CA2588008A1 - Method of sealing an annular space in a wellbore - Google Patents

Method of sealing an annular space in a wellbore Download PDF

Info

Publication number
CA2588008A1
CA2588008A1 CA002588008A CA2588008A CA2588008A1 CA 2588008 A1 CA2588008 A1 CA 2588008A1 CA 002588008 A CA002588008 A CA 002588008A CA 2588008 A CA2588008 A CA 2588008A CA 2588008 A1 CA2588008 A1 CA 2588008A1
Authority
CA
Canada
Prior art keywords
gel
fluid
annular space
wellbore
tubular element
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
CA002588008A
Other languages
French (fr)
Inventor
Martin Gerard Rene Bosma
Erik Kerst Cornelissen
Mikhail Boris Geilikman
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shell Canada Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of CA2588008A1 publication Critical patent/CA2588008A1/en
Abandoned legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/42Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells
    • C09K8/422Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells specially adapted for sealing expandable pipes, e.g. of the non-hardening type
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B26/00Compositions of mortars, concrete or artificial stone, containing only organic binders, e.g. polymer or resin concrete
    • C04B26/02Macromolecular compounds
    • C04B26/04Macromolecular compounds obtained by reactions only involving carbon-to-carbon unsaturated bonds
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/42Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells
    • C09K8/44Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells containing organic binders only
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • E21B33/14Methods or devices for cementing, for plugging holes, crevices or the like for cementing casings into boreholes
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/02Subsoil filtering
    • E21B43/10Setting of casings, screens, liners or the like in wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/02Subsoil filtering
    • E21B43/10Setting of casings, screens, liners or the like in wells
    • E21B43/103Setting of casings, screens, liners or the like in wells of expandable casings, screens, liners, or the like

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Physics & Mathematics (AREA)
  • Organic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Ceramic Engineering (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Structural Engineering (AREA)
  • Sealing Material Composition (AREA)
  • Colloid Chemistry (AREA)
  • Non-Disconnectible Joints And Screw-Threaded Joints (AREA)
  • Physical Or Chemical Processes And Apparatus (AREA)
  • Sealing Devices (AREA)
  • Compositions Of Macromolecular Compounds (AREA)
  • Earth Drilling (AREA)
  • Measuring Fluid Pressure (AREA)

Abstract

A method is provided of sealing an annular space (7) between an expandable tubular element (6) arranged in a wellbore and a wall surrounding the expandable tubular element, whereby a pressure difference occurs between a first location in the annular space and a second location in the annular space axially spaced from the first location. The method comprises: -installing the tubular element (6) in the wellbore; -locating a body of fluid (10) in the annular space (7) between said first and second locations, said fluid having a yield strength selected such that said pressure difference is insufficient to induce axial flow of the body of fluid in the annular space (7) after radial expansionof the tubular element (S) ,- and - racially expanding the tubular element (6) .

Description

METHOD OF SEALING AN ANNULAR SPACE IN A WELLBORE
The present invention relates to a method of sealing an annular space formed between an expandable tubular element arranged in a wellbore and a wall surrounding the expandable tubular element, whereby a pressure difference occurs between a first location in the annular space and a second location in the annular space axially spaced from the first location.

Wellbores for the production of hydrocarbon fluid are conventionally provided with one or more casings to provide stability to the wellbore wall, and to provide zonal isolation between different earth formation layers.
Generally several casings are set at different depth, in a nested arrangement whereby the diameter of each (subsequent) casing is smaller than the diameter of the previous casing in order to allow lowering of the casing through the previous casing. The annular space between each casing and the wellbore wall is filled with cement to provide annular sealing and to support the casing in the wellbore. In most applications such cement layer provides adequate sealing functionality as long as the annular space is not too narrow.

Recently it has become practice to radially expand casings in the wellbore. In an attractive method of installing expandable casings, each subsequent casing is lowered through the previous casing and then radially expanded to substantially the same diameter as the previous casing. In this manner a wellbore of substantially uniform diameter is obtained. Such procedure is particularly advantageous for relatively deep wellbores or for extended reach wellbores.
Furthermore, it has been proposed to expand casings against the wellbore wall such that a seal is created between the casing and the wellbore wall without a cement layer inbetween. Although such expansion against the earth formation is considered feasible, there may still be concerns regarding the effectiveness of the seal after the casing has been expanded against the formation.
Experience has indicated that cement may not be a good solution for sealing a very narrow annulus in view of the possibility that the cement does not adequately flow into the annular space, and in view of possible shrinkage of the (narrow) annular cement layer upon hardening.

It is therefore an object of the invention to provide an improved method of sealing an annular space formed between an expandable tubular element arranged in a wellbore and a wall surrounding the expandable tubular element, which overcomes the drawbacks of the prior art.
In accordance with the invention there is provided a method of sealing an annular space formed between an expandable tubular element arranged in a wellbore and a wall surrounding the expandable tubular element, whereby a pressure difference occurs between a first location in the annular space and a second location in the annular space axially spaced from the first location, the method comprising:

- installing the tubular element in the welibore;

- locating a body of fluid in the annular space between said first and second locations, said fluid having a yield strength selected such that said pressure difference is insufficient to induce axial flow of the body of non-hardening fluid in the annular space after radial expansion of the tubular element; and - radially expanding the tubular element.

It is thereby achieved that the fluid can be inserted in the annular space at a relatively low pumping pressure prior to expansion of the tubular element, since the annular space is relatively wide before the expansion process. Once the fluid is in the annular space and the tubular element has been expanded, the pressure required to induce longitudinal movement of the body of fluid through the annular space, and thus the sealing capacity of the annular body of fluid, increases. Such increase is almost exponential if the annular space becomes very narrow such as in case the tubular element is expanded (almost) against the wellbore wall. It will therefore be understood that the method of the invention is particularly advantageous for applications whereby the tubular element is radially expanded to near the wellbore wall, or even locally against the wellbore wall.

Preferably said fluid is a non-hardening fluid, so that any risk of shrinkage of the annular body due to hardening is avoided.

A suitable fluid for use in the method of the invention is a thixotropic fluid. Preferably the fluid is selected from a gel, a Bingham Plastic and a Herschel Bulkley fluid.

Examples of suitable gels for use in the method of the invention are:

1) Chromium cross-linked Polyacrylamide such as MarasealTM, MarcitTM available from Schlumberger or OFPG.
These gels are based on partially hydrolyzed polyacrylamide polymers crosslinked with Cr(III) released via a chrome acetate complex. Upper application temperatures are 124 C for Maraseal, and 104 C for Marcit. After setting, the gel is able to resist high concentrations of divalent ions.

2) Polyvinyl alcohol cross linked with a special (photosynthesized) agent, such as disclosed by Advanced Gel Technology Inc. in US 2002/0128374A1, and named WondergelTM. For a more extensive description of WondergelTM reference is made to WO 03/083259, WO 04/041872, WO 98/12239, US 2004/0072946A1, US 2002/0128374A1 or GB 2396 617A1.

3) Synthetic layered Silicate clay gels such as LAPONITETM.

4) Thixotropic, oleophilic based clay packer gels for steam injectors such as disclosed in US 5,677,267.
5) Oil based, thermal insulating gels such as disclosed in US 4,258,791 or US 5,607,901 which are environmentally safe, non aqueous, non corrosive and thermally insulating gels, wherein the liquid part includes an ester of animal or vegetable oil.
6) In situ gelleable compositions, normally used in the shut-off of steam injectors, for example as disclosed in US 4,858,134.
7) Thermoset synthetic gels having a long lifetime at elevated temperature conditions, for example RTV Silicone gels such as Dow Corning's SylgardTM and/or perfluorether silicone gels such as Shin Etsu's SIFELTM.
8) Modified Xantham gums or HPG's for temperatures below 60 C.
9) SilJelTM, composed of inorganic silicates which solidify in solution to form a permanent gel after a pre-determined set time. The solution has a viscosity close to that of water until more than 90% of the set-time has elapsed. The set-time is temperature- and pH dependent, and varies between a few minutes and a few hours at temperatures up to 93 C, depending on the pH. The addition of urea at higher temperatures results in a delayed gelling time due to the buffering capacity of the urea through the formation of ammonia.
10) InjectrolTM, which is an internally catalyzed silicate system. Three types of InjectrolTM systems are available dependent on the catalyst applied, i.e. type G
for temperatures between 23-66 C, type IT for temperatures between 49-82 C, and type U for temperatures between 82-149 C. The internal catalyst system enables pumping of a low viscosity solution (typically 1.2 mPa.s) into the formation before the material sets to a stiff gel. The amount of catalyst and the bottom hole temperature determines the gelling time. For the type G system, the gelling time is between a few minutes at 66 C and 600 minutes at 23 C.
11) H2zeroLTTM or H2zeroTM developed by Halliburton, includes an acrylamide acrylate co-polymer having a molecular weight of 250.000, with polyethyleneimine as cross-linker. For applications at temperatures below 50 C, Zr0C12 is used as cross-linker to achieve reduced gelling times.
12) PermSeal E+TM or PermSeal 600TM, developed by Halliburton, includes an acrylate monomer and a thermally controlled activator. KCl, water and a pH adjuster (acetic acid) are included to provide a standardized ionic concentration. Thermal degradation of the activator induces in-situ polymerization of the polymer. Gelling times can be controlled to be between 1 and 20 hours at temperatures from 21 to 65 C. PermSeal initially has the same viscosity as water, and forms a polymer after being pumped into the wellbore.
13) Floperm 700TM, developed by Halliburton, includes polyacrylamide and phenol and formaldehyde as cross-linkers. Precursors which form phenol and formaldehyde in-situ by degradation reactions, such as hydroquinone and hexamethylenetetramine, are less toxic. Floperm 700TM
can be used at temperatures up to about 175 C.

The polymer concentration is of the order of 3000-7000.
14) HE300TM, developed by Halliburton, includes three monomers (acrylamide-based copolymers). This polymer is recommended for temperatures beyond 100 C. Crosslinking is possible with organic components, such as a mixture of phenol and formaldehyde or precursors to phenol and formaldehyde. Resorcinol can be used to accelerate the reaction at lower temperatures, while ferric ions can delay the gelling process.
In order to enhance the sealing and/or plugging properties of the body of gel in the annular space, suitably the body of gel comprises a plurality of solid particles of large particle size distribution.

Suitable solid particles to be included in the body of fluid, are:

- malleable particles such as walnut hulls, fibres (organic or inorganic such as Nylon or Poly-ethylene), hollow ceramic spheres, wood cuttings, and saw dust;

- high density particles such as Mn304 (MicromaxTM), Barite, Ilmenite, Haematite, Magnetite, Ferrosilicon, Specularite, Ferrophosphorous, Silica flour, Silica sand, Bauxite particles, Aluminium micro balls and micro steel balls;

- low density particles such as fly ash, low density spheres (e.g. CarbopropTM), Bentonite, Pozzolanes, expanded Perlite, powdered coal, GilsoniteTM , glas and ceramic micro spheres;

- poorly sorted particle systems such as Dense CreteTM, Lite CreteTM, SandabandTM

and SilverfoxTM.

The invention will be described hereinafter by way of example in more detail, with reference to the accompanying drawings in which:

Fig. 1 schematically shows a wellbore provided with an expandable casing and a stream of gel being pumped into the wellbore;

Fig. 2 schematically shows the wellbore of Fig. 1 after pumping of the stream of gel into the wellbore;
Fig. 3 schematically shows the wellbore of Fig. 1 during radial expansion of the expandable casing;

Fig. 4 schematically shows the wellbore of Fig. 1 after radial expansion of the expandable casing; and Fig. 5 schematically shows a diagram indicating the effect of radial expansion of a tubular element in a wellbore on the sealing functionality of a body of gel in the annular space between the tubular element and the wellbore wall.

In the drawings, like reference numerals relate to like components.
Referring to Fig. 1 there is shown a wellbore 1 formed in an earth formation 2 which includes a reservoir layer 3 containing hydrocarbon fluid, and an overburden layer 4 overlaying the reservoir layer 3. The wellbore 1 passes through the overburden layer 4 and extends into the reservoir layer 3. An expandable tubular element in the form of casing 6 extends from surface into the wellbore 1 such that the lower end of the casing 6 is arranged a short distance above the bottom 8 of the wellbore 1. An annular space 7 is formed between the casing 6 and the wellbore wall. A stream of gel 10 is pumped through the casing 6 and into the lower portion of the wellbore 1 using a pump plug 12 located in the casing 6. The pump plug 12 separates the stream of gel 10 from a suitable pumping fluid (such as brine) trailing the stream of gel 10 and the pump plug 12. The gel has a yield strength selected in accordance with selection criteria discussed hereinafter.

Referring to Fig. 2 there is shown the wellbore 1 after the stream of gel 10 has been fully pumped into the wellbore 1, whereby the pump plug 12 is located at the lower end of the casing 6. The gel 10 extends into the annular space 7 thereby forming an annular body of gel 11.
Referring to Fig. 3 there is shown the casing 6 during radial expansion thereof using an expansion cone 14 connected to a pump (not shown) at surface by a pipe string 16. The expansion cone 14 is operable between a collapsed state in which the cone 14 has a largest diameter smaller than the inner diameter of the unexpanded casing 6, and an expanded state in which the cone 14 has a largest diameter commensurate with the inner diameter to which the casing 6 is to be expanded.
Further, the expansion cone is provided with a longitudinal through-passage 18 providing fluid communication between the interior of the casing 6 below the expansion cone 14, and the pipe string 16. A

packer 20 is provided at the lower end of the casing 6.
Similarly to the cone 14, the packer 20 is operable between a collapsed state in which the packer 20 has a largest diameter smaller than the inner diameter of the unexpanded casing 6, and an expanded state in which the packer 20 has a largest diameter commensurate with the inner diameter to which the casing 6 is to be expanded.

Referring to Fig. 4 there is shown the casing 6 after radial expansion thereof, whereby the expansion cone 14 and the plug 20 are removed from the casing 6, and whereby a production tubing 22 extends from surface through the expanded casing 6, and into the lower open-hole portion 13 of the wellbore 1. The production tubing 22 is at surface connected to conventional production equipment (not shown) so as to allow produced hydrocarbon fluid to flow from the lower open-hole portion 13 of the wellbore 1 to the production equipment.
Further, the production tubing 22 is near its lower end sealed to the casing 6 by a production packer 24. The portion of the stream of gel 10 located in the lower open-hole portion 13 of the wellbore lhas been removed from the wellbore 1.
During normal operation the casing 6 is lowered into the wellbore and suspended in the wellbore 1 from surface at the required depth. The annular space 7 is filled with brine (not shown). Subsequently the stream of gel 10 is pumped via the casing 6 into the wellbore 1 by means of the pump plug 12 which trails the stream of gel 10 in the casing (Figs. 1 and 2). The stream of gel 10 flows into the annular space 7 thereby gradually displacing the brine present in the annular space 7.
Upon arrival of the pump plug 12 at the lower end of the casing 6, pumping is stopped and the pump plug 12 is removed from the casing 6 using a suitable retrieve string (not shown). At this stage the gel 10 fills the open-hole portion 13 of the wellbore 1 and extends into the annular space 7 thereby forming the annular body of gel 11.

In a next step the expansion cone 14 and the packer 20 are brought to their respective collapsed states, and the packer 20 is removably attached to the lower end of the cone 14. The combined cone 14 and packer 20 are then lowered through the casing 6 by means of pipe string 16 until the cone 14 extends below the lower end of the casing 6, i.e. in the open-hole portion 13 of the wellbore 1. The cone 14 is then brought to its expanded state and pulled into the casing 6 using a force multiplier (not shown) thereby radially expanding a lower end portion of the casing 6. When the cone 14 and the packer 20 are fully located in the casing 6, the packer 20 is radially expanded so as to be anchored to the inner surface of the casing 6. After the packer 20 has been set, the cone 14 is detached from the packer 20 and brine is pumped via the pipe string 16 and the through-passage 18, into the interior of the casing 6 between the cone 14 and the packer 20. The cone 14 thereby moves upwardly through the casing 6 and gradually expands the casing 6 (Fig. 3). As the annular space 7 becomes narrower during the expansion process, the annular body of gel 11 moves upwardly. Upward movement of the annular body of gel 11 stops when the expansion cone 14 arrives at a level where no gel is present anymore in the annular space 7. In the Figures, such level is indicated by dotted line A.
After the casing 6 has been fully expanded, or after expansion of a desired portion of the casing 6, the cone 14 and the packer 20 are removed from the casing.
The open-hole portion 13 of the wellbore 1 is then cleaned, and the production tubing 22 and the production packer 24 are installed in conventional manner.

When the well is taken in production, hydrocarbon fluid flows from the reservoir zone 3 into the open-hole section 13 of the wellbore, and from there into the production tubing 22 to surface. The annular body of gel 11 seals the annular space 7 and thereby prevents that hydrocarbon fluid flows along the outside of the casing 6 in upward direction. In order that the body of gel 11 in the annular space 7 withstands the (high) fluid pressure of the hydrocarbon fluid entering the wellbore 1, the yield strength of the gel is selected such that the axial pressure difference across the body of gel 11 is lower than a minimum axial pressure difference across the body of gel 11 required to induce movement of the body of gel 11.
An example calculation of the minimum axial pressure difference across the annular body of gel required to induce movement of the body of gel for a given gel yield strength, is presented below.
Example A wellbore is drilled to a depth of 2000 m, with a diameter of 0.302 m (11.9 inch) in a lower section of the wellbore. The fluid pressure in the earth formation at the depth of 2000 m is 200 bar. An expandable casing is installed in the wellbore such that the lower end of the casing is positioned a short distance above the wellbore bottom. The outer diameter of the casing in unexpanded state is 0.244 m (9.625 inch). A stream of gel having a yield strength of 1000 Pa (0.01 bar), is pumped into the wellbore in the manner described above such that an annular body of gel of 2.28 m3 is contained in the annular space between the unexpanded casing and the wellbore wall. The length of the annular body of gel, before radial expansion of the casing, is 92.08 m. The maximum pressure at the lower end of the casing required to pump the gel in the annular space, is 63.74 bar which is well below the fracture pressure of the surrounding rock formation. The casing is then radially expanded to an outer diameter of 0.286 m (11.261 inch). The annular space thereby becomes narrower so that the length of the body of gel in the annular space increases to about 304.8 m (1000 ft). The effect of expansion of the casing on the minimum axial pressure required to induce longitudinal movement of the body of gel in the annular space, is twofold. Firstly the resistance of the body of gel to axial movement increases due to a longer contact surface with both the wellbore wall and the casing wall, and secondly the cross-sectional area of the annular body of gel decreases. In the present example it is found that the minimum axial pressure difference across the body of gel required to induce longitudinal movement of the body of gel through the annular space, increases from 211 bar before expansion of the casing, to 751 bar after expansion of the casing. In the present example, the axial formation fluid pressure difference across the body of gel is taken to be solely due to the hydrostatic column of formation fluid along the length of the body of gel, which is about 30 bar. Thus the actual axial fluid pressure difference across the body of gel is far below the minimum axial fluid pressure difference required to induce longitudinal movement of the body of gel.

Therefore in the present example a gel with a lower yield strength could safely be applied if desired or, alternatively, the length of the body of gel in the annular space could be reduced.

Reference is further made to Fig. 5 showing a diagram illustrating the minimum axial pressure difference Pa (bar) required across an annular body of gel having a length of 10 m, to induce longitudinal movement of the body of gel through an annular space of width T (mm) for different magnitudes of the yield strength of the gel whereby:
- line (a) indicates a gel yield strength of 50 Pa;
- line (b) indicates a gel yield strength of 100 Pa;
- line (c) indicates a gel yield strength of 200 Pa;

- line (d) indicates a gel yield strength of 400 Pa;
- line (e) indicates a gel yield strength of 800 Pa;
- line (f) indicates a gel yield strength of 1600 Pa.
As apparent from the diagram, the magnitude of Pa increases exponentially for T decreasing to near zero.
The effect of radial expansion of the tubular element is therefore that a gel of relatively low yield strength can be used, or alternatively a relatively short annular body of gel can be used, to achieve an effective seal in the annular space. The sealing functionality of the gel is particularly effective if the tubular element is radially expanded to near the wellbore wall, or even locally against the wellbore wall.
Instead of pumping a gel into the wellbore, a fluid can be pumped which transforms into a gel some time after being pumped into the wellbore. Thus, such fluid obtains the desired yield strength and, optionally, the desired thixotropic properties after being inserted in the wellbore.

Claims (18)

1. A method of sealing an annular space formed between an expandable tubular element arranged in a wellbore and a wall surrounding the expandable tubular element, whereby a pressure difference occurs between a first location in the annular space and a second location in the annular space axially spaced from the first location, the method comprising:
- installing the tubular element in the wellbore;

- locating a body of fluid in the annular space between said first and second locations, said fluid having a yield strength selected such that said pressure difference is insufficient to induce axial flow of the body of fluid in the annular space after radial expansion of the tubular element; and - radially expanding the tubular element.
2. The method of claim 1, wherein said body of fluid is at least partly located in the annular space by pumping said fluid via the tubular element before expansion thereof, into the annular space.
3. The method of claim 1 or 2, wherein said body of fluid is at least partly located in the annular space by the step of radially expanding the tubular element.
4. The method of any one of claims 1-3, wherein said wall is the wall of the wellbore.
5. The method of any one of claims 1-4, wherein said fluid is a non-hardening fluid.
6. The method of any one of claims 1-5, wherein said fluid is a thixotropic fluid.
7. The method of any one of claims 1-6, wherein said fluid is selected from a Bingham Plastic and a Herschel Bulkley fluid.
8. The method of any one of claims 1-7, wherein said fluid is a gel.
9. The method of claim 8, wherein the gel includes at least one of a chromium cross-linked polyacrylamide, a polymer cross-linked by a backbone of carbon atoms, a synthetic layered silicate clay, an oleophilic based clay packer gel, an oil based thermal insulating gel, an in situ gelleable composition, a thermoset synthetic gel, and a modified xantham gum.
10. The method of claim 9, wherein the gel includes a polymer cross-linked by a backbone of carbon atoms, and wherein said backbone of carbon atoms includes groups capable of forming bonds with the polymers.
11. The method of any one of claims 8-10, wherein the gel includes Hydrogel .TM. marketed by Advanced Gel Technology (AGT).
12. The method of any one of claims 8-11, wherein the gel includes a chromium cross-linked polyacrylamide in the form of Maraseal .TM..
13. The method of any one of claims 8-12, wherein the gel includes a synthetic layered silicate clay in the form of LAPONITE .TM..
14. The method of any one of claims 8-13, wherein the gel includes a thermoset synthetic gel including at least on of a RTV silicone gel and a perfluorether silicone gel.
15. The method of claim 14, wherein the gel includes a RTV silicone gel in the form of Sylgard .TM..
16. The method of claim 14 or 15, wherein the gel includes a perfluorether silicone gel in the form of SIFEL .TM..
17. The method of any one of claims 8-16, wherein the stream of gel includes a plurality of solid particles of different sizes.
18. The method substantially as described hereinbefore with reference to the drawings.
CA002588008A 2004-12-15 2005-12-13 Method of sealing an annular space in a wellbore Abandoned CA2588008A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
EP04257820.3 2004-12-15
EP04257820 2004-12-15
PCT/EP2005/056716 WO2006063986A1 (en) 2004-12-15 2005-12-13 Method of sealing an annular space in a wellbore

Publications (1)

Publication Number Publication Date
CA2588008A1 true CA2588008A1 (en) 2006-06-22

Family

ID=34930921

Family Applications (1)

Application Number Title Priority Date Filing Date
CA002588008A Abandoned CA2588008A1 (en) 2004-12-15 2005-12-13 Method of sealing an annular space in a wellbore

Country Status (10)

Country Link
US (1) US20080110628A1 (en)
CN (1) CN101080549A (en)
AR (1) AR052814A1 (en)
AU (1) AU2005315670A1 (en)
BR (1) BRPI0519027A2 (en)
CA (1) CA2588008A1 (en)
EA (1) EA009321B1 (en)
GB (1) GB2435176A (en)
NO (1) NO20073538L (en)
WO (1) WO2006063986A1 (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100186955A1 (en) * 2007-06-01 2010-07-29 Arild Saasen Method of well cementing
US20110266007A1 (en) * 2007-12-04 2011-11-03 Fu Joseph Hou Method of radially expanding a tubular element
US20120061078A1 (en) * 2009-03-31 2012-03-15 Algu Devendra R Cement as anchor for expandable tubing
MX2012001353A (en) * 2009-07-31 2012-02-17 Bp Corp North America Inc Method to control driving fluid breakthrough during production of hydrocarbons from a subterranean reservoir.
US8322423B2 (en) * 2010-06-14 2012-12-04 Halliburton Energy Services, Inc. Oil-based grouting composition with an insulating material
US8875800B2 (en) 2011-09-02 2014-11-04 Baker Hughes Incorporated Downhole sealing system using cement activated material and method of downhole sealing
US9993996B2 (en) * 2015-06-17 2018-06-12 Deborah Duen Ling Chung Thixotropic liquid-metal-based fluid and its use in making metal-based structures with or without a mold
WO2019094044A1 (en) * 2017-11-13 2019-05-16 Halliburton Energy Services, Inc. Swellable metal for non-elastomeric o-rings, seal stacks, and gaskets
CN113266303B (en) * 2021-06-28 2024-05-07 安东柏林石油科技(北京)有限公司 Packer, method and well completion structure for improving axial packing effect of continuous packing body along shaft

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4258791A (en) * 1980-01-29 1981-03-31 Nl Industries, Inc. Thermal insulation method
JPH0818569B2 (en) * 1986-09-24 1996-02-28 豊田工機株式会社 Steering force control device for power steering device
MY121223A (en) * 1995-01-16 2006-01-28 Shell Int Research Method of creating a casing in a borehole
GB2345308B (en) * 1998-12-22 2003-08-06 Petroline Wellsystems Ltd Tubing anchor
AU3818500A (en) * 1999-04-09 2000-11-14 Shell Internationale Research Maatschappij B.V. Method of creating a wellbore in an underground formation
EP1283939B1 (en) * 2000-05-22 2007-09-19 Shell Internationale Researchmaatschappij B.V. Method for plugging a well with a resin
US7066284B2 (en) * 2001-11-14 2006-06-27 Halliburton Energy Services, Inc. Method and apparatus for a monodiameter wellbore, monodiameter casing, monobore, and/or monowell
WO2003042494A1 (en) * 2001-11-15 2003-05-22 Services Petroliers Schlumberger Method and apparatus for borehole stabilisation
US7040404B2 (en) * 2001-12-04 2006-05-09 Halliburton Energy Services, Inc. Methods and compositions for sealing an expandable tubular in a wellbore
US6939833B2 (en) * 2002-08-01 2005-09-06 Burts, Iii Boyce Donald Additive for, treatment fluid for, and method of plugging a tubing/casing annulus in a well bore
US20040221990A1 (en) * 2003-05-05 2004-11-11 Heathman James F. Methods and compositions for compensating for cement hydration volume reduction
GB2419902B (en) * 2004-11-09 2008-02-13 Schlumberger Holdings Method of cementing expandable tubulars

Also Published As

Publication number Publication date
EA200701275A1 (en) 2007-10-26
GB0710204D0 (en) 2007-07-04
GB2435176A (en) 2007-08-15
WO2006063986A1 (en) 2006-06-22
AU2005315670A1 (en) 2006-06-22
NO20073538L (en) 2007-09-14
EA009321B1 (en) 2007-12-28
AR052814A1 (en) 2007-04-04
US20080110628A1 (en) 2008-05-15
BRPI0519027A2 (en) 2008-12-23
CN101080549A (en) 2007-11-28

Similar Documents

Publication Publication Date Title
US20080110628A1 (en) Method of Sealing an Annular Space in a Wellbore
CA2368885C (en) Method for annular sealing
CN102704906B (en) Methods of stabilizing unconsolidated subterranean formations
AU2006318933B2 (en) Methods of consolidating unconsolidated particulates in subterranean formations
US7669653B2 (en) System and method for maintaining zonal isolation in a wellbore
US8680027B2 (en) Method and composition for treatment of a well
US6575240B1 (en) System and method for driving pipe
CA2548748A1 (en) Method of creating a zonal isolation in an underground wellbore
NZ517492A (en) Apparatus for and a method of anchoring an expandable conduit
EA010193B1 (en) Variable density drilling mud
AU2014287199B2 (en) Mitigating annular pressure buildup using temperature-activated polymeric particulates
US20080149346A1 (en) Method of Installing an Expandable Tubular in a Wellbore
EP1331357A1 (en) Method of forming permeable sand screens in well bores
CN102365420A (en) Cement as anchor for expandable tubing
US7798222B2 (en) Expandable fluid cement sand control
US10294406B2 (en) Sealant composition for use in subterranean formations
NL2023940B1 (en) Method for plugging wellbores in the earth
AU2018410834A1 (en) Downhole check valve assembly with a swellable element mechanism
US11913309B2 (en) Filtration media including porous polymeric material and degradable shape memory material
RU2153571C2 (en) Method of tightness recovery of well tubing-casing annular space

Legal Events

Date Code Title Description
FZDE Discontinued