CA1220795A - Oil recovery mining method and apparatus - Google Patents

Oil recovery mining method and apparatus

Info

Publication number
CA1220795A
CA1220795A CA000453063A CA453063A CA1220795A CA 1220795 A CA1220795 A CA 1220795A CA 000453063 A CA000453063 A CA 000453063A CA 453063 A CA453063 A CA 453063A CA 1220795 A CA1220795 A CA 1220795A
Authority
CA
Canada
Prior art keywords
oil
drain
conductor pipe
production
well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
CA000453063A
Other languages
French (fr)
Inventor
Maynard F. Ayler
George F. Vranesh
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
VRANESH GEORGE F
Original Assignee
VRANESH GEORGE F
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by VRANESH GEORGE F filed Critical VRANESH GEORGE F
Priority to CA000453063A priority Critical patent/CA1220795A/en
Priority to CA000513658A priority patent/CA1220797A/en
Priority to CA000513657A priority patent/CA1220796A/en
Application granted granted Critical
Publication of CA1220795A publication Critical patent/CA1220795A/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/24Methods of underground mining; Layouts therefor for oil-bearing deposits

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Remote Sensing (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Earth Drilling (AREA)

Abstract

ABSTRACT
New and improved techniques, systems and equipment for the practical underground mining of petroleum from both virgin and depleted oil fields under certain geological conditions, are described. A method of drilling relatively small diamter, drainage-type oil wells using a fluid and cutting control assembly from within an access underground drilled tunnel, is provided. The fluid and cutting control assembly facilitates the safe underground drilling and installation of the small diameter, drainage-type oil wells which can be operated either under the natural pressures occurring in the geological strata, as gravity drain wells or by suitable secondary treatment measures arti-ficially pressurized to facilitate drainage of oil from oil bearing strata into which such wells are drilled.
Techniques and equipment to facilitate the safe drilling of such wells, placing them into production and thereafter controlling operation of the mine workings in a safe and reliable manner, is described, together with the control system, sensors and other equipment required for safe installation and operation of an underground petroleum mine.

Description

~220795 TECHN I CAL F I ELD
This invention relates to the recovery of oil using mining techniques.
More specifically, the invention relates to a novel method and apparatus for the recovery of oil contained in oil bearing fields which are either virgin (untapped previously by known oil well drilling and pumping techniques) currently producing fields, or are classified as depleted and incapable of further oil production using existing surface oil well drilling, pumping and secondary treatment techniques. The recovery of oil from such fields is achieved by the application of novel underground mining methods and apparatus used in combination with oil well technology.
~ACKGROUND PROBL~I AND PRIOR ART
The petroleum industry beaan in 1859 in ~ennsylvania when the Drake well was drilled purposely to find liauid petroleum The petroleum industry grew very slowly. It was not until 1901, with the discovery of the Spindletop field in Texas, that the world was convinced there was ~ore petroleum than could ever be consumed. The birth of the automobile industry created a growing demand for petroleum products and an acceleratea growth in the petroleum industry.
As the world ~ad more petroleum than it could consume, the oil reservoirs found prior to 1940 were produced utilizin~ only the natural energies of the petroleum accumulation. In the late 30' 5 waterflooding and ~as injection were initiated in some petroleum reservoirs that had ~een depleted of their natural energies. These reservoirs were usually at pressures of less than 100 psi and were waterflooded at pressures of 400 to 800 psi.
After ~orld War II the petroleum industry began utilizing more engineering in the development of petroleum reservoirs. This resulted in initiation of pressure maintenance by water injection and gas injection much earlier in the pro~uctive life ~f the reservoir. These`
..

injection projects were carried out at pressures usually in excess of 500 psi and often at pressures as hig~ as 4000 psi. Oil remaining in these reservoirs contains considerable yas in solution.
In the late '50's it was already evident that finding new petroleum was becoming more difficult and more expensive. The world demand for petroleum had grown at an unpredicted rate. It became evident that the world would soon be short of petroleum. As a result, new processes were initiated in an attempt to recover more of the pëtroleum that had alreadv been found.
These new processes, fire-flooding, steam stimulation, steam flooding and misciable flooding, were initiated in an effort to increase the recovery from existing reser-voirs. Most of these techniques were verv expensive and in most cases did not achieve the desired degree of success. At present, the only process still being util-ized is steam stimulation and steam flooding, in reser-voirs with low gravity and viscosity oil.
In the mid '60's the industry began to investi-gate possibilities of tertiary recovery in reservoirs that had been water flooded in the mid '4Q's. Tertiary projects utilizing caustics, surfactants, special emulsions and polymers were initiated on an experimental ~5 basis. At the present time the FedeEal government, through ERDA, and the petroleum industry are continuing to investigate the tertiary recovery processes.~ None of these techniques have been classified an economic success with a great future potential of recovering large quantities of aaditional petroleum~
In the late 1960's the first large scale commer-cial mining of an oil sand was initiated in Alberta, Canada. This project is strip mining a "tar" sand and processing the sand to recover the hy~rocarbon. The project was uneconomic at world oil prices prior to 1973~
The project became economical after pe~roleum prices were .

i22079S

increasea. As of this ~^iting other projects scheduled in the area have still not been placed on a production status because of economics.
Oil reservoirs which: may be candidates for a mining recovery process can be classified into two general categories, depleted or virgin. The depleted reservoirs were estimated to contain some 300 billion barrels of unrecovered oil in a 1976 study ~y the Nationai Petroleum Council and are estimated to comprise between 60 and 80 percent of the oil originally present in these fields. The depleted reservoirs can be classi~
fied into two general categories; those which have under~
gone some type of secondary recovery process and those which have only been primarily depleted. The former category would prohably be classified as containing the greatest amount of remaining petroleum because they represent the greatest number of petroleum reservoirs.
A considerable'number of primary depleted reservoirs exist in the viscous crude oil category. Some of these reservoirs have undergone steam stimulation but not a secondary recovery process. The volume of oil in this cat~gory is probably in excess of 150 billion barrels.
The depleted systems which have undergone second-ary recovery processes are the ones flooded in the late '30's and early '40's. These were at relatively shallow depths and which were at very low pressures. Some of these reservoirs were placed on a vacuum during World ~ar II and hence would contain very small amounts of gas in solution`in the oil. The low gas in solution results in very small amounts of any gas in the reser voir to be utilized as a displacing fluid.
The other type of reservoirs which have undergone secondary recovery will have been flooded at pressures in excess of 500 psi and will have considerable gas in solution and possibly free yas to assist in the xemoval of fluids from the fo~nation.

i2207gs These depleted reservoirs will probably contain oil having the following properties.
Viscosity - 1 to 10 centiposes Gravity - greater than 25 API
Gas in Solution - bet~een 10 and 800 std. cu. ft.
per reservoir barrel Oil Saturation - between 10 and 4~ percent of the pore space Porosity - between 15 and 30 percent Whether these reservoirs will be feasible ~or a mining process will be a function of the product of the formation thickness, formation porosity and residual oil saturation.
Oil in Place = Area x Thickness x Porosity x Oil Saturation. Factors`o~ depth ~nd mineability of forma-tions above or below the oil zone itself will be major factors in the economics or feasibility of any such pro-cess.
The reservoirs which have undergone primary depletion only, with or without steam stimulation, will normally contain a much higher percentage of inplace oil at the time any mining process may be initiated.
These reservoirs will normally contain a more viscous oil, be at relative low pressures, and at relatively shallow depths. These reservoirs are repre-sented by the higher viscosity oil reservoirs in California, Venezuela, and in Canada. They are presently being produced but with great difficulty. There is probably over 500 billion barrels of oil in this class of reservoir in the world.
Virgin reservoirs which might be suscepti~le to ~
underground mining are represented by the ~nown tar sands and the very viscous or high pour point oil deposits throughout the world. It is ~nown that very e~tensive reserves of petroleum exist in these type of deposits in the United States, Canada and South America. ~he 122~)'795 estimated reserve is 1,000 billion barrels. These virgin deposits are susceptible to both strip mining and to some types o~ under~round recovery.
The "tar" sands which are being produced in Canada by means of strip mining have been drilled and tested by conventional petroleum recovery mechanisms with very little success. The petroleum content of these "tar" sands change into a very viscous oil with depth. They have not been treated with combinations of known recovery technology in order to make them produc-tive. They have been overlooked as a potential source of petroleum production primarily because of the quality of the petroleum and their location. In many cases these reservoirs represent a petroleum deposit which is directly mineable by surface methods. As the depth of these deposits increase, the contained petro-leum is very highly viscous and has gas in solution so that removal of the petroleum containing formation is not possible because of gas release to the atmosphere in the pit and the resultant ventilation and fire-explosion hazard.
It is believed that using available mining technology it is possible to develop mine working preferably beneath the oil-water contact of certain oil fields in selected areas. By being below the oil-water contact, it should be possible to hold the greatest hazard to mining, the inflow of any of the gasses normally associated with oil production, to an acceptable minimum.
The other important limiting criteria include the following items:
- (1) Rock Characteristics for Mine Workinqs`
-If mine workings are to be developed below an oil-water contact, it is likely that the workings must be in a formation which is highly competent with very low permeability such as a shale or dense limestone, ~;

or at least with such a stratigra~hic unit actin~ as a seal against uncontrolled inflow of fluids from the producing reservoir. At least in the early stages of oil recovery by mining, fields with minimum faulting should be developed, again, to aid in control or elimination of unexpected gas and water inflows.
Since shales are relatively incompetent and often tend to "flow" or "squeeze" to fill mine workings, thus causing expensive support problems, it is estimated that development in shales should be limited to depths of 1200 feet or less. However circumstances may exist where a much greater depth can be worked.
Limestones are more competent. It is estimated that in general, with acceptable levels of support requirements, it should be possible to develop mine workings, under oil, reservoirs, in limestones or dolomites to depths of at least 4000 feet. Again circumstances may exist where a much greater depth can be worked.
Probably mine development within a salt unit would be the ideal. In this case, the salt would be an excellent seal against water inflow, it is easily cut by conventional mining equipment, and it is possible that the salt produced in the development of mine workings could be marketed. The flow charaateristics of salt would limit the depth of working possible without excessive support problems Sandstones may or may not be a desirable medium for mine development. Such things as permeability and porosity, gas, oil or water content, and strength of the formation would be major limiting factors, as well as stratigraphic features of the formations above and below the sandstone.
(2) R ervoir Temperatuxe In general, men can work in mine workings in rocks with temperatures up to about 1~5F. At temperatures above this, cooling is possible but may or may not be economical.
~3) Quality of Crude Two important considexations suggest that reser-voirs with higher quality crude, roughly defined here as - higher than 30 API, should be the target for oil mining.
The lower gravity crudes, 8-12 API, are worth less than a barrel of 50 API crude. This indicates the payout for high quality crude will likely come much ea~lier than for the lower quality crudes. The only reason for any qùestion in this regard is the needed estimate of siæe or reserve versus mining cost. This will have to be developed for each individual case. Higher quality crudes, with contained lighter fractions, are likely to be more mobil in a reservoir than are the low gravity crudes.
(4) Pour Point The reservoirs planned for mining of oil should `contain crudes with low pour points although this is not a limiting factor. There are systems available, one in particular that has recently been publicly announced, that will permit in-place controlled heating of a reser-voir. It will be possible to heat the reservoir uniformly in blocks extending for several hundreds of feet. The temperature can be raised several hundreds of degrees, if necessary, within a few weeks time. Such heating would fluidize high pour point crudes, or in other cases, could be used to increase gas pressures within a reser-voir, thus tending to re-establish a natural gas drive within the reservoir. In the few cases of higher gravity oil, lower rock temperature and higher pour point, heating of reservoir, with development and production through mine workings could be an excellent so3ution to an otherwise non-producible field.
(5) Thickness of Pay ~ection The thickness of pay section should be as great as possible. This would simply allow more reservoir development per foot of mine workings, thus reducing the development cost per barrel of oil produced.

(6) Depth of Pay Section It is hoped that the first oil mines can be developed in reasonably shallow fields, that is at depths of 1000 feet or less, to hold down development costs and to permit more easily handled rock conditions for mine development. The reservoir should be deep enough that natural water and/or gas drives, to the extent possible in a depleted field, could still be utilized.
(7) Porosity Target reservoirs must have sufficient oil-saturated porosity, with enouah oil remaining after production by surface well methods, to make the reservoir a potentially economic target. Data for this determina-tion should be available for any developed field, in varying degrees of completeness. Probably this type of data will be less complete or useable for the earlier discovered field, which may also be the best targets for initial oil mining.
Limestones may range in porosity from zero to cavernous. In more cavernous limestones, porosity at the well may be essentially zero while a short distance away a large untapped oil reserve may exist. Limestone reservoirs, overlain and underlain by competent forma-tions are fairly prevalent in the Appalachian states, West Texas and New Mexico. Many of these reservoirs contain large ~uantities of`hydrocarbon material, but the recovery, either by primary or secondary methods, is usually extremely small. These formations have not ` behaved as existing petroleum engineering theory pre-dicted, hence it is believed that a tremendous amount of oil is still present in most of these limestone formations~ More complete opening of the reservoir by mining techniques may provide the `'permeability`' that appears to be lacking in the porosity.

(8~ _ermeability In normal well production, permeability, the interconnection between points of oil-containing porosity is essential. For oil mining, higher permeability reser~
voirs would be desireable in sandstone reservoirs.
Within limestone reservoirs, particularly those that tend to be cavernous, more complete development of the reservo~r, mav permit much more complete recovery from these reservoirs.
(9~ Other Characteristics Other oil and reservoir characteristics, such as viscosity, pressures, gas in solution, sulfur content of the oil and H2S percentage in gas, uniformity of reser-voir vertically and horizontally to name but a fewt will all be important characteristics, but are not thought to be as important as those listed separately above.
Advantages of Oil Mining There are several advantages offered by oil mining which are as follows:
1. This is a possible way of placing "wells`' on approximately one acre spacing or less, providing a much greater possibility that oil entrained in the reservoir will move to the well.
2. Natural gas and/or water drives can be utilized.
3. By drawing from the bottom, gravity can be used to the maximum effect.
4. Drill holes for each well are much shorter than those drilled from the surface and hence less expensive per well while the cost of the access shaft and tunnels can be amortized over a large number of wells.
5. No pumping equipment at each well would be needed but ~nly at the bottom of the shaft or all wells.

1220';~9S
6. Currently, depending upon the company, discovery of new oil costs from $4 to $7 per barrel.
Since the mining development would be within known fields there would be no cost of aiscovery. It is thought that the saving from this cost alone could pay most if not all of the development and production costs.
7. Iandowners would already be familiar with oil production and its benefits. Perhaps they would be reasonably receptive to oil mines being developed in their area.
8. If there has been production from the field r perhaps useable surface pipelines to refineries might be reasonably close.
The concept of applying mining techniques to the production of oil from oil bearing sands, both virgin and depleted, is both old and well kno~n as described in a United States Bureau of Mines Bulletin No. 351 entitled "Mining Petroleum By Underground Methods" by George S.
Rice published by the U. S. Government Printing Office in Washington, D. C. in 1932. Methods for the under-ground mining of oil were further investigated and reported in a bulletin entitled "Mining For Petroleum:
Feasibility Study" prepared for the U. S. Department of the Interior - Bureau of Mines under contract No. JO275002 July, 1978. These prior art publications while informa-tive, do not include sufficient specific aetails of how to go about overcoming the many practical problems encountered in the underground mining of petroleum.
To overcome this deficiency the present invention was devised.
SU~ARY OF INVENTION
It is therefore a primary object of the invention to provide new and improved techniques and equipment for the practical underground mining of petroleum from both virgin and depleted oil fields under certain geological conditions ~here such mining of oil is feasible.

lZZ0795 ~ n practicing the invention, a method of drilling a relatively small diameter drainage-type ~ine oil well using a fluid and cutting control assembly,is provided.
The fluid and cutting control assem~ly comprises a stop valve mounted on a pipe ca~ement for securement to a firmly anchored collar pipe providing the outer liner for an access opening to a drainage-ty~e mine oil well. The drainage-type mine oil well is drilled into the overlying roof of a tunnel cut into a competent rock zone below oil well sands containing unrecovered oil. The gate valve and pipe casement have an inside diameter opening with the gate ~alve in the open condition ~hich is sufficient to acco~modate the outside diameter of a drainage-type mine oil well produc~ion~ conductor pipe and/or a drill bit and drill string together with appended stop valve, coupling and the like required to support the drill string or production conductor pipe. Upper and lower blow-out preventers are secured to the casement below the stop valve and have internal diameters sufficient to accommo-`
date the external diameter of the drainage-type mine oil well production conductor pipe and/or the drill string fitting for the drill kit. An upper drain vent control valve is connected to a first drain vent branch pipeline and to the casement hetween the stop valve and the upper blow-out preventer. A lower drain vent control valve is connected to a second drain vent branch pipeline and to the casement intermediate to the upper and lower blow-out preventers. With the fluid and cutting control assembly in place mounted on the annular collar, a arill bit ànd supporting drill string is inserted through the opened lower and upper blow-out preventers and through the opened stop valve. The small diameter gravity-type oil drain well is then drilled upwardly through the overlying com-petent rock roof of the tunnel and into the oil bearing sana zone to a desired depth while supplying cutting fluid to the drill bit under pressure upwardly through the drill lZZ079~

.
string. During arilling, the upper and lower blow-out preventers are maintained tightened down on the exterior of the drill strin~ to only a slide fit and cutting fluid and entrained cuttings are dra~n off through the upper and lower drain vent control valve and the connected branch drain pipeline for supply through a piping system installed in the tunnel and to a pump for pumping to the - surface and disposal.
` Another feature of the invention is the provision of a method for installing oil well production conductor pipe in the relatively small diameter drainage-type mined -oil wells after drilling in the above-described manner.
The method comprises loosening the upper and lower blow-out preventers while withdrawing the drill string to the point where the drill bit is just below the stop valve while drawing off any fluid cutting oil and gas - and water entrained in the fluid through the upper and lower drain vent control valve for removal to the surface in the above-described manner. The stop valve is then closed and the drill bit cQmpletely withdrawn from the fluid and cutting control assembly. A production conductor pipe is then inserted within the casement through the locsened upper and lower blow-out preventers to a point where the upper end of the conductor pipe is just below the stop valye. The blow-out preventers are then tightened to the point of providing only a slide fit for the exterior surface of the production conductor pipe while maintaining the upper and lower drain vent control valve open and under suction to drain off any leakage of fluid past the upper blow-out preventers. The stop valve is then opened and the production conductor pipe driven upwardly through the drilled opening into the oil bearing sand strata to a desired depth.
Another feature of the invention is the provision of a closure over the upper end of the relatively small :12Z0795 diameter drainage-type oil mine well production conductor pipe during the emplacement thereof in the preceeding aescribed manner together with selectively opening the upper end of the production conductor pipe after it is secured in place to a desired depth into the oil sand strata in order to place the well into production. To facilitate placement of the production conductor pipe with its upper end closed, the pipe is vented during emplacement and subseauent cementing into place. For this purpose, it is necessary to vent the space inter-mediate the drilled hole and the conductor pipe as it is being emplaced and cemented. To accomplish the venting, a small ~iameter flexible fluid impervious venting tube is supported through the interior of the conductor pipe while it is being emplaced and at the upper tip end thereof extends through a small port in the upper end of the conductor pipe. A control valve is secured in the - venting tube at a lower accessible end of the tube so that it can be controllably opened and closed to control the venting through the tube. The discharge end of the vent tube is led through the tunnel back up through the access shaft to the surface in order that the mine at-mosphere is not contaminated with gases vented through the venting tube.
Still another feature of the invention is the provision of a method for permanently cementing`the pro-duction conductor pipe into place by first tightening do~n the upper and lower blow-out preventers to the greatest possible e~tend to prevent movement of the con-ductor pipe during cementing. Cement under pressure is then forced from a cement pump connected through the upper drain vent control valve and its interconnected - first branch pipeline to the space surrounaing the con-ductor pipe. During cementing the stop valve is in its fully opened condition so that it is not cemented into ~220795 placè ana subsequently can be removed along with the fluid and cutting control assembly. To facilitate this oper-ation, the space between the upper and lower blow-out preventers preferably is ~loode~ with water during the cementing stage. After setting of the cement, the fluid and control assembly casement including the stop valve is removed and a new stop valve coupled to the end of the cemented in place proauction conductor pipe along with any additional lengths of proauction conductor pipe re~uired to lead away the oil produced by the well to a suitable collection point within the mine tunnel system.
A still further feature of the invention is the provision of a method for opening the upper end of the production conductor pipe after it has been cemented into place. A preferred method is to attach a small charge of explosive to the closed upper end of the production conductor pipe and thereafter selectively detonating the charge to blow open the top of the conductor pipe and place it into production. An alternative method is to employ a Johnson Screen to~ether with a suitable closure element such as a one way check valve disposed in the conductor pipe below the screen. A small charge of explosive should be attached to the closure element and a small remotely operated aetonator secured to the charge ~5 for selectively detonating the charge and blowing open the closure element to place the oil well into production through the Johnson Screen. In the case o the Johnson Screen care must be e~ercised to assure that the cement is not allowed to rise sufficiently high to close the Johnson Screen. A further method is to employ a ~ Schlumberger type perforating gun secured to the interior of the closed end of the production conductor pipe t~hile it is inserted into place and thereafter remotely fired - to perforate the upper end and upper sides of the pro-duction pipe in order to place the well into production.

~220'~95 BRIEF DESCRIPTION OF DRAWINGS
Other objects, features and many of the attendant advantases of this invention will become better under-stood upon a reading of the following detailed description when considered in connection with the accompanying draw-ings; wherein, like parts in each of the several figures are identified by the same reference character, and wherein:
Figure 1 is a schematic drawing illustrating the positioning of two access mine shafts through an oil bearing sand strata in such ~ manner that the shaft pene-trates from an upper competent roc~ shelf, through a gas cap, through an oil bearing zone and down into a lower compe~ent rock zone where access tunnels are pro-~ided for mining development of drainage-type oil wells within the tunnel system;
Figure 2 is a more detailed schematic drawing of an oil field being mined according to the invention but which has no ~as cap and illustrates the manner in which drainage-type procudtion oil wells are conne~ted to col-lection lines leading to`a vertical access shaft where the oil is pumped to the surface for storage;
Figure 2A is similar to Figure 2 except that it depicts an oil field wherein a gas cap is present in the strata;
Figure 3 is a schematic drawing illustrating a preferred way of driving an enlarged diameter shaft of sufficient size to accommodate men and equipment through a competent rock zone to near the oil and gas bearing horizon, then proviaing an annular chamber by means of which small drift holes are drilled in an annular array around the intended path of the extended lar~e diameter access shaft to permit freezing, grouting or otherwise stabilizing the oil-producing zone to permit sinking of the large diameter access shaft through it to a second lo~er competent rock zone into ~hich access tunnels beneath the oil field can be drilled. Figure 3 also 1220'79S
-16~

illustrates the provision of a fluid impervious casing arouna the large diameter access shaft for the portion of the len~th thereof which extends through the oil bearing sand strata;
Figure 4 is a schematic illustration of the manner in which a relatively small diameter drainage- -ty~e mine oil`well is initailly drilled through the roof of a tunnel formed in the underl~ing lower or second competent rock zone by initially placing a cemented in place enlarged diameter collar pipe in a - larger diameter hole drilled upwardly through the roof of the tunnel so as to provide a solid anchor for a well hole collar pipe;
Figure 5 is a schematic~ side sectional view of a fluid and cutting control assembly employed in prac-ticing the invention and shows the same installed in place on a drainage-type mine oil well ~eing drilled in the roof o~ one of the access tunnels to permit the drilling of such wells within the mine without contam-- 20 inating the mine workings atmosphere;
Figure ~ is a schematic elongated side sectional view similar to Figure 5 illustrating the manner in which a production conductor oil pipe for a drainage-type mine oil well is cemented into place employing the fluid cuttin~ and control assembly;
Figure 7 is a partial elongated sectional view of a cemented-in=place production conductor pipe for a drainage-type mine oil well5after it has been processed accordin~ to Figules 5 and 6 and sho~ing different types of stop valyes, screens~ detonator Gontrol circuits~ flow control valves as well as other measuring instruments, and the connection of the cemented-in-place oil well conductor pipe to an oil collection piping system that - runs through the mine tunnel for accumulating oil drained from a multiplicity of different drainage type oil wells placed ~long the length of the tunnel;

~220`79~

Fiyure 8A illustrates a modification of the installation sho~ in Figure 2 wherein certain of the relatively smalldi`ameterdrainaae-type oil well production conductor pipes are connected to a supply line for supplying secondary treatment fluids such as steam, compressed air, water or other fluid for pressurizing particular points.along the length of a tunnel to im-prove collectlon at different points within the tunnel or within the dèpth of the field having another tunnel or tunnel`s b~yond the pressurization point in the same plane;
Figure 8B is a schematic, elongated sectional view of a somewhat different form of drainage-type oil well emplaced in a mine according to the invention which uses a Johnson Screen and also incidentally shows a geological installation where there is a gas cap over an oil bearing sand strata which in turn has an oil/water interface below the oil bearing sand;
Figure 9 illustrates still another alternative arrangement for perforating a production conductor pipe which has been sealed closed during its installation and emplaced within the oil bearing sand strata using a Schlumberger gun;
Figure 10 is a schematic functional diagram of ~ a suitableproduction 1uids sensing and control system useable in conjunction with a main control computer located remotely from the mine workings and which allows oil production within the mine workings to ke completely automated, semi-automated or manually controlled as operating conditions permit;
Figure 11 is-a schematic side view of a motor actuated valve usea in the control system of Figure 10 and showing the manner in which limit switches can be 35 - employed to telegraph to a main control computer or ~- control console the operating condition of such valves;

lZ20'~95 ` Figure 12 is a s~hematic functional diagram of a li~e support and safety system designed for use in petroleum mines according to tlle invention and which provide`ventilation air, gas detection and protection, fire detection and protection, flooding detection and prote~tion and m~nitors operation of vital equipment needed in the safe operation of an underground petroleum mine.
Figure 13 is a detailed, schematic side sectional view of sub-~roupsof underground drainage-type mine oil wellsconstructed according to the invention and filled with necessary sensors and-equipment to allow completely automated control over oil product~on from the wells pursuant to the control system shown in Figure 10;
Figure 14 is a detailed, schematic side sectional view of an alterative form of installation similar to that of Figure 13 but which allows introduction in a controlled manner of secondary treatment agents into selected ones of the drainage-type underground mine oil wells for use in conducting re-pressurization and/or other secondary treatment processes in connection with selected portions of the oil field;
Figure 15 is a partial, detailed,-schematic diagram showing the Fire Detection and Protection System portion of the life support system shown generally in Figure 12; and Figure 16 is a pa-tial, detailed, schematic diagram showing the Gas Detection and Control System comprising a part of the overall life support system of Figure 12.
DETAILED DESCRIPTION OF BEST MODE FOR CARRYING OUT THE
INVENTION
Figure 1 is a schematic illustration of a typical 1220'795 . . -17B-layoùt for a mine development for the recovery of oil by mining. In Figure 1, two relatively large diameter ver-tical shafts 11 and 12 which are of sufficient size to accommodate both men and equipment for mining beneath the ground have been driven through an overlying upper competent rock strata 13, through an oil bearing sand zone 14 and into a lower competent rock zone 15. The two verti-cal shafts 11 and 12 terminate in a horizontal tunneI indi-cated at 16 which likewise is of sufficient size to accomo-date workmen and the equipment required for driving upwardlythrough the roof of the tunnel 16 a number of relatively small diameter, drainage-tupe oil production wells indicated at 19, 19~ and 19" with the drainage-type oil ~Z0795 prodùction wells being placed at predetermined intervals along the length of the tunnel 16. `It is anticipated that the tunnel 16 will interconnect with other horizon-tally èxtending tunnels (not shown) so that substantially a criss cross network of tunnels will be provided beneath the oil field depicted at 14. The drawing is illustrative of a typical geological condition wherein the oil field is capped by a gas cap indicated at 17 which at least at some time in the past pressurized the oil within the oil sands 14 as well as a layer of water indicated at 18 trapped between the lower competent rock strata 15 and the oil bearing sands 14. This results in the formation of an oil-water interface as shown at 21.
From Figure 1 it will be seen that the vertical access shafts 11 and 12 for mine access must pass through - the oil and/or gas bearing productive ~one or 20nes all of which may be under pressure. The sinking of the verti-cal shafts under such conditions requires a system whereby all possible inflow of gas and/or oil will be completely controlled without danger to men and equipment working on and in the mine. The mine workings are to provide access preferably under an oil-water interface for drilling operations and the placing of the piping, for the removal of drill cuttings, any oil and/or gas encountered during the drilling of production wells in addition to providing for a piping system for transporting produced gas and oil from the wells. This ~`in addition to the normal mine drainage, ventilation, power and waste removal systen~ re~uired in any mine workings. Pre~era~ly the development should be such that oil and gas prodùc-tion can be carried out even while mine development workings are going on to drive additional drainage-type oil wells as will be described hereinafter.

~20'795 The mine shaft configuration shown in Figure 1 employs two vertical access shafts since safety rules and regulations require two entryways to a mine. Thus the drilling cuttings removal and oil production system and piping can be placed in one of the vertical shafts for access to the surface and the other vertical shaft can be employed for personnel access and egress~ It is `~ desirable that,the two vertical shafts be rotary drilled or sunk at a pre-set distance apart and the shafts securely sealed by fluid impervious liners through at least the oil ana gas zones 14, and the two shafts extended`down into the lower competent rock zone 15 where the ends of the shaft are interconnected through the tunnel 16.
Shaft 11 can then be used for ventilation exhaust, removal of production drill hole cuttings, produced gas and oil and removal of mine wastewater as well as to provide an escapeway if necessary. Shaft 12 can be the main mine development shaft carrying the ventilation inflow, any electrical systems for supply of electricity to equipment required below as well as all other services needed for developing the mine.
Figure 2 illustrates an installation quite similar to that depicted in Figure 1 but shows in greater detail the fluid impervious liners 22 and 23, respectively, for ,25 the vertical access shafts 11 and 12 which extend through the oil and gas bearing zone 14. Figure 2 further illus-trates thecollection piping system 24 laid through the horizontal tunnel 16 which interconnects the production conductor pipes 19, 19` and 19" at the plurality of `30 drainage-type mine oil well sites to a pump 25 at the base ~ of vertical access shaft 11 which pumps the collected oil and gas to an oil storage tank 26 on the surface. The installation shown in Figure 2 does not include a gas cap but does include an oil-water interface shown at 21.
For this reason, the lengths of the small diameter gravity-i2Z0795 type drain oil well pipes 19, 19' and 19" are extended above the oil-water interface. Because of the height of the oil-water interface it is possible that there may have beèn existing surface oil wells such as the one indicated at 27 driven into the field which are no longer sufficiently productive to justify further working. In such instances the abandoned surface oil wells could be capped as indicated or alternatively could be used as a means for introducing secondary treatment agents such as hot steam, compressed gas water, etc., to increase working pressure within tne oil sand strata. In addition to such measures, one or more of the individual gravity-type oil production conductor pipes 19 at different locations along the length of the access tunnel 15 could be disconnected from the main collection pipe 24 and instead connectèd to a secondary treatment agent supply pipe 23 such as shown in Figure 8A of the drawings in order to introduce such secondary treatment agents into the oil bearing sand strata at different selected sites along the length of the access tunnels.
Figure 2A is a view similar to that shown in Figure 2 but illustrates instead a geological installa-tion wherein there is a gas cap 17 interposed between the upper cap rock 13 and the oil bearing sand strata 14.
In such installations it may be desireable to provide drain oil well production conductor pipes such as 19' of sufficient length to reach into the gas cap 17 for the purpose of controlling pressure induced by the existence of the cap. For this purpose, the extended lengths of production conductor pipes such as 19' could be used to bleed off certain of the gas pressure in the gas cap to maintain it below certain predetermined levels or alternatively, such extended lengths of pipe could be connected to pressurized gas sources for increasing the 12207gS

pressure within the gas cap for improving production from the other adjacent drainage-type oil mine production eonduetor pipes sueh as 19 and 19" or those located further along tunnel 16.
The existenee of a gas cap such as shown at 17 in Figure 1 and in Figure 2A would tend to complicate the process of driving a large diameter access shaft such as 11 or 12 down through the upper cap rock 13 into and through the oil bearing sand strata and thence down into the lower cap rock 15. The gas eap zone would be relatively free of water or oil and thus would probably not respond to freezing teehniques and may not react satisfactorily to grout~ If such conditions are indicated by prior exploration and evaluation, it is likely that rotary drilling of the shaft, using conventional oil well drilling needs and teehniques, would be indicated. Shaft casing ean be floated on the mud, down into position, and cemented, perhaps using the same technique as was used in lining the U.S. Bureau of Mines deep shaft through oil shale near Rio Blanco, Colorado.
Where gas eap danger is not indicated but it will be neeessary to sink the shaft through an oil and/
or water saturated formationr the shaft can be sunk by any conventional sinking procedure to a safe depth above the oil-bearing zone 14.

~220795 At this particular level, an annular chamber shown at 28 is mined in the upper competent cap rock 13 so as to completely surround the shaft location 11. From the floor of the annular chamber 28, a number of very small diameter drill holes are drilled completely around the circumfer-ence of the path of the projected vertical access shaft 11 as shown at 29~ The vertical drill holes 29 are then supplied with a suitable solidifying agent such as grout, cement, silicon fluoride or the like or alternatively may be supplied with a suitable refrigerant for freezing the oil sands 14 within the region of the projected path of the vertical access shaft. The vertical access shaft is then drilled through the solidified gas and oil bearing sand region and sides of the shaft in this region are lined with a suitable fluid impervious liner 23 or ~4 as described earlier with respect to Figures 2 and 2A
of the drawings. The drill holes 29 must be positioned so that the temperature of the oil and gas zones 14 can be lowered below the freezing point of water and pour point temperature of the contained oil. As noted above, freezing may be replaced by the use of any of the several possible grouts including but not limited to AM-9 manufactured and sold by American Cyanamide, silicon fluoride or cement grouting. In the event that the oil and gas region 14 is quite shallow and close to the surface of the earth, the drill holes 29 could be drilled from the surface in a similar manner in order to solidify the projected path through which the vertical access shaft must be driven. After the oil and gas bearing zone 14 has been frozen or otherwise stabilized, the shaft 11 can be driven, using gassy mine techniques through the oil and gas bearing zone 14 down to and , , -23-through a portion of the lower competent cap rock region 15. If desired, a suitable sump such as shown at 31 can be provided at the base of the vertical access shaft.
The development of the mine workin~ using verti-cal access shafts 11 and 12 drilled in the above briefly described manner, can be on ~hatever pattern appears appropriate as dictated ~y cost analysis of the geology of the particular oil deposit being mined. The mine workings are solely for the purpose of providing access for drill site locations for the relatively small diameter drainaqe-type oil wells to be drilled upwardly into the overlying competent cap rock roof of the access tunnel 16.
~he location of the drainage-type oil well sites along the lengths of the access tunnel will be determined primarily ky the following basic factors:
a) Competence and impermeability characteristics - of the host rocks in which the access tunnel 16's have been,bored.
b) ~he location of needed drill sites as deter-mined by the nature of the oil aeposit.
c) Ventilation requirements.
d) Optimum scheduling permiting simultaneous continued mine development, drilling of pro-duction wells and completion and production from producing`wells.
e) Accomplishing the above with the least possible complexity of the mine workings.
5ince each oil field is different from all others, the above analysis undoubtedly will result in different mine layouts fox each field. As previously noted, the mine workings simply are to provide continuous access to the producing drain oil wells, a way of removing waste during mine development and any that may develop later and to provide passageways for the positioning of produc-tion pipelines for removal of produced oil and gas. Themine workings in the form of the access tunnels can be driven by known underground mining drilling-blasting-muck removal techniques and by the utilization of hori-zon~al tunnel borinq systems with or without hydraulic jet assist. ~hatever system is used, it will be advan-tageous in the environment noted to keep fracture of the raw rock around the tunnels to a minimum in order to assist in prevention of undesired leakage from the over-lying oil and gas horizon. Also it is anticipated that all of the small diameter drainage-type mine oil wells such as 19, 19' and 19" within the mine workings would be tied into central piping systems designed to optimize both manual and automatic production control of oil and gas through the well head~ :
Referring to Figure 4 of the drawings, a cross section of one of the access tunnels 16 is illustrated lS with the cross section being taken through a drainage-type oil mine well site. At the well site, a hole shown at 32 is drilled upwardly through the overlying roof 15 of access tunnel 16 at any angle upward through only a portion of the competent rock cap surrounding access tunnel 16. The hole 32 is drilled to a depth great enough to permit solid cementing into place of a collar -~ pipe 33. The collar pipe, for example, may have a diameter from about 6 to 8 inchesmore or less depending u~on the desired diameter for the gravity-type drain oil wells to be in-stalled at the site. A shoe flange shown at 34 is threaded over the lower threaded end 38 of collar pipe 33 in order to close the space between the outer surface of collar pipe 33 and the inside of the drilled hole 32.
Cement is then supplied under pressure to this space via cement ports 35 formed in the end of the collar pipe above the threaded end 38 and a cement gun nozzle shown at 36. After cementing, the cement gun 36 is removed and the ports 35 closed with suitable stoppers while the cement 37 sets. After the cement 37 has set, so as to firmly seal collar pipe 33 into place in the drilled 12:;~0795 hole 32, the shoe flange 34 can be unscrewed and removed.
With reference now to Figure 5 of the drawings, the cemented into place collar pipe 33 has a coupling 39 screwea onto its lower threaded end 38 for coupling to the collar pipe 33 a fluid cutting and control assembly shown`generally at 40. The fluid cutting and control assembly 40 is comprised by an outer casement 41 which in fact may be made up of different segments which include a manually operated stop valve 42 which may be of the well known, commercially available gate valve type, an upper blow-out preventer 43, a lower blow-out preventer 44, an upper drain vent control valve 45 connected to the casement 41 intermediate stop valve 42 and the upper blow-out pre-venter 43 and a lower drain vent control valve 47 connected to casement 41 in the space between upper and lower blow-out preventers 43 and 44. The upper and lower drain vent control valves 45 and 47 are connected through respective branch pipelines 46 and 48 to a suitable trunk pipeline that carries fluids used during drilling, any entrained oil, gas, rubble and the like away through a suitable mud pump (not shown) for trans-port through a conduit laid down through the access tunnels and vertical access shaft up to the surface and discharged to a suitable collection point. Where it is desired to use the fluid and cutting control assembly 40 repeatedly at different well sites, a third drain vent control valve 49 is provided together with an inter-connected branch pipeline for connection to the same discharge conduit system. The purpose of the third drain vent control valve 49 will be described more fully here-after with relation to Figure 6 of the drawings.
The drain vent control valves 4~, 47 and 49 are entirely conventionàl and availakle commercially, and hence need no further description. Likewise, the piping, collar pipe, casement segment, couplings, ~langes and the likè are believed to be entirely conventional and .

20~95 commerciall~ available and require no further description.
The stop valve 42 and upper and lower blow-out preventers 43 and 44 similarly are conventionally available items obtainable ~rom oil field equipment supply firms such as the Hydril Co. of Los Angeles, California, the Gardner Denver Corp., the Grinnell Valve Co. and the Jamesbury Corp.
These items must be of sufficient size so that their inside diameters will accommodate passage through the centers of the equipment and valves of the outside diameter of a drill bit 51 and its associated supporting drill string 52, coup-lings between segments of the drill string and a one-way flap or check valve 54 which is mounted at the top of the drill string 52 immediately under the drill bit 51. The flap valve 54 which is set in the first section of the drill string or drill pipe 52 supporting drill bit 51 permits drilling fluid such as water under pressure to flow upward around the drill bit 51 to facilitate drilling but will check or stop any back pressure to the drill string 52 and prevents any backflow of such fluid down through the inside of drill pipe 52 when the drilling fluid input is discontinued.
With a drilling rig, such as manufactured by Joy Mfg. Co. or Boyles Bros., set up in the manner shown in Figure 5, the drill bit and its supporting string is inserted through the fluid and cutting control assembly 40 by loosening the blow-out preventers 43 and 44 and opening the stop valve 42 to allow passage of the drill bit 51 and its supporting string up through the casement 41 to the end of the hole in which the firmly anchored collar pipe 33 is - cemented. The blow-out preventers 43 and 44 are then tightened down to just a slide fit, drilling fluid is sup~
plied to the inside of the drill pipe 52 and the drain vent valves 45 and 47 opened to drain off the drilling fluids and any entrained solid matter contained in such drilling fluids. If desired, a suction can be placed on the drain conduit connected to the branch pipelines 46 and ~8 via a suitable mud pump of the type sold by Ideco or Envirotech ~not shown) connected to the conduit or pumpin~ the 1220'795 fluids back up to the surface and discharged. During drilling in a c~nventional fashion, the check valve 54 will prevent any backflow of fluids, gas, or other matter due to encountering a high pressure pocket as drilling proceeds. The drilled oil well drainage hole 53 then is drilled upwardly through the roof of the overlying com-petent rock shelf 15 out into the oil bearing sand`strata as described previously with respect to Figures 1, 2 and 2A of the drawings.
After drilling of the oil well hole 53 at a particular site has been completed to a desired depth, the drill rig is then withdrawn from 'he hole. To facilitate this operation, as well as the drilling operation, it is anticipated that the drill string 52 .15 will be coupled to drill bit 51 in segments which would - ailow its handling within the confines of access tunnel 16. For this purpose, the drill string is withdrawn until the drill bit 51 is just below the stop valve 42.
At this point in the withdrawal of the drill string , the stop vàlve`42 is closed so as to hold off any back pressure that otherwise might force gas, oil, water, or other rubble down into the access tunnel 16. The drill string is then withdrawn completely by loosening the blow-out preventers 43 and 44 and from this point on further withdrawal of fluids through the drain vent valves 45 and 47 and their interconnected branch pipeline would cease. An oil production conductor pipe 61 sho~ in Figure 6 of the drawings is then mounted for emplacement in the previously drilled oil well hole 53. The oil production conductor pipe 61 likewise will be inserted into the hole in suitable length segments so that it ca~
be handled within the confines of the access tunnel 16.
As best shown in Figure 6, the topmost segment of the conductor pipe 61 has its end 6~ completely closed so that after it is inserted in place in hole 53 and ~220795 cemented as shown at 69 in a manner to be described more fully hereafter, it will prevent the passage of any oil, gas, water or other fluid down through the conductor pipe until it is desired to commence produc-tion from the Qil well site.
In order to inser~ the oil production conductor ~pipe 61 into place, the blow~out preventers 43 and 44 are loosened and the topmost segment of the conductor . pipe 61 inserted in the fluid and control assembly 40 to a point where the closed end 62 of the topmost seg-ment of conductor pipe 61 is just below stop valve 42.
At this point the -~low-out preventers 43 and 44 are ti~htened down to just a slide fit so that the conductor ' pipe 61 can be lifted upwardly through hole ~ seg~ent 15 by segment until it reache~ the desired depth into the oil bearing sand zone 14 as shown-in Figure 6. At this point, the hlow-out preventers 43 and 44 are tight~
ed down to a firm grip and water under pressure is supplied from a water pump 67 which may be somewhere in the tunnel system or possibl~ even on the surface through the branch pipe 48 and vent control valve 47 to the space intermediate conductor pipe 61andcasement 41.
The space between the outside surface of the oil con-ductor pipe 61 and the inside of casement 41 is then flooded with water under pressure hetween upper and lower blow-out preventers 43 and 44. During this flooding, the air in the space is vènted throuyh the third vent and control valve 49 until water passes through the vaive and then the valve is closed so that - 30 the space can ~e pressurized with water. As a bac~up, a retainer collar 50 may be threaded into the end of the casement 41 below the lo~er blow-out prPventer 44 so as to completely seal off the possibility of water seep-ing past the lower blow-out preventer and down into the tunnel space 16. Alternatlvely, it may be desired to also flood this space by slackening the lower blow-out _ ~9 _ preventer 44 until the space is filled and pressurized to the same extent as the upper space and then re-tightening the lower blow-out preventer. By this means, cement will not be allowed to enter into the fluid and coupling assembly so that it can be removed and reused at different oil well sites in the tunnel.
With the production conductor pipe 61 in place and the fluid and control assembly 40 flooded in the above-described manner, a cement pump 68 is coupled through the branch pipeline 46 and drain vent control valve 45 to the space between the entire extent of the production conduc-tor pipe 61 and the inside of the oil well hole 53 above the stopped down upper blow-out preventer 43. At this point the stop valve 42 is in the fully opened condition so that lS cement provided through the upper fluid vent control valve 45 is allowed to pass upwardly into~the space. During cementing, gas or fluids in the space above the cement level as it rises in the space intermediate the sides of hole 53 and the exterior surfaces of conductor pip~ 61 is vented if necessary through a suitable fluid impervious vent pipe shown at 65 which extends out of a port in the closed upper end of the upper production conductor pipe segment 61. This fluid impervious vent tube 65 extends down through the interior of the conductor pipe 61 ~5 along with suitakle detonator wire 64 for detonating a charge of explosive 63 attached to the upper closed end 62 of conductor pipe 61. The vent tube 65 leads down through a vent tube control valve 66 which may be located remotely on the surface or at some other accessible point in the mine working system where it is safe to locate the valve and may be even right at the base of the oil well site being worked upon as shown in Figure 6.
As cementing takes place and cement rises upwardly around the production conductor pipe 61, venting of the space in this manner will facilitate the cementing process.

12~0'~95 After cementing has been completed, the upper drain vent control valve ~5 may be closed down and the cement allowed to set so as to ass~re firm anchGring in place of the oil well production con~uctor pipe 61.
Figure 7 of the drawings shows the final produc-tion conductor oil piping installation after the cement 69 has set and firmly anchored the segments of the con-ductor pipes 61 extending throuyh the tunnel 16 roof.
After cement 69 has set, the water within the casement 41 between the upper and lower blow-out preventers 43 and 44 is drained out via the lower drain vent control val~e 47 and pump 67 which may be a reversible pump or alter-natively connected through a branch pipeline to a single acting pump used to reverse flow of water through the casement section and branch pipeline 48. Following this, the entire fluid and cutting control assembly 40 is removed including the interconnected branch pipelines 46 and 48 and the stop valve 42. Following this step, a new segment of conductor pipe indicated at 70 is coupled to the end of the cemented conductor pipe 61 protruding beyond the end of the cemented section 69 by means of a coupling (not shown) which may be of the type indicated at 73. In this additional segment of production conduc-tor piping a stop valve 71 is provided which may be of the conventional gate valve type available from any oil field equipment manufacturer or supply warehouse. ~lso included in the a`dditional condutor pipe segment at this point is a detonator control assembly sllown at 72 which is connected via the wires 6~ to the detonator for the explosive charge 63 in the capped end of cemented conduc-tor segment 61. This portion of the installation will be removed following the blowing open of the top end or head of conductor pipe segment 61 as described hereafter.
Below the detonator control assembly 72 a fairly strong screen shown at 74 is insertea in the pipe segment 70 1220'795 by means of coupler 73 so that it ~an catch blasting wires 64, the venting tu~e 65 and other any assorted rubble that may result from the blast of the detonator charge 63 which places the oil well into production.
Similar to the detonator control assembly 72 the screen 74 and any assorted ru~ble caught in the screen is re-moved after the capped end of conductor pipe segment 61 has been blasted open by closing down the stop valve 71 and unscrewing the coupler segments 73. In its place a sand screen also indicated at 74 is inserted for use in screening sand out of any oil and gas production flow through the well during operation.
Below the sand screen 74 is a unit 75 which may con-s~itute a coupling for coupling to the production con-15 ductor pipe segment 70 an input branch pipeline 77 for supplying to the production conductor pipe 70 and 61 input secondary treatment agents such as high pressure steam, pressurized gas, ~ater, or other suitable treat-ment agents for increasing flow and production thru~gh either the well in question or for increasing pLoduction at adjacent well sites in the field. A suitable pressure guage 76 is attached at the input coupling 75 in order to assure that the input secondary treatment pressure is within presecribed values. If desired, additional metering instruments for temperature, flow rate, etc., in monitoring the input of the secondary treatment agents can be installed at this point or the sensors for such parameters can be installed here for leading back to a central control room whereby a master controller can be employed to control these parameters for all the well sites where it is desired to introduce such secondary treatment agents. During normal production from the oil well site, however, the coupling 75 would constitu~e a straight-through coupling for oil so that it passes down through the lower end of the pipe segment 70 through a 1220'~95 second stop valve 78 and any other desired measuringinstrument sensor heads indicated generally at 79 for sensing such parameters as the oil and gas pressure, temperàture, flow rate, viscosity, or other desired characteristics to be e~ployed in controlling production from the well site. Finally, the conductor pipe segment 70 is coupled to and supplies the collector trunk pipeline ; 24 for leading the produced oil or gas back out through the tunnel system to the pump 25 at the base of the access shaft 11 for pumping back up to the surface as shown in Figures 2 and~2A of the drawings. ~ -With the conductor pipe segment 61 cemented inplace and capped at the top, there is no leakage of fluids through the conductor pipe segment 61 until its upper capped end is blasted open. After the conductor pipe segment 70 is in place together with its appended upper stop valve 71, the detonator blast control unit 72, screen 74, coupler 75, the lower stop and flow control valve 78 and appended instrument sensors 79, the lower stop valve 78 is closed and coupler 75 placed in the position such that the supply input branch line 77 is closed and upper stop valve 71 is maintained open. The detonator wires 64 are then connected to a suitable detonating signal generator for detonating the small explosive charge 63 attached to the capped upper end of the cemented conductor pipe sesment 61 as shown in Figure 6. Upon detonating this charge, the wires 64, venting tube 65 together with other assorted rubble will fall down through the conductor pipe segment and ba re-tained by screen 74. The stop valve 71 tXen is i~nedi- ;
ately closed to minimize any flow of gas or oil or other fluids through the conductor pipe and allows the lower portion of pipe segment 70 to be opened up, the screen 74 removed together with the collected rubble and a sand screen inserted in its place and the blasting control ass~lbly 72 removed entirely.
While a wired system for detonating the charge 63 and upper capped end of the conductor pipe 61 has been in-dicated, it should be appreciated by one of ordinary skill in the art that a radio controlled detonator could be employ~d in place of the wired detonator described with relation to Figure 6. With such an arrangement, the control assembly 72 would comprise an input transmitter end for a microwave signal generator for emitting a micro-wave signal up through the ce~en~ed conductor pipe 61which would serve as a suitable waveguide to transmit the control microwave signal to the radio wave controlled detonator thereby eliminating the wires 64 from the rubble,that will be collected by the screen 74. Col~
lector screen 74 still would be required however for any rubble that might initially drop down throu~h con-ductor pipe 61 after blasting open the upper capped end of the pipe. A similar radio wave control venting valve could be installed at the capped end of conductor pipe 61 whereby the valve could be opened durin~ cementing and eliminate the need for the fluia impervi~us venting pipeline 65 together with its exhaust system, but in such eventuality, the end of the production conductor pipe 61 during cementing would have to be connected to a suitable exhaust conduit temporarily provided during the cementing process for exhaus~ing out any vented gas from the mine workings atmosphere. Further, in place of a combined flow control and stop valve 78, it may he desireable to use s;n~le valves for each of these purposes wherein in place of a combined valve there would be a separate lower stop valve such as shown at 78 and below that a flow control valve which could be either manually or automatically controlled from a remote located control room. The operating parameter sensor units 79 woula then of course have suitable leads out to the master control ~2:Z0795 .

room to allow an operator of the well to monitor oil and gas flow out of each well site from the master control room location. Such remotely controlled instrumentation and flow control valves as well as the stop and flow control valves including the upper master stop valve 71 could be designed for remote operation and tied in with a suitable computer system to allow computer control of the oil and gas production from all of the well sites as will be aes-cribed hereinafter with relation to Figure 10. Other variations and changes will occur to those skillea in the art of oil well production control for use in place of or in conjunction with the instrumentation and control valve system described above without departing from the spirit of the invention.
In addition ~o the above-described characteristics, the flow coupler/diverter 75 similarly could be designed to be automatically operated from a remote master control location together with the lower stop valve 78 whereby the production conductor pipe segment 61 of any individual well could be isolated and that well site coupled through the branch pipeline 77 to a supply line 28 for secondary treatment agents extending through the network of horizontal tunnels 16 as shown in Figure 8A of the drawings. In this - manner any individual well site can be either man~lally or automatically controlled from a remote master control loca tion to convert from a producing well to a well which can be used for injecting secondary treatm~nt agents into the oil bearing sand strata 14 or into an upper gas cap region 17 or a water containing region, etc. as will be described with relation to Figure 14.
Should alternate systems and techniques for open-ing the capped end of the production conductor pipe 61 to production be desired, Figure 8B of the drawings illustrates one possible alternate system. In the arrangement of Figure 8B, a Johnson type screen is shown at 81 secured to the u~per top end of the ~jl conductor pipe segment 61~

~220795 Below the Johnson type screen 81 is inserted a suitable flap valve 82 which will prevent any back pressurizing of the conductor pipe 61 until it is desired to place the oil well into production. Here again, a small ex-plosive charge will have to be provided to remove theflap valve 82 together with its remotely actuated detonator charge. Similarly, a small vent opening should be provided throu~h the inclusion of a fluid impervious vent tube together with associated stop valve as described with relation to Figure 6 to facilitate cementing. The detonator for deton`ating the flap valve 82 and its attendant connected wires and vent tube may be either a wired detonator or radio wave controlled detonator as described above. If the cost is not prohibitive, the flap valve 82 could be designed to permit a slide opening for a sufficient distance to allow venting of the space to be cemented,during the cementing process,to the interior of the production conductor pipe 61. In this eventuality, some suitàble condùit system for exhaus~ing the conductor pipe must be provided to prevent any vent gases from escaping into the mine workings atmosphere. In other respects, the installation and procedure for placing the gravity-type oil drain well into production would be entirely similar to that described earlier with respect to Figures 6 and 7.
Particular care should be taken, however, during the cementing process to assure that cement does not rise to and clog the openings of the Johnson type screen 81.
An altèrnative arrangement using a Schlumberger : 30 type perforating gun to perforate the upper capped opening ~ of the oil production conductor pipe 61 is illustrated in Figure 9 of the drawings. The Schlumberger type perfor-ating guns are shown at 85l In utilizing this system a closed conductor pipe~
as indicated in Figure 6 would be cemented into the ~rill ~ZZO'795 hole. The explosive charge 63 and detonation wires 64 would not be needed nor would the blasting control assembly, item 72 of Figures 7 and 8B.
After the conductor pipe 61 is cemented in place and the collar end finished to its final form, the stop valve 71 can be attached and the fluid and control assembly 40 can be reattached. The conventional Schlumberger perforation gun could then be modified into segments to permit raising through this unit. The Schlumberger unit would have to be redesigned so that the firing circuitry could be plugged through successive pipe segments that would be needed to raise the perforation gun into firing position.
After the conductor pipe had been perforated as desired, the gun could then be lowered through stop valve 71. Then the fluid control assembly 40 could be removed.
The blowout preventors 43 and 44 would prevent fluid and gas leakage into the atmosphere during perforating gun withdrawal. Any fluids produced at this stage would be drained off through valves 45 and 47 as indicated in Figure 6.

~220795 ~ The drainage type oil wells drilled in the above-described manner may be drilled at whatever angle or direction is deemed most feasible for maximization of oil production from a given oil field. The mine workings for access should be designed for each individual oil field but should provide adequate room for collector piping systems, secondary treatment agent piping systems, automated well control systems, ventilation, drainage of the mine workings, and easy access to all ~ell sites for routine inspection and maintenance. During drilling special measures to supply ventilation air and to withdraw any leakage gases around the drillin~ site by a suitable air and gas exhaust system should be undertaken. This may incluae jacketing and exhausting the drilling rig. Each oil well site should have its own flow meter to measure production of gas, oil and water, pressure gauge, temperature gauge and any other oil well operating characteristic measurement device needed to provide the required measure~ent to report 1220'~95 continuously to a central control station conditions at each well site within the field being mined. As noted earlier, all well sites can be constructed for either automatic or manual changes in well management or pro-duction, or both, depending upon the economics of anygiven oil field being mined.
In addition to the oil well site reporting, proauction control and management systems desc~ibed above, the mine workings should be provided with suitable hydro-carbon gas, sulphur gas, carbon dioxide gas, oxygendeficiency and other ~imilar detectors for safety pur-poses. Further, fire warning systems should be placed at key positions throughout the mine workings with con-tinuous reporting to the central control station. suilt-in immediate warning systems should be providea throughoutthe mine workings to signal personnel should any of the above-noted factors become abnormal and signal`the ex-istence of problems or the possibility of such problems developing. These warning systems should be designed to ~0 warn all persons within the mine workings and alert crews both in the mine workings and on the surface as to the potential for a problem developing.
If the mine workings are monitored in the above-described manner, there should be no fire or explosion hazard provided timely action is taken with respect to any of the advance warning systems output alarms. How-ever, to guard against the unexpected, it is recommended that the mine workings include pipelines carrying carbon dioxide gas, together with valves that can be opened either manually or by remote control. These valves should be so located that any portion of the mine workings can be quickly flooded t~ith carbon dioxide gas thus aenying any fire or potential explosion the required - oxygen and reaucing the potential for a disaster~ The same system should be designed to stop normal mine 1220'795 ~ -3g-.

ventilation to an affected area within the mine workings but of course should be tied in with very stringent alarm systems to indicate to personnel within any par-ticular section of the mine that it is about to be CO2 flooded and a safetv stop accessible to possible per-sonnel in the affected sector who could countermand the proposed action immediately until excape from the affected section is accomplished.
MINE WORKIN~S SURPERVISORY CONTROL SYSTEM
Figures 10 and 12 of the drawings comprise schemati~, functional illustrations of a suitable super-visory control systèm for the mine workings which embodies the above-listed desirable characteristics and which when used in conjunction with the sensing instruments, pumps, air blowers, motor driven valves, motor driven airtight sealing doors and other devices illustrated schematically in Figures 11 and 13-16 together with a ma;n control computer (not shown), provide for safe and productive operation of the petroleum mine from a central control room by super-visory personnel. The control room can be located remotely from the mine workings and above surface so that during continuous operation of the mine only minimum exposure of personnel to hazards inherent in the opera-tion of such a mine will occur. A suitable main controlcomputer for use in suchsupervisory control system is the Hewlett Packard 2250 Data Acquisition and Control System -Processor and Series Control Computer 9800. While the main control computer itself has not been illustrated, input and output terminals to and from the computer have been sho~n in the control syste~ schematic diagrams by hexagon-shaped terminals C~, .
Figure 10 is a schematic illustration of the mine workings drainage oil collection piping system constlucted ~22079S

according to the invention, taken in plan looking do~
on a typical mine workings without illustrating the interconnecting access tunnels or access shafts, for simplicity in illustration. The various drainage-type oil ~ell sites are sho~n at 19, 19' and 19" and would correspond to similarly numbered elements described earlier in the specification. The drainage-type oil well sites are interconnected through a mine workings collection piping system shown at 24. Tncluded in the piping system 24 intermediate each interconnected - group of drainage-type oil well sites 19, 19', 19" are system flow control valves 101, the construction of which is shown in Figure 11 of the drawings. The main control computer, the access terminals of which are indicated by the hexagon-shaped terminal 102 is con-nected to each of the flow control valves 101 through a remote monitoring and signal transmission system 103 such as the Cutler Hammer '`DIRECTROL" manufactured and sold by the Cutler Hammer Corporation~ As shown in Figure 11, the f low control valves 101 includes suitable sensors such as limit switches 104 for sensing the con-dition of the flow control valve 101 whether it is open or clocedand if open the degree to which it is open and sending a signal back to the main control computer ~hich is indicative of the operating condition of the flow control valve. By suitably monitoring with ~ control console the condition of these f low control valves, the mine wor~inqs supervisor can control total flow of collected fluids out of the mine workings which then are supplied throùgh suitable booster pumps such as the one indicated at 105 for pumping the collected fluids to the sur~ace for treatment and disposition as will be descri~ed further on. As is true in all vital e~lipment usea in the mine workings, the booster pump 105 is driven by a hermetically sealed electric motor 106 whose operating condition is monitored by a temperature sensor T~2-107 whose output is supplied back through the remote monitoring and signal transmission syst~m 1~3 to the main control computer through terminals 102.

~220'795 Figure 13 of the drawings is a schematic illus-tration of a preferred form of arainage well site monitoring ana production control system according to the invention ~or a sub-group of three wells 19, 19' and 19" wherein each well in the sub-group as well as all sub-groups in the collection system are constructed in substantially the same mannerlexcept as to possible modification to include the introduction of secondary treatment agents as will be described with relation to Figure 14 of the drawings. It is anticipated that the drainage well opera-tion monitoring and control system shown in Figure 13 would be installed in back of the main, manually and/or automatically operated cutoff valve installed during drilling of the well such as valve 71 ~hown in Figures 7 and 8B of the drawings but would replace other flow control valves, ete., shown in those figures.
As shown in Figure 13, the output from each individuai drainage-type well site 19 is supplied first through a conductivity analyzer device CE-CT - 111 such as the BecXman Model CELR 155-160 manufactured and sold by the Beckman Instrument Company. The conductivity analy~er device senses and analyzes the type of fluid being produeed by the individual well in question, whether oil, gas or water and transmits a corresponding eleetrical signal thrutheremote monitoring and signal transmission system 103 and computer terminal input 102 to the main control computer indicative of the nature of the fluid being produeed by that well site at any given instanee. The pressure of the fluid in the t~ell site at the eorresponding point in time is sensed by a pressure sensor such as a VITRAN Model 701 pressure sensor;112 t~hich~~
supplies an electrical signal back thru the data trans-mission system 103 and computer tèrminal 102 to the main control computer which is indicative of the pressure in ~0' ~ S
. -42-the fluid at the well head at any given time. Similarly, a temperature sensor TEl-113 which may be of the t~pe manufactured and sold by ~-Cal Engineering their ~odel ULTRA-7, senses the temperatùre of the fluids in the well head and supplies an electrical signal through the data transmission system 103 and main computer input terminal 102 ~ack to the main control computer which is indicative of the temperature o~ the fluids being delivered at the well head, These parameters, i.e~ type of fluid, pressure of fluid, and temperature of fluid may ~e displayed on a suitable display console upon call~-up or during periodic checks by the supervlsor in charge of the mine~
Control of the fluids discharged from each drainage-type oil well drill hole 19 in the system is 15 accomplished by supplying the discharge after passing sensors 111~ 112 and 113 into a holding tank 114 which has a pressure sensor connected thereto for 'sensing the build-up of pressure in the holding tank 114. Pressure -sensor 115 has its electrical output supplied to control operation of a motor operated valve 116 connected in the discharge line 117 from holding tank 114 into the mine workings drainage oil well collection piplng system 24 through a conventional check valve 118.~ ChecX valve 118 prevents ,any backup of fluids from the collection system piping 24 in the event the pressure in piping 24 ex`ceeds the pressure in any o~ the holding tanks 114. The motor operated valve 116 includes operating condition sensor switches 119 and 121 which sense the operating condition of the motor-operated valve 116 whether open or closed and if open to what extent the valve is open and sùpplies signals back through the data transmission system lQ3 and terminals 102 to the main control computer for use in monitoring conditions at the well site~

~2Z0'79S
-~3-~he flow rate of fluids supplied from each well site via holding tank 114 to collection piping system 24 is measured by a flow rate sensor FTl-122 whose output signal is supplied through the data transmission system 103 and terminals 102 back to the main control computer.
Based on data supplied from the flow rate sensor 122, the main control computer can compute the true flow rate for given periods of time which together ~ith the identity of the flowing fluid medium as determined by the inputs from a conductivity analyzer 111, provides the mine supervisor with information concerning the totalized flow of fluid through the well head as well as the nature and type of the fluid. The computer of course can integrate the flow rate being sensed by : 15 flow rate sensor 122 over particular operating inter vals to provide the superyisor with an indication of the total amount and t~7pe of fluid being produced over a given period of time.
As noted earlier, control of the discharge of fluids from each oil well site drill hole is accomplished by sensing the hydrostatic head of fluid pressure built-up in the holding tanks 114. When the level of the fluid pressure in holding tank 114 reaches a value indicating a full condition, pressure switch 115 causes motor~
operated valve 116 to open thereby emptying the holding tank content into the collection piping system 24~ l~hen the pressure sensor switch 115 senses that the tank 114 is subst~ntially empty, the valve 116 is reclosed~ The limit switches 11~ and 1~1 on motor-operated valve 116 provide electrical signals to the main control computer which are indicative of the operating condition of the motor-operated valve 116. The piping system motor-operated valves 101 sho~ in Figure 10 of the drawings which are located throughout the collection piping , 1;~20';~95 system 24 are set to automatically close when flow in excess of a predesigned maximum flow rate occurs, or in the event of a reverse flow. Closure of the valves 101 under such operating conditions, isolates any particular section of the collection piping system 24 that may have ruptured and thus prevents or at least limits spillage that might occur as a result of such rupture. Suitable limit switches on the valves 101 supply information back to the data transmission system 103 and terminals 102 to the main control computer indicating the operating condition of each of the flow control valve 101 including the information that the valve is open and operating normally.
As described previously, oil bearing fluids collected at each of the drainage-type well sitesin the above-briefly descri~ed manner iscupplied through the mine workings collection system 24 via booster pumps such as 105 shown in Figure 10 which are located throughout the collection piping system 24 at strategic points. The fluids are pumped to a suitable collection point (which may be above ground) for treatment and storage. At this point, the fluids are supplied to a separator 123 which may be of the type manufactured and sold by CE-NATCO under model VFH. CE-NATCO is the name of the company formed by the merger of Combustion Engineering with National Tank Co.
The separator 123 separates the fluids into their con-stitutent parts oil, gas and water and supplies each constitutent part through a respective discharge line 124 for the oil, 125 for the gas and 126 for the water.
The oil flow rate supplied through oil line 12~ to an oil collection tank 128 is measured by a flow sensor 127 which supplies its output signal back through the transmission line 103 to the main control computer via input terminal 102. The gas being produced by the system is measured by a flow sensor 129 installed in the gas out-let line 125 which supplies its output signal back through the transmission line 103 and terminal 102 to the main ~Z20'795 control c~mputer. Similarly, water being produced by the system and supplied through outlet line 126 is measured by a flow sensor 131 whose sensed signal is supplied back to the main control computer via trans-mission line 103 and terminal 102. At this point in the system operation, the computer is provided with suffi-cient input data to provide a cross check on the sum-mation of the flow rate produced at each of the drainage-type oil well sites against the su~mation of the pro-duction flow rates of th~ respective constitutent fluids - oil, gas and water. Oil from the separator is supplied to the collection tank 128 which normally will be located above the surface. The gas being produced by the mine can flow either to gas pipe lines for supply ` 15 to a market, to a storage tank or can be used to re-pressure the oil field being drained by the mine.
Water being produced by the system either can be dis-charged to.waste or can be pumped back to maintain pressure on the oil field being drained.
Figure 14 is a schematic illustration of an alternative production control installation for use at the respective drainage-type oil weli sites 19, 19' and 19". For the sake of simplicity, the illustration shown - in Figure 14 does not include the conductivity analyzer 111, the pressure sensor 112, the temperature sensor 113 or the main flow sensor 122 in order not to unduly com-plicate the drawings. However, it is anticipated that all of these sensing .instruments would be included in the alternative embodiment ~hown in Figure 14 but have not been illustrated in order not to unauly complicate the drawings. The significant elements such as the holding tank 114 and the main flow control valves 116 have been illustrated however in order to show the alternative system connection points~

1220'795 The alternative installation shown in Figure 14 is intended for use with those mine fields where it is anticipated that secondary treatment processes will ha~e to be applied in order to maximize oil production from the petroleum mine~ Secondary treatment processes and a~ents used in such processes are well known in conven~
tional oil well production systems, and hence need not be described in detail. In such secondary treatment processes~ a secondary treatment agent such as steam, water, pressu~ize~ gas, or other similar agent is intro~
duc~d into the oil bearing sand strata, or the gas cap above the oil bearing sand strata or the water table below the oil bearin~ sand strata~ In order to intro-duce such secondary treatment agents, a separate line working secondary treatment supply piping system (not shown in overall systems context~ indicated in part at 133 in Figure 14 is connected to the disc~arye conduit 117 interc~nnecting the holdlng tank 114 with the main mine work~n~s draina~e oil collection piping system 24 ' In this alternative installation~ the valve 116 will - ~ have to ~e a separate motor~operated valve under the control of the main control computer via terminal 102 and data transmission system 103 whereby the valve 116 selectively can be closed in order to introduce secondary treatment agents into the well head at any one of tfie dr~inage~type oil well sites 19~ Prior to the intro~
duction Qf any such secondary treatment agents~ the main drainage valves 116 are closed by their associated motor 116M vi~ the main con~rol computer, The secondary treatment agents are introduced via the piping system 133 by means of an on-o~f control v~lve 134 whose on-off condition is indicated back at the main control co~puter console via the limi~ switches 119 and 121 and which can be opened or closed from the main control computer console hy motor 134M via the main control computer terminal 102 and data transmission `

system 103. A flow sensor 135 connected in a secondary treatment agent supply pipeline 133 measures the flow of the secondary treatment agents passing through the pipeline ana supplies the flow rate back to the main control computer via data transmission 103 and terminal 102.
With a well head installation constructed as shown in Figure 14, the flow of secondary treatment agents such as steam, water, gas,~surfactants or other secondary recovery enhancing agents is measured by the flow rate sensor 135 appropriate for the secondary treatment medium being used. The resulting electrical signal is transmitted back to the main control computer console for display and recording and use by superVisQry per-sonnel in working the mine field. Pressurization ofthe mine field secondary treatment agents is accom-plished from the main control console first by operating the motor ll6M to close the main drainage control valv~
116 and thereafter operating the motor 134M to open or `20 close the secondary treatment agent flow control valve 134. The limit switches 119 and 121 provide positive feed~ack signals to the main computer control console for displaying the operating condition of the secondary treatment agent flow control valve 134. The flow rate~
sensor 135 Xeeps supèrvisory personnel advised of the rate of introduction of the secon`dary treatment a~ent and the computer can integrate the flow rate o~rer pre-determined periods of time to di~play and record the total amount of secondary treatment agent being intro-duced for the period in question, It is anticipatedthat not all of the well sites in any sub-group or other groupings of well sites would be pressurized with secondary treatment agents at the same time, but that such secondary treatment processes would be used to 1220'795 enhance oil recovery at other adjacent sites in a pre-determined pattern of pressurization and secondary -treatment. Consequently, at the producing oil well sites, the pressure at the well heaa, the temperature of the well head and the classification of the fluids being produced will be recorded by that particular well site's sensing instrumentation and fed back to the main control computer for recording, display and use by supervisory personnel in enhancing oil recovery from the petroleum mine. If desired, the same supply system - can be employed to depressurize~a particular oil well site by bleeding off gases, water and the like to a collection point above ground to the desired extent to return a particular site to gravity-drain type of opera-tion as opposed to a pressurization-squeeze type of , operation again under the control of the main computer and supervisory personnel at the main computer control console.
In addition to the above-described forms of secondary treatment, there are other known secondary treatment procedures which have been successfully used to enhance oil well production and which utilize electro-magnetic radiation in the form o~ either radio frequency wave or microwave propogation of electromagnetic waves through the oil bearing sands. This is achieved with suitable electrode emplacement and excitation by a radio wave fre~uency or microwave frequency signal source for propogating such electromagnetic waves through the oil bearing sands. The prcsent invention contemplates the use o~ such electromagnetic waves secondary treatment procedures by suitable emplacement of the required electrodes and radio frequency signal transmitters at strategic points in the access tunnels as well as in the - access vertical shafts to enhance collection at the lZ2~'795 _~9_ - drainage-type oil well sites. It is anticipated that in any such system, control over the electromagnetic wave si~nal producing equipment would be achieved via the main control computer by the mine workings supervisory personnel.
Figure 12 is a schematic diagram of the air supply and personnel protection detection and control systems required for safe operation o~ the mine workings.
These protective systems include an air flow monitoring and control system shown ~enerally at 141, a gas detec-tion and control system shown generally at 142, a fire detection and protection control system shown generally at 143, a mine flooding detection and protection control system shown generally at 144, and a vital motor protec-tion control system shown generally at 145. All of thesedetection and protection control systems have elements located at strategic points throughout the mine workings, the network of which is shown at 16 and are comprised generally by the access tunnels 16 which extend through the lower competent rock level below the oil field being mined. As will become apparent, all of the personnel protective syst`ems listed above and to be described in detail hereafter, provide sensory inputs to the~main control computer via data transmission links and the input terminals so that supervisory mine personnel operating from the computer control console can continu-ously monitor safety conditions within the mine workings and undertake protective measures whenever such measures are indicated.
AIR FLOW AND MONITORING ~ONTROL SYST~
Adequa~e fresh air supply for personnel in the mine working is assured by a number of air blowers shown at 151 which are located at strategic points throughout the mine workings for supplying forced air through ducting indicated at 152 having suitable air discharge 1220~795 .

outlets at preselected points throughout the mine working access tunnel 16 network. At selected points throughout this air supply d~lcting system air flow sensors PT~153 are installed ~or measuring the flow rate of air at these points in the air supply ducting system. The air flow rate sensors 153 have their outputs supplied back through the data transmission system 103 and input terminals 102 to the main control computer for display and recording and use by supervisory personnel in maintaining safe conditions in the mine. In the event that air supply to any particular section of the mine is interrupted, the main control computer auto-matically or under the control of the supervisory pers-onell can signal both a visual and audible alarm indicated at 155 located throughout the mine workings in order to alert personnel in the mine of the danger.
GAS DETECTION A~D PRO~ECTION SYSTEM
The gas detection and control system 142 may comprise a system such as the mine safety appliance se~ies 500 system shown generally at 142 in Figure 16.
This system includes a number of methane gas sensors indicated at 161 for sensing the build-up of methane or other dangerous gases within the mine workings access tunnels or vertical shafts and providing an output signal of the build-up of such dangerous gases back to the main control computer via the data transmission system 103 and terminals 102. The gas protection system further includes a series of gas-tight doors shown at 162 in both Fiyures 12 and 16 o~ the drawin~s which can be opened and closed by motors 163 under the control of the main control computer via terminals 102 and data transmission system 103. Limit switches 119 and 121 sense whether the door is opened or closed and provide output signals back to the main control ~computer via t~le data transmission system 103 and terminals 102 as a backup indication to supervisory personnel of either ~2:~0'795 the opened or closed condition of the doors 162. Manually operated electric switches shown ~t 164 are installed on each side of every door 162 so that personnel caught in a section which is being closed off can open the door for egress. When a door is thus opened, the main control computer automatically recloses it after a predetermined time interval should con~itions not permit the personnel seeking to escape from a section enough time to reclose the door af~er opening it.
A further function of the gas detection and pro-tection system 142 shown in Figures 12 and 16 is to immea-iately sound a local alarm shown at 155 which is located at regular intervals along each section of the mine workings.
The local alarm 155 provides both a visual and sound warning signal to personnel who may be located in an affected section. It is anticipated that in a petroleum mine r all personnel will be rigorously trained in safety procedures.
These safety procedures will include the required carrying of oxygen masks which can be donned by all personnel entering the mine immediately upon the occurrance of an alarm signal by the alarms 155 in a section where they may be working. The personnel thus assured of an adequate oxygen supply then can work themselves out of an isolated section of the mine in the event that the condition requires immediate closing and sealing off by the airtight doors 162 and CO2 flooding of an endangered section of the mine workings.
FIRE DETECTION AN~ PROTECTION SYST~
The fire detection and protection system 143 is sho~ in greater detail in Figure 15 of the drawings. The system is comprised by a plurality of smoke/temperature sensors shown generally at 164 in Fi~ure 15 which supply alarm signals to a central control panel 143 commected through data transmission system 103 and terminal 10~
back to`the main control computer. The fire protection and detèction system 143 can ~e installed so as to auto-matically activate the cardox-type carbon dioxide fixe ~z~o 7ss 52~

extin~uishing systelll sho~n generally at 165 for in~ediate C2 flooa~ng of any fire that might occur in a given section of the mine workin~s. Simultaneously~ the occurrance of an alarm conditlon and presence o~ the fire is signalled back through the main control computer for use by supervisory personnel in ascertaining what other further protective measures mi~ht ~e taken. Concurrently with the activation of the carbon dloxide (C02~ extinguishing system, fire pro-tection system 143 is connected to activàte the drive motors 163 for automatically closing the air and gas-tight doors 162 for isolating particular sections of the mine workings as described a~ove with respect to the gas detec~
tion and protection control system. The limit switches 119 and 121 monitor the condition of the doors 162 and si~nal back to the main control computer whether the door is open or closed.' Here again~ the presence of manually actuated switches 164 on either side of the sealing doors 162 can - be manually actuated by any personnel present in the affected section to allow e~ress of such personnel. The fire pro-tection sy~tem 143 also instantaneously sounds the local alarm 155 to advise m~ne personnel of the onset of a danger should they ~e in a sectiPn of the mine workings affected by the detected fire A further protective step which can be taken by-the supervisory personnel at the control console of`the main control computer, is to discontinue the supply o~ ventilatin~ air to an affected section after detection of the onset o a, fire alarm condition~ This can ~e safely done s~nce any ~ffected personnel will be carrying oxygen masks which they t~.ill have donned.
~SINE FLOQDING PROTECTION AND DETECTION SYSTEM
In the event Qf flooding of any part of the mine workin~s by water or other liquidr level sensing s~itches shown at 171 in ~i~ure 12 and comprisin~ part of the 100d detection and control system 144r will sense the build-up of w~ter a,nd siynal the occurance of a flooding 1220'795 cond~tion to the main control computer via data trans-mission system 103 and computer input/output terminal 102t The level sensing switches 171 will be distri~,uted throughtout the floor of the mine working for sensing the occurrance of flooding in any section of the mine.
Level sensing switch 171 also is connected to acutate the nearest sump pump shown at 172 whose motor 173 is monitored by a temperature sensor 174 supplying its output signal through data transmission link 103 and terminal 102 back to the main control computer which can monit~r then safe operation of the sump pumps. As an additional piece of data, a pressure sensor indicated at 175 monitors the discharge pressure of the sump pump 172 and supplies its output si~nal back through data link 103 and terminal 102 to the main control computer.
Thus, the level sensing switches 171 can sense the build-up of water or oil on the mine floor and siqnal this condition ~ac~ to Ihe main control computer. Simultan-; eously, the a~fected sump pumps 172 will be actuated to pump out the liquid through an appropriate discharge conduit (not shown) which transports the flood waters to a remote point for discharge safely away fLom the mine workings. During operation, the sump pumps are monitored by the temperature sensor 174 and pressure output sensor 175 and the outputs of these sensors are supplied back to the main control computer for use by supervisory personnel in monitoring safe opeîation of the mine flooding protection system thus comprised~
VITAL MOTOR PROTECTION SYSTEM
In`addition to the detecting and protecting system described above, all of the vital motors employed in the personnel protective safety systems of the mine such as air blower motors, sump pumps ~ safety door closure motors, valve motors and the like are monitored by temperature sensors such as 174 for the sump pump motor i220'~95 and temperature sensors such as 176 shown used in con-junction with the drive motors 177 ~or driving air blowers 151. Similar temperature sensors for the isola-tion seàling doors 162 drive motors, the valve drive motors and the like have not been shown for the sake of simplicity. The temperature sensors thus comprised all are connected back to the data transmission system link 103 and computer input/output te~ninal 102 to the main control computer to facilitate monitoring of thè
safe operation of these vital motors throughout the mine workings personnel protective systems.
From the foregoing description, it will be appreciated that the status of all operating par~neters of the petroleum mine together with the status of the personnel protective systems can be sensed by instrumen-tation and the outputs are presented to mine supervisory per-sonnel on a cathode ray tube or other display which is a part of the control console of the main control computer. With this data and the in-place sensors, control valves, drive motors and the like the mine supervisory personnel can remotely start or sto~ all motors, open and close all doors and valves, and activate any alarm systems such as horns, lights, CO2 fire extinguishing systems and the like.
Having described several methods, systems and forms of ap aratus to be employed in carrying out the novel method of underground mining of petroleum according to the invention, it is believed that other modifications, changes and variations to the described methods, svst~ms t and apparatus will occur to those skilled in the art in the liqht of the above teachinas. It is therefore to ~e ~
understood that all such obvious changes to those of ordinary sXill in the art are believed to come within the scope of the invention as defined by the appendea claims.

Claims (40)

WHAT IS CLAIMED IS:
1. The method of drilling a relatively small diameter gravity-type drain oil well using a fluid and cutting control assembly comprising a stop valve mounted on a pipe casement for securement to a firmly anchored collar pipe providing the outer liner for an access opening to a gravity-type drain oil well, said gate valve and pipe casement having an inside diameter opening with said gate valve in the open condition sufficient to accommodate the outside diameter of gravity-type drain oil well production conductor pipe and drill string-together with appended stop valves couplings and the like, upper and lower blow-out preventers secured to said casement below said stop valve and having internal diameters sufficient to accommodate the external diameter of the gravity-type drain oil well production conductor pipe and drill string fittings, an upper drain vent control valve connected to a first drain vent branch pipeline and to said casement between the stop valve and the upper blow-out preventer and a lower drain vent control valve connected to a second drain vent branch pipeline and to the casement intermediate the upper and lower blow-out preventers, and wherein the assembly is secured to an annular collar mounted in and surrounding a relatively small diameter access opening for a gravity-type oil drain well to be drilled into the overlying roof of a tunnel cut into a competent rock zone below oil well sands containing unrecovered oil, inserting the drill bit and supporting drill string through the opened lower and upper blow-out preventers and through the opened stop valve, drilling the small diameter gravity-type oil drain well upwardly through the overlying competent rock roof of the tunnel and into the oil bearing sand zone to a desired depth while supplying cutting fluid to the drill bit under pressure upwardly through the drill string, maintaining the upper and lower blow-out preventers tightened down on the exterior of the drill string to only a slide fit during drilling and drawing off used cutting fluid and entrained cuttings through the upper and lower drain vent control valves and connected branch drain pipelines for removal to the surface.
2. The method according to claim 1 further comprising sequentially loosening and tightening the upper and lower blow-out preventers while inserting or withdrawing additional lengths of drill string during the drilling and removal of the drill string.
3. The method according to claim 1 further comprising introducing a solidifying agent into the drilling fluid at the point in drilling operation where the drill bit enters the oil bearing strata to facilitate drilling the gravity drain wells through the oil bearing strata to a desired depth into the underlying competent rock strata.
4. The method according to claim 1 using the fluid and cutting control assembly for installing oil well production conductor pipe in the relatively small diameter gravity-type oil drain well after drilling of the drain-type oil well hole comprising loosening the upper and lower blow-out preventers while withdrawing the drill string to the point where the drill bit is just below the stop valve while drawing off any fluid, cuttings, oil, gas and water through the upper and lower drain vent control valves for removal to the surface, closing the stop valve and withdrawing the drill bit and drill string from the fluid and cutting control assembly, inserting the production conductor pipe within the casement through the loosened upper and lower blow-out preventers to a point where the upper end of the conductor pipe is just below the stop valve, tightening the blow-out preventers to the point of providing a slide fit for the exterior surface of the production conductor pipe while maintaining the upper and lower drain vent control valves open and under suction to drain off any leakage of fluid past the upper blow-out preventers, opening the stop valve and driving the production conductor pipe upwardly through the drilled opening into the oil bearing sand strata to a desired depth.
5. The method according to claim 3 using the fluid and cutting control assembly for installing oil well production conductor pipe in the relatively small diameter gravity-type oil drain well after drilling of the drain-type oil well hole comprising loosening the upper and lower blow-out preventers while withdrawing the drill string to the point where the drill bit is just below the stop valve while drawing off any fluid, cuttings, oil, gas and water through the upper and lower drain vent control valves for removal to the surface, closing the stop valve, inserting the production conductor pipe within the casement through the loosened upper and lower blow-out preventers to a point where the upper end of the conductor pipe is just below the stop valve, tightening the blow-out preventers to the point of providing a slide fit for the exterior surface of the production conductor pipe while maintaining the upper and lower drain vent control valves open to drain off any leakage of fluid past the upper blow-out preventer, opening the stop valve and driving the production conductor pipe upwardly through the drilled opening into the oil bearing sand strata to a desired depth.
6. The method according to claim 4 wherein the upper end of the relatively small diameter gravity-type oil drain well production conductor pipe is closed during the emplacement thereof and means are provided for selectively opening the upper end of the production conductor pipe after it is secured in place to a desired depth into the oil sand strata in order to place the well into production.
7. The method according to claim 6 wherein the space between the exterior of the conductor pipe and the sides of drilled oil well hole for accomodating the pipe is vented to facilitate emplacement and subsequent cementing into place of the conductor pipe.
8. The method according to claim 7 wherein the venting of the space intermediate the drilled hole and the conductor pipe is accomplished by a small diameter flexible fluid impervious venting tube extending up through the interior of the pipe and having the upper tip end extending through a small port in the upper end of the conductor pipe and a venting tube control valve secured in the venting tube at a lower accessible end of the vent tube with the vent tube being discharged to an exhaust conduit to the surface.
9. The method according to claim 7 wherein the production conductor pipe is permanently cemented into place by tightening down the upper and lower blow-out preventers to the greatest possible extent to prevent movement to the conductor pipe during cementing, and forcing cement under pressure from a cement pump con-nected through the upper drain vent control valve and its interconnected first branch pipeline with the stop valve in its fully open condition to completely fill the space of the drilled oil well holes surrounding the conductor pipe with cement down to the top of the upper blow-out preventer while venting said space from the top, removing the fluid and cuttings control assembly including the stop valve after the cement sets, and coupling additional lengths of production conductor pipe to the cemented in place conductor pipe through at least one stop valve.
10. The method according to claim 9 employing a fluid cuttings and control assembly wherein the lower drain vent control valve is above the lower blow-out preventer and closely adjacent thereto and a third drain vent control valve is connected to a third drain vent branch pipe line and to the casement-at a point below the upper blow-out preventer and closely adjacent thereto and wherein water is introduced into the casement in the space between the casement and the exterior of the production conductor pipe prior to cementing by supplying water under pressure from a water pump through the lower drain vent control valve and interconnected second drain vent branch pipeline with the third drain vent control valve initially open to vent the space between the upper and lower blow-out preventers while filling the same with water and then closed to fill the space with water under pressure greater than the pressure used in the cementing of the production conductor pipe whereby the fluid cutting and control assembly can be kept clean of cement for repeated use at different oil well sites.
11. The method according to claim 9 wherein the closed upper end of the production conductor pipe has a small charge of explosive attached thereto for blowing open the end of the conductor pipe to place it into production and a small remotely operated detonator is secured to the charge of explosive for selectively detonating the charge to blow open the top of the con-ductor pipe and place it into production.
12. The method according to claim 9 wherein the closed upper end of the production conductor pipe is closed by a screen having a closure element disposed in the conductor pipe below the screen for preventing flow of fluids through the pipe during its emplacement, a small charge of explosive attached to the closure element and a small remotely operated detonator secured to the charge of explosive for selectively detonating the charge and blowing open the closure element to place the well into production.
13. The method according to claim 9 wherein the closed upper end of the production conductor pipe has a perforating gun secured therein for perforating upper sides and closed upper end of the conductor pipe and remote operated means for selectively firing the Schlumberger type perforating gun when it is desired to place the gravity drain-type oil well into production.
14. The method of sinking a relatively large diameter vertical shaft for an oil mine capable of accommodating workmen and equipment extending from an upper competent rock zone through an intermediate oil bearing sand zone into a lower competent rock zone forming a laterally extending annular chamber in the upper competent rock zone immediately above the oil bearing sands and surrounding the vertical shaft using known horizontal tunnel rock boring techniques, said annular chamber being of sufficient extent to accommodate workmen and the drilling of a predetermined pattern of small diameter holes into the floor of the annular chamber surrounding the vertical shaft to varying depths within the oil bearing sand zone, supplying a solidifying agent through the holes into the oil bearing sand immediately surrounding the vertical shaft through substantially the extent of the thickness of the oil sand zone to thereby thicken and substantially solidify the oil and water bearing sands in the region below the vertical shaft, sinking the vertical shaft further downward through the remaining thickness of the upper competent rock zone, the solidified thickness region of the oil bearing sand zone and into the lower competent rock zone to a desired depth, lining the depth of the vertical shaft with a suitable liner that is impervious to pressurized fluids, and driving one or more horizontal tunnels of sufficient size to accommodate workmen and rock drilling equipment horizontally out from the base of the shaft to a desired extent using known horizontal tunnel rock boring techniques.
15. The method according to claim 14 wherein the solidifying agent is a grout such as cement, silicon fluoride and the like.
16. The method according to claim 14 wherein the solidifying agent is a ground freezing agent for lowering the temperature of the oil bearing sands in the region of the vertical shaft to a temperature below the freezing point of water.
17. The method according to claim 14 wherein the horizontal tunnels are formed in a desired pattern extending outward from the vertical shaft to form a predetermined drain basin, the tunnels are bulwarked and shored in accordance with known mining safety techniques and regulations and are properly ventilated to assure safe working spaces for humans.
18. The method according to claim 14 wherein a second parallel vertical shaft is driven through the upper competent rock zone, the oil bearing zone and into the lower competent rock zone in a similar manner and a horizontal tunnel joins the base of the two shafts to form an underground central work area whereby one of the vertical shafts can be used for ventilating air supply, utilities, working fluid supply and other services required by the mine and for working personnel access and egress to the work area and tunnels, and the remaining shaft can be used for ventilation exhaust, removal of tunnel and drill hole cuttings, produced gas and oil, removal of mine waste water and provides an escapeway for working personnel should it be required.
19. The method according to claim 18 wherein the horizontal tunnels are formed in a desired pattern extend-ing outward from the vertical shaft to form a predetermined drain basin, the tunnels are bulwarked and shored in accordance with known mining safety techniques and regulations and are properly ventilated to assure safe working spaces for humans.
20. The method according to claim 17 wherein the horizontal tunnels each have a plurality of relative small diameter gravity-type drain wells drilled generally upward through the overlying competent rock layer roofs thereof at predetermined spaced-apart points along the lengths of the tunnels, said gravity-type drain wells extending upwardly through the overlying competent rock layer roof to extend into the overlying oil sand zone to a desired depth.
21. The method according to claim 19 wherein the horizontal tunnels each have a plurality of relative small diameter gravity-type drain wells drilled generally upward through the overlying competent rock layer roofs thereof at predetermined spaced-apart points along the lengths of the tunnels, said gravity-type drain wells extending upwardly through the overlying competent rock layer roof to extend into the overlying oil sand zone to a desired depth.
22. The method according to claim 20 wherein the horizontal tunnels are sufficiently large to accommodate utility pipelines for supply of electricity, ventilating air, compressed air steam, drilling and secondary treat-ment fluids and the like to gravity drain-type oil well sites along the length of the tunnel as well as return conduits for waste drilling fluids, cuttings, exhaust air, oil and/or gas, water and the like to the base of a vertical shaft for pumping back up to the surface.
23. The method according to claim 21 wherein the horizontal tunnels are sufficiently large to accommodate utility pipelines for supply of electricity, ventilating air, compressed air,steam, drilling and secondary treat-ment fluids and the like to gravity drain-type oil well sites along the length of the tunnel as well as return conduits for waste drilling fluids, cuttings, exhaust air, oil and/or gas, water and the like to the base of a vertical shaft for pumping back up to the surface.
24. The method according to claim 22 wherein the relatively small diameter gravity-type drain oil wells each are drilled using a fluid and cutting control assembly comprising a stop valve mounted on a pipe casement for securement to a firmly anchored collar pipe providing the outer liner for an access opening to a gravity-type drain oil well, said gate valve and pipe casement having an inside diameter opening with said gate valve in the open condition sufficient to accom-odate the outside diameter of gravity-type drain oil well production conductor pipe and drill string-together with appended stop valves, couplings and the like, upper and lower blow-out preventers secured to said casement below said stop valve and having internal diameters sufficient to accommodate the external diameter of the gravity-type drain oil well production conductor pipe and drill string fittings, an upper drain vent control valve connected to a first drain vent branch pipeline and to said casement between the stop valve and upper blow-out preventer and a lower drain vent control valve connected to a second drain vent branch pipeline and to the casement intermediate the upper and lower blow-out preventers, and wherein the assembly is secured to an annular collar mounted in and surrounding a relatively small diameter access-opening for a gravity-type oil drain well to be drilled into the overlying roof of a tunnel cut into a competent rock zone below oil well sands containing unrecovered oil, inserting the drill bit and supporting drill string through the opened lower and upper blow-out preventers and through the opened stop valve, drilling the small diameter gravity-type oil drain well upwardly through the overlying competent rock roof of the tunnel and into the oil bearing sand zone to a desired depth while supplying cutting fluid to the drill bit under pressure upwardly through the drill string, maintaining the upper and lower blow-out preventers tightened down on the exterior of the drill string to only a slide fit during drilling and drawing off used cutting fluid and entrained cuttings through the upper and lower drain vent control valves and connected branch drain pipelines for removal to the surface.
25. The method according to claim 24 further comprising introducing a solidifying agent into the drilling fluid at the point in drilling operation where the drill bit enters the oil bearing strata to facilitate drilling the gravity drain wells through the oil bearing strata to a desired depth into the underlying competent rock strata.
26. The method according to claim 24 using the fluid and cutting control assembly for installing oil well production conductor pipe in the relatively small diameter gravity-type oil drain well after drilling of the drain-type oil well hole comprising loosening the upper and lower blow-out preventers while withdrawing the drill string to the point where the drill bit is just below the stop valve while drawing off any fluid, cuttings, oil, gas and water through the upper and lower drain vent control valves for removal to the surface, closing the stop valve, inserting the production conductor pipe within the casement through the loosened upper and lower blow-out preventers to a point where the upper end of the conductor pipe is just below the stop valve, tightening the blow-out preventers to the point of providing a slide fit for the exterior surface of the production conductor pipe while maintaining the upper and lower drain vent control valves open and under suction to drain off any leakage of fluid past the upper blow-out preventers, opening the stop valve and driving the production conductor pipe upwardly through the drilled opening into the oil bearing sand strata to a desired point.
27. The method according to claim 26 wherein the upper end of the relatively small diameter gravity-type oil drain well production conductor pipe is closed during the emplacement thereof and means are provided for selectively opening the upper end of the production conductor pipe after it is secured in place to a desired depth into the oil sand strata in order to place the well into production.
28. The method according to claim 27 wherein the space between the exterior of the conductor pipe and the sides of drilled oil well hole for accommodating the pipe is vented to facilitate emplacement and subsequent cementing into place of the conductor pipe.
29. The method according to claim 28 wherein the venting of the space between the drilled hole and the conductor pipe is accomplished by a small diameter flexible fluid impervious venting tube extending up through the interior of the pipe and having the upper tip end extending through a small port in the upper end of the conductor pipe and a venting tube control valve secured in the venting tube at a lower accessible end of the vent tube with the vent tube being discharged to an exhaust conduit to the surface.
30. The method according to claim 29 wherein the production conductor pipe is permanently cemented into place by tightening down the upper and lower blow-out preventers to the greatest possible extent to prevent movement of the conductor pipe during cementing, and forcing cement under pressure from a cement pump connected through the upper drain vent control valve and its interconnected first branch pipeline with the stop valve in its fully open condition to completely fill the space of the drilled oil well hole surrounding the conductor pipe with cement while venting said space from the top.
31. The method according to claim 30 wherein the closed upper end of the production conductor pipe has a small charge of explosive attached thereto for blowing open the end of the conductor pipe to place it into production and a small remotely operated detonator is secured to the charge of explosive for selectively detonating the charge to blow open the top of the con-ductor pipe and place it into production.
32. The method according to claim 30 wherein the closed upper end of the production conductor pipe is closed by a screen having a closure element disposed in the conductor pipe below the screen for preventing flow of fluids through the pipe during its emplacement, a small charge of explosive attached to the closure element and a small remotely operated detonator secured to the charge of explosive for selectively detonating the charge and blowing open the closure element to place the well into production.
33. The method according to claim 30 wherein the closed upper end of the production conductor pipe has a perforating gun supported therein for perforating upper sides and closed upper end of the conductor pipe and remote operated means for selectively firing the perforating gun when it is desired to place the gravity drain-type oil well into production.
34. The method according to claims 30, 31 or 32 wherein at least a second parallel vertical shaft is driven through the upper competent rock zone, the oil bearing sand zone and into the lower competent rock zone in a similar manner and a horizontal tunnel joins the base of the two shafts to form an underground central work area whereby one of the vertical shafts can be used for ventilating air supply, utilities, working fluid supply and other services required by the mine and for working personnel access and egress to the work area and tunnels, and the remaining shaft can be used for ventilation exhaust, removal of tunnel and drill hole cuttings, produced gas and oil, removal of mine waste water and provides an escapeway for working personnel should it be required.
35. The method according to claims 11, 12 or 13 wherein suitable monitoring instruments in the form of flow rate sensors, temperature sensors, pressure sensors, viscosimeters and the like are mounted on an accessible end of the production conductor pipe at respective ones of the gravity-type drain oil wells to assist in monitoring and controlling production of the well.
36. The method according to claims 6, 11 or 12 wherein suitable fittings are secured to an accessible end of the production conductor pipe at respective ones of the gravity-type drain oil wells to allow for back pressuring the respective wells with compressed gas, steam, water and secondary treatment agents to improve production from the wells.
37. The method according to claims 6, 11 or 12 wherein radio wave propagating means are mounted in the oil sand strata being drained for producing and propagating electyromagnetic waves in either the radio frequency or microwave range through the oil sands to increase the temperature of the oil-bearing zone thus lowering the oil viscosity, and increasing the gas pressure in the reservoir to facilitate drainage of oil through the wells.
35. The method according to claim 6, 11 or 12 wherein radio wave propagating means are mounted in the oil sand strata being drained for producing and propagating electromagnetic waves in either the radio frequency or microwave range through oil sands to facilitate drainage of oil through the wells, and wherein suitable monitoring instruments in the form of flow rate sensors, temperature sensors, pressure sensors, viscosimeters and the like are mounted on an accessible end of the production conductor pipe at respective ones of the gravity-type drain oil wells to assist in monitoring and controlling production of the well, and wherein suitable fittings are secured to an accessible end of the production conductor pipe at respective ones of the gravity-type drain oil wells to allow for back pressuring the respective wells with compressed gas, steam, water and secondary treatment agents to improve production from the wells.
39. The method according to claims 27, 31 or 3 wherein suitable monitoring instruments in the form of flow rate sensors, temperature sensors, pressure sensors, viscosimeters and the like are mounted on an accessible end of the production conductor pipe at respective one of the gravity-type drain oil wells to assist in monitoring and controlling production of the well.
40. The method according to claims 27, 31 or 32 wherein suitable fittings are secured to an accessible end of the production conductor pipe at respective ones of the gravity-type drain oil wells to allow for back pressuring the respective wells with compressed gas, steam, water and secondary treatment agents to improve production from the wells.
CA000453063A 1984-04-27 1984-04-27 Oil recovery mining method and apparatus Expired CA1220795A (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CA000453063A CA1220795A (en) 1984-04-27 1984-04-27 Oil recovery mining method and apparatus
CA000513658A CA1220797A (en) 1984-04-27 1986-07-11 Oil recovery mining method and apparatus
CA000513657A CA1220796A (en) 1984-04-27 1986-07-11 Oil recovery mining method and apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CA000453063A CA1220795A (en) 1984-04-27 1984-04-27 Oil recovery mining method and apparatus

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CA000513657A Division CA1220796A (en) 1984-04-27 1986-07-11 Oil recovery mining method and apparatus

Publications (1)

Publication Number Publication Date
CA1220795A true CA1220795A (en) 1987-04-21

Family

ID=4127741

Family Applications (3)

Application Number Title Priority Date Filing Date
CA000453063A Expired CA1220795A (en) 1984-04-27 1984-04-27 Oil recovery mining method and apparatus
CA000513657A Expired CA1220796A (en) 1984-04-27 1986-07-11 Oil recovery mining method and apparatus
CA000513658A Expired CA1220797A (en) 1984-04-27 1986-07-11 Oil recovery mining method and apparatus

Family Applications After (2)

Application Number Title Priority Date Filing Date
CA000513657A Expired CA1220796A (en) 1984-04-27 1986-07-11 Oil recovery mining method and apparatus
CA000513658A Expired CA1220797A (en) 1984-04-27 1986-07-11 Oil recovery mining method and apparatus

Country Status (1)

Country Link
CA (3) CA1220795A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112240184A (en) * 2020-10-30 2021-01-19 中国石油天然气股份有限公司 Method and system for improving recovery ratio by three-dimensional displacement of low-permeability tight oil reservoir
CN118008198A (en) * 2024-04-09 2024-05-10 山东省鲁南地质工程勘察院(山东省地质矿产勘查开发局第二地质大队) Water stopping device for geological water pumping test

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114920308B (en) * 2022-04-18 2023-02-07 长沙矿山研究院有限责任公司 Underground mine wastewater zero discharge process

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112240184A (en) * 2020-10-30 2021-01-19 中国石油天然气股份有限公司 Method and system for improving recovery ratio by three-dimensional displacement of low-permeability tight oil reservoir
CN112240184B (en) * 2020-10-30 2022-06-03 中国石油天然气股份有限公司 Method and system for improving recovery ratio by three-dimensional displacement of low-permeability tight oil reservoir
CN118008198A (en) * 2024-04-09 2024-05-10 山东省鲁南地质工程勘察院(山东省地质矿产勘查开发局第二地质大队) Water stopping device for geological water pumping test

Also Published As

Publication number Publication date
CA1220797A (en) 1987-04-21
CA1220796A (en) 1987-04-21

Similar Documents

Publication Publication Date Title
US4458945A (en) Oil recovery mining method and apparatus
Diamond Methane Control for Underground Coal Mines: Chapter 11
CN106089296B (en) A kind of prevention and treatment method of roof absciss layer water
US9273553B2 (en) Mining method for gassy and low permeability coal seams
CN112228142B (en) Slow-dip coal seam roadway design and adjacent layer and goaf gas extraction method
CN108412453A (en) A kind of coal mining water controls system and construction method altogether with gas
Elder et al. Degasification of the Mary Lee Coalbed Near Oak Grove, Jefferson County, Ala: By Vertical Borehole in Advance of Mining
US10280726B2 (en) Solution mining using subterranean drilling techniques
US2783986A (en) Method of extracting sulfur from underground deposits
US1812305A (en) Recovery of oil from the earth by mining operations
CA1220795A (en) Oil recovery mining method and apparatus
US1811561A (en) Method and means for working oil sands
US4272128A (en) Method of creating a safe environment in salt mining
Dobson et al. Mining Technology Assists Oil Recovery from Wyoming Field
Finfinger et al. Review of horizontal drilling technology for methane drainage from US coalbeds
CN113756857B (en) Fire prevention and extinguishment extraction method for efficiently extracting coal bed gas in multi-layer old goaf on ground
US4269449A (en) Method for preparing an oil shale deposit for in situ retorting
Black et al. Actions to improve coal seam gas drainage performance
Singh et al. Design considerations for mine workings under accumulations of water
US4153297A (en) Ground water control for an in situ oil shale retort
CN108561175A (en) The method that the associated digging laneway of coal rock tunnel carries out drawing-off gas using throughbore
Ngah et al. Groundwater problems in Surface mining in the united kingdom
CN114233368B (en) Method for treating harmful gas leakage in overlying goaf
Campoli et al. Control of Longwall Gob Gas With Cross-Measure Boreholes (Upper Kittanning Coalbed)
CA1232196A (en) Method for recovering mineral values from a subterranean formation through wellbores penetrating the formation from tunnels

Legal Events

Date Code Title Description
MKEX Expiry