CA2759362C - Procede de recuperation d'huile a deplacement de front continu dans un puits horizontal - Google Patents

Procede de recuperation d'huile a deplacement de front continu dans un puits horizontal Download PDF

Info

Publication number
CA2759362C
CA2759362C CA2759362A CA2759362A CA2759362C CA 2759362 C CA2759362 C CA 2759362C CA 2759362 A CA2759362 A CA 2759362A CA 2759362 A CA2759362 A CA 2759362A CA 2759362 C CA2759362 C CA 2759362C
Authority
CA
Canada
Prior art keywords
well
horizontal well
reservoir
horizontal
oil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CA2759362A
Other languages
English (en)
Other versions
CA2759362A1 (fr
Inventor
Conrad Ayasse
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CAPRI PETROLEUM TECHNOLOGIES Ltd
Original Assignee
CAPRI PETROLEUM TECHNOLOGIES Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CAPRI PETROLEUM TECHNOLOGIES Ltd filed Critical CAPRI PETROLEUM TECHNOLOGIES Ltd
Priority to CA2759362A priority Critical patent/CA2759362C/fr
Priority to US13/314,078 priority patent/US8960317B2/en
Publication of CA2759362A1 publication Critical patent/CA2759362A1/fr
Application granted granted Critical
Publication of CA2759362C publication Critical patent/CA2759362C/fr
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/30Specific pattern of wells, e.g. optimising the spacing of wells
    • E21B43/305Specific pattern of wells, e.g. optimising the spacing of wells comprising at least one inclined or horizontal well
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)

Abstract

On décrit un procédé de combustion in situ qui entraîne la production simultanée de liquides et de gaz de combustion, ledit procédé combinant linjection de fluide, la séparation de phases par gravité et le drainage par gravité pour produire des hydrocarbures à partir dun gisement pétrolier souterrain. Ledit procédé comprend les étapes qui consistent à : injecter initialement un gaz à travers un puits horizontal situé à un niveau supérieur du gisement et à produire des gaz de combustion et du pétrole à travers des puits parallèles et latéralement décalés situés à un niveau inférieur du gisement. Ledit procédé dexploitation de gisement comprend la conversion séquentielle des puits de production en puits dinjection par balayage en ligne. Le procédé peut également être mis en uvre sans combustion in situ, en utilisant plutôt une injection de solvant gazeux ou de vapeur.
CA2759362A 2011-11-25 2011-11-25 Procede de recuperation d'huile a deplacement de front continu dans un puits horizontal Expired - Fee Related CA2759362C (fr)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CA2759362A CA2759362C (fr) 2011-11-25 2011-11-25 Procede de recuperation d'huile a deplacement de front continu dans un puits horizontal
US13/314,078 US8960317B2 (en) 2011-11-25 2011-12-07 Horizontal well line-drive oil recovery process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CA2759362A CA2759362C (fr) 2011-11-25 2011-11-25 Procede de recuperation d'huile a deplacement de front continu dans un puits horizontal

Publications (2)

Publication Number Publication Date
CA2759362A1 CA2759362A1 (fr) 2013-05-25
CA2759362C true CA2759362C (fr) 2016-01-19

Family

ID=48464190

Family Applications (1)

Application Number Title Priority Date Filing Date
CA2759362A Expired - Fee Related CA2759362C (fr) 2011-11-25 2011-11-25 Procede de recuperation d'huile a deplacement de front continu dans un puits horizontal

Country Status (1)

Country Link
CA (1) CA2759362C (fr)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104011331B (zh) 2011-10-21 2017-09-01 尼克森能源无限责任公司 伴加氧的蒸汽辅助重力泄油方法
CN104919134B (zh) 2012-05-15 2018-11-06 尼克森能源无限责任公司 用于受损沥青储层的sagdox几何结构
CN106368667A (zh) * 2015-07-20 2017-02-01 中国石油天然气股份有限公司 用于稠油的立体双水平井井网及稠油的开采方法
CN106761612B (zh) * 2017-02-14 2019-03-15 中国石油大学(北京) 拉链式布缝的双压裂水平井异井异步注水采油方法

Also Published As

Publication number Publication date
CA2759362A1 (fr) 2013-05-25

Similar Documents

Publication Publication Date Title
US20210277757A1 (en) Pressure assisted oil recovery
CA2857211C (fr) Production de petrole lourd par prechauffage electromagnetique et injection de gaz
US5803171A (en) Modified continuous drive drainage process
US7621326B2 (en) Petroleum extraction from hydrocarbon formations
CA2759356C (fr) Procede de recuperation d'huile a l'aide de puits horizontaux croises
US20130105147A1 (en) Recovery From A Hydrocarbon Reservoir
RU2539048C2 (ru) Способ добычи нефти при помощи внутрипластового горения (варианты)
US20130146284A1 (en) Staggered horizontal well oil recovery process
ZA200603083B (en) Hydrocarbon recovery from impermeable oil shales
US8770289B2 (en) Method and system for lifting fluids from a reservoir
WO2012170157A2 (fr) Récupération d'hydrocarbures par une régulation de production de gaz pour des solvants ou gaz non condensables
CA2759362C (fr) Procede de recuperation d'huile a deplacement de front continu dans un puits horizontal
US20150192002A1 (en) Method of recovering hydrocarbons from carbonate and shale formations
CA2759357C (fr) Procede de recuperation d'huile a l'aide de puits horizontal espace
WO2013075206A1 (fr) Procédé de récupération de pétrole par balayage en ligne dans un puits horizontal
US8960317B2 (en) Horizontal well line-drive oil recovery process
CA2899805A1 (fr) Deshydratation de zones pauvres par injection de gnc dans les puits de production et d'injection
WO2013075208A1 (fr) Procédé de récupération de pétrole mettant en œuvre des puits horizontaux croisés
WO2013075207A1 (fr) Procédé de récupération de pétrole dans des puits horizontaux disposés en quinconce
WO1997012119A1 (fr) Procede modifie de drainage a commande continue
CA2180267A1 (fr) Procede modifie de drainage a commande continue
CA2976575A1 (fr) Configuration de puits en vue de la coinjection
CA2545505A1 (fr) Extraction de petrole de formations d'hydrocarbures
CA2813001A1 (fr) Procede de commande d'une operation de recuperation et de valorisation dans un reservoir

Legal Events

Date Code Title Description
MKLA Lapsed

Effective date: 20201125