CA2863764A1 - Procede de stimulation progressive - Google Patents

Procede de stimulation progressive Download PDF

Info

Publication number
CA2863764A1
CA2863764A1 CA 2863764 CA2863764A CA2863764A1 CA 2863764 A1 CA2863764 A1 CA 2863764A1 CA 2863764 CA2863764 CA 2863764 CA 2863764 A CA2863764 A CA 2863764A CA 2863764 A1 CA2863764 A1 CA 2863764A1
Authority
CA
Canada
Prior art keywords
fractures
fracture spacing
production
well bore
zone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
CA 2863764
Other languages
English (en)
Inventor
Ernesto Rafael Fonseca Ocampos
Anastasia Dobroskok
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shell Internationale Research Maatschappij BV
Original Assignee
Shell Internationale Research Maatschappij BV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shell Internationale Research Maatschappij BV filed Critical Shell Internationale Research Maatschappij BV
Publication of CA2863764A1 publication Critical patent/CA2863764A1/fr
Abandoned legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
CA 2863764 2013-09-19 2014-09-17 Procede de stimulation progressive Abandoned CA2863764A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201361879886P 2013-09-19 2013-09-19
US61/879,886 2013-09-19

Publications (1)

Publication Number Publication Date
CA2863764A1 true CA2863764A1 (fr) 2015-03-19

Family

ID=52666912

Family Applications (1)

Application Number Title Priority Date Filing Date
CA 2863764 Abandoned CA2863764A1 (fr) 2013-09-19 2014-09-17 Procede de stimulation progressive

Country Status (3)

Country Link
US (1) US20150075784A1 (fr)
CN (1) CN104453822A (fr)
CA (1) CA2863764A1 (fr)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10012064B2 (en) 2015-04-09 2018-07-03 Highlands Natural Resources, Plc Gas diverter for well and reservoir stimulation
US10344204B2 (en) 2015-04-09 2019-07-09 Diversion Technologies, LLC Gas diverter for well and reservoir stimulation
US10982520B2 (en) 2016-04-27 2021-04-20 Highland Natural Resources, PLC Gas diverter for well and reservoir stimulation

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10310136B2 (en) * 2015-04-24 2019-06-04 W.D. Von Gonten Laboratories Inc. Lateral placement and completion design for improved well performance of unconventional reservoirs
US20190063186A1 (en) 2016-03-17 2019-02-28 Shell Oil Company Single entry fracturing process
CN106194141A (zh) * 2016-08-19 2016-12-07 中国石油天然气股份有限公司 基于体积压裂下缝网形成的工艺方法
US10611952B2 (en) 2016-12-29 2020-04-07 Shell Oil Company Fracturing a formation with mortar slurry

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070215345A1 (en) * 2006-03-14 2007-09-20 Theodore Lafferty Method And Apparatus For Hydraulic Fracturing And Monitoring
US7934553B2 (en) * 2008-04-21 2011-05-03 Schlumberger Technology Corporation Method for controlling placement and flow at multiple gravel pack zones in a wellbore
US8210257B2 (en) * 2010-03-01 2012-07-03 Halliburton Energy Services Inc. Fracturing a stress-altered subterranean formation
CA2814750A1 (fr) * 2010-10-20 2012-04-26 Exxonmobil Upstream Research Company Procedes d'etablissement de reseau de fractures souterrain
CN103733091A (zh) * 2011-06-24 2014-04-16 德州系统大学董事会 用于确定岩层中的水力裂缝的间距的方法
US8967262B2 (en) * 2011-09-14 2015-03-03 Baker Hughes Incorporated Method for determining fracture spacing and well fracturing using the method
CA2854371C (fr) * 2011-11-04 2019-12-24 Schlumberger Canada Limited Modelisation de l'interaction de fractures hydrauliques dans des reseaux de fractures complexes
CN102606124B (zh) * 2012-03-16 2015-07-29 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 双水平井分段多簇同步体积压裂工艺技术
CN103015955B (zh) * 2012-12-28 2015-06-24 中国石油集团渤海钻探工程有限公司 裸眼水平井多簇滑套分段压裂方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10012064B2 (en) 2015-04-09 2018-07-03 Highlands Natural Resources, Plc Gas diverter for well and reservoir stimulation
US10344204B2 (en) 2015-04-09 2019-07-09 Diversion Technologies, LLC Gas diverter for well and reservoir stimulation
US10385258B2 (en) 2015-04-09 2019-08-20 Highlands Natural Resources, Plc Gas diverter for well and reservoir stimulation
US10385257B2 (en) 2015-04-09 2019-08-20 Highands Natural Resources, PLC Gas diverter for well and reservoir stimulation
US10982520B2 (en) 2016-04-27 2021-04-20 Highland Natural Resources, PLC Gas diverter for well and reservoir stimulation

Also Published As

Publication number Publication date
CN104453822A (zh) 2015-03-25
US20150075784A1 (en) 2015-03-19

Similar Documents

Publication Publication Date Title
US20150075784A1 (en) Phased stimulation methods
Shah et al. A comprehensive overview on recent developments in refracturing technique for shale gas reservoirs
CN106223922B (zh) 页岩气水平井支撑剂缝内屏蔽暂堵分段压裂工艺
CA3029247C (fr) Determination d'efficacite de deflecteur dans un puits de forage de fracture
Vincent Restimulation of unconventional reservoirs: when are refracs beneficial?
Zeng et al. Breakthrough in staged fracturing technology for deep shale gas reservoirs in SE Sichuan Basin and its implications
Soliman et al. Fracturing unconventional formations to enhance productivity
RU2526937C1 (ru) Способ разработки низкопроницаемой нефтяной залежи
Anderson* et al. Maximizing productive stimulated reservoir volume in the eagle ford-an infill case study
US20210148211A1 (en) Methods and systems for ballooned hydraulic fractures and complex toe-to-heel flooding
CN105350948B (zh) 页岩气水平井分段压裂方法和页岩气水平井完井方法
Manchanda et al. Overcoming the impact of reservoir depletion to achieve effective parent well refracturing
US9784090B2 (en) Method for selecting the location of a stimulating geothermal well
RU2732905C1 (ru) Способ проведения повторного управляемого гидравлического разрыва пласта в горизонтальных скважинах
Gutierrez et al. Improvements in multistage fracturing, Remolino field, Mexico
Li et al. Multi-stage fracturing stimulations improve well performance in tight oil reservoirs of the Changqing Oilfield
Radu et al. First Applications of Novel Microproppant to Achieve Optimal Production and Enhance Hydraulic Fracture Treatment Placement—A Romanian Case History
Pearson Hydraulic Fracturing of Horizontal Wells
Al-Naimi et al. Application of a Novel Open-Hole Horizontal Well Completion in Saudi Arabia
Salah et al. First application of cemented sliding sleeves with degradable drop ball technique optimizes horizontal multistage fracturing operations in the Middle East: Egypt western desert case study
Pyecroft* et al. Plugless non-isolated multi-stage hydraulic fractured horizontal well experiments in the Canadian Horn River Basin
Grieser et al. Horizontal Mississippian fracture completions in Oklahoma and Kansas
Austin et al. Innovation in Well Design and Lifting Coupled with Subsurface Understanding Provides New Development Concepts in a Tight Oil Carbonate Resource
CN112112617B (zh) 异位蓄能压裂开发厚层砂砾岩油藏的方法
Al-Naimi et al. Successful Case History of a Novel Open-Hole Horizontal Well Completion in Saudi Arabia

Legal Events

Date Code Title Description
FZDE Discontinued

Effective date: 20180918