CA2712873A1 - Method of artificial neural network loadflow computation for electrical power system - Google Patents
Method of artificial neural network loadflow computation for electrical power system Download PDFInfo
- Publication number
- CA2712873A1 CA2712873A1 CA 2712873 CA2712873A CA2712873A1 CA 2712873 A1 CA2712873 A1 CA 2712873A1 CA 2712873 CA2712873 CA 2712873 CA 2712873 A CA2712873 A CA 2712873A CA 2712873 A1 CA2712873 A1 CA 2712873A1
- Authority
- CA
- Canada
- Prior art keywords
- power
- nodes
- delta
- loadflow
- theta
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/18—Arrangements for adjusting, eliminating or compensating reactive power in networks
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/30—Reactive power compensation
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
A method of performing loadflow calculations for controlling voltages and power flow in a power network by reading on-line data of given/specified/scheduled/set network variables/parameters and using control means, so that no component of the power network is overloaded as well as there is no over/under voltage at any nodes in the network following a small or large disturbances. The invented generalized Patel Super Decoupled Loadflow (PSDL) calculation method is characterized in that 1) modified real power mismatch at any PQ-node-p is calculated as RP p =[.DELTA.P p' +(G pp'/ B pp') .DELTA.Q p'] / V p2, which takes different form for different manifestation of the generalized version PSDL-X'X' method, 2) transformed values of known/given/specified/scheduled/set quantities in the diagonal elements of the gain matrices [Y6]
of the P-.theta. sub-problem and [YV] of the Q-V sub-problem are present, and 3) transformation angles are restricted to maximum in the range of -48° to -90°
particularly for the most successful version PSDL-YY method, and these inventive loadflow calculation steps together yield some processing acceleration and consequent efficiency gains, and are each individually inventive. The other two Patel Super Decoupled Loadflow methods: BGX' version (PSDL-BGX') and X'G pvX' version (PSDL-X'G pvX') are characterized in the use of simultaneous (1V, 1.theta.) iteration scheme thereby calculating mismatches only once in each iteration and consequent efficiency gain.
of the P-.theta. sub-problem and [YV] of the Q-V sub-problem are present, and 3) transformation angles are restricted to maximum in the range of -48° to -90°
particularly for the most successful version PSDL-YY method, and these inventive loadflow calculation steps together yield some processing acceleration and consequent efficiency gains, and are each individually inventive. The other two Patel Super Decoupled Loadflow methods: BGX' version (PSDL-BGX') and X'G pvX' version (PSDL-X'G pvX') are characterized in the use of simultaneous (1V, 1.theta.) iteration scheme thereby calculating mismatches only once in each iteration and consequent efficiency gain.
Description
Provisional Patent Application Dated January 19, 2010 SYSTEM OF PATEL SUPER DECOUPLED LOADFLOW CALCULATION FOR
ELECTRICAL POWER SYSTEM
FIELD OF THE INVENTION
[001] The present invention relates to a method of load flow calculation in power flow control and voltage control for an electrical power system.
BACKGROUND OF THE INVENTION
ELECTRICAL POWER SYSTEM
FIELD OF THE INVENTION
[001] The present invention relates to a method of load flow calculation in power flow control and voltage control for an electrical power system.
BACKGROUND OF THE INVENTION
[002] The present invention relates to power-flow/voltage control in utility/industrial power networks of the types including many power plants/generators interconnected through transmission/distribution lines to other loads and motors.. Each of these components of the power network is protected against unhealthy or alternatively faulty, over/under voltage, and/or over loaded damaging operating conditions. Such a protection is automatic and operates without the consent of power network operator, and takes an unhealthy component out of service by disconnecting it from the network. The time domain of operation of the protection is of the order of milliseconds.
[003] The purpose of a utility/industrial power network is to meet the electricity demands of its various consumers 24-hours a day, 7-days a week while maintaining the quality of electricity supply. The quality of electricity supply means the consumer demands be met at specified voltage and frequency levels without over loaded, under/over voltage operation of any of the power network components. The operation of a power network is different at different times due to changing consumer demands and development of any faulty/contingency situation.
In other words healthy operating power network is constantly subjected to small and large disturbances. These disturbances could be consumer/operator initiated, or initiated by overload and under/over voltage alleviating functions collectively referred to as security control functions and various optimization functions such as economic operation and minimization of losses, or caused by a fault/contingency incident.
In other words healthy operating power network is constantly subjected to small and large disturbances. These disturbances could be consumer/operator initiated, or initiated by overload and under/over voltage alleviating functions collectively referred to as security control functions and various optimization functions such as economic operation and minimization of losses, or caused by a fault/contingency incident.
[004] For example, a power network is operating healthy and meeting quality electricity needs of its consumers. A fault occurs on a line or a transformer or a generator which faulty component gets isolated from the rest of the healthy network by virtue of the automatic operation of its Provisional Patent Application Dated January 19, 2010 protection. Such a disturbance would cause a change in the pattern of power flows in the network, which can cause over loading of one or more of the other components and/or over/under voltage at one or more nodes in the rest of the network. This in turn can isolate one or more other components out of service by virtue of the operation of associated protection, which disturbance can trigger chain reaction disintegrating the power network.
[0051 Therefore, the most basic and integral part of all other functions including optimizations in power network operation and control is security control. Security control means controlling power flows so that no component of the network is over loaded and controlling voltages such that there is no over voltage or under voltage at any of the nodes in the network following a disturbance small or large. As is well known, controlling electric power flows include both controlling real power flows which is given in MWs, and controlling reactive power flows which is given in MVARs. Security control functions or alternatively overloads alleviation and over/under voltage alleviation functions can be realized through one or combination of more controls in the network. These involve control of power flow over tie line connecting other utility network, turbine steam/water/gas input control to control real power generated by each generator, load shedding function curtails load demands of consumers, excitation controls reactive power generated by individual generator which essentially controls generator terminal voltage, transformer taps control connected node voltage, switching in/out in capacitor/reactor banks controls reactive power at the connected node.
[0061 Control of an electrical power system involving power-flow control and voltage control commonly is performed according to a process shown in fig.5. The various steps entail the following.
Step-10: Obtain on-line/simulated readings of open/close status of all switches and circuit breakers, and read data of maximum and minimum reactive power generation capability limits of PV-node generators, maximum and minimum tap positions limits of tap changing transformers, and maximum power carrying capability limits of transmission lines, transformers in the power network, or alternatively read data of operating limits of power network components.
Provisional Patent Application Dated January 19, 2010 Step-20: Obtain on-line readings of real and reactive power assignments/schedules/specifications/settings at PQ-nodes, real power and voltage magnitude assignments/schedules/specifications/settings at PV-nodes and transformer turns ratios. These assigned/set values are controllable and are called controlled variables/parameters.
Step-30: Resulting voltage magnitudes and angles at power network nodes, power flows through various power network components, reactive power generations by generators and turns ratios of transformers in the power network are determined by performance of loadflow calculation, for the assigned/set/given/known values from step-20 or previous process cycle step-60, of controlled variables/parameters.
Step-40: The results of Loadflow calculation of step-30 are evaluated for any over loaded power network components like transmission lines and transformers, and over/under voltages at different nodes in the power system Step-50: If the system state is acceptable implying no over loaded transmission lines and transformers and no over/under voltages, the process branches to step-70, and if otherwise, then to step-60 Step-60: Changes the controlled variables/parameters set in step-20 or as later set by the previous process cycle step-60 and returns to step-30 Step-70:' Actually implements the corrected controlled variables/parameters to obtain secure/correct/acceptable operation of power system [0071 Overload and under/over voltage alleviation functions produce changes in controlled variables/parameters in step-60 of Fig.5. In other words controlled variables/parameters are assigned or changed to the new values in step-60. This correction in controlled variables/parameters could be even optimized in case of simulation of all possible imaginable disturbances including outage of a line and loss of generation for corrective action stored and made readily available for acting upon in case the simulated disturbance actually occurs in the power network. In fact simulation of all possible imaginable disturbances is the modern practice because corrective actions need be taken before the operation of individual protection of the power network components.
Provisional Patent Application Dated January 19, 2010 [008] It is obvious that loadflow calculation consequently is performed many times in real-time operation and control environment and, therefore, efficient and high-speed loadflow calculation is necessary to provide corrective control in the changing power system conditions including an outage or failure of any of the power network components. Moreover, the loadflow calculation must be highly reliable to yield converged solution under a wide range of system operating conditions and network parameters. Failure to yield converged loadflow solution creates blind spot as to what exactly could be happening in the network leading to potentially damaging operational and control decisions/actions in capital-intensive power utilities.
[009] The power system control process shown in Fig. 5 is very general and elaborate. It includes control of power-flows through network components and voltage control at network nodes. However, the control of voltage magnitude at connected nodes within reactive power generation capabilities of electrical machines including generators, synchronous motors, and capacitor/inductor banks, and within operating ranges of transformer taps is normally integral part of load flow calculation as described in "LTC Transformers and MVAR violations in the Fast Decoupled Load Flow, IEEE Trans., PAS-101, No.9, PP. 3328-3332, September 1982." If under/over voltage still exists in the results of load flow calculation, other control actions, manual or automatic, may be taken in step-60 in the above and in Fig.5. For example, under voltage can be alleviated by shedding some of the load connected.
[010] The prior art and present invention are described using the following symbols and terms:
Ypq = Gpq + j Bpq : (p-q) th element of nodal admittance matrix without shunts Ypp = Gpp + jBpp : p-th diagonal element of nodal admittance matrix without shunts yp = gp + jbp : total shunt admittance at any node-p VP = ep + jfp = VpLAp : complex voltage of any node-p AOP, AVp : voltage angle, magnitude corrections Aep, Aff : real, imaginary components of voltage corrections PP + jQP : net nodal injected power calculated APP + jAQp : nodal power residue or mismatch RPP + jRQp : modified nodal power residue or mismatch (DP rotation or transformation angle Provisional Patent Application Dated January 19, 2010 [RP] : vector of modified real power residue or mismatch [RQ] : vector of modified reactive power residue or mismatch [Y6] : gain matrix of the P-6 loadflow sub-problem defined by eqn. (1) [YV] : gain matrix of the Q-V loadflow sub-problem defined by eqn. (2) m : number of PQ-nodes k : number of PV-nodes n=m+k+1 : total number of nodes q>p : q is the node adjacent to node-p excluding the case of q=p [ ] : indicates enclosed variable symbol to be a vector or a matrix LRA : Limiting Rotation Angle, -36 for prior art, -48 for invented models PQ-node: load-node, where, Real-Power-P and Reactive-Power-Q are specified PV-node: generator-node, where, Real-Power-P and Voltage-Magnitude-V are specified Ypq' = Gpq' + jBpq': rotated (p-q) th element of nodal admittance matrix without shunts Ypp' = Gpp' + jBpp': rotated p-th diagonal element of nodal admittance matrix without shunts APP'= APpCos(Dp + AQpSin(Dp: rotated or transformed real power mismatch AQp'= AQpCos(Dp - APpSin(Dp: rotated or transformed reactive power mismatch Loadflow Calculation: Each node in a power network is associated with four electrical quantities, which are voltage magnitude, voltage angle, real power, and reactive power.
The loadflow calculation involves calculation/determination of two unknown electrical quantities for other two given/specified/scheduled/set/known electrical quantities for each node. In other words the loadflow calculation involves determination of unknown quantities in dependence on the given/specified/scheduled/ set/known electrical quantities.
Loadflow Model : a set of equations describing the physical power network and its operation for the purpose of loadflow calculation. The term `loadflow model' can be alternatively referred to as `model of the power network for loadflow calculation'. The process of writing Mathematical equations that describe physical power network and its operation is called Mathematical Modeling. If the equations do not describe/represent the power network and its operation accurately the model is inaccurate, and the iterative loadflow calculation method could be slow and unreliable in yielding converged loadflow Provisional Patent Application Dated January 19, 2010 calculation. There could be variety of Loadflow Models depending on organization of set of equations describing the physical power network and its operation, including Decoupled Loadflow Models, Super Decoupled Loadflow Models, Fast Super Decoupled Loadflow (FSDL) Model, and Patel Super Decoupled Loadflow (PSDL) Model.
Loadflow Method: sequence of steps used to solve a set of equations describing the physical power network and its operation for the purpose of loadflow calculation is called Loadflow Method, which term can alternatively be referred to as `loadflow calculation method' or `method of loadflow calculation'. One word for a set of equations describing the physical power network and its operation is: Model. In other words, sequence of steps used to solve a Loadflow Model is a Loadflow Method. The loadflow method involves definition/formation of a loadflow model and its solution. There could be variety of Loadflow Methods depending on a loadflow model and iterative scheme used to solve the model including Decoupled Loadflow Methods, Super Decoupled Loadflow Methods, Fast Super Decoupled Loadflow (FSDL) Method, and Patel Super Decoupled Loadflow (PSDL) Method. All decoupled loadflow methods described in this application use either successive (10, 1V) iteration scheme or simultaneous (IV, 10) iteration scheme, defined in the following.
[011] Prior art method of loadflow calculation of the kind carried out as step-30 in Fig. 5, include a class of methods known as decoupled loadflow. This class of methods consists of decouled loadflow and super decoupled loadflow methods including Fast Super Decoupled Loadflow method. However, functional forms of different elements of the prior art Super Decoupled Loadflow: Fast Super Decoupled Loadflow (FSDL) model defined by system of equations (1) and (2) will be given below before description of steps of the prior art loadflow calculation method. The prior art FSDL model is very sensitive, in terms of iterations required to achieve converged loadflow calculation, to the restricted value of the rotation angle applied to complex power mismatch in terms of mismatch in real and reactive power flowing in through each of PQ-nodes. Moreover, the presence of twice the value of transformed network shunt in a diagonal element of the gain matrix [YV] for certain power network causes slow convergence Provisional Patent Application Dated January 19, 2010 taking increased number of iterations to converge to a solution, and therefore required increased calculation time.
[012] The aforesaid class of Decoupled Loadflow models involves a system of equations for the separate calculation of voltage angle and voltage magnitude corrections. Each decoupled model comprises a system of equations (1) and (2) differing in the definition of elements of [RP], [RQ], [Y0] and [YV].
[RP] _ [Y0] [00] (1) [RQ] _ [YV] [AV] (2) [013] A decoupled loadflow calculation method involves solution of a decoupled loadflow model comprising system of equations (1) and (2) in an iterative manner.
Commonly, successive (10, 1V) iteration scheme is used for solving system of equations (1) and (2) alternately with intermediate updating. Each iteration involves one calculation of [RP] and [A0] to update [0] and then one calculation of [RQ] and [AV] to update [V]. The sequence of equations (3) to (6) depicts the scheme.
[A0] _ [Y0] -' [RP] (3) [0] = [0] + [AO] (4) [AV] = [YV] -' [RQ] (5) [V] = [V] + [AV] (6) [014] The elements of [RP] and [RQ] for PQ-nodes are given by equations (7) to (10).
RPp = (APpCos(Dp + AQpSin(Dp)/Vp = APp'/Vp (7) RQp = (-APpSin(Dp + AQpCos(Dp)/Vp = AQp'/Vp (8) Cos(Dp = Absolute (Bpp / v (Gpp2 + Bpp2)) Cos (-36 ) (9) Sin I = -Absolute (Gpp / v (Gpp2 + Bpp2)) Sin (-36 ) (10) [015] A description of Super Decoupling principle and the prior art FSDL model is given in, "Fast Super Decoupled Loadflow", IEE proceedings Part-C, Vol.139, No.1, pp. 13-20, January 1992.
Provisional Patent Application Dated January 19, 2010 10161 Fast Super Decoupled Loadflow (FSDL) model consists of equations (3) to (16).
RPp = APP / (KpVp) (11) YOpq = -Ypq -for branch r/x ratio <_ 2.0 -(Bpq + 0.9(Ypq-Bpq)) -for branch r/x ratio > 2.0 -Bpq -for branches connected between two PV-nodes or a PV-node and the slack-node (12) YVpq = -Ypq -for branch r/x ratio <_ 2.0 Bpq + 0.9(Ypq-Bpq)) -for branch r/x ratio > 2.0 (13) YOpp E YOpq and YVpp = -2bp' + YVpq (14) qq>p by = bpCos(Dp or bp' = by (15) Kp = Absolute (Bpp/YOpp) (16) [0171 Branch admittance magnitude in (12) and (13) is of the same algebraic sign as its susceptance. Elements of the two gain matrices differ in that diagonal elements of [YV]
additionally contain the b' values given by equation (15) and in respect of elements corresponding to branches connected between two PV-nodes or a PV-node and the slack-node. In two simple variations of the FSDL model, one is to make YVpq YOpq and the other is to make YOpq YVpq.
[0181 The steps of loadflow calculation method FSDL are shown in the flowchart of Fig. 1.
Referring to the flowchart of Fig. 1, different steps are elaborated in steps marked with similar letters in the following. The words "Read system data" in Step-a correspond to step-10 and step-20 in Fig. 5, and step-14, step-20, step-32, step-44, step-50 in Fig. 6. All other steps in the following correspond to step-30 in Fig.5, and step-60, step-62, and step-64 in Fig. 6.
a. Read system data and assign an initial approximate solution. If better solution estimate is not available, set all the nodes voltage magnitudes and angles equal to those of the slack-node. This is referred to as the slack-start.
b. Form nodal admittance matrix, and Initialize iteration count ITRP = ITRQ= r = 0.
Provisional Patent Application Dated January 19, 2010 c. Compute sine and cosine of rotation angles using equations (9) and (10), and store them.
If Cos(DP < Cos (-36 ), set Cos(DP = Cos (-36 ) and Sin(DP = Sin (-36 ).
d. Form (m+k) x (m+k) size gain matrices [Y0] and [YV] of (1) and (2) respectively each in a compact storage exploiting sparsity, using equations (12) to (15). In [YV]
matrix, replace diagonal elements corresponding to PV-nodes by very large value, say, 10.010.
Factorize [Y8] and [YV] using the same ordering of nodes regardless of node-types and store them using the same indexing and addressing information.
e. Compute residues [AP] at PQ- and PV-nodes and [AQ] at only PQ-nodes. If all are less than the tolerance (s), proceed to step-m. Otherwise follow the next step.
f. Compute the vector of modified residues [RP] using (7) for PQ-nodes, and using (11) and (16) for PV-nodes.
g. Solve (3) for [AO] and update voltage angles using, [0] = [0] + [AO].
h. Set voltage magnitudes of PV-nodes equal to the specified values, and Increment the iteration count ITRP=ITRP+1 and r=(ITRP+ITRQ)/2.
i. Compute residues [AP] at PQ- and PV-nodes and [AQ] at PQ-nodes only. If all are less than the tolerance (c), proceed to step-m. Otherwise follow the next step.
j. Compute the vector of modified residues [RQ] using (8) for only PQ-nodes.
k. Solve (5) for [AV] and update PQ-node magnitudes using [V] = [V] + [AV].
While solving equation (5), skip all the rows and columns corresponding to PV-nodes.
1. Calculate reactive power generation at PV-nodes and tap positions of tap-changing transformers. If the maximum and minimum reactive power generation capability and transformer tap position limits are violated, implement the violated physical limits and adjust the loadflow solution by the method described in "LTC Transformers and MVAR
violations in the Fast Decoupled Load Flow, IEEE Trans., PAS-101, No.9, PP.
3328-3332, September 1982".
in. Increment the iteration count ITRQ=ITRQ+1 and r=(ITRP+ITRQ)/2, and Proceed to step-d.
n. From calculated values of voltage magnitude and voltage angle at PQ-nodes, voltage angle and reactive power generation at PV-nodes, and tap position of tap changing transformers, calculate power flows through power network components.
Provisional Patent Application Dated January 19, 2010 [019] In super decoupled loadflow models [YO] and [YV] are real, sparse, symmetrical and built only from network elements. Since they are constant, they need to be factorized once only at the start of the solution. Equations (1) and (2) are to be solved repeatedly by forward and backward substitutions. [YO] and [YV] are of the same dimensions (m+k) x (m+k) when only a row/column of the slack-node or reference-node is excluded and both are triangularized using the same ordering regardless of the node-types. For a row/column corresponding to a PV-node excluded in [YV], use a large diagonal to mask out the effects of the off-diagonal terms. When the PV-node is switched to the PQ-type, removing the large diagonal reactivates the row/column corresponding to a switched PV-node to PQ-node type. This technique is especially useful in the treatment of PV-nodes in the gain matrix [YV].
[020] The convergence of the prior art FSDL method is very sensitive to the value of the restriction applied to the rotation angle. The best possible convergence from non-linearity consideration could be achieved by restricting rotation angle to maximum of -36 . However, when large Resistance (R)/Reactance (X) ratio branch is present in the network without creating non-linearity problem, it takes large number of iterations to converge.
Moreover, the presence of twice the transformed value of network shunts in the diagonal elements of the gain matrix [YV], causes it to take increased number of iterations in case of certain power networks. These problems are overcome by formulating power flow equations such that transformed values of known/given/specified/scheduled/set quantities appears in the diagonal elements of the gain matrix [YV] as described in the following.
SUMMARY OF THE INVENTION
[021] It is a primary object of the present invention to improve convergence and efficiency of the prior art Fast Super Decoupled Loadflow calculation method under wide range of system operating conditions and network parameters for use in power flow control and voltage control in the power system. A further object of the invention is to reduce computer storage/memory or calculating volume requirements.
[022] The above and other objects are achieved, according to the present invention, with any one system of Patel Super Decoupled Loadflow, X'X'-version (PSDL-X'X') and its many manifestations, calculation for Electrical Power System. In context of voltage control, the Provisional Patent Application Dated January 19, 2010 inventive system of PSDL calculation for Electrical Power system consisting of plurality of electromechanical rotating machines, transformers and electrical loads connected in a network, each machine having a reactive power characteristic and an excitation element which is controllable for adjusting the reactive power generated or absorbed by the machine, and some of the transformers each having a tap changing element, which is controllable for adjusting turns ratio or alternatively terminal voltage of the transformer, said system comprising:
means defining and solving loadflow model of the power network characterized by inventive PSDLmodel for providing an indication of the quantity of reactive power to be supplied by each generator including the slack/reference node generator, and for providing an indication of turns ratio of each tap-changing transformer in dependence on the obtained-online or given/specified/set/known controlled network variables/parameters, and physical limits of operation of the network components, machine control means connected to the said means defining and solving loadflow model and to the excitation elements of the rotating machines for controlling the operation of the excitation elements of machines to produce or absorb the amount of reactive power indicated by said means defining and solving loadflow model in dependence on the set of obtained-online or given/specified/set controlled network variables/parameters, and physical limits of excitation elements, transformer tap position control means connected to the said means defining and solving loadflow model and to the tap changing elements of the controllable transformers for controlling the operation of the tap changing elements to adjust the turns ratios of transformers indicated by the said means defining and solving loadflow model in dependence on the set of obtained-online or given/specified/set controlled network variables/parameters, and operating limits of the tap-changing elements.
10231 The method and system of voltage control according to the preferred embodiment of the present invention provide voltage control for the nodes connected to PV-node generators and tap changing transformers for a network in which real power assignments have already been fixed.
The said voltage control is realized by controlling reactive power generation and transformer tap positions.
Provisional Patent Application Dated January 19, 2010 [0241 The inventive system of Patel Super Decoupled Loadflow (PSDL) calculation can be used to solve a model of the Electrical Power System for voltage control. For this purpose real and reactive power assignments or settings at PQ-nodes, real power and voltage magnitude assignments or settings at PV-nodes and transformer turns ratios, open/close status of all circuit breaker, the reactive capability characteristic or curve for each machine, maximum and minimum tap positions limits of tap changing transformers, operating limits of all other network components, and the impedance or admittance of all lines are supplied. A
decoupled loadflow system of equations (1) and (2) is solved by an iterative process until convergence. During this solution the quantities which can vary are the real and reactive power at the reference/slack node, the reactive power set points for each PV-node generator, the transformer transformation ratios, and voltages on all PQ-nodes nodes, all being held within the specified ranges. When the iterative process converges to a solution, indications of reactive power generation at PV-nodes and transformer turns-ratios or tap-settings are provided. Based on the known reactive power capability characteristics of each PV-node generator, the determined reactive power values are used to adjust the excitation current to each generator to establish the reactive power set points.
The transformer taps are set in accordance with the turns ratio indication provided by the system of loadflow calculation.
[0251 For voltage control, system of PSDLcalculation can be employed either on-line or off-line. In off-line operation, the user can simulate and experiment with various sets of operating conditions and determine reactive power generation and transformer tap settings requirements. A
general-purpose computer can implement the entire system. For on-line operation, the load flow calculation system is provided with data identifying the current real and reactive power assignments and transformer transformation ratios, the present status of all switches and circuit breakers in the network and machine characteristic curves in steps-10 and -20 in Fig. 5, and steps 12, 20, 32, 44, and 50 in Fig 6 described below. Based on this information, a model of the system based on gain matrices of invented load flow calculation systems provide the values for the corresponding node voltages, reactive power set points for each machine and the transformation ratio and tap changer position for each transformer.
[0261 The present inventive system of loadflow calculation for Electrical Power System consists of, a Patel Super Decoupled Loadflow: X'X'-version (PSDL-X'X') method characterized in that Provisional Patent Application Dated January 19, 2010 1) modified real power mismatch at any PQ-node-p is calculated as RPp = [APp' + (Gpp'/ Bpp') AQp'] / Vp2, which takes different form for different manifestation of the PSDL-X'X' method, 2) the presence of transformed values of known/given/specified/scheduled/set quantities in the diagonal elements of the gain matrix [YO] of P-O sub-problem and the gain matrix [YV] of the Q-V sub-problem, and 3) transformation angles are restricted to maximum of -48 to -90 , and these inventive loadflow calculation steps together yield some processing acceleration and consequent efficiency gains, and are each individually inventive, and 4) except in the manifestation PSDL-BX, modified real power mismatches at PV-nodes are determined as RPp =
APp/(KpVp2) in order to keep gain matrix [YO] symmetrical. If the value of factor Kp 1, the gain matrix [YO] becomes unsymmetrical in that elements in the rows corresponding to PV-nodes are defined without transformation or rotation applied, as YOpq= -Bpq.
BRIEF DESCRIPTION OF DRAWINGS
[027] Fig. 1 is a flow-chart of prior art FSDL method [028] Fig. 2 is a flow-chart embodiment of the invented Patel Super Decoupled Loadflow (PSDL-YY) calculation method [029] Fig. 3 is a flow-chart embodiment of the invented Patel Super Decoupled Loadflow (PSDL- BGX', PSDL-BGY, and PSDL-BGX)=calculation methods [030] Fig. 4 is a flow-chart embodiment of the invented Patel Super Decoupled Loadflow (PSDL- X'GpvX') calculation method [031] Fig. 5 is a flow-chart of the overall controlling method for an electrical power system involving loadflow calculation as a step which can be executed using one of the loadflow calculation methods embodied in Figs. 1, 2, 3 or 4 [032] Fig. 6 is a flow-chart of the simple special case of voltage control system in overall controlling system of Fig. 5 for an electrical power system [033] Fig. 7 is a one-line diagram of an exemplary 6-node power network having a slack/swing/reference node, two PV-nodes, and three PQ-nodes DESCRIPTION OF A PREFERED EMBODYMENT
Provisional Patent Application Dated January 19, 2010 [0341 A loadflow calculation is involved as a step in power flow control and/or voltage control in accordance with Fig. 5 or Fig. 6. A preferred embodiment of the present invention is described with reference to Fig. 7 as directed to achieving voltage control.
[0351 Fig. 7 is a simplified one-line diagram of an exemplary utility power network to which the present invention may be applied. The fundamentals of one-line diagrams are described in section 6.11 of the text ELEMENTS OF POWER SYSTEM ANALYSIS, forth edition, by William D.
Stevenson, Jr., McGrow-Hill Company, 1982. In Fig. 7, each thick vertical line is a network node.
The nodes are interconnected in a desired manner by transmission lines and transformers each having its impedance, which appears in the loadflow models. Two transformers in Fig.7 are equipped with tap changers to control their turns ratios in order to control terminal voltage of node-1 and node-2 where large loads are connected.
[0361 Node-6 is a reference-node alternatively referred to as the slack or swing -node, representing the biggest power plant in a power network. Nodes-4 and -5 are PV-nodes where generators are connected, and nodes-1, -2, and -3 are PQ-nodes where loads are connected. It should be noted that the nodes-4, -5, and -6 each represents a power plant that contains many generators in parallel operation. The single generator symbol at each of the nodes-4, -5, and -6 is equivalent of all generators in each plant. The power network further includes controllable circuit breakers located at each end of the transmission lines and transformers, and depicted by cross markings in one-line diagram of Fig. 7. The circuit breakers can be operated or in other words opened or closed manually by the power system operator or relevant circuit breakers operate automatically consequent of unhealthy or faulty operating conditions. The operation of one or more circuit breakers modify the configuration of the network. The arrows extending certain nodes represent loads.
[0371 A goal of the present invention is to provide a reliable and computationally efficient loadflow calculation that appears as a step in power flow control and/or voltage control systems of Fig. 5 and Fig. 6. However, the preferred embodiment of loadflow calculation as a step in control of terminal node voltages of PV-node generators and tap-changing transformers is illustrated in the flow diagram of Fig. 6 in which present invention resides in function steps 60 and 62.
Provisional Patent Application Dated January 19, 2010 [038] Short description of other possible embodiment of the present invention is also provided herein. The present invention relates to control of utility/industrial power networks of the types including plurality of power plants/generators and one or more motors/loads, and connected to other external utility. In the utility/industrial systems of this type, it is the usual practice to adjust the real and reactive power produced by each generator and each of the other sources including synchronous condensers and capacitor/inductor banks, in order to optimize the real and reactive power generation assignments of the system. Healthy or secure operation of the network can be shifted to optimized operation through corrective control produced by optimization functions without violation of security constraints. This is referred to as security constrained optimization of operation. Such an optimization is described in the United States Patent Number: 5,081,591 dated Jan. 13, 1992: "Optimizing Reactive Power Distribution in an Industrial Power Network", where the present invention can be embodied by replacing the step nos. 56 and 66 each by a step of constant gain matrices [YO] and [YV], and replacing steps of "Exercise Newton-Raphson Algorithm" by steps of "Exercise Patel Super Decoupled Loadflow Calculation"
in places of steps 58 and 68. This is just to indicate the possible embodiment of the present invention in optimization functions like in many others including state estimation function. However, invention is being claimed through a simplified embodiment without optimization function as in Fig. 6 in this application. The inventive steps-60 and -62 in Fig.6 are different than those corresponding steps-56, and -58, which constitute a well known Newton-Raphson loadflow method, and were not inventive even in United States Patent Number: 5,081,591.
[0391 In Fig. 6, function step 10 provides stored impedance values of each network component in the system. This data is modified in a function step 12, which contains stored information about the open or close status of each circuit breaker. For each breaker that is open, the function step 12 assigns very high impedance to the associated line or transformer. The resulting data is than employed in a function step 14 to establish an admittance matrix for the power network. The data provided by function step 10 can be input by the computer operator from calculations based on measured values of impedance of each line and transformer, or on the basis of impedance measurements after the power network has been assembled.
Provisional Patent Application Dated January 19, 2010 [040] Each of the transformers Ti and T2 in Fig. 7 is a tap changing transformer having a plurality of tap positions each representing a given transformation ratio. An indication of initially assigned transformation ratio for each transformer is provided by function step 20.
[041] The indications provided by function steps 14, and 20 are supplied to a function step 60 in which constant gain matrices [YO] and [YV] of any of the invented super decoupled loadflow models are constructed, factorized and stored. The gain matrices [YO] and [YV]
are conventional tools employed for solving Super Decoupled Loadflow model defined by equations (1) and (2) for a power system.
[042] Indications of initial reactive power, or Q on each node, based on initial calculations or measurements, are provided by a function step 30 and these indications are used in function step 32, to assign a Q level to each generator and motor. Initially, the Q assigned to each machine can be the same as the indicated Q value for the node to which that machine is connected.
[043] An indication of measured real power, P, on each node is supplied by function step 40.
Indications of assigned/specified/scheduled/set generating plant loads that are constituted by known program are provided by function step 42, which assigns the real power, P, load for each generating plant on the basis of the total P which must be generated within the power system. The value of P assigned to each power plant represents an economic optimum, and these values represent fixed constraints on the variations, which can be made by the system according to the present invention. The indications provided by function steps 40 and 42 are supplied to function step 44 which adjusts the P distribution on the various plant nodes accordingly. Function step 50 assigns initial approximate or guess solution to begin iterative method of loadflow calculation, and reads data file of operating limits on power network components, such as maximum and minimum reactive power generation capability limits of PV-nodes generators.
[044] The indications provided by function steps 32, 44, 50 and 60 are supplied to function step 62 where inventive Fast Super Decoupled Loadflow calculation or Novel Fast Super Decoupled Loadflow calculation is carried out, the results of which appear in function step 64. The loadflow calculation yields voltage magnitudes and voltage angles at PQ-nodes, real and reactive power generation by the slack/swing/reference node generator, voltage angles and reactive power generation indications at PV-nodes, and transformer turns ratio or tap position indications for tap Provisional Patent Application Dated January 19, 2010 changing transformers. The system stores in step 62 a representation of the reactive capability characteristic of each PV-node generator and these characteristics act as constraints on the reactive power that can be calculated for each PV-node generator for indication in step 64. The indications provided in step 64 actuate machine excitation control and transformer tap position control. All the loadflow calculation methods using PSDLmodels can be used to effect efficient and reliable voltage control in power systems as in the process flow diagram of Fig. 6.
[045] Particular inventive loadflow calculation steps of all the PSDLmethods are described followed by inventive PSDLmodels in terms of equations for determining elements of vectors [RP], [RQ], and elements of gain matrices [Y0], and [YV] of equations (1) and (2), further followed by detailed steps of inventive loadflow calculation methods. Also, calculation accelerating and storage reducing techniques are described, which are not inventive.
[046] The presence of transformed values of known/given/specified/scheduled/set quantities in the diagonal elements of the gain matrix [YO] of the P-0 sub-problem in equation (22) and the diagonal elements of the gain matrix [YV] of the Q-V sub-problem in equation (23), which takes different form for different manifestation of the PSDL-X'X' method, is brought about by such formulation of loadflow equations. The said transformed quantities in the diagonal elements of the gain matrix [YO] and the gain matrix [YV] improved convergence and the reliability of obtaining converged loadflow calculation, when modified real power mismatch at any PQ-node-p is calculated as RPp = [APp' + (Gpp'/ Bpp') AQp'] / Vp2, which takes different form for different manifestation of the PSDL-X'X' method.
Patel Super Decoupled Loadflow: X'X'-version (PSDL-X'X') [047] The general model, in successive (10, 1 V) iteration scheme represented by sequence of equations (3) to (6), can be realized as PSDL-X'X', from which manifested are many versions.
The elements of [RP], [RQ], [Y0] and [YV] are defined by (17) to (30).
RPp = [APr' + (Gpp'/ Bpp') AQp'] / Vp2 -for PQ-nodes (17) RQp = [AQp' - (Gpp'/ Bpp') OPp'] / Vp -for PQ-nodes (18) RPp = [APp / (Kp*Vp2)] -for PV-nodes (19) Provisional Patent Application Dated January 19, 2010 YOpq = -I /Xpq' and YVpq = -I /Xpq' (20) YOpp = bpg + Y--YOpq and YVpp = bPV + Y--YVpq (21) q>p q>p Where, bp0 = 6~SNp ~- 'e rs f,~ Y~SH ~ / to + t 6V Ccr . 9 (22) bp,, = I [QSHp' - (Gpp'/ Bpp') PSHp'] / VS2 - (2-I) bpCos I' (23) APP' = APPCos(Dp + AQpSin'p -for PQ-nodes (24) AQp' = AQPCos(Dp - APpSin(Dp -for PQ-nodes (25) PSHp' = PSHPCos(Dp + QSHPSin(Dp -for PQ-nodes (26) QSHp' = QSHpCos(Dp - PSHpSin(Dp -for PQ-nodes (27) Cos( DP = Absolute [Bpp / v (GPp2 + BPp2)] Cos (any angle from 0 to -90 degrees) (28) Sinop = -Absolute [Gpp / v (GPp2 + BPP2)] Sin (any angle from 0 to -90 degrees) (29) Kp = Absolute (BPP/YOPp) (30) [0481 Where, Gpp' and Bpp' are the transformed values of Gpp and Bpp as given by equation (107) in the appendix. The factor Kp of (30) is restricted to the minimum of 0.75 determined experimentally; however its restriction is lowered to the minimum value of 0.6 when its average over all less than 1.0 values at PV-nodes is less than 0.6. This factor is system and method independent. However it can be tuned for the best possible convergence for any given system.
This statement is valid when the factor Kp is applied in the manner of equation (19) in all the models derived in the following from the most general model PSDL-X'X'. The factor "I" in equations (22) and (23) can take any value from - oo, ..., -2, -1, 0, 1, 2, ..., + oo.
[0491 The definition of YOpq in (20) is simplified because it does not explicitly state that it always takes the value of -Bpq for a branch connected between two PV-nodes or a PV-node and the slack-node. This fact should be understood implied in all the definitions of YOpq in this document. Xpq' in equation (20) is the transformed branch reactance defined in the appendix by equation (108).
Provisional Patent Application Dated January 19, 2010 The following and others invented models will be completed when the application is finalized in about one year time as was done in the international application PCT/CA2003/001312.
Patel Super Decoupled Loadflow: YY-version (PSDL-YY) Patel Super Decoupled Loadflow: XX-version (PSDL-XX) Patel Super Decoupled Loadflow: BX-version (PSDL-BX) Patel Super Decoupled Loadflow: X'B'-version (PSDL-X'B') Patel Super Decoupled Loadflow: YB'-version (PSDL-YB') Patel Super Decoupled Loadflow: B'X'-version (PSDL-B'X') Patel Super Decoupled Loadflow: B'Y-version (PSDL- B'Y) Models using Simultaneous (1V, 10) Iteration Scheme Models using Global Corrections APPENDIX
[0501 The following steps give the procedure for determining transformed/rotated branch admittance necessary in forming symmetrical gain matrices [YV] and/or [Y0] of the PSDLmodels.
1. Compute: Op = arctan (Gpp/Bpp) and Dq = arctan (Gqq/Bqq) (103) 2. Compute the average of rotations at the terminal nodes p and q of a branch:
(Iav = ((D p + thq)/2 (104) 3. Compare I av with the Limiting Rotation Angle (LRA) and let'av to be the smaller of the two:
Dav = minimum ((Dav, LRA) (105) 4. Compute transformed pq-th element of the admittance matrix:
Ypq' = Gpq' + jBpq' = (Cos I av + j Sin Oav) (Gpq +JBpq) (106) YPp' = Gpp' +j Bpp' = Y,-(Gpq' +.1BPq') (107) q>p 5. Note that the transformed branch reactance is:
Xpq' = Bpq'/(Gpq'2 + Bpq'2) (108) Similarly, Xpp' = Bpp'/(Gpp'2 + Bpp'2) (109) Provisional Patent Application Dated January 19, 2010 REFERENCES
Foreign Patent Document 1. US Patent Number: 4868410 dated September 19, 1989: "System of Load Flow Calculation for Electric Power System"
2. US Patent Number: 5081591 dated January 14, 1992: "Optimizing Reactive Power Distribution in an Industrial Power Network"
Published Pending Patent Applications 3. Canadian Patent Application Number: CA2107388 dated 9 November, 1993:
"System of Fast Super Decoupled Loadflow Calcutation for Electrical Power System"
4. International Patent Application Number: PCT/CA/2003/001312 dated 29 August, 2003:
"System of Super Super Decoupled Loadflow Computation for Electrical Power System"
Other Publications 5. Stagg G.W. and El-Abiad A.H., "Computer methods in Power System Analysis", McGrow-Hill, New York, 1968 6. S.B.Patel, "Fast Super Decoupled Loadflow", IEE proceedings Part-C, Vol.139, No.1, pp. 13-20, January 1992 7. S.B.Patel, "Super Super Decoupled Loadflow", TIC-STH 2009 IEEE Conference proceedings, pp. 652-659, September 26-27, 2009 (Priority Document)
[0051 Therefore, the most basic and integral part of all other functions including optimizations in power network operation and control is security control. Security control means controlling power flows so that no component of the network is over loaded and controlling voltages such that there is no over voltage or under voltage at any of the nodes in the network following a disturbance small or large. As is well known, controlling electric power flows include both controlling real power flows which is given in MWs, and controlling reactive power flows which is given in MVARs. Security control functions or alternatively overloads alleviation and over/under voltage alleviation functions can be realized through one or combination of more controls in the network. These involve control of power flow over tie line connecting other utility network, turbine steam/water/gas input control to control real power generated by each generator, load shedding function curtails load demands of consumers, excitation controls reactive power generated by individual generator which essentially controls generator terminal voltage, transformer taps control connected node voltage, switching in/out in capacitor/reactor banks controls reactive power at the connected node.
[0061 Control of an electrical power system involving power-flow control and voltage control commonly is performed according to a process shown in fig.5. The various steps entail the following.
Step-10: Obtain on-line/simulated readings of open/close status of all switches and circuit breakers, and read data of maximum and minimum reactive power generation capability limits of PV-node generators, maximum and minimum tap positions limits of tap changing transformers, and maximum power carrying capability limits of transmission lines, transformers in the power network, or alternatively read data of operating limits of power network components.
Provisional Patent Application Dated January 19, 2010 Step-20: Obtain on-line readings of real and reactive power assignments/schedules/specifications/settings at PQ-nodes, real power and voltage magnitude assignments/schedules/specifications/settings at PV-nodes and transformer turns ratios. These assigned/set values are controllable and are called controlled variables/parameters.
Step-30: Resulting voltage magnitudes and angles at power network nodes, power flows through various power network components, reactive power generations by generators and turns ratios of transformers in the power network are determined by performance of loadflow calculation, for the assigned/set/given/known values from step-20 or previous process cycle step-60, of controlled variables/parameters.
Step-40: The results of Loadflow calculation of step-30 are evaluated for any over loaded power network components like transmission lines and transformers, and over/under voltages at different nodes in the power system Step-50: If the system state is acceptable implying no over loaded transmission lines and transformers and no over/under voltages, the process branches to step-70, and if otherwise, then to step-60 Step-60: Changes the controlled variables/parameters set in step-20 or as later set by the previous process cycle step-60 and returns to step-30 Step-70:' Actually implements the corrected controlled variables/parameters to obtain secure/correct/acceptable operation of power system [0071 Overload and under/over voltage alleviation functions produce changes in controlled variables/parameters in step-60 of Fig.5. In other words controlled variables/parameters are assigned or changed to the new values in step-60. This correction in controlled variables/parameters could be even optimized in case of simulation of all possible imaginable disturbances including outage of a line and loss of generation for corrective action stored and made readily available for acting upon in case the simulated disturbance actually occurs in the power network. In fact simulation of all possible imaginable disturbances is the modern practice because corrective actions need be taken before the operation of individual protection of the power network components.
Provisional Patent Application Dated January 19, 2010 [008] It is obvious that loadflow calculation consequently is performed many times in real-time operation and control environment and, therefore, efficient and high-speed loadflow calculation is necessary to provide corrective control in the changing power system conditions including an outage or failure of any of the power network components. Moreover, the loadflow calculation must be highly reliable to yield converged solution under a wide range of system operating conditions and network parameters. Failure to yield converged loadflow solution creates blind spot as to what exactly could be happening in the network leading to potentially damaging operational and control decisions/actions in capital-intensive power utilities.
[009] The power system control process shown in Fig. 5 is very general and elaborate. It includes control of power-flows through network components and voltage control at network nodes. However, the control of voltage magnitude at connected nodes within reactive power generation capabilities of electrical machines including generators, synchronous motors, and capacitor/inductor banks, and within operating ranges of transformer taps is normally integral part of load flow calculation as described in "LTC Transformers and MVAR violations in the Fast Decoupled Load Flow, IEEE Trans., PAS-101, No.9, PP. 3328-3332, September 1982." If under/over voltage still exists in the results of load flow calculation, other control actions, manual or automatic, may be taken in step-60 in the above and in Fig.5. For example, under voltage can be alleviated by shedding some of the load connected.
[010] The prior art and present invention are described using the following symbols and terms:
Ypq = Gpq + j Bpq : (p-q) th element of nodal admittance matrix without shunts Ypp = Gpp + jBpp : p-th diagonal element of nodal admittance matrix without shunts yp = gp + jbp : total shunt admittance at any node-p VP = ep + jfp = VpLAp : complex voltage of any node-p AOP, AVp : voltage angle, magnitude corrections Aep, Aff : real, imaginary components of voltage corrections PP + jQP : net nodal injected power calculated APP + jAQp : nodal power residue or mismatch RPP + jRQp : modified nodal power residue or mismatch (DP rotation or transformation angle Provisional Patent Application Dated January 19, 2010 [RP] : vector of modified real power residue or mismatch [RQ] : vector of modified reactive power residue or mismatch [Y6] : gain matrix of the P-6 loadflow sub-problem defined by eqn. (1) [YV] : gain matrix of the Q-V loadflow sub-problem defined by eqn. (2) m : number of PQ-nodes k : number of PV-nodes n=m+k+1 : total number of nodes q>p : q is the node adjacent to node-p excluding the case of q=p [ ] : indicates enclosed variable symbol to be a vector or a matrix LRA : Limiting Rotation Angle, -36 for prior art, -48 for invented models PQ-node: load-node, where, Real-Power-P and Reactive-Power-Q are specified PV-node: generator-node, where, Real-Power-P and Voltage-Magnitude-V are specified Ypq' = Gpq' + jBpq': rotated (p-q) th element of nodal admittance matrix without shunts Ypp' = Gpp' + jBpp': rotated p-th diagonal element of nodal admittance matrix without shunts APP'= APpCos(Dp + AQpSin(Dp: rotated or transformed real power mismatch AQp'= AQpCos(Dp - APpSin(Dp: rotated or transformed reactive power mismatch Loadflow Calculation: Each node in a power network is associated with four electrical quantities, which are voltage magnitude, voltage angle, real power, and reactive power.
The loadflow calculation involves calculation/determination of two unknown electrical quantities for other two given/specified/scheduled/set/known electrical quantities for each node. In other words the loadflow calculation involves determination of unknown quantities in dependence on the given/specified/scheduled/ set/known electrical quantities.
Loadflow Model : a set of equations describing the physical power network and its operation for the purpose of loadflow calculation. The term `loadflow model' can be alternatively referred to as `model of the power network for loadflow calculation'. The process of writing Mathematical equations that describe physical power network and its operation is called Mathematical Modeling. If the equations do not describe/represent the power network and its operation accurately the model is inaccurate, and the iterative loadflow calculation method could be slow and unreliable in yielding converged loadflow Provisional Patent Application Dated January 19, 2010 calculation. There could be variety of Loadflow Models depending on organization of set of equations describing the physical power network and its operation, including Decoupled Loadflow Models, Super Decoupled Loadflow Models, Fast Super Decoupled Loadflow (FSDL) Model, and Patel Super Decoupled Loadflow (PSDL) Model.
Loadflow Method: sequence of steps used to solve a set of equations describing the physical power network and its operation for the purpose of loadflow calculation is called Loadflow Method, which term can alternatively be referred to as `loadflow calculation method' or `method of loadflow calculation'. One word for a set of equations describing the physical power network and its operation is: Model. In other words, sequence of steps used to solve a Loadflow Model is a Loadflow Method. The loadflow method involves definition/formation of a loadflow model and its solution. There could be variety of Loadflow Methods depending on a loadflow model and iterative scheme used to solve the model including Decoupled Loadflow Methods, Super Decoupled Loadflow Methods, Fast Super Decoupled Loadflow (FSDL) Method, and Patel Super Decoupled Loadflow (PSDL) Method. All decoupled loadflow methods described in this application use either successive (10, 1V) iteration scheme or simultaneous (IV, 10) iteration scheme, defined in the following.
[011] Prior art method of loadflow calculation of the kind carried out as step-30 in Fig. 5, include a class of methods known as decoupled loadflow. This class of methods consists of decouled loadflow and super decoupled loadflow methods including Fast Super Decoupled Loadflow method. However, functional forms of different elements of the prior art Super Decoupled Loadflow: Fast Super Decoupled Loadflow (FSDL) model defined by system of equations (1) and (2) will be given below before description of steps of the prior art loadflow calculation method. The prior art FSDL model is very sensitive, in terms of iterations required to achieve converged loadflow calculation, to the restricted value of the rotation angle applied to complex power mismatch in terms of mismatch in real and reactive power flowing in through each of PQ-nodes. Moreover, the presence of twice the value of transformed network shunt in a diagonal element of the gain matrix [YV] for certain power network causes slow convergence Provisional Patent Application Dated January 19, 2010 taking increased number of iterations to converge to a solution, and therefore required increased calculation time.
[012] The aforesaid class of Decoupled Loadflow models involves a system of equations for the separate calculation of voltage angle and voltage magnitude corrections. Each decoupled model comprises a system of equations (1) and (2) differing in the definition of elements of [RP], [RQ], [Y0] and [YV].
[RP] _ [Y0] [00] (1) [RQ] _ [YV] [AV] (2) [013] A decoupled loadflow calculation method involves solution of a decoupled loadflow model comprising system of equations (1) and (2) in an iterative manner.
Commonly, successive (10, 1V) iteration scheme is used for solving system of equations (1) and (2) alternately with intermediate updating. Each iteration involves one calculation of [RP] and [A0] to update [0] and then one calculation of [RQ] and [AV] to update [V]. The sequence of equations (3) to (6) depicts the scheme.
[A0] _ [Y0] -' [RP] (3) [0] = [0] + [AO] (4) [AV] = [YV] -' [RQ] (5) [V] = [V] + [AV] (6) [014] The elements of [RP] and [RQ] for PQ-nodes are given by equations (7) to (10).
RPp = (APpCos(Dp + AQpSin(Dp)/Vp = APp'/Vp (7) RQp = (-APpSin(Dp + AQpCos(Dp)/Vp = AQp'/Vp (8) Cos(Dp = Absolute (Bpp / v (Gpp2 + Bpp2)) Cos (-36 ) (9) Sin I = -Absolute (Gpp / v (Gpp2 + Bpp2)) Sin (-36 ) (10) [015] A description of Super Decoupling principle and the prior art FSDL model is given in, "Fast Super Decoupled Loadflow", IEE proceedings Part-C, Vol.139, No.1, pp. 13-20, January 1992.
Provisional Patent Application Dated January 19, 2010 10161 Fast Super Decoupled Loadflow (FSDL) model consists of equations (3) to (16).
RPp = APP / (KpVp) (11) YOpq = -Ypq -for branch r/x ratio <_ 2.0 -(Bpq + 0.9(Ypq-Bpq)) -for branch r/x ratio > 2.0 -Bpq -for branches connected between two PV-nodes or a PV-node and the slack-node (12) YVpq = -Ypq -for branch r/x ratio <_ 2.0 Bpq + 0.9(Ypq-Bpq)) -for branch r/x ratio > 2.0 (13) YOpp E YOpq and YVpp = -2bp' + YVpq (14) qq>p by = bpCos(Dp or bp' = by (15) Kp = Absolute (Bpp/YOpp) (16) [0171 Branch admittance magnitude in (12) and (13) is of the same algebraic sign as its susceptance. Elements of the two gain matrices differ in that diagonal elements of [YV]
additionally contain the b' values given by equation (15) and in respect of elements corresponding to branches connected between two PV-nodes or a PV-node and the slack-node. In two simple variations of the FSDL model, one is to make YVpq YOpq and the other is to make YOpq YVpq.
[0181 The steps of loadflow calculation method FSDL are shown in the flowchart of Fig. 1.
Referring to the flowchart of Fig. 1, different steps are elaborated in steps marked with similar letters in the following. The words "Read system data" in Step-a correspond to step-10 and step-20 in Fig. 5, and step-14, step-20, step-32, step-44, step-50 in Fig. 6. All other steps in the following correspond to step-30 in Fig.5, and step-60, step-62, and step-64 in Fig. 6.
a. Read system data and assign an initial approximate solution. If better solution estimate is not available, set all the nodes voltage magnitudes and angles equal to those of the slack-node. This is referred to as the slack-start.
b. Form nodal admittance matrix, and Initialize iteration count ITRP = ITRQ= r = 0.
Provisional Patent Application Dated January 19, 2010 c. Compute sine and cosine of rotation angles using equations (9) and (10), and store them.
If Cos(DP < Cos (-36 ), set Cos(DP = Cos (-36 ) and Sin(DP = Sin (-36 ).
d. Form (m+k) x (m+k) size gain matrices [Y0] and [YV] of (1) and (2) respectively each in a compact storage exploiting sparsity, using equations (12) to (15). In [YV]
matrix, replace diagonal elements corresponding to PV-nodes by very large value, say, 10.010.
Factorize [Y8] and [YV] using the same ordering of nodes regardless of node-types and store them using the same indexing and addressing information.
e. Compute residues [AP] at PQ- and PV-nodes and [AQ] at only PQ-nodes. If all are less than the tolerance (s), proceed to step-m. Otherwise follow the next step.
f. Compute the vector of modified residues [RP] using (7) for PQ-nodes, and using (11) and (16) for PV-nodes.
g. Solve (3) for [AO] and update voltage angles using, [0] = [0] + [AO].
h. Set voltage magnitudes of PV-nodes equal to the specified values, and Increment the iteration count ITRP=ITRP+1 and r=(ITRP+ITRQ)/2.
i. Compute residues [AP] at PQ- and PV-nodes and [AQ] at PQ-nodes only. If all are less than the tolerance (c), proceed to step-m. Otherwise follow the next step.
j. Compute the vector of modified residues [RQ] using (8) for only PQ-nodes.
k. Solve (5) for [AV] and update PQ-node magnitudes using [V] = [V] + [AV].
While solving equation (5), skip all the rows and columns corresponding to PV-nodes.
1. Calculate reactive power generation at PV-nodes and tap positions of tap-changing transformers. If the maximum and minimum reactive power generation capability and transformer tap position limits are violated, implement the violated physical limits and adjust the loadflow solution by the method described in "LTC Transformers and MVAR
violations in the Fast Decoupled Load Flow, IEEE Trans., PAS-101, No.9, PP.
3328-3332, September 1982".
in. Increment the iteration count ITRQ=ITRQ+1 and r=(ITRP+ITRQ)/2, and Proceed to step-d.
n. From calculated values of voltage magnitude and voltage angle at PQ-nodes, voltage angle and reactive power generation at PV-nodes, and tap position of tap changing transformers, calculate power flows through power network components.
Provisional Patent Application Dated January 19, 2010 [019] In super decoupled loadflow models [YO] and [YV] are real, sparse, symmetrical and built only from network elements. Since they are constant, they need to be factorized once only at the start of the solution. Equations (1) and (2) are to be solved repeatedly by forward and backward substitutions. [YO] and [YV] are of the same dimensions (m+k) x (m+k) when only a row/column of the slack-node or reference-node is excluded and both are triangularized using the same ordering regardless of the node-types. For a row/column corresponding to a PV-node excluded in [YV], use a large diagonal to mask out the effects of the off-diagonal terms. When the PV-node is switched to the PQ-type, removing the large diagonal reactivates the row/column corresponding to a switched PV-node to PQ-node type. This technique is especially useful in the treatment of PV-nodes in the gain matrix [YV].
[020] The convergence of the prior art FSDL method is very sensitive to the value of the restriction applied to the rotation angle. The best possible convergence from non-linearity consideration could be achieved by restricting rotation angle to maximum of -36 . However, when large Resistance (R)/Reactance (X) ratio branch is present in the network without creating non-linearity problem, it takes large number of iterations to converge.
Moreover, the presence of twice the transformed value of network shunts in the diagonal elements of the gain matrix [YV], causes it to take increased number of iterations in case of certain power networks. These problems are overcome by formulating power flow equations such that transformed values of known/given/specified/scheduled/set quantities appears in the diagonal elements of the gain matrix [YV] as described in the following.
SUMMARY OF THE INVENTION
[021] It is a primary object of the present invention to improve convergence and efficiency of the prior art Fast Super Decoupled Loadflow calculation method under wide range of system operating conditions and network parameters for use in power flow control and voltage control in the power system. A further object of the invention is to reduce computer storage/memory or calculating volume requirements.
[022] The above and other objects are achieved, according to the present invention, with any one system of Patel Super Decoupled Loadflow, X'X'-version (PSDL-X'X') and its many manifestations, calculation for Electrical Power System. In context of voltage control, the Provisional Patent Application Dated January 19, 2010 inventive system of PSDL calculation for Electrical Power system consisting of plurality of electromechanical rotating machines, transformers and electrical loads connected in a network, each machine having a reactive power characteristic and an excitation element which is controllable for adjusting the reactive power generated or absorbed by the machine, and some of the transformers each having a tap changing element, which is controllable for adjusting turns ratio or alternatively terminal voltage of the transformer, said system comprising:
means defining and solving loadflow model of the power network characterized by inventive PSDLmodel for providing an indication of the quantity of reactive power to be supplied by each generator including the slack/reference node generator, and for providing an indication of turns ratio of each tap-changing transformer in dependence on the obtained-online or given/specified/set/known controlled network variables/parameters, and physical limits of operation of the network components, machine control means connected to the said means defining and solving loadflow model and to the excitation elements of the rotating machines for controlling the operation of the excitation elements of machines to produce or absorb the amount of reactive power indicated by said means defining and solving loadflow model in dependence on the set of obtained-online or given/specified/set controlled network variables/parameters, and physical limits of excitation elements, transformer tap position control means connected to the said means defining and solving loadflow model and to the tap changing elements of the controllable transformers for controlling the operation of the tap changing elements to adjust the turns ratios of transformers indicated by the said means defining and solving loadflow model in dependence on the set of obtained-online or given/specified/set controlled network variables/parameters, and operating limits of the tap-changing elements.
10231 The method and system of voltage control according to the preferred embodiment of the present invention provide voltage control for the nodes connected to PV-node generators and tap changing transformers for a network in which real power assignments have already been fixed.
The said voltage control is realized by controlling reactive power generation and transformer tap positions.
Provisional Patent Application Dated January 19, 2010 [0241 The inventive system of Patel Super Decoupled Loadflow (PSDL) calculation can be used to solve a model of the Electrical Power System for voltage control. For this purpose real and reactive power assignments or settings at PQ-nodes, real power and voltage magnitude assignments or settings at PV-nodes and transformer turns ratios, open/close status of all circuit breaker, the reactive capability characteristic or curve for each machine, maximum and minimum tap positions limits of tap changing transformers, operating limits of all other network components, and the impedance or admittance of all lines are supplied. A
decoupled loadflow system of equations (1) and (2) is solved by an iterative process until convergence. During this solution the quantities which can vary are the real and reactive power at the reference/slack node, the reactive power set points for each PV-node generator, the transformer transformation ratios, and voltages on all PQ-nodes nodes, all being held within the specified ranges. When the iterative process converges to a solution, indications of reactive power generation at PV-nodes and transformer turns-ratios or tap-settings are provided. Based on the known reactive power capability characteristics of each PV-node generator, the determined reactive power values are used to adjust the excitation current to each generator to establish the reactive power set points.
The transformer taps are set in accordance with the turns ratio indication provided by the system of loadflow calculation.
[0251 For voltage control, system of PSDLcalculation can be employed either on-line or off-line. In off-line operation, the user can simulate and experiment with various sets of operating conditions and determine reactive power generation and transformer tap settings requirements. A
general-purpose computer can implement the entire system. For on-line operation, the load flow calculation system is provided with data identifying the current real and reactive power assignments and transformer transformation ratios, the present status of all switches and circuit breakers in the network and machine characteristic curves in steps-10 and -20 in Fig. 5, and steps 12, 20, 32, 44, and 50 in Fig 6 described below. Based on this information, a model of the system based on gain matrices of invented load flow calculation systems provide the values for the corresponding node voltages, reactive power set points for each machine and the transformation ratio and tap changer position for each transformer.
[0261 The present inventive system of loadflow calculation for Electrical Power System consists of, a Patel Super Decoupled Loadflow: X'X'-version (PSDL-X'X') method characterized in that Provisional Patent Application Dated January 19, 2010 1) modified real power mismatch at any PQ-node-p is calculated as RPp = [APp' + (Gpp'/ Bpp') AQp'] / Vp2, which takes different form for different manifestation of the PSDL-X'X' method, 2) the presence of transformed values of known/given/specified/scheduled/set quantities in the diagonal elements of the gain matrix [YO] of P-O sub-problem and the gain matrix [YV] of the Q-V sub-problem, and 3) transformation angles are restricted to maximum of -48 to -90 , and these inventive loadflow calculation steps together yield some processing acceleration and consequent efficiency gains, and are each individually inventive, and 4) except in the manifestation PSDL-BX, modified real power mismatches at PV-nodes are determined as RPp =
APp/(KpVp2) in order to keep gain matrix [YO] symmetrical. If the value of factor Kp 1, the gain matrix [YO] becomes unsymmetrical in that elements in the rows corresponding to PV-nodes are defined without transformation or rotation applied, as YOpq= -Bpq.
BRIEF DESCRIPTION OF DRAWINGS
[027] Fig. 1 is a flow-chart of prior art FSDL method [028] Fig. 2 is a flow-chart embodiment of the invented Patel Super Decoupled Loadflow (PSDL-YY) calculation method [029] Fig. 3 is a flow-chart embodiment of the invented Patel Super Decoupled Loadflow (PSDL- BGX', PSDL-BGY, and PSDL-BGX)=calculation methods [030] Fig. 4 is a flow-chart embodiment of the invented Patel Super Decoupled Loadflow (PSDL- X'GpvX') calculation method [031] Fig. 5 is a flow-chart of the overall controlling method for an electrical power system involving loadflow calculation as a step which can be executed using one of the loadflow calculation methods embodied in Figs. 1, 2, 3 or 4 [032] Fig. 6 is a flow-chart of the simple special case of voltage control system in overall controlling system of Fig. 5 for an electrical power system [033] Fig. 7 is a one-line diagram of an exemplary 6-node power network having a slack/swing/reference node, two PV-nodes, and three PQ-nodes DESCRIPTION OF A PREFERED EMBODYMENT
Provisional Patent Application Dated January 19, 2010 [0341 A loadflow calculation is involved as a step in power flow control and/or voltage control in accordance with Fig. 5 or Fig. 6. A preferred embodiment of the present invention is described with reference to Fig. 7 as directed to achieving voltage control.
[0351 Fig. 7 is a simplified one-line diagram of an exemplary utility power network to which the present invention may be applied. The fundamentals of one-line diagrams are described in section 6.11 of the text ELEMENTS OF POWER SYSTEM ANALYSIS, forth edition, by William D.
Stevenson, Jr., McGrow-Hill Company, 1982. In Fig. 7, each thick vertical line is a network node.
The nodes are interconnected in a desired manner by transmission lines and transformers each having its impedance, which appears in the loadflow models. Two transformers in Fig.7 are equipped with tap changers to control their turns ratios in order to control terminal voltage of node-1 and node-2 where large loads are connected.
[0361 Node-6 is a reference-node alternatively referred to as the slack or swing -node, representing the biggest power plant in a power network. Nodes-4 and -5 are PV-nodes where generators are connected, and nodes-1, -2, and -3 are PQ-nodes where loads are connected. It should be noted that the nodes-4, -5, and -6 each represents a power plant that contains many generators in parallel operation. The single generator symbol at each of the nodes-4, -5, and -6 is equivalent of all generators in each plant. The power network further includes controllable circuit breakers located at each end of the transmission lines and transformers, and depicted by cross markings in one-line diagram of Fig. 7. The circuit breakers can be operated or in other words opened or closed manually by the power system operator or relevant circuit breakers operate automatically consequent of unhealthy or faulty operating conditions. The operation of one or more circuit breakers modify the configuration of the network. The arrows extending certain nodes represent loads.
[0371 A goal of the present invention is to provide a reliable and computationally efficient loadflow calculation that appears as a step in power flow control and/or voltage control systems of Fig. 5 and Fig. 6. However, the preferred embodiment of loadflow calculation as a step in control of terminal node voltages of PV-node generators and tap-changing transformers is illustrated in the flow diagram of Fig. 6 in which present invention resides in function steps 60 and 62.
Provisional Patent Application Dated January 19, 2010 [038] Short description of other possible embodiment of the present invention is also provided herein. The present invention relates to control of utility/industrial power networks of the types including plurality of power plants/generators and one or more motors/loads, and connected to other external utility. In the utility/industrial systems of this type, it is the usual practice to adjust the real and reactive power produced by each generator and each of the other sources including synchronous condensers and capacitor/inductor banks, in order to optimize the real and reactive power generation assignments of the system. Healthy or secure operation of the network can be shifted to optimized operation through corrective control produced by optimization functions without violation of security constraints. This is referred to as security constrained optimization of operation. Such an optimization is described in the United States Patent Number: 5,081,591 dated Jan. 13, 1992: "Optimizing Reactive Power Distribution in an Industrial Power Network", where the present invention can be embodied by replacing the step nos. 56 and 66 each by a step of constant gain matrices [YO] and [YV], and replacing steps of "Exercise Newton-Raphson Algorithm" by steps of "Exercise Patel Super Decoupled Loadflow Calculation"
in places of steps 58 and 68. This is just to indicate the possible embodiment of the present invention in optimization functions like in many others including state estimation function. However, invention is being claimed through a simplified embodiment without optimization function as in Fig. 6 in this application. The inventive steps-60 and -62 in Fig.6 are different than those corresponding steps-56, and -58, which constitute a well known Newton-Raphson loadflow method, and were not inventive even in United States Patent Number: 5,081,591.
[0391 In Fig. 6, function step 10 provides stored impedance values of each network component in the system. This data is modified in a function step 12, which contains stored information about the open or close status of each circuit breaker. For each breaker that is open, the function step 12 assigns very high impedance to the associated line or transformer. The resulting data is than employed in a function step 14 to establish an admittance matrix for the power network. The data provided by function step 10 can be input by the computer operator from calculations based on measured values of impedance of each line and transformer, or on the basis of impedance measurements after the power network has been assembled.
Provisional Patent Application Dated January 19, 2010 [040] Each of the transformers Ti and T2 in Fig. 7 is a tap changing transformer having a plurality of tap positions each representing a given transformation ratio. An indication of initially assigned transformation ratio for each transformer is provided by function step 20.
[041] The indications provided by function steps 14, and 20 are supplied to a function step 60 in which constant gain matrices [YO] and [YV] of any of the invented super decoupled loadflow models are constructed, factorized and stored. The gain matrices [YO] and [YV]
are conventional tools employed for solving Super Decoupled Loadflow model defined by equations (1) and (2) for a power system.
[042] Indications of initial reactive power, or Q on each node, based on initial calculations or measurements, are provided by a function step 30 and these indications are used in function step 32, to assign a Q level to each generator and motor. Initially, the Q assigned to each machine can be the same as the indicated Q value for the node to which that machine is connected.
[043] An indication of measured real power, P, on each node is supplied by function step 40.
Indications of assigned/specified/scheduled/set generating plant loads that are constituted by known program are provided by function step 42, which assigns the real power, P, load for each generating plant on the basis of the total P which must be generated within the power system. The value of P assigned to each power plant represents an economic optimum, and these values represent fixed constraints on the variations, which can be made by the system according to the present invention. The indications provided by function steps 40 and 42 are supplied to function step 44 which adjusts the P distribution on the various plant nodes accordingly. Function step 50 assigns initial approximate or guess solution to begin iterative method of loadflow calculation, and reads data file of operating limits on power network components, such as maximum and minimum reactive power generation capability limits of PV-nodes generators.
[044] The indications provided by function steps 32, 44, 50 and 60 are supplied to function step 62 where inventive Fast Super Decoupled Loadflow calculation or Novel Fast Super Decoupled Loadflow calculation is carried out, the results of which appear in function step 64. The loadflow calculation yields voltage magnitudes and voltage angles at PQ-nodes, real and reactive power generation by the slack/swing/reference node generator, voltage angles and reactive power generation indications at PV-nodes, and transformer turns ratio or tap position indications for tap Provisional Patent Application Dated January 19, 2010 changing transformers. The system stores in step 62 a representation of the reactive capability characteristic of each PV-node generator and these characteristics act as constraints on the reactive power that can be calculated for each PV-node generator for indication in step 64. The indications provided in step 64 actuate machine excitation control and transformer tap position control. All the loadflow calculation methods using PSDLmodels can be used to effect efficient and reliable voltage control in power systems as in the process flow diagram of Fig. 6.
[045] Particular inventive loadflow calculation steps of all the PSDLmethods are described followed by inventive PSDLmodels in terms of equations for determining elements of vectors [RP], [RQ], and elements of gain matrices [Y0], and [YV] of equations (1) and (2), further followed by detailed steps of inventive loadflow calculation methods. Also, calculation accelerating and storage reducing techniques are described, which are not inventive.
[046] The presence of transformed values of known/given/specified/scheduled/set quantities in the diagonal elements of the gain matrix [YO] of the P-0 sub-problem in equation (22) and the diagonal elements of the gain matrix [YV] of the Q-V sub-problem in equation (23), which takes different form for different manifestation of the PSDL-X'X' method, is brought about by such formulation of loadflow equations. The said transformed quantities in the diagonal elements of the gain matrix [YO] and the gain matrix [YV] improved convergence and the reliability of obtaining converged loadflow calculation, when modified real power mismatch at any PQ-node-p is calculated as RPp = [APp' + (Gpp'/ Bpp') AQp'] / Vp2, which takes different form for different manifestation of the PSDL-X'X' method.
Patel Super Decoupled Loadflow: X'X'-version (PSDL-X'X') [047] The general model, in successive (10, 1 V) iteration scheme represented by sequence of equations (3) to (6), can be realized as PSDL-X'X', from which manifested are many versions.
The elements of [RP], [RQ], [Y0] and [YV] are defined by (17) to (30).
RPp = [APr' + (Gpp'/ Bpp') AQp'] / Vp2 -for PQ-nodes (17) RQp = [AQp' - (Gpp'/ Bpp') OPp'] / Vp -for PQ-nodes (18) RPp = [APp / (Kp*Vp2)] -for PV-nodes (19) Provisional Patent Application Dated January 19, 2010 YOpq = -I /Xpq' and YVpq = -I /Xpq' (20) YOpp = bpg + Y--YOpq and YVpp = bPV + Y--YVpq (21) q>p q>p Where, bp0 = 6~SNp ~- 'e rs f,~ Y~SH ~ / to + t 6V Ccr . 9 (22) bp,, = I [QSHp' - (Gpp'/ Bpp') PSHp'] / VS2 - (2-I) bpCos I' (23) APP' = APPCos(Dp + AQpSin'p -for PQ-nodes (24) AQp' = AQPCos(Dp - APpSin(Dp -for PQ-nodes (25) PSHp' = PSHPCos(Dp + QSHPSin(Dp -for PQ-nodes (26) QSHp' = QSHpCos(Dp - PSHpSin(Dp -for PQ-nodes (27) Cos( DP = Absolute [Bpp / v (GPp2 + BPp2)] Cos (any angle from 0 to -90 degrees) (28) Sinop = -Absolute [Gpp / v (GPp2 + BPP2)] Sin (any angle from 0 to -90 degrees) (29) Kp = Absolute (BPP/YOPp) (30) [0481 Where, Gpp' and Bpp' are the transformed values of Gpp and Bpp as given by equation (107) in the appendix. The factor Kp of (30) is restricted to the minimum of 0.75 determined experimentally; however its restriction is lowered to the minimum value of 0.6 when its average over all less than 1.0 values at PV-nodes is less than 0.6. This factor is system and method independent. However it can be tuned for the best possible convergence for any given system.
This statement is valid when the factor Kp is applied in the manner of equation (19) in all the models derived in the following from the most general model PSDL-X'X'. The factor "I" in equations (22) and (23) can take any value from - oo, ..., -2, -1, 0, 1, 2, ..., + oo.
[0491 The definition of YOpq in (20) is simplified because it does not explicitly state that it always takes the value of -Bpq for a branch connected between two PV-nodes or a PV-node and the slack-node. This fact should be understood implied in all the definitions of YOpq in this document. Xpq' in equation (20) is the transformed branch reactance defined in the appendix by equation (108).
Provisional Patent Application Dated January 19, 2010 The following and others invented models will be completed when the application is finalized in about one year time as was done in the international application PCT/CA2003/001312.
Patel Super Decoupled Loadflow: YY-version (PSDL-YY) Patel Super Decoupled Loadflow: XX-version (PSDL-XX) Patel Super Decoupled Loadflow: BX-version (PSDL-BX) Patel Super Decoupled Loadflow: X'B'-version (PSDL-X'B') Patel Super Decoupled Loadflow: YB'-version (PSDL-YB') Patel Super Decoupled Loadflow: B'X'-version (PSDL-B'X') Patel Super Decoupled Loadflow: B'Y-version (PSDL- B'Y) Models using Simultaneous (1V, 10) Iteration Scheme Models using Global Corrections APPENDIX
[0501 The following steps give the procedure for determining transformed/rotated branch admittance necessary in forming symmetrical gain matrices [YV] and/or [Y0] of the PSDLmodels.
1. Compute: Op = arctan (Gpp/Bpp) and Dq = arctan (Gqq/Bqq) (103) 2. Compute the average of rotations at the terminal nodes p and q of a branch:
(Iav = ((D p + thq)/2 (104) 3. Compare I av with the Limiting Rotation Angle (LRA) and let'av to be the smaller of the two:
Dav = minimum ((Dav, LRA) (105) 4. Compute transformed pq-th element of the admittance matrix:
Ypq' = Gpq' + jBpq' = (Cos I av + j Sin Oav) (Gpq +JBpq) (106) YPp' = Gpp' +j Bpp' = Y,-(Gpq' +.1BPq') (107) q>p 5. Note that the transformed branch reactance is:
Xpq' = Bpq'/(Gpq'2 + Bpq'2) (108) Similarly, Xpp' = Bpp'/(Gpp'2 + Bpp'2) (109) Provisional Patent Application Dated January 19, 2010 REFERENCES
Foreign Patent Document 1. US Patent Number: 4868410 dated September 19, 1989: "System of Load Flow Calculation for Electric Power System"
2. US Patent Number: 5081591 dated January 14, 1992: "Optimizing Reactive Power Distribution in an Industrial Power Network"
Published Pending Patent Applications 3. Canadian Patent Application Number: CA2107388 dated 9 November, 1993:
"System of Fast Super Decoupled Loadflow Calcutation for Electrical Power System"
4. International Patent Application Number: PCT/CA/2003/001312 dated 29 August, 2003:
"System of Super Super Decoupled Loadflow Computation for Electrical Power System"
Other Publications 5. Stagg G.W. and El-Abiad A.H., "Computer methods in Power System Analysis", McGrow-Hill, New York, 1968 6. S.B.Patel, "Fast Super Decoupled Loadflow", IEE proceedings Part-C, Vol.139, No.1, pp. 13-20, January 1992 7. S.B.Patel, "Super Super Decoupled Loadflow", TIC-STH 2009 IEEE Conference proceedings, pp. 652-659, September 26-27, 2009 (Priority Document)
Claims
1. A method of forming/defining and solving a model of the power network to affect control of voltages and power flows in a power system, comprising the steps of.
obtaining on-line/simulated data of open/close status of switches and circuit breakers in the power network, and reading data of operating limits of the network components including PV-node, a generator-node where Real-Power-P and Voltage-Magnitude-V are given/assigned/specified/set, generators maximum and minimum reactive power generation capability limits and transformers tap position limits, obtaining on-line readings of given/assigned/specified/set real and reactive power at PQ-nodes, the load-nodes where Real-Power-P and Reactive-Power-Q are given/assigned/specified/set, real power and voltage magnitude at PV-nodes, voltage magnitude and angle at the reference/slack node, and transformer turns ratios, which are the controlled variables/parameters, initiating loadflow calculation with initial approximate/guess solution of the same voltage magnitude and angle as those of the slack/reference node for all the other nodes referred to as the slack-start, forming and storing factorized gain matrices [Y.theta.] and [YV] using the same indexing and addressing information for both as they are of the same dimension and sparsity structure, wherein said [Y.theta.] relate vector of modified real power mismatches [RP]
to angle corrections vector [.delta..theta.] in equation [RP] =[Y.theta.]
[.delta..theta.] referred to as P-.theta.
sub-problem, and said [YV] relate vector of modified reactive power mismatches [RQ] to voltage magnitude corrections vector [.delta.V] in equation [RQ] =[YV]
[AV]
referred to as Q-V sub-problem, restricting transformation/rotation angle .PHI.p to maximum in the range -48° to -90° in determining transformed real and reactive power mismatch as, .delta.P p'= .delta.P pCos.PHI.p + .delta.Q pSin.PHI.p -for PQ-nodes (24) .delta.Q p'= .delta.Q pCos.PHI.p - .delta.P pSin.PHI.p -for PQ-nodes (25) Wherein, .delta.P p and .delta.Q p are real and reactive power mismatches at node-p, calculating modified real and reactive power mismatches as given in the following in the most general form of equations that take different form for different Patel Super Decoupled Loadflow model:
RP p = [.delta.P p' + (G pp'/B pp') .delta.Q p'] /V p2 -for PQ-nodes (17) RQ p = [.delta.Qp' - (G pp'/B pp') .delta.P p'] / V p -for PQ-nodes (18) and calculating modified real power mismatch at a PV-node as, RP p = .delta.P p/(K pV p2) -for PV-nodes (19) Wherein, K p = Absolute (B pp/Y.theta.pp) (30) and V p is voltage magnitude at node-p, and B pp is imaginary part of the diagonal element Y pp of the admittance matrix without network shunts, and Y.theta.pp is the diagonal element of the gain matrix [Y.theta.], using network shunt parameters b p.theta. and b pv that appears in diagonal elements of gain matrix [Y.theta.] and [YV] as given in the following in the most general form of equations that take different form for different loadflow model:
b p.theta. = (22) b pv = I [QSH p' - (G pp'/B pp') PSH p'] / V s2 - (2-I) b pCos.PHI.p (23) wherein, G pp'and B pp' are the real and imaginary parts of the transformed diagonal element Y pp' of the admittance matrix without network shunts, b p is network shunt susceptance at node-p, V s is slack-node voltage magnitude, and the factor "I"
in equations (22) and (23) can take any value from - ~, ..., -2, -1, 0, 1, 2, ..., + ~;
and, PSH p' = PSH pCos.PHI.p+ QSH pSin.PHI.p -for PQ-nodes (26) QSH p' = QSH pCos.PHI.p - PSH pSin.PHI.p -for PQ-nodes (27) wherein, PSH p, and QSH p are given/specified/scheduled/set real and reactive power respectively, performing loadflow calculation by solving a super decoupled loadflow model of the power network defined by set of equations [RP] =[Y.theta.] [.delta..theta.]
and [RQ] = [YV]
[.delta.V] employing successive (1.theta., 1V) iteration scheme, wherein each iteration involves one calculation of [RP] and [.delta..theta.] to update voltage angle vector [.theta.] and then one calculation of [RQ] and [.delta.V] to update voltage magnitude vector [V], to calculate values of the voltage angle and the voltage magnitude at PQ-nodes, voltage angle and reactive power generation at PV-nodes, and turns ratio of tap-changing transformers in dependence on the set of said obtained-online readings, or given/scheduled/specified/set values of controlled variables/parameters and physical limits of operation of the network components, evaluating loadflow calculation for any of the over loaded power network components and for under/over voltage at any of the network nodes, correcting one or more controlled parameters and repeating the calculating, performing, evaluating, and correcting steps until evaluating step finds no over loaded components and no under/over voltages in the power network, and affecting a change in the power flowing through network components and voltage magnitudes and angles at the nodes of the power network by actually implementing the finally obtained values of controlled variables/parameters after evaluating step finds a good power system or alternatively a power network without any overloaded components and under/over voltages, which finally obtained controlled variables/parameters however are stored in case of simulation for acting upon fast in case the simulated event actually occurs.
obtaining on-line/simulated data of open/close status of switches and circuit breakers in the power network, and reading data of operating limits of the network components including PV-node, a generator-node where Real-Power-P and Voltage-Magnitude-V are given/assigned/specified/set, generators maximum and minimum reactive power generation capability limits and transformers tap position limits, obtaining on-line readings of given/assigned/specified/set real and reactive power at PQ-nodes, the load-nodes where Real-Power-P and Reactive-Power-Q are given/assigned/specified/set, real power and voltage magnitude at PV-nodes, voltage magnitude and angle at the reference/slack node, and transformer turns ratios, which are the controlled variables/parameters, initiating loadflow calculation with initial approximate/guess solution of the same voltage magnitude and angle as those of the slack/reference node for all the other nodes referred to as the slack-start, forming and storing factorized gain matrices [Y.theta.] and [YV] using the same indexing and addressing information for both as they are of the same dimension and sparsity structure, wherein said [Y.theta.] relate vector of modified real power mismatches [RP]
to angle corrections vector [.delta..theta.] in equation [RP] =[Y.theta.]
[.delta..theta.] referred to as P-.theta.
sub-problem, and said [YV] relate vector of modified reactive power mismatches [RQ] to voltage magnitude corrections vector [.delta.V] in equation [RQ] =[YV]
[AV]
referred to as Q-V sub-problem, restricting transformation/rotation angle .PHI.p to maximum in the range -48° to -90° in determining transformed real and reactive power mismatch as, .delta.P p'= .delta.P pCos.PHI.p + .delta.Q pSin.PHI.p -for PQ-nodes (24) .delta.Q p'= .delta.Q pCos.PHI.p - .delta.P pSin.PHI.p -for PQ-nodes (25) Wherein, .delta.P p and .delta.Q p are real and reactive power mismatches at node-p, calculating modified real and reactive power mismatches as given in the following in the most general form of equations that take different form for different Patel Super Decoupled Loadflow model:
RP p = [.delta.P p' + (G pp'/B pp') .delta.Q p'] /V p2 -for PQ-nodes (17) RQ p = [.delta.Qp' - (G pp'/B pp') .delta.P p'] / V p -for PQ-nodes (18) and calculating modified real power mismatch at a PV-node as, RP p = .delta.P p/(K pV p2) -for PV-nodes (19) Wherein, K p = Absolute (B pp/Y.theta.pp) (30) and V p is voltage magnitude at node-p, and B pp is imaginary part of the diagonal element Y pp of the admittance matrix without network shunts, and Y.theta.pp is the diagonal element of the gain matrix [Y.theta.], using network shunt parameters b p.theta. and b pv that appears in diagonal elements of gain matrix [Y.theta.] and [YV] as given in the following in the most general form of equations that take different form for different loadflow model:
b p.theta. = (22) b pv = I [QSH p' - (G pp'/B pp') PSH p'] / V s2 - (2-I) b pCos.PHI.p (23) wherein, G pp'and B pp' are the real and imaginary parts of the transformed diagonal element Y pp' of the admittance matrix without network shunts, b p is network shunt susceptance at node-p, V s is slack-node voltage magnitude, and the factor "I"
in equations (22) and (23) can take any value from - ~, ..., -2, -1, 0, 1, 2, ..., + ~;
and, PSH p' = PSH pCos.PHI.p+ QSH pSin.PHI.p -for PQ-nodes (26) QSH p' = QSH pCos.PHI.p - PSH pSin.PHI.p -for PQ-nodes (27) wherein, PSH p, and QSH p are given/specified/scheduled/set real and reactive power respectively, performing loadflow calculation by solving a super decoupled loadflow model of the power network defined by set of equations [RP] =[Y.theta.] [.delta..theta.]
and [RQ] = [YV]
[.delta.V] employing successive (1.theta., 1V) iteration scheme, wherein each iteration involves one calculation of [RP] and [.delta..theta.] to update voltage angle vector [.theta.] and then one calculation of [RQ] and [.delta.V] to update voltage magnitude vector [V], to calculate values of the voltage angle and the voltage magnitude at PQ-nodes, voltage angle and reactive power generation at PV-nodes, and turns ratio of tap-changing transformers in dependence on the set of said obtained-online readings, or given/scheduled/specified/set values of controlled variables/parameters and physical limits of operation of the network components, evaluating loadflow calculation for any of the over loaded power network components and for under/over voltage at any of the network nodes, correcting one or more controlled parameters and repeating the calculating, performing, evaluating, and correcting steps until evaluating step finds no over loaded components and no under/over voltages in the power network, and affecting a change in the power flowing through network components and voltage magnitudes and angles at the nodes of the power network by actually implementing the finally obtained values of controlled variables/parameters after evaluating step finds a good power system or alternatively a power network without any overloaded components and under/over voltages, which finally obtained controlled variables/parameters however are stored in case of simulation for acting upon fast in case the simulated event actually occurs.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CA2712873A CA2712873C (en) | 2010-08-18 | 2010-08-18 | Method of artificial neural network loadflow computation for electrical power system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CA2712873A CA2712873C (en) | 2010-08-18 | 2010-08-18 | Method of artificial neural network loadflow computation for electrical power system |
Publications (2)
Publication Number | Publication Date |
---|---|
CA2712873A1 true CA2712873A1 (en) | 2012-02-18 |
CA2712873C CA2712873C (en) | 2016-05-03 |
Family
ID=45596086
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CA2712873A Active CA2712873C (en) | 2010-08-18 | 2010-08-18 | Method of artificial neural network loadflow computation for electrical power system |
Country Status (1)
Country | Link |
---|---|
CA (1) | CA2712873C (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105633979A (en) * | 2016-03-21 | 2016-06-01 | 中国电力科学研究院 | Reactive power compensation method and system |
CN113283547A (en) * | 2021-07-21 | 2021-08-20 | 之江实验室 | Optimal power flow calculation method based on multi-task deep learning |
CN113489010A (en) * | 2021-06-21 | 2021-10-08 | 清华大学 | Power flow sample convergence adjusting method for power system |
CN113705986A (en) * | 2021-08-12 | 2021-11-26 | 武汉大学 | Risk theory-based core backbone network frame construction method |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11853384B2 (en) | 2014-09-22 | 2023-12-26 | Sureshchandra B. Patel | Methods of patel loadflow computation for electrical power system |
-
2010
- 2010-08-18 CA CA2712873A patent/CA2712873C/en active Active
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105633979A (en) * | 2016-03-21 | 2016-06-01 | 中国电力科学研究院 | Reactive power compensation method and system |
CN105633979B (en) * | 2016-03-21 | 2018-06-26 | 中国电力科学研究院有限公司 | A kind of Non Power Compensation Process and system |
CN113489010A (en) * | 2021-06-21 | 2021-10-08 | 清华大学 | Power flow sample convergence adjusting method for power system |
CN113489010B (en) * | 2021-06-21 | 2024-05-28 | 清华大学 | Power system power flow sample convergence adjustment method |
CN113283547A (en) * | 2021-07-21 | 2021-08-20 | 之江实验室 | Optimal power flow calculation method based on multi-task deep learning |
WO2023000450A1 (en) * | 2021-07-21 | 2023-01-26 | 之江实验室 | Multi-task deep learning-based optimal power flow calculation method |
CN113705986A (en) * | 2021-08-12 | 2021-11-26 | 武汉大学 | Risk theory-based core backbone network frame construction method |
CN113705986B (en) * | 2021-08-12 | 2023-11-07 | 武汉大学 | Method for constructing core backbone network frame based on risk theory |
Also Published As
Publication number | Publication date |
---|---|
CA2712873C (en) | 2016-05-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2007291862B2 (en) | Method of loadflow computation for electrical power system | |
CA2548096C (en) | Method of super super decoupled loadflow computation for electrical power system | |
US20150112498A1 (en) | Methods of Patel Loadflow Computation for Electrical Power System | |
US7788051B2 (en) | Method and apparatus for parallel loadflow computation for electrical power system | |
Zhang et al. | Distributed generation planning in active distribution network considering demand side management and network reconfiguration | |
US20190296548A1 (en) | Methods of Patel Loadflow Computation for Electrical Power System | |
US20120078436A1 (en) | Method of Artificial Nueral Network Loadflow computation for electrical power system | |
US20180048151A1 (en) | Methods of Patel Loadflow Computation for Electrical Power System | |
US20210049228A1 (en) | Methods of Patel Loadflow Computation for Electrical Power System | |
CA2712873A1 (en) | Method of artificial neural network loadflow computation for electrical power system | |
Chen et al. | Pareto optimal allocation of resistive‐type fault current limiters in active distribution networks with inverter‐interfaced and synchronous distributed generators | |
Preece | Improving the stability of meshed power networks: a probabilistic approach using embedded HVDC lines | |
Karagiannopoulos et al. | Data-driven control design schemes in active distribution grids: Capabilities and challenges | |
Xiao et al. | Optimal power quality compensation of energy storage system in distribution networks based on unified multi-phase OPF model | |
CA2661753C (en) | Method of loadflow computation for electrical power system | |
CA3091655A1 (en) | Methods of patel loadflow computation for electrical power system | |
CA2107388C (en) | Method of fast super decoupled loadflow computation for electrical power system | |
Mohanty et al. | Impact Assessment of PV Penetration on Unbalanced Distribution network with Dynamic load condition | |
CA2564625C (en) | Method and apparatus for parallel loadflow computation for electrical power system | |
Montenegro et al. | Harmonics analysis using sequential-time simulation for addressing smart grid challenges | |
CA2968813A1 (en) | Methods of patel loadflow computation for electrical power system | |
AU2006259212B2 (en) | System and Method of parallel loadflow calculation for electrical power system | |
Martin et al. | Loss reduction in a windfarm participating in primary voltage control using an extension of the convex distflow OPF | |
Bernier et al. | Comprehensive framework for PV integration with an OLTC in a rural distribution grid within the SMAP project | |
CN118473013B (en) | Low-voltage distribution network voltage out-of-limit suppression method and device based on control input optimization |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
EEER | Examination request |