CA2213631A1 - Method and apparatus for reducing gas well production costs using improved downhole valves - Google Patents
Method and apparatus for reducing gas well production costs using improved downhole valvesInfo
- Publication number
- CA2213631A1 CA2213631A1 CA002213631A CA2213631A CA2213631A1 CA 2213631 A1 CA2213631 A1 CA 2213631A1 CA 002213631 A CA002213631 A CA 002213631A CA 2213631 A CA2213631 A CA 2213631A CA 2213631 A1 CA2213631 A1 CA 2213631A1
- Authority
- CA
- Canada
- Prior art keywords
- production
- casing
- string
- perforations
- packer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 38
- 238000000034 method Methods 0.000 title claims abstract description 9
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 45
- 238000002347 injection Methods 0.000 claims abstract description 26
- 239000007924 injection Substances 0.000 claims abstract description 26
- 239000004215 Carbon black (E152) Substances 0.000 claims abstract 11
- 229930195733 hydrocarbon Natural products 0.000 claims abstract 11
- 150000002430 hydrocarbons Chemical class 0.000 claims abstract 11
- 239000012530 fluid Substances 0.000 claims description 15
- 238000005086 pumping Methods 0.000 claims description 9
- 238000004891 communication Methods 0.000 claims description 4
- 230000005484 gravity Effects 0.000 claims description 3
- 230000000149 penetrating effect Effects 0.000 claims description 2
- 230000015572 biosynthetic process Effects 0.000 description 6
- 238000005755 formation reaction Methods 0.000 description 6
- 230000002706 hydrostatic effect Effects 0.000 description 3
- 230000009977 dual effect Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 239000003129 oil well Substances 0.000 description 2
- 230000009467 reduction Effects 0.000 description 2
- 150000003839 salts Chemical class 0.000 description 2
- 238000007789 sealing Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000002351 wastewater Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/34—Arrangements for separating materials produced by the well
- E21B43/38—Arrangements for separating materials produced by the well in the well
- E21B43/385—Arrangements for separating materials produced by the well in the well by reinjecting the separated materials into an earth formation in the same well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
- E21B43/121—Lifting well fluids
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
Methods and apparatus are disclosed for reducing lifting costs in a producing hydrocarbon well by injecting produced water into a set of injection perforations located lower in the well borehole from a set of production perforations. A plunger pump and a cage-ball valve system are placed above a production packer which is located between the production and injection perforations. The valve system and pump are arranged to take produced water from above the packer and pump into the injection perforations only on the downstroke of the rod string activated plunger pump.
Description
METHOD AND APPARATUS FOR REDUCING GAS WELL
PRODUCTION COSTS USING IMPROVED DOWNXOLE VALVES
(D# 91140) REFERENCE TO RELATED APPLICATIONS
This application is related to and is an improvement of systems described in prior application Serial No. 08/286,361 filed August 5, 1994, for "DUAL ACTION PUMPING SYSTEM".
B~CKGROUND OF THE INVENTION
The invention described herein pertains to a method and apparatus for improving the economics of production from a producing well. While the descriptions of the invention contained herein are given with respect to producing gas wells, it will be understood by those of skill in the art that they are also applicable to producing oil wells for the reduction of lifting costs therein.
A problem associated with the production of oil and gas throughout the history of the industry has been that of the - disposal of undesired water produced along with the desired oil or gas. The above referenced co-pending application deals with the re-injection of produced water into an injection zone lower in the producing well. The produced water is separated by using the casing-production tubing annulus as a gravity separator in the wellbore in a producing oil well. The oil is pumped to the surface and the produced water is pumped into a set of injection perforations lower in the wellbore, and sealed off interior to - t~e casing from the producing perforations by a production packer. This packer is penetrated by a tubing string connected to a dual action mechanical pump located above the packer which pumps oil to the surface on the upstroke of the pump, and which pumps water into the injection perforations below the packer on the downstroke of the pump.
The pumping system described in the referenced co-pending application has been in operation a sufficient time to permit observation of some weaknesses in the system. One such weakness, which the present invention addresses, is that of the valving used to selectively pick up the water or oil for pumping to the injection perforations or to the surface respectively.
The valves used in the referenced application had relatively small cross sectional area, necessitating the use of a plurality of such valves. This can lead to earlier failure because of a multiplicity of parts. Also the valves previously used were of a spring loaded or biased type, which used spring pressure to assist in the opening and closing of valves. The use of springs in the high temperature, often corrosive, well fluid environment would be better avoided, if possible. The present invention does so by completely eliminating the use of spring operated or assisted valves.
Typically gas wells flow to the surface using the reservoir pressure as a means of lifting the gas which is ~ produced into the cased well borehole through production perforations and is allowed to enter a production tubing string run coaxially into the casing and extending from the surface down to the producing zone. Over time, essentially all gas producing wells also produce unwanted water along with the gas into the casing. This builds up a hydrostatic pressure head in the casing-tubing annulus which must be overcome by the formation pressure, or by a pumping system, to produce gas and fluid to the surface through the tubing string or the casing-tubing annulus.
The production of salt water creates a water handling problem. The water is conventionally separated at the surface in gravity or other type separators and is then re-injected into a disposal well or hauled off by truck to be disposed of. A
typical way of reducing the undesired hydrostatic head problem, which slows gas production, is to pump the water to the surface and to allow gas to flow to the surface in the tubing-casing annulus. Again, this creates a water disposal problem. The re-injection of water downhole in a manner similar to that disclosedin the above referenced patent application can significantly reduce lifting costs and can virtually eliminate waste water disposal problems.
BRIEF DESCRIPTION OF THE INVENTION
The present invention operates in an improved manner to ~~ re~-inject produced salt water from a set of upper producing perforations into a set of lower injection perforations in a well borehole. The cased hole is provided with a production packer to interiorly separate the upper production perforations from the lower injection perforations. A pumping system is run into the casing on a string of production tubing. The pumping system uses a combination system of two valves. This valve combination is set below a conventional mechanical pump with a plugged plunger.
There is an upper ball in cage valve, and a lower ball in cage valve. On the upstroke of the pump cycle water enters the tubing beneath the pump but above the packer through a port in the upper valve beneath the conventional cage-ball seat. Also on the upstroke, the lower cage-ball valve seats preventing water flow from the injection interval (below the packer) into the production tubing penetrating the packer. On the downstroke of the pump, the upper cage-ball valve seats (closes) and water is forced by the pump plunger through both valves and the tubing into the lower injection interval below the packer. Thus water is pumped for re-injection on the downstroke of the cycle and gas flows to the surface in the casing-tubing annulus.
The above and other features and advantages of the invention are best understood by reference to the following detailed description thereof when taken in conjunction with the accompanying drawings. These descriptions and drawings are ~ in~ended as illustrative of the invention and not as limitative thereof.
BRIEF DESCRIPTION OF THE DRAWINGS
The appended drawings comprise 7 figures which are:
Figure 1 is a schematic cross-section of a wellbore employing the pumping and valving system of the invention in a gas well.
Figure 2 is a schematic cross-sectional view looking down on the upper end of the upper valve assembly of the system.
Figure 3 is a schematic longitudinal cross-sectional view of the upper valve assembly.
Figure 4 is a schematic cross-sectional view looking downwardly on the upper end of the lower valve assembly of the system.
Figure S is a longitudinal cross-sectional view along - line A-B of Figure 4.
Figure 6 is a longitudinal cross-sectional view of the lower portion of the lower valve assembly.
Figure 7 is a longitudinal cross-section of the valve portion of the lower valve assembly of the system.
DETAILED DESCRIPTION OF THE INVENTION
Referring initially to Figure 1 of the drawings a ~ylfiC~
~~ p~oducing ~ well is schematically illustrated in which is provided a water disposal system according to the concepts of the present invention. A cased wellbore production interval is shown generally as numeral 9. A well casing 10 is cemented in place over the gas producing zone outside the casing 10 and extends to the surface of the earth. A production tubing string 10 is run into the borehole 9 and contains a plugged plunger pump 12, illustrated schematically operated by a rod string 11 which extends to the surface. A valve assembly according to the concepts of the present invention is shown schematically in the tubing string 14 below the pump 12 and comprises an upper ball valve 19 and a lower ball valve 20 whose operation will be described in more detail subsequently.
The producing zone produces gas and water into casing 10 through production perforations 16. The casing 10 is also provided with a set of lower injection perforations 18 which are separated from and sealed off from the production perforations 16 (interiorly to the casing 10) by a production packer 17. The tubing string 14 penetrates packer 17 via the valve assembly 19-20.
As gas and water is produced into casing 10 through perforations 16 it separates into an upper gas layer 13 in the - -- . CA 02213631 1997-08-22 casing-tubing annulus and a lower water layer 15 also in the casing-tubing annulus. As more water is produced a hydrostatic - p~essure head is built up over the perforations 16. Formation pressure may become insufficient to overcome this head and the production of fluids from the formation slows down. In order to reduce or eliminate the head, water is pumped to the surface via a tubing pump in conventional production. This is costly and produces a water disposal problem. The system of the present invention eliminates the need to pump water to the surface as it is re-injected into the producing formation (or into a lower disposal formation) via the injection perforations 18.
In operation the up and down motion of the rod string 11 and plugged plunger pump 12 is used to inject, via valve assembly 19-20, produced water is through packer 17 and injected perforations 18, back into the formations exterior to casing 10.
On the upstroke of rod string 11 and pump 12, water is allowed to enter the tubing string via upper valve 19 which unseats or opens on this upstroke. Also on the upstroke, the lower valve 20 closes or seats. This prevents entry of water in to the tubing string 14 from below packer 17. On the downstroke of rod string 11 and pump 12, upper valve 19 closes, preventing entry of water into tubing string 14 and effectively sealing off the casing-tubing annulus above the packer 17. Also on the downstroke, the lower valve 20 opens, or unseats. This allows the pump 12 to force the water inside the tubing string 14 down through packer 17 and into the disposal injection perforations 18.
-~ ~~ Reference is now made to Figures 2-7 for a more detailed explanation of the operation of the upper and lower valves, 19 and 20, of the valve assembly. Figures 2 and 3 show the upper valve assembly 19 of Figure 1 in more detail, but still schematically. Figure 2 is a view looking down on the top of the upper valve assembly shown generally as 21. The valve assembly 21 is machined from a block of steel and is threaded by threads 22 on its extension surface to fit a standard sized production tubing collar 31 (Fig. 3). Three discharge holes 23 or passages are bored through the body 21 of the valve assembly. A fluid input port 24 is bored in the right side (Fig. 3) of the body member 21 and leads to an interior chamber 25 which can be closed off at its upper end by ball in cage valve 27-28 when the ball 27 sealingly engages the valve seat 26. The chamber 25 is in fluid communication with the tubing interior and discharge passages 23 via upper opening 29 when the cage ball valve 27-28 is not closed. On the upstroke of the pump 12, ball 27 leaves seat 26 because of reduction of pressure below the pump 12 in tubing 14.
Water enters the tubing 14 via port 24 and opening 29. On the downstroke of pump 12, increased pressure in tubing string 14 closes cage ball valve 27-28 by seating the ball against seat 26, thereby sealing off the casing-tubing annulus from the interior CA 022l363l l997-08-22 of the tubing string 14. Fluid communication inside the tubing string is maintained via discharge passages 23 below the upper ~~ v~lve assembly.
Now referring to Figures 4-7 the lower valve assembly 20 of Figure 1 is shown in more detail, but still schematically.
Figure 4 shows a view of the top end of the lower valve assembly looking downwardly on it. Body member 41 is provided with fluid passages 42, 43 and 44 bored therein. The exterior of the body member 41 is threaded with threads 42 to fit standard tubing collars. Passages 43 and 44 are in fluid communication with passages 42 via interior bores 4 5 and 46. Figure 6 is a vertical cross-section along plane C-D (Fig. 4) and Figure 5 is a vertical cross-section along diameter A-B of Figure 4. Figure 7 is a more schematic cross-sectional view of the entire lower valve assembly lS showing the attachment mechanism for ball and cage valves 50-51 which comprises a compression screw 52 and shaft 53 to press on top of the cage member 51 holding it in place.
Fluid passage 42 is provided near its lower end with a cage ball valve 50-51. Fluid entering from the hole 44 opening into the tubing string 14 from the top of the lower valve assembly is routed via passage 44 to a point below ball-cage valve 50-51.
Fluid entering tubing 14 from below the lower valve assembly is routed via bore 43 and opening 4s to a point above the ball-cage valve 50-51 in bore 42. Thus on the upstroke of pump 12 water tending to enter tubing string 14 is routed via ~~ bore 43 and opening 45 to a point above the ball-cage valve 50-51 such that valve 50-51 seats or closes, preventing this water from . entering tublng string 14 any further.
On the downstroke of pump 12 the increased pressure in the tubing string 14 above the lower valve assembly routes water via bore 44 and opening 46 to a point in bore 42 below ball-cage valve 50-51. Thus the water is forced below the packer 17 and through the injection perforations by the downstroke action of pump 12.
The foregoing descriptions may make changes and modifications apparent to those of skill in the art. It is the aim of the appended claims to cover all such changes and modifications as fall within the true spirit and scope of the invention.
PRODUCTION COSTS USING IMPROVED DOWNXOLE VALVES
(D# 91140) REFERENCE TO RELATED APPLICATIONS
This application is related to and is an improvement of systems described in prior application Serial No. 08/286,361 filed August 5, 1994, for "DUAL ACTION PUMPING SYSTEM".
B~CKGROUND OF THE INVENTION
The invention described herein pertains to a method and apparatus for improving the economics of production from a producing well. While the descriptions of the invention contained herein are given with respect to producing gas wells, it will be understood by those of skill in the art that they are also applicable to producing oil wells for the reduction of lifting costs therein.
A problem associated with the production of oil and gas throughout the history of the industry has been that of the - disposal of undesired water produced along with the desired oil or gas. The above referenced co-pending application deals with the re-injection of produced water into an injection zone lower in the producing well. The produced water is separated by using the casing-production tubing annulus as a gravity separator in the wellbore in a producing oil well. The oil is pumped to the surface and the produced water is pumped into a set of injection perforations lower in the wellbore, and sealed off interior to - t~e casing from the producing perforations by a production packer. This packer is penetrated by a tubing string connected to a dual action mechanical pump located above the packer which pumps oil to the surface on the upstroke of the pump, and which pumps water into the injection perforations below the packer on the downstroke of the pump.
The pumping system described in the referenced co-pending application has been in operation a sufficient time to permit observation of some weaknesses in the system. One such weakness, which the present invention addresses, is that of the valving used to selectively pick up the water or oil for pumping to the injection perforations or to the surface respectively.
The valves used in the referenced application had relatively small cross sectional area, necessitating the use of a plurality of such valves. This can lead to earlier failure because of a multiplicity of parts. Also the valves previously used were of a spring loaded or biased type, which used spring pressure to assist in the opening and closing of valves. The use of springs in the high temperature, often corrosive, well fluid environment would be better avoided, if possible. The present invention does so by completely eliminating the use of spring operated or assisted valves.
Typically gas wells flow to the surface using the reservoir pressure as a means of lifting the gas which is ~ produced into the cased well borehole through production perforations and is allowed to enter a production tubing string run coaxially into the casing and extending from the surface down to the producing zone. Over time, essentially all gas producing wells also produce unwanted water along with the gas into the casing. This builds up a hydrostatic pressure head in the casing-tubing annulus which must be overcome by the formation pressure, or by a pumping system, to produce gas and fluid to the surface through the tubing string or the casing-tubing annulus.
The production of salt water creates a water handling problem. The water is conventionally separated at the surface in gravity or other type separators and is then re-injected into a disposal well or hauled off by truck to be disposed of. A
typical way of reducing the undesired hydrostatic head problem, which slows gas production, is to pump the water to the surface and to allow gas to flow to the surface in the tubing-casing annulus. Again, this creates a water disposal problem. The re-injection of water downhole in a manner similar to that disclosedin the above referenced patent application can significantly reduce lifting costs and can virtually eliminate waste water disposal problems.
BRIEF DESCRIPTION OF THE INVENTION
The present invention operates in an improved manner to ~~ re~-inject produced salt water from a set of upper producing perforations into a set of lower injection perforations in a well borehole. The cased hole is provided with a production packer to interiorly separate the upper production perforations from the lower injection perforations. A pumping system is run into the casing on a string of production tubing. The pumping system uses a combination system of two valves. This valve combination is set below a conventional mechanical pump with a plugged plunger.
There is an upper ball in cage valve, and a lower ball in cage valve. On the upstroke of the pump cycle water enters the tubing beneath the pump but above the packer through a port in the upper valve beneath the conventional cage-ball seat. Also on the upstroke, the lower cage-ball valve seats preventing water flow from the injection interval (below the packer) into the production tubing penetrating the packer. On the downstroke of the pump, the upper cage-ball valve seats (closes) and water is forced by the pump plunger through both valves and the tubing into the lower injection interval below the packer. Thus water is pumped for re-injection on the downstroke of the cycle and gas flows to the surface in the casing-tubing annulus.
The above and other features and advantages of the invention are best understood by reference to the following detailed description thereof when taken in conjunction with the accompanying drawings. These descriptions and drawings are ~ in~ended as illustrative of the invention and not as limitative thereof.
BRIEF DESCRIPTION OF THE DRAWINGS
The appended drawings comprise 7 figures which are:
Figure 1 is a schematic cross-section of a wellbore employing the pumping and valving system of the invention in a gas well.
Figure 2 is a schematic cross-sectional view looking down on the upper end of the upper valve assembly of the system.
Figure 3 is a schematic longitudinal cross-sectional view of the upper valve assembly.
Figure 4 is a schematic cross-sectional view looking downwardly on the upper end of the lower valve assembly of the system.
Figure S is a longitudinal cross-sectional view along - line A-B of Figure 4.
Figure 6 is a longitudinal cross-sectional view of the lower portion of the lower valve assembly.
Figure 7 is a longitudinal cross-section of the valve portion of the lower valve assembly of the system.
DETAILED DESCRIPTION OF THE INVENTION
Referring initially to Figure 1 of the drawings a ~ylfiC~
~~ p~oducing ~ well is schematically illustrated in which is provided a water disposal system according to the concepts of the present invention. A cased wellbore production interval is shown generally as numeral 9. A well casing 10 is cemented in place over the gas producing zone outside the casing 10 and extends to the surface of the earth. A production tubing string 10 is run into the borehole 9 and contains a plugged plunger pump 12, illustrated schematically operated by a rod string 11 which extends to the surface. A valve assembly according to the concepts of the present invention is shown schematically in the tubing string 14 below the pump 12 and comprises an upper ball valve 19 and a lower ball valve 20 whose operation will be described in more detail subsequently.
The producing zone produces gas and water into casing 10 through production perforations 16. The casing 10 is also provided with a set of lower injection perforations 18 which are separated from and sealed off from the production perforations 16 (interiorly to the casing 10) by a production packer 17. The tubing string 14 penetrates packer 17 via the valve assembly 19-20.
As gas and water is produced into casing 10 through perforations 16 it separates into an upper gas layer 13 in the - -- . CA 02213631 1997-08-22 casing-tubing annulus and a lower water layer 15 also in the casing-tubing annulus. As more water is produced a hydrostatic - p~essure head is built up over the perforations 16. Formation pressure may become insufficient to overcome this head and the production of fluids from the formation slows down. In order to reduce or eliminate the head, water is pumped to the surface via a tubing pump in conventional production. This is costly and produces a water disposal problem. The system of the present invention eliminates the need to pump water to the surface as it is re-injected into the producing formation (or into a lower disposal formation) via the injection perforations 18.
In operation the up and down motion of the rod string 11 and plugged plunger pump 12 is used to inject, via valve assembly 19-20, produced water is through packer 17 and injected perforations 18, back into the formations exterior to casing 10.
On the upstroke of rod string 11 and pump 12, water is allowed to enter the tubing string via upper valve 19 which unseats or opens on this upstroke. Also on the upstroke, the lower valve 20 closes or seats. This prevents entry of water in to the tubing string 14 from below packer 17. On the downstroke of rod string 11 and pump 12, upper valve 19 closes, preventing entry of water into tubing string 14 and effectively sealing off the casing-tubing annulus above the packer 17. Also on the downstroke, the lower valve 20 opens, or unseats. This allows the pump 12 to force the water inside the tubing string 14 down through packer 17 and into the disposal injection perforations 18.
-~ ~~ Reference is now made to Figures 2-7 for a more detailed explanation of the operation of the upper and lower valves, 19 and 20, of the valve assembly. Figures 2 and 3 show the upper valve assembly 19 of Figure 1 in more detail, but still schematically. Figure 2 is a view looking down on the top of the upper valve assembly shown generally as 21. The valve assembly 21 is machined from a block of steel and is threaded by threads 22 on its extension surface to fit a standard sized production tubing collar 31 (Fig. 3). Three discharge holes 23 or passages are bored through the body 21 of the valve assembly. A fluid input port 24 is bored in the right side (Fig. 3) of the body member 21 and leads to an interior chamber 25 which can be closed off at its upper end by ball in cage valve 27-28 when the ball 27 sealingly engages the valve seat 26. The chamber 25 is in fluid communication with the tubing interior and discharge passages 23 via upper opening 29 when the cage ball valve 27-28 is not closed. On the upstroke of the pump 12, ball 27 leaves seat 26 because of reduction of pressure below the pump 12 in tubing 14.
Water enters the tubing 14 via port 24 and opening 29. On the downstroke of pump 12, increased pressure in tubing string 14 closes cage ball valve 27-28 by seating the ball against seat 26, thereby sealing off the casing-tubing annulus from the interior CA 022l363l l997-08-22 of the tubing string 14. Fluid communication inside the tubing string is maintained via discharge passages 23 below the upper ~~ v~lve assembly.
Now referring to Figures 4-7 the lower valve assembly 20 of Figure 1 is shown in more detail, but still schematically.
Figure 4 shows a view of the top end of the lower valve assembly looking downwardly on it. Body member 41 is provided with fluid passages 42, 43 and 44 bored therein. The exterior of the body member 41 is threaded with threads 42 to fit standard tubing collars. Passages 43 and 44 are in fluid communication with passages 42 via interior bores 4 5 and 46. Figure 6 is a vertical cross-section along plane C-D (Fig. 4) and Figure 5 is a vertical cross-section along diameter A-B of Figure 4. Figure 7 is a more schematic cross-sectional view of the entire lower valve assembly lS showing the attachment mechanism for ball and cage valves 50-51 which comprises a compression screw 52 and shaft 53 to press on top of the cage member 51 holding it in place.
Fluid passage 42 is provided near its lower end with a cage ball valve 50-51. Fluid entering from the hole 44 opening into the tubing string 14 from the top of the lower valve assembly is routed via passage 44 to a point below ball-cage valve 50-51.
Fluid entering tubing 14 from below the lower valve assembly is routed via bore 43 and opening 4s to a point above the ball-cage valve 50-51 in bore 42. Thus on the upstroke of pump 12 water tending to enter tubing string 14 is routed via ~~ bore 43 and opening 45 to a point above the ball-cage valve 50-51 such that valve 50-51 seats or closes, preventing this water from . entering tublng string 14 any further.
On the downstroke of pump 12 the increased pressure in the tubing string 14 above the lower valve assembly routes water via bore 44 and opening 46 to a point in bore 42 below ball-cage valve 50-51. Thus the water is forced below the packer 17 and through the injection perforations by the downstroke action of pump 12.
The foregoing descriptions may make changes and modifications apparent to those of skill in the art. It is the aim of the appended claims to cover all such changes and modifications as fall within the true spirit and scope of the invention.
Claims (10)
1 A method for improving the economics of production from a producing hydrocarbon well by reducing lifting costs comprising the steps of:
placing a casing string downhole through a hydrocarbon producing zone in a well borehole;
placing a production tubing string extending downwardly through said casing and forming a casing-tubing annulus therebetween;
placing upper production perforations and injection perforations in said casing string in upper and lower portions of said producing zone;
placing a production packer in said casing string between said production perforations and said injection perforations;
producing hydrocarbon and water fluids into said casing-tubing annulus through said production perforations and allowing produced fluids to separate into a water head and produced hydrocarbon under the influence of gravity;
placing a cage-ball valve system below a plunger pump activated by upward and downward motion of a rod string extending to the surface of the earth, said valve system being located above said production packer; and pumping water from said casing-tubing annulus above said packer through said cage-ball valve system into said injection perforations below said packer while producing hydrocarbon fluids to the surface.
placing a casing string downhole through a hydrocarbon producing zone in a well borehole;
placing a production tubing string extending downwardly through said casing and forming a casing-tubing annulus therebetween;
placing upper production perforations and injection perforations in said casing string in upper and lower portions of said producing zone;
placing a production packer in said casing string between said production perforations and said injection perforations;
producing hydrocarbon and water fluids into said casing-tubing annulus through said production perforations and allowing produced fluids to separate into a water head and produced hydrocarbon under the influence of gravity;
placing a cage-ball valve system below a plunger pump activated by upward and downward motion of a rod string extending to the surface of the earth, said valve system being located above said production packer; and pumping water from said casing-tubing annulus above said packer through said cage-ball valve system into said injection perforations below said packer while producing hydrocarbon fluids to the surface.
2. The method of Claim 1 wherein the step of pumping water into said injection perforations is performed only on the downward motion of said rod string.
3. The method of Claim 2 wherein said cage-ball valve system comprises an upper cage ball valve and a lower cage ball valve arranged such that said upper valve opens on the upward motion of said rod string and closes on the downward motion of said rod string.
4. The method of Claim 3 wherein said lower cage-ball valve opens on the downward motion of said rod string and closes on the upward motion of said rod string.
5. The method of Claim 4 wherein said plunger pump comprises a plugged plunger pump.
6. A system for improving the economics of production from a producing hydrocarbon well by reducing lifting costs, comprising:
a casing string extending downhole in a well borehole penetrating a hydrocarbon production zone therein;
upper production perforations and lower injection perforations in said casing string placed respectively in upper and lower portions of said hydrocarbon production zone;
a production packer placed in said casing string between said upper and lower perforations;
a production tubing string run into the wellbore through said casing string forming a casing-tubing annulus and carrying thereon;
a rod string extending to the surface and powering a plunger pump by upward and downward motion thereof and a caged-ball valve system mounted on said tubing string below said plunger pump and seated onto said packer with said tubing string in fluid communication with said injection perforations below said packer via said valve system, whereby produced hydrocarbon and water flow into said casing tubing annulus and separate and the produced water is injected via said pump and said valve system into said injection perforations while produced hydrocarbon is accumulated in said casing-tubing annulus and produced to the surface.
a casing string extending downhole in a well borehole penetrating a hydrocarbon production zone therein;
upper production perforations and lower injection perforations in said casing string placed respectively in upper and lower portions of said hydrocarbon production zone;
a production packer placed in said casing string between said upper and lower perforations;
a production tubing string run into the wellbore through said casing string forming a casing-tubing annulus and carrying thereon;
a rod string extending to the surface and powering a plunger pump by upward and downward motion thereof and a caged-ball valve system mounted on said tubing string below said plunger pump and seated onto said packer with said tubing string in fluid communication with said injection perforations below said packer via said valve system, whereby produced hydrocarbon and water flow into said casing tubing annulus and separate and the produced water is injected via said pump and said valve system into said injection perforations while produced hydrocarbon is accumulated in said casing-tubing annulus and produced to the surface.
7. The system of Claim 6 wherein said valve system comprises an upper cage-ball valve which opens on an upstroke of said rod string and closes on a downstroke of said rod string.
8. The system of Claim 7 wherein said valve system further comprises a lower cage-ball valve which opens on a downstroke of said rod string and closes on an upstroke of said rod string.
9. The system of Claim 8 wherein water is pumped to said injection perforations only on the downstroke of said rod string.
10. The system of Claim 9 wherein said plunger pump comprises a plugged plunger pump.
Priority Applications (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CA002213631A CA2213631A1 (en) | 1997-08-22 | 1997-08-22 | Method and apparatus for reducing gas well production costs using improved downhole valves |
US09/154,143 US6092599A (en) | 1997-08-22 | 1998-09-17 | Downhole oil and water separation system and method |
US09/154,141 US6092600A (en) | 1997-08-22 | 1998-09-17 | Dual injection and lifting system using a rod driven progressive cavity pump and an electrical submersible pump and associate a method |
US09/154,142 US6079491A (en) | 1997-08-22 | 1998-09-17 | Dual injection and lifting system using a rod driven progressive cavity pump and an electrical submersible progressive cavity pump |
AU95718/98A AU9571898A (en) | 1997-08-22 | 1998-09-21 | Dual injection and lifting system |
PCT/US1998/019585 WO1999015755A2 (en) | 1997-08-22 | 1998-09-21 | Dual injection and lifting system |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CA002213631A CA2213631A1 (en) | 1997-08-22 | 1997-08-22 | Method and apparatus for reducing gas well production costs using improved downhole valves |
US09/154,141 US6092600A (en) | 1997-08-22 | 1998-09-17 | Dual injection and lifting system using a rod driven progressive cavity pump and an electrical submersible pump and associate a method |
Publications (1)
Publication Number | Publication Date |
---|---|
CA2213631A1 true CA2213631A1 (en) | 1999-02-22 |
Family
ID=25679564
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CA002213631A Abandoned CA2213631A1 (en) | 1997-08-22 | 1997-08-22 | Method and apparatus for reducing gas well production costs using improved downhole valves |
Country Status (1)
Country | Link |
---|---|
CA (1) | CA2213631A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110886595A (en) * | 2018-09-07 | 2020-03-17 | 中国石油天然气股份有限公司 | Injection and production integrated device |
CN114109270A (en) * | 2020-08-31 | 2022-03-01 | 中国石油天然气股份有限公司 | Perforating steam injection production primary tubular column and perforating steam injection production primary oil extraction method |
-
1997
- 1997-08-22 CA CA002213631A patent/CA2213631A1/en not_active Abandoned
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110886595A (en) * | 2018-09-07 | 2020-03-17 | 中国石油天然气股份有限公司 | Injection and production integrated device |
CN110886595B (en) * | 2018-09-07 | 2022-03-29 | 中国石油天然气股份有限公司 | Injection and production integrated device |
CN114109270A (en) * | 2020-08-31 | 2022-03-01 | 中国石油天然气股份有限公司 | Perforating steam injection production primary tubular column and perforating steam injection production primary oil extraction method |
CN114109270B (en) * | 2020-08-31 | 2024-05-28 | 中国石油天然气股份有限公司 | Perforating and steam injection production primary pipe column and perforating and steam injection production primary oil extraction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8006756B2 (en) | Gas assisted downhole pump | |
US5497832A (en) | Dual action pumping system | |
US9322251B2 (en) | System and method for production of reservoir fluids | |
AU753037B2 (en) | Method and apparatus for increasing fluid recovery from a subterranean formation | |
US5765639A (en) | Tubing pump system for pumping well fluids | |
US6092600A (en) | Dual injection and lifting system using a rod driven progressive cavity pump and an electrical submersible pump and associate a method | |
US6196312B1 (en) | Dual pump gravity separation system | |
US20200199987A1 (en) | Crossover valve system and method for gas production | |
US6079491A (en) | Dual injection and lifting system using a rod driven progressive cavity pump and an electrical submersible progressive cavity pump | |
AU2010273768B2 (en) | System and method for intermittent gas lift | |
US11994011B2 (en) | Permanent packer and extended gas lift method using permanent packer | |
US6123149A (en) | Dual injection and lifting system using an electrical submersible progressive cavity pump and an electrical submersible pump | |
US8651191B2 (en) | Slim hole production system and method | |
US10883349B2 (en) | Bottom hole assembly for configuring between artificial lift systems | |
US6032743A (en) | Method and apparatus for reducing gas well production costs using improved downhole valves | |
CA2829630A1 (en) | Crossover valve system and method for gas production | |
CA2213631A1 (en) | Method and apparatus for reducing gas well production costs using improved downhole valves | |
US20170191355A1 (en) | Two-step artificial lift system and method | |
RU2799221C1 (en) | Pumping unit for exploitation of formations complicated by sand production with reservoir pressure growing from bottom to top | |
RU2330995C1 (en) | Jet assembly for chemical treatment of bottomhole zone | |
RU2307234C2 (en) | Sucker-rod pump assembly | |
RU2338057C1 (en) | Method of simultaneous-separate operation of multibed well | |
RU2080486C1 (en) | Lock support for inserted oil-ell sucker-rod pump | |
WO2013042128A2 (en) | System and method for simultaneous and segregated oil and gas production from multiple zone wells |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FZDE | Discontinued |