BRPI0815491A2 - Método para determinar vazões de fluido em um grupo de poços de injeção de fluido conectoados a um conduto coletor de suprimento de fluido coletivo - Google Patents
Método para determinar vazões de fluido em um grupo de poços de injeção de fluido conectoados a um conduto coletor de suprimento de fluido coletivoInfo
- Publication number
- BRPI0815491A2 BRPI0815491A2 BRPI0815491-0A2A BRPI0815491A BRPI0815491A2 BR PI0815491 A2 BRPI0815491 A2 BR PI0815491A2 BR PI0815491 A BRPI0815491 A BR PI0815491A BR PI0815491 A2 BRPI0815491 A2 BR PI0815491A2
- Authority
- BR
- Brazil
- Prior art keywords
- fluid
- group
- collective
- injection wells
- determining
- Prior art date
Links
- 239000012530 fluid Substances 0.000 title 3
- 238000002347 injection Methods 0.000 title 1
- 239000007924 injection Substances 0.000 title 1
- 238000000034 method Methods 0.000 title 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
-
- E21B41/0092—
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- General Engineering & Computer Science (AREA)
- Operations Research (AREA)
- Automatic Analysis And Handling Materials Therefor (AREA)
- Physical Or Chemical Processes And Apparatus (AREA)
- Measuring Volume Flow (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP07114567 | 2007-08-17 | ||
PCT/EP2008/060748 WO2009024544A2 (en) | 2007-08-17 | 2008-08-15 | Method for virtual metering of injection wells and allocation and control of multi-zonal injection wells |
Publications (2)
Publication Number | Publication Date |
---|---|
BRPI0815491A2 true BRPI0815491A2 (pt) | 2015-02-10 |
BRPI0815491B1 BRPI0815491B1 (pt) | 2018-10-16 |
Family
ID=38627117
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
BRPI0815491A BRPI0815491B1 (pt) | 2007-08-17 | 2008-08-15 | método para determinar vazões de fluido em um grupo de poços de injeção de fluido conectados a um conduto coletor de suprimento de fluido coletivo |
Country Status (6)
Country | Link |
---|---|
US (1) | US8204693B2 (pt) |
AU (1) | AU2008290584B2 (pt) |
BR (1) | BRPI0815491B1 (pt) |
CA (1) | CA2694014C (pt) |
GB (1) | GB2466390B (pt) |
WO (1) | WO2009024544A2 (pt) |
Families Citing this family (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2471139A (en) * | 2009-06-19 | 2010-12-22 | Kongsberg Maritime As Oil And Gas | Method for providing reconciled estimates of three phase flow for individual wells and at individual locations in a hydrocarbon production process facility |
CA2927234C (en) * | 2013-11-13 | 2023-01-03 | Schlumberger Canada Limited | Well testing and monitoring |
US10072485B2 (en) * | 2014-02-12 | 2018-09-11 | Rockwell Automation Asia Pacific Business Center Pte. Ltd. | Systems and methods for localized well analysis and control |
US10280722B2 (en) | 2015-06-02 | 2019-05-07 | Baker Hughes, A Ge Company, Llc | System and method for real-time monitoring and estimation of intelligent well system production performance |
CN106918377B (zh) * | 2015-12-24 | 2019-11-05 | 通用电气公司 | 用于虚拟流量计的校准装置、灵敏度确定模块及相应方法 |
US10401207B2 (en) * | 2016-09-14 | 2019-09-03 | GE Oil & Gas UK, Ltd. | Method for assessing and managing sensor uncertainties in a virtual flow meter |
US11940318B2 (en) * | 2016-09-27 | 2024-03-26 | Baker Hughes Energy Technology UK Limited | Method for detection and isolation of faulty sensors |
US10943182B2 (en) | 2017-03-27 | 2021-03-09 | International Business Machines Corporation | Cognitive screening of EOR additives |
CN108121369B (zh) * | 2017-12-20 | 2023-10-27 | 中国石油天然气股份有限公司 | 一种智能注水远程控制装置及方法 |
US10975668B2 (en) | 2018-03-29 | 2021-04-13 | Ge Inspection Technologies, Lp | Rapid steam allocation management and optimization for oil sands |
US10719782B2 (en) * | 2018-05-09 | 2020-07-21 | International Business Machines Corporation | Chemical EOR materials database architecture and method for screening EOR materials |
GB2575630B (en) * | 2018-07-15 | 2022-08-31 | Geomec Eng Ltd | Tubing condition monitoring |
US11441395B2 (en) | 2019-05-16 | 2022-09-13 | Saudi Arabian Oil Company | Automated production optimization technique for smart well completions using real-time nodal analysis including real-time modeling |
US11326423B2 (en) | 2019-05-16 | 2022-05-10 | Saudi Arabian Oil Company | Automated production optimization technique for smart well completions using real-time nodal analysis including recommending changes to downhole settings |
US11499423B2 (en) | 2019-05-16 | 2022-11-15 | Saudi Arabian Oil Company | Automated production optimization technique for smart well completions using real-time nodal analysis including comingled production calibration |
US11821289B2 (en) | 2019-11-18 | 2023-11-21 | Saudi Arabian Oil Company | Automated production optimization technique for smart well completions using real-time nodal analysis |
CN114151049B (zh) * | 2020-08-18 | 2023-11-28 | 中国石油化工股份有限公司 | 基于多参数分析的水井工况诊断方法 |
US20230258059A1 (en) * | 2022-02-16 | 2023-08-17 | Saudi Arabian Oil Company | Method and system for operating wells at optimum rates using orifice performance curves |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4192182A (en) * | 1978-11-16 | 1980-03-11 | Sylvester G Clay | Method for performing step rate tests on injection wells |
US4374544A (en) * | 1980-09-19 | 1983-02-22 | Standard Oil Company (Indiana) | Technique for control of injection wells |
US4523459A (en) * | 1984-03-09 | 1985-06-18 | Atlantic Richfield Company | Method for performing step rate tests on injection wells |
US4676313A (en) * | 1985-10-30 | 1987-06-30 | Rinaldi Roger E | Controlled reservoir production |
US4721158A (en) * | 1986-08-15 | 1988-01-26 | Amoco Corporation | Fluid injection control system |
US5732776A (en) * | 1995-02-09 | 1998-03-31 | Baker Hughes Incorporated | Downhole production well control system and method |
US6615917B2 (en) * | 1997-07-09 | 2003-09-09 | Baker Hughes Incorporated | Computer controlled injection wells |
US6980940B1 (en) * | 2000-02-22 | 2005-12-27 | Schlumberger Technology Corp. | Intergrated reservoir optimization |
US6561041B1 (en) * | 2001-11-28 | 2003-05-13 | Conocophillips Company | Production metering and well testing system |
ATE393297T1 (de) * | 2004-11-01 | 2008-05-15 | Shell Int Research | Verfahren und system zur dosierung der produktion von ölbohrlöchern |
EP2013447B1 (en) | 2006-04-07 | 2010-01-13 | Shell Internationale Research Maatschappij | Method for production metering of oil wells |
DE602007002702D1 (de) | 2006-04-07 | 2009-11-19 | Shell Int Research | Verfahren zur optimierung der erzeugung einer bohrlochgruppe |
-
2008
- 2008-08-15 BR BRPI0815491A patent/BRPI0815491B1/pt active IP Right Grant
- 2008-08-15 CA CA2694014A patent/CA2694014C/en active Active
- 2008-08-15 AU AU2008290584A patent/AU2008290584B2/en active Active
- 2008-08-15 GB GB1000654A patent/GB2466390B/en active Active
- 2008-08-15 US US12/673,013 patent/US8204693B2/en active Active
- 2008-08-15 WO PCT/EP2008/060748 patent/WO2009024544A2/en active Application Filing
Also Published As
Publication number | Publication date |
---|---|
US8204693B2 (en) | 2012-06-19 |
WO2009024544A2 (en) | 2009-02-26 |
WO2009024544A3 (en) | 2010-05-20 |
AU2008290584A1 (en) | 2009-02-26 |
CA2694014A1 (en) | 2009-02-26 |
GB2466390B (en) | 2011-08-24 |
BRPI0815491B1 (pt) | 2018-10-16 |
US20110301851A1 (en) | 2011-12-08 |
CA2694014C (en) | 2016-06-14 |
AU2008290584B2 (en) | 2011-09-15 |
GB2466390A (en) | 2010-06-23 |
GB201000654D0 (en) | 2010-03-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
BRPI0815491A2 (pt) | Método para determinar vazões de fluido em um grupo de poços de injeção de fluido conectoados a um conduto coletor de suprimento de fluido coletivo | |
BRPI0919457A2 (pt) | método para simular escoamento de fluido em um reservatório de hidrocarboneto | |
BR112012000676A2 (pt) | método para caracterizar fluido de petróleo em um reservatório atravessado por um furo de poço | |
BR112012005310A2 (pt) | método para caracterizar fluido de petroleo em um reservatório atravessado por ao menos um furo de poço | |
BRPI0912806A2 (pt) | método de multi-escalas para uso na simulação de fluxo de fluido em um reservatório de subsuperfície | |
BRPI0908452A2 (pt) | método para medir propriedades termo-físicas de um fluido de reservatório | |
BRPI1008084A2 (pt) | método, e , sistema para monitorar fluxo de fluido em um furo de poço | |
BR112012016366A2 (pt) | máquina de fornecimento de fluido móvel e método para fornecer fluido para um sítio usando uma máquina de fornecimento de fluido móvel | |
BR112012003282A2 (pt) | método de medição de escoamento de fluido polifásico de fundo de poço | |
BR112012017664A2 (pt) | sensor de fluxo térmico e método para dectar o fluxo de fluido após um sensor de fluxo | |
BRPI0822598A2 (pt) | Método para detectar um desvio em um parâmetro de medidor de fluxo | |
BR112013022514A2 (pt) | método para determinar a mobilidade de fluido em uma amostra de rocha | |
GB2472722B (en) | Compositions and methods for diverting injected fluids to achieve improved hydrocarbon fluid recovery | |
FR2945879B1 (fr) | Methode d'exploitation de milieu poreux au moyen d'une modelisation d'ecoulements de fluide | |
DK2237960T3 (da) | Printhovedpatron med to fluidkoblinger | |
BR112012001165A2 (pt) | aparelho de geração de vapor de fundo de poço e método para injetar mistura de fluido aquecido em um reservatório | |
BRPI0919456A2 (pt) | método para modelar escoamento de fluido em um reservatório de hidrocarboneto | |
BRPI0913194A2 (pt) | método para medir fluxo multifásico | |
BRPI0908467A2 (pt) | aquecimento rápido segmentado de fluido | |
BRPI0819608A2 (pt) | métodos para monitorar escoamento de fluido e para produzir hidrocarbonetos | |
BRPI1011179A2 (pt) | eletrônica de medidor, e, método de quantificação de fluido para um fluído sendo transferido | |
EP2260177A4 (en) | MONITORING DISPLACEMENTS OF THE RESERVOIR FLUID ALONG THE FLOW PATHWAYS IN A OIL FIELD IN PRODUCTION USING PASSIVATED SEISMIC EMISSIONS | |
BR112012002345A2 (pt) | aparelho de válvula de desvio para montagem em uma coluna de perfuração e método para usar uma válvula para seletivamente fornecer fluxo de desvio em um poço | |
BRPI0909357A2 (pt) | sistema e método para controlar o fluxo de fluido em um poço ramificado | |
BR112012029011A2 (pt) | sistema para monitorar um fluxo de líquido em um poço de hidrocarboneto, método para monitorar um fluxo de líquido em um furo de poço, método para monitorar um fluxo de água em uma região de interesse, e dispositivo de monitoramento de líquido passivo |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
B06A | Patent application procedure suspended [chapter 6.1 patent gazette] | ||
B09A | Decision: intention to grant [chapter 9.1 patent gazette] | ||
B16A | Patent or certificate of addition of invention granted [chapter 16.1 patent gazette] |
Free format text: PRAZO DE VALIDADE: 10 (DEZ) ANOS CONTADOS A PARTIR DE 16/10/2018, OBSERVADAS AS CONDICOES LEGAIS. |