CA3081430A1 - Methods of patel loadflow computation for electrical power system - Google Patents

Methods of patel loadflow computation for electrical power system Download PDF

Info

Publication number
CA3081430A1
CA3081430A1 CA3081430A CA3081430A CA3081430A1 CA 3081430 A1 CA3081430 A1 CA 3081430A1 CA 3081430 A CA3081430 A CA 3081430A CA 3081430 A CA3081430 A CA 3081430A CA 3081430 A1 CA3081430 A1 CA 3081430A1
Authority
CA
Canada
Prior art keywords
delta
node
nodes
power
network
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
CA3081430A
Other languages
French (fr)
Inventor
Sureshchandra B. Patel
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US16/431,952 external-priority patent/US20190296548A1/en
Application filed by Individual filed Critical Individual
Priority to CA3091655A priority Critical patent/CA3091655A1/en
Priority to US17/089,456 priority patent/US11853384B2/en
Publication of CA3081430A1 publication Critical patent/CA3081430A1/en
Abandoned legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/04Circuit arrangements for ac mains or ac distribution networks for connecting networks of the same frequency but supplied from different sources
    • H02J3/06Controlling transfer of power between connected networks; Controlling sharing of load between connected networks
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/26Pc applications
    • G05B2219/2639Energy management, use maximum of cheap power, keep peak load low
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/10The network having a local or delimited stationary reach
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

Propounding statement of Patel Numerical Method (PNM) for solution of simultaneous algebraic equations, both linear and non-linear, is presented. A new class of Loadflow Methods are invented. These invented Loadflow Methods are Patel Loadflow-1 (PL-1), PL-2, Patel Super Decoupled Loadflow -1 (PSDL-YY1), PSDL-YY2, Y-matrix based coefficient matrix Patel Loadflow - 1 (CPL-1), CPL-2, Sparse Z-matrix based Patel Loadflow {SZPL or S[C]-1PL
(SCIPL)}, and Accurately and Reliably convergent Gauss-Seide Loadflow (ARGSL) that can also be developed into Decoupled ARGSL-method. Sparse Z-matrix could be real or complex, and it can be derived from fully inverted coefficient matrix [C] or Jacobiam matrix [J] or their different variants.

Description

May 26, 2020 METHODS OF PATEL LOADFLOW COMPUTATION FOR ELECTRICAL POWER
SYSTEM
FIELD OF THE INVENTION
[0001] The present invention relates to a method of loadflow computation in power flow control and voltage control for an electrical power system.
BACKGROUND OF THE INVENTION
[0002] The present invention relates to power-flow/voltage control in utility/industrial power networks of the types including many power plants/generators interconnected through transmission/distribution lines to other loads and motors. Each of these components of the power network is protected against unhealthy or alternatively faulty, over/under voltage, and/or over loaded damaging operating conditions. Such a protection is automatic and operates without the consent of power network operator, and takes an unhealthy component out of service by disconnecting it from the network. The time domain of operation of the protection is of the order of milliseconds.
[0003] The purpose of a utility/industrial power network is to meet the electricity demands of its various consumers 24-hours a day, 7-days a week while maintaining the quality of electricity supply. The quality of electricity supply means the consumer demands be met at specified voltage and frequency levels without over loaded, under/over voltage operation of any of the power network components. The operation of a power network is different at different times due to changing consumer demands and development of any faulty/contingency situation.
In other words healthy operating power network is constantly subjected to small and large disturbances. These disturbances could be consumer/operator initiated, or initiated by overload and under/over voltage alleviating functions collectively referred to as security control functions and various optimization functions such as economic operation and minimization of losses, or caused by a fault/contingency incident.
[0004] For example, a power network is operating healthy and meeting quality electricity needs of its consumers. A fault occurs on a line or a transformer or a generator which faulty component gets isolated from the rest of the healthy network by virtue of the automatic operation of its protection. Such a disturbance would cause a change in the pattern of power flows in the network, Date Recue/Date Received 2020-05-27 May 26, 2020 which can cause over loading of one or more of the other components and/or over/under voltage at one or more nodes in the rest of the network. This in turn can isolate one or more other components out of service by virtue of the operation of associated protection, which disturbance can trigger chain reaction disintegrating the power network.
[0005] Therefore, the most basic and integral part of all other functions including optimizations in power network operation and control is security control. Security control means controlling power flows so that no component of the network is over loaded and controlling voltages such that there is no over voltage or under voltage at any of the nodes in the network following a disturbance small or large. As is well known, controlling electric power flows include both controlling real power flows which is given in MWs, and controlling reactive power flows which is given in MVARs. Security control functions or alternatively overloads alleviation and over/under voltage alleviation functions can be realized through one or combination of more controls in the network.
These involve control of power flow over tie line connecting other utility network, turbine steam/water/gas input control to control real power generated by each generator, load shedding function curtails load demands of consumers, excitation controls reactive power generated by individual generator which essentially controls generator terminal voltage, transformer taps control connected node voltage, switching in/out in capacitor/reactor banks controls reactive power at the connected node.
[0006] Control of an electrical power system involving power-flow control and voltage control commonly is performed according to a process shown in Fig. [[5]]7, which is a method of forming/defining and solving a loadflow computation model of a power network to affect control of voltages and power flows in a power system comprising the steps of:
Step-10: obtaining on-line/simulated data of open/close status of all switches and circuit breakers in the power network, and reading data of operating limits of components of the power network including maximum power carrying capability limits of transmission lines, transformers, and PV-node, a generator-node where Real-Power-P and Voltage-Magnitude-V are given/assigned/specified/set, maximum and minimum reactive power generation capability limits of generators, and transformers tap position limits, or stated alternatively in a single statement as reading operating limits of components of the power network, Date Recue/Date Received 2020-05-27 May 26, 2020 Step-20: obtaining on-line readings of given/assigned/specified/set Real-Power-P and Reactive-Power-Q at PQ-nodes, Real-Power-P and voltage-magnitude-V at PV-nodes, voltage magnitude and angle at a reference/slack node, and transformer turns ratios, wherein said on-line readings are the controlled variables/parameters, Step-30: performing loadflow computation to calculate, depending on loadflow computation model used, complex voltages or their real and imaginary components or voltage magnitude corrections and voltage angle corrections at nodes of the power network providing for calculation of power flow through different components of the power network, and to calculate reactive power generation and transformer tap-position indications, Step-40: evaluating the results of Loadflow computation of step-30 for any over loaded power network components like transmission lines and transformers, and over/under voltages at different nodes in the power system, Step-50: if the system state is acceptable implying no over loaded transmission lines and transformers and no over/under voltages, the process branches to step-70, and if otherwise, then to step-60, Step-60: correcting one or more controlled variables/parameters set in step-20 or at later set by the previous process cycle step-60 and returns to step-30, Step-70: affecting a change in power flow through components of the power network and voltage magnitudes and angles at the nodes of the power network by actually implementing the finally obtained values of controlled variables/parameters after evaluating step finds a good power system or stated alternatively as the power network without any overloaded components and under/over voltages, which finally obtained controlled variables/parameters however are stored for acting upon fast in case a simulated event actually occurs or stated alternatively as actually implementing the corrected controlled variables/parameters to obtain secure/correct/acceptable operation of power system.
[0007] Overload and under/over voltage alleviation functions produce changes in controlled variables/parameters in step-60 of Fig.7. In other words controlled variables/parameters are assigned or changed to the new values in step-60. This correction in controlled variables/parameters could be even optimized in case of simulation of all possible imaginable disturbances including outage of a line and loss of generation for corrective action stored and Date Recue/Date Received 2020-05-27 May 26, 2020 made readily available for acting upon in case the simulated disturbance actually occurs in the power network. In fact simulation of all possible imaginable disturbances is the modern practice because corrective actions need be taken before the operation of individual protection of the power network components.
[0008] It is obvious that loadflow computation consequently is performed many times in real-time operation and control environment and, therefore, efficient and high-speed loadflow computation is necessary to provide corrective control in the changing power system conditions including an outage or failure of any of the power network components. Moreover, the loadflow computation must be highly reliable to yield converged solution under a wide range of system operating conditions and network parameters. Failure to yield converged loadflow solution creates blind spot as to what exactly could be happening in the network leading to potentially damaging operational and control decisions/actions in capital-intensive power utilities.
[0009] The power system control process shown in Fig. 7 is very general and elaborate. It includes control of power-flows through network components and voltage control at network nodes.
However, the control of voltage magnitude at connected nodes within reactive power generation capabilities of electrical machines including generators, synchronous motors, and capacitor/inductor banks, and within operating ranges of transformer taps is normally integral part of loadflow computation as described in "LTC Transformers and MVAR violations in the Fast Decoupled Load Flow, IEEE Trans., PAS-101, No.9, PP. 3328-3332, September 1982." If under/over voltage still exists in the results of loadflow computation, other control actions, manual or automatic, may be taken in step-60 in the above and in Fig.7. For example, under voltage can be alleviated by shedding some of the load connected.
[0010] The prior art and present invention are described using the following symbols and terms:
Ypq Gpq+ jBpq : (p-q) th element of nodal admittance matrix without shunts Ypp Gpp+ B pp : p-th diagonal element of nodal admittance matrix without shunts yp = gp + jbp : total shunt admittance at any node-p VP = ep + jfp = VpZ0p : complex voltage of any node-p V, = e + jfs = VsZO, : complex slack-node voltage AO, AVp : voltage angle, magnitude corrections Afp, Aep : imaginary, real part of complex voltage corrections Date Recue/Date Received 2020-05-27 May 26, 2020 Sp = Pp + j Qp : net nodal injected power, calculated APp + j AQp : nodal power residue or mismatch RPp + jRQp : modified nodal power residue or mismatch RIp + j IIp : net nodal injected current, calculated ARID + j Allp : nodal injected current residue or mismatch RRIp + jRIIp : modified nodal current residue or mismatch SSHp = PSHp + jQSHp: net nodal injected power, scheduled/specified Cp = 1/T= Cos(top+ j Sint: Unitary rotation/transfoimation : number of PQ-nodes : number of PV-nodes n=m+k+1 : total number of nodes ep : node-q is connected to node-p excluding the case of q=p [ : indicates enclosed variable symbol to be a vector or matrix LRA : Limiting Rotation Angle, -48 for invented models PQ-node: load-node, where, Real-Power-P and Reactive-Power-Q are specified PV-node: generator-node, where, Real-Power-P and Voltage-Magnitude-V are specified Vs Vi VN : Slack-node voltage magnitude, Base value, and Nominal value of voltage magnitude are very closely similar, and therefore, they can be used interchangeably. However, in the following development only Vs will be used. Particularly, in the treatment of loadflow problem with distributed slack-node, there is no specific slack-node and VB or VN can be used.
Loadflow Computation: Each node in a power network is associated with four electrical quantities, which are voltage magnitude, voltage angle, real power, and reactive power.
The loadflow computation involves calculation/deteimination of two unknown electrical quantities for other two given/specified/scheduled/set/known electrical quantities for each node. In other words the loadflow computation involves deteimination of unknown quantities in dependence on the given/specified/scheduled/set/known electrical quantities.
Loadflow Model: a set of equations describing the physical power network and its operation for the purpose of loadflow computation. The term loadflow model' can be alternatively referred to as 'model of the power network for loadflow computation'. The process of writing Mathematical equations that describe Date Recue/Date Received 2020-05-27 May 26, 2020 physical power network and its operation is called Mathematical Modeling. If the equations do not describe/represent the power network and its operation accurately the model is inaccurate, and the iterative loadflow computation method could be slow and unreliable in yielding converged loadflow computation. There could be variety of Loadflow Models depending on organization of set of equations describing the physical power network and its operation, including Decoupled Loadflow Models, Super Decoupled Loadflow Models, Fast Super Decoupled Loadflow (FSDL) Model, and Super Super Decoupled Loadflow (SSDL) Model.
Loadflow Method: sequence of steps used to solve a set of equations describing the physical power network and its operation for the purpose of loadflow computation is called Loadflow Method, which telin can alternatively be referred to as `loadflow computation method' or 'method of loadflow computation'. One word for a set of equations describing the physical power network and its operation is: Model. In other words, sequence of steps used to solve a Loadflow Model is a Loadflow Method. The loadflow method involves definition/founation of a loadflow model and its solution. There could be variety of Loadflow Methods depending on a loadflow model and iterative scheme used to solve the model including Decoupled Loadflow Methods, Super Decoupled Loadflow Methods, Fast Super Decoupled Loadflow (FSDL) Method, and Super Super Decoupled Loadflow (SSDL) Method. All decoupled loadflow methods described in this application use either successive (10, 1V) iteration scheme or simultaneous (1V, 10) iteration scheme, defined in the following.
[0011] Prior art method of loadflow computation of the kind carried out as step-30 in Fig. 7, include a class of methods known as decoupled loadflow. This class of methods consists of decouled loadflow and super decoupled loadflow methods including Super Super Decoupled Loadflow method all foimulated involving Power Mismatch computation and polar coordinates.
Prior-art Loadflow Computation Methods are described in details in the documents of Research Publications and granted patents cited in Infoimation Disclosure Statement (IDS) by this inventor.
Therefore, prior art methods will not be described here.

Date Recue/Date Received 2020-05-27 May 26, 2020 SUMMARY OF THE INVENTION
[0012] It is a primary object of the present invention to improve convergence and efficiency of the prior art Super Super Decoupled Loadflow computation method under wide range of system operating conditions and network parameters for use in power flow control and voltage control in the power system. A further object of the invention is to reduce computer storage/memory or calculating volume requirements.
[0013] The above and other objects are achieved, according to the present inventions, Patel Loadflow (PL-1 & PL-2), Patel Super Decoupled Loadflow (PSDL-YY1 & PSDL-YY2), Y matrix based ¨ Patel Loadflow (CPL-1 & CPL2), Sparse Z or C-1 matrix - Patel Loadflow (SZPL or SCIPL), Accurate and Reliable Guass-Seidel Loadflow (ARGSL) Methods and their many variants, for loadflow calculation for Electrical Power System. In context of voltage control, one of the inventive systems of PSDL-YY2 and others listed in the above methods of loadflow computation is used for Electrical Power system consisting of plurality of electromechanical rotating machines, transformers and electrical loads connected in a network, each machine having a reactive power characteristic and an excitation element which is controllable for adjusting the reactive power generated or absorbed by the machine, and some of the transformers each having a tap changing element, which is controllable for adjusting turns ratio or alternatively terminal voltage of the transformer, said system comprising:
means defining and solving one of the loadflow models of the power network listed in the above for providing an indication of the quantity of reactive power to be supplied by each generator including the reference/slack node generator, and for providing an indication of turns ratio of each tap-changing transformer in dependence on the obtained-online or given/specified/set/known controlled network variables/
parameters, and physical limits of operation of the network components, machine control means connected to the said means defining and solving loadflow model and to the excitation elements of the rotating machines for controlling the operation of the excitation elements of machines to produce or absorb the amount of reactive power indicated by said means defining and solving loadflow model in dependence on the set of obtained-online or given/specified/set controlled network variables/parameters, and physical limits of excitation elements, Date Recue/Date Received 2020-05-27 May 26, 2020 transformer tap position control means connected to the said means defining and solving loadflow model and to the tap changing elements of the controllable transformers for controlling the operation of the tap changing elements to adjust the turns ratios of transformers indicated by the said means defining and solving loadflow model in dependence on the set of obtained-online or given/specified/set controlled network variables/parameters, and operating limits of the tap-changing elements.
[0014] The method and system of voltage control according to the preferred embodiment of the present invention provide voltage control for the nodes connected to PV-node generators and tap changing transformers for a network in which real power assignments have already been fixed.
The said voltage control is realized by controlling reactive power generation and transformer tap positions.
[0015] One of the inventive methods of defining and solving loadflow computation models PL-1, PL-2, PSDL-YY1, PSDL-YY2, CPL-1, CPL-2, SZPL or SCIPL, or ARGSL can be used for voltage control in Electrical power System. For this purpose real and reactive power assignments or settings at PQ-nodes, real power and voltage magnitude assignments or settings at PV-nodes and transformer turns ratios, open/close status of all circuit breaker, the reactive capability characteristic or curve for each machine, maximum and minimum tap positions limits of tap changing transformers, operating limits of all other network components, and the impedance or admittance of all lines are supplied. A decoupled loadflow system of equations 1(28) and (29)1 or 1(30) and (31)1 is solved by an iterative process until convergence. During this solution the quantities which can vary are the real and reactive power at the reference/slack node, the reactive power set points for each PV-node generator, the transformer transformation ratios, and voltages on all PQ-nodes nodes, all being held within the specified ranges. When the iterative process converges to a solution, indications of reactive power generation at PV-nodes and transformer turns-ratios or tap-settings are provided. Based on the known reactive power capability characteristics of each PV-node generator, the determined reactive power values are used to adjust the excitation current to each generator to establish the reactive power set points. The transformer taps are set in accordance with the turns ratio indication provided by the system of loadflow computation.

Date Recue/Date Received 2020-05-27 May 26, 2020
[0016] For voltage control, system of PSDL-YY2 or others and many variants listed in the above Methods of Loadflow computation can be employed either on-line or off-line. In off-line operation, the user can simulate and experiment with various sets of operating conditions and determine reactive power generation and transformer tap settings requirements.
A general-purpose computer can implement the entire system. For on-line operation, the loadflow computation system is provided with data identifying the current real and reactive power assignments and transformer transformation ratios, the present status of all switches and circuit breakers in the network and machine characteristic curves in steps-10 and -20 in Fig. 7, and steps 12, 14, 18, 22, 24, 32, 34, and 38 in Fig. 8 described below. Based on this information, a model of the system based on coefficient matrices of invented loadflow computation systems provide the values for the corresponding node voltages, reactive power set points for each machine and the transformation ratio and tap changer position for each transformer.
[0017] The present inventive system of loadflow computation for Electrical Power System consists of, one of the Patel Super Decoupled Loadflow: YY2-version (PSDL-YY2) or PSDL-B'B', or others listed in the above Methods characterized in that 1) single decoupled coefficient matrix solution requiring only 50% of memory used by prior art methods, 2) the presence of transformed values of known/given/specified/scheduled/set quantities in the diagonal elements of the gain matrices [Yf] and [Ye] of the decoupled loadflow sub-problems, and 3) transformation angles are restricted to maximum of ¨0 to ¨90 (say, -48 ) to be determined experimentally, 4) PV-nodes being active in both RI-f and The sub-problems, PQ-node to PV-node and PV-node to PQ-node switching is simple to implement, and these inventive loadflow computation steps together yield some processing acceleration and consequent efficiency gains, and are each individually inventive, and 5) modified real and imaginary current mismatches at PV-nodes in case of PSDL-YY1, SSDL-YY, HSSDL-YY, ESSDL-YY or their generalized variations PSDL-B'B', SSDL-B'B', HSSDL-B'B', ESSDL-B'B', are determined as RRIp = (Lpfp+epAPp )/[Kp(ep2 +
f2)] and RIIp = (Lep - fpAPp)/[Kp(ep2 + 42)] in order to keep gain matrices [Yf] and [Ye]
symmetrical. If the value of factor Kp=1, the gain matrices [Yf] and [Ye]
becomes unsymmetrical in that elements in the rows corresponding to PV-nodes are defined without transformation or rotation applied, as Yfpq= Yepq= -Bpq. It is possible that Patel Super Decoupled methods can be formulated in polar coordinates by simply replacing correction vectors [Af]
and [Ae] in equations (28) and (29) and subsequently followed equations by correction vectors [AO]
and [AV].

Date Recue/Date Received 2020-05-27 May 26, 2020 However, it will not be easy to have single gain matrix model, because [AV]
for PV-nodes is zero and absent.
BRIEF DESCRIPTION OF DRAWINGS
[0018] Fig. 1 is a flow-chart embodiment of the invented PSDL-YY1 computation method.
[0019] Fig. 2 is a flow-chart embodiment of the invented PSDL-YY2 computation method.
[0020] Fig. 3 is a flow-chart embodiment of the invented Y matrix based Patel Loadflow (CPL-1) computation method using complex algebra.
[0021] Fig. 4 is a flow-chart embodiment of the invented Y matrix based Patel Loadflow (CPL-2) computation method using complex algebra.
[0022] Fig. 5 is a flow-chart embodiment of the invented method of sparse [Z]
or [C]-1 based Patel Loadflow (SZPL) or (SCIPL) computation method using complex algebra.
[0023] Fig. 6 is a flow-chart embodiment of the invented ARGSL computation method.
[0024] Fig. 7 is a flow-chart of the overall controlling method for an electrical power system involving loadflow computation as a step which can be executed using one of the loadflow computation methods embodied in Figs. 1, 2, 3, 4, 5 or 6.
[0025] Fig. 8 is a flow-chart of the simple special case of voltage control system in overall controlling system of Fig.7 for an electrical power system.
[0026] Fig. 9 is a one-line diagram of an exemplary 6-node power network having a reference/slack/swing node, two PV-nodes, and three PQ-nodes.
[0027] Fig. 10a is a parallel computer organization/architecture that can be applied for parallel solution of SZPL or SCIPL and ARGSL methods (US Patent No.: 7788051 of year 2010).
00281 Fig. 10b is a parallel computer organization/architecture with wireless interconnect that can be applied for parallel solution of SZPL or SCIPL and ARGSL methods (US Patent No.:
9891827 of year 2018).
DESCRIPTION OF A PREFERED EMBODYMENT
[0029] A loadflow computation is involved as a step in power flow control and/or voltage control in accordance with Fig. 7 or Fig. 8. A preferred embodiment of the present invention is described with reference to Fig. 8 as directed to achieving voltage control.
[0030] Fig. 9 is a simplified one-line diagram of an exemplary utility power network to which the present invention may be applied. The fundamentals of one-line diagrams are described in section Date Recue/Date Received 2020-05-27 May 26, 2020 6.11 of the text ELEMENTS OF POWER SYSTEM ANALYSIS, fourth edition, by William D.
Stevenson, Jr., McGrow-Hill Company, 1982. In Fig. 9 each thick vertical line is a network node.
The nodes are interconnected in a desired manner by transmission lines and transformers each having its impedance, which appears in the loadflow models. Two transformers in Fig.9 are equipped with tap changers to control their turns ratios in order to control terminal voltage of node-1 and node-2 where large loads are connected.
[0031] Node-6 is a reference/slack-node alternatively referred to as the slack or swing -node, representing the biggest power plant in a power network. Nodes-4 and ¨5 are PV-nodes where generators are connected, and nodes-1, -2, and ¨3 are PQ-nodes where loads are connected. It should be noted that the nodes-4, -5, and ¨6 each represents a power plant that contains many generators in parallel operation. The single generator symbol at each of the nodes-4, -5, and ¨6 is equivalent of all generators in each plant. The power network further includes controllable circuit breakers located at each end of the transmission lines and transformers, and depicted by cross markings in one-line diagram of Fig. 9. The circuit breakers can be operated or in other words opened or closed manually by the power system operator or relevant circuit breakers operate automatically consequent of unhealthy or faulty operating conditions. The operation of one or more circuit breakers modify the configuration of the network. The arrows extending certain nodes represent loads.
[0032] A goal of the present invention is to provide a reliable and computationally efficient loadflow computation that appears as a step in power flow control and/or voltage control systems of Fig. 7 and Fig. 8. However, the preferred embodiment of loadflow computation as a step in control of terminal node voltages of PV-node generators and tap-changing transformers is illustrated in the flow diagram of Fig. 8 in which present invention resides in function steps 42 and 44.
[0033] Short description of other possible embodiment of the present invention is also provided herein. The present invention relates to control of utility/industrial power networks of the types including plurality of power plants/generators and one or more motors/loads, and connected to other external utility. In the utility/industrial systems of this type, it is the usual practice to adjust the real and reactive power produced by each generator and each of the other sources including synchronous condensers and capacitor/inductor banks, in order to optimize the real and reactive Date Recue/Date Received 2020-05-27 May 26, 2020 power generation assignments of the system. Healthy or secure operation of the network can be shifted to optimized operation through corrective control produced by optimization functions without violation of security constraints. This is referred to as security constrained optimization of operation. Such an optimization is described in the United States Patent Number: 5,081,591 dated Jan. 13, 1992: "Optimizing Reactive Power Distribution in an Industrial Power Network", where the present invention can be embodied by replacing the step nos. 56 and 66 each by a step of constant gain matrices [Yf] and [Ye], and replacing steps of "Exercise Newton-Raphson Algorithm" by steps of "Exercise PSDL-YY1 or PSDL-YY2 or CPL-1 or CPL-2 or SZPL or SCIPL or ARGSL Computation" in places of steps 58 and 68. This is just to indicate the possible embodiment of the present invention in optimization functions like in many others including state estimation function. However, invention is being claimed through a simplified embodiment without optimization function as in Fig. 8 in this application. The inventive steps-42 and ¨44 in Fig.8 are different than those corresponding steps-56, and ¨58, which constitute a well known Newton-Raphson loadflow method, and were not inventive even in United States Patent Number:
5,081,591.
[0034] In Fig. 8, function step 12 provides stored impedance values of each network component in the system. This data is modified in a function step 14, which contains stored information about the open or close status of each circuit breaker. For each breaker that is open, the function step 14 assigns very high impedance to the associated line or transformer. The resulting data is than employed in a function step 16 to establish an admittance matrix for the power network. The data provided by function step 12 can be input by the computer operator from calculations based on measured values of impedance of each line and transformer, or on the basis of impedance measurements after the power network has been assembled.
[0035] Each of the transformers Ti and T2 in Fig. 9 is a tap changing transformer having a plurality of tap positions each representing a given transformation ratio. An indication of initially assigned transformation ratio for each transformer is provided by function step 18 in Fig. 8.
[0036] The indications provided by function steps 14, and 22 are supplied to a function step 42 in which constant gain matrices [Yf] and [Ye], or [Y] or sparse [Z] or sparse [C]-1 of any of the invented PSDL-YY1 or PSDL-YY2 or CPL-1 or CPL-2 or SZPL or SCIPL or ARGSL
models are constructed, factorized or inverted and stored. The coefficient matrices [Yf]
and [Ye], or [C] or Date Recue/Date Received 2020-05-27 May 26, 2020 sparse [C]-1 or sparse [Z] are conventional tools employed for solving PSDL-YY1 or PSDL-YY2 or CPL-1 or CPL-2 or SZPL or SCIPL models defined by equations 1(28) and (29)1 or 1(30) and (31)1 or 1(56) or (58)1 or 1(69) or (70)1 of a power system. [C] is the most general representation of all possible matrices involved in the solution of linear and non-linear simultaneous algebraic equations. [C] could be the Jacobian, approximated Jacobian, constant Jacobian, approximated constant decoupled Jacobian in case of Newton-Raphson based approaches. It could be the coefficient matrix, approximated coefficient matrix, constant coefficient matrix, approximated constant decoupled coefficient matrix in case of Patel Numerical Method (PNM) based approaches described as preferred embodiments in this application. [CI' when fully inverted is the full matrix.
However, it can be made sparse by storing and processing only selected elements, and it becomes approximation of fully inverted [CI'.
[0037] Indications of initial reactive power, or Q on each node, based on initial calculations or measurements, are provided by a function step 22 and these indications are used in function step 24, to assign a Q level to each generator and motor. Initially, the Q assigned to each machine can be the same as the indicated Q value for the node to which that machine is connected.
[0038] An indication of measured real power, P, on each node is supplied by function step 32.
Indications of assigned/specified/scheduled/set generating plant loads that are constituted by known program are provided by function step 34, which assigns the real power, P, load for each generating plant on the basis of the total P, which must be generated within the power system. The value of P assigned to each power plant represents an economic optimum, and these values represent fixed constraints on the variations, which can be made by the system according to the present invention. The indications provided by function steps 32 and 34 are supplied to function step 36 which adjusts the P distribution on the various plant nodes accordingly. Function step 38 assigns initial approximate or guess solution to begin iterative method of loadflow computation, and reads data file of operating limits on power network components, such as maximum and minimum reactive power generation capability limits of PV-nodes generators.
[0039] The indications provided by function steps 24, 36, 38 and 42 are supplied to function step 44 where inventive PSDL-YY1 or PSDL-YY2 or CPL-1 or CPL-2 or SZPL or SCIPL or ARGSL
model solution is carried out, the results of which appear in function step 46. The loadflow computation yields voltage magnitudes and voltage angles at PQ-nodes, real and reactive power Date Recue/Date Received 2020-05-27 May 26, 2020 generation by the reference/slack/swing node generator, voltage angles and reactive power generation indications at PV-nodes, and transfoimer turns ratio or tap position indications for tap changing transfaimers. The system stores in step 44 a representation of the reactive capability characteristic of each PV-node generator and these characteristics act as constraints on the reactive power that can be calculated for each PV-node generator for indication in step 46. The indications provided in step 46 actuate machine excitation control and transfoimer tap position control. All the loadflow computation methods using inventive PSDL-YY1 or PSDL-YY2 or CPL-1 or CPL-2 or SZPL or ARGSL computation models can be used to affect efficient and reliable voltage control in power systems as in the process flow diagram of Fig. 8.
[0040] Particularly inventive PSDL-YY1 or PSDL-YY2 or CPL-1 or CPL-2 or SZPL
or ARGSL
models in teims of equations for deteimining elements of vectors [RI'], [II'], [ARP], [MI'1, [I], [AI] and elements of coefficient matrices [Yf] and [Ye], or [C] or [Z] or sparse {[Z] or [CV} are described followed by computation steps of corresponding methods are described.
[0041] The presence of values of known/given/specified/scheduled/set quantities in the diagonal elements of the coefficient matrix [Yf] and [Ye], or [C] or [Z] or sparse {[Z]
or [C]'}, which takes different faun for different methods, is brought about by such foimulation of loadflow equations. The said quantities in the diagonal elements in the coefficient matrices improved convergence and the reliability of obtaining converged loadflow computation.
[0042] The slack-start is to use the same voltage magnitude and angle as those of the reference/slack/swing node as the initial guess solution estimate for initiating the iterative loadflow computation. With the specified/scheduled/set voltage magnitudes, PV-node voltage magnitudes are adjusted to their known values after the first P-0 iteration.
This slack-start saves almost all effort of mismatch calculation in the first P-f iteration. It requires only shunt flows from each node to ground to be calculated at each node, because no flows occurs from one node to another because they are at the same voltage magnitude and angle.
Patel Numerical Method [0043] All inventions of this application are based on newly propounded Patel Numerical Method (PNM), which is applicable to both linear and nonlinear simultaneous algebraic equations first of its kind in about 200 years.
[0044] Propounding Statement of Patel Numerical Method (PNM) Date Recue/Date Received 2020-05-27 May 26, 2020 1. Organize linear or nonlinear equations as mismatch functions equated to zero.
2. In each of the mismatch functions, club any teim with known quantities or value into a diagonal teim with simple algebraic manipulations.
3. Express a vector of the mismatch functions as a product of a coefficient matrix and a vector of unknown variables, which can sometimes be treated as a correction vector of unknown variables.
4. Equate the vector of mismatch functions to the product of the coefficient matrix and the vector of unknown variables or the correction vector of unknown variables to be calcula-ted.
5. Solve such a matrix equation by iterations for the vector of unknown variables or the correction vector of unknown variables using evaluation of the vector of mismatch functions with guess values of unknown variables to begin with, and inverting or factoring the coefficient matrix.
Alternatively the PNM can be propounded as:
1. Let yp = f(xq) be a system of n linear or non-linear simultaneous algebraic equations in n variables, where subscripts p and q are 1, 2, ..., n. It could also be a single equation in single variable. yp are "constant terms" or "known value terms", and xq are "unknowns" or "variables" to be deteimined or calculated or solved for.
2. Subtract from each side the other side as: yp - f(xq) = f(xq) - yp transfaiming functional equations into equations of mismatches.
3. Express usually a right hand side as a product of the coefficient matrix and the vector of unknown variables or the correction vector of unknown variables to be deteimined after clubbing yp teims into diagonal terms with simple algebraic manipulations.
4. Solve such a matrix equation by iterations for the vector of unknown variables or the correction vector of unknown variables using evaluation of usually the left hand side vector of mismatch functions with guess values of unknown variables to begin with, and by inverting or factoring the coefficient matrix.
5. It is also possible to replace the coefficient matrix of right hand side by the Jacobian or its many possible variants by taking first order differentiations with respect to relevant real or complex valued variables of the right hand side, and the resulting numerical method may be referred to as Newton-Raphson-Patel (NRP) numerical method.
Date Recue/Date Received 2020-05-27 May 26, 2020 6. Such a matrix equation involving either coefficient matrix or Jacobian and its many possible variants can also be solved by Gauss or Gauss-Seidel iterations not requiring coefficient matrix factorization or inversion, and the resulting numerical methods may be referred to as Gauss-Patel (GP) and Gauss-Seidel-Patel (GSP) methods respectively.
7. Patel Numerical Method (PNM) is the first known formalized updating attempt to the classical numerical methods, and they can be referred to as Gauss-Patel (GP), Gauss-Seidel-Patel (GSP), and Newton-Raphson-Patel methods, in addition to its being the new numerical method on its own.
[0045] Preliminary investigations suggest that Patel Numerical Method may potentially produce monotonous convergence, and therefore may be amenable to acceleration factors unlike Newton-Raphson method.
[0046] Patel Loadflow ¨ 1 (PL-1) The PL-1 Model comprises eqns. (1) to (9) [R; 1 e [ C 1 [ f 1 (1) I
[f 1 (r+1) [ ci -1[ Ri (r) (2) II
Where, RIp = (epPSHp + fpQSHp)/(ep2 + fp2) = - [(Bpp bp)fp + 1 Bpqfq] + [(Gpp +
gp)e + 1 GPq eq ] (3) cFp P cl>1) Hp ¨ (epQSHp - fpPSHp)/(ep2 + fp2) ¨ -[(Gpp + gp)fn + 1 Gnnfn'] - [(Bpp bp)ep + 1 BPq eq ] (4) r cFp " cl>1) [ l [Bf Ge C = l (5) Gf Be j Bfpq ¨ Bepq ¨ -BIN Bfpp= Bepp= - (Bpp bp) (6) Gfpq ¨ -Gepq ¨ 'Gm Gfpp= -Gepp= - (Gpp gp) (7) [0047] The equations (1) to (7) represents linearized global solution of the nonlinear loadflow equations. Local nonlinearity can be handled by introduction of self-iterations as per equations (8) to (9).

Date Recue/Date Received 2020-05-27 May 26, 2020 [fp(sr-(1)] (r+1) pup/Bfpo (sr)] (r) (8) [ep(sr+1)] (r+1) = [(Ilp/Bepp)(s1)] (I) (9) [0048] Equations (8) to (9) are solved independently for each node, and can be performed simultaneously in parallel for all the nodes. Equations (2) and {(8) and (9)1 are solved in sequence. In other words linear global solution followed by non-linear local (nodal) solution by self-iterations, or non-linear local (nodal) solution by self-iterations followed by linear global solution.
[0049] It should be noted that equations (3) and (4) can be organized for Decoupled-Gauss-Seidel-Patel formulation involving factor Lp defined in the following equation (68).
Factor Lp takes care of diagonal dominance issue and ensures that all the Loadflow Computation Models developed in this application almost always provide converged solution, particularly when diagonal dominance issue arises in the presence of capacitive series branch or an excessive shunt capacitive compensation at a node. This is being achieved for the first time since the development of Loadflow Computation Models began in 1950s, and for first the time in about 200 years of use and application of Gauss-Seidel numerical method in different subject areas.
Patel Loadflow ¨2 (PL-2) [0050] The PL-2 model comprises eqns. {(11) and (12)1 or (14), (5), (15) to (20), and {(21) to (24)1 or 425) to (26)1.
ARI Af (10) [AII 1 [ CI [ Ael rAfi (r+1) [ Cl -1 ARP (I) (11) L. Ae j (AII .
[ f 1 (r+1) if I (I) [ [ Afl (r+1) e [e +
Ae J
(12) [AR1 [ CI [ f 1 (13) AII e Date Recue/Date Received 2020-05-27 May 26, 2020 i fi (r+1) -1 1 [ARP (r) [ i = [ C
., (14) e AII
Where, ARID = (epPSHp + fpQSHp)/(ep2 + fp2) + [(Bpp bp)fp + Icillyqfq] - [(Gpp gp)ep 1 q9rpqed (15) ARID = [ {(Bpp+bp)+Q SHp/(ep2+fp2)} fp+ ilp3pqfq] - [ {(Gpp+gp)-PSHp/(ep2+fp2)} ep+ V, meg] (15) ARID = (epAPp + fpAQp) / (ep2+ fp2) (15) ARID ,,--f RepPSHp + fpQSHp)/(ep2 + 42)] - [(epPSHp + fpQSHp)/(es2 + fs2)]
(15) Allp = (epQSHp - fpPSHp)/(ep2 + fp2) + [(Gpp + gp)fp + Igypqfq] + [(Bpp bp)ep + 1 qB,req] (16) Allp = [ {(Gpp+gp)-PSHp/(ep2+fp2)} fp+ wpc,fd + [ {(Bpp+bp)+Q SHp/(ep2+fp2)}
ep+ Ilbeq] (16) Allp = (epAQp - fpAPp) / (ep2+ fp2) (16) Allp ,,--f RepQSHp - fpPSHp)/(ep2 + 42)] - [(epQSHp - fpPSHp)/(es2 + fs2)]
(16) Bfpq = Bepq = - Bpq (17) Gfpq ¨ -Gepq ¨ - Gpq (18) Bfpp = Bepp = - [Bpp bp] - QSHp/(ep2 + fp2) ,c--f -[B bp] - QS}Ipi(es2 fs2) (19) Gfpp= -Gepp= - [Gpp gp] PS}Ipi(ep2 fp2) ':"-- - [Gpp gp] P Slipi(eS2 t2) (20) [0051] Equations (15) and (16) provides alternative expressions of real and imaginary current mismatches where AQp = 0.0 at PV-nodes. An alternative definition of PL-2 model can be provided by defining ARID of (15) and Allp of (16) as the subtraction of the temis containing specified values from the calculated values that would make ARID and Allp defined by eqns. (15) and (16) and elements of [C] defined by eqns. (17) to (20) negative.
[0052] It can be seen that diagonal elements of the coefficient matrix [C] are changing with changing values of (ep2 + fp2), and therefore, requiring time consuming re-factorization of [C] in each iteration. To avoid re-factorization, it is proposed to make [C] constant by using (es2 + fs2), the slack-node voltage values, instead of (ep2 + fp2) in equations (19) and (20) requiring factorization or full inversion of [C] only once in the beginning of the iteration process.
[0053] The equations (10) to (20) represents linearized global solution of the nonlinear loadflow Date Recue/Date Received 2020-05-27 May 26, 2020 equations. Local nonlinearity can be handled by introduction of self-iterations as per equations 421) to (24)1 or 1(25) to (26)1. It is possible to expand in detail all equations involving self iterations as in equations (21), (23), (25), (26), (54), (55), (66), (67) etc.
in the following.
[Afp(sr+1)] (r+1) RARIp/Bfpp) (sr)] (r) (21) [fp(sr+1)] (r+1) = [fp(sr)] (r) [Afp (sr+1)] (r+1) (22) [Aep(sr+1)] (r(1)= [(AIIp/Bepp) (sr)] (r) (23) [ep(sr+1)] (r+1) [ep(sr)] (r) [Aep (sr+1)] (r+1) (24) [0054] Equations 421) to (24)1 or 1(25) to (26)1 are solved independently for each node, and can be performed simultaneously in parallel for all the nodes. Equations 411) and (12)1 or (14), and 421) to (24)1 or 1(25) and (26)1 are solved in sequence. In other words linear global solution followed by non-linear local (nodal) solution by self-iterations, or non-linear local (nodal) solution by self-iterations followed by linear global solution.
[fp(sr+1)] (r+1) RARIp/Bfpp) (sr)] (r) (25) [ep(sr+1)] (r+1) RAIIp/Bepp) (sr)] (r) (26) Patel Super Decoupled Loadflow (PSDL) [0055] In a class of super decoupled loadflow models, each super decoupled loadflow model comprises a system of equations 1(28) and (29)1 or 1(30) and (31)1 differing in the definition of elements of [ART'], [All'], [RI'], [II'], and [Yfl and [Ye]. It is a system of equations for the separate calculation of imaginary part of and real part of complex voltage or its corrections. [C] is the transformed coefficient matrix.
rYf C'l =
(27) 0 Ye [ART'] = [Yfl [Af]
(28) [All'] = [Ye] [Ae]
(29) ([ART'] or [RI']} = [Yfl [fl
(30) 1[AII1 or [II']} = [Ye] [e]
(31) Successive (1f, le) Iteration Scheme Date Recue/Date Received 2020-05-27 May 26, 2020 [0056] In this scheme {(28) and (29)1 or {(30) and (31)1 are solved alternately with inteitnediate updating. Each iteration involves one calculation of HARP] or [MT and {[Af] or [f] } to update [f] and then one calculation of HAM or [II']} and {[Ae] or [e]} to update [e].
The sequence of relations {(32) to (35)1 or {(36) to (37)1 depicts the scheme.
[Af] = [Yf] -1 [AU]
(32) [fl = [fl [Af]
(33) [Ae] = [Ye] -1 [All']
(34) [e] = [e] + [Ae]
(35) [f] = [Yf] -1 {[ARI1 or [RI']}
(36) [e] = [Ye]' {[AII1 or [II']}
(37) [0057] The scheme involves solution of system of equations {(28) and (29)1 or {(30) and (31)1 in an iterative manner depicted in the sequence of relations {(32) to (35)1 or {(36) to (37)1. This scheme requires calculation for each half iteration because HARP] and [All']
or {[RI1 and [II']
is calculated always using the most recent imaginary part of and real part of complex voltage values, and it is block Gauss-Seidel approach. The scheme is block successive, which imparts increased stability to the solution process, and it in turn improves convergence and increases the reliability of obtaining solution.
Patel Super Decoupled Loadflow - 1 (PSDL-YY1) [0058] The PSDL-YY1 model comprises equations{(32) to (35)1or {(36) to (37)1&
(38) to (50).
Where, Yfpq¨ Yepq¨ - Ypq : for branch r/x ratio < 3.0 - (Bpq 0.9(Ypq-Bpq)) : for branch r/x ratio > 3.0 Brtn : for branches connected between two PV-nodes or a PV-node and the slack-node (38) Yfpp= Yepp= bp' + Lp + Yfpq
(39) ep bp' = - (QS}IpCos(top - PS}IpSin(top)/(es2+ fs2) - bpCos(top : at PQ-node
(40) bp' = - Qpo/(es2 + fs2) - bp : at PV-node
(41) (QO- calculated at initial estimate solution) ARID' = Lpfp + ARIpCos(top + AIIpSin(top : for PQ-nodes
(42) Date Recue/Date Received 2020-05-27 May 26, 2020 ARID' = Lpfp + (epAPp' + fpAQp') /(ep2 + fp2) : for PQ-nodes (42) AIIp' = Lep + AIIpCos(top - ARIpSin(top : for PQ-nodes
(43) AIIp' = Lep + (epAQp' - fpAPp')/(ep2+ fp2) : for PQ-nodes (43) APR' = APpCos(top + AQpSin(top : for PQ-nodes
(44) AQp' = AQpCos(top - APpSin(top : for PQ-nodes
(45) ARID = (Lpfp +epAPp ) / [Kp(ep2+ 42)] : for PV-nodes
(46) Allp = (Lep - fpAPp) / [Kp(ep2+ 42)] : for PV-nodes
(47) Costo = I [ Bpp/A/(Gpp2 +Bpp2)] I > COS (00 to -90 ) : to be determined experimentally (48) Sinto = - I [Gpp/A/(Gpp2 +Bpp2)] I > Sin (0 to -90 ) : to be determined experimentally (49) Kp = I ((Lp +Bpp)/ (Lp + I-Yfpq) I
(50) ep Lp in all equations is defined by equation (68) in the following.
Super Super Decoupled Loadflow (SSDL-YY) [0059] Two new versions of SSDL-YY are provided. One is Hybrid SSDL-YY (HSSDL-YY) and the other is Efficient SSDL-YY (ESSDL-YY). The HSSDL model comprises eqns.
(32) to (35), (38a), (38b), (39a), (39b), (40a), (40b), (41a), (41b), {(42) to (45)}, (46a), (47a), and (48) to (50).
The ESSDL-YY model comprises eqns. (32) to (35), (38c), (39a), (39b), (40a), (40b), {(41c) and (41d)} where QSHp replaced by Qpo calculated value at initial estimate at PV-nodes, {(42) and (43)} with approximate versions of {(15) and (16)1 where QSHp replaced by Qp (calculated value) at PV-nodes, and {(48) and (49)1.
Yfpq= t- -YPq : for branch r/x ratio < 3.0 -(Bpq 0.9(Ypq-Bpq)) : for branch r/x ratio > 3.0 -13,-F4 : for branches connected between two PV-nodes or a PV-node and the slack-node (38a) Yepq- [ -Ypq : for branch r/x ratio < 3.0 -(Bpq 0.9(Ypq-Bpq)) : for branch r/x ratio > 3.0 (38b) Yfpq = Yepq= [-Ypq : for branch r/x ratio < 3.0 -(Bpq 0.9(Ypq-Bpq)) : for branch r/x ratio > 3.0 (38c) Yfpp = bfp' + Lp + I-Yfpq (39a) ep Date Recue/Date Received 2020-05-27 May 26, 2020 Yepp = bee' + Lp + I-YePq (39b) ep bfp' = -(QS}IpCos(top - PSHpSin(top)/(es2+ fs2) - bpCos(top : at PQ-node (40a) bee' = +(QS}IpCos(top - PSHpSin(top)/(es2+ fs2) - bpCos(top : at PQ-node (40b) bfp' = 0.0 : at PV-node (41a) bee' = 10.010 (say, it is chosen very large value) : at PV-node (41b) bfp' = -(QS}IpCos(top - PSHpSin(top)/(es2+ fs2) - bpCos(top : at PV-node (41c) bee' = +(QS}IpCos(top - PSHpSin(top)/(es2+ fs2) - bpCos(top :
at PV-node (41d) ARID = APp / (KpVp2) : at PV-node (46a) Allp = 0.0 : at PV-node (47a) [0060] Branch admittance magnitude in (38), (38a), (38b), (38c) is of the same algebraic sign as its susceptance. Rotation angles are to be determined as per (48) and (49), and could be restricted to the maximum anywhere ¨0 to ¨90 degrees to be determined experimentally.
There can be many possible variations of PSDL, HSSDL, and ESSDL models, and the one variation being their generalized versions PSDL-B'B', HSSDL-B'B', and ESSDL-B'B' where B' symbolizes suceptance matrix transformed, B'pq= Bpq+Gpqtan(topq and tan(topq= Gpq/Bpq. Also, the two versions PSDL-YY
and PSDL-B'B', HSSDL-YY and HSSDL-B'B', and ESSDL-YY and ESSDL-B'B' can be mixed in any possible combination. Corresponding transformed diagonal elements Bpp' and transformed mismatches can easily be determined.
Slack-start [0061] Slack-Start is use of the same voltage magnitude and angle as those of the slack-node for all nodes as an initial guess solution. With the specified magnitudes, PV-nodes voltage magnitudes are adjusted to their known values after the first half iteration.
This start procedure referred to as the slack-start, saves almost all effort of mismatch calculation in the first P-f iteration as it requires only shunt flows to be calculated at each node.
[0062] where, Kp is defined in equation (50) which is initially restricted to the minimum value of 0.75 determined experimentally; however its restriction is lowered to the minimum value of 0.6 when its average over all less than 1.0 values at PV nodes is less than 0.6.
[0063] In super decoupled loadflow models [Yf] and [Ye] are real, sparse, symmetrical and built only from network elements. Since they are constant, they need to be factorized once only at the Date Recue/Date Received 2020-05-27 May 26, 2020 start of the solution. Equations 1(28) and (29)1 or 1(30) and (31)1 are to be solved repeatedly by forward and backward substitutions. [Yf] and [Ye] are of the same dimensions (m+k) x (m+k) when only a row/column of the reference/slack-node is excluded and both are triangularized using the same ordering regardless of the node-types.
[0064] Unlike the HSSDL and the prior art SSDL (Super Super Decoupled Loadflow, presented at Toronto International Conference ¨ Science and Technology for Humanity-2009, pages: 652-659) methods, the PSDL methods are single matrix loadflow computations substantially reducing memory requirements, and since all nodes are active in the iterative process implementations of PQ-node to PV-node and PV-node to PQ-node switching is simple. The best possible convergence from non-linearity consideration could be achieved by restricting rotation angle to maximum of -0 to ¨90 degrees (say, -48 degrees) to be deteimined experimentally.
[0065] The steps of loadflow computation method, PSDL-YY1 method are shown in the flowchart of Fig. 1. Computation steps of HSSDL method are similar, therefore, they are not given explicitly. Referring to the flowchart of Fig.1, different steps are elaborated in steps marked with similar letters in the following. Double lettered steps are the characteristic steps of PSDL-YY1 method. The words "Read system data" in Step-a correspond to step-10 and step-20 in Fig. 7, and step-16, step-18, step-24, step-36, step-38 in Fig. 8. All other steps in the following correspond to step-30 in Fig.7, and step-42, step-44, and step-46 in Fig. 8.
a. Read system data and assign an initial approximate solution. If better solution estimate is not available, set voltage magnitude and angle of all nodes equal to those of the slack-node, referred to as the slack-start.
b. Form nodal admittance matrix, and Initialize iteration count ITRF =
ITRE= r = 0 c. Compute Cosine and Sine of nodal rotation angles using equations (48), (49), and store them. If Costo < Cos (0 to -90 degrees, to be determined experimentally), set Costo = Cos (say, 0 to -90 degrees to be determined experimentally) and Sinto = Sin (say, 0 to -90 degrees to be determined experimentally).
dd. Form, factorize, and store (m+k) x (m+k) matrix [Yf] or [Ye] of {(28) and (29)1 or {(30) and (31)1 in a compact storage exploiting sparsity, using equations (38) to (41).
e. Compute residues [AP] at PQ- and PV-nodes and [AQ] at only PQ-nodes. If all are less than the tolerance (6), proceed to step-n. Otherwise follow the next step.

Date Recue/Date Received 2020-05-27 May 26, 2020 ff. Compute the vector of transformed residues [ARP] as in (42) for PQ-nodes, and using (46) and (50) for PV-nodes.
gg. Solve 1(32) for [Af]} or 1(36) for [f]} and update using, [f] = [f] +
[Af].
h. Set voltage magnitudes of PV-nodes equal to the specified values, and Increment the iteration count ITRF=ITRF+1 and r=(ITRF+ITRE)/2.
i. Compute residues [AP] at PQ- and PV-nodes and [AQ] at PQ-nodes only. If all are less than the tolerance (6), proceed to step-n. Otherwise follow the next step.
Compute the vector of transformed residues [All'] as in (43) for PQ-nodes, and using (47) and (50) for PV-nodes.
kk. Solve 1(34) for [Ae]} or 1(37) for [e]} and update using [e] = [e] +
[Ae].
1. Calculate reactive power generation at PV-nodes and tap positions of tap-changing transformers. If the maximum and minimum reactive power generation capability and transformer tap position limits are violated, implement the violated physical limits and adjust the loadflow solution by the method like one described in "LTC
Transformers and MVAR violations in the Fast Decoupled Load Flow, IEEE Trans., PAS-101, No.9, PP.
3328-3332, September 1982".
m. Increment the iteration count ITRE=ITRE+1 and r=(ITRFATRE)/2, & Proceed to step-e.
n. From calculated values of real and imaginary components of nodal voltages, reactive power generation at PV-nodes, and tap position of tap changing transformers, calculate power flows through power network components.
Patel Super Decoupled Loadflow ¨2 (PSDL-YY2) [0066] The Patel Super Decoupled Loadflow-2 (PSDL-YY2) model comprises equations 1(32) to (35)1 or 1(36) to (37)1, 1(3), (4), (51), (52), and (40c) or 1(42), (43) with approximate versions of (15) and (16), and (40)1, (39), and 1(53), (54) and (55)1. In (3), (4), (15), and (16): QSHp is replaced by Qp (calculated) for PV-nodes, and in (40) QSHp is replaced by Qpo (calculated at initial estimate) for PV-nodes.
Where, RI'p = RIp Costo + IIp Sin(top + Lpfp (51) II', = IIp Costo - RIp Sinto + Lep (52) Date Recue/Date Received 2020-05-27 May 26, 2020 Yfpq¨ Yfpq¨ -Ypq [ : for branch r/x ratio < 3.0 -(3pq 0.9(Ypq-Bpq)) : for branch r/x ratio > 3.0 (53) bp' = - bpCos(DP : at PV-nodes (40c) [0067] All equations other than (54) and (55) of the model PSDL-YY2 represents linearized global solution of the nonlinear loadflow equations. Local nonlinearity can be handled by introduction of self-iterations as per equations (54) to (55).
[fp(sr+1)] (r+1) [{(RI' or ARI'p)/Yfpp} (sr)] (r) (54) [ep(sr+1)] (r+1) [{(II'p or Affp)/Yepp} (Sr)]

(r) (55) Equations (54) to (55) are solved independently for each node, and can be perfoitned simultaneously in parallel for all the nodes. Super Decoupled equations {(32) or (36), and (54)1 and {(34) or (37), and (55)1 are solved in sequence. In other words linear global solution followed by non-linear local (nodal) solution by self-iterations.
[0068] It should be noted that in addition to being derived from a new Patel Numerical Method (PNM) first of its kind in about 200 years, the models PSDL-YY1 and PSDL-YY2 with their relevant defining equations {(38), (39), (40), (41)} and [{(53a), (39), (40)}
or {(53b), (39), (40c)}] respectively indicate single decoupled matrix models. The models require factorization and storage of single decoupled matrix for its solution reducing computer storage requirements and factorization time to almost 50%. It is a significant reduction in computational resources (computer time, storage, and electricity) for achieving the same result, in addition to being highly reliable in providing converged solution because of application of factor L.
There is a huge literature on the subject of Loadflow Computation Models and their solution methods developed since 1950s, but a single decoupled matrix model has never been achieved.
[0069] The steps of loadflow computation method, PSDL-YY2 method are shown in the flowchart of Fig. 2. Computation steps of ESSDL method are similar, therefore, they are not given explicitly. Referring to the flowchart of Fig.2, different steps are elaborated in steps marked with similar letters in the following. Triple lettered steps are the characteristic steps of PSDL-YY2 method. The words "Read system data" in Step-a correspond to step-10 and step-20 in Fig. 7, and step-16, step-18, step-24, step-36, step-38 in Fig. 8. All other steps in the following correspond to Date Recue/Date Received 2020-05-27 May 26, 2020 step-30 in Fig.7, and step-42, step-44, and step-46 in Fig. 8.
a. Read system data and assign an initial approximate solution vectors [fO], [e0], and store it.
If better solution estimate is not available, set voltage magnitude to 1.0 pu at load nodes and specified values at PV-nodes, and angle of all nodes equal to that of the slack-node, referred to as the flat-start.
b. Form nodal admittance matrix, and Initialize iteration count ITRF =
ITRE= r = 0 and MXDF=MXDE=0.0 c. Compute Cosine and Sine of nodal rotation angles using equations (48), (49), and store them. If Costo < Cos (0 to -90 degrees , to be determined experimentally), set Costo =
Cos (say, 0 to -90 degrees to be determined experimentally) and Sinto = Sin (say, 0 to -90 degrees to be deteimined experimentally).
ddd. Form, factorize, and store (m+k) x (m+k) size matrix [Yf] or [Ye] of {(28) and (29)1 or {(30) and (31)1 in a compact storage exploiting sparsity, using equations {(53a), (39), (40) and (41)1 or {(53b), (39), and (40c)1 .
eee. Compute the vector of transformed residues [ART'] using (42) {with approximated values of [ART] and [All] from (15) and (16)1 or [RI'] using (51). Use calculated values of Qp in place of QSHp for PV-nodes, and implement Q-limit violations at PV-node generators.
fff. Solve {(32) for [Af]} or {(36) for [f]}, perform Self-Iterations for each node using (54), and update using, [f] = [f] + [Af].
g. Take a difference of vectors {[f ] ¨ [f0]}, find the maximum of the element difference and store it in variable 'MXDF', and perfoim [f0] = [f] and Increment the iteration count ITRF=ITRF+1 and r=(ITRFATRE)/2.
hl. Are MXDF and MXDE both less than specified tolerance? If it is, Proceed to step-n or else follow the next step.
Compute the vector of modified residues [ATP] using (43) {with approximated values [ART] and [All] from (15) and (16)1or [II'] using (52). Use calculated values of Qp in place of QSHp for PV-nodes, and implement Q-limit violations at PV-node generators.
Solve {(34) for [Ae]} for {(37) for [e]1, perfaim Self-Iterations for each node using (55), and update using [e] = [e] + [Ae].
k. Take a difference of vectors {[e] ¨ [e0]}, find the maximum of the element difference and store it in variable 'MXDE', and perfoim [e0] = [e] and Increment the iteration count Date Recue/Date Received 2020-05-27 May 26, 2020 ITRE=ITRE+ 1 and r=(ITRFATRE)/2 .
11. Are MXDF and MXDE both less than specified tolerance? If it is not, Proceed to step-eee or else follow the next step.
n. From calculated values of real and imaginary components of nodal voltages, reactive power generation at PV-nodes, and tap position of tap changing transformers, calculate power flows through power network components.
Coefficient matrix [C] based Patel Loadflow (CPL) [0070] Patel Loadflow model can be organized in coefficient matrix [C] based complex form, because it is not involved with any partial differentiation of original or mismatch functions. The model constitutes eqns. {(57) or (59)1, {(60) to (62)1 or {(63) to (65)1 or {(60a), (61), and (62a)1, {(66) or (67)1, and (68). It involves one solution of {(57) or (59)1 followed by one solution of {(66) or (67)1, or one solution of {(66) or (67)1 followed by one solution of {(57) or (59)1.
However, {(66) or (67)1 constitutes one equation for each node except the Slack-node, and equations for all the nodes can be solved in parallel, just like Gauss numerical method.
[AI] = [C] [AV]
(56) [AV] = [C]-1 [AI]
(57) OR
{[AI] or [I]} = [C] [V]
(58) [V] = [C]-1 {[AI] or [I]}
(59) Where, components of vectors [I] and [AI], and matrix [C] are defined in the following:
Ip = (PSHp - jQSHp)/(ep - jfp) = (SSHp*Np*) = [(Ypp+ yp)Vp + ii typNci]
(60a) AS (SSHp*¨ Sp* )= [(PSHp ¨ j Q SHp) ¨ (Pp ¨ j Qp )] = (AP_ j AQp ) (60) Alp= (SSHp*¨ Sp* )Np* = [(PSHp ¨ j QSHp) ¨ (Pp ¨ jQp )]/Arp*= (APp ¨ j AQp )/Vp* (60) AIp= [ISSIlp*/(ep2 + 42)1 - (Ypp+yp)]Vp ¨ 1 YpqVci (60) cl>P
AIp;---=-= [ISSIlp*/(ep2 +42)1 - {Lp ssiip*i(es2 +f,2)}wp= SSHp*Np*- Lp smip*viivs2 (60) AIp z [ISSIlp*/(ep2 +42)1 - Lp]Vp= SSHp*Np* - LpVp (60) Cpq Ypq (61) Cpp=[(Ypp+yp) ¨ ISSHp*/(ep2 + 42)1] ,=,' [(Ypp+yp) ¨ {Lp ssHp*/(es2 +t2)}]
(62) Date Recue/Date Received 2020-05-27 May 26, 2020 Cpp = [(Ypp+Yp) ¨ Lid (62) CPP = (YPICEYP) (62a) OR
AI= (Sp*- SSIIp*)Np* = [(Pp ¨ j Qp) - (P SHp - j QSHp)]/Vp* = [(-APp ) - j (-AQp )]Np* (63) AIp = [(Ypp+yp) ¨ {SSHp*/(ep2 fp2)}wp ypqvq (63) AI [{Lp SSHp*/(e52 +f52)} {SSHp*/(ep2 fp2)1]¨p v Lp SSHp* Vp/Vs2¨ SSHp*Np*
(63) Alp [Lp - {SSHp*/(ep2 fp2)}]¨p v LpVp ¨ SSHp*Np*
(63) Cpq -Ypq (64) Cpp= [ {Lp SSHp*/(ep2 42)}
(Ypp-Fyp) [{Lp SSHp*/(e52 f52) (ypp+3,)]
(65) CPP = 1LP ¨ (YPICEYP)1 (65) [AVp(sr+1)] (r+1) [(mpicpp) (sr)] (r) (66) [vp(sr+1)] (r+1) [((AIp or I)/C) (sr)] (r) (67) Lp = - co, ..., -1, 0, +1, + co (including fractions) (68) [0071] The equations (62), (65), and (68) provide elegant formulation for diagonal elements of the coefficient matrix [C] that suggest a mechanism for their numerical manipulations particularly useful when diagonal dominance issue arise in the presence of a capacitive series branch or an excessive capacitive compensation at a node. The factor Lp of different value can be applied separately to real and imaginary components of a diagonal element of [C].
Similar developments can be provided for Patel Super Decoupled Loadflow models and other loadflow models.
Equations (66) and (67) and their expanded versions can also be written with factor L.
[0072] It can be seen that diagonal elements of the coefficient matrix [C] are changing with changing values of Vp, and therefore, values of (ep2 fp2) during iteration process requiring time consuming re-factorization of [C] in each iteration. To avoid re-factorization, it is proposed to make [C] constant by using (e52 + f52), the slack-node voltage values, instead of (ep2 fp2) in equations (62) and (65) requiring factorization of [C] only once in the beginning of the iteration process.
[0073] It should be noted that equations (61), (62), (63), and (66), (67), (68) can be organized as Date Recue/Date Received 2020-05-27 May 26, 2020 ARGSL formulations of equations (76), (80) and (82) for solution of individual node equation.
The factor Lp in equations {(39), (42), (43), (46), (47), (50), (51), (52), (60), (62), (63), (65)} and in equations {(76), (80), (82)} provides an experimentation opportunity to study the effect of degree of diagonal dominance on the convergence of Patel Super Decoupled Loadflow (PSDL), CPL, ARGSL iterative methods and similar application of numerical methods for solution of similar problems in different subject areas. It is at this stage the factor Lp can be finalized and used in formation of matrices [Yf] and [Ye] of {(28), (29)} or {(30), (31)}, and matrix [C] of (56) or (58) before inverting and solving by Patel Sparse [C] Inverse Solver (PSIS) of the next section.
Coefficient matrix [C] based Patel Loadflow-1 (CPL-1) [0074] The steps of loadflow calculation by CPL-1 method are shown in the flowchart of Fig. 3.
Referring to the flowchart of Fig.3, different steps are elaborated in steps marked with similar numbers in the following. Double numbered steps are the inventive steps. The words "Read system data" in Step-a correspond to step-10 and step-20 in Fig. 7, and step-16, step-18, step-24, step-36, step-38 in Fig. 8. All other steps in the following correspond to step-30 in Fig.7, and step-42, step-44, and step-46 in Fig. 8.
1. Read system data and assign an initial approximate solution. If better solution estimate is not available, set voltage magnitude and angle of all nodes equal to those of the slack-node, referred to as the slack-start.
2. Form nodal admittance matrix [Y], and Initialize iteration count ITR = 0 33. Form, factorize, and store (m+k) x (m+k) size complex coefficient matrix [C] of {(56) or (58)1 in a compact storage exploiting sparsity, using equations 461) and (62)}
or {(64) and (65)1.
44. Compute complex residues [AS] and [AI] using (60) or (63). However, use calculated value Qp instead of QSHp for PV-nodes, and implement violated Qmax or ()imp limits of PV-node generators, and change the status of violated PV-node to PQ-node.
5. Find residues [AP] at PQ-nodes and PV-nodes and [AQ] at PQ-nodes from complex vector [AS], and if all are less than the tolerance (6), proceed to step-9. Otherwise follow the next step.
66. Solve (57) for [AV] or (59) for [V], perform Self-Iterations for only violated PV-nodes using (66) or (67). Update voltage using, [V] = [V] + [AV]. Adjust real and reactive Date Recue/Date Received 2020-05-27 May 26, 2020 components of PV-node complex voltage for specified voltage magnitude.
7. Increment the iteration count ITR=ITR+1, and Go to step-4 10. From calculated values of complex nodal voltages, output reactive power generation at PV-nodes, tap position of tap changing transformers, and calculate power flows through power network components.
Recently, it has been found out that when Q-limit violations are enforced at PV-node generators, real and reactive power mismatch convergence check may not work to produce converged solution and continue to oscillate to the maximum number of iterations for the solution process to stop. However, it provides converged solution if Q-limit violations not enforced, and PV-nodes are not present such as in some distribution power networks.
Therefore, it is preferred to have two stages of convergence check by both real and reactive components of complex voltage change from iteration to iteration, and also by real and reactive power mismatch after convergence by the first criterion particularly when Q-limit violations need to be enforced as in CPL-2 method of the following.
Coefficient matrix [C] based Patel Loadflow-2 (CPL-2) [0075] The steps of loadflow calculation by CPL-2 method are shown in the flowchart of Fig. 4.
Referring to the flowchart of Fig.4, different steps are elaborated in steps marked with similar numbers in the following. Triple numbered steps are the inventive steps. The words "Read system data" in Step-a correspond to step-10 and step-20 in Fig. 7, and step-16, step-18, step-24, step-36, step-38 in Fig. 8. All other steps in the following correspond to step-30 in Fig.7, and step-42, step-44, and step-46 in Fig. 8.
1. Read system data and assign an initial approximate solution vector [V0], and store it. If better solution estimate is not available, set voltage magnitude to 1.0 pu at load nodes and specified values at PV-nodes, and angle of all nodes equal to that of the slack-node, referred to as the flat-start.
2. Form nodal admittance matrix [Y], and Initialize iteration count ITR = 0 333. Form, factorize, and store (m+k) x (m+k) size complex coefficient matrix [C] of {(56) or (58)1 in a compact storage exploiting sparsity, using equations 461) and (62)}, or {(64) and (65)} or 461) and (62a)}.
444. Compute the vector {[I] using (60a)} or {[AI]} using (60) or (63)1.
However, use calculated value Qp instead of QSHp for PV-nodes, and implement violated Qmax or Qmm Date Recue/Date Received 2020-05-27 May 26, 2020 limits of PV-node generators, and change the status of violated PV-node to PQ-node.
66. Solve {(57) for [AV]} or {(59) for [V]1, perform Self-Iterations only for violated PV-nodes using (66) or (67), update voltage using [V] = [V] + [AV], and adjust real and reactive components of PV-node complex voltage for specified voltage magnitude.
777. Take a difference of vectors {[V] ¨ [V0]}, find the maximum of the real and imaginary components differences, and store them as DEMX and DFMX, perform [VO] = [V], and increment iteration count ITR=ITR+1.
8. Are both DEMX and DFMX less than specified tolerance (EV)? If they are not, Proceed to step-444 or else follow the next step.
9. Compute real power mismatch APp at PQ+PV nodes, compute reactive power mismatch AQp at PQ nodes, and if all (or both DPMX and DQMX) are not less than specified tolerance (EM), go to step 444, otherwise follow the next step.
10. From calculated values of complex nodal voltages, reactive power generation at PV-nodes, and tap position of tap changing transformers, calculate power flows through power network components.
Patel Sparse Inverse Solver (PSIS) and Sparse [C]-1 (pronounced as 'C
inverse', which is sparse [Z]) based Patel Loadflow (SCIPL or SZPL):
[0076] Matrix complex [C] or real [C] is the coefficient matrix based on original equations (functions) or organized as mismatch equations (functions) in the solution of linear or non-linear simultaneous algebraic equations. Inverses complex [C]-1 and real [C]-1 are sometimes correspondingly referred to as complex [Z]-matrix and real [Z]-matrix in this application. The complex [C]-1 and real [C]-1 can also represent admittance matrices respectively complex [Ye and real [Y]-1. Complex ICI' and real [C]-1 are generalized representations, wherein real [C]-1 can be Newton-Raphson approach based Jacobian [J]-1 and its simplified approximations including inverses of decoupled or Super Decoupled matrices.
100771 The complex [C] and real [C] are generally sparse matrices wherein many of its off diagonal elements are zeros. In order to save computation time and computer storage, processing of off-diagonal elements that are zeros can be avoided by sparsity preserving programing techniques. However, fully inverted complex [C]-matrix and real [C]-matrix are full matrices wherein no off-diagonal elements are zeros. Therefore, it is proposed to make complex ICI' -Date Recue/Date Received 2020-05-27 May 26, 2020 matrix and real [C]-1-matrix sparse by selectively choosing off-diagonal elements that need to be stored and processed, and thereby introducing approximations. There are two extremes, one is to store and process only one element in each raw corresponding to the diagonal element introducing maximum approximation and the other is to store and process the diagonal and all the off-diagonal elements in each row introducing zero approximation. And there are many situations in between the two extremes stated in the above to be determined experimentally depending on the nature of the problem for optimal use of computational resources (computer time and computer storage). In electrical circuits (networks), one situation for Complex ICI' and real [C]-1 is to store and process off-diagonal elements only corresponding to directly connected nodes (level-1 connectivity) to a given node, which is the same sparsity of the matrix complex [C] or real [C].
For a given node, other situations are to store off-diagonal elements corresponding to directly connected nodes (level-1), and directly connected nodes to level-1 nodes (level-2 nodes), and directly connected nodes to level-2 nodes (level-3 nodes), and so on. For a given node, the level of outward connectivity is to be determined experimentally to determine number of off-diagonal element required to be stored and processed in the complex [C]-1-matrix and the real [C['-matrix for efficient and reliable computation.
[0078] In equations (69) and (70): vectors [V] and [I] are of complex voltage and complex current element components respectively. Vectors [AV] and [AI] are composed of complex voltage correction and complex current mismatch components respectively. Voltage and current quantities appear in electrical circuits. Equation (69) corresponds to equation (59), Equation (70) corresponds to equation (57), and relevant quantities are defined in equations (60) to (65), and (68), wherein complex [Z] becomes complex [C]-1.
[0079] Equation (69) corresponds to two super decoupled equations (36) and (37), and equation (70) corresponds to two super decoupled equations (32) and (34). Relevant quantities are defined in equations (38) to (50), and (51) to (53). It should be noted that all quantities involved are real and not complex, wherein real [Z] becomes equivalent to two super decoupled real matrices [Yr]-1 and [Ye]-1, which are the same and identical in case of PSDL-YY1 and PSDL-YY2 models.
[0080] Application of Newton-Raphson approach to solution of simultaneous non-linear algebraic equations involves calculation of correction vector in each iteration and requires updating as in equations (33) and (35) in case of decoupled models.

Date Recue/Date Received 2020-05-27 May 26, 2020 All the computation models and their solution methods developed in this application are for electrical power network. However, similar computation models and their solution methods can be developed using techniques developed in this application for all possible areas of study and application that requires solution of linear or non-linear simultaneous algebraic equations.
Computation models and their solution methods could be for a system, a circuit, a machine, an apparatus, a device, a material etc.
[0081] It should be noted that ZPL [[or]]and SZPL or CIPL and SCIPL are embarrassingly parallel problems, and readily amenable to parallel processing. This inventor believes, an approach outlined in the above is likely to work. If it works subject to verification by this inventor, it can produce grand simplifications in the sense that no need for specialized triangulation and back-substitution or factorization software, and no need for storing indexing and addressing information required for processing elements of factorized matrix. It appears the next numerical wonder is brewing. This inventor is humbled listening words Guardians of Galaxy chanting: "Indeed, Mr. Patel, You are the one, chosen".
[0082] Fifteen different variant of invented models constitute: {(69) and (72a)}, and {(73a) or (73b) or ((71a), (71b), and (73c)) or ((71c), (71d), and (73d)) or (73e)} OR
{(69) or (70) and (72b)}, and {(74a) or (74b) or ((71a), (71b), and (74c)) or ((71c), (71d), and (74d)) or (74e)} .
However, {(73a) or (73c) or (73d) or (730 or (74a) or (74c) or (74d) or (7401 constitutes one equation for each node except the Slack-node, and equations for all the nodes can be solved in parallel, just like Gauss numerical method with self-iteration for each-node to handle local non-linearity. The name of self-iteration, formulation of self-iterations in an equation, and its analogy to planet earth spinning on its own axis while making rounds around the Sun Self iterations were introduced by this inventor the first-time in the year 2005 in his patent # US
7788051 and Canadian Patent # 2548096 issued January 5, 2011. This is a grand Gaussification of all the possible classical numerical methods. Equation {(73b) or (73e) or (73g) or (74b) or (74e) or (74g)} constitutes one equation for each node except the slack-node, and equations for all the nodes can be solved in sequence like Gauss-Seidel numerical method with self-iteration for each-node to handle local non-linearity. This is a grand Gauss-Seidelization of all the possible classical numerical methods. Gauss numerical method is Raflembarrassingly parallel. However, the best approach seems to solve nodal equation for each node and nodal equations of its directly Date Recue/Date Received 2020-05-27 May 26, 2020 connected nodes in sequence like Gauss-Seidel numerical method with self-iteration for each-node to handle local non-linearity on separate processor simultaneously in parallel by the technique introduced by this inventor in his patent # US 7788051 and Canadian Patent #
2548096 issued January 5, 2011. The parallelization technique of patent # US 7788051 has produced 10-times speed-up in Ybus formulation of Gauss-Seidel loadflow method involving self-iterations. The same parallelization technique applied to sparse [Z] based models (69) and (70), could potentially produce 20-to-40 times speed-ups and could be of the order of 100 times speed-up in case of large problems. It looks like a revolution (Patelution) in numerical computation.
The real matrix [Z]
or the complex matrix [Z] in equations (69) and (70) can also be created by using building algorithm to create real or complex inverted coefficient matrix [C] or complex inverted admittance matrix [Y] or inverted real Jacobian matrix [J] and [[its]]their different variations.
[V] = [Z] {[AI] or [I]} OR
(69) [AV] = [Z] [Al]
(70) [0083] Wherein, though it is possible to write equations (69) and (70) in complex form or real form in terms of real and imaginary components, of involved variables/parameters relevant to problem being solved, development in the following is given only for complex versions of equations (69) and (70) involving variables/parameter (voltage, current, and admittance) relevant to an electrical circuit or a network where, components of vectors [V], [I], [AV], [Al], and special Symbols are defined in the following:
": means node q is directly connected to node-p q<p : means node-q among directly connected are processed prior to the current node-p q>p : means node-q among directly connected are yet to be processed after the current node-p nq : No. of off-diagonal elements in a row-p of [Z] that correspond to directly connected nodes to a node-p nk : No. of off-diagonal elements in a row-p of [Z] that correspond to not directly connected nodes to a node-p = (n-1) ¨ nq n : No. of total elements in a row-p of [Z] that corresponds to total no.
of nodes or equations p-1 n ZKp = {IZpk +IZpk} /(n-1) (71a) k=1 k=p+1 Date Recue/Date Received 2020-05-27 May 26, 2020 p-1 n p-1 n IKp ={IIk +DO / (n-1) OR AIKp / (n-1) (71b) k=1 k=p+1 k=1 k=p+1 p-1 n ZKp = {IZpk +IZpk} /(nk) (71c) k=1 k=p+1 k#q k#q p-1 n p-1 n IKp ={IIk +DO / (nk) OR AIKp / (nk) (71d) k=1 k=p+1 1=1 k=p+1 k#q k#q k#q k#q Ip = SSHp*Np* = (PSHp - jQSHp ) / (ep - jfp) (72a) Alp = SSHp*Np*- (Ypp Yp)Vp YpqVg (72b) q¨>p Sparse Complex Matrix-Z formulation:
[Vp(sr+11(r+1) = zpp[ {(Ip)(sr)} (I)]
IZpqici( (73a) q¨>p q<p q>p [Vp(sr+11(r+1) = zpp[Ip)(sr)} (r) [IZpq(Ig)(r+1)) +IZpq(Ig)(11 (73b) q¨>p q¨>p [vp(sr+1)] (r+1) zpp [ {(4)(sr)}(r)] (n_i)(zKpoKie :from (71a), (71b) (73c) [V1 i(1 zpp [ {(4)(sr)}(r)] (r)s (1)) +(nk)(ZKp)(IKp)(r) :from (71c), (71d) (73d) q¨>p q<p q>p [vp(sr+1)] (r+1) zpp[ip)(sr)}(r)] [Izpoo(r+1)) Izpq(ion +(nk)(ZKp)(IKp)(r) (73e) q¨>p q¨>p Full Complex Matrix-Z fotmulation:
p-1 [vp(sr+11(r+1) Zpp[SSHp* /{(V*))} (r)] IZpq(SSHq* /(Vq*)(r))+ IZpq(SSHq* /(Vq*)(r)) (730 cr1 q=p+1 [vp(sr+1)] (r+1) Zpp [SRI; /{(Vp*)(sr)} { IZpq(SSHq* /(Vq*)(r+1)) +IZpq(SSHq*
/(Vq*)(r))} (73g) q1q=p+1 Sparse Complex Matrix-Z fotmulation:
Date Re cue/Date Received 2020-05-27 May 26, 2020 [AVp(sr+i)](r+l) = Zpp[{(AIp)(sr)}(r)] + IZpq(Alq)(r)) (74a) q¨>p q<p q>p [AVp(sr+1)](r+1) = Zpp[ {(j 4)(sr)} (r)]+ IZpq(Alq)(1* 1)) +IZpq(Alq)) (74b) q¨>p q¨>p [AVp(sr+1)](r+1) = Zpp[ {(411"11)(sr)} (r)] +(n-1)(ZKI)(IKI,)(r) :from (71a), (71b) (74c) [AVp(sr+1)](r+1) =Zpp [ [ (Alp*)(sr)} (I)] +IZpq(Alq*)(r)HIlk)(ZKI,)(AlKp)(r):
from (71c), (71d) (74d) q¨>p q<p q>p [AVp(sr+1)](r+1) =Z[ {(AI *)(sr)} (r)]+ql_>Zppci q>
Alq*P+1)) +ZppciAlq*P)) +(11k)(ZKO(AlKp)(r) P
(74e) Full Complex Matrix-Z formulation:
p-1 n [Avp(sr+l)](r+1) ¨ zpp[ 441111)00} (1)] Izpq(ALIII*11)(0) IzpodqR*11)(0) (740 q=1 q=p+1 P-1 n [Avp(sr+l)](r+1) ¨ zpp[ 441111)00} (1)] Izpq(ALIII*11)(1+1)) Izpq(AIqR*11)(0) (74g) q=1 q=p+1 I VP(r+1) - VP I < E
(75) [0084] Matrix [Z] can also be made-up of real or complex components, and it is an inverse of coefficient matrix of linear and non-linear equations organized in different possible ways including in super-decoupled form, or an inverse of the Jacobian [J]-1 or its different constant or approximated variations including decoupled or super decoupled versions. It should be noted that equations (72a) and (72b) are the same as (60a) and (60) respectively, and (60s) and (63s) are different variations of (60). Equations (71a) to (74g) are provided for the case matrix [Z] is built with network ground as reference and equation for slack-node current Is and AI
s based on all other calculated nodal I's and AI's and known value of slack-node voltage can be written. However, for slack-node as reference requires deletion of a row and a column corresponding to the slack-node from matrix [Z] built from ground as reference, and simple algebraic manipulation of equations (72a) and (72b). In Newton-Raphson (NR) approach based real matrix [Z] which is inverted Jacobian, or its constant Jacobian and Super Decoupled variations, the dimension of real matrix [Z] with a row and column corresponding to the slack-node removed is the same as the complex matrix [Z] with the slack-node as reference. Therefore, for both NR-approach based inverted Date Recue/Date Received 2020-05-27 May 26, 2020 Jacobian or its variants as real [Z], and real [Z] or complex [Z] built with the slack-node as reference, the definition of "n" becomes "(n-1)" and "nk" becomes nk=(n-2)-nq in the above equations (71a) to (74g).
[0085] The steps of loadflow calculation by ZPL or SZPL method are shown in the flowchart of Fig. 5. It should be noted that Fig.5 and corresponding calculation steps in the following are for complex inverted matrix based, which is Gauss method without immediate updating as in Gaus-Seidel method. Referring to the flowchart of Fig.5, different steps are elaborated in steps marked with similar numbers in the following. Four numbered steps are the inventive steps. The words "Read system data" in Step-a correspond to step-10 and step-20 in Fig. 7, and step-16, step-18, step-24, step-36, step-38 in Fig. 8. All other steps in the following correspond to step-30 in Fig.7, and step-42, step-44, and step-46 in Fig. 8.
1. Read system data and assign an initial approximate solution vector [VO], and store it. If better solution estimate is not available, set voltage magnitude to 1.0 pu at load nodes and specified values at PV-nodes, and angle of all nodes equal to that of the slack-node, referred to as the flat-start.
2. Faun nodal impedance matrix [Y], and Initialize iteration count ITR = 0.
3333. Faun and store (m+k) x (m+k) size constant sparse matrix [Z] of {(69) or (70)}, using an algorithm or by inverting a coefficient matrix [C] or the Jacobian matrix [J]
or its different variants 4444. Compute the vector of {[I] or [AI]} using equations {(72a) or (72b)}.
However, use calculated value Qp instead of QSHp for PV-nodes, implement violated Qmax or Qmm limit of PV-node generators, and change the status of violated PV-node to PQ-node.
5555. Solve {(69) for [AV]} or {(70) for [V]}, using Gauss method as per (73a) or (73c) or (73d) or (730 or (74a) or (74c) or (74d), or (740, or using Gauss-Seidel as per (73b) or (73e) or (73g) or (74b) or (74e) or (74g). Self-iterations need to be perfoitned only at violated PV-nodes. Update voltage using [V] = [V] + [AV], and adjust real and reactive components of PV-node complex voltage for specified voltage magnitude.
777. Take a difference of vectors {[V] ¨ [V0]}, find the maximum of the real and imaginary components differences, and store them as DEMX and DFMX, perfonn [VO] = [V], and increment iteration count ITR=ITR+1.
8. Are both DEMX and DFMX less than specified tolerance (EV)? If they are not, Proceed to Date Recue/Date Received 2020-05-27 May 26, 2020 step-444 or else follow the next step.
9. Compute real power mismatch APp at PQ+PV nodes, compute reactive power mismatch AQp at PQ nodes, and if all (or both DPMX and DQMX) are not less than specified tolerance (EM), go to step 444, otherwise follow the next step.
10. From calculated values of complex nodal voltages, reactive power generation at PV-nodes, and tap position of tap changing transfoimers, calculate power flows through power network components.
Accurate and Reliable GAUSS-SEIDEL LOADFLOW (ARGSL) [0086] The complex conjugate power injected into the node-p of a power network is given by the following equation (76) and its other alternative organizations.
* n *
Pp - j Qp ¨ Vp YpqVg =Vp (Ypp+ Yp)Vp Vp YpqVg (76) q=1 q>p (PSHp - jQSHp)Np* - LpVp= (Ypp+ yp)Vp - LpVp+ YpqVg (76) q >p (SSHp*Np*) - LpVp= (Ypp+ yp - 1-ap)Vp YpqVg (76) q >p Vp = YpqVg [{ SRI; i(ep2 fp2)} (Ypp+ yp)] (76) q>p Vp = [(SSHp*Np* ) - LpVp - YpqVg (Ypp+ yp - Lp) (76) q>p (SSHp*Np*) - KYpp+ yp) 1vp - 2.0* YpqVg = i(Ypp+ Yp) - (ssHp*Np2 )1vp (76) q >p Vp = [(SSHp*Np* ) - 1(Ypp+ yp) 1vp - 2.0* YpqVcd / i(Ypp+ yp) -(ssHp*Np2 )] (76) q >p Vp ¨ [(16Sp*Np* ) Lp vp - YpqVg] / 10(pp+ yp) Lp - (ssHp*Np2 )] (76) q >p Where, Lp = - co, ..., -1, 0, +1.....+ co (including fractions) (77) Pp = Re {Vp YpqVg (78) cr1 Date Recue/Date Received 2020-05-27 May 26, 2020 Qp = - Im{Vp YpqVg (79) q=1 [0087] Where, Re means "real part of' and Im means "imaginary part of'. The equation (76) can also be written for complex power injected into the node-p, instead of complex conjugate power injected into the node-p for the purpose of the following development of ARGS
Loadflow method.
However, detailed generalized propounding statement of the Accurate and Reliable Gauss-Seidel[[-Patel]] numerical method will be provided in the proposed book writing project.
[0088] The Accurate and Reliable Gauss-Seidel (ARGS) is for solving a set of simultaneous linear and nonlinear algebraic equations iteratively. The ARGSL-method calculates complex node voltage for any node-p as given in equation (76).
Iteration Process [0089] Iterations start with the experienced/reasonable/logical guess for the solution. The reference node also referred to as the slack-node voltage being specified, starting voltage guess is made for the remaining (n-1)-nodes in n-node network. Node voltage value is immediately updated with its newly calculated value in the iteration process in which one node voltage is calculated at a time using latest updated other node voltage values. A node voltage value calculation at a time process is iterated over (n-1)-nodes in an n-node network, the reference node voltage being specified not required to be calculated.
[0090] Now, for the iteration-(r+1), the complex voltage calculation at node-p equation (76) and reactive power calculation at node-p equation (79), becomes:
p-1 vp(r+1) vpqvg(r+1) vpq vg r ) [I (PSHp - j Q Slip ) / (ep2 + fp2) r - (Yee+
ye)] (80) cr1 q=p+1 p-1 Vp(r+1)= KSSIlp*/(Vp*)r) - LpVpr - (n(pqVq(r+1) n(pqVcir)) / (Yee+ ye - Le) (80) C1=1 crp+
p-1 Vp(r+1)= KASp"/(Vp")r)-LpVp - r (n(pqVg(r+1)+D(pqVcir)1/1Ypp-Fyp-Lp-SSII *N 21 p s (80) cr1 q=p+1 p-1 VP {(y*(r1) fr 1Pq v v r (r+1) * 1Pq v r r (81) P q P q 14=1 q=P

Date Recue/Date Received 2020-05-27 May 26, 2020 [0091] The well-known limitation of the Gauss-Seidel numerical method to be not able to converge to the high accuracy solution, was resolved by the introduction of the concept of self-iteration of each calculated variable until convergence before proceeding to calculate the next. This is achieved by replacing equation (80) by equation (82) stated in the following where self-iteration-(sr+1) over a node variable itself within the global iteration-(r+1) over (n-1) nodes in the n-node network is depicted. During the self-iteration process only Vp and its real and imaginary components change without affecting any of the terms involving Vq. At the start of the self-iteration Vpsr= Vpr, , and at the convergence of the self-iteration Vp(r+1) vp(sr+1) p-1 (vp(sr+1))(r+1) (µ , Pq V (r+1) vpq .. r V )/[{(PSHp - j Q SHp )/((ep2 +42) sry _ (ypp+yp)) (82) , (1 q=p+1 (vp(sr+1))(r+1)=

1(SSI1p*/(Vp*)sr)r ¨ Lp(Vp)sry _ (1VpqVq(r+1)+IYpqVqr)1/1(Ypp+yp)-(LpSSHp*/Vs2)]
(82) crl q=p+1 (vp(sr+1))(r+1)=

i(ASp*/(Vp*)sr)r)-(Lp(vosTivs2)41ypqvq(r+i)+Iypqvgr))/Kypp yp_ + Lp - SSHp*/Vs2)]
(82) crl q=p+1 Self-convergence [0092] The self-iteration process for a node is carried out until changes in the real and imaginary parts of the node-p voltage calculated in two consecutive self-iterations are less than the specified tolerance. It has been possible to establish a relationship between the tolerance specification for self-convergence and the tolerance specification for global-convergence. It is found sufficient for the self-convergence tolerance specification to be ten times the global-convergence tolerance specification.
Afp(sr+i) fp(sr+i) _ fpsrl < los (83) Aep(sr+1) = ep(sr+1) epsr < 06 (84) [0093] For the global-convergence tolerance specification of 0.000001, it has been found sufficient to have the self-convergence tolerance specification of 0.00001 in order to have the Date Recue/Date Received 2020-05-27 May 26, 2020 maximum real and reactive power mismatches of 0.0001 in the converged solution. However, for small networks under not difficult to solve conditions they respectively could be 0.00001 and 0.0001 or 0.000001 and 0.0001, and for large networks under difficult to solve conditions they sometimes need to be respectively 0.0000001 and 0.000001.
Convergence [0094] There are indications that there is a need for two stages of solution process stopping criteria. The first stopping criterion is to carry out the iteration process until changes in the real and imaginary parts of the set of (n-1)-node voltages calculated in two consecutive iterations are all less than the specified tolerance as given by equations (85) and (86). In the second stopping criteria, iterations are continued until both the maximum real power mismatch (DPMX) at PQ+PV
(Ni) nodes and the maximum reactive power mismatch (DQMX) at PQ (N2) nodes are not less than the specified tolerance as given by equations (85a) and (86a). A typical value of EV=0.000001, and that of 04=0.0001. The lower the value of the specified tolerance for convergence check, the greater the solution accuracy.
Afp(r+i)1 fp(r+i) _ r < EV : subscript P= 1, 2, ..., Ni (number of PQ+PV ¨ nodes) (85) Aeprr+1)1=1 eprr+1) - epr < EV : subscript P= 1, 2, ..., Ni (number of PQ+PV ¨
nodes) (86) App(r+i)1 < Em : subscript P= 1, 2, ..., Ni (number of PQ+PV ¨ nodes) (85a) AQp(r+i)1 < Em : subscript P= 1, 2, ..., N2 (number of PQ ¨ nodes) (86a) Accelerated Convergence [0095] The ARGS-method being inherently slow to converge, it is characterized by the use of an acceleration factor applied to the difference in calculated node voltage between two consecutive iterations to speed-up the iterative solution process. The accelerated value of node-p voltage at iteration-(r+1) is given by, Vp(r+1) (accelerated) = Vpr +13 (Vprr+1) - Vpr) (87) Where, 13 is the real number called acceleration factor, the value of which for the best possible convergence for any given network can be deteitnined by trial solutions. The ARGS-method is very sensitive to the choice of 13, causing very slow convergence and even divergence for the Date Recue/Date Received 2020-05-27 May 26, 2020 wrong choice.
Scheduled or specified voltage at a PV-node [0096] Of the four variables, real power PSHp and voltage magnitude VSHp are scheduled/specified/set at a PV-node. If the reactive power calculated using VSHp at the PV-node is within the upper and lower generation capability limits of a PV-node generator, it is capable of holding the specified voltage at its terminal. Therefore the complex voltage calculated by equation (80) or (82) by using actually calculated reactive power Qp in place of QSHp is adjusted to specified voltage magnitude by equation (88). However, in case of violation of upper or lower generation capability limits of a PV-node generator, a violated limit value is used for QSHp in (80) and (82), meaning a PV-node generator is no longer capable of holding its terminal voltage at its scheduled voltage magnitude VSHp, and the PV-node is switched to a PQ-node type.
vp(r+i) (VSHp Vp(r+1))/1Vp(r+1)1 (88) Calculation steps of Accurate and Reliable Gauss-Seidel Loadflow (ARGSL)method [0097] The steps of loadflow calculation by ARGSL method are shown in the flowchart of Fig. 6.
Referring to the flowchart of Fig.6, different steps are elaborated in steps marked with similar numbers in the following. Steps marked with double numerals are the inventive steps. The words The words "Read system data" in Step-a correspond to step-10 and step-20 in Fig. 7, and step-16, step-18, step-24, step-36, step-38 in Fig. 8. All other steps in the following correspond to step-30 in Fig.7, and step-42, step-44, and step-46 in Fig. 8.
71. Read system data and assign an initial approximate solution. If better solution estimate is not available, set specified voltage magnitude at PV-nodes, 1.0 p.u. voltage magnitude at PQ-nodes, and all the node angles equal to that of the slack-node angle, which is referred to as the flat-start.
72. Form nodal admittance matrix, and Initialize iteration count r= 1 73. Scan all the node of a network, except the slack-node whose voltage having been specified need not be calculated. Initialize node count p=1, and initialize maximum change in real and imaginary parts of node voltage variables DEMX=0.0 and DFMX=0.0 74. Test for the type of a node at a time. For the slack-node go to step-82, for a PQ-node go to the step-99, and for a PV-node follow the next step.
75. Compute Qp(r+1) for use as an imaginary part in determining complex schedule power at a Date Recue/Date Received 2020-05-27 May 26, 2020 PV-node from equation (81) after adjusting its complex voltage for specified value by equation (88) 76. If Qp(r+i) is greater than the upper reactive power generation capability limit of the PV-node generator, set QSHp = the upper limit Qpn' for use in equation (82), and go to step-99. If not, follow the next step.
78. If Qprr+1) is less than the lower reactive power generation capability limit of the PV-node generator, set QSHp = the lower limit Qpnlin for use in equation (82), and go to step-99. If not, follow the next step.
88. Compute V IP" by equation (80) using QSHp = Qprr+1), and adjust for specified voltage at the PV-node by equation (88), and go to step-80.
99. Compute VIP" by equations (82), (83), (84) involving self-iterations.
80. Compute changes in the imaginary and real parts of the node-p voltage by using equations (85) and (86), and replace current value of DFMX and DEMX
respectively in case any of them is larger.
81. Calculate accelerated value of Vprr+1) by using equation (87), and update voltage by Vpr =
Vp(r+1) for immediate use in the next node voltage calculation.
82. Check if the total numbers of nodes - n are scanned. That is if p< n, increment p=p+1, and go to step-74. Otherwise follow the next step.
83. Advance iteration count r=r+1, and if DEMX and DFMX both are not less than the convergence tolerance (EV) specified for the purpose of the accuracy of the solution, go to step-73, otherwise follow the next step.
84. Compute real power mismatch APp at PQ+PV (Ni) nodes, compute reactive power mismatch AQp at PQ (N2) nodes, and if all (or both DPMX and DQMX) are not less than (EM), go to step 73, otherwise follow the next step.
85. From calculated and known values of complex voltage at different power network nodes, and tap position of tap changing transformers, calculate power flows through power network components, reactive power generation at PV-nodes, and real and reactive power generation at the slack node.
Parallel Processing and Parallel Computer Architecture [0098] US Patent no. 7788051 and US Patent no. 9891827 of this inventor and applicant are Date Recue/Date Received 2020-05-27 May 26, 2020 incorporated here by reference as patented prior art. Fig. 10a is reproduced Fig.4 of US 7788051, and Fig. 10b reproduced Fig.2a of US 9891827 for easy reference to patented best possible parallel computer architectures. Fig.2a reproduced as Fig. 10b of US Patent no. 9891827 implements wireless interconnections among components of Parallel Computer, wherein different symbols are defined as follows:
PU : a Processing Unit, which can be a Central Processing Unit (CPU), or a Graphical processing Unit (GPU), or a Field Programmable Gate Array (FPGA), or an Application Specific Processing Unit (ASPU) like Tensor Processing Unit (TPU).
PM : a Private Memory for each PU, which is not accessible by any other component of Parallel Computer.
SMU : Shared Memory Unit, and different SMUs can be accessed by different PUs simultaneously that reduces the contention for memory access by different processors unlike as in case of large single Common Shared Memory Unit (SMU) of Fig. 10a Shared by all processors.
TRA : Transmitter-Receiver-Antenna, wherein antenna is common for both Transmitter and Receiver.
[0099] Equations (73a) or (73b) or (73c) or (73d) or (73e) or (74a) or (74b) or (74c) or (74d) or (74e) are Sparse Inverse matrix based formulations of loadflow calculation problem called SZPL
or SCIPL models. The ARGSL model is inherently solved by sequential steps.
Therefore, sequential steps for the solution of (73b) or (73e) or (73g) or (74b) or (74e) or (74g) are similar to those of ARGSL model and corresponding Fig. 6, and they are not given explicitly.
[0100] However, {(73b) or (73e) or (73g) or (74b) or (74e) or (74g)} or {(76) or (80) or (82)1 can be solved in parallel by the technique of US patent no. 7788051 as per its flow-chart of Fig.3b using its the best possible parallel computer architecture of Fig. 4 (reproduced as Fig. 10a in this application). The parallel solution technique of US Patent no. 7788051 involves decomposition of a whole n-node problem into n-sub-problems each being comprised of a node and its directly connected nodes, and solving each sub-problem on different processor wherein all different processors are coordinated by a main or server processor. The solution of each sub-problem (each sub-network: a node and its directly connected nodes) on different processors is then coordinated (mapped) into network wide a whole n-node problem solution.
[0101] Similarly, (73a) or (73c) or (73d) or (730 or (74a) or (74c) or (74d) or (740 for different Date Recue/Date Received 2020-05-27 May 26, 2020 nodes can be solved on a single computer in sequence without immediate updating of nodal solution or said equations for different nodes can be solved simultaneously in parallel on different processors. Steps involving vectors {[I] or [AI]}, {[V] or [AV]}, and [VO] in Fig. 5, wherein each component of vector is computed in parallel on different processors, and the rest of the steps are performed in sequence on Server Processor (delegating and coordinating processor of Fig. 10a in similar corresponding steps of parallel computation in Fig.3b of US patent no. 7788051.
Patel Loadflow (PL)Model [[0102] Equations (3) and (4) can be organized in matrix form as per Patel Numerical Method:
IR1 = i_B f II j -B [ e (89) Patel Transformation Decoupled Loadflow Model [IR] = [-Y] [f]
(90) [II = [-Y] [e]
(91) where, IRp' = (epPSHp' + fpQSHp')/(ep2 + fp2) (92) II' = (epQSHp' - fpPSHp')/(ep2 + fp2) (93) [0103] This is the model where elements of equations (90) and (91) are defined by following equations.
[-Y] = [-B] + [G] [-B]-1 [G]
(94) [1R1 = [IR] - [G] [-B]-1[II]
(95) [II'] = [II] + [G] [-B]-1[RI]
(96) Regular loadflow models can also be obtained by differentiating on both sides of equations (89), (90) and (91).
Generalized Gauss-Seidel-Patel Numerical method for Solution of System of Simultaneous Algebraic Equations both linear and nonlinear:
[0104] A linear system of equations Ax=b can be written for any equation-p as equations (98) and (97). They can also be written in alternative forms like equation (76) including factor Lp of (77).
(r+1) XP ¨ apqXq(1+1) apqXqr) / [ bp/(Xp)r - app]
(97) q=1 q=p+1 Date Recue/Date Received 2020-05-27 May 26, 2020 p-1 n (Xp(sr+1))(r+1) = (1 apqXcP+1) - 1 ax r) / [Ibp/ ((xp) sr)r} - app]
(98) q1crp-Nq q [0105] A nonlinear system of equations f(x)=y can be written for any equation-p as equations (82), which is specifically a nonlinear power flow equation of a power network involving complex variables and constant parameters.
[0106] Equations (98) and (82) are defining equations of Generalized Gauss-Seidel-Patel numerical method involving self-iterations. It should be noted that self-iterations within global iterations are analogous to the earth rotating on its own axis while making rounds around the Sun.
This generalized approach for solution of both linear and nonlinear system of simultaneous algebraic equations could potentially be amenable to acceleration factors greater than 2 unlike original Gauss-Seidel numerical method subject to experimental numerical verification. Further verbal elaborations about the Generalized Gauss-Seidel-Patel numerical method will be provided as part of the proposed book writing project.
General Statements [0107] The system stores a representation of the reactive capability characteristic of each machine and these characteristics act as constraints on the reactive power, which can be calculated for each machine.
[0108] While the description above refers to particular embodiments of the present invention, it will be understood that many modifications may be made without departing from the spirit thereof. The accompanying claims are intended to cover such modifications as would fall within the true scope and spirit of the present invention.
[0109] The presently disclosed embodiments are therefore to be considered in all respect as illustrative and not restrictive, the scope of the invention being indicated by the appended claims in addition to the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein.

Date Recue/Date Received 2020-05-27

Claims (5)

What is claimed is:
1. A Method of forming and solving a Loadflow computation model of a power network to affect control of voltages and power flows in a power system, comprising the steps of:
obtaining on-line or simulated data of open or close status of all switches and circuit breakers in the power network, and reading data of operating limits of components of the power network including maximum Voltage x Ampere (VA or MVA) carrying capability limits of transmission lines, transformers, and PV-node, a generator-node where Real-Power-P and Voltage-Magnitude-V are specified, maximum and minimum reactive power generation capability limits of generators, and transformers tap position limits, obtaining on-line readings of specified Real-Power-P and Reactive-Power-Q at PQ-nodes, Real-Power-P and voltage-magnitude-V at PV-nodes, voltage magnitude and angle at a slack node, and transformer turns ratios, wherein said on-line readings are the controlled variables, initiating loadflow calculation with initial approximate/guess solution of the same voltage magnitude and angle as those of the reference/slack node for all the other nodes referred to as the slack-start, Defining Patel Super Decoupled Loadflow - YY2 (PSDL-YY2) computation model of the Power Network by equations {(32) to (35)} or {(36) and (37)}, [.DELTA.f] = [Yf] -1 [.DELTA.RI'] (32) [f] = [f] + [.DELTA.f]
(33) [.DELTA.e] = [Ye] -1 [.DELTA.II'] (34) [e] = [e] + [.DELTA.e] (35) [f] = [Yf] -1 {[.DELTA.RI'] or [RI'] (36) [e] = [Ye] -1 {[.DELTA.II'] or [II'] (37) forming and storing factorized or fully inverted decoupled coefficient matrix [Yf] or [Ye]
of PSDL-YY2 computation model of the power network, wherein, elements of [Yf]
or [Ye] are defined by {(53[[a]]), (39), and (40)1 or {(53[[b]]), (39) and (40c)}
given in the following:
Yf pp = Ye pp = b p' + L p + ~Yf pq (39) b p' = - (QSH p Cos.PHI.p - PSH p Sin.PHI.p)/(e s2+ f s2) [[+]]- b p Cos.PHI.p (40) b p' = - b p Cos.PHI.p (40c) L p = - .infin., ..., -1, 0, +1, ..., + .infin. (including fractions) (68) wherein, G pq and B pq are the real and imaginary parts of the nodal admittance matrix element Y pq without network shunts, Y pq is admittance magnitude with the same algebraic sign of B pq, b p is network shunt susceptance at node-p, e s and f s are real and imaginary parts of slack-node voltage, Q p0 is reactive power at node p - Q p -calculated at initial estimate solution is used for QSH p, for PV-nodes, and .PHI.p is rotation or transformation angle that normally takes value of -48 degrees, though it can take any value from -0 to -90 degrees to be determined experimentally, calculating elements of vectors {[.DELTA.RI'] and [.DELTA.II'] by (42), (43), (15), (16)} or {[RI'] and [II'] by (51), (52), (3), (4)} using {(48), (49)} of PSDL-YY2 computation model of the power network as in the following:
.DELTA.RI p' = L p f p + .DELTA.RI p Cos.PHI.p + .DELTA.II p Sin.PHI.p : for PQ-nodes (42) .DELTA.II p' = L p e p + .DELTA.II p Cos.PHI.p - .DELTA.RI p Sin.PHI.p : for PQ-nodes .. (43) .DELTA.RI p ~ [(e p PSH p + f p QSH p)/(e s2 + f s2)] - [(e p PSH p + f p QSH
p)/( ep2 + f p2)] (15) .DELTA.II p ~ [(e p QSH p - f p PSH p)/(e s2 + f s2)] - [(e p QSH p - f p PSH
p)/(e p2 + f p2)] (16) RI'p = L p f p+ RI p Cos.PHI.p + II p Sin.PHI.p (51) II'p = L p e p+ I Ip Cos.PHI.p - RI p Sin.PHI.p (52) RI p = (e p PSH p + f p QSH p)/(e p2 + f p2) = -[(B pp + b p)f p + ~pq f q] +
[(G pp + g p)e p + .SIGMA.~q e q] (3) II p = (e p QSH p - f p PSH p)/(e p2 + f p2) = (4) Cos.PHI.p = ¦[ B pp/.sqroot.(G pp2 +B pp2)]¦ >= Cos (0° to -90°) : to be determined experimentally (48) Sin.PHI.p = -¦[G pp/.sqroot.(G pp2 +B pp2)]¦ >= Sin (0° to -90°) : to be determined experimentally (49) wherein, G pq and B pq are the real and imaginary parts of off-diagonal element Y pq , and G pp and B pp are the real and imaginary parts of the diagonal element Y
pp of the admittance matrix [Y] without network shunts, g p and b p are network shunt conductance and susceptance at node-p, e p and e s; and f p and f s are respectively real and imaginary parts of any node-p and the slack-node voltage, PSH p, and QSH p are given/specified/scheduled/set real and reactive power respectively, and QSH p in equations (3), (4), (15) and (16) is to be taken calculated value of reactive power Q p for PV-nodes, performing loadflow calculation by solving loadflow computation model of the power network defined by set of equations {(32) to (35)} or {(36) and (37)}
employing successive (1f, 1e) iteration scheme, wherein each iteration involves one calculation of {[.DELTA.RI'] or [RI'] } and [.DELTA.f] to update [f] and then one calculation of {[.DELTA.II'] or [II']} and [.DELTA.e] to update [e] to calculate values of the e p and f p at PQ-nodes and PV-nodes, reactive power generation at PV-nodes, and turns ratio of tap-changing transformers in dependence on the set of said obtained-online readings, or given/scheduled/specified/set values of controlled variables/parameters and physical limits of operation of the power network components, evaluating loadflow computation for any over loaded components of the power network and for under or over voltage at any of the nodes of the power network, correcting one or more controlled variables and repeating the performing loadflow computation, evaluating, and correcting steps until evaluating step finds no over loaded components and no under or over voltages in the power network, and affecting a change in power flow through components of the power network and voltage magnitudes and angles at the nodes of the power network by actually implementing the finally obtained values of controlled variables after evaluating step finds a good power system or stated alternatively the power network without any overloaded components and under or over voltages, which finally obtained controlled variables however are stored for acting upon fast in case a simulated event actually occurs.
2. A method as defined in claim 4, wherein steps of: forming and storing factorized or fully inverted decoupled coefficient matrix [Yf] or [Ye] ..., and calculating elements of vectors {[.DELTA.RI'] and [.DELTA.II'] by ..., as detailed in the following defines Patel Super Decoupled Loadflow - YY1 (PSDL-YY1) computation model of the Power Network by equations {(32) to (35)} or {(36) and (37)}, forming and storing factorized or fully inverted decoupled coefficient matrix [Yf] or [Ye]
of PSDL-YY1 computation model of the power network, wherein, elements of [Yf]
or [Ye] are defined by {(38), (39), (40), (41), and (68)} given in the following:
Yf pp= Ye pp= b p' + L p + ~Yf pq (39) b p' = - (QSH p Cos.PHI.p - PSH p Sin.PHI.p)/(e s2+ f s2) - b p Cos.PHI.p : at PQ-node (40) b p' = - Q p0/(e s2+ f s2) - b p : at PV-node (41) (Q p0 - calculated at initial estimate solution) L p = - .infin., ..., -1, 0, +1, ..., + .infin. (including fractions) (68) calculating elements of vectors {[.DELTA.RI'] and [.DELTA.II'] by {(42) to (50)} and {(15), (16), and (68)} of PSDL-YY1 computation model of the power network as in the following:
.DELTA.RI p' = L p f p + .DELTA.RI p Cos.PHI.p + .DELTA.II p Sin.PHI.p : for PQ-nodes (42) .DELTA.RI p' = L p f p + (e p.DELTA.P p' + f p.DELTA.Q p') /(e p2 + f p2) : for PQ-nodes (42) .DELTA.II p' = L p e p + .DELTA.II p Cos.PHI.p - .DELTA.RI p Sin.PHI.p : for PQ-nodes (43) .DELTA.II p' = L p e p + (e p.DELTA.Q ' - f p .DELTA.P p')/(e p2+ f p2) : for PQ-nodes (43) .DELTA.P p' = .DELTA.P p Cos.PHI.p + .DELTA.Q p Sin.PHI.p : for PQ-nodes (44) .DELTA.Q p' = .DELTA.Q p Cos.PHI.p - .DELTA.P p Sin.PHI.p : for PQ-nodes (45) .DELTA.RI p = (L p f p +e p.DELTA.P p) / [K p(e p2+ f p2)]
: for PV-nodes (46) .DELTA.II p = (L p e p - f p.DELTA.P p) / [K p(e p2+ f p2)]
: for PV-nodes (47) Cos.PHI.p = | [ B pp/.sqroot.(G pp2 +B pp2)] | >= Cos (0° to -90°) : to be determined experimentally (48) Sin.PHI.p = - ¦[G pp/.sqroot.(G pp2 +B pp2)]¦ >= Sin (0° to -90°) : to be determined experimentally (49) K p = (50) .DELTA.RI p = (15) .DELTA.RI p = (15) .DELTA.RI p = (e p.DELTA.P p + f p.DELTA.Q p) / (e p2 + f p2) (15) .DELTA.ll p = (16) .DELTA.ll p = (16) .DELTA.ll p = (e p.DELTA.Q p - f p.DELTA.P p) / (e p2 + f p2) (16) wherein, .DELTA.P p , .DELTA.Q p are real and reactive power mismatch at any node-p, and mismatch is the difference between specified and calculated values.
3. A Method of forming and solving a Loadflow computation model of a power network to affect control of voltages and power flows in a power system, comprising the steps of:
obtaining on-line or simulated data of open or close status of all switches and circuit breakers in the power network, and reading data of operating limits of components of the power network including maximum Voltage x Ampere (VA or MVA) carrying capability limits of transmission lines, transformers, and PV-node, a generator-node where Real-Power-P and Voltage-Magnitude-V are specified, maximum and minimum reactive power generation capability limits of generators, and transformers tap position limits, obtaining on-line readings of specified Real-Power-P and Reactive-Power-Q at PQ-nodes, Real-Power-P and voltage-magnitude-V at PV-nodes, voltage magnitude and angle at a slack node, and transformer turns ratios, wherein said on-line readings are the controlled variables, the said loadflow computation model of the power network is formed as a sparse inverse of complex coefficient matrix [C] as [C]-1, which is referred to as a sparse complex matrix [Z], based Patel Loadflow - (SCIPL or SZPL) characterized by and comprises equations {(69) to (75)} listed in the following:
[V] = [Z] {[.DELTA.I] or [I]} OR
(69) [AV] = [Z] [.DELTA.I]

(70) wherein, components of complex voltage, complex current, complex voltage correction, complex current mismatch vectors [V], [I], [.DELTA.V], [.DELTA.I], and special Symbols are defined in the following:
means node q is directly connected to node-p q<p : means node-q among directly connected are processed prior to the current node-p q>p : means node-q among directly connected are yet to be processed after the current node-p nq : No. of off-diagonal elements in a row-p of [Z] that correspond to directly connected nodes to a node-p nk : No. of off-diagonal elements in a row-p of [Z] that correspond to not directly connected nodes to a node-p = (n-1) ¨ nq n : No. of total elements in a row-p of [Z] that corresponds to total no.
of nodes or equations or I p= SSH p*/V p*=(PSH p-jQSH p)/(e p-jf p) (72a) .DELTA.I p= SSH p*/V p*-(Y pp+ yp)V p-~ Y pq V q (72b) Sparse Complex Matrix-Z formulation:
[V p (sr+1)](r+1)= Z pp{(I p) (sr)}(r)] + (n-1) (ZK p)(IK p)(r) : from (71a),(71b) (73c) wherein, superscript "r" is the iteration count, and superscript "sr" is the self-iteration count, using a parallel computer comprising a main or a sever processor coordinating multiple processing units (PUs) each having a private memory, and a shared memory accessible by all PUs, decomposing a whole n-node problem into n-sub-problems each being comprised of a node and its directly connected nodes, and solving each sub-problem on a different PU wherein the solution of each sub-problem on different PU is then mapped into the power network wide whole n-node problem solution, performing loadflow computation by forming and solving a loadflow computation model SZPL or SCIPL of the power network to calculate, complex voltages or their real and imaginary components or voltage magnitude and voltage angle at nodes of the power network providing for calculation of power flow through different components of the power network, and to calculate reactive power generations at PV-nodes and slack node, real power generation at the slack node and transformer tap-position indications of tap-changing transformers in dependence of the said obtained on-line readings of given or specified values of the controlled variables or parameters and physical limits of operation of the power network components, evaluating loadflow computation for any over loaded components of the power network and for under or over voltage at any of the nodes of the power network, correcting one or more controlled variables and repeating the performing loadflow computation, evaluating, and correcting steps until evaluating step finds no over loaded components and no under or over voltages in the power network, and affecting a change in power flow through components of the power network and voltage magnitudes and angles at the nodes of the power network by actually implementing the finally obtained values of controlled variables after evaluating step finds a good power system or stated alternatively the power network without any overloaded components and under or over voltages, which finally obtained controlled variables however are stored for acting upon fast in case a simulated event actually occurs.
4. The method as defined in claim 3, wherein, the complex matrix [Z] can also be a real matrix [Z], which are inverses of coefficient matrix of linear and non-linear equations organized in different possible ways including in super-decoupled form, relating all possible physical variables and parameters depending on problem being solved, and in particular a real matrix [Z] can be an inverse of the Jacobian [J]-1 or its different constant or approximated variations including super decoupled versions.
5. A method of forming and solving a model of a system, a network, an equipment, an apparatus, a device or a material to affect control of controlled variables/parameters in the system, the network, the equipment, the apparatus, the device or the material, comprising the steps of:
obtaining on-line or simulated data of physical status of all components of the system, the network, the equipment, the apparatus, the device or the material and their maximum and minimum operating and physical capability limits, obtaining on-line readings of specified/known/given/set variables/parameters, wherein said on-line readings are the controlled variables/parameters, performing computation by forming and solving a computation model of the system, the network, the equipment, the apparatus, the device or the material to calculate the unknown variables/parameters, in dependence on the said obtained on-line readings of specified/known/given/set values of the controlled variables/parameters and operational and physical limits of the components of the system, the network, the equipment, the apparatus, the device or the material, the said computation model of the system, the network, the equipment, the apparatus, the device or the material is referred to as Patel Computation Model (PCM) characterized by and derived from the following steps:
organizing linear or nonlinear equations as mismatch functions equated to zero, in each of the mismatch functions, club any term with known quantities or value into a diagonal term with simple algebraic manipulations, expressing a vector of the mismatch functions as a product of a coefficient matrix and a vector of unknown variables, which can sometimes be treated as a correction vector of unknown variables, equating the vector of mismatch functions to the product of the coefficient matrix and the vector of unknown variables or the correction vector of unknown variables to be calculated, solving such a matrix equation by iterations for the vector of unknown variables or the correction vector of unknown variables using evaluation of the vector of mismatch functions with guess values of unknown variables to begin with, and inverting or factoring the coefficient matrix, solving the said computation model of the system, the network, the equipment, the apparatus, the device or the material referred to as Patel Computation Model (PCM) using a parallel computer comprising a main or a sever processor coordinating multiple processing units (PUs) each having a private memory, and a shared memory accessible by all PUs, decomposing a whole n-node problem into n-sub-problems each being comprised of a node and its directly connected nodes, and solving each sub-problem on a different PU wherein the solution of each sub-problem on different PU is then mapped into the system, the network, the equipment, the apparatus, the device or the material wide whole n-node problem solution, evaluating solution of Patel Computation Model for any violation of operational and physical limits of the components of the system, the network, the equipment, the apparatus, the device or the material, correcting one or more controlled variables and repeating the performing computation, evaluating, and correcting steps until evaluating step finds no violation of operating and physical limits of the components of the system, the network, the equipment, the apparatus, the device or the material, affecting a change in controlled variables/parameters of the components of the system, the network, the equipment, the apparatus, the device or the material by actually implementing the finally obtained values of controlled variables/parameters after evaluating step finds a good or stated alternatively no violations of the operational and physical limits of the components of the system, the network, the equipment, the apparatus, the device or the material.
CA3081430A 2014-09-22 2020-05-27 Methods of patel loadflow computation for electrical power system Abandoned CA3081430A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CA3091655A CA3091655A1 (en) 2019-06-05 2020-08-31 Methods of patel loadflow computation for electrical power system
US17/089,456 US11853384B2 (en) 2014-09-22 2020-11-04 Methods of patel loadflow computation for electrical power system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US16/431,952 US20190296548A1 (en) 2014-09-22 2019-06-05 Methods of Patel Loadflow Computation for Electrical Power System
US16431952 2019-06-05

Publications (1)

Publication Number Publication Date
CA3081430A1 true CA3081430A1 (en) 2020-12-05

Family

ID=73649898

Family Applications (2)

Application Number Title Priority Date Filing Date
CA3081430A Abandoned CA3081430A1 (en) 2014-09-22 2020-05-27 Methods of patel loadflow computation for electrical power system
CA3091655A Abandoned CA3091655A1 (en) 2019-06-05 2020-08-31 Methods of patel loadflow computation for electrical power system

Family Applications After (1)

Application Number Title Priority Date Filing Date
CA3091655A Abandoned CA3091655A1 (en) 2019-06-05 2020-08-31 Methods of patel loadflow computation for electrical power system

Country Status (1)

Country Link
CA (2) CA3081430A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113690893A (en) * 2021-08-26 2021-11-23 广东电网有限责任公司广州供电局 Load flow calculation method and system of microgrid with voltage regulator
CN114865617A (en) * 2022-04-12 2022-08-05 中国电建集团华东勘测设计研究院有限公司 Distributed power flow optimization method based on large-network and small-network splitting

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113690893A (en) * 2021-08-26 2021-11-23 广东电网有限责任公司广州供电局 Load flow calculation method and system of microgrid with voltage regulator
CN113690893B (en) * 2021-08-26 2022-08-02 广东电网有限责任公司广州供电局 Load flow calculation method and system of microgrid with voltage regulator
CN114865617A (en) * 2022-04-12 2022-08-05 中国电建集团华东勘测设计研究院有限公司 Distributed power flow optimization method based on large-network and small-network splitting

Also Published As

Publication number Publication date
CA3091655A1 (en) 2021-11-27

Similar Documents

Publication Publication Date Title
US20150112498A1 (en) Methods of Patel Loadflow Computation for Electrical Power System
CA2548096C (en) Method of super super decoupled loadflow computation for electrical power system
AU2007291862B2 (en) Method of loadflow computation for electrical power system
Peng et al. Distributed optimal power flow algorithm for radial networks, I: Balanced single phase case
US20210049228A1 (en) Methods of Patel Loadflow Computation for Electrical Power System
Wang et al. Modern power systems analysis
US7788051B2 (en) Method and apparatus for parallel loadflow computation for electrical power system
US20190296548A1 (en) Methods of Patel Loadflow Computation for Electrical Power System
Hijazi et al. Polynomial SDP cuts for optimal power flow
US20180048151A1 (en) Methods of Patel Loadflow Computation for Electrical Power System
CA3081430A1 (en) Methods of patel loadflow computation for electrical power system
Zhao et al. Optimal transmission switching to eliminate voltage violations during light-load periods using decomposition approach
Zhang et al. On the convergence of the implicit Z-Bus power flow method for distribution systems
Bagde et al. An efficient transient stability‐constrained optimal power flow using biogeography‐based algorithm
CA2712873A1 (en) Method of artificial neural network loadflow computation for electrical power system
Cortés et al. On distributed reactive power and storage control on microgrids
Mahseredjian et al. Solution techniques for electromagnetic transients in power systems
CA3115921A1 (en) Methods of loadflow computation for electrical power system
Peng et al. Optimal branch exchange for distribution system reconfiguration
CA2661753C (en) Method of loadflow computation for electrical power system
US20240054261A1 (en) Methods of Patel Loadflow Computation for Electrical Power System
CA2564625C (en) Method and apparatus for parallel loadflow computation for electrical power system
Sharma et al. Faster load flow algorithm for radial distribution network using graph theory
CA2107388C (en) Method of fast super decoupled loadflow computation for electrical power system
Park et al. Uniqueness of power flow solutions using monotonicity and network topology

Legal Events

Date Code Title Description
FZDE Discontinued

Effective date: 20231128