CA1044488A - Process for heating and sintering ferrous powder metal compacts - Google Patents

Process for heating and sintering ferrous powder metal compacts

Info

Publication number
CA1044488A
CA1044488A CA209,849A CA209849A CA1044488A CA 1044488 A CA1044488 A CA 1044488A CA 209849 A CA209849 A CA 209849A CA 1044488 A CA1044488 A CA 1044488A
Authority
CA
Canada
Prior art keywords
compact
magnetic field
radio frequency
khz
heating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
CA209,849A
Other languages
French (fr)
Inventor
Robert L. Conta
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gleason Works
Original Assignee
Gleason Works
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US406774A external-priority patent/US3894892A/en
Application filed by Gleason Works filed Critical Gleason Works
Application granted granted Critical
Publication of CA1044488A publication Critical patent/CA1044488A/en
Expired legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B30PRESSES
    • B30BPRESSES IN GENERAL
    • B30B15/00Details of, or accessories for, presses; Auxiliary measures in connection with pressing
    • B30B15/34Heating or cooling presses or parts thereof
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22FWORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
    • B22F3/00Manufacture of workpieces or articles from metallic powder characterised by the manner of compacting or sintering; Apparatus specially adapted therefor ; Presses and furnaces
    • B22F3/10Sintering only
    • B22F3/105Sintering only by using electric current other than for infrared radiant energy, laser radiation or plasma ; by ultrasonic bonding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22FWORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
    • B22F5/00Manufacture of workpieces or articles from metallic powder characterised by the special shape of the product
    • B22F5/08Manufacture of workpieces or articles from metallic powder characterised by the special shape of the product of toothed articles, e.g. gear wheels; of cam discs

Abstract

PROCESS FOR HEATING AND SINTERING
FERROUS POWDER METAL COMPACTS

Abstract of the Disclosure A relatively high frequency (in the radio frequency range) magnetic field is used for reducing electrical resistivity of ferrous powder metal compacts prior to subjecting the compacts to a relatively lower frequency magnetic field which rapidly raises the temperature level of the material of each compact to a sintering temperature.

Description

1 Background of Invention The present invention particularly relates to processes for heat treating and sintering powder metal compacts to prepare the compacts for final forming operations which increase the density and establish final shapes of the compacts as finished parts, but the discoveries of this invention may be applied to processes which :: sinter powder metal parts as a final step in a technique which does not require final forming or forging of the parts. The invention is specifically concerned with improvements in heating and sintering of compacts formed from ferrous metal powders for use in the production of high strength finished parts such as bevel and spur gears, and the like.
Various processes are known for compacting loose powder material into a coherent form which can be more easily handled during required treatments of heating ; and sintering prior to final forming or forging operations~ -Typically, a precisely measured quantity of the metal powder is compacted with isostatic equipment, F with , .: ' - , .
: ' ...
- 2 -B
, 1~4 ~488 mechanical die means, into an initial shape having characteristics of increased density and coherency.
This "green~ compact form is then subjected to heating and forming treatments required for driving off lubricants or binders, deoxidizing the material of the compact, coalescing particles of the compact, and increasing density and shape of the compact into a finished part.
It is also known to raise the temperature of powder metal compacts to a level at which individual particles of the compact coalesce into a homogeneous mass without actual melting of the particles (also described as diffusion bonding). This treatment is commonly carried out at about 1120C with known sintering equipment, however, it has been recently discovered that somewhat higher temperatures can be used for effecting coalescence of particles of a powder compact and for simultaneously deoxidizing the compact. In the context of this specification - 20 and its claims, references to sintering or sintering temperatures are intended to define deoxidation of a compact as well as the formation of a homogeneous -mass from a metal powder.
Various processes and means have been attempted ~ -for carrying out efficient sintering of powder metal compacts so that the compacts will be in a desired metallurgical condition or in a condition to be formed in a die to increase their densities to nearly ~- -100~ of theoretical density and to establish a final ~hape of a finished part. Known processes for
-3-heating and sintering compacts have been ~omewhat inefficient or uneconomical because of excessiqe heating times or energies required to carry out the necessary conditioning of a compact for final S forming or other use. For example, it is known to sinter a compact with radiant heating means to a level of about 1120C for a relatively long period of time of about 20 minutes in order to fully deoxidize and sinter the powder metal material of the compact.
It is also known to preheat all of the material of a compact at a temperature below the subsequent sintering temperature so as to initially burn off lubricants which may be contained within the material of the compact as-a result of a particular compacting process requiring such lubricants. It has been suggested that such a burning-off step should precede higher temperature sintering of a compact irrespective of whether sintering is carried out with a radiant furnace or with induction heating means. Very recently, it has been suggested that surface lubricants be ! burned off in a radio frequency magnetic field prior to sintering in a lower frequency field, and it has - -- been proposed ~see British Patent Specification 1,299,064, published December 6, 1972) to use a radio frequency field to carry out the complete sintering of a powder metal part. Magnetic fields in the radio frequency range have also been used to harden or treat surfaces of fully dense objects.
Induction heating has been considered as an ~ntereating way or rai~ing the temperature of a 1~4~
ferrous metal powder compact because it permits a controlled addition of substantial energy into the body of the compact to thereby raise its temperature in a relatively short time. However, it has been discovered that when a commercially available, low frequency (3 kiloHertz, for example) induction field is utilized as a means for raising the temperature of a compact to a sintering temperature level, there is a characteristic "incubation" period at the onset of each heating cycle in which there appears to be a delayed temperature response to the induction field. This delay is significant, sometimes amounting to several minutes depending upon the size, density, and material of the compact, and this adds considerably ~-lS to the cost of energy required for an induction heating treatment. It is not known precisely why ; a powder compact exhibits an incubation period at s the beginning of an induction heating cycle, but ~-it is apparent that the compact exhibits high electrical . -:
resistivity, is very inefficient in absorbing power, and that initial heating is slow in an induction field. One attempt to overcome this problem has - required a presintering of the compact with resistance heating means, as described in U.S. patent 3,708,645.
The theory of this process appears to be one of raising the temperature of the material of the entire compact ~o a point where preliminary sintering takes place between powder particles of the compact so as to improve heat conduction from outside surfaces to inside sections of the compact. However, 1 resistance heating of a compact can be somewhat difficult to handle because of a need to directly contact each paxt - with electrodes of the resistance heating equipment.
Thus, there is a need for an improved process for conditioning the material of a powder metal compact so as to take advantage of presently available induction heating e~uipment in a sintering operation.
Brief Description and Summary of Invention United States Patent No. 3,779,747 describes an invention for improving treating processes for ferrous powder metal compacts so that such compacts can be economically and efficiently heat treated in a continuous - process which carries each treated compact to a final forming operation where its density is increased to approximately 100%
of theoretical value and its shape is established for a finished part. The invention described therein provides for an overall decrease in time and energy required for heat treating such compacts through a use of induction heating in an efficient and economical manner for at least a part of the .. ~
heat treatment of each compact. More specifically, United States Patent No. ~,779,747 emphasizes a preheating step which involved a low temperature preheating of only outside surfaces of a compact so as to produce an irreversible change in charac-, teristic for the compactj resulting in a substantially reduced ~ response time for the compact in an induction field.

~, .

, , .

: ~1 The preheating step was preferably carried out at about 205C but below the sintering temperature for the material of the compact.
The present specification will emphasize my further discovery that the incubation period (or - the time it takes for a compact to effectively couple with a magnetic field of an induction heating system) of a given compact in a relatively low frequency induction field can be substantially reduced or eliminated by a pretreating step which involves the placing of a powder metal compact in a magnetic field of a relatively high frequency (in radio frequency ranges of around 50 kHz or above) for a sufficient length of time to substantially reduce the electrical resistivity of the powder metal compact. It is - not known just what mechanical or chemical changes take place when the compact is pretreated in a high frequency induction field, but it can be observed that the pretreated compact has substantially less electrical resistivity and responds much more readily ~` to lower frequency induction heating than would be the case if the compact were not pretreated at all. Since the pretreating step can be carried - out in a very short period of time, on the order of one second or more depending upon the size of the compact, there is an overall reduction in the total power and time required to carry out induction ,r, heating o~ the compact to a sintering level.
Pretreating of a compact with certain radio frequency lnduction fields can produce relatively .

_7_ , . . . . . . . . .
.

i'3~
1 high temperatures in the outer surface of the material of the compact, thereby resulting in something similar to a highly localized presintering of the compact. From this it can be theorized that such presintering has an effect of substantially reducing electrical resistivity of the compact in those sections where the internal temperatures are high enough to result in improved particle-to-particle bonding of the powder. Such a theory, however, does not completely explain the improvement in response time for compacts which do not reach sintering temperatures in their outer surfaces and for those sections of the compact which are adjacent to the high temperature areas of reaction ~ to the radio frequency induction field. The adjacent sections ; appear to experience a low temperature (i.e., below sintering temperature) change of the type described in United States ` Patent No. 3,779,747, and this low temperature change could result from heat transfer from the outer surfaces to the , interior sections of the compact. Thus, the use of a high frequency induction field can result in a composite 20 change in a compact in which a relatively localized pene- -tration of eddy currents induced by the high frequency field will result in a significant improvement in induction response time for the compact.
In accordance with the present invention, a basic process will be emphasized in which there is a pretreating of powder metal compacts with a relatively high frequency (for example, radio frequency .'~` ' -' ,, . :
,, ' ~2 ' , ,. . , , ", , , ,, ~ , . ..
4~38 range) field for a sufficient period of time to substantially reduce the time it takes to subsequently raise the temperature of the compact to a sintering level in a lower frequency induction field. In its broadest form the invention comprises the steps of (a) rapidly adjusting resistivity of a "green"
powder metal compact with a sufficiently high frequency magnetic field to obtain a desired depth of current inducement in the compact for the particular electrical resistivity characteristics of the compact, followed by (b) a step of adjusting the frequency of a magnetic field downwardly to maintain a desired depth of -current inducement to efficiently raise the temperature of the powder metal compact to a sintering level.
In this sense, there could be a series of adjustments of frequency of the magnetic field, if desired and if equipment were available for offering such adjustments, however, the initial decrease in resistivity is so rapid there appears to be no real need for more than a single adjustment in frequency after the pretreating step.
Reduced to practical terms, and ~eeping in m~nd availability of commercial equipment for generating --h~gh and low frequency magnetic fields, the invention -can be practiced by pretreating the powder metal compact with a radio frequency magnetic field, followed by a heating of the compact to sintering level ~n a lon~ frequency ~1 to 10 kHz) induction f~eld.
Because of the relatively localized penetration _9_ .. . . . .

~Q~488 of radio frequency induction fields in untreated compacts, it is possible to utilize the principles of the present invention to selectively pretreat different portions of a single compact so as to produce different response characteristics of different parts of the compact in a low frequency induction field. Such a use of selective treatment may be useful in pretreating powder metal compacts having configurations which include major and minor diameter portions which are to be heated in an induction coil of a single common diameter ~that diameter being larger than the major diameter). By improving response time of one portion of the compact relative to another portion thereof, it is possible to balance out the overall response of such a compact in a relatively simple coil which does not have to be custom designed to the particular shape of the ` compact.
~hese and other features and advantages of the invention will become apparent in the detailed discussion which follows. In that discussion reference -~
will be made to the accompanying drawings as briefly ;- described below.
, '- ' Brief De~criPtions of Drawings Pigure 1 is a schematic illustration of a continuous process by which a compact of ferrous - powder metal i3 prepared and treated in accordance -with the present invention for use in a final forming operatlon;

,. . .
.

Figure 2 is a view of a typical powder metal compact configuration as it would be positioned in a coil for producing a radio frequency magnetic field;

; 5 Figure 3 is a sectional view taken across the middle of the compact shown in Figure 2 to illustrate sections which are treatad by a radio frequency induction field;

`; Figure 4 is an elevational view, in section, ` 10 of a compact shape which was used in an experiment : of the present invention;

F~gure 5 is an elevational view, in section, -~
. of another compact shape used in an experiment o~
the present invention; and . .
Figure 6 is a view of a compact configuration in which there are major and minor diameter portions - -which can be selectively treated in accordance with the present invention. ~ -, Detailed Desc ~ tion of Invention . -' The process depicted in Figure 1 i8 especially useful in producing high strength gear forms which .:
exhibit equal or superior characteristics to present day gears manufactured by a method of cutting and removing material from a blank. The gear forms ' '~ " ' ' ' ,: , " ' ' ' ,: , ' ~3~

which can be produced by the process of the present invention include various known bevel gears as well as spur gears and other types of gear designs and gear tooth forms.
Station I of Figure 1 comprises a place at which a ferrous metal powder is compacted to increase its density and to create a coherent preform or ~green" compact which can be easily handled in subsequent steps of heating and forming. The compacting technique does not form a separate part of the present invention and may consist of any known isostatic or mechanical method for increasinq metal powder density to about 70~ to 90% of its theoretical full density. Prior to compacting, the ferrous metal powder is selected or prepared to provide - for a controlled admixture of carbon for reacting with combined oxygen and for forming an alloy with the ferrous metal of the powder. For example, a commercially available, water atomized, annealed metal powder having a high ferrous content of about 98% by weight of the powder can be used. About 0.20% to 0.80~ by weight of graphite is admixed with the metal powder, and the mixture is subjected to isostatic compacting to produce a preform or compact having about 75~ to 90% of the theoretical full density for the selected material. It is not essential that a lubricant binder be added to powder mixture when isostatic te¢hniques are used for - ¢ompacting~ and therefore, a subsequent step for removing ~uch a lubricant or binder is not required, " , _.

~4488 as is the case with certain other compacting methods.
After compacting, the powder metal co~pact is delivered to suitable apparatus for carrying out a series of heating treatments in accordance with the present invention. These heating treatments may be included as a part of a continous process which provides for delivery of compacted preforms from a compacting machine to the heating apparatus which will carry out critical steps of heating as the compacts move through a series of heating zones ` within the apparatus. Such continuous processes include continuous delivery of preforms through a series of stations as well as delivery of batches of preforms to separate stations. Stations II, ~II, IV and V represent the stations at which heating - -treatments will be applied to compacts moving through heating zones contained therein. Upon completion ~ -of the heating treatment of this invention, the hot compacts will be rapidly delivered to a final forming or forging press at Station VI. Again, -~
final forming can be included as part of an overall ` continuous process, and means would be provided for unloading hot compacts from the final heating Station V for a rapid transfer into the forming -press at Station VI. A continuous process of the type depicted in Figure 1 can be carried out in a time period of about 6 to 10 minutes ~for relati~ely small gear parts) from the time of initial compacting until a finished form i5 produced at Station VI.
The heating and sintéring Stations II-V provide .
,: ,, ", .

1'~4 ~
for treatments which are necessary to carry out the reactions and physical changes in a powder metal compact before it can be formed into a high strength finished product. The Stations III-V are arranged to maintain an inert (or reducing) atmosphere around each compact as the compact advances from station-to-station.
Induction heating is used at Station III to add substantial heat energy to a powder compact in a relatively short period of time so as to bring the material of the compact to a sintering temperature ` at or above 980C (and preferably to about 1285~C).
However, it has been observed that ferrous metal compacts exhibit a characteristic incubation period at the beginning of a heating treatment in a low - 15 frequency induction field, and this period i8 of sufficient duration to result in a costly expenditure o energy without attainment of the desired rapid change in the temperature of the compact. In accordance --with the present invention, the incubation period is substantially reduced or eliminated by subjecting each compact to a pretreating step in a relatively high frequency induction field.
Pretreating is carried out at Station II with known radio frequency generating equipment which operates, for example, at a frequency in the range of S0 to 450 kHz. It is preferred that a frequency at the lower end of the range, for example at about 50 kHz, be used in certain applications. An inert atmosphere may be provided at this Station but in certain applications may not be necessary.

,~ .

, ; , .................... . ............................ .
,, , " , . . . . . ..

1~4~48~
Figure 2 illustrates a typical relationship between a compact 10 and a coil 12 for carrying out high frequency treatment of the compact at Station II. The effect of pretreating in a radio frequency magnetic field appears to one of substantially reducing electrical resistivity of at least the skin of the powder metal compact in a very short time duration. For example, pretreating may take only 1 or 2 seconds for compacts typically used in the formation of bevel gears. In the art of induction heating, it is known that the reference depth d of induced current in powder metal compact should be one-fourth or less than the maximum thickness of the compact load for reasonable efficiency of ~ -~, 15 the system. A typical preferred reference depth ~ is illustrated between the arrows shown in Figure - 3, and this depth is less than one-fourth of the -; wall thickness of the compact shape which is shown.
It is also known that there is a direct relationship between depth of induced current and resistivity of the compact in accordance with the formula:
;',, ~ ' , d ~ K ~r/mf) d = reference depth of induced current K - dimensional constant r - electrical resistivity of the material m s magnetic permeability of the material f ~ frequency of heating current :, .

l,., , .. . , . " , , _ 4~3~
It can be seen that once there is an adjustment in resistivity r of the material resulting from the use of a relatively high frequency f magnetic field, it is necessary to shift to a lower frequency f magnetic field to maintain a desired reference depth d of induced current in the part. Thus, the relationship between the pretreating and heating steps of the process is one of determining desired depth of induced current in a given size of part and then adjusting frequency to compensate for a change in electrical resistivity of the material of the compact.
Figures 4 and 5 illustrate specific configurations of powder metal compacts which were treated in accordance with the process of the present invention.
Each of the illustrated compacts were formed from a commercially available, water atomized, ferrous metal powder marketed as "Hoeganeas 2000" powder and having the following composition:
.` .
Carbon - 0.018~
Manganese - 0.350%
Phosphorus - 0.007%
Sulfur - trace Silicon - 0.013%
Oxygen (2) ~ 0.120%
N~ckel - 0.500%
Molybdenum - 0.48%
Iron - balance to make 100%

The compacts were prepared isostatically without addition of a lubricant and their densities were approximately 75% of the theoretical density for the material used.
; 5 Example l:
The compact configuration illustrated in Figures 4 and 5 included a minor diameter hub portion 14 formed on a common axis with a major diameter body portion 16. The Figure 4 configuration of such a ~hubbed" preform included the following parameters:
, - ',, Overall Height A = 1-7/8 inches - -Height of Hub B - l inch - Major Diameter C - 2-1/2 inches Minor Diameter D = 1-1/2 inches Bore Diameter E = 1 inch -Weight = 500 grams ~; This preform was heated in a nominal 450 kHz system for -approximately 5 seconds. Actual machine operating frequency was unknown but could vary from 250 to 600 kHz during the heating cycle. Power consumed ; was about 5 kilowatts. The coil 12 included four turns, and clearances between the coil and outside surfaces of the preform tfor both major and minor diameter portions) were in the range of l/4 to 3/16 inch. After heating, the treated compact was heated to a sintering temperature in a stack of such compacts which were moved through a coil 12 having a single cross-sectional diameter throughout tas shown in P~gure 6), and the cornpact exhibited very efficient .

8~3 ~essentially instantaneous) coupling with a 3 kHz magnetic field induced by the coil. The illustrated "hubbed" preform can be used to produce a hubbed bevel gear (such as an autOmGtiVe differential siae gear) with a final forming step after sintering.

Example 2:

Figure 5 illustrates a clutch ring type of preform which included the following parameters:

Overall Height A = 1-1/4 inches Overall Diameter C = 4-3/4 inches Bore Diameter E = 3-1/2 inches - Weight = 900 grams This preform was heated in a nominal 450 kHz coil (four turns of tubing having a square cross section of 1/4 inch) for about 16 seconds. A clearance of about 1/4 inch was provided between the preform and the coil during heating at high frequency. Power consumption was about 12 kilowatts peak. The treated preform was subsequently sintered in a low frequency (3 kHz) magnetic field, and the treated preform exhibited very rapid coupling and heating up to sintering temperature level.
In both of the examples above, the time cycle for treatment was determined by a change in plate current level of the power supply rather than by using a constant t~m~ for each size and shape of compact. For example, when the samples exhibited an initial plate cuxrent of ., 1C94~ 8 0.2 to 0.3 amperes, treatment was continued until the plate current reading was 1 ampere. The samples were then maintained at the 1 ampere level for approximately 1 to 2 seconds before removal from the field. Other ` 5 electrical parameters in the heating cir~uit may be used to detect a change in the efficiency of coupling between the field and the sample.
It has been discovered that use of a 450 kHz field can present certain limitations in the treating of relatively large parts where depth of penetration of the ield may be very shallow. This results in poor --pre-treatment of such large parts and a slower response time of the parts to a lower frequency field. Since longer exposure to the 450 k~z field can result in rupturing of the sample ~from thermal hoop stresses developing in the outer surface of the sample), techniques were studied to improve the treatment of larger parts. It was determined that the 450 kHz field could be used if the field were either (a) "pulsed" by turning the field on and off several timesr (see U.S. patent 3,331,686 wherein ` pulsing during high frequency sintering is suggested) to allow surface heat to transfer deeper into the sample without developing large thermal hoop stresses, or (b) operated at a lower power level for a longer period of time, as was done in Example 2 above. These techniques required longer cycle times or more complex control of equipment. --- Another technique involves the use of a lower radio requency to increase the depth of penetration of the field without developing laxge thermal stresses. The , ,: --19--.

4~
disadvantage of this technique is that it can require more power than is required with higher frequency levels, however, the increase in power usage may be acceptable with certain large parts. This technique was tested with the following e~ample.

.
Example 3 A clutch ring preform of the type and dimensions -used in Example 2 above was treated in a plate coil 18 of the type illustrated in Figure 5. The plate coil was one and one-half incAes in height and the clearance between the preform and the plate was about 3/16 inch.
The preform was treated with equipment having a nominal rating of 50 kHz for 6 to 7 seconds. Power consumption was 25 kilowatts. Preforms treated in this manner coupled almost immediately into a 3 kHz field. Thus, the use of a 50 kHz frequency (or a frequency at the lower end of the radio frequency range) may be preferred for larger parts where a shorter cycle time is desired. " -The high frequency treatment of this invention produces an irreversible change in heating characteristics of powder metal compacts, and the compacts can be stored after such treatment if desired.
Although the invention has been described above with -reference to a specific ferrous metal powder and specific treatr~nt steps applied thereto, it shou1d be appreciated ',;

4~8 that the principles of this invention can be utilized in improving characteristics of other ferrous metal compositions which are subjected to induction heating processes. Of course, composition, or other characteristics of a particular powder metal selected for use will change some of the parameters discussed above.

Claims (13)

The embodiments of the invention in which an exclusive property or privilege is claimed are defined as follows:
1. A process for heating and sintering ferrous powder metal compacts, comprising the steps of pretreating a powder metal compact in a magnetic field having a relatively high frequency selected from a radio frequency magnetic field at about 50 kHz or above to induce current in the compact to a depth distance of about one-fourth of the maximum thickness of the compact, continuing said pretreating for a sufficient time to effect a substantial decrease in electrical resistively of said compact, and thereafter subjecting the compact to a magnetic field having a relatively low frequency of about 10 kHz or less which provides for an efficient heating of said compact to a sintering tempera-ture level in accordance with the changed electrical resistivity of the compact.
2. A process as claimed in claim 1 wherein said pre-treating step is carried out in a radio frequency magnetic field at about 50 kHz to about 450 kHz.
3. A process as claimed in claim 1 wherein said pre-treating step is carried out for a time duration of less than 20 seconds for a compact which weighs about 900 grams.
4. A process as claimed in claims 1 to 3 wherein said low frequency magnetic field has a frequency of about 10 kHz to 1 kHz.
5. A process as claimed in claim 1 wherein said pre-treating step comprises an application of a radio frequency magnetic field to only surface areas of said compact.
6. A process as claimed in claim 5 wherein said applica-tion of a radio frequency magnetic field to surface areas of the compact is carried out with a sufficient energy input to result in a low temperature preheating of sections of the compact adjacent to said surface areas.
7. A process as claimed in claim 6 wherein said sections adjacent to said surface areas are preheated to a temperature of at least 150°C but less than the sintering temperature for the material of said compact.
8. A process as claimed in claims 1 to 3 wherein said pretreating step comprises an application of a radio frequency magnetic field to selected areas of a compact so as to provide for a differential response time for separate areas of the compact when the compact is placed in a lower frequency induction field.
9. A process as claimed in claim 1 wherein said compact is of a shape which includes a major diameter portion and a minor diameter portion, and wherein said pretreating step is characterized by a selective treatment of said minor diameter portion with said radio frequency magnetic field so as to decrease the time of induction heating response of said minor diameter portion relative to said major diameter portion when the compact is placed in a low frequency induction field formed by a multi-turn coil having a single diameter cross-section.
10. A process as claimed in claims 1 to 3 wherein the duration of said pretreating step is determined by a change in an electrical parameter of the radio frequency heating circuit.
11. A process for selectively adjusting the response time of different portions of a powder metal compact to an induction field, comprising the steps of:
subjecting a selected portion of a powder metal compact to a radio frequency magnetic field operating at a frequency of at least about 50 kHz so as to produce relatively high temperature heating of the selected portion of the compact, and thereafter subjecting the compact to a lower frequency induction field of not greater than about 10 kHz which raises the tempera-ture level of said selected portion more rapidly than portions of the same compact which were not subjected to said radio frequency magnetic field.
12. A process as claimed in claim 11 wherein said radio frequency magnetic field operates at a frequency in the range between 50 and 450 kHz.
13. A process as claimed in claim 11 or 12 wherein portions of said compact adjacent to said selected portion are preheated to a temperature level of at least 150°C, but below a sintering temperature for the material of the compact, during the time said selected portion is subjected to said radio frequency magnetic field.
CA209,849A 1973-10-15 1974-09-24 Process for heating and sintering ferrous powder metal compacts Expired CA1044488A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US406774A US3894892A (en) 1972-09-05 1973-10-15 Process for heating and sintering ferrous powder metal compacts with radio frequency magnetic field

Publications (1)

Publication Number Publication Date
CA1044488A true CA1044488A (en) 1978-12-19

Family

ID=23609406

Family Applications (1)

Application Number Title Priority Date Filing Date
CA209,849A Expired CA1044488A (en) 1973-10-15 1974-09-24 Process for heating and sintering ferrous powder metal compacts

Country Status (5)

Country Link
JP (1) JPS5066409A (en)
CA (1) CA1044488A (en)
DE (1) DE2447788A1 (en)
FR (1) FR2247304B2 (en)
GB (1) GB1431528A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS522818A (en) * 1975-06-24 1977-01-10 Toyota Motor Corp Quick sintering method of iron_base metal pwder for sintered forgings

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5224483B2 (en) * 1973-05-07 1977-07-01

Also Published As

Publication number Publication date
DE2447788A1 (en) 1975-04-17
FR2247304B2 (en) 1978-04-07
FR2247304A2 (en) 1975-05-09
GB1431528A (en) 1976-04-07
JPS5066409A (en) 1975-06-04

Similar Documents

Publication Publication Date Title
US3779747A (en) Process for heating and sintering ferrous powder metal compacts
US3894892A (en) Process for heating and sintering ferrous powder metal compacts with radio frequency magnetic field
JP2682823B2 (en) Refractory material manufacturing method
DE3232525C2 (en) Heating chamber for systems for sintering and hot isostatic pressing of compacts made of powder
CA1217362A (en) Method for producing aluminum powder alloy products having improved strength properties
CA1059344A (en) Production of high density powdered metal parts
US8133329B2 (en) Selective sintering of compacted components
US2342799A (en) Process of manufacturing shaped bodies from iron powders
CA1044488A (en) Process for heating and sintering ferrous powder metal compacts
CA1087880A (en) Process and an apparatus for producing low-oxygen iron-base metallic powder
US3331686A (en) Method of heating and forming powdered metals
EP0105138B1 (en) High efficiency reduction carburization and sintering method
CA1326144C (en) Isostatic hot forming of powder metal material
US4655853A (en) Method for making powder metal forging preforms of high-strength ferrous-base alloys
Jiandong et al. Laser sintering of green compacts
JP3982945B2 (en) Method for sintering ferrous sintered alloys
JPS5514163A (en) Forging method of powder
US20030039572A1 (en) Method of producing powder metal parts using induction sintering
EP1556871B1 (en) Heat treatment of soft magnetic components
US6093232A (en) Iron-carbon compacts and process for making them
JPS5484813A (en) Manufacture of sintered high-speed steel
JPS6133881B2 (en)
JPS61264105A (en) Production of high-strength sintered member
SU959925A1 (en) Method of producing porous coating of metallic powder
US2247370A (en) Powder metallurgy