BRPI0919368A2 - dispositivos e métodos para planejar localizações de poços com critérios dinâmicos de produção - Google Patents
dispositivos e métodos para planejar localizações de poços com critérios dinâmicos de produçãoInfo
- Publication number
- BRPI0919368A2 BRPI0919368A2 BRPI0919368A BRPI0919368A BRPI0919368A2 BR PI0919368 A2 BRPI0919368 A2 BR PI0919368A2 BR PI0919368 A BRPI0919368 A BR PI0919368A BR PI0919368 A BRPI0919368 A BR PI0919368A BR PI0919368 A2 BRPI0919368 A2 BR PI0919368A2
- Authority
- BR
- Brazil
- Prior art keywords
- methods
- devices
- well locations
- dynamic production
- production criteria
- Prior art date
Links
- 238000000034 method Methods 0.000 title 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimising the spacing of wells
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US12/351,754 US10060245B2 (en) | 2009-01-09 | 2009-01-09 | Systems and methods for planning well locations with dynamic production criteria |
PCT/US2009/066913 WO2010080270A1 (en) | 2009-01-09 | 2009-12-07 | Systems and methods for planning well locations with dynamic production criteria |
Publications (1)
Publication Number | Publication Date |
---|---|
BRPI0919368A2 true BRPI0919368A2 (pt) | 2016-01-05 |
Family
ID=42316700
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
BRPI0919368A BRPI0919368A2 (pt) | 2009-01-09 | 2009-12-07 | dispositivos e métodos para planejar localizações de poços com critérios dinâmicos de produção |
Country Status (8)
Country | Link |
---|---|
US (1) | US10060245B2 (pt) |
EP (1) | EP2377017A4 (pt) |
CN (2) | CN104196515A (pt) |
AU (3) | AU2009336057A1 (pt) |
BR (1) | BRPI0919368A2 (pt) |
CA (1) | CA2745880A1 (pt) |
MX (1) | MX2011006840A (pt) |
WO (1) | WO2010080270A1 (pt) |
Families Citing this family (40)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8301382B2 (en) * | 2009-03-27 | 2012-10-30 | Schlumberger Technology Corporation | Continuous geomechanically stable wellbore trajectories |
US8931580B2 (en) | 2010-02-03 | 2015-01-13 | Exxonmobil Upstream Research Company | Method for using dynamic target region for well path/drill center optimization |
US9367564B2 (en) | 2010-03-12 | 2016-06-14 | Exxonmobil Upstream Research Company | Dynamic grouping of domain objects via smart groups |
US8768671B2 (en) | 2010-04-26 | 2014-07-01 | Schlumberger Technology Corporation | System for optimizing a drilling operation and method for using same |
GB2479989A (en) * | 2010-04-26 | 2011-11-02 | Schlumberger Holdings | Optimizing a borehole trajectory based on a stress model |
EP2564309A4 (en) | 2010-04-30 | 2017-12-20 | Exxonmobil Upstream Research Company | Method and system for finite volume simulation of flow |
WO2012015515A1 (en) | 2010-07-29 | 2012-02-02 | Exxonmobil Upstream Research Company | Methods and systems for machine-learning based simulation of flow |
US9187984B2 (en) | 2010-07-29 | 2015-11-17 | Exxonmobil Upstream Research Company | Methods and systems for machine-learning based simulation of flow |
EP2599032A4 (en) | 2010-07-29 | 2018-01-17 | Exxonmobil Upstream Research Company | Method and system for reservoir modeling |
CA2807300C (en) | 2010-09-20 | 2017-01-03 | Exxonmobil Upstream Research Company | Flexible and adaptive formulations for complex reservoir simulations |
US20120143577A1 (en) * | 2010-12-02 | 2012-06-07 | Matthew Szyndel | Prioritizing well drilling propositions |
US10318663B2 (en) | 2011-01-26 | 2019-06-11 | Exxonmobil Upstream Research Company | Method of reservoir compartment analysis using topological structure in 3D earth model |
WO2012115690A1 (en) * | 2011-02-21 | 2012-08-30 | Exxonmobil Upstream Research Company | Method and system for field planning |
FR2979724B1 (fr) * | 2011-09-06 | 2018-11-23 | Ifp Energies Now | Procede d'exploitation d'un gisement petrolier a partir d'une technique de selection des positions des puits a forer |
WO2013039606A1 (en) | 2011-09-15 | 2013-03-21 | Exxonmobil Upstream Research Company | Optimized matrix and vector operations in instruction limited algorithms that perform eos calculations |
US10287857B2 (en) | 2012-05-30 | 2019-05-14 | Landmark Graphics Corporation | System and method for reservoir simulation optimization |
EP2901363A4 (en) | 2012-09-28 | 2016-06-01 | Exxonmobil Upstream Res Co | ERROR REMOVAL IN GEOLOGICAL MODELS |
EP2904530B1 (en) | 2012-12-13 | 2018-10-10 | Landmark Graphics Corporation | System, method and computer program product for determining placement of perforation intervals using facies, fluid boundaries, geobodies and dynamic fluid properties |
US20140303951A1 (en) * | 2013-04-09 | 2014-10-09 | Schlumberger Technology Corporation | Integrated system for production design assistance |
SG11201507825UA (en) * | 2013-04-22 | 2015-10-29 | Landmark Graphics Corp | Systems and methods for adjusting existing well plans |
EP2811108B1 (en) * | 2013-06-06 | 2017-11-22 | Repsol, S.A. | Method for Assessing Production Strategy Plans |
CA2907728C (en) * | 2013-06-10 | 2021-04-27 | Exxonmobil Upstream Research Company | Interactively planning a well site |
US9864098B2 (en) | 2013-09-30 | 2018-01-09 | Exxonmobil Upstream Research Company | Method and system of interactive drill center and well planning evaluation and optimization |
CN105849360A (zh) * | 2014-01-24 | 2016-08-10 | 界标制图有限公司 | 确定储层系统中的评价位置 |
US11414975B2 (en) | 2014-07-14 | 2022-08-16 | Saudi Arabian Oil Company | Quantifying well productivity and near wellbore flow conditions in gas reservoirs |
US9816366B2 (en) | 2014-07-14 | 2017-11-14 | Saudi Arabian Oil Company | Methods, systems, and computer medium having computer programs stored thereon to optimize reservoir management decisions |
EP3175265A1 (en) | 2014-07-30 | 2017-06-07 | ExxonMobil Upstream Research Company | Method for volumetric grid generation in a domain with heterogeneous material properties |
US10221659B2 (en) | 2014-10-08 | 2019-03-05 | Chevron U.S.A. Inc. | Automated well placement for reservoir evaluation |
EP3213126A1 (en) | 2014-10-31 | 2017-09-06 | Exxonmobil Upstream Research Company | Handling domain discontinuity in a subsurface grid model with the help of grid optimization techniques |
CA2963092C (en) | 2014-10-31 | 2021-07-06 | Exxonmobil Upstream Research Company | Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares |
WO2016161291A1 (en) | 2015-04-03 | 2016-10-06 | Schlumberger Technology Corporation | Wellsite system services |
CN106156933B (zh) * | 2015-04-17 | 2022-01-28 | 普拉德研究及开发股份有限公司 | 设计井规划及预测钻井性能 |
CN106156934B (zh) * | 2015-04-17 | 2022-06-28 | 普拉德研究及开发股份有限公司 | 分布式井工程和规划 |
CA2980717A1 (en) * | 2015-04-30 | 2016-11-03 | Landmark Graphics Corporation | Shale geomechanics for multi-stage hydraulic fracturing optimization in resource shale and tight plays |
WO2016178666A1 (en) * | 2015-05-05 | 2016-11-10 | Schlumberger Canada Limited | Method and system for production analysis using data analytics |
US10060227B2 (en) * | 2016-08-02 | 2018-08-28 | Saudi Arabian Oil Company | Systems and methods for developing hydrocarbon reservoirs |
US10839114B2 (en) | 2016-12-23 | 2020-11-17 | Exxonmobil Upstream Research Company | Method and system for stable and efficient reservoir simulation using stability proxies |
RU2685005C1 (ru) * | 2017-11-07 | 2019-04-16 | Публичное акционерное общество "Газпром нефть" | Способ и компьютерная система для проектирования размещения кустовых площадок на месторождении |
EP4052123A4 (en) | 2019-10-28 | 2023-07-26 | Services Pétroliers Schlumberger | DRILLING ACTIVITY RECOMMENDATION SYSTEM AND PROCEDURES |
US11586790B2 (en) * | 2020-05-06 | 2023-02-21 | Saudi Arabian Oil Company | Determining hydrocarbon production sweet spots |
Family Cites Families (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8297377B2 (en) * | 1998-11-20 | 2012-10-30 | Vitruvian Exploration, Llc | Method and system for accessing subterranean deposits from the surface and tools therefor |
US7096172B2 (en) * | 2003-01-31 | 2006-08-22 | Landmark Graphics Corporation, A Division Of Halliburton Energy Services, Inc. | System and method for automated reservoir targeting |
US7546884B2 (en) * | 2004-03-17 | 2009-06-16 | Schlumberger Technology Corporation | Method and apparatus and program storage device adapted for automatic drill string design based on wellbore geometry and trajectory requirements |
EP1759226A1 (en) | 2004-06-07 | 2007-03-07 | ExxonMobil Upstream Research Company | Method for solving implicit reservoir simulation matrix equation |
MX2007006993A (es) | 2004-12-14 | 2007-08-07 | Schlumberger Technology Bv | Optimizacion geometrica de trayectorias de pozos multiples. |
US8209202B2 (en) * | 2005-04-29 | 2012-06-26 | Landmark Graphics Corporation | Analysis of multiple assets in view of uncertainties |
US7584081B2 (en) * | 2005-11-21 | 2009-09-01 | Chevron U.S.A. Inc. | Method, system and apparatus for real-time reservoir model updating using ensemble kalman filter |
BRPI0708449B1 (pt) * | 2006-03-02 | 2019-01-22 | Exxonmobil Upstream Res Co | métodos para produção de hidrocarbonetos |
US7657407B2 (en) * | 2006-08-15 | 2010-02-02 | Landmark Graphics Corporation | Method and system of planning hydrocarbon extraction from a hydrocarbon formation |
US8005658B2 (en) * | 2007-05-31 | 2011-08-23 | Schlumberger Technology Corporation | Automated field development planning of well and drainage locations |
CN101515372B (zh) * | 2009-02-04 | 2011-12-07 | 北京石油化工学院 | 基于虚拟地质模型的可视化分析预测方法 |
-
2009
- 2009-01-09 US US12/351,754 patent/US10060245B2/en not_active Expired - Fee Related
- 2009-12-07 AU AU2009336057A patent/AU2009336057A1/en not_active Abandoned
- 2009-12-07 BR BRPI0919368A patent/BRPI0919368A2/pt not_active IP Right Cessation
- 2009-12-07 CA CA2745880A patent/CA2745880A1/en not_active Withdrawn
- 2009-12-07 EP EP09837813.6A patent/EP2377017A4/en not_active Withdrawn
- 2009-12-07 CN CN201410409372.XA patent/CN104196515A/zh active Pending
- 2009-12-07 MX MX2011006840A patent/MX2011006840A/es active IP Right Grant
- 2009-12-07 WO PCT/US2009/066913 patent/WO2010080270A1/en active Application Filing
- 2009-12-07 CN CN200980153946.9A patent/CN102272725B/zh not_active Expired - Fee Related
-
2016
- 2016-09-01 AU AU2016222449A patent/AU2016222449A1/en not_active Abandoned
-
2018
- 2018-08-08 AU AU2018214036A patent/AU2018214036A1/en not_active Abandoned
Also Published As
Publication number | Publication date |
---|---|
US20100179797A1 (en) | 2010-07-15 |
EP2377017A1 (en) | 2011-10-19 |
CN104196515A (zh) | 2014-12-10 |
WO2010080270A1 (en) | 2010-07-15 |
CA2745880A1 (en) | 2010-07-15 |
MX2011006840A (es) | 2011-10-24 |
CN102272725A (zh) | 2011-12-07 |
AU2009336057A1 (en) | 2011-06-30 |
EP2377017A4 (en) | 2018-05-16 |
CN102272725B (zh) | 2014-08-27 |
AU2016222449A1 (en) | 2016-09-22 |
US10060245B2 (en) | 2018-08-28 |
AU2018214036A1 (en) | 2018-08-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
BRPI0919368A2 (pt) | dispositivos e métodos para planejar localizações de poços com critérios dinâmicos de produção | |
BR112012015322A2 (pt) | propante e método para formar o propante | |
BRPI0924349A2 (pt) | dispositivos revestidos para produção de poços de petróleo e gás | |
BR112012025697A2 (pt) | "dispositivo e método para conjunto estrutural" | |
BR112013014442A2 (pt) | micro-organismos para a produção de putrescina e método para a produção de putrescina utilizando o mesmo | |
BR112013001592A2 (pt) | artigo e método | |
BR112012000171A2 (pt) | composição lubrificante, e, método | |
BR112012004707A2 (pt) | método | |
BR112012027159A2 (pt) | estrutura e método | |
FI20090389A0 (fi) | Menetelmä | |
BR112012019778A2 (pt) | dispositivo de produção de hidrogênio e método para produzir hidrogênio | |
BRPI1006537A2 (pt) | método e artigo | |
DK2529050T3 (da) | Jernbane- eller metroskinnestøtte | |
BR112013010847A2 (pt) | artigo e método | |
BRPI1012526A2 (pt) | método | |
BRPI1010705A2 (pt) | método | |
FI20105414A0 (fi) | Menetelmä ja sovitelma rakenteen liikkumisen estämiseksi | |
BR112012002334A2 (pt) | sensor com orifício para transcontactação | |
BR112013016641A2 (pt) | artigo e método | |
BRPI1012532A2 (pt) | método | |
BRPI1009350A2 (pt) | método | |
JP2012026111A5 (ja) | 巾木及びその製造方法 | |
BRPI1009102A2 (pt) | método e dispositivo para gaseificação | |
BR112013012843A2 (pt) | composições e métodos para o suprimento de nutriente | |
FI20105760A0 (fi) | Menetelmä ja järjestely |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
B08F | Application fees: dismissal - article 86 of industrial property law |
Free format text: REFERENTE A 9A ANUIDADE. |
|
B08K | Lapse as no evidence of payment of the annual fee has been furnished to inpi (acc. art. 87) |
Free format text: EM VIRTUDE DO ARQUIVAMENTO PUBLICADO NA RPI 2494 DE 23-10-2018 E CONSIDERANDO AUSENCIA DE MANIFESTACAO DENTRO DOS PRAZOS LEGAIS, INFORMO QUE CABE SER MANTIDO O ARQUIVAMENTO DO PEDIDO DE PATENTE, CONFORME O DISPOSTO NO ARTIGO 12, DA RESOLUCAO 113/2013. |