CA2288867C - Composite steel/concrete column - Google Patents
Composite steel/concrete column Download PDFInfo
- Publication number
- CA2288867C CA2288867C CA002288867A CA2288867A CA2288867C CA 2288867 C CA2288867 C CA 2288867C CA 002288867 A CA002288867 A CA 002288867A CA 2288867 A CA2288867 A CA 2288867A CA 2288867 C CA2288867 C CA 2288867C
- Authority
- CA
- Canada
- Prior art keywords
- steel
- column
- concrete
- concrete column
- surface area
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/30—Columns; Pillars; Struts
- E04C3/34—Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Rod-Shaped Construction Members (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
The composite steel/concrete column (2) comprises a longitudinally extending H-shaped steel assembly (4) having a pair parallel flange plates (6) and a web plate (8) interconnecting the flange plates and defining two opposite channel-shaped spaces (10). A plurality of spaced-apart transversal tie bars (12) are disposed along the steel assembly on each side of the web plate for interconnecting the flange plates. A mass of concrete (14) is filling the channel-shaped spaces. The column steel concrete column is characterised in that the ratio of the cross-sectional surface area of the steel assembly with respect to the total surface area of the composite steel/concrete column is less than 9 %, preferably 2 % to 5 %. The column is principally to be utilized in structural steel high-rise buildings which have the advantage of shop prefabrication resulting in rapid on-site construction. The column shows a steel to concrete ratio greatly reduced as compared to prior art composite columns, thereby greatly reducing the production cost and the size of the column and also greatly reducing its construction time.
Description
COMPOSITE STEEL/CONCRETE COLUMN
FIELD OF THE INVENTION
The present invention relates to a composite steel and concrete structure and in particular to high-rise column constructions designed to resist primarily axial loads resulting from gravity loads or a combination of gravity loads and axial loads resulting from wind or seismic forces. The column is principally to be utilized in structural steel high-rise buildings which have the advantage of shop prefabrication resulting in rapid on site construction.
BACKGROUND OF THE INVENTION
Composite steellconcrete columns which can withstand very important tensile and compressive forces are already known in prior art. Thus it is already known to fill a tube or the free space of an H-shaped steel beam with concrete to increase its compression strength. Such columns are described in US patents no 3,050,161 and 4,196, 558.
Also known in prior art, there are fire-resistant concrete and steel structural elements which comprise a steel beam covered with concrete to increase the fire resistance of the steel. Examples of such prior art beams are given in US
3,516,213;
4,571,913 and 4,779,395.
The following documents are other examples of prior art steellconcrete columns: US 915,295; 918,643; 1,813,118; 2,618,148; 2,844,023; 2,912,849;
3,147,571; 3,267,627; 3,300,912; 3,590,547; 3,798,867; 3,890,750; 3,916,592;
3,938,294; 4,128,980; 4,407,106; 4,722,156; 4,783,940; 5,012,622; 5,119,614 and 5, 410, 847.
A drawback commonly experienced with the known high strength composite steellconcrete columns is that the steel portion of the column which is obtained from a single steel section is still very important as compared to the concrete portion rendering such column not very 'interesting as far as prices are concerned.
Another drawback with such heavy steel sections used with prior art composite columns is that heavy and costly equipment is required to erect those sections on the construction site, as the sections are not easy to manipulate due to their heavy weight.
OBJECTS OF THE INVENTION
An object of the present invention is to provide an improved steel concrete column that will overcome the above mentioned drawbacks. More particularly, an object of the present invention is to propose a high strength steellconcrete column that shows a steel to concrete ratio greatly reduced as compared to prior art composite cotumns, thereby greatly reducing the production cost and the size of the column, and also reducing the size and cost of the lifting equipment necessary to install the column.
SUMMARY OF THE INVENTION
In accordance with the present invention, these above-mentioned objects are achieved with a composite steellconcrete column comprising:
a longitudinally extending H-shaped steel assembly having a given cross-sectional surface area and comprising a pair of substantially parallel flange plates and a web plate interconnecting the flange plates and defining two opposite channel-shaped spaces;
a plurality of spaced-apart transversal tie bars disposed along the steel assembly on each side of the web plate, each tie bar interconnecting the flange plates; and a mass of concrete filling the channel-shaped spaces. The composite steel/concrete column is characterized in that the ratio of the cross-sectional surface area of the steel assembly with respect to a total surface area of the composite steel/concrete column is less than 9%, preferably 2% to 5%.
FIELD OF THE INVENTION
The present invention relates to a composite steel and concrete structure and in particular to high-rise column constructions designed to resist primarily axial loads resulting from gravity loads or a combination of gravity loads and axial loads resulting from wind or seismic forces. The column is principally to be utilized in structural steel high-rise buildings which have the advantage of shop prefabrication resulting in rapid on site construction.
BACKGROUND OF THE INVENTION
Composite steellconcrete columns which can withstand very important tensile and compressive forces are already known in prior art. Thus it is already known to fill a tube or the free space of an H-shaped steel beam with concrete to increase its compression strength. Such columns are described in US patents no 3,050,161 and 4,196, 558.
Also known in prior art, there are fire-resistant concrete and steel structural elements which comprise a steel beam covered with concrete to increase the fire resistance of the steel. Examples of such prior art beams are given in US
3,516,213;
4,571,913 and 4,779,395.
The following documents are other examples of prior art steellconcrete columns: US 915,295; 918,643; 1,813,118; 2,618,148; 2,844,023; 2,912,849;
3,147,571; 3,267,627; 3,300,912; 3,590,547; 3,798,867; 3,890,750; 3,916,592;
3,938,294; 4,128,980; 4,407,106; 4,722,156; 4,783,940; 5,012,622; 5,119,614 and 5, 410, 847.
A drawback commonly experienced with the known high strength composite steellconcrete columns is that the steel portion of the column which is obtained from a single steel section is still very important as compared to the concrete portion rendering such column not very 'interesting as far as prices are concerned.
Another drawback with such heavy steel sections used with prior art composite columns is that heavy and costly equipment is required to erect those sections on the construction site, as the sections are not easy to manipulate due to their heavy weight.
OBJECTS OF THE INVENTION
An object of the present invention is to provide an improved steel concrete column that will overcome the above mentioned drawbacks. More particularly, an object of the present invention is to propose a high strength steellconcrete column that shows a steel to concrete ratio greatly reduced as compared to prior art composite cotumns, thereby greatly reducing the production cost and the size of the column, and also reducing the size and cost of the lifting equipment necessary to install the column.
SUMMARY OF THE INVENTION
In accordance with the present invention, these above-mentioned objects are achieved with a composite steellconcrete column comprising:
a longitudinally extending H-shaped steel assembly having a given cross-sectional surface area and comprising a pair of substantially parallel flange plates and a web plate interconnecting the flange plates and defining two opposite channel-shaped spaces;
a plurality of spaced-apart transversal tie bars disposed along the steel assembly on each side of the web plate, each tie bar interconnecting the flange plates; and a mass of concrete filling the channel-shaped spaces. The composite steel/concrete column is characterized in that the ratio of the cross-sectional surface area of the steel assembly with respect to a total surface area of the composite steel/concrete column is less than 9%, preferably 2% to 5%.
The present invention also relates to a method of building a steellconcrete column having a given cross-sectional surface area and wherein the steel has a cross-sectional surface area representing less than 9% of the cross-sectional surface area of the column, the method comprising the following consecutives steps of:
a) erecting a bare steel column comprising:
a longitudinally extending steel assembly including a pair of substantially parallel flange plates and a web plate interconnecting the flange plates and defining two opposite channel-shaped spaces; and a plurality of transversal tie bars disposed along the steel assembly on each side of the web plate, each tie bar interconnecting the flanges;
b) providing formwork for longitudinally closing the channel-shaped spaces;
c) pouring a mass of concrete into the channel-shaped spaces; and d) stripping the formwork.
The steel assembly is prefabricated from three relatively thin steel plates into a substantially "H" configuration. The steel portion of the column is designed to resist all the construction dead and live loads as well as a portion or all of the permanent dead loads and possibly some live load. The remaining permanent dead loads as well as the live loads are to be resisted by the composite steel - concrete column.
BRIEF DESCRIPTION OF THE DRAWINGS
This invention will now be described with reference to the accompanying drawings in which only one preferred embodiment is shown.
Figure 1 is a perspective view of a steel/concrete column according to a preferred embodiment of the present invention over a three storey section of a typical high-rise building in various phases of advancement during on site construction.
a) erecting a bare steel column comprising:
a longitudinally extending steel assembly including a pair of substantially parallel flange plates and a web plate interconnecting the flange plates and defining two opposite channel-shaped spaces; and a plurality of transversal tie bars disposed along the steel assembly on each side of the web plate, each tie bar interconnecting the flanges;
b) providing formwork for longitudinally closing the channel-shaped spaces;
c) pouring a mass of concrete into the channel-shaped spaces; and d) stripping the formwork.
The steel assembly is prefabricated from three relatively thin steel plates into a substantially "H" configuration. The steel portion of the column is designed to resist all the construction dead and live loads as well as a portion or all of the permanent dead loads and possibly some live load. The remaining permanent dead loads as well as the live loads are to be resisted by the composite steel - concrete column.
BRIEF DESCRIPTION OF THE DRAWINGS
This invention will now be described with reference to the accompanying drawings in which only one preferred embodiment is shown.
Figure 1 is a perspective view of a steel/concrete column according to a preferred embodiment of the present invention over a three storey section of a typical high-rise building in various phases of advancement during on site construction.
Figure 2 is a cross-sectional top view of the composite steellconcrete column taken along line II-II of Figure 1, after the concrete has been poured and the formwork removed.
Figure 3 is a cross-sectional top view of the steel assembly of the column shown in Figure 1, taken along line III-III between floors of the typical high-rise building before the concrete has been poured and the formwork has been installed:
Figure 4 is a cross-sectional top view of the steel assembly of Figure 1 taken along line IV-IV at a typical floor level of the high-rise steel building before the concrete has been poured.
Figure 5 is a cross-sectional top view of the steel assembly taken along line V-V of Figure 1 between floors of a typical high-rise building with formwork in place and before the concrete has been poured.
DESCRIPTION OF A PREFERRED EMBODIMENT
Referring to Figures 1 and 2, a composite steel/concrete column (2) according to a preferred embodiment of the present invention comprises a longitudinally extending H-shaped steel assembly (4) comprising a pair of substantially parallel flange plates (6) and a web plate (8) interconnecting the flange plates (6) and defining two opposite channel-shaped spaces (10). Each flange plate (6) is preferably welded to a respective end (9) of the web plate (8). A plurality of spaced-apart transversal tie bars (12) is disposed along the steel assembly (4) on each side of the web plate (8). Each tie bar (12) interconnects and supports the flange plates (6). Preferably, each of the tie bars (12) is interconnecting the flange plates (6) near an outside edge of said plates (6). As best shown in Figure 1, the tie bars (12) are preferably regularly spaced along the column (2) to provide a uniform support.
A mass of concrete (14) is filling the channel-shaped spaces (10). The ratio of the cross-sectional surface area of the steel assembly (4) with respect to the total surface area of the composite steellconcrete column (2) is less than 9%, preferably 2% to 5%. A conventional composite column which comprises a H-shaped steel section obtained and formed from a single steel bar and wherein the flanges and the web are integral to each other does not show such a low ratio of steel therein.
Figure 3 is a cross-sectional top view of the steel assembly of the column shown in Figure 1, taken along line III-III between floors of the typical high-rise building before the concrete has been poured and the formwork has been installed:
Figure 4 is a cross-sectional top view of the steel assembly of Figure 1 taken along line IV-IV at a typical floor level of the high-rise steel building before the concrete has been poured.
Figure 5 is a cross-sectional top view of the steel assembly taken along line V-V of Figure 1 between floors of a typical high-rise building with formwork in place and before the concrete has been poured.
DESCRIPTION OF A PREFERRED EMBODIMENT
Referring to Figures 1 and 2, a composite steel/concrete column (2) according to a preferred embodiment of the present invention comprises a longitudinally extending H-shaped steel assembly (4) comprising a pair of substantially parallel flange plates (6) and a web plate (8) interconnecting the flange plates (6) and defining two opposite channel-shaped spaces (10). Each flange plate (6) is preferably welded to a respective end (9) of the web plate (8). A plurality of spaced-apart transversal tie bars (12) is disposed along the steel assembly (4) on each side of the web plate (8). Each tie bar (12) interconnects and supports the flange plates (6). Preferably, each of the tie bars (12) is interconnecting the flange plates (6) near an outside edge of said plates (6). As best shown in Figure 1, the tie bars (12) are preferably regularly spaced along the column (2) to provide a uniform support.
A mass of concrete (14) is filling the channel-shaped spaces (10). The ratio of the cross-sectional surface area of the steel assembly (4) with respect to the total surface area of the composite steellconcrete column (2) is less than 9%, preferably 2% to 5%. A conventional composite column which comprises a H-shaped steel section obtained and formed from a single steel bar and wherein the flanges and the web are integral to each other does not show such a low ratio of steel therein.
5 It has been discovered that by using a steel assembly (4) designed with independent thin plate sections, namely the flange plates (6) and the web plate (8), it was possible to obtain such low ratio without lowering too much the axial strength of the steel assembly (4). More particularly, the steel assembly (4) is a shop welded three plate section, as shown in Figure 2, and is fabricated from relatively thin flange plates (6) and a relatively thin web plate (8). The flange plates (6) are supported near their outside tips by the tie bars (12), which are welded to the column flange plates (6) and spaced at approximately equal intervals along the height of the column. The tie bars (12) may be made of round or flat bar shapes or of reinforcing bar steel.
The built up section is similar in shape to a conventional hot rolled shape except that the properties and behavior of the section are significantly different. The width to thickness ratios of the flanges (6) and web (8) are significantly greater than for a hot rolled shape or even of a three plate built up section exceeding by one and a half to five times the normal limit. This limit for flanges is defined as 951(Fy)°~5 in the American Institute of Steel Construction's "Specification for Structural Steel Buildings" and "Load and Resistance Factor Design Specification for Structural Steel Buildings", where Fy is the specified yield strength of the steel. The limit for webs is 257/(Fy)°~5 and 253/(Fy)°'S respectively for the same codes. The width to thickness ratios are of the magnitude to make the section unpractical for normal construction as the flanges would buckle prematurely at a very low stress. The tie bars (12) are added between the flanges (6) along the length of the column and located close to the edges of the flanges (6) to increase the buckling strength of the section.
These new column sections are so designed so that the total area enclosed by the steel section contains only between two and five percent steel area. This sets the concrete to steel ratio of the composite column at between 19 to 49. The percentage of steel area to enclosed area of a conventional high rise hot rolled column is between 9%
The built up section is similar in shape to a conventional hot rolled shape except that the properties and behavior of the section are significantly different. The width to thickness ratios of the flanges (6) and web (8) are significantly greater than for a hot rolled shape or even of a three plate built up section exceeding by one and a half to five times the normal limit. This limit for flanges is defined as 951(Fy)°~5 in the American Institute of Steel Construction's "Specification for Structural Steel Buildings" and "Load and Resistance Factor Design Specification for Structural Steel Buildings", where Fy is the specified yield strength of the steel. The limit for webs is 257/(Fy)°~5 and 253/(Fy)°'S respectively for the same codes. The width to thickness ratios are of the magnitude to make the section unpractical for normal construction as the flanges would buckle prematurely at a very low stress. The tie bars (12) are added between the flanges (6) along the length of the column and located close to the edges of the flanges (6) to increase the buckling strength of the section.
These new column sections are so designed so that the total area enclosed by the steel section contains only between two and five percent steel area. This sets the concrete to steel ratio of the composite column at between 19 to 49. The percentage of steel area to enclosed area of a conventional high rise hot rolled column is between 9%
and 54°/a and usually greater for three plate built up high-rise columns. The aim of this invention is to use as small an area of steel column as feasibly possible while building a steel high-rise building using the steel/concrete column.
As mentioned before, the tie bars (12) act as flange support ties for the steel section prior to pouring of the concrete (14). They prevent lateral buckling of the thin flange plates (6) and greatly enhance the load carrying capacity of the bare steel column {4).
The tie bars (12) also act as lateral ties for the concrete (14), providing confinement to the concrete {14) on the open face while the concrete (14) is completely confined on the three other sides by the flanges (6) and web (8) of the steel assembly (4). This confinement increases the axial capacity of the concrete portion (14) of the composite column (2). The tie bars (12) can be made from standard flat or round bars or reinforcing bars. The ends of the bars (12) can be welded directly to the inside face of the column flange (6). Alternatively, as shown in Figures 2 and 3, the bar ends can be bent at 90° to the bar (12) and this end positioned toward the web (8) of the column (2) and perpendicular to the column axis and these bar ends welded to the inside face of the column flange (6).
As mentioned hereinbefore the present invention also relates to a method of building a steel/concrete column (2) as previously described. The method comprises the following consecutives steps of:
a) erecting a bare steel column consisting of a longitudinally extending steel assembly (4) described hereinbefore;
b) providing formwork (16) for longitudinally closing the channel-shaped spaces ( 10);
c) pouring a mass of concrete (14) into the channel-shaped spaces (10); and d) stripping the formwork (16).
Referring more particularly to Figure 1, the composite steel-concrete column (2) is shown after the concrete (14) has been poured and the formwork (16) stripped in the lower level (A) of the three storey view. in the middle level (B), the steel assembly (4) with plywood formwork (16) is shown prior to the pouring of the coflcrete (14) in khe channel-shaped spaces or column cavity created between the flanges (6) and web (8) of the steel assembly (4} and the formwork (16), as illustrated in Figure 5. In the upper level (C), the steel assembly (4) is shown in the shop fabricated state, as illustrated in Figure 3. Typical floor beams (18) are shown framing into the flanges (6} of the steel column assembly (4). The standard floor beam to column flange connection has not been shown for clarity. Typical floor beams (19) or other types of floor supporting members such as trusses or joists (not illustrated) framing into the web side (8) of the column assembly (4) are connected to a steel connection plate (20). Once again, the standard connection between the beam (19) and the connection plate (20) has not been shown for clarity. A
typical steel floor deck (22) is shown supporting the concrete floor slab (24) which acts as the finished floor for the middle level (B). The tie bars (12) can be seen in the steel assembly (4) of the upper level (C).
Referring to Figure 4, a steel connection plate (20) is shop welded to the toes or edges of the column flanges (6) to facilitate the connections for the floor members (19) framing into the web (8) of the column assembly (4) at the floor level.
As best seen in Figure 1, the connection plate (20) preferably projects below the bottom flange (26} of the floor framing member (19) to facilitate the placing and removal of the formwork ( 16).
Referring to Figure 5, the formwork (16), depicted as plywood sheeting in this figure, can be of any material which can resist the concrete pouring loads.
Strapping (28) or any suitable attachment can be used to support the plywood ( 16) in place and to make it easily removable. Vertical reinforcing steel bars (30) are preferably added to increase the concrete confinement and carry additional vertical load.
As can be appreciated from Figure 1, the steel plate connections (20) welded to the toes of the column flanges (6) allow conventional steel connections to be made for the floor members framing (19) directly into the column assembly (4).
This plate connection (20) becomes the permanent formwork during the pouring of the concrete in situ which creates the composite column (2).
Simple plywood or similar formwork boards (16) are required to enclose the area surrounded by the toes of the column flanges (6) and the web (8) of the column assembly (4). The height of the formwork (16) need only to span from the finished floor slab (24) below to the underside of the steel connection plate (20) of the next floor level above, as shown in Figure 1.
The concrete (14) in the column (2) is poured from the floor above, through the channel-shaped spaces (10), in other words, the openings created between the steel plate connections (20) or the formwork (16) and the area between the web (8) of the steel column assembly (4) and the tips of the flanges (6). The concrete (14) is poured in the same sequence as the concrete for the floor directly above the column.
As can be appreciated, the concrete (14) acts as a heat sink during a fire and protects the steel portion of the column (2) from buckling prematurely, thereby achieving a fire-rating without the need of additional fire protection.
Shear connectors may be located on the inside faces of the flanges (6) and steel connector plates (20) as well as the web (8) of the steel column assembly (4) to distribute the axial load between the concrete (14) and the steel portions (4) of the composite column (2). Advantageously, a steel/concrete composite column according to the present invention allows a structural high-rise building to be built very rapidly at a relatively low cost. The erection of a high-rise building implies that the columns be able to resist very important axial loads.
The prefabricated steel assembly is mainly devised to withstand axial loads during the building erecting phase of the building. As the steel portion is very reduced as compared to prior art composite columns, the size of lifting equipment required for erecting the steel assemblies is greatly reduced, and smaffer and faster cranes can be used. Therefore, many floor levels can be rapidly erected. The axial strength of the column is then increased by pouring the concrete in the channel-shaped spaces of the steel assembly.
As mentioned before, the tie bars (12) act as flange support ties for the steel section prior to pouring of the concrete (14). They prevent lateral buckling of the thin flange plates (6) and greatly enhance the load carrying capacity of the bare steel column {4).
The tie bars (12) also act as lateral ties for the concrete (14), providing confinement to the concrete {14) on the open face while the concrete (14) is completely confined on the three other sides by the flanges (6) and web (8) of the steel assembly (4). This confinement increases the axial capacity of the concrete portion (14) of the composite column (2). The tie bars (12) can be made from standard flat or round bars or reinforcing bars. The ends of the bars (12) can be welded directly to the inside face of the column flange (6). Alternatively, as shown in Figures 2 and 3, the bar ends can be bent at 90° to the bar (12) and this end positioned toward the web (8) of the column (2) and perpendicular to the column axis and these bar ends welded to the inside face of the column flange (6).
As mentioned hereinbefore the present invention also relates to a method of building a steel/concrete column (2) as previously described. The method comprises the following consecutives steps of:
a) erecting a bare steel column consisting of a longitudinally extending steel assembly (4) described hereinbefore;
b) providing formwork (16) for longitudinally closing the channel-shaped spaces ( 10);
c) pouring a mass of concrete (14) into the channel-shaped spaces (10); and d) stripping the formwork (16).
Referring more particularly to Figure 1, the composite steel-concrete column (2) is shown after the concrete (14) has been poured and the formwork (16) stripped in the lower level (A) of the three storey view. in the middle level (B), the steel assembly (4) with plywood formwork (16) is shown prior to the pouring of the coflcrete (14) in khe channel-shaped spaces or column cavity created between the flanges (6) and web (8) of the steel assembly (4} and the formwork (16), as illustrated in Figure 5. In the upper level (C), the steel assembly (4) is shown in the shop fabricated state, as illustrated in Figure 3. Typical floor beams (18) are shown framing into the flanges (6} of the steel column assembly (4). The standard floor beam to column flange connection has not been shown for clarity. Typical floor beams (19) or other types of floor supporting members such as trusses or joists (not illustrated) framing into the web side (8) of the column assembly (4) are connected to a steel connection plate (20). Once again, the standard connection between the beam (19) and the connection plate (20) has not been shown for clarity. A
typical steel floor deck (22) is shown supporting the concrete floor slab (24) which acts as the finished floor for the middle level (B). The tie bars (12) can be seen in the steel assembly (4) of the upper level (C).
Referring to Figure 4, a steel connection plate (20) is shop welded to the toes or edges of the column flanges (6) to facilitate the connections for the floor members (19) framing into the web (8) of the column assembly (4) at the floor level.
As best seen in Figure 1, the connection plate (20) preferably projects below the bottom flange (26} of the floor framing member (19) to facilitate the placing and removal of the formwork ( 16).
Referring to Figure 5, the formwork (16), depicted as plywood sheeting in this figure, can be of any material which can resist the concrete pouring loads.
Strapping (28) or any suitable attachment can be used to support the plywood ( 16) in place and to make it easily removable. Vertical reinforcing steel bars (30) are preferably added to increase the concrete confinement and carry additional vertical load.
As can be appreciated from Figure 1, the steel plate connections (20) welded to the toes of the column flanges (6) allow conventional steel connections to be made for the floor members framing (19) directly into the column assembly (4).
This plate connection (20) becomes the permanent formwork during the pouring of the concrete in situ which creates the composite column (2).
Simple plywood or similar formwork boards (16) are required to enclose the area surrounded by the toes of the column flanges (6) and the web (8) of the column assembly (4). The height of the formwork (16) need only to span from the finished floor slab (24) below to the underside of the steel connection plate (20) of the next floor level above, as shown in Figure 1.
The concrete (14) in the column (2) is poured from the floor above, through the channel-shaped spaces (10), in other words, the openings created between the steel plate connections (20) or the formwork (16) and the area between the web (8) of the steel column assembly (4) and the tips of the flanges (6). The concrete (14) is poured in the same sequence as the concrete for the floor directly above the column.
As can be appreciated, the concrete (14) acts as a heat sink during a fire and protects the steel portion of the column (2) from buckling prematurely, thereby achieving a fire-rating without the need of additional fire protection.
Shear connectors may be located on the inside faces of the flanges (6) and steel connector plates (20) as well as the web (8) of the steel column assembly (4) to distribute the axial load between the concrete (14) and the steel portions (4) of the composite column (2). Advantageously, a steel/concrete composite column according to the present invention allows a structural high-rise building to be built very rapidly at a relatively low cost. The erection of a high-rise building implies that the columns be able to resist very important axial loads.
The prefabricated steel assembly is mainly devised to withstand axial loads during the building erecting phase of the building. As the steel portion is very reduced as compared to prior art composite columns, the size of lifting equipment required for erecting the steel assemblies is greatly reduced, and smaffer and faster cranes can be used. Therefore, many floor levels can be rapidly erected. The axial strength of the column is then increased by pouring the concrete in the channel-shaped spaces of the steel assembly.
Claims (11)
1. A composite steel/concrete column (2) comprising:
a longitudinally extending H-shaped steel assembly (4) having a given cross-sectional surface area and comprising a pair of substantially parallel flange plates (6) and a web plate (8) interconnecting the flange plates (6) and defining two opposite channel-shaped spaces (10);
a plurality of spaced-apart transversal tie bars (12) disposed along the steel assembly (4) on each side of the web plate (8), each tie bar (12) interconnecting the flange plates (6);
a mass of concrete (14) filling the channel-shaped spaces (10); and the composite steel/concrete column (2) being characterized in that the ratio of the cross-sectional surface area of the steel assembly (4) with respect to a total surface area of the composite steel/concrete column (2) is less than 9%.
a longitudinally extending H-shaped steel assembly (4) having a given cross-sectional surface area and comprising a pair of substantially parallel flange plates (6) and a web plate (8) interconnecting the flange plates (6) and defining two opposite channel-shaped spaces (10);
a plurality of spaced-apart transversal tie bars (12) disposed along the steel assembly (4) on each side of the web plate (8), each tie bar (12) interconnecting the flange plates (6);
a mass of concrete (14) filling the channel-shaped spaces (10); and the composite steel/concrete column (2) being characterized in that the ratio of the cross-sectional surface area of the steel assembly (4) with respect to a total surface area of the composite steel/concrete column (2) is less than 9%.
2. A composite steel/concrete column (2) as claimed in claim 1, characterized in that the ratio of the cross-sectional surface area of the steel assembly (4) with respect to the total surface area of the composite steel/concrete column (2) is 2% to 5%.
3. A composite steel/concrete column (2) as claimed in claim 1 or 2, characterized in that each flange plate (6) is welded to a respective end (9) of the web plate (8).
4. A composite steel/concrete column (2) as claimed in anyone of claims 1 to 3, characterized in that each of the tie bars (12) is interconnecting the flange plates (6) near an outside edge of said flange plates (6).
5. A composite steel/concrete column (2) as claimed in anyone of claims 1 to 4, characterized in that each tie bar (12) is welded to the flange plates (6).
6. A composite steel/concrete column (2) as claimed in anyone of claims 1 to 5, characterized in that the tie bars (12) are substantially, longitudinally and regularly spaced along the column (2).
7. A composite steel/concrete column (2) as claimed in anyone of claims 1 to 6, wherein the width to thickness ratio of the flange plates (6) of the steel assembly (4) exceeds by one and a half to five times a normal limit defined as 95/(F y)0.5 where F y is the yield strength of the steel.
8. A composite steel/concrete column (2) as claimed in anyone of claims 1 to 7, characterized in that the width to thickness ratio of the web plate (8) of the steel assembly (4) is greater than 257/(F y)0.5.
9. A composite steel/concrete column (2) as claimed in anyone of claims 1 to 8, characterized in that it further comprises longitudinally extending reinforcing bars (30) embedded in the mass of concrete (14).
10. A method of building a steel/concrete column (2) having a given cross-sectional surface area and wherein the column (2) is characterized in that the steel has a cross-sectional surface area representing less than 9% of the cross-sectional surface area of the column (2), the method being characterized in that it comprises the following consecutives steps of:
a) erecting a bare steel column comprising:
a longitudinally extending steel assembly (4) including a pair of substantially parallel flange plates (6) and a web plate (8) interconnecting the flange plates (6) and defining two opposite channel-shaped spaces (10); and a plurality of transversal tie bars (12) disposed along the steel assembly (4) on each side of the web plate (8), each tie bar (12) interconnecting the flanges (6);
b) providing formwork (16) for longitudinally closing the channel-shaped spaces (10);
c) pouring a mass of concrete (14) into the channel-shaped spaces (10); and d) stripping the formwork (16).
a) erecting a bare steel column comprising:
a longitudinally extending steel assembly (4) including a pair of substantially parallel flange plates (6) and a web plate (8) interconnecting the flange plates (6) and defining two opposite channel-shaped spaces (10); and a plurality of transversal tie bars (12) disposed along the steel assembly (4) on each side of the web plate (8), each tie bar (12) interconnecting the flanges (6);
b) providing formwork (16) for longitudinally closing the channel-shaped spaces (10);
c) pouring a mass of concrete (14) into the channel-shaped spaces (10); and d) stripping the formwork (16).
11. A method as claimed in claim 10, characterized in that the ratio of the cross-sectional surface area of the steel assembly (4) with respect to the total surface area of the steel/concrete column (2) is 2 to 5%.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CA002288867A CA2288867C (en) | 1997-05-15 | 1998-05-14 | Composite steel/concrete column |
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CA002206830A CA2206830A1 (en) | 1997-05-15 | 1997-05-15 | High rise steel column |
CA2,206,830 | 1997-05-15 | ||
CA002288867A CA2288867C (en) | 1997-05-15 | 1998-05-14 | Composite steel/concrete column |
PCT/CA1998/000480 WO1998051883A1 (en) | 1997-05-15 | 1998-05-14 | Composite steel/concrete column |
Publications (2)
Publication Number | Publication Date |
---|---|
CA2288867A1 CA2288867A1 (en) | 1998-11-19 |
CA2288867C true CA2288867C (en) | 2001-10-30 |
Family
ID=25679401
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CA002288867A Expired - Fee Related CA2288867C (en) | 1997-05-15 | 1998-05-14 | Composite steel/concrete column |
Country Status (1)
Country | Link |
---|---|
CA (1) | CA2288867C (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108252412B (en) * | 2018-01-03 | 2024-06-11 | 浙江绿筑集成科技有限公司 | Staggered truss structure system adopting partial combined columns and construction method thereof |
CN110453850B (en) * | 2019-07-22 | 2024-08-09 | 重庆大学 | Assembled steel concrete combined connecting beam |
-
1998
- 1998-05-14 CA CA002288867A patent/CA2288867C/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CA2288867A1 (en) | 1998-11-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0996795B1 (en) | Composite steel/concrete column | |
TWI241374B (en) | Constructing the large-span self-braced buildings of composite load-bearing wall-panels and floors | |
US4147009A (en) | Precast panel building construction | |
CA2358747C (en) | Ring beam/lintel system | |
US5588272A (en) | Reinforced monolithic concrete wall structure for spanning spaced-apart footings and the like | |
US6244008B1 (en) | Lightweight floor panel | |
CA2407359C (en) | Open web dissymmetric beam construction | |
EP0141478B1 (en) | A method for forming a composite structural member | |
US7121061B2 (en) | Reinforced concrete building system | |
US5704181A (en) | Dissymetric beam construction | |
US5501055A (en) | Method for reinforced concrete construction | |
WO1999006642A1 (en) | Building panels for use in the construction of buildings | |
US20040107660A1 (en) | Composite floor system | |
CN212453065U (en) | Assembled building frame structure member | |
WO2016086948A1 (en) | The modified hollow core slabs | |
CA2288867C (en) | Composite steel/concrete column | |
CN114809404B (en) | Integrally assembled steel-concrete combined floor system | |
WO1996021069A1 (en) | A structural member | |
CN211690805U (en) | Precast concrete component connected node | |
CA2441737C (en) | Composite floor system | |
RU2134751C1 (en) | Framework of building and method of its erection | |
AU707101B2 (en) | A structural member | |
CN215858253U (en) | Concrete floor stand node connection structure | |
RU2226593C2 (en) | Composite multi-store building frame made of reinforced concrete | |
CN214696254U (en) | Be applied to connected node of non-bearing concrete wall structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
EEER | Examination request | ||
MKLA | Lapsed |