US1811561A - Method and means for working oil sands - Google Patents

Method and means for working oil sands Download PDF

Info

Publication number
US1811561A
US1811561A US160793A US16079327A US1811561A US 1811561 A US1811561 A US 1811561A US 160793 A US160793 A US 160793A US 16079327 A US16079327 A US 16079327A US 1811561 A US1811561 A US 1811561A
Authority
US
United States
Prior art keywords
oil
gas
sand
mine
pipes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US160793A
Inventor
Ranney Leo
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Standard Oil Development Co
Original Assignee
Standard Oil Development Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Standard Oil Development Co filed Critical Standard Oil Development Co
Priority to US160793A priority Critical patent/US1811561A/en
Application granted granted Critical
Publication of US1811561A publication Critical patent/US1811561A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/24Methods of underground mining; Layouts therefor for oil-bearing deposits

Definitions

  • This invention relates toimprovements in the recovery of oil from the earth by mining methods of the general type described and claimed and 1,634,236 granted June 28, 1927.
  • a gas adapted to facilitate flow of oil is forced into the oil sand in a manner to be described
  • the mining method involves the sinkmg of a shaft to a point adjacent an oil sand; the dr1v1ng ofv galleries from the shaft above or below the sand and. adjacent to it, but
  • FIG. 3 is a diagrammatic vertical 'section' showing the lines of flow of gas and oil;
  • F1g. 4 is a diagrammatic plan view showene method of operating an oil field
  • g. 5 1s a view'similar'to Fig. 3, but showg a modified method of introducing a gas -intothe s and.
  • reference nu-v meral 1 denotes aizidftight seal between the cap rock 2 and nipples 5.
  • the drilled openings 8, formmg extenslons of holes 6, tap the oil. sand and .form what I term mine'wells, Openings 8 epreferably enlarged at their ends by reaming or'blasting to Aform iiuidcolle'etf ing or distributory areas 9, as vsubsequently described.
  • a gate valve 10 is fitted at the end of a nipple 5 and is connected with a cross-fitting 11.
  • the lower arm of the cross is closed by a removable cap 11.
  • the -pipe 15 is connected to an oil-collecting conduit 17 resting 'on the bottom of the trough.
  • This conduit leadsto a separator (not shown) in whichoil may be separated from gas and water, if necessary, before'the oill is pumped to the earths surface.
  • pipe 14 is connected with a gas-conveying pipe 18.
  • 'Pipes 14 and 15 have .valves 19 and 20, respectively, so that eiljther or both' of these pipes may be shut oi.
  • a. Tlftting 21 is used instead of the. crossvfitting 11.
  • the lower arm of the T-iitting' has a removable cap 21.
  • An elbow 22 leads fromVV the T-iitting vandis connected with a pipe 23 which discharges into the oilcollect ing conduit 17.
  • This type of. equipment may be used exclusively for the withdrawal of oil, a'. separate fitting 5 being connected f to thegas line 18 onlyY (Fig.'3).
  • -It is generally desirable to form a mine gallery entirely around the area to be worked, for 'example a 40 acre "track, d1agrammat1cally shown in Fig. 4.
  • 24 denote'sla shaft sunk from the earths surface to a pointnear the oil sand, and the galleries l are extended from the shaft around the tract.
  • One 'ormore surfacewells 25 may be .drilled Within the tract for the purpose of in-l troducing an expulsive-agentto drive the Ordlnarily,
  • Figs. 1 to 4. The operation of the improved method is as follows, reference being made first to Figs. 1 to 4.
  • the nipples 5 are sealed in place at frequent intervals throughout the gallery.
  • 132 mine wells on each side at distances of about 10 feet apart. A smaller number may of course be used, but the recovery of oil will not then be so complete.
  • a ate valve 10 and a cross-fitting 11 or T-ttln 21 are attached to each.
  • the cap 11 (or 21 is removed.
  • a drill is inserted throu h the fitting and the open gate valve into t e niplple. Drilling proceeds until an as been made for a substantial distance into the oil sand. The drill is then withdrawn to-a point just below the gate valve, and this is closed.
  • the drill may now be removed without permitting fluids to escape into the gallery. After the drill is taken out, thev cap 11 (or 21') on the lower arm of the fitting is replaced. Drilling in this way is safe even when considerable pressure prevails in the sand.
  • the How of oil is expedited by forcing into the oil sand a. scrubbing as, that is, one which has the effect of reducing the forces of surface tension which hold the oil in the sand.
  • the scrubbing gas preferably has the i property of decreasing the specific gravity .and the viscosity of the oil.
  • the first step in the use of the scrubbingv gas is the formation of an unexcavated drainage tunnel in the oil sand.
  • a tunnel isan area of facilitated oil How, generally paralleling the mine galleries.
  • the oil sand adjacent them is caused to yield its oil to the mine wells.
  • the extent of the unexcavated drainage tunnels is thus progressively increased.
  • the scrubbing gas As the agency for forming the unexcavated 4drainage tunnel.
  • the scrubbing gas (which may be assumed to be natural gas saturated with gasoline vapors) is introduced through the nipples 5 at intervals; for example, every fourth or fifth nipple' may be used for this purpose, the others serving to collect the oil.
  • the scrubbing gas passesthrough pipe 18, branch pipe 14 (valve 19 being open and valve 20 closed), through the open gate valve 10, and thence into theoil sand through the nipple 5 and hole 8.
  • the scrlgbing )gas may be supplied through pipes 5 ig. 3
  • the gas should be forced in under a pressure of about 10 to 100 lbs. or more per square inch, depending lon the difliculty ofdriving the gas through the particular sand being worked.
  • the gas spreads out from the openings 8 into the sand and forms a continuous area saturated with gas. Throughout this area the oil is charged with gas and gasoline hydrocarbons and flows rapidly by gravity into the adjacent mine wells.
  • the scrubbing gas iills the pores in the unexcavated drainage tunnel formed as just'described. As gas is continuously forced into the sand, the area saturated with gas extends.
  • the line of advancing pressure is shown diagrammatically in Figs. 1 and 2.
  • the oil coming under the iniuence yof the advancing gas is caused to flow, and travels toward the mine wells along the line of the heavy arrows.
  • Theoil contains dissolved gas which may be recovered at the separator mentioned above.v Escape of gas as such may be substantially prevented by opening gate valves 10 only enough to permit passage of the streams of liquid oil.
  • valves 19 in pipes 14 may be closed, and the valves. 2O in pipes 15 opened. The latter pipes may then be used in the same way as the pipes 23 for the recovery of oil. Injection of gas through pipes 14 will be resumed when tending nearly upto the4 upper cap rock, as
  • agate valve near the exposed end of certain of said pipes, an elbow connected to each said pipe below the gate valve, an oil-collecting pipe, and a connection between said elbow and said oil-collecting pipe.
  • said gate valve being arranged to permit the introduction and withdrawal of a drill without allowing fluids to escape. into the gallery fromthe sand.
  • the improvement which comprises passing an agent facilitating oil flow in a stream adjacent the oil-bearing stratum but out of contact therewith, tapping ofpportions of the agent from the stream at frequent intervals and passing such portions into the stratum toform areas of facilitated ow therein generally paralleling the iiow of the stream, and collecting oil from points-near the bottom of the stratum and arranged in'- terlnediate the into the stratum.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Remote Sensing (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Earth Drilling (AREA)

Description

yJune 23, 1931. RANNEY METHOD AND MEANS FOR WORKING OIL SANDS Filed Jan. 13, 1927 4 sheets-sheet 1 H fx w.
@jmmr XNNQSNO k O RNW U/// //y/ ECON @No WQSOQ .1 mw
June 23, 1931. L. RANNEY v Y 1,811,561
METHOD AND MEANS FOR WORKING'OIL SANDS 'Filed Jan. 1s, 192? 4 sheets-sheet ,2
OQ'BBBO@ 00000001300000009000 SHAFT/ f FIG', -4
d0/DOOOO\OOOOOOOGOOOOO Oooooooooooooooc0060000000000 Lao Rumpf Snowdon v\\ NSMM v3 n L, RANNEY Y METHOD AND MEANS FOR WORKING OIL ySANDS Filed Jan. 15, 1927 4 Sheets-Sheet 3 `.ruim 23, 1931.
June 23, 1931. L. RANNEY METHOD AND MEANS FOR WORKINGA OIL SANDS Filed Jan. 13, 1927 4sheets-sheet 4` CQ vwmtoc Armen' A V LeoR 33u, hw 61u Patented 1931 u1u-T111) Ysx1."111sj LEo BLANNEY, or NEW roux, N. Y., AssIeNon'To STANDARD on. nrsvrznoPimm* oon- PATENT OFFICE PANY, .A CORPORATION F mamon Ann'mns ron woaxme oI'L sms Application filed January 13, 192'?. Serial No. 160,793. i
This invention relates toimprovements in the recovery of oil from the earth by mining methods of the general type described and claimed and 1,634,236 granted June 28, 1927.
accordance with the present invention, a gas adapted to facilitate flow of oil is forced into the oil sand in a manner to be described,
v and means are provided for the effective use of such gas and the collection of oil...
As described in the patents above ment1oned,the mining method involves the sinkmg of a shaft to a point adjacent an oil sand; the dr1v1ng ofv galleries from the shaft above or below the sand and. adjacent to it, but
spaced therefrom; the drilling of mine Wells into the sand, and the collection of oil flow- Vingrfrom the mine wells.
he present invention will lbe .fully understood from the following description read 1n connectlon with the accompanying drawings, in which y Fig. 1 is a vertical section through a mine gallryfor the collection of oil;
21s a transverse section on the line Fig. 3 is a diagrammatic vertical 'section' showing the lines of flow of gas and oil;
F1g. 4 is a diagrammatic plan view showene method of operating an oil field, and
g. 5 1s a view'similar'to Fig. 3, but showg a modified method of introducing a gas -intothe s and. Referring to the drawings, reference nu-v meral 1 denotes a luidftight seal between the cap rock 2 and nipples 5. The drilled openings 8, formmg extenslons of holes 6, tap the oil. sand and .form what I term mine'wells, Openings 8 epreferably enlarged at their ends by reaming or'blasting to Aform iiuidcolle'etf ing or distributory areas 9, as vsubsequently described. A
Referring' to the mine well installation shown at the-left of Fig. 1, .a gate valve 10 is fitted at the end of a nipple 5 and is connected witha cross-fitting 11. The lower arm of the cross is closed by a removable cap 11. The
' horizontal arms of the cross are connected to elbows 12 and 13, and these in turn lead into pipes v14 and l5 extending downwardly into' ,a trough 1 6 cut into the floor of the gallery.
The -pipe 15 is connected to an oil-collecting conduit 17 resting 'on the bottom of the trough. This conduit leadsto a separator (not shown) in whichoil may be separated from gas and water, if necessary, before'the oill is pumped to the earths surface. The
pipe 14 is connected with a gas-conveying pipe 18. ' Pipes 14 and 15 have . valves 19 and 20, respectively, so that eiljther or both' of these pipes may be shut oi.
YReferring to the construction shown at the right hand side of Fig. 1, the sealed nipple 5 and gate valve 1() are as above described, but
a. Tlftting 21 is used instead of the. crossvfitting 11. The lower arm of the T-iitting' has a removable cap 21. An elbow 22 leads fromVV the T-iitting vandis connected with a pipe 23 which discharges into the oilcollect ing conduit 17. This type of. equipment may be used exclusively for the withdrawal of oil, a'. separate fitting 5 being connected f to thegas line 18 onlyY (Fig.'3).
-It is generally desirable to form a mine gallery entirely around the area to be worked, for 'example a 40 acre "track, d1agrammat1cally shown in Fig. 4. In this figure, 24 denote'sla shaft sunk from the earths surface to a pointnear the oil sand, and the galleries l are extended from the shaft around the tract.' One 'ormore surfacewells 25 may be .drilled Within the tract for the purpose of in-l troducing an expulsive-agentto drive the Ordlnarily,
oil toward the mine wells. however, excellent recoveries-of ollv'can be obtained without the use of:surface wells.
- n Fig. 4 the series of mine wells is denoted by numeral26.
I Instead ofl introducingl the gas through the nipples 5, it may in some cases be desiropening 8 able to put it in at the top of the sand. For this purpose one or morepipes 27 preferably sealed in the sand and extending nearly tothe upper caprock 4 may be provided (Fig. 5)
The operation of the improved method is as follows, reference being made first to Figs. 1 to 4. The nipples 5 are sealed in place at frequent intervals throughout the gallery. When operating` around a square acre tract it is usually desirable to have 132 mine wells on each side, at distances of about 10 feet apart. A smaller number may of course be used, but the recovery of oil will not then be so complete.
After the nipples have been set in the cap rock, a ate valve 10 and a cross-fitting 11 or T-ttln 21 are attached to each. The cap 11 (or 21 is removed. A drill is inserted throu h the fitting and the open gate valve into t e niplple. Drilling proceeds until an as been made for a substantial distance into the oil sand. The drill is then withdrawn to-a point just below the gate valve, and this is closed.
The drill may now be removed without permitting fluids to escape into the gallery. After the drill is taken out, thev cap 11 (or 21') on the lower arm of the fitting is replaced. Drilling in this way is safe even when considerable pressure prevails in the sand.
In accordance with this invention, the How of oil is expedited by forcing into the oil sand a. scrubbing as, that is, one which has the effect of reducing the forces of surface tension which hold the oil in the sand. Inv addition, the scrubbing gas preferably has the i property of decreasing the specific gravity .and the viscosity of the oil. For this purpose I prefer to use natural gas saturated with gasoline vapors, but other gases having similar properties may be used. Air is not so desir-- able, either alone or as a carrier for gasoline vapors, since it increases the viscosity of the I oil. Casingheadgasoline plantvaporsmay be used alone, when they cany be obtained economically.
The first step in the use of the scrubbingv gas is the formation of an unexcavated drainage tunnel in the oil sand. As explained in Patent No. 1,634,236, above re` ferred to, such a tunnel isan area of facilitated oil How, generally paralleling the mine galleries. By means of heat, pressure, suction, or other expulsive agency, applied from the galleries, the oil sand adjacent them is caused to yield its oil to the mine wells. Into vthe evacuated areas in the oil sand more oil flows, and the extent of the unexcavated drainage tunnels is thus progressively increased. Y.
In the present case I prefer to use the scrubbing gas as the agency for forming the unexcavated 4drainage tunnel. To this end the scrubbing gas (which may be assumed to be natural gas saturated with gasoline vapors) is introduced through the nipples 5 at intervals; for example, every fourth or fifth nipple' may be used for this purpose, the others serving to collect the oil. It will be noted (Fig. 1) that the scrubbing gaspassesthrough pipe 18, branch pipe 14 (valve 19 being open and valve 20 closed), through the open gate valve 10, and thence into theoil sand through the nipple 5 and hole 8. Alternatively, the scrlgbing )gas may be supplied through pipes 5 ig. 3
The gas should be forced in under a pressure of about 10 to 100 lbs. or more per square inch, depending lon the difliculty ofdriving the gas through the particular sand being worked. The gas spreads out from the openings 8 into the sand and forms a continuous area saturated with gas. Throughout this area the oil is charged with gas and gasoline hydrocarbons and flows rapidly by gravity into the adjacent mine wells. The scrubbing gas iills the pores in the unexcavated drainage tunnel formed as just'described. As gas is continuously forced into the sand, the area saturated with gas extends. The line of advancing pressure is shown diagrammatically in Figs. 1 and 2. The oil coming under the iniuence yof the advancing gas is caused to flow, and travels toward the mine wells along the line of the heavy arrows. Theoil contains dissolved gas which may be recovered at the separator mentioned above.v Escape of gas as such may be substantially prevented by opening gate valves 10 only enough to permit passage of the streams of liquid oil.
When working along an extended line of attack from mine alleries, itis possible to maintain the scrubbing as in mostelicient condition for a considera le distance into the sand. The relatively slow pressure drop permits this. If it were attempted to inject the scrubbing gas from a surface well, the radial movement of the gas from this single point of attack would soon cause a great decrease in pressure. The capacity of the gas to hold gasoline vapors would be correspondingly diminished and the effectiveness of the gas would be destroyed for the most part.
If a satisfactory flow is established, the
valves 19 in pipes 14 may be closed, and the valves. 2O in pipes 15 opened. The latter pipes may then be used in the same way as the pipes 23 for the recovery of oil. Injection of gas through pipes 14 will be resumed when tending nearly upto the4 upper cap rock, as
shown in Fig. 5. l y
The success of the methods described depends in part u on the absence pf fissures ory reaksin the oil sand and cap rocks, which might vent the scrubbing gas. VAny such 'places should be sealed, if possible. The -usual sand is suiciently gas tight to respond satisfactorily to my method.
It is usually more advantageous t@ work from beneath the sand than from above.
However, the principles of tliepresent ini l vention are equally applicable to working from a gallery above the sand.
Various changes may be made inthe preferred embodiments described within the (scope of the appended claims, vin which it is my intention to claim all novelty inherent in the invention as broadly as the prior art permits.
I claim:
1.- In an installation for recovering oil from the earth by means of a mine gallery adjacent an oil sand,'but spaced therefrom the improvement which comprises a series of A pipes in the gallery and tapping the oil sand,
agate valve near the exposed end of certain of said pipes, an elbow connected to each said pipe below the gate valve, an oil-collecting pipe, and a connection between said elbow and said oil-collecting pipe. 2. In an installation for recovering oil i from the earth by means of a mine gallery adjacent an oil sand, but spaced therefrom, the improvement which-com rises av series of pipes in the gallery and tapplng the oil sand, across-fitting on the exposed end of certain of said pipes, two conduits connected to said'` crosstting, a pipe for supplying a scrubbing gas to one of saidconduits, and a separate' pipe for conveying oil from the other of said conduits. l
3. Apparatus according to claim 2 1n which valves -are provided in the conduits permitting either or both to be shut off.
4. Apparatus according.. to claim 2, in
i which a gate valve is provided between the cross-fitting and the pipe tapping the sand,
said gate valve being arranged to permit the introduction and withdrawal of a drill without allowing fluids to escape. into the gallery fromthe sand.
5; In the recovery of oil from an oil-bearing stratum, the improvement which comprises passing an agent facilitating oil flow in a stream adjacent the oil-bearing stratum but out of contact therewith, tapping ofpportions of the agent from the stream at frequent intervals and passing such portions into the stratum toform areas of facilitated ow therein generally paralleling the iiow of the stream, and collecting oil from points-near the bottom of the stratum and arranged in'- terlnediate the into the stratum.
In testimony that I claim the foregoing as my invention, I aix my signature. 'y
- LEO RANNEY.
points vat which gas is passed
US160793A 1927-01-13 1927-01-13 Method and means for working oil sands Expired - Lifetime US1811561A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US160793A US1811561A (en) 1927-01-13 1927-01-13 Method and means for working oil sands

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US160793A US1811561A (en) 1927-01-13 1927-01-13 Method and means for working oil sands

Publications (1)

Publication Number Publication Date
US1811561A true US1811561A (en) 1931-06-23

Family

ID=22578476

Family Applications (1)

Application Number Title Priority Date Filing Date
US160793A Expired - Lifetime US1811561A (en) 1927-01-13 1927-01-13 Method and means for working oil sands

Country Status (1)

Country Link
US (1) US1811561A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2725106A (en) * 1951-12-20 1955-11-29 Spearow Ralph Oil production
US4165903A (en) * 1978-02-06 1979-08-28 Cobbs James H Mine enhanced hydrocarbon recovery technique
US4265485A (en) * 1979-01-14 1981-05-05 Boxerman Arkady A Thermal-mine oil production method
US4607888A (en) * 1983-12-19 1986-08-26 New Tech Oil, Inc. Method of recovering hydrocarbon using mining assisted methods
US20060290197A1 (en) * 2005-06-10 2006-12-28 See Jackie R Oil extraction system and method
US20080164020A1 (en) * 2007-01-04 2008-07-10 Rock Well Petroleum, Inc. Method of collecting crude oil and crude oil collection header apparatus
US20080169104A1 (en) * 2007-01-11 2008-07-17 Rock Well Petroleum, Inc. Method of collecting crude oil and crude oil collection header apparatus
US20080314640A1 (en) * 2007-06-20 2008-12-25 Greg Vandersnick Hydrocarbon recovery drill string apparatus, subterranean hydrocarbon recovery drilling methods, and subterranean hydrocarbon recovery methods
US20090183872A1 (en) * 2008-01-23 2009-07-23 Trent Robert H Methods Of Recovering Hydrocarbons From Oil Shale And Sub-Surface Oil Shale Recovery Arrangements For Recovering Hydrocarbons From Oil Shale
US9408542B1 (en) 2010-07-22 2016-08-09 Masimo Corporation Non-invasive blood pressure measurement system

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2725106A (en) * 1951-12-20 1955-11-29 Spearow Ralph Oil production
US4165903A (en) * 1978-02-06 1979-08-28 Cobbs James H Mine enhanced hydrocarbon recovery technique
US4265485A (en) * 1979-01-14 1981-05-05 Boxerman Arkady A Thermal-mine oil production method
US4607888A (en) * 1983-12-19 1986-08-26 New Tech Oil, Inc. Method of recovering hydrocarbon using mining assisted methods
US20060290197A1 (en) * 2005-06-10 2006-12-28 See Jackie R Oil extraction system and method
US20080164020A1 (en) * 2007-01-04 2008-07-10 Rock Well Petroleum, Inc. Method of collecting crude oil and crude oil collection header apparatus
US7568527B2 (en) 2007-01-04 2009-08-04 Rock Well Petroleum, Inc. Method of collecting crude oil and crude oil collection header apparatus
US7543649B2 (en) 2007-01-11 2009-06-09 Rock Well Petroleum Inc. Method of collecting crude oil and crude oil collection header apparatus
US20080169104A1 (en) * 2007-01-11 2008-07-17 Rock Well Petroleum, Inc. Method of collecting crude oil and crude oil collection header apparatus
US20080314640A1 (en) * 2007-06-20 2008-12-25 Greg Vandersnick Hydrocarbon recovery drill string apparatus, subterranean hydrocarbon recovery drilling methods, and subterranean hydrocarbon recovery methods
US7823662B2 (en) 2007-06-20 2010-11-02 New Era Petroleum, Llc. Hydrocarbon recovery drill string apparatus, subterranean hydrocarbon recovery drilling methods, and subterranean hydrocarbon recovery methods
US20110011574A1 (en) * 2007-06-20 2011-01-20 New Era Petroleum LLC. Hydrocarbon Recovery Drill String Apparatus, Subterranean Hydrocarbon Recovery Drilling Methods, and Subterranean Hydrocarbon Recovery Methods
US8307918B2 (en) 2007-06-20 2012-11-13 New Era Petroleum, Llc Hydrocarbon recovery drill string apparatus, subterranean hydrocarbon recovery drilling methods, and subterranean hydrocarbon recovery methods
US8474551B2 (en) 2007-06-20 2013-07-02 Nep Ip, Llc Hydrocarbon recovery drill string apparatus, subterranean hydrocarbon recovery drilling methods, and subterranean hydrocarbon recovery methods
US8534382B2 (en) 2007-06-20 2013-09-17 Nep Ip, Llc Hydrocarbon recovery drill string apparatus, subterranean hydrocarbon recovery drilling methods, and subterranean hydrocarbon recovery methods
US20090183872A1 (en) * 2008-01-23 2009-07-23 Trent Robert H Methods Of Recovering Hydrocarbons From Oil Shale And Sub-Surface Oil Shale Recovery Arrangements For Recovering Hydrocarbons From Oil Shale
US7832483B2 (en) 2008-01-23 2010-11-16 New Era Petroleum, Llc. Methods of recovering hydrocarbons from oil shale and sub-surface oil shale recovery arrangements for recovering hydrocarbons from oil shale
US9408542B1 (en) 2010-07-22 2016-08-09 Masimo Corporation Non-invasive blood pressure measurement system

Similar Documents

Publication Publication Date Title
US4595239A (en) Oil recovery mining apparatus
US4533182A (en) Process for production of oil and gas through horizontal drainholes from underground workings
US7644769B2 (en) Method of collecting hydrocarbons using a barrier tunnel
US1634236A (en) Method of and apparatus for recovering oil
US4029360A (en) Method of recovering oil and water from in situ oil shale retort flue gas
US3057404A (en) Method and system for producing oil tenaciously held in porous formations
US4165903A (en) Mine enhanced hydrocarbon recovery technique
US1722679A (en) Pressure method of working oil sands
US1811561A (en) Method and means for working oil sands
CN108952796A (en) Comb-shaped bottom plate through-layer drilling fracturing permeability-increasing-based modular extraction method
Thakur Coal seam degasification
US1660187A (en) Method of winning petroleum
US1634235A (en) Method of and apparatus for recovering oil
US1826371A (en) Method of treating oil fields
US1867758A (en) Process of degasifying coal and other carbonaceous material in situ
CN112228142A (en) Slow-dip coal seam roadway design and adjacent layer and goaf gas extraction method
US4140343A (en) Gas withdrawal from an in situ oil shale retort
US1812305A (en) Recovery of oil from the earth by mining operations
US2783986A (en) Method of extracting sulfur from underground deposits
US1842098A (en) Process for obtaining hydrocarbons from producing sands
US1851446A (en) Oil recharging and recovery method and apparatus
US3915498A (en) Oil shale retort flue gas cooling and cleaning
CN107143374A (en) The gas production method and system of belt pressing type drilling malleation mining
Finfinger et al. Review of horizontal drilling technology for methane drainage from US coalbeds
US6164727A (en) Method of mining a soluble mineral