CA2699503C - Procede d'utilisation de signatures de pression pour predire des anomalies de puits d'injection - Google Patents
Procede d'utilisation de signatures de pression pour predire des anomalies de puits d'injection Download PDFInfo
- Publication number
- CA2699503C CA2699503C CA2699503A CA2699503A CA2699503C CA 2699503 C CA2699503 C CA 2699503C CA 2699503 A CA2699503 A CA 2699503A CA 2699503 A CA2699503 A CA 2699503A CA 2699503 C CA2699503 C CA 2699503C
- Authority
- CA
- Canada
- Prior art keywords
- pressure
- fracture
- formation
- fracture behavior
- pressure signature
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/06—Arrangements for treating drilling fluids outside the borehole
- E21B21/063—Arrangements for treating drilling fluids outside the borehole by separating components
- E21B21/065—Separating solids from drilling fluids
- E21B21/066—Separating solids from drilling fluids with further treatment of the solids, e.g. for disposal
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/01—Arrangements for handling drilling fluids or cuttings outside the borehole, e.g. mud boxes
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/005—Waste disposal systems
- E21B41/0057—Disposal of a fluid by injection into a subterranean formation
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/008—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells by injection test; by analysing pressure variations in an injection or production test, e.g. for estimating the skin factor
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- Geochemistry & Mineralogy (AREA)
- Mechanical Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Processing Of Solid Wastes (AREA)
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Measuring Fluid Pressure (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
La présente invention concerne un procédé de conception d'une réponse à un comportement de fracture d'une formation au cours de ré-injection de déblais de forage dans une formation, le procédé consistant à obtenir une signature de pression pendant une période, interpréter la signature de pression pendant la période pour déterminer un comportement de fracture de la formation, à déterminer une solution sur la base du comportement de fracture de la formation, et à mettre la solution en application. La présente invention concerne un procédé d'évaluation d'un risque de fond d'une opération de ré-injection de déblais de forage, le procédé consistant à obtenir une signature de pression pendant une période, à interpréter la signature de pression pour déterminer un comportement de fracture de la formation, à caractériser un risque associé au comportement de fracture déterminé de la formation, et à mettre une solution en application sur la base du risque caractérisé.
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US97209207P | 2007-09-13 | 2007-09-13 | |
| US60/972,092 | 2007-09-13 | ||
| PCT/US2008/075087 WO2009035884A1 (fr) | 2007-09-13 | 2008-09-03 | Procédé d'utilisation de signatures de pression pour prédire des anomalies de puits d'injection |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CA2699503A1 CA2699503A1 (fr) | 2009-03-19 |
| CA2699503C true CA2699503C (fr) | 2015-05-05 |
Family
ID=40452407
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CA2699503A Active CA2699503C (fr) | 2007-09-13 | 2008-09-03 | Procede d'utilisation de signatures de pression pour predire des anomalies de puits d'injection |
Country Status (12)
| Country | Link |
|---|---|
| US (1) | US20100314104A1 (fr) |
| EP (1) | EP2198115B1 (fr) |
| CN (2) | CN104265211A (fr) |
| AR (1) | AR068426A1 (fr) |
| AU (1) | AU2008299195B2 (fr) |
| BR (1) | BRPI0816851A2 (fr) |
| CA (1) | CA2699503C (fr) |
| CO (1) | CO6270163A2 (fr) |
| EA (1) | EA021727B1 (fr) |
| MX (1) | MX343973B (fr) |
| NO (1) | NO2198115T3 (fr) |
| WO (1) | WO2009035884A1 (fr) |
Families Citing this family (22)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2009105330A2 (fr) * | 2008-02-22 | 2009-08-27 | M-I L.L.C. | Procédé d'estimation de capacité d'élimination de puits |
| US8047284B2 (en) * | 2009-02-27 | 2011-11-01 | Halliburton Energy Services, Inc. | Determining the use of stimulation treatments based on high process zone stress |
| US20120325462A1 (en) * | 2011-06-24 | 2012-12-27 | Roussel Nicolas P | Method for Determining Spacing of Hydraulic Fractures in a Rock Formation |
| PL408174A1 (pl) | 2011-07-11 | 2014-12-22 | Schlumberger Technology B.V. | Układ i sposób przeprowadzania operacji stymulacji odwiertu |
| US20140231084A1 (en) * | 2011-11-09 | 2014-08-21 | Ramesh Varadaraj | Drill Cuttings Re-Injection |
| US10578766B2 (en) | 2013-08-05 | 2020-03-03 | Advantek International Corp. | Quantifying a reservoir volume and pump pressure limit |
| CA2937225C (fr) * | 2013-12-18 | 2024-02-13 | Conocophillips Company | Procede pour la determination d'orientation et de dimension de fracture hydraulique |
| GB2586349B (en) | 2014-06-11 | 2021-06-23 | Advantek Int Corporation | Quantifying a reservoir volume and pump pressure limit |
| MX2017000006A (es) | 2014-06-30 | 2017-06-20 | Advantek Int Corp | Generacion de lechadas y eliminacion de residuos por bombeo a presion hacia una formacion de subsuperficie. |
| US10385686B2 (en) * | 2014-10-28 | 2019-08-20 | Eog Resources, Inc. | Completions index analysis |
| US10385670B2 (en) | 2014-10-28 | 2019-08-20 | Eog Resources, Inc. | Completions index analysis |
| CA2993949A1 (fr) * | 2015-08-31 | 2017-03-09 | Halliburton Energy Services, Inc. | Flux de travail integre pour une etude de faisabilite de reinjection de deblais en se basant sur une analyse geomecanique 3d |
| CN106371989A (zh) * | 2016-05-06 | 2017-02-01 | 北京中电华大电子设计有限责任公司 | 一种采用批处理方式的高效安全攻击故障注入方法 |
| GB2562752B (en) * | 2017-05-24 | 2021-11-24 | Geomec Eng Ltd | Improvements in or relating to injection wells |
| US10975669B2 (en) | 2017-06-16 | 2021-04-13 | Advantek Waste Management Services, Llc | Optimizing waste slurry disposal in fractured injection operations |
| US11500114B2 (en) | 2018-05-09 | 2022-11-15 | Conocophillips Company | Ubiquitous real-time fracture monitoring |
| CN108952700B (zh) * | 2018-08-21 | 2022-03-25 | 西南石油大学 | 一种各向异性地层井壁破裂压力确定方法 |
| CN112211622B (zh) * | 2019-07-11 | 2023-02-07 | 中国石油天然气股份有限公司 | 油藏压力场划分的方法和装置 |
| CA3160203A1 (fr) * | 2019-11-21 | 2021-05-27 | Conocophillips Company | Surveillance de pression d'espace annulaire de puits |
| US11790320B2 (en) * | 2020-06-25 | 2023-10-17 | Schlumberger Technology Corporation | Approaches to creating and evaluating multiple candidate well plans |
| US12486747B1 (en) | 2024-05-30 | 2025-12-02 | Halliburton Energy Services, Inc. | Well plug integrity |
| US12523143B2 (en) | 2024-05-30 | 2026-01-13 | Halliburton Energy Services, Inc. | Addressing plug movement in hydraulic fracturing |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5050674A (en) * | 1990-05-07 | 1991-09-24 | Halliburton Company | Method for determining fracture closure pressure and fracture volume of a subsurface formation |
| US6002063A (en) * | 1996-09-13 | 1999-12-14 | Terralog Technologies Inc. | Apparatus and method for subterranean injection of slurried wastes |
| US6076046A (en) | 1998-07-24 | 2000-06-13 | Schlumberger Technology Corporation | Post-closure analysis in hydraulic fracturing |
| US7440876B2 (en) * | 2004-03-11 | 2008-10-21 | M-I Llc | Method and apparatus for drilling waste disposal engineering and operations using a probabilistic approach |
| US8091625B2 (en) * | 2006-02-21 | 2012-01-10 | World Energy Systems Incorporated | Method for producing viscous hydrocarbon using steam and carbon dioxide |
| CN103370494B (zh) * | 2010-12-30 | 2017-02-22 | 普拉德研究及开发股份有限公司 | 用于执行井下增产作业的系统和方法 |
-
2008
- 2008-09-03 CA CA2699503A patent/CA2699503C/fr active Active
- 2008-09-03 BR BRPI0816851 patent/BRPI0816851A2/pt active Search and Examination
- 2008-09-03 NO NO08799094A patent/NO2198115T3/no unknown
- 2008-09-03 EP EP08799094.1A patent/EP2198115B1/fr not_active Not-in-force
- 2008-09-03 AU AU2008299195A patent/AU2008299195B2/en not_active Ceased
- 2008-09-03 US US12/677,719 patent/US20100314104A1/en not_active Abandoned
- 2008-09-03 MX MX2010002779A patent/MX343973B/es active IP Right Grant
- 2008-09-03 CN CN201410356336.1A patent/CN104265211A/zh active Pending
- 2008-09-03 WO PCT/US2008/075087 patent/WO2009035884A1/fr not_active Ceased
- 2008-09-03 EA EA201070362A patent/EA021727B1/ru not_active IP Right Cessation
- 2008-09-03 CN CN200880107170A patent/CN101849080A/zh active Pending
- 2008-09-12 AR ARP080103969A patent/AR068426A1/es not_active Application Discontinuation
-
2010
- 2010-03-12 CO CO10029656A patent/CO6270163A2/es not_active Application Discontinuation
Also Published As
| Publication number | Publication date |
|---|---|
| EP2198115B1 (fr) | 2017-08-02 |
| CA2699503A1 (fr) | 2009-03-19 |
| AR068426A1 (es) | 2009-11-18 |
| BRPI0816851A2 (pt) | 2015-03-17 |
| MX2010002779A (es) | 2010-04-07 |
| MX343973B (es) | 2016-11-30 |
| WO2009035884A1 (fr) | 2009-03-19 |
| EP2198115A1 (fr) | 2010-06-23 |
| AU2008299195A1 (en) | 2009-03-19 |
| EA021727B1 (ru) | 2015-08-31 |
| NO2198115T3 (fr) | 2017-12-30 |
| EP2198115A4 (fr) | 2015-12-02 |
| CO6270163A2 (es) | 2011-04-20 |
| AU2008299195B2 (en) | 2012-08-23 |
| CN101849080A (zh) | 2010-09-29 |
| EA201070362A1 (ru) | 2010-10-29 |
| CN104265211A (zh) | 2015-01-07 |
| US20100314104A1 (en) | 2010-12-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CA2699503C (fr) | Procede d'utilisation de signatures de pression pour predire des anomalies de puits d'injection | |
| US8401795B2 (en) | Methods of detecting, preventing, and remediating lost circulation | |
| US9803467B2 (en) | Well screen-out prediction and prevention | |
| Dusseault et al. | Towards a road map for mitigating the rates and occurrences of long-term wellbore leakage | |
| EP2718536B1 (fr) | Procédé pour renforcer un puits de forage d'un puits | |
| Wang et al. | The key to successfully applying today's lost circulation solutions | |
| CA2716018C (fr) | Procede d'estimation de capacite d'elimination de puits | |
| MX2014012049A (es) | Metodos y sistemas para monitoreo y procesamiento en tiempo real de datos de barrenos de pozos. | |
| GB2354852A (en) | Borehole construction with real-time updating of earth model | |
| Soroush et al. | Investigation into strengthening methods for stabilizing wellbores in fractured formations | |
| US11519265B2 (en) | Well system including a downhole particle measurement system | |
| Guo et al. | Increased assurance of drill cuttings reinjection: challenges, recent advances, and case studies | |
| Jayah et al. | Integrated technology approach to explore carbonate reservoirs in Malaysia enhances PMCD potentials and enables successful prospect evaluations | |
| Abd Rahim et al. | Overcoming subsurface and batch drilling challenges in a heavily faulted deepwater environment | |
| WO2020014385A1 (fr) | Systèmes et procédés d'identification et d'inhibition de défaillance de trou de forage en toile d'araignée dans des puits d'hydrocarbures | |
| Wang et al. | Strengthening a wellbore with multiple fractures: further investigation of factors for strengthening a wellbore | |
| Fragachán et al. | Mitigating Risks from Waste Subsurface Pressure Injection and Decline Analysis | |
| Noah et al. | Comprehensive Wellbore Instability Management by Determination of Safe Mud Weight Windows Using Mechanical Earth Model, Meleiha Field, Western Desert, Egypt | |
| Patel et al. | Managing drilling risk using an integrated approach to real-time pore pressure prediction | |
| Mehtar et al. | Feed to execution: first successful hydraulic fracture cuttings re-injection process offshore Abu Dhabi | |
| Shokanov et al. | Waste Subsurface Injection: Pressure Injection and Decline Analysis | |
| Oyeneyin | Fundamental Principles of Management of Reservoirs with Sanding Problems | |
| Ovalle et al. | Improved Waste Injection Monitoring and Modified Operational Procedures: The Keys to Prolong Well Storage Capacity | |
| Mohamed et al. | Accurate forecasts of stress accumulation during slurry injection operations | |
| Kunze et al. | Merits of Suspending the First Platform Well as a Cuttings Injector |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| EEER | Examination request |