et clans laquelle se déplace un tapis 85  à raclettes 86, actionné, dans le sens des flè  ches f, par un moteur 87. Les détritus évacués  par le transporteur 18     (fig.    1. et 7),     entraînés     par les raclettes 86, sont évacués dans le ré  ceptacle 81 et, lorsque ce dernier est plein,  sont dirigés en 88, vers la goulotte du wagon  trémie suivant.  



  Dans la variante des     fig.        \?8    à 30, une  charpente 89 fixée sur le réceptacle 81, sup  porte un tapis sans fin 90, monté entre des  tambours d'extrémité 91. Ce tapis,     supporté     par des rouleaux intermédiaires 9?, est  actionné, à partir d'un arbre moteur 93, par  l'intermédiaire de toute transmission appro  priée,     dans    le sens des flèches f.  



  Les déblais, évacués par le transporteur  18, sont reçus dans une trémie     9.1    pour être  déversés sur le tapis 90.  



  Au-dessus et sur toute la longueur de ce  tapis 90 est aménagé un double chemin de  roulement 95 le long duquel peut être déplacé  un chariot 96. Un câble de commande 97, fixé  en 98 à ce chariot. et passant sur des poulies  d'extrémité 99, peut être actionné par tout  moyen approprié, par exemple à l'aide d'une  simple manivelle 100.  



  Le chariot est muni, à sa partie antérieure,  d'une étrave<B>101,</B> en forme de V, qui permet  de rejeter les déblais de part et d'autre du  tapis, dans le réceptacle 81; une bavette 102  en caoutchouc, cuir ou similaire, s'oppose au  passage des déblais entre la partie inférieure  du chariot et la surface du tapis, tout en assu  rant la souplesse nécessaire; une brosse 103  assure le nettoyage complet de ce tapis.  



  Au début. du chargement du wagon, le  chariot 96 est amené au voisinage de la tré  mie     9-1;    les     déblais,    déversés sur le tapis par    1e transporteur 18, en sont chassés par l'étrave  du chariot. et tombent. dans la partie du récep  tacle située au-dessous de la position occupée  par le chariot. Au fur et à mesure de l'arri  vée des déblais, ce chariot, est déplacé dans  le sens de la flèche f, de     facon    à faire varier  le point, de     chute    de ces déblais, jusqu'à rem  plissage complet du réceptacle.

   A ce moment,  le chariot se trouve en fin de course vers l'ar  rière et ces mêmes     déblais    sont amenés par  le tapis 90 à. un wagon attelé au précédent et  équipé clé la     même    façon.  



  Pour     assurer    le libre passage de ces dé  blais, le chariot lui-même, ou simplement  l'étrave, sont enlevés ou, de     préférence,    bas  eulés.  



  Comme décrit ci-dessus, le ballast, épuré  et ramené sous la voie, est égalisé au moyen  d'une     régaleuse.    Cette égalisation, quoique       assurairt    une assiette plane pour la voie, laisse  subsister un tassement     insuffisant    du ballast  qui oblige à des opérations clé bourrage répé  tées.  



  Dans ce but., l'installation comprend, de  préférence, outre les parties décrites jus,  qu'ici, un appareillage susceptible de tasser  le ballast meuble dès sa mise en. place sous la  voie, en une seule     opération,    ce qui permet  d'établir aussitôt une voie parfaitement sta  ble qui, après un premier nivellement, auto  rise la. circulation à     grande    vitesse.  



  La partie essentielle de cet appareillage est  un élément, destiné à être engagé sous la voie  préalablement soulevée sur une certaine lon  gueur. Cet élément est muni     d'organes,        grâce     auxquels il est possible de le soumettre à des  vibrations.  



  11 serait donc rationnel d'adjoindre cet  appareillage à la     dégarnisseuse,    en l'instal  lant immédiatement après     l'excavateur,    au  point. de chute du ballast épuré. Toutefois,  plus généralement et comme décrit ci-après,  ledit appareillage est supporté par un véhi  cule circulant soit. sur la voie elle-même, soit  sur un chemin de roulement. provisoire établi  le long de la voie, soit même directement sur  la plate-forme, s'il est muni     (le    roues à ban  dages     pneumatiques.         Le soulèvement de la voie est, dans ces  derniers cas, opéré par des moyens indépen  dants.  



  Les vibrations peuvent s'exercer sur le  ballast soit. en surface, auquel cas elles pro  duisent. des     effets    comparables à ceux d'un       damage,    soit à une     profondeur    plus ou moins  grande, auquel cas elles réalisent un tassement       sous    l'effet d'éboulements élémentaires pro  voqués au sein du ballast. par le travail d'ou  tils vibrants plongés à une profondeur plus  ou moins grande dans ce ballast.

   Il est d'ail  leurs possible de combiner entre elles des opé  rations exigent des vibrations verticales  (effets de     damage)    et des vibrations horizon  tales (effets de     rateau    travaillant. en     profon-          (leur),    ou encore d'exécuter ces opérations sé  parément, mais immédiatement à. la suite les  unes des autres, l'appareillage utilisé pour en  gendrer ces vibrations pouvant être     lui-même     combiné ou non avec un appareillage     réga-          leur        servant    à égaliser et niveler la surface du  ballast.  



  La     fig.    31 représente une     régaleuse,    du  type représenté sur les     fig.    8 et 9, constituée  par un cadre formé de deux longerons 101 et  (le deux traverses 105. Ce cadre sert de     sup-          poxl    aux barres 106 disposées en     r/,    qui sont  les outils     régaleurs    proprement dits.  



  Cette     régaleuse    est suspendue à un véhi  cule (non représenté) qui la porte au moyen  de quatre tirants 107, dont deux sont repré  sentés sur le dessin, articulés à l'extrémité de  consoles<B>108</B> solidaires du véhicule.  



  Les vibrations sont obtenues au moyen de  moteurs électriques excentrés dont les uns,  tels que 109, sont interposés entre la régale-Lise  et ses consoles de support et dont les autres,  tels que 110 sont fixés à des emplacements       i    appropriés sur le corps de la     régaleuse,    par  exemple, comme représenté, sur les barres en  106.  



  Les vibreurs<B>109</B> sont solidaires     d'une     barre 111, articulée en 112 sur 1_a     régaleuse     et d'une barre 113, montée à coulissement  dans un fourreau 114; une tête 115     (fig.        31a)     de cette barre 113 repose sur un ressort 116  logé dans ledit fourreau.    Sur chacun des tirants de     suspension    de  la     régaleuse,    une tige filetée 117, munie d'un  volant de     manceuvre    118 et dont le filetage  est de sens différent de part et d'autre de ce  volant,     permet    le réglage en hauteur de l'ap  pareillage.  



  Les     fig.    32 à 36 sont relatives à un dis  positif     dameur    à vibrations monté sur un  véhicule qui, schématiquement représenté en  119, est     muni    de roues 120 lui permettant de       eirculer    sur une portion de voie préalablement  soulevée 121.  



  Un outil     dameur    est constitué par une  poutre 122 ayant une semelle inférieure 123  qui s'étend sur toute sa longueur et une série  de semelles supérieures de protection 124.  



  Le véhicule 119 supporte, en outre, un  plancher 125 sur lequel sont installés, d'une  part, un arbre 126 muni à chacune de ses  extrémités d'une came 127 qui coopère avec  deux bras 128, articulés en 129 sur un sup  port 130 solidaire du plancher 125, d'autre  part, un moteur 131 qui     commande    en 132  l'arbre 126.  



  Les deux bras 128     (fig.    33) agissent, par  l'intermédiaire de tiges 133 sur des blocs 134  servant, ainsi qu'il sera exposé ci-après, à la  suspension de l'outil     dameur    122.  



  Un ressort 135, logé dans une cloche 136  solidaire du bâti, est interposé entre cette der  nière et un des blocs 134.  



  La poutre 122 qui constitue l'outil     dameur     est reliée aux organes vibrants au moyen de  deux bras amovibles 137,     137a,    de configura  tion     appropriée,    dont. la liaison avec les blocs  134 est réalisée, comme représenté sur la       fig.    34, par un assemblage à coin 138, muni  d'une vis de blocage 139 avec écrou de     ma-          n#uvre    140.  



  La rotation de l'arbre à cames 126 trans  met ainsi à la poutre 122 son mouvement vi  bratoire vertical qui produit sur le ballast  l'effet de damage désiré résultant des succes  sions de compressions et de détentes du res  sort 135. La hauteur du plancher 125 par rap  port à la voie est, comme     précédemment,    ré  glée par des tirants à vis     manoeuvrés    par vo  lants 118.      Le dispositif représenté sur la     fig.    37 com  porte, comme outil de travail, une traverse  141 munie de dents     14\?,    destinées à pénétrer  dans le ballast.  



  Cette traverse est. articulée, à chacune de  ses extrémités,     sur    des bras     143-143a,        eux-          mêmes    articulés en     1.44-144a.    sur le plancher  du véhicule. Le moteur 131 actionne     Lin    arbre  145 sur lequel est calé un excentrique 146.  Les deux couronnes     147-147a        (fig.    38) de  cet excentrique sont. respectivement formées  sur deux bielles 148 et 148a.     artieulées    respec  tivement en     1.49-149a    aux extrémités des  bras 143 et     143a.     



  La rotation de l'arbre 145 détermine ainsi  un mouvement vibratoire longitudinal de la  traverse 141, c'est-à-dire un mouvement vi  bratoire sensiblement horizontal dirigé per  pendiculairement à. l'axe de la voie.  



  Le dispositif peut être soit simple, comme  représenté sur la     fig.    38, soit double, comme  représenté sur la     fig.    39, c'est-à-dire compor  ter un seul ou deux outils de travail.  



  La     fig.    40 représente un appareillage dans  lequel une     régaleuse    150 est combinée avec un  outil de travail 141 du type représenté sur  les     fig.    37 à 39.  



  Les dispositifs décrits peuvent être utilisés  successivement: tout d'abord la     régaleuse    se  lon la     fig.    31, ensuite le dispositif à vibrations  horizontales, à     Lin    ou deux outils, selon les       fig.    37 à 39 et finalement le dispositif à damer  selon les     fig.    3? à 36.     Alternativement,    on  peut utiliser l'appareillage     vibro-régaleur     combiné de la     fig.    40 et ensuite le dispositif  à damer selon les     fig.    3? à 36.  



  II est bien entendu que les moyens indi  qués pour actionner les organes vibrants       pourraient    être remplacés par tous moyens  équivalents, mécaniques, électriques, hydrau  liques, pneumatiques ou autres.



      Installation for the maintenance of railway tracks. The present invention relates to an installation for the maintenance of railways, characterized in that it comprises, mounted on various vehicles of service train and in combination with means, on the one hand, for lifting and maintaining raised a portion of track, on the other hand, to pick up the ballast, under the raised portion of track, means for screening the ballast and its separation into various categories, means for bringing the various categories back to the track of purified ballast, means for the evacuation of rubbish,

   means for equalizing the ballast spilled after purification. The means for evacuating the rubbish and for replacing the purified ballast can also be used for storing or piling up small purified ballasts and, if necessary, part of the large ballast.



  The appended drawing represents, by way of example, two embodiments and variants of the installation which is the subject of the present invention.



  Fig. 1 is the elevational view of a first embodiment of the service train of the installation on which a stripper and its accessories are mounted.



  Figs. 2, 3 and 4 are detail views of certain members shown in FIG. 1. Figs. 5 and 6 are detail views showing the arrangement of screens, chutes and ballast carriers. Fig. 7 is a partial elevational view of a second embodiment of the service train.



  Figs. 8 and 9 are views, respectively in elevation and in plan, of a ballast regulator device of the second embodiment.



  Figs. 10 and 11 are views, respectively in elevation and in plan, of a variant of the device shown in FIG. 3.



  Figs. 12, 13 and 14 are sectional and elevation-sectional crumbs of the frame of an excavator which each of the two embodiments shown, FIGS. 13 and 14 being taken at 90 from each other.



  Fig. 15 is a perspective view of a device for attaching a chain guide to the arms of the excavator.



  Figs. 16 and 17 illustrate the operation of an auxiliary device.



  Figs. 18, 19 and 20 show details of some parts of an excavator chain, fig. 19 being a sectional view along 19-19 of the. fig. 18.



  Figs. 21, 22 and 23 are, respectively, sectional views and a plan view of a track guiding device at the level of the excavator.



  Figs. 24, 25 and 26 show details of chain guide accessories.



  Fig. 27 is a schematic view, in side elevation, of a hopper car for the evacuation of rubbish. Fig. 28 is a quick side elevation of a variant of the hopper car.



  Figs. 29 and. 30 are views, respectively in plan and in front elevation, of the wa gon-hopper of FIG. 28.



  Fig. 31 is a perspective view of a vibrating leveler.



  Fig. 31, is a quick detail of FIG. 31.



  Fig. 32 is a quick schematic, in elevation from the side, of a vibratory tamping device mounted on a vehicle.



  Fig. 33 shows a detail of FIG. 32.



  Fig. 34 is a sectional view along -I-A of the fi-. <B> Ô3. </B>



  Fig. 35 is a schematic elevational front view, corresponding to FIG. 32, but not representative. than the vibrating organs and their control.



  The fi, -. 36 is a plan view of a tamper tool that comprises the device shown in fi, -. 32 to 35.



  Fig. 37 is a schematic view, in front elevation, of a horizontal vibration device.



  Figs. 38 and 39 are planar speeds, corresponding to FIG. 37 and showing two variants of this device.



  Fig. 40 is a perspective view of part of an apparatus comprising a positive horizontal vibration device, combined with a leveler.



  The two embodiments (fig. 1 and 7) of the installation differ from each other only by the distribution of components and masses and by the arrangements provided for the screening and distribution of the screened ballast. .



  The installation shown in fi-. 1 includes the equipment of a park train which is made up of three units: 1 A stripper, the frame of which, consisting of a long rigid beam, about 30 meters in length, is supported at each of its two ends by a bogie and fitted, in its middle part, with an excavator. This unit ensures stripping and lifting of the purified ballast.



  2 A screen wagon, coupled to the rear of the stripper, which ensures the screening and the so-called ballast purification, as well as the evacuation of the detritus.



  3 A motor wagon coupled to the front, which includes a generator and a winch for hauling the assembly.



  In fig. 1, the wagon on which are installed: the generator 2 which supplies various electric motors of the. stripper and a winch 3 which ensures the hauling of the stripper during work. The cable of the winch is. anchored at the front.



  In the middle part of a chîtssis 3 of the stripper is mounted an excavator 5 comprising a bucket chain which moves in a plane perpendicular to the axis of the track and works under the sleepers, raised by the action of 'a device also serving to guide the chain.



  A conveyor belt 6 drives the ballast backwards. dumped by the buckets, tan say that another conveyor 7 brings back the uncluttered ball behind the excavator; this ballast then comes, with the relatively high speed it has acquired on the transporter 7, colliding with the beak of a part 7a (fig. 6) in the form of a ship's bow which ensures its spread over the entire width of the way, thus preparing the work.

   equalization which is executed by means of a regulator 8, driven by the stripper and which works spells the sleepers. the. way of an ehasse-nei-e.



  As shown in fi-. 3. the trans carrier 6 taken up under the excavator can pivot around a vertical axis 6n, located not far from a rear roller 6b (fig. 3). This transport.tir is. integral with the frame of said excavator, which, as will be described below, can move perpendicular to the axis of the track. This transporter 6 is. sup carried by a frame: 53 (see fig. 4, transverse section of the conveyor) (it is provided, at certain points along its length, with rollers 54 rolling on cross members 55 secured to a main beam of the chassls 4.

   The conveyor belt is supported, on the one hand, on its rising strand, alternately by straight rollers 56 on its central part and (the inclined side rollers 57, on its lateral part, on the other hand, on its descending strand , by straight rollers 58.



  The screen wagon 9 comprises (see fig. 1) 1 A horizontal belt 10 (fi-. <B> 1) </B> said distributor whose march is reversible and which receives the ballast brought from the excavator by the transporter 6, through a transporter 11.



  2 Screens 12 and. 13 (fig. 1 and. 5) which are constituted by perforated sheets, mounted on shaking tables inclined towards the front and superimposed. These screens receive, in normal operation, the ballast from the distributor and distribute forward, separately and on two different stages, on the one hand, the (Yros ballast purified in 14 and, on the other hand, the small ballast refined in 15.



  3 A gutter 16 which ensures distribution (the large, uncluttered ballast, in all desired proportions, in one part at the front towards the transporter? For the immediate raising of the track, and another on the sides to be spread between the sleepers, either in cords or in piles along the track.



       4 A mat 17 which picks up the rubbish under the screens and lifts them backwards.



  5 An orientable conveyor belt 1.8, which reviews the debris thus coming from the screens and which, depending on its orientation (fig. 2) rejects them, either, at the rear, on specially equipped wagons with a set of conveyors, or, on the side, at a short distance from the rail, to form a track or to be taken up, or, again on the side, but at a great distance, to be incorporated into the embankment.



  The role of the distributor belt 10 is to make it possible to prevent access of the ballast, to the screens, by reversing its course; all of the stripped ballast is, in this case, evacuated by the belts 17 then 18. The mechanical stripper then functions as a grounding tool.

      Figs. 5 and 6 show how the large ballast, from the ballast to be purified arriving at 19, moves under the effect of its weight and the action of the shaking tables, towards the gutter 16, in order to be distributed there by means of a movable triangular flap 20, and according to the height of the latter, that is to say according to the distance which remains free between this flap and the bottom of the gutter, between the conveyor 7 and the side chutes 21; for its part, the small ballast remains on the screen 13 with small perforations which separates it from the rubbish.

   These are evacuated by the belt 17, while the small ballast falls into the chutes 15 to be, in turn, as needed, either spread between the sleepers or piled up along the track. In the latter case, the. chutes 15 are longer and provided with movable shutters (such as 15a) whose periodic opening ensures the stacking of small ballast.



  In the embodiment of FIG. 7, the stripper is still moved using a winch wagon coupled to the front, which offers the advantage of isolating the energy generator, which allows, on the condition of having in reserve a similar unit, to overcome the failures of the engine or the generator.



  On the other hand, the screens and the debris evacuator are. fitted out on the stripper itself, that is to say on the beam which supports the excavator and the leveler; in addition, the ballast route has been significantly reduced, due to the reduction to a minimum of the number and length of conveyor belts.



  The stripper exclusively comprises a recovery conveyor which goes from the excavator to the screens, a first trash conveyor which goes from the lower part of the screens to a trash evacuator, finally this trash evacuator itself. The ballast falls directly from the screens under the track, through the chutes.



  In this case, the increased load may lead to the use of three-axle bogies.



  In the stripper of this second embodiment, the excavator has been placed, not in the center of the frame, but further ahead. In addition, the track solenoid device has been modified to allow this lift to keep a constant value. Advantages are thus obtained which will be explained below.



  As shown in fig. 7, the excavator 34 is installed forward with respect to the middle of the frame. This arrangement makes it possible to distribute the load more evenly over the two bogies, since most of the heavy components are located at the rear part of the chassis. For this purpose, there is provided, as shown in the drawing, a rear bogie with three axles, the front bogie shown being with two axles.

   This position chosen for the excavator offers, moreover, the advantage of giving the uplift wave of the track a more rational propagation, and above all of leaving more space at the rear for setting up. place and equalization of the ballast, both in height and in width, since the top. of the arch formed by the raised track part is at the rear of the excavator. This result is further improved by the fact that, whatever the depth of stripping, the lifting of the track is constantly maintained at its maximum, as described below.



  The installation shown in fig. 7 com takes a set of three-stage screens 35, 35a., 35b, so as to separate the large ballast, the medium ballast and the gravel or small ballast from one another. The rubbish is picked up by a conveyor 36, established below the lower screen.



  The various chutes 37, 37a, 37b, which start from each of the screen stages are subjected to. a vibratory movement which is imparted to them by the screens to which these droplets are connected, but which could also be imparted to them by an independent means. This vibration makes the ball last forward, thus increasing the action of gravity alone.



  The large ballast falls under the raised track, immediately behind the excavator, to be attacked there by a double leveler, that is to say with two superimposed stages. The two floors of this regaler are. independent of each other, but could. also be combined. The medium ballast, discharged beyond the lower stage, falls on the first layer of large ballast to be leveled in turn by the second stage. The small ballast can either be spread over the previous layers or. be placed along the track, in the gap, in a cordon or in a pile.

   Means analogous to. those described above and shown in FIGS. 5 and. 6, could be interposed in the chutes which extend. the stages of the screens, so as to allow a choice and. to deposit in the between track, or between the sleepers on the already leveled layers, a part of each of the categories of the ballast. This possibility of spreading the ballast in successive layers of different sizes facilitates the drainage of the track and certain maintenance work and constitutes one of the important characteristics of this embodiment.



  Figs. 8 and 9 represent the double regulator. This comprises two stages in the form of a <B> V. </B> A frame 38, suspended from a beam 39 by vertical arms 40, supports two stages of leveling bars 4lJ11a and. 42-42a. The first 41 --- 11a of these stages constitutes a large ballast regulator and the second 42--12a is raised above the first and constitutes a medium ballast regulator.

   At the tip of this second stage are fixed two plates 43-.13a, in <B> V, </B> which play the role of ploughshare and dig a groove in the ballast, along the axis of the track, so that the rolling loads exert their force on the sleeper parts under the rail and not on the middle part of these sleepers.



  The various constituent parts of the adjustment machine are articulated one on the other, so as to be able to be folded up or, conversely, to be put in place in a simple way, when stopping or when resuming. the building site. An adjustment device 44 is provided to modify the length of the support arms 40 of the frame 38 at will.

   Any suitable device can be used to freely adjust the relative height of the two stages of the adjuster. We could also add to the leveling machine suitable vibrating devices, placed at suitable points on the leveling machine, we could also use, beyond the leveling machine, an independent interior device, the key purpose of these additions being to settle the ball. uncluttered last on the platform, which allows faster track stabilization and, consequently,

   to travel there at high speed within shorter time limits.



  The ballast, delivered by the excavator 31 is removed by the recovery conveyor 45 (fig. 7) and discharged into a hopper 46 which comprises an articulated flap 47, the operation of which makes it possible to direct the ballast at will, either towards the screens 35, or, by a chute 48, on the trash transporter 36, in the event that it is desired to remove all of the old ballast.



  This conveyor 36 dumps the rubbish onto mid evacuating conveyor 18 mounted at the rear part of the frame and adjustable in all positions, as in the first embodiment.



       Still as in the first embodiment, and as shown in FIGS. 10 and 11, the conveyor 45 integral, at the bottom end of the silk end, of the frame of the excavator, can pivot, at its upper part, around an axis 51 located not far from the rear roller 52, It comprises intermediate supports , like those shown in fi-. 4.



  The excavator of the forms of execution which has just been described in a general way is represented in the figures. 12 to 14. As in known installations, it comprises a chain -odets 59 which passes under the raised track and.

    (it is guided under the latter by a chain guide 60, supported on each side of the track by arms 61-61a. This chain guide also serves to keep the track raised by means (the shoes, described below). after, which are integral (its upper face, and which are intended to; smooth under the sleepers. In known excavators, the excavator arms, four in number, are integral with the same frame, movable horizontally and perpendicular to the axis of the track.

   This movement takes place in relation to one. second frame carried by four jacks capable of giving the assembly a vertical movement making it possible to adjust the depth of the stripping. The shift from the working position to the rolling position is effected by folding the arms upwards. A serious drawback of this device consists in that, during this maneuver, the gauge of the neighboring track was momentarily engaged.



  It has been imagined to insert, between the arms of the excavator and the frame which supports them, a device consisting of four jacks, which can be operated by hand by means of chains and. which allow the arms to be folded up by raising their upper part, while their lower part rests against the beam. The gauge of the neighboring track thus remains free during. the process.



  A preferred solution is to put the arms of the exca: #ateur to an overall vertical movement relative to a horizontally movable frame, by means of rollers rolling on cross members secured to the main beam of the frame.



  As shown in Figs. 12, 13 and 14, the arms 61-61a of the excavator, respectively articulated at 62-62a, are capable of vertical sliding along uprights 63-63a of the frame, the latter itself being capable of horizontal movements , as indicated above. These excavator arms are, on either side of the beam, made integral by a cross member 64. They are four in number, respectively driven by four jacks 65-65a actuated together by a motor 66 and. acting on nuts 49.

    The rear arms are slightly shorter than the front arms so as to give the chain guide, engaged under the track and supporting the latter, an inclination corresponding to that of the track, in front of the top of the arc that it forms in the interval between the bogies. In addition, the arms located on the same side of the beam are preferably shorter than those located on the other side, in order to allow the platform to be given a certain inclination favorable to the flow of water. waters.



  This arrangement of the excavator frame ensures significant lightening of the entire installation. On the other hand, it makes it possible to perform simply - which constitutes a significant improvement - the maneuvers of hooking the arms to the chain guide and unhooking the arms thereof, without ever engaging the jig. the adjacent track, the rolling position with folded arms shown in FIG. 12 corresponding to the highest position of the sleepers 64.



  Fig. <B> 15 </B> shows, in perspective, the positive device used to operate the attachment and release of the arms, respectively of the chain guide. This attachment is carried out using a tenon 67 formed at the lower part of the arm 61 and a mortise 68 made in the chain guide 60. To achieve the attachment, the arms 61 are lowered, while moving them away from the vertical, after having unlocked them at 69-69a, until the tenon 67 comes to appear, from below, in front of the corresponding mortise 68 of the chain guide already in place under the track and in which there is already engaged a section of the cut bucket chain.

   It is then sufficient to reassemble the arms so that the hooking takes place automatically; these arms are then locked at 69-69b and 69a-69c and can drive the chain guide which itself drags the track. The start-up is completed by connecting the chain.



  It is. Obviously, if you encounter an obstacle on the track (needle, wedge, etc.), it is necessary to leave the chain guide under the track and hook it up to another chain guide prepared for advanced.



  For the installation of the chain guide, you can use the stripper itself. As shown in Figs. 16 and 17, it suffices to provide, for this purpose, on the frame of the trimmer, a bracket 22 intended for the suspension of the chain guide 60. This bracket is, for example, installed near one bogies. On the other hand, two lifting devices 24 and 21a are arranged on either side of the excavator.



  After excavation 25 intended to receive the chain guide and hooking up to lifting devices 24 and 2.1a of rail 26 (fig. 16), it suffices to move the stripper to bring it to the position shown on the. fig. 17 and lower the chain guide 60 into the excavation 2: 5. The lag maneuver is. executed by means of an electric puller powered by the generator.



  When the work site is stopped to be resumed later, we push the guide bar under the track, stripping in place to the maximum depth, we cut the chain on either side of the guide bar and unhook the one. here from the arms of the excavator, so that the installation can be carried out at the neighboring station. By wedging the track on either side of the chain guide, the latter can remain in place.



  To prevent the chain guide from burying during an interruption in stripping, it is possible to use, as shown in fig. 18 and 19, an excavator chain of which a certain number of successive buckets - for example six - are removable in two parts 27 and 28 ajnstable to each other by simple means, so that in vant one of these parts, 27, the remaining part only slightly protrudes below the guide bar. It is.

   thus possible to reduce very significantly - that is to say of the height jz - the burial depth of the guide bar. A robust assembly of the two parts 27 and 28 is obtained by means of two articulation studs 29 formed one on the internal face of one of the flanges of the part 28, the other on the outer face of the other flange of this same part. and which engage in holes 30 drilled in appendages 30a of the flanges of part 27. On the other hand, two ears 3a and 31b, respectively integral with part 27 and part 28, are pierced with a hole to receive a che ville 31.

        The two parts are assembled by lateral displacement of part 27, engagement of pins 29 in holes 30, pivoting of part 27 around the fictitious axis <B> 29-29 </B> and engagement of the ankle 31 in the holes of the ears 31R, and 31b. According to a variant shown in.

         fig. 20, the chain has a thin section 33, called a false chain, not comprising buckets and intended to come under the chain guide during the interruptions of the stripping. Each of the embodiments described above generally also comprises a device for working in curves, in which case the frame 63 of the excavator is moved laterally by means of a rack assembly of the known type mentioned above. -the above opposite fig. 12 to 14. This device for working in curves is shown in FIGS. 21 to 23 and is used to maintain the track laterally.

   It comprises guide rollers 70-7l, mounted on the frame of the excavator, which are applied on the lateral faces of the mushrooms of the rails of each of the rows. To take account of slight variations in spacing, these rollers are inclined forward at a small angle a (fig. 21). Springs 72 ensure permanent contact of the upper cheeks of the rollers on the running tables of the two rows of rails.

   These rollers are also fitted with a height adjustment device 73-74 (fig. 22) actuated by a motor (fig. 21) and which makes it possible to follow the up and down movements of the track, if necessary, depending on the stripping depth. As we can see in particular. in fig. 23, the rollers 70-71 are offset with respect to each other in the direction of the axis of the track, so that rollers with a diameter greater than half of the diameter can be used. distance between the two tracks of the track.

    It is in fact advantageous to use rollers of large diameter and to be able to replace them with rollers of even larger diameter to perform work on wide gauge tracks, such as, for example, the Spanish track.



  In each of said embodiments also, when working on a curve, the track is brought back in its axis before the passage of the rear bogie by a roller device 75 (FIG. 7), similar to the previous one. A sleeper of sleepers 76, rotating or not, is mounted on the frame of the stripper of the second embodiment (FIG. 7), in front of the rear bogie.



  Figs. 24, 25 and 26 show the chain guide 60 which ensures, in addition to guiding the excavator bucket chain, the lifting of the track.



  To this end, this chain guide comprises pads 77, which support the track. In the currently existing devices, the lifting varies with the depth of the stripping, the track being raised less the more the stripping has been carried out more deeply.



  The installations described each include a device which makes it possible to constantly raise the track to the maximum possible, having regard to the force undergone by the rails. It is in fact advantageous to have a large space between the track and the bare platform, in order to be able to introduce and level under the track the largest possible quantity of recovered ballast.



  To this end, this device shown in FIG. 24 comprises skids 77 movable vertically with respect to the chain guide, by means of a pinion mechanism 78 and cre mesh 79. The height of the skates can thus be adjusted as required. According to variations, any other control means, for example by screw and nut, could moreover be considered. It would also be possible to use shims of which there would be a complete set, of the type shown at 80 in FIGS. 25 and 26 and matching the exact shape of the pads 77.

   A particular application of this device or any of its variants is working on a track mounted on metal sleepers (see fig. 26). Especially in work in trenches, it may be advantageous to attach to the two-unit train which constitutes the stripper described, a certain number of hopper wagons of one of the types shown in FIGS. 27 to 30.



  According to the variant of FIG. 27, each of these wagons has a refuse receptacle 81, above which is placed a chute 82 open at 83-84, in line with this receptacle, and in which moves a carpet 85 with scraper 86, actuated, in the direction of the arrows f, by a motor 87. The detritus evacuated by the conveyor 18 (fig. 1. and 7), driven by the scrapers 86, are evacuated into the receptacle 81 and, when the latter is full, are directed to 88, towards the chute of the next hopper wagon.



  In the variant of FIGS. \? 8 to 30, a frame 89 fixed on the receptacle 81, sup carries an endless belt 90, mounted between end drums 91. This belt, supported by intermediate rollers 9 ?, is actuated from a motor shaft 93, by means of any appropriate transmission, in the direction of the arrows f.



  The cuttings, evacuated by the conveyor 18, are received in a hopper 9.1 to be discharged onto the belt 90.



  Above and over the entire length of this belt 90 is arranged a double track 95 along which can be moved a carriage 96. A control cable 97, fixed at 98 to this carriage. and passing over end pulleys 99, can be actuated by any suitable means, for example using a simple crank 100.



  The carriage is provided, at its front part, with a V-shaped bow <B> 101, </B>, which makes it possible to reject the cuttings on either side of the belt, into the receptacle 81; a bib 102 made of rubber, leather or the like, opposes the passage of the cuttings between the lower part of the carriage and the surface of the belt, while ensuring the necessary flexibility; a brush 103 ensures the complete cleaning of this carpet.



  In the beginning. loading the wagon, the cart 96 is brought to the vicinity of the hopper 9-1; the cuttings, dumped on the belt by the conveyor 18, are driven therefrom by the bow of the carriage. and fall. in the part of the receptacle located below the position occupied by the carriage. As the spoil arrives, this carriage is moved in the direction of arrow f, so as to vary the point of fall of this spoil, until the receptacle is completely filled.

   At this time, the carriage is at the end of its travel towards the rear and these same cuttings are brought by the belt 90 to. a wagon coupled to the previous one and equipped with the key in the same way.



  To ensure the free passage of these spoil, the carriage itself, or simply the bow, are removed or, preferably, lowered.



  As described above, the ballast, purified and brought under the track, is equalized by means of a regulator. This equalization, although ensuring a flat trim for the track, leaves insufficient settling of the ballast which requires repeated key tamping operations.



  For this purpose., The installation preferably comprises, in addition to the parts described juice, that here, an apparatus capable of packing the loose ballast as soon as it is put in. placed under the track, in a single operation, which immediately establishes a perfectly stable track which, after a first leveling, allows it. high speed traffic.



  The essential part of this equipment is an element, intended to be engaged under the track previously raised for a certain length. This element is provided with organs, thanks to which it is possible to subject it to vibrations.



  It would therefore be rational to add this equipment to the stripper, by installing it immediately after the excavator, to the point. of the purified ballast drop. However, more generally and as described below, said equipment is supported by a circulating vehicle either. on the track itself, or on a track. provisional set up along the track, or even directly on the platform, if it is fitted (the wheels with pneumatic ban dages. The lifting of the track is, in these latter cases, operated by independent means.



  The vibrations can be exerted on the ballast either. on the surface, in which case they produce. effects comparable to those of tamping, either at a greater or lesser depth, in which case they settle under the effect of elementary landslides caused within the ballast. by the work of vibrating tools plunged to a greater or lesser depth in this ballast.

   It is also possible to combine operations requiring vertical vibrations (ramming effects) and horizontal vibrations (rake effects working in depth), or to carry out these operations separately. , but immediately following each other, the apparatus used to generate these vibrations may or may not itself be combined with a regulating apparatus serving to equalize and level the surface of the ballast.



  Fig. 31 shows a regulator, of the type shown in FIGS. 8 and 9, consisting of a frame formed of two side members 101 and (the two cross members 105. This frame serves as a sup- poxl for the bars 106 arranged in r /, which are the actual adjustment tools.



  This regulator is suspended from a vehicle (not shown) which carries it by means of four tie rods 107, two of which are shown in the drawing, articulated at the end of brackets <B> 108 </B> integral with the vehicle.



  The vibrations are obtained by means of eccentric electric motors, some of which, such as 109, are interposed between the Régale-Lise and its support consoles and the others, such as 110, are fixed at appropriate locations on the body of the regulator, for example, as shown, on the bars at 106.



  The vibrators <B> 109 </B> are integral with a bar 111, articulated at 112 on the regulator and a bar 113, slidably mounted in a sleeve 114; a head 115 (FIG. 31a) of this bar 113 rests on a spring 116 housed in said sheath. On each of the regulator's suspension tie rods, a threaded rod 117, fitted with a handwheel 118 and whose thread is in different directions on either side of this handwheel, allows the height of the device to be adjusted. similarly.



  Figs. 32 to 36 relate to a positive vibration tamper device mounted on a vehicle which, schematically represented at 119, is provided with wheels 120 allowing it to circulate on a portion of the previously raised track 121.



  A tamper tool consists of a beam 122 having a bottom flange 123 which extends over its entire length and a series of protective top flanges 124.



  The vehicle 119 also supports a floor 125 on which are installed, on the one hand, a shaft 126 provided at each of its ends with a cam 127 which cooperates with two arms 128, articulated at 129 on a support 130 integral with the floor 125, on the other hand, a motor 131 which controls the shaft 126 at 132.



  The two arms 128 (fig. 33) act, via rods 133 on blocks 134 serving, as will be explained below, to suspend the tamper tool 122.



  A spring 135, housed in a bell 136 integral with the frame, is interposed between the latter and one of the blocks 134.



  The beam 122 which constitutes the tamper tool is connected to the vibrating members by means of two removable arms 137, 137a, of suitable configuration, including. the connection with the blocks 134 is made, as shown in FIG. 34, by a wedge joint 138, provided with a locking screw 139 with operating nut 140.



  The rotation of the camshaft 126 thus transmits to the beam 122 its vertical vibratory movement which produces on the ballast the desired tamping effect resulting from the successions of compressions and detents of the spring 135. The height of the floor 125 with respect to the track is, as before, adjusted by screw tie rods operated by wings 118. The device shown in FIG. 37 com carries, as a work tool, a cross member 141 provided with teeth 14 \ ?, intended to penetrate into the ballast.



  This cross is. articulated, at each of its ends, on arms 143-143a, themselves articulated in 1.44-144a. on the vehicle floor. The motor 131 drives the shaft 145 on which an eccentric 146 is wedged. The two rings 147-147a (fig. 38) of this eccentric are. respectively formed on two connecting rods 148 and 148a. articulated respectively in 1.49-149a at the ends of arms 143 and 143a.



  The rotation of the shaft 145 thus determines a longitudinal vibratory movement of the cross member 141, that is to say a substantially horizontal vibratory movement directed perpendicularly to. the axis of the track.



  The device can be either simple, as shown in FIG. 38, or double, as shown in FIG. 39, that is to say to have one or two working tools.



  Fig. 40 shows an apparatus in which a leveler 150 is combined with a working tool 141 of the type shown in FIGS. 37 to 39.



  The devices described can be used successively: first of all the regulator according to FIG. 31, then the horizontal vibration device, Lin or two tools, according to fig. 37 to 39 and finally the tamping device according to fig. 3? to 36. Alternatively, it is possible to use the combined vibro-regulator apparatus of FIG. 40 and then the tamping device according to FIGS. 3? to 36.



  It is understood that the means indicated for actuating the vibrating members could be replaced by any equivalent means, mechanical, electrical, hydraulic, pneumatic or others.

 

Claims (1)

REVENDICATION Installation pour l'entretien des voies fer rées, caractérisée en ce qu'elle comprend, mon ; tés sur divers véhicules d'un train de service et en combinaison avec des moyens, d'une part, pour soulever et maintenir soulevée une portion de voie, d'autre part, pour piocher le ballast, sous la portion de voie soulevée, des moyens pour le criblage du ballast et sa sépa ration en diverses catégories, des moyens pour ramener sur la voie lesdites diverses catégo ries de ballast épuré, des moyens pour l'éva cuation des détritus, des moyens polir l'égali sation du ballast répandu après épuration. SOUS-REVENDICATIONS: 1. CLAIM Installation for the maintenance of railways, characterized in that it comprises, mon; tees on various vehicles of a service train and in combination with means, on the one hand, for lifting and keeping raised a portion of track, on the other hand, for digging the ballast, under the portion of track raised, means for screening the ballast and separating it into various categories, means for returning said various categories of purified ballast to the track, means for evacuating debris, means for polishing the equalization of the ballast spilled after purification. SUBCLAIMS: 1. Installation selon la. revendication, ca ractérisée en ce qu'elle comprend un excava teur à chaîne passant sous la voie, transversa lement à l'axe de eelle-ci, des outils de tra vail fixés sur ladite chaîne, un guide-chaîne rigide engageable sous la voie, des bras de support du guide-chaine, des traverses sup portant. ces bras, des moyens articulés de liai son de ces traverses avec. Installation according to. claim, charac terized in that it comprises a chain excavator passing under the track, transversely to the axis of the latter, working tools attached to said chain, a rigid chain guide that can be engaged under the track , chain guide support arms, supporting cross members. these arms, articulated means of linking the sound of these sleepers with. les bras, des moyens pour immobilisercesbras, des moyens pour dé placer verticalement ces traverses sur un châs sis, des moyens pour déplacer horizontalement le châssis sur son véhicule porteur, perpendi- culairement à l'axe de la voie et des moyens à tenon et mortaise pour l'accrochage des bras aux extrémités du guide-chaîne. 2. Installation selon la revendication et la sous-revendication 1, caractérisée en ce qu'une certaine longueur de la chaîne munie d'outils de travail est démunie d'outils de travail. 3. the arms, means for immobilizing these arms, means for moving these cross members vertically on a frame, means for moving the chassis horizontally on its carrier vehicle, perpendicular to the axis of the track and means with tenon and mortise for hooking the arms to the ends of the chain guide. 2. Installation according to claim and sub-claim 1, characterized in that a certain length of the chain provided with working tools is devoid of working tools. 3. Installation selon la revendication et la sous-revendication 1, caractérisée en ce qu'elle comprend un excavateur à chaîne à godets passant sous la voie et un guide-chaîne rigide engageable sous la voie, les godets de chaîne étant constitués chacun par deiLY parties sé parables l'une de l'autre, des moyens étant. prévus pour ajuster ces deux parties l'une par rapport à l'autre. 4. Installation according to claim and sub-claim 1, characterized in that it comprises a chain excavator with buckets passing under the track and a rigid chain guide which can be engaged under the track, the chain buckets each being made up of separate parts. parable from each other, means being. provided to adjust these two parts relative to each other. 4. Installation selon la revendication et la sous-revendication 1, caractérisée en ce qu'elle comprend des patins, montés sur le guide- chaîne, interposés entre ce guide-chaîne et la voie et des moyens mécaniques pour le ré glage en hauteur de ces patins. 5. Installation selon la revendication et les sous-revendications 1 et 4, caractérisée en ce que des cales sont prévues, susceptibles d'être interposées entre lesdits patins et la voie. 6. Installation according to claim and sub-claim 1, characterized in that it comprises pads, mounted on the chain guide, interposed between this chain guide and the track and mechanical means for the height adjustment of these pads . 5. Installation according to claim and sub-claims 1 and 4, characterized in that wedges are provided which can be interposed between said pads and the track. 6. Installation selon la revendication et la sous-revendication 1, caractérisée en ce qu'elle comprend des bras de support du guide- ehaine de longueur différente, correspondant à l'inclinaison du guide-chaîne par rapport à la plate-forme. 7. Installation according to claim and sub-claim 1, characterized in that it comprises chain guide support arms of different length, corresponding to the inclination of the chain guide relative to the platform. 7. Installation selon la revendication et la sous-revendication 1, caractérisée en ce qu'elle comprend un châssis mobile transversalement par rapport ait véhicule porteur, une paire de galets montés sur ledit châssis et applica bles contre les rails, les plans desdits galets étant inclinés vers l'avant par rapport au plan de roulement et décalés l'un par rapport à l'autre dans le sens de l'axe de la voie et (les moyens pour le réglage en hauteur de la position des galets par rapport au châssis. 8. Installation according to claim and sub-claim 1, characterized in that it comprises a frame movable transversely with respect to the carrier vehicle, a pair of rollers mounted on said frame and applied against the rails, the planes of said rollers being inclined towards the front relative to the running surface and offset relative to each other in the direction of the axis of the track and (the means for height adjustment of the position of the rollers relative to the chassis. 8 . Installation selon la revendication et la sous-revendication 1, caractérisée en ce qu'elle comprend, sur un véhicule de service, un dis positif de cribles à plusieurs toiles superpo sées, de mailles différentes, un tapis distribu teur, à inversion de marche, à l'entrée des cribles et, sur un véhicule de service attelé en avant (lu précédent, un excavateur à chaîne à godets, un transporteur continu pour le bal last, de l'excavateur au distributeur, un trans porteur continu de retour du ballast des cri bles à l'excavation, une étrave de dispersion du ballast à la sortie du transporteur de re tour, des moyens interposés à la sortie des cribles pour la distribution du ballast par catégories dans diverses directions, des moyens pour répartir, dans chaque catégorie, Installation according to claim and sub-claim 1, characterized in that it comprises, on a service vehicle, a screen device with several superposed fabrics, of different meshes, a distributor belt, with reversal of movement, at the entrance to the screens and, on a service vehicle hitched in front (read previous, a bucket chain excavator, a continuous conveyor for the ball last, from the excavator to the distributor, a continuous conveyor for returning the ballast screens at the excavation, a bow for dispersing the ballast at the exit of the return conveyor, means interposed at the exit of the screens for the distribution of ballast by categories in various directions, means for distributing, in each category , le ballast entre ces diverses directions, un transporteur d'évacuation sous les cribles et un transporteur de projection des détritus hors de la voie. 9. Installation selon la revendication et les sous-revendications 1 à 8, caractérisée en ce qu'elle comprend une trémie à l'entrée des cri bles, un volet orientable sur cette trémie, un transporteur continu entre l'excavateur et la trémie, des goulottes de retour du ballast dans l'excavation, des étraves de dispersion du bal last à la sortie des goulottes, une goulotte d'alimentation du transporteur d'évacuation par la trémie, des moyens pour la manoeuvre du volet orientable de cette trémie. 10. Installation selon la revendication, ca ractérisée en ce qu'elle comprend un trans porteur orientable pour la. projection des dé tritus hors de la voie. 11. the ballast between these various directions, an evacuation conveyor under the screens and a conveyor for throwing the debris out of the way. 9. Installation according to claim and sub-claims 1 to 8, characterized in that it comprises a hopper at the inlet of the screens, an orientable flap on this hopper, a continuous conveyor between the excavator and the hopper, ballast return chutes in the excavation, bal last dispersion bows at the outlet of the chutes, a feed chute for the discharge conveyor through the hopper, means for operating the orientable shutter of this hopper. 10. Installation according to claim, characterized in that it comprises an orientable trans carrier for the. projection of debris out of the way. 11. Installation selon la revendication et les sous-revendications 1 et 7, caractérisée en ce que le transporteur continu entre excava teur et cribles est solidaire du châssis mobile de l'excavateur et monté pivotant à son extré mité opposée, des supports intermédiaires étant prévus pour ce transporteur continu et des moyens pour le déplacement latéral de ces supports. 12. Installation according to claim and sub-claims 1 and 7, characterized in that the continuous conveyor between excavator and screens is integral with the mobile frame of the excavator and pivotally mounted at its opposite end, intermediate supports being provided for this. continuous conveyor and means for the lateral displacement of these supports. 12. Installation selon la revendication, ca-, ractérisée en ce qu'elle comprend un dispositif d'égalisation du ballast répandu, engageable. sous la voie, ayant un cadre et des étages de traverses en V montées sur ce cadre, des moyens pour suspendre ledit cadre d'iun vé hicule de service et des moyens pour régler la hauteur de Bette suspension. 13. Installation selon la revendication et la sous-revendication 12, caractérisée en ce que des moyens sont prévus pour imprimer, des vibrations au dispositif égalisateur de bal last. 14. Installation according to claim, characterized in that it comprises a device for equalizing the spilled ballast, which can be engaged. under the track, having a frame and stages of V-shaped cross members mounted on this frame, means for suspending said frame from a service vehicle and means for adjusting the height of the suspension. 13. Installation according to claim and sub-claim 12, characterized in that means are provided for imparting vibrations to the bal last equalizer device. 14. Installation selon la revendication, ca ractérisée en ce qu'elle comprend des moyens pour imprimer au ballast répandu sous la , voie des vibrations verticales. 15. Installation selon la revendication, ca ractérisée en ce qu'elle comprend des moyens pour imprimer au ballast répandu sous la voie des vibrations horizontales perpendiculaire ment à la direction de l'axe de la voie. 16. Installation selon la revendication, ca ractérisée en ce qu'elle comprend des moyens pour l'acheminement des détritus vers un wa gon attelé au train de service et des moyens, pour l'acheminement des détritus vers un wa gon suivant. 17. Installation according to claim, characterized in that it comprises means for imparting vertical vibrations to the ballast spread under the track. 15. Installation according to claim, characterized in that it comprises means for imparting to the ballast spread under the track horizontal vibrations perpendicular to the direction of the axis of the track. 16. Installation according to claim, ca ractérisée in that it comprises means for the routing of the rubbish to a wa gon hitched to the service train and means for the routing of the rubbish to a following wa gon. 17. Installation selon la revendication et la sous-revendication 16, caractérisée en ce qu'elle comprend, sur un wagon réceptacle, , une ehaine à palettes pour le déversement. des détritus dans ledit wagon. 18. Installation selon la revendication et la sous-revendication 16, caractérisée en ce qu'elle comprend, sur un wagon réceptacle, un tapis sans fin dans l'axe et sur tonte la longueur du wagon, des moyens pour provo quer, en un point déterminé du tapis, la chute dans le réceptacle des détritus transportés et des moyens pour faire varier la position de ce point sur le tapis. 19. Installation according to claim and sub-claim 16, characterized in that it comprises, on a receiving wagon, a pallet chain for the discharge. rubbish in said wagon. 18. Installation according to claim and sub-claim 16, characterized in that it comprises, on a receiving wagon, an endless belt in the axis and over mowing the length of the wagon, means for causing, in a determined point of the carpet, the fall into the receptacle of the transported detritus and means for varying the position of this point on the carpet. 19. Installation selon la revendication et les sous-revendications 16 et. 18, caractérisée en ce qu'elle comprend un chariot à étraves, mobile sur un chemin de roulement parallèle au tapis, engagé sur le parcours des détritus sur ce tapis, et des moyens pour empêcher l'action du chariot sur les détritus. Installation according to claim and sub-claims 16 and. 18, characterized in that it comprises a trolley with bows, movable on a track parallel to the belt, engaged on the path of the rubbish on this carpet, and means for preventing the action of the carriage on the rubbish.
CH291449D 1949-01-12 1950-01-12 Installation for the maintenance of railway tracks. CH291449A (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
FR291449X 1949-01-12
FR240849X 1949-08-24
FR11249X 1949-12-01
FR201249X 1949-12-20

Publications (1)

Publication Number Publication Date
CH291449A true CH291449A (en) 1953-06-30

Family

ID=27444848

Family Applications (1)

Application Number Title Priority Date Filing Date
CH291449D CH291449A (en) 1949-01-12 1950-01-12 Installation for the maintenance of railway tracks.

Country Status (1)

Country Link
CH (1) CH291449A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4958573A (en) * 1987-08-07 1990-09-25 Danieli & C. Officine Meccaniche S.P.A. Rehabilitation machine having its feed and discharge of materials at its leading end in the direction of its advance

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4958573A (en) * 1987-08-07 1990-09-25 Danieli & C. Officine Meccaniche S.P.A. Rehabilitation machine having its feed and discharge of materials at its leading end in the direction of its advance

Similar Documents

Publication Publication Date Title
EP0004985B1 (en) Train for the renewal of a railway track
US4861461A (en) Pipeline padding machine and method
FR2518602A1 (en) ROLLING PLANT AND PROCESS FOR THE PROGRESSIVE CONTINUOUS CLEAN-UP OF THE INFRASTRUCTURE OF A RAILWAY
FR2473575A1 (en) MOBILE INSTALLATION FOR SANITATION OF INFRASTRUCTURE OF RAILWAYS AND METHOD FOR PERFORMING SANITATION USING SUCH FACILITY
EP0143043B1 (en) Slipform paver comprising two conforming plates for the construction of concrete carriage ways
FR2621935A1 (en) MOBILE MACHINE ON RAILWAYS, EQUIPPED WITH A LEVEL SOC FOR DISTRIBUTING AND FORMING THE EMBANKMENT BALLAST
EP0386209A1 (en) Self-propelled machine for the concreting of ditches.
FR2659990A1 (en) BALLAST BED DISTRIBUTION AND LEVELING MACHINE.
US5540003A (en) Padding machine with shaker for separator
FR2480815A1 (en) RAILWAY CONSTRUCTION MACHINE COMPRISING A DEVICE FOR DEBLAYING AND PLACING THE BALLAST LAYER
CH657649A5 (en) Railway site machine for the at least partial repair of a railway track portion
CH291449A (en) Installation for the maintenance of railway tracks.
FR2671567A1 (en) Machine for simultaneously spreading at least one solid material and a binder
FR2504162A1 (en) ROLLING INSTALLATION FOR CARRYING OUT A PROTECTIVE LAYER EXTENDING BETWEEN THE TRACK BEARING AND THE BALLAST PIERRAILLE BED OF A RAILWAY
BE493189A (en)
EP3617409B1 (en) Device and method for mechanical backfilling of trenches
FR2805831A1 (en) RECONFIGURABLE TRAY MOVING APPARATUS FOR CONSTRUCTING PART OF A RECONFIGURABLE ACTIVITY SURFACE
EP0085790B1 (en) Railway track reconditioning train
FR2722809A1 (en) Trench digging, cable laying and backfilling machine
FR2536772A1 (en) Machine for spreading and finishing a non-slip road surfacing.
CH309855A (en) Screen wagon for the continuous purification of railroad ballast.
FR2530594A1 (en) EXCAVATING APPARATUS WITH A ROLLING BRIDGE FOR DEBLAYING A BULK MATERIAL
FR3009724A1 (en) METHOD FOR REPLACING RAILS AND ASSOCIATED RAILWAYS.
FR2741024A1 (en) MOBILE PLATFORM FOR CROSSING DEGREE DEDUCTIONS
US844959A (en) Excavator.