CA2171897C - Pre-cast concrete panel wall - Google Patents

Pre-cast concrete panel wall Download PDF

Info

Publication number
CA2171897C
CA2171897C CA 2171897 CA2171897A CA2171897C CA 2171897 C CA2171897 C CA 2171897C CA 2171897 CA2171897 CA 2171897 CA 2171897 A CA2171897 A CA 2171897A CA 2171897 C CA2171897 C CA 2171897C
Authority
CA
Canada
Prior art keywords
trench
panel
walls
cast
guide walls
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CA 2171897
Other languages
French (fr)
Other versions
CA2171897A1 (en
Inventor
Nino Catalano
Eli Aboukheir
Gregory Sanchez
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TREVIICOS Corp
Original Assignee
Nino Catalano
Eli Aboukheir
Gregory Sanchez
Icos Boston
Treviicos Corporation
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nino Catalano, Eli Aboukheir, Gregory Sanchez, Icos Boston, Treviicos Corporation filed Critical Nino Catalano
Priority to CA 2171897 priority Critical patent/CA2171897C/en
Publication of CA2171897A1 publication Critical patent/CA2171897A1/en
Application granted granted Critical
Publication of CA2171897C publication Critical patent/CA2171897C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/10Prefabricated parts, e.g. composite sheet piles made of concrete or reinforced concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The present invention provides a method of constructing underground structural concrete walls, using pre-cast, preferably pre-stressed, concrete panels, including: (a) casting in place a pair of parallel, opposing, underground guide walls spaced a predetermined distance apart; (b) excavating a trench, using the guide walls to guide the excavation tool, the trench having a predetermined width substantially equal to the space between the guide walls; (c) pouring a footing at the base of the trench; and (d) lowering a pre-cast panel into the trench in a desired orientation relative to the trench walls.

Description

PREW~.T c~.,~~',~~'.~~''N~~'~i~,T~~~~
The present invention relates to systems and methods for the construction of underground structural concrete walls.
It is often necessary to provide concrete walls below grade, for example in the const.~ruction of railroad or highway tunnels, underground parking garages, foundation walls and retaining walls. These underground walls are commonly formed by excavating a trench and pouring concrete into the trench, i.e., casting the wall in place. The physical properties of cast-rn-place slurry walls tend to vary depending upon the composition of tk~e concrete, the weather, and other variables present when the concrete is poured.
~~~g~~arv of ~~,~ Invention The present invention provides an improved method of constructing underground structural concrete walls, using pre-cast concrete panels. Preferably, the panels are also pre-stressed to provide the walls with high strength and resistance to bending moments, e.g., exerted by soil pressure against the wall. Advantageously, the concrete walls have a smooth, finished surface that is substantially free of defects such as inclusions. Moreover, the method of the invention may require less manpower than the construction of conventional cast-in-place slurry walls.
Finally, the pre-cast concrete panels can be manufactured under carefully controlled conditions and subjected to quality control, and, if desired, a predetermined preload may be applied to the panels, allowing excellent control over the physical properties of the finished concrete wall.

In one aspect, the method includes: (a) providing, e.g., by casting in place, a pair of parallel, opposing, underground guide walls spaced a predetermined distance apart; (b) excavating a trench, using the guide walls to guide the excavation tool, the trench having a predetermined width substantially equal to the space between the guide walls; (c) pouring a footing at the base of the trench; and (d) lowering a pre-cast panel into the trench in a desired orientation relative to the trench walls.
Preferred embodiments of the invention include one or more of the following features. The footing formed in step (c) is formed of concrete, and is poured into the trench using the tremie method. Trre method further includes (e) pumping an excavating slurry containing a thickening agent, e.g., bentonite or polymer, into the trench during step (b) to prevent the walls of the trench from collapsing.
The method further includes (f) pumping a soil replacement material, e.g., a cement/thickening agent slurry, into the space between the panel and trench walls. This soil replacement material provides support and resists movement of the panels relative to the trench walls when the panel is loaded, and also provides a waterproof barrier. Preferably, each slurry contains from about 3 to ~~ bentonite as the thickening agent, and the cement/thickening agent slurry contains cement and bentonite in a ratio of from about 3:1 to 5:1, more preferably 4:1.
In a preferred embodiment of the invention, th~
guide walls are constructed to support the weight of the panel, and the method further includes the step of suspending the panel from a pair of beams placed transversely across the guide walls and trench opening. The panel is suspended by providing the panel with threaded inserts extending verticall~r from the upper edge of the panel into the panel, inserting a threaded rod into each of the threaded inserts, passing the threaded rod through a through hole in the beam, and securing the threaded rod, e.g., with a threaded nut. The elevation of the panel in the trench can then be readily adjusted by raising the panel to unweight the threaded nut and changing the position of the threaded nut on the threaded rod.
In preferred embodiments, the wall is formed of a plurality of pre-cast panels placed side by side in the trench, and the method further includes joining the panels along their adjoining edges. Preferably, the panels are joined by engagement of corresponding interlocking members.
Preferred interlocking members include, on one of the adjoining edges, a channel, and, on the opposite edge, a member dimensioned to be received by the channel. It. is particularly preferred that the channel and member be keyed for interlocking engagement to provide a secure connection between adjoining panels.
In a particularly preferred embodiment, each of the adjoining edges includes a slot, the slots being positioned so that when the interlocking members are engaged the slots align to define a common slot, and the method further includes introducing into the common slot a liquid, e.g., a polymer, that is curable to form an elastomeric rubber material. Preferably, the elastomeric material is water-swellable. The presence of the elastomer-filled common slot prevents leakage of water through the interface between the panels.
Preferably, when the wall is formed of a plurality of panels, the trench into which the panels are lowered is excavated incrementally, i.e., the entire length of the trench is not excavated prior to placing the panels, but instead a first length of trench is excavated, one or more panels are positioned in this trench, then a further trench is excavated adjacent the first trench. Preferably the entire length of the guidewalls is formed initially, prior to beginning excavation of the trench.
In another aspect, the invention features a method of constructing an underground tunnel. The method includes (i) forming a pair of spaced, opposed vertical walls by the method described above, (iii excavating to a predetermined roof level, (iii) casting the tunnel roof in place between the vertical walls, (iv) excavating the tunnel to an elevation suitable for the base slab, and (v) casting the base slab in place between the vertical walls.
Preferably, the method further includes (vi) scraping the cement~'bentonite slurry (from step (f), above) off of the exposed side of the vertical walls to expose the surface of the precast pane:. This step provides the exposed side of each vertical wall with a smooth, finished surf ace .
The invention also features methods of forming retaining and foundation walls by forming a wall according to a method of the invention and excavation a raglan adjacent the wall to expose a surface of the wall.
Other features and advantages of the invention will be apparent from the description of preferred embodiments thereof, taken together with the drawings, and from the claims.
Fig. 1 is a tog schematic view of the vertical walls of a tunnel, formed according to ane embodiment of the invention. Fig. la is a side W ew in elevation of one of the vertical walls.

Fig. 2 i$ a cross-sectional w~.ew of a pre-cast panel, taken along line 2-~2 in Fig. ~. Fig. 2a is a detail view showing the engagement of the interlocking members joining two pre-cast panels.
Fig. 3 is a cross-sectional end view of a tunnel formed according to one embodiment of the invention.
Figs. 4~4g are schematic diagrams illustrating the steps of a method according to one embodiment of the invention.
Figs. 5 and 5a are top plan and side cross sectional detail views, respectively, showing the manner in which the panel is suspended in Fig. ~g*
Fig. 6 is a top plan view of adjoining panels according to the invention, showing a common slot containing a water-swellable polymer.
Fig. 7 is a front view of a panel according to an alternate embodiment of the invention.
As shown in Fig. 1, a tunnel 10 includes two opposing vertical walls 12, 1~. Each of the opposing walls includes a plurality of pre-cast panels 16 arranged side by side, as shown i.n Fig. la.
Referring to Fig. 2, each pre-cast panel 16 includes a plurality of prestressing strands 18 imbedded in concrete 20. The material used for prestressing strands 18, and the preload applied, may be selected to suit s particular application, as would be understood by a person skilled in the art. In a preferred embodiment, prestressing strands 18 are 7-wire (0.6" diameter) low relaxation strands conforming to ASTM A416 and having an ultimate tensile strength of 270,000 psi. The preload is agpiied by tensioning the strands to a desired tension prior to pouring the concrete, 5 .*

and releasing the tension from the strands when the strength of the concrete reaches ~OOt~ psi during curing. In the tunnel application described herein a preload of about 2 million pounds was desired due to design considerations, By way of example, to provide this preload, ~8 strands were each tensioned to about 44,000 pounds. The strands can typically be tensioned to about 75% of their total yield strength, The total preload can be varied by changing the number of strands used, or the material ~xsed to form the strands.
Each pre-cast panel 1~5 also includes a first interlocking member 22 on one of its longitudinal edges and a second interlocking member 24 on its opposite longitudinal edge, In a preferred embodiment, the first interlocking member includes a channel. 25 having a substantially diamond-shaped cross-section, and the second interlocking member includes a rod 28 having a substantially round cross-section arid being dimensioned to be received a.n the channel. by sliding the rod downwardly through the upper opening of the channel (see Fig. 2ay. Rod 28 is mounted on the panel by an elongate member 25. The rod 28 preferably includes two coaxially arranged rod portions that each have a length that is much smaller than the length of the panel. The diamond-shaped cross-section of the channel 2~ ~.s preferred over other shapes because it has been found to have good resistance to breakage during and after engagement of the interlocking members, 'The channel may be formed of angle iron or any other suitable high-strength material.
Similarly, the elongate member 25 and rod 28 may be formed of any suitable high strength, rigid material.
Preferably, the interlocking members also include a tongue 2a and groove 29 which interlock in tongue and groove fashion. The combination of the keyed channel and rod and -1"~~.~
the tongue and groove engagement provides a particularly stable, secure connection between panels, providing dimensional stability to the wall when the wall is placed, positioned and loaded.
Referring to Fig. 6, in preferred embodiments the pre-cast panels further include a slot 31 extending along each of the vertical edges of the panel. These slots align when the panels are in place, defining a common slot 33 extending vertically between each pair of adjoining panels.
A liquid that is curable to form an elastomeric material is poured into the common slot and allowed to cure to form a gasket-like seal 35 between the panels. A suitable liquid is a liquid rubber commercially available from Asahi Denka under the tradename ADEKA tnLTRA SEAL A-~50. This preferred rubber, after curing, has a tensile strength of more than 47 kg/m and an elasticity of greater than 1000. Importantly, this seal provides a second:~ry waterproofing barrier against water leakage between the ad~oix~ing panels in addition to the barrier formed by the soil replacement material.
In addition, each panel includes a plurality of vertical through holes 30 extending through the interior of the panel. These through holes act as a relief, allowing the concrete at the base of the trench and the bentonite slurry in the trench, displaced by the volume of the panel, to flow into the through holes rather than cause the panel to be buoyed up in the trench. The panels may also include transverse through holes (not shown) through which ti.e-backs (soil anchors) may be inserted to further stabilize the finished vertical wall, as is well known in the art.
ane side of a finished tunnel 10 is shown in F'ig. 3.
In addition to vertical walls 14, the tunnel includes a roof slab 32 and a base slab 34. Threaded steel bar inserts 36, 3~8 are provided at the intersection of the roof slab and z~~~~~~
vertical wall and base slab and vertical wall, respectively.
These inserts assure the structural continuity of the tunnel struCturea A preferred method of installation of the pre-cast panels is illustrated in Figs. 4-4g. Figs. 4-4b illustrate the initial steps used to form the guide walls 40. First, as shown in Fig. 4, a relatively wide ~e.g., 7-8 ft.), shallow (e. g., 4-6 ft.j trench 42 is excavated and formwork 44 and rebar 46 are placed on each side of the trench. Then concrete 4'7 is poured into each side of the formwork 44 and allowed to cure (Fig. 4a), and the formwork is remo ed (Fig.
4b), leaving a pair of opposed guide walls 40 spaced a predetermined distance (the width of the formwork 44) apart.
Once the guide walls have been completed, a narrow (e.g., 1 to 3 ft.), deep trench 48 is excavated using the guide walls to guide the excavation bucket, as shown ire Fig. 4c. During this excavation step, a bentonite slurry 50 is continuously pumped into the trench 4~ to prevent the walls of the trench from collapsing. Preferably, the bentonite is a high swelling, Wyoming type, sodium based bentonite consisting mainly of montmorillonite, and the slurry contains a concentration of from about 3 to 6~ bentonite in water. The concentration of bentonite will vary depending upon the type of ground to be excavated, as is understood in the art. The slurry is formed by mixing bentonite and water at high shear, as is well known. When excavation has been completed, i.e., when the depth of the trench is substantially equal to the desired height of the vertical wall, th~ trench bottom is cleaned. The trench preferably has a depth substantially equal to the height of the wall to be formed. Then, concrete footing 51. is placed in the bottom of the trench, preferably using the tremie method as shown in Fig. 4d, to a depth at which a small portion (e. g., 1~.~'~
1 to 3 ft.) of the bottom edge of the pre-cast panel will be embedded in the concrete when the panel is in place in the trench. Before the concrete has set, pre-cast panels 16 are then inserted into the trench, a.g., by a crane (not shown), one at a time, as shown in Fig» 4e, the position of each panel being adjusted until the panel is plumb and level.
Each panel is suspended from the upper surface of the guide walls 40, e.g., by a pair of structural steel box beams 52 (Fig. 4f). As shown in detail in Figs. 5 and 5a, each panel includes two pairs of threaded inserts 60. A threaded rod 62 is inserted into each of the threaded inserts, and each threaded rod is inserted through apertures in box beam 52 and retained in this position by threading a nut 5~4 canto each rod above the beam 52. The elevation of the panel is then adjusted by raising the panel sufficiently to unweight the threaded nuts and then adjusting the position of each threaded nut 64 on the threaded rod, As subsequent panels are placed, the second interlocking member 24 an the panel being placed is engaged with the first interlocking member 22 an the adjoining, previously placed panel (see Fig. 2a), to securely join the panels together. Finally, a sail replacement material 54, e.g., a cement/bentonite slurry, is pumped into the area between the panels and the trench walls (Fig. 4g) to provide support to the panels and resist movement of the panel relative to the trench walls when the panel is loaded.
Preferred soil replacement materials, such as the cement/bentonite slurry, also provide a barrier to infiltration of water or moisture tram the soil through the wall or between the panels.
To construct a tunnel as shown in Fig» 3, panels are installed as shown in Figs. 4-fig, to farm a first vertical wall, and installed in similar manner to form a second g vertical wall spaced a predetermined distance from the first vertical wall and substantially parallel thereto. Then, the area between the vertical walls is excavated to the design level of the lower surface of the tunnel roof, and the roof slab is cast in place. Next, the tunnel is excavated, under the cured roof slab, to the level of the lower surface of the base slab, and the base slab is cast in place.
Other embodiments are within the claims. For example, although the method has been described above in the context of tunnel construction, the method is useful in many other underground wall applicat:i.ons.
Moreover, while a preferred method of prestressing the pre-cast panels has been described, other prestressing techniques could be used, as would be understand bar a person skilled in the art.
Further, while preferred interlocking members are illustrated herein, other interlocking arrangements can be used, e.g., the channel and/or °~he rod may haws a different cross-sectional shape.
Additionally, while the precast panels have been illustrated as being suspended from the guide walls so that their upper edge is slightly below grade level, the panels could be placed so that a portion oaf the panel extends above grade level, or suspended in a manner that would allow the upper edge of the panel to be further below grade revel, if desired.
rf desired, the concrete that is placed in the bottom of the trench prior to insertion of the panel may instead be placed in the bottom of the trench after insertion of the panel, e.g., by providing a vertical through hole through the interior of the panel having a sufficient diameter to allow the concrete to be tremied through the panel.
- m -While bentonite has been described as the preferred thickening agent for use in both slurries, either slurry can include a different thickening agent. ether suitable thickening agents, e.g., polymers, for excavating slurries are well known in the oil dr~.lli.ng art.
Moreover, other soil. replacement materials could be used instead of a cement/bentonite slurry. Suitable materials are those that could be pumped into the space between the panel and trench walls and that would provide support equal to or greater than that of soil, e.g», lean concrete, cement/atapulgite slurry and flowable fill.
Moreover, rather than using two slurries, an excavating slurry and a soil replacement slurry, a single, thickening agent/concrete slurry can tae used for both steps.
Alternatively, a curing additive can be added to the thickening agent/water slurxy, after insertion of the panel, to cause the slurry to solidify.
The pre-cast panels need not be rectangular, as shown. For example, as Shawn in Fig. 7, in an alternate embodiment the precast panel includes a pair of "a:rms" 102 that allow the upper edge of the panel to be placed below grade level. These arms may be cut off after the ;panel is in place, allowing the soil above the upper edge of the panel to be excavated after the wall has already been formed.
~- 11 -

Claims (28)

1. A method of constructing an underground structural concrete wall comprising:
(a) providing a pair of parallel, opposing, underground guide walls spaced a predetermined distance apart;
(b) excavating a trench, using the guide walls to guide the excavation tool, the trench having a predetermined width substantially equal to the space between the guide walls;
(c) pouring a footing at the base of the trench; and (d) lowering a pre-cast panel into the trench in a desired orientation relative to the trench walls.
2. A method of claim 1 wherein said pre-cast panel is pre-stressed.
3. A method of claim 2 wherein said pre-cast panel is pre-stressed by pouring concrete around one or more tensioned wires and releasing the tension from the wires after the concrete attains a predetermined strength.
4. A method of claim 2 wherein the wall carries a preload of about 2 million pounds.
5. A method of claim 1 further comprising pumping an excavating slurry containing a thickening agent into the trench during step (b) to prevent the walls of the trench from collapsing.
6. A method of claim 1 further comprising pumping a soil replacement material into the space between the panel and trench walls, to provide support and resist movement of the panel relative to the trench walls when the panel is loaded.
7. A method of claim 6 wherein said soil replacement material comprises a slurry comprising cement, thickening agent and water.
8. A method of claim 5 or 7 wherein said thickening agent is bentonite.
9. A method of claim 8 wherein each slurry contains from about 3 to 6% bentonite.
10. A method of claim 7 wherein the ratio of cement to thickening agent is about 3:1 to 5:1.
11. A method of claim 1 further comprising selecting the trench depth, depth of the footing formed in step (c), and panel height so that the bottom edge of the panel extends about 1 to 5 feet into the footing and the top edge of the panel is approximately at ground level.
12. A method of claim 1 wherein the wall is formed of a plurality of pre-cast panels, and the method further includes inserting a second pre-cast panel adjoining the first pre-cast panel and joining the pre-cast panels along their adjoining edges.
13. A method of claim 12 wherein the pre-cast panels are joined by engagement of corresponding interlocking members.
14. A method of claim 13 wherein the interlocking members comprise a channel disposed along the edge of one of the pre-cast panels and a member dimensioned to be received by the channel disposed along the adjoining edge of the other pre-cast panel.
15. A method of claim 14 wherein the channel and member are keyed for interlocking engagement.
16. A method of claim 15 wherein the channel has a substantially diamond-shaped cross-section.
17. A method of claim 16 wherein the member has a substantially round cross-section.
18. A method of constructing an underground tunnel comprising:
(i) forming a pair of spaced, opposed vertical walls, each wall being formed by:
(a) providing a pair of parallel, opposing, underground guide walls spaced a predetermined distance apart, the guide walls having a depth that is significantly less than the height of the wall to be formed;
(b) excavating a trench, using the guide walls to guide the excavation tool, the trench having a predetermined width substantially equal to the space between the guide walls;
(c) pouring a footing at the base of the trench; and (d) placing a pre-cast panel into the trench in a desired orientation relative to the trench walls;
(ii) excavating the area between the vertical walls to a predetermined roof level;

(iii) casting a tunnel root in place between the vertical walls;
(iv) excavating a tunnel beneath the tunnel roof to a predetermined tunnel base elevation; and (v) casting a base slab in place between the vertical walls.
19. A method of constructing an underground structural concrete wall comprising:
(a) providing a pair of parallel, opposing, underground guide walls spaced a predetermined distance apart;
(b) excavating a trench, using the guide walls to guide the excavation tool, the trench having a predetermined width substantially equal to the space between the guide walls;
(c) pouring a footing at the base of the trench; and (d) placing a pre-cast, pre-stressed panel into the trench in a desired orientation relative to the trench walls.
20. A method of constructing an underground structural concrete wall comprising:
(a) providing a pair of parallel, opposing, underground guide walls spaced a predetermined distance apart;
(b) excavating a trench, using the guide walls to guide the excavation tool, the trench having a predetermined width substantially equal to the space between the guide walls;
(c) pouring a footing at the base of the trench; and (d) placing a first pre-cast panel into the trench in a desired orientation relative to the trench walls, said first pre-cast panel having a slot along at least one of its vertical edges;
(e) placing a second pre-cast panel into the trench adjacent the first pre-cast panel, said second pre-cast panel having a slot along at least one of its vertical edges, and aligning said slots to define a common slot; and (f) introducing into the common slot a liquid that is curable to form an elastomeric material, the elastomeric material providing a waterproofing barrier.
21. A method of claim 20 wherein the elastomeric material is water-swellable.
22. A method of claim 20 wherein the polymer is curable by exposure to air and/or moisture.
23. A method of claim 20 wherein the pre-cast panels are joined by engagement of corresponding interlocking members.
24. A method of claim 23 wherein the interlocking members comprise a channel disposed along the edge of one of the pre-cast panels and a member dimensioned to be received by the channel disposed along the adjoining edge of the other pre-cast panel.
25. A method of claim 24 wherein the channel and member are keyed for interlocking engagement.
26. A method of claim 25 wherein the channel has a substantially diamond-shaped cross-section.
27. A method of constructing an underground structural concrete wall comprising:
(a) providing a pair of parallel, opposing, underground guide walls spaced a predetermined distance apart;
(b) excavating a trench, using the guide walls to guide the excavation tool, the trench having a predetermined width substantially equal to the space between the guide walls;
(c) pouring a footing at the base of the trench; and (d) placing a pre-cast panel into the trench in a desired orientation relative to the trench walls, said pre-cast panel having a pair of threaded inserts extending vertically into the panel from its upper edge, and a pair of threaded rods received by said threaded inserts;
(e) placing a beam transversely across the guide walls and the trench above the upper edge of the panel, said beam having apertures dimensioned to receive said threaded rods, and inserting said threaded rods through said apertures;
(f) securing said threaded rods in said apertures by attaching a threaded nut to each threaded rod above said beam; and (g) adjusting the elevation of the panel by unweighting the threaded nuts and adjusting the position of said threaded nuts on said threaded rods.
28. A method of constructing a retaining or foundation wall comprising:
(i) forming an underground wall by:
(a) providing a pair of parallel, opposing, underground guide walls spaced a predetermined distance apart, the guide walls having a depth that is significantly less than the height of the wall to be formed;
(b) excavating a trench, using the guide walls to guide the excavation tool, the trench having a predetermined width substantially equal to the space between the guide walls;
(c) pouring a footing at the base of the trench; and (d) placing a pre-cast panel into the trench in a desired orientation relative to the trench walls; and (ii) excavating a region adjacent the wall to expose a surface of the wall.
CA 2171897 1996-03-15 1996-03-15 Pre-cast concrete panel wall Expired - Fee Related CA2171897C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CA 2171897 CA2171897C (en) 1996-03-15 1996-03-15 Pre-cast concrete panel wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CA 2171897 CA2171897C (en) 1996-03-15 1996-03-15 Pre-cast concrete panel wall

Publications (2)

Publication Number Publication Date
CA2171897A1 CA2171897A1 (en) 1997-09-16
CA2171897C true CA2171897C (en) 2006-02-14

Family

ID=4157754

Family Applications (1)

Application Number Title Priority Date Filing Date
CA 2171897 Expired - Fee Related CA2171897C (en) 1996-03-15 1996-03-15 Pre-cast concrete panel wall

Country Status (1)

Country Link
CA (1) CA2171897C (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113605369A (en) * 2021-08-24 2021-11-05 中国建设基础设施有限公司 Underground continuous wall and construction method thereof
CN114809074A (en) * 2022-04-20 2022-07-29 浙江交工金筑交通建设有限公司 Construction method for horizontal prefabricated assembly type box-shaped channel of cast-in-place bottom plate

Also Published As

Publication number Publication date
CA2171897A1 (en) 1997-09-16

Similar Documents

Publication Publication Date Title
US4290246A (en) Multi-purpose precast concrete panels, and methods of constructing concrete structures employing the same
US4407612A (en) Soil and/or water-retaining wall; method for forming this soil and/or water-retaining wall; and forming mould suitable for use with this method
CN105155551B (en) Pressure compensation type foundation pit supporting structure and construction method
US4697955A (en) Method of constructing reinforced concrete works such as underground galleries, road tunnels, et cetera; pre-fabricated contrete elements for constructing such works
CA1046297A (en) Precast element for the construction of trenched structures and the process related thereto
US5131786A (en) Traffic barrier and method of construction
CN103572755A (en) Prestressed concrete precast pile
CH707671B1 (en) Supporting masonry element and retaining wall made of supporting masonry elements.
KR102431393B1 (en) Construction Method of Underground Structures
CN111254966A (en) Mountain abutment and pier column foundation structure and construction method thereof
US4453366A (en) Process of forming a continuous wall in the ground
CN106285032B (en) Basement reconstruction construction with raft foundation building
US5871307A (en) Pre-cast concrete panel wall
US1747038A (en) Retaining wall
EP0079887B1 (en) Multi-purpose precast concrete panels, and methods of constructing concrete structures employing the same
CN112302007B (en) Pile bearing frame for pile foundation and construction method
CA2171897C (en) Pre-cast concrete panel wall
CN203559419U (en) Prestressed concrete precast pile
CN109750567A (en) Expressway extension structure and expressway extension method
CN113982002B (en) Construction method of light side slope framework structure
EP1426495A2 (en) Method and device for the construction of a tunnel or a trench
KR101234270B1 (en) Method for non excavated excavating construction using steel pipe and steel pipe with hole
CN111042075B (en) Assembled fishway and construction method
US10077539B1 (en) Wall and retaining members and fluidizing installation of retaining members
CN211228521U (en) Frame bridge supporting construction

Legal Events

Date Code Title Description
EEER Examination request
MKLA Lapsed