CA2409694C - Pile driving - Google Patents

Pile driving Download PDF

Info

Publication number
CA2409694C
CA2409694C CA002409694A CA2409694A CA2409694C CA 2409694 C CA2409694 C CA 2409694C CA 002409694 A CA002409694 A CA 002409694A CA 2409694 A CA2409694 A CA 2409694A CA 2409694 C CA2409694 C CA 2409694C
Authority
CA
Canada
Prior art keywords
pile
guide
finned
substrate
pair
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CA002409694A
Other languages
French (fr)
Other versions
CA2409694A1 (en
Inventor
Clive Jones
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHC Sea Steel Ltd
Original Assignee
Fast Frames UK Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from GB0013136A external-priority patent/GB0013136D0/en
Priority claimed from GB0105843A external-priority patent/GB0105843D0/en
Application filed by Fast Frames UK Ltd filed Critical Fast Frames UK Ltd
Publication of CA2409694A1 publication Critical patent/CA2409694A1/en
Application granted granted Critical
Publication of CA2409694C publication Critical patent/CA2409694C/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/02Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers specially adapted for placing or removing bulkheads

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Piles And Underground Anchors (AREA)
  • Seal Device For Vehicle (AREA)
  • Transition And Organic Metals Composition Catalysts For Addition Polymerization (AREA)

Abstract

A pile guide (20) comprises a base frame (22) and a guide member (24) mounted in the base frame (22). The guide member (24) comprises a pair of upright guide channels (30) for receiving and guiding a pair of stabilizing fins associated with a finned pile during pile driving. A finned pile follower is also provided for continued pile driving once the finned pile is embedded in the substrate. The finned pile follower has a pair of stabilizing fins which likewise are received and guided in the guide channels (30).

Description

TITLE: PILE DRIVING

BACKGROUND OF THE INVENTION
FIELD OF THE INVENTION

The invention relates to pile driving, and more particularly, but not exclusively, to underwater pile driving, e.g. for stabbing piles directly into the seabed.
DESCRIPTION OF THE BACKGROUND ART

It is known to provide a guide for aligning a pile with the surface of a substrate into which the pile is to be driven and to provide stability for a piling hammer.
Particularly when piling underwater there is the problem that after the pile has been introduced into the seabed or the like, the guide must be removed to allow the pile to be driven into its final position. This guide removal is time consuming and thus expensive. Accordingly, the present applicant proposed in International patent CONFIRMATION COPY
publication W099/11872 a pile guide which allows pile driving to continue from start to finish without any need to interrupt driving to remove the guide.

The pile driving apparatus described in W099/11872 is supported on a base frame, a plan view of which is reproduced in Figure 1. The base frame 10 has a substantially rectangular footprint (made up of a welded framework of girders and mudmats) with a centrally-placed aperture (12) through which a pile (14) is guided. The base frame 10 thus surrounds the pile (14) It will be seen however, that the base frame is formed with an aperture or slot (16) extending through the frame from its exterior to the central aperture (12) and through which a tether or rigging (18) fixed to the pile (14) can be passed.

The present applicant has appreciated certain problems associated with transporting a pile guide of the kind shown in W099/11872. The rectangular footprint of the base frame may have an area exceeding l00m2, effectively ruling out all forms of transport other than by sea. The present applicant has sought to obviate or at least alleviate such problems.

SUNIMARY OF THE INVENTION

In accordance with the present invention, there is provided a pile guide for supporting a pile as it is driven into a substrate, comprising a base frame and a pile guide member mounted on the base frame characterised in that the base frame comprises a rigid member, preferably substantially U-shaped and at least one ground-engaging panel releasably coupled to the rigid member.

Advantageously, the releasable coupling between the U-shaped member and the at least one ground engaging panel enables the pile guide to be transported in more than one piece to the site where it will be used. This fact overcomes dependence on transport by sea alone, since each piece may be moved, for example, by road, albeit with a police escort if required. Such improved transportability is important since it is in the very nature of pile driving that the pile guide must be moved from site to site if it is to be reused.

The substantially U-shaped rigid member may support the pile guide member. The rigid member has a central aperture through which a pile guided by the pile guide member may be driven. Being substantially U-shaped, there is a channel, communicating with the central aperture, through which a tether or rigging fixed to a pile may pass in order to disengage the pile guide from the pile once driven into the substrate. The present applicant has appreciated that the U-shaped rigid member is the backbone of the pile guide, having to withstand the stresses of supporting the pile guide member even during pile driving.
The pile guide member may be of conventional form (e.g. an immobile channel adapted to receive slidingly a pile to be driven into the substrate) or of improved form (e.g. of two part and pivotable construction, each part being adapted to pivot away from the pile once partially driven into the seabed, see W099/11872).

The at least one ground-engaging panel, or mudmat, may extend laterally of the substantially U-shaped rigid member. The at least one ground-engaging panel may be releasably coupled to the rigid member by a plurality of bolts.

The base frame may include a pair of ground-engaging panels, releasably coupled one per opposing side of the substantially U-shaped rigid member. Each ground- engaging panel may extend laterally of the respective side of the U-shaped rigid member to which it is releasably coupled.
The at least one substrate-engaging panel or the substantially U-shaped rigid member may comprise receptors for engagement by fork means of a fork-lift truck. The receptors may comprise a pair of flanges which project laterally such that their undersides are contactable by the fork means of a fork-lift truck. Each flange may form part of a channel, either of open- or closed-box construction. The pile guide may further comprise means for attaching lifting lines (e.g. ropes or cables) to the base frame. The attaching means may be selected from the group consisting of hooks, rings and apertures.

The substantially U-shaped rigid member and the at least one substrate-engaging panel may include location means for secure stacking of one on top of the other. The location means may comprise complementary profiles which enable one to nest against the other.

In accordance with another aspect of the present invention, there is provided a pile guide for supporting a finned pile as it is driven into a substrate, comprising a base frame and a guide member mounted on the base frame, characterised in that the guide member comprises a pair of 5 upright guide channels for receiving and guiding a pair of stabilising fins associated with a finned pile during pile driving.

The present applicant has appreciated that the use of such a pile guide with finned piles has a number of significant advantages. Firstly, there may be sufficient clearance space between the pair of guide channels to enable finned piles to be driven fully into the seabed in one operation. With conventional pile guides and conventional piles, the pile driving operation needed to be interrupted to remove the pile guide before the pile could be driven all the way into the seabed. Secondly, for a given size of pile, the finned piles are anchored more securely to the seabed than conventional piles because of the lateral resistance to movement offered by the fins in silty layers above underlying hard layers.
Thus, in order to achieve an anchorage with specific lateral loading resistance against tip rotation, finned piles of a smaller diameter than conventional piles may be used. The use of more lightweight finned piles enables a consequential reduction in the build specification of the corresponding pile guide; leading to cost savings in terms of both materials and transportation considerations.

A third and potentially more significant advantage arises from the flexibility of using a pile guide which guides fins associated with a pile, rather than the main body of the pile. Provided the fins achieve a given "wing span", variable diameter piles may be supported by the same pile guide. This in turn has a knock-on benefit of speeding up pile driving a set of finned piles of different sizes, since the same guide may be used for each.

In one embodiment, the pair of upright guide channels may be positioned opposite each other, with channel openings facing each other. In this way, the guide channels are configured to receive a finned pile having a pair of diametrically opposed stabilising fins extending in an axial direction along the curved periphery of the pile. The upright guide channels may be supported by inclined struts extending from an outer periphery of the base frame.

In accordance with yet another aspect of the present invention, there is provided apparatus for driving a pile into a substrate, comprising a pile follower for transmitting impact from a pile driver to a pile being driven into a substrate, wherein the pile follower has a pair of fins for engaging corresponding guide channels of a pile guide.

When pile driving below water level, a pile may be part-driven into a substrate (e.g. seabed) with the aid of a pile guide. Once one end of the pile is embedded in the sea floor, a follower can be fitted to the exposed end of the pile. In order to transmit pile hammer impacts squarely to the pile in such a way as to drive the pile vertically, the follower has traditionally been machined to very tight tolerances which is expensive with such a large object. However, by providing a pair of fins, the follower can be guided in the same way as a finned pile.
In this way, the need for accurate machinery is substantially reduced.

The pair of fins may extend in a common plane to engage diametrically opposed guide channels of the pile guide. The pile follower may have an end profile comprising a driving face and an alignment member projecting axially beyond the driving face. The alignment member aids registration of the driving face with the exposed end of the pile by providing a positive locating action therewith. The alignment member may be configured to engage the radially inner periphery of a tubular pile.
The alignment member may comprise a plurality of plates arranged around the radially inner or outer periphery of the pile follower.

The apparatus may further comprise a pile guide in accordance with earlier aspects and embodiments of the present invention.

BRIEF DESCRIPTION OF THE DRAWINGS

Embodiments of the invention will now be described by way of example with reference to the accompanying drawings in which:

Figure 1 is a plane view of a prior art base frame;
Figure 2 is a plane view of a pile guide embodying one aspect of the present invention;

Figure 3 is a front view of the pile guide of Figure 2;

Figure 4 is a perspective exploded view showing base frame detail of the pile guide of Figure 2;

Figure 5 is a schematic front view of a finned follower embodying another aspect of the present invention; and Figure 6 is a parti'al cross-sectional view along A-A
in Figure 5 showing detail of the finned follower.
DESCRIPTION OF EMBODIMENTS OF THE INVENTION

Figures 2 and 3 show plan and front view respectively of a pile guide (20) embodying the present invention. The pile guide (20) comprises a base frame (22) and a pile guide member (24) mounted on the base frame (22). The base. frame (22) comprises a generally U-shaped rigid member (26) and a pair of substrate-engaging panels or mudmats (28) which are releasably coupled to- the rigid=

member (26). The pile guide member (24 ') comprises a pair of upright guide channels (30) mounted on the rigid member (26) and supported by inclined struts (32) extending from the peripheral corners of the base frame (22). The pile guide (20) may be dismantled to improve ease of .25 transportation, and, in particular, the base frame (22) constituents may be decoupled into three more manageable pieces, namely two tnudmats (28) and the rigid member (26).
Figure 4 illustrates the construction of the base frame (22) in more detail. The generally U-shaped rigid member (26) forms the backbone of the structure and is also fundamental to the operation of the pile guide (20).
The rigid member not only provides the points of anchorage for the pile guiding member (24) and mudmats (28), but also defines a central aperture (40) through which a pile is driven into the substrate. Thereafter, the base frame (22) may be disengaged from around the pile by moving the base frame (22) to pass the pile through channel or peripheral opening (42); the peripheral opening having a span which exceeds the diameter of the pile. The mudmats (28) are bolted to, and extend laterally of the sides (44) of the rigid member. Thus, in use, the base frame (22) may have a footprint covering something in excess of 100m2.

However, when being stored or in transit to the pile driving site, the mudmats (28) may be detached from the rigid member (26) to reduce the overall area which must be made available to accommodate the pile guide.

As shown in Figure 4, the sides of the rigid member (26) and mudmats (28) are provided with receptors (50) for receiving the forks of fork-lift trucks. The receptors (50) comprise a pair of flanges (52) forming an open channel into which the prongs of a fork-lift may be inserted. The uppermost flange in each pair then bears the weight of the component during lifting. Padeyes (60) are also provided at the corners of the rigid member (26) for attaching lifting lines (e.g. cables) and thereby lifting the base frame (22).

The pile guide member (24) illustrated in Figures 2 and 3 is just one of several different designs which could be used in combination with the base frame (22). For example, the pile guide member (24) could be replaced by a pivoting/counterweighted arrangement as described in W099/11872. Nonetheless, for completeness, the pile guide member (24) will now be described in detail. The pile guide member (24) is adapted to guide a pile having a pair of diametrically opposed stabilising fins extending in an axial direction along the curved periphery of the pile. The pair of upright guide channels (30) are positioned opposite each other with channel openings facing each other. In this way, the channels receive and guide the stabilising fins during pile driving. Once the pile has been driven into the substrate (e.g. seabed) the pile guide (20) may be lifted over the protuberant part of the pile to disengage the stabilising fins from the pile guide member. Of course, if the stabilising fins have been driven into the substrate, the upright guide channels (30) no longer engage the pile, and the pile guide (20) may disengage the pile by sliding the pile guide (20) to pass the pile through the opening (42).

Figures 5 and 6 show a pile follower (100) embodying another aspect of the present invention. The pile follower (100) is illustrated in use between a pile driving hammer (102) and a finned pile (104), both of which are shown in phantom lines. The pile follower (100) has a pair of diametrically opposed fins (106) which are configured to be a sliding fit inside the guide channels (30) of pile guide (20). The pile follower (100) has an end profile (110) comprising a driving face (112) and an alignment ring (114). The alignment ring (114) comprises a plurality of members (116) which extend axially beyond the driving face (112). The alignment ring (114) is a snug fit inside the bore (118) of the finned pile (104) to achieve registration between the driving face (112) and the exposed end of the finned pile (104).

The operation of the pile guide (20), the finned pile (104) and the pile follower (100) will now be described to illustrate the interaction therebetween. The pile guide (20) is positioned on a substrate (e.g. seabed) and finned pile (104) is loaded into the pile guide (20) with its fins slidingly received in the upright guide channels (30). The finned pile (104) is driven into the seabed as far as the reciprocating motion of the drive hammer (102) will allow. The drive hammer (102) is then raised clear of the exposed end of the finned pile (104) so that follower (100) may be fitted to it. The fins (106) of the follower (100) are aligned with those of the pile (104) so that the fins (106) are slidably received in the guide channels (30). The alignment ring (114) engages the bore of the finned pile (104) as the latter is lowered into position, ensuring that the driving face (112) of the follower (100) registers with and abuts the end of the finned pile. The hammer (102) is then re-engaged, with the follower (100) now transmitting impact to the finned pile (104) .

Claims (10)

1. A pile guide (20) for supporting a pile as it is driven into a substrate by a pile driver, comprising a base frame (22) and a guide member (24) mounted on the base frame (22) and configured to guide a pile as it is driven into the substrate, characterised in that the guide member (24) comprises a pair of upright, spaced apart guide channels (30), each configured to receive and guide a respective one of a pair of stabilising fins of a finned pile, with resulting engagement between fins and channels providing alignment with the substrate during pile driving.
2. A pile guide (20) according to claim 1, in which the upright guide channels (30) are positioned opposite each other, with channel openings facing each other.
3. A pile guide (20) according to claim 1 or claim 2, in which the upright guide channels (30) are supported by inclined struts (32) extending from an outer periphery of the base frame (22).
4. Apparatus for driving a pile into a substrate, comprising a pile guide (20) according to any one of claims 1 to 3, and a pile follower (100) for transmitting impact from a pile driver to a pile being driven into a substrate, the pile follower (100) having a pair of fins (106) configured to slidably engage the pair of upright guide channels (30) of the pile guide (20).
5. Apparatus according to claim 4, in which the pair of fins (106) extend in a common plane.
6. Apparatus according to claim 4 or claim 5, in which the pile follower (100) has an end profile (110) comprising a driving face (112) for engaging a pile and an alignment member (114) projecting axially beyond the driving face (112) for aligning the driving face (112) with a pile.
7. Apparatus according to claim 6, in which the alignment member (114) is annular.
8. Apparatus according to claim 7, in which the alignment member (114) comprises a plurality of plates (116) arranged in a ring.
9. A method of driving a finned pile into a substrate, comprising:

providing a pile guide (20) comprising a base frame (22) and a guide member (24) mounted on the base frame (22) and configured to guide a pile as it is driven into the substrate, the guide member (24) having a pair of upright, spaced apart guide channels (30), each configured to receive and guide a respective one of a pair of stabilising fins of a finned pile, with resulting engagement between fins and channels providing alignment with the substrate during pile driving;

positioning a finned pile (104) in the pile guide (20) with the fins slidably engaging the upright guide channels (30) ; and pile driving the finned pile (104) into the substrate.
10. A method according to claim 9, further comprising:
interrupting pile driving;

fitting a pile follower (100) to an exposed end of the finned pile, the pile follower (100) having a pair of fins (106) which slidably engage the upright guide channels (30) of the pile guide (20); and further pile driving the finned pile ()104) into the substrate, using the pile follower (100) to transmit impact to the finned pile.
CA002409694A 2000-05-31 2001-05-30 Pile driving Expired - Lifetime CA2409694C (en)

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
GB0013136A GB0013136D0 (en) 2000-05-31 2000-05-31 Pile driving
GB0013136.7 2000-05-31
GB0105843.7 2001-03-09
GB0105843A GB0105843D0 (en) 2001-03-09 2001-03-09 Pile driving
PCT/GB2001/002389 WO2001092645A2 (en) 2000-05-31 2001-05-30 Pile driving

Publications (2)

Publication Number Publication Date
CA2409694A1 CA2409694A1 (en) 2001-12-06
CA2409694C true CA2409694C (en) 2009-12-15

Family

ID=26244385

Family Applications (1)

Application Number Title Priority Date Filing Date
CA002409694A Expired - Lifetime CA2409694C (en) 2000-05-31 2001-05-30 Pile driving

Country Status (6)

Country Link
EP (1) EP1285138B1 (en)
AT (1) ATE272752T1 (en)
AU (2) AU6249401A (en)
CA (1) CA2409694C (en)
DE (1) DE60104681T2 (en)
WO (1) WO2001092645A2 (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB0524825D0 (en) 2005-12-06 2006-01-11 Fast Frames Uk Ltd Pile driving
GB2473683B (en) 2010-01-05 2012-01-11 Fast Frames Uk Ltd Method and apparatus for driving a pile into a substrate
GB201104612D0 (en) 2011-03-18 2011-05-04 Fast Frames Uk Ltd Method and apparatus for driving a pile into a substrate
GB201106783D0 (en) 2011-04-21 2011-06-01 Fast Frames Uk Ltd Method and apparatus for driving a pile into a substrate
GB201119340D0 (en) 2011-11-09 2011-12-21 Fast Frames Uk Ltd
NL2009610C2 (en) 2012-10-11 2014-04-14 Ihc Sea Steel Ltd Pile driving guide.
NL2010375C2 (en) 2013-02-28 2014-09-01 Ihc Sea Steel Ltd Pile driving guide.
NL2017560B1 (en) 2016-09-30 2018-04-10 Ihc Iqip Uk Ltd Pile guide comprising a base frame and a guide member

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202814C (en) *
US1359956A (en) * 1919-04-15 1920-11-23 Lackawanna Steel Co Pile-follower
FR2644811B1 (en) * 1989-03-23 1991-05-24 Castagner Bernard PYROTECHNIC SYSTEM FOR PUSHING GROUND ANCHORS
FR2678011B1 (en) * 1991-06-19 1993-11-05 Christian Badaroux SIMPLIFIED PYROTECHNIC DEVICE FOR LANDING MICRO-PILES INTO THE GROUND.
WO1999011872A1 (en) 1997-08-28 1999-03-11 Fast Frames (Uk) Limited Pile driving

Also Published As

Publication number Publication date
AU6249401A (en) 2001-12-11
DE60104681D1 (en) 2004-09-09
ATE272752T1 (en) 2004-08-15
DE60104681T2 (en) 2005-08-11
EP1285138B1 (en) 2004-08-04
AU2001262494B2 (en) 2005-06-02
WO2001092645A3 (en) 2002-04-25
EP1285138A2 (en) 2003-02-26
CA2409694A1 (en) 2001-12-06
WO2001092645A2 (en) 2001-12-06

Similar Documents

Publication Publication Date Title
CA2409694C (en) Pile driving
KR101928978B1 (en) Clamping device
EP1007792B1 (en) Pile guide
AU2001262494A1 (en) Pile driving
EP2557232B1 (en) A pile driving assembly
US6994493B2 (en) Pile driving system and pile for engagement with said system
AU2012288595B2 (en) Pile guide
EP2976185B1 (en) Cover alignment tool
CA2632611A1 (en) Pile driving
US4626138A (en) Non-impacting pile driver
EP1304415B1 (en) Pile guide
ZA200207630B (en) Pile driving.
US10378171B2 (en) Method and apparatus for improved installation of caissons
KR102012367B1 (en) Bridge using temporary bridge and construction method
CN211974388U (en) Be used for assembled steel construction building high altitude construction slip frame
KR100440766B1 (en) A crawler transport vehicle with a removable side
AU2009100447A4 (en) Panel handling apparatus and method for handling panels
JP5121028B2 (en) Liner plate and deep foundation method
KR102235148B1 (en) Multi-purpose automatic file construction system and construction method thereof
SE509126C2 (en) Procedure and device for side lifting to handle standing containers
CN114562301B (en) Construction method of foundation pit supporting system with inclined supporting piles
CN217839995U (en) Pile pulling platform is demolishd to self-navigation jack-up lifting formula support on water
US20230294964A1 (en) Mobile crane having a counterweight device
KR100504380B1 (en) Pine Pile Lifting Apparatus
GB2272921A (en) Supporting an excavation

Legal Events

Date Code Title Description
EEER Examination request
MKEX Expiry

Effective date: 20210531