BRPI0706980A2 - single span free span suspended bridge - Google Patents

single span free span suspended bridge Download PDF

Info

Publication number
BRPI0706980A2
BRPI0706980A2 BRPI0706980-4A BRPI0706980A BRPI0706980A2 BR PI0706980 A2 BRPI0706980 A2 BR PI0706980A2 BR PI0706980 A BRPI0706980 A BR PI0706980A BR PI0706980 A2 BRPI0706980 A2 BR PI0706980A2
Authority
BR
Brazil
Prior art keywords
arches
bridge
bridge according
vertical
horizontal
Prior art date
Application number
BRPI0706980-4A
Other languages
Portuguese (pt)
Inventor
Mauro Baschieri
Original Assignee
Mauro Baschieri
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mauro Baschieri filed Critical Mauro Baschieri
Publication of BRPI0706980A2 publication Critical patent/BRPI0706980A2/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D1/00Bridges in general
    • E01D1/005Bowstring bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/10Cantilevered erection
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D4/00Arch-type bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Earth Drilling (AREA)

Abstract

Ponte em arco de piso suspenso e vão livre único. Uma ponte em arco de vão livre único, de tipo com piso suspenso, com fundações nas margens, prevista para atravessar corpos de água também muito extensos (> 3 Km). Fundações flutuantes e diafragmas anti deslizamento tornam-na insensível com a possível liquefação do solo. A ponte pode ser construída no modo em balanço e auto portante, portanto sem andaimes ou suportes e pólos provisórios e sem a necessidade de operações subaquáticas. Uma modalidade estrutural preferida, mas não exclusiva, prevê o equilíbrio dos empuxos por meio de tirantes independentes do piso, formando-se assim uma ponte em arco protendida. Grupos de macacos, dispostos na chave de fechamento, induzem uma condição restritiva permanente e variável, ajustada para otimizar, em tempo real, a condição de tensão da ponte, a qual, portanto, se comporta como uma estrutura inteligente. A presença de diversos componentes estruturais tensionados como tirantes, cabos verticais e treliças predispõem a estrutura a um uso seletivo de materiais inovadores com propriedades mecânicas muito boas, muito leves, resistentes a fadiga e á agressividade do ambiente, e livres de manutenção.Arch bridge with suspended floor and single span. A single-span arch bridge, of a type with a suspended floor, with foundations on the banks, intended to cross bodies of water that are also very extensive (> 3 km). Floating foundations and anti-slip diaphragms make it insensitive to possible soil liquefaction. The bridge can be built in cantilever and self-supporting mode, therefore without scaffolding or temporary supports and poles and without the need for underwater operations. A preferred structural modality, but not exclusive, provides for the balance of the thrusts by means of independent struts from the floor, thus forming a prestressed arch bridge. Groups of monkeys, arranged in the closing switch, induce a permanent and variable restrictive condition, adjusted to optimize, in real time, the stress condition of the bridge, which, therefore, behaves as an intelligent structure. The presence of several tensioned structural components such as rods, vertical cables and trusses predispose the structure to a selective use of innovative materials with very good mechanical properties, very light, resistant to fatigue and the aggressiveness of the environment, and free of maintenance.

Description

Ponte em arco de piso suspenso e vão livre único.Single-span and free-span arched bridge.

CAMPO TÉCNICOTECHNICAL FIELD

Área de pontes em arco de piso suspenso em engenhariacivil estrutural.Area of suspended floor arch bridges in structural engineering.

FUNDAMENTOS DA ARTEART GROUNDS

No estado da arte são conhecidas diversas realizações paratravessias suspensas com grandes vãos livres (> 500 m); estas são principalmentepontes suspensas, as quais, entre todas as pontes, são aquelas com os maiores vãoslivres (> 1000 m). Entres estas ditas pontes suspensas, apenas uma parcela destas éprojetada de modo a permitir o transito de trens, porém em apenas quatro destas otransito é realmente realizado (Ponte Tagus, em Lisboa - 1013 m; Ponte da baia de SãoFranciso oeste - 704 m; Ponte Tsing Ma em Hong Kong - 1377 m; uma das pontes dosistema Seto-Ohashi no Japão - 1100 m). Desta forma os trens que se deslocam sobreestas são trens leves (com cerca de 500 t, contra os trens de carga mais pesados com5000 t). Sintomaticamente, a ponte Akashi-Kaikyo no Japão, com 2000 m de vão livre, amaior ponte suspensa em todo o mundo, não permite o trânsito de trens.In the state of the art a number of accomplishments are known for suspended crossings with large clearances (> 500 m); these are mainly suspended bridges, which, among all bridges, are those with the largest free spans (> 1000 m). Of these so-called suspension bridges, only a portion of them are designed to allow train transit, but only four of these are actually made (Tagus Bridge, Lisbon - 1013 m; São Francisco Bay Bridge - 704 m; Ponte Tsing Ma in Hong Kong - 1377 m; one of the Seto-Ohashi system bridges in Japan - 1100 m). In this way the trains traveling overest are light trains (about 500 t against the heaviest freight trains with 5,000 t). Symptomatically, the Akashi-Kaikyo Bridge in Japan, with 2000m of clear span, the largest suspension bridge in the world, does not allow trains to travel.

Apesar de muito poucas pontes em arco terem sidoconstruídas com vãos livres de cerca de 500 m, estas são muito menos que as grandespontes suspensas. Em relação às pontes suspensas por cabos, ou pontes pênseis, o seuvão livre máximo é de cerca de 1200 m (Ponte Ting Kau em Hong Kong, 1177 m, na qualnão é permitido o trânsito de trens). As modalidades de construção de ditas pontes pênsilimplica necessariamente em uma condição de tensão da força axial de compressão paratodo o piso. O dito piso, antes de ser unido ao vão livre intermediário, apresentaproblemas de instabilidade lateral, tão mais sérios quanto maior é o vão livre, de modo aque se torna muito complicada a construção vãos livres muito grandes, a menos que sejarealizada a duplicação do piso, a qual é uma das características principais da invenção.Although very few arched bridges have been built with free spans of about 500 m, they are much less than the large suspended bridges. For cable suspension bridges, or suspension bridges, their maximum free span is about 1200 m (Ting Kau Bridge in Hong Kong, 1177 m, where trains are not allowed). The modalities of construction of said suspension bridges necessarily implies in a condition of tension of the axial compression force for all the floor. Said flooring, before being joined to the intermediate clearance, presents problems of lateral instability, the more serious the larger the clearance, so that the construction of very large openings becomes very complicated, unless duplication of the floor is performed. which is one of the main features of the invention.

Além disto, também foram construídas algumas pontescantiléver, entre as quais as maiores apresentam um vão máximo de cerca de 750 m(Ponte Tappan Zee). A arquitetura das pontes cantiléver implica na presença, no centrode cada vão, de um elemento de suporte simples, cujo comprimento é um percentualsignificativo de toda a ponte.In addition to that, some bridge cranes were also built, the largest of which have a maximum span of about 750 m (Tappan Zee Bridge). The architecture of cantilever bridges implies the presence, at the center of each span, of a single support element, the length of which is a significant percentage of the entire bridge.

Caso não seja desta forma (caso este seja muito mais curtoque todo o vão) esta se torna uma variante das pontes pênsil, com os problemas jácitados para estas pontes, mesmo que com um aspecto mitigado. Desta forma, para osgrandes vãos, as pontes cantiléver apresentam os seguintes problemas:If this is not the case (if it is much shorter than the entire span) it becomes a variant of suspension bridges, with the problems already mentioned for these bridges, even with a mitigated aspect. Thus, for large spans, cantilever bridges have the following problems:

- o cantiléver, a ser suportado por meios similares aos utilizados nas pontes pênseis,apresenta os mesmos problemas, com a pior situação sendo aquela na qual oelemento central com apenas um suporte não está fixado de modo a reagir contra apotencial instabilidade lateral dos cantiléver que a suportam, devida a falta decontinuidade dos vãos, que pelo contrário tipifica as pontes pênsil;- the cantilever, to be supported by means similar to those used in suspension bridges, presents the same problems, with the worst case being that the central element with only one support is not fixed in order to react against the potential lateral instability of the cantilever bear, due to the lack of continuity of the spans, which on the contrary typifies the suspension bridges;

- além do mais, o dito elemento central, o qual para grandes vãos deve apresentar umcomprimento enorme, implica em consideráveis dificuldades de instalação, desde quenão seja permitido o uso de andaimes provisórios, uma vez que estes não sãocompatíveis com a navegabilidade.- Moreover, this central element, which for large spans must be of enormous length, implies considerable installation difficulties, provided that the use of temporary scaffolding is not permissible as it is not compatible with navigability.

Assim, pode-se inferir que as pontes cantiléver, apesar denão muitas, provavelmente já esgotaram toda a sua potencialidade. Portanto, estas sãomuito menos propensas à construção de vãos livres muito grandes. As maiores pontescantiléver são as seguintes:Thus, it can be inferred that the cantilever bridges, although not many, have probably already exhausted their full potential. Therefore, they are much less likely to construct very large clearances. The largest pontescantiléver are as follows:

Ponte Tappan Zee (Nova Iorque - EUA) - 736 m : rodoviáriaPonte Quebec (Quebec - Canadá) - 549 m : rodoviária e ferroviáriaPonte Forth (Firth of Forth - Escócia - Reino Unido) - 521 m : ferroviáriaPonte Comodoro Barry (rio Delaware - EUA) - 501 m : rodoviáriaPonte Grande Nova Orleans (Nova Orleans - EUA) - 480 m : rodoviáriaPonte Howrah (Calcutá - índia) - 457 m : rodoviária (até algum tempo atrás tambémferroviária).Tappan Zee Bridge (New York - USA) - 736 m: bus stationPont Quebec (Quebec - Canada) - 549 m: bus stationPonte Forth (Firth of Forth - Scotland - United Kingdom) - 521 m: railwayPonte Comodoro Barry (Delaware River - USA) ) - 501 m: bus stationPonte Grande New Orleans (New Orleans - USA) - 480 m: bus stationPonte Howrah (Calcutta - India) - 457 m: bus station (until some time ago also bus station).

Em relação às pontes em arco, as maiores são asseguintes:Regarding arch bridges, the largest are as follows:

Ponte Lu Pu (Xangai, China) - 550 m : ponte em arco com piso suspenso; rodoviáriaPonte do Porto de Sidney (Sidney, Austrália) - 530 m : ponte em arco com pisosuspenso; rodoviária e ferroviária (trens leves)Lu Pu Bridge (Shanghai, China) - 550 m: suspended bridge arch bridge; Sydney Harbor Bridge (Sydney, Australia) - 530 m: suspended bridge arch bridge; road and rail (light trains)

Ponte New River Gorge (Virgínia do Oeste, EUA) - 510 m : ponte em arco tímpano;rodoviáriaNew River Gorge Bridge (West Virginia, USA) - 510 m: tympanic arch bridge;

DESCRIÇÃO DA INVENÇÃODESCRIPTION OF THE INVENTION

De acordo com a variante principal desta invenção, aestrutura é composta de dois arcos iguais, planos, paralelos e verticais. Cada arco igualou gêmeo apresenta, no centro do vão, uma junta especial equipada com um grupo demacacos hidráulicos os quais exercem empuxos horizontais permanentes e variáveis,nos arcos correspondentes, equilibrados por forças de tensão horizontais iguais queagem nos tirantes horizontais posicionados no nível do piso. Os empuxos, ao nível dachave de fechamento, podem ser modulados por meio de sistemas especiais de controleretro alimentados, os quais agem em tempo real, de acordo com a variação das cargasativas, principalmente os trens e o vento, de modo a se obter a otimização da linha depressão, particularmente reduzindo o momento de flexão nas impostas do arco.In accordance with the main embodiment of this invention, the structure is composed of two equal, flat, parallel and vertical arcs. Each twin even arch features, in the center of the span, a special joint equipped with a set of hydraulic jacks which exert permanent and variable horizontal thrusts at the corresponding arcs, balanced by equal horizontal tensile forces on the horizontal risers positioned at floor level. The thrust at the closing level can be modulated by means of special powered controleretro systems, which act in real time, according to the variation of the loads, mainly the trains and the wind, in order to obtain the optimization. of the depression line, particularly reducing the bending moment in the arch thrusts.

Um sistema de chapas verticais e horizontais, equipadascom fendas e pinos, é posicionado na chave de fechamento para compensar os relativosdeslocamentos transversais entre os semi-arcos, opostos um em relação ao outro, nadita chave de fechamento, de modo a permitir ao invés dos deslocamentos relativoslongitudinais horizontais, para permitir que os macacos exerçam somente forçashorizontais coplanares aos arcos.A system of vertical and horizontal plates, equipped with slots and pins, is positioned on the closing switch to compensate for relative transverse displacements between the half-arches opposite each other in the closing switch to allow instead of the offsets. relative horizontal lengthwise, to allow monkeys to exert only coplanar horizontal forces to the arches.

Uma segunda variante apresenta a instalação dos macacosnas extremidades dos tirantes, portanto no mesmo nível do piso. Em um caso, na chavede fechamento é prescrita uma continuidade estrutural de forma que pode ser gerado ummomento de torção interno em dita chave de fechamento de modo a equilibrar omomento externo gerado nos tirantes pela força de tração nos macacos. Em relação àsjuntas, estas podem ser concebidas com diversas formas, sem escapar do escopo destainvenção. Porém, é especificado que a dita junta é composta de duas juntas separadas,uma para cada arco, de modo a permitir somente rotações, na chave de fechamento, dasextremidades dos arcos ao redor de um eixo horizontal e transversal à ponte. As hastesverticais convenientemente dotadas de treliças, se ajustam de modo a suportar as forçasde compressão e conectar os arcos nos pisos abaixo, posicionados no centro do vão enos quartos do vão, suportar potenciais deslocamentos para cima do piso, assimevitando o aparecimento de instabilidades elásticas aéreas (oscilações [flutter]),integrando a ação similar de compensação exercida pelos cabos verticais que suportamos deslocamentos para baixo. Assim, consegue-se a compensação total das grandesdeformações devidas a mudança de forma, que ao contrário não são removíveis naspontes suspensas.A second variant presents the installation of the jacks at the ends of the tie rods, therefore at the same level as the floor. In one case, in the locking key a structural continuity is prescribed so that an internal torsion moment can be generated in said locking key in order to balance the external moment generated in the tie rods by the pulling force in the jacks. With regard to joints, they can be designed in various forms without departing from the scope of this invention. However, it is specified that said joint is made up of two separate joints, one for each arc, so as to allow only rotations in the closing switch of the ends of the arcs around a horizontal axis and transverse to the bridge. Conveniently trussed upright rods adjust to withstand compressive forces and connect arches to the floors below, positioned in the center of the span and quarters of the span, to withstand potential upward displacement of the floor, thus preventing the emergence of air elastic instability ( flutter), integrating the similar compensating action exerted by the vertical cables that we support downward shifts. Thus, full compensation is achieved for large deformations due to shape change, which are not removable on the suspended bridges.

O piso é dividido em duas partes, uma em cada direção,cada um posicionado na projeção vertical de um arco e sustentado pelos cabos verticaissuperiormente fixados em dito arco. Esta duplicidade permite separar, de formaconveniente, os dois arcos gêmeos de modo a se obter uma relação entre o vão daponte e o seu comprimento total apta a garantir uma rigidez transversal global ajustadapara suportar os ventos e as forças transversais sísmicas.The floor is divided into two parts, one in each direction, each positioned in the vertical projection of an arc and supported by the upper vertical cables fixed in said arc. This duplicity makes it possible to properly separate the two twin arcs so as to achieve a relationship between the span and its overall length to ensure an overall transverse stiffness adjusted to withstand winds and seismic transverse forces.

Uma solução preferida, mas não restritiva, contempla quecada um dos dois pisos é separado em dois níveis, um superior para os veículos e uminferior para os trens. A rigidez transversal da ponte em sua totalidade é garantida pormeio de um primeiro sistema de treliças transversais que conectam os dois arcos, por umsegundo sistema disposto em um plano horizontal e que conecta os dois pisos e por umterceiro sistema que conecta verticalmente, preferencialmente no centro do vão e nosquartos do vão, os arcos com os pisos.A preferred but not restrictive solution is that one of the two floors is separated into two levels, one upper for vehicles and one lower for trains. The transverse stiffness of the bridge as a whole is ensured by means of a first system of transverse trusses connecting the two arches, a second system arranged in a horizontal plane connecting the two floors and a third system connecting vertically, preferably in the center of the bridge. vain and in the vain rooms, the arches with the floors.

Os dois pisos paralelos e gêmeos se estendem das a partirdas margens, suportados por dois travessões retilíneos de suporte, paralelos e subhorizontais os quais formam a continuação estrutural dos correspondentes arcos, e comos quais estes são unidos e estão em continuidade. Além disto, as treliças do planohorizontal dos pisos podem ser estendidas, mas não necessariamente, até estestravessões contínuos. Nas extremidades destes travessões contínuos, e com umcomprimento conveniente, o qual é um percentual relevante em relação ao vão do arco,estes são fixados a grandes cabos verticais de ancoragem no solo, que realizam umaação de contrapeso, necessária para fazer uso das modalidades propostas deconstrução.The two parallel and twin floors extend from the margins, supported by two parallel and subhorizontal straight support struts which form the structural continuation of the corresponding arches, and with which they are joined and in continuity. In addition, the horizontal floor plan trusses can be extended, but not necessarily, to these continuous breaks. At the ends of these continuous struts, and with a convenient length, which is a relevant percentage in relation to the arc span, these are attached to large vertical ground anchoring cables, which perform a counterweight action necessary to make use of the proposed construction modalities. .

Os dois arcos ficam sobre quatro pontos, dois em cadamargem, sobre seções de impostas dos ditos arcos. Assim, e no todo, a estruturaapresenta oito suportes, quatro próximos as margens para suportar os arcos e quatronas extremidades externas dos travessões contínuos.The two arches are on four points, two in each margin, on imposed sections of said arches. Thus, in total, the structure has eight supports, four close to the edges to support the arches and four outer ends of the continuous struts.

São previstos dispositivos de suporte sísmicos de acordocom uma modalidade preferencial, mas não exclusiva (isolantes sísmicos):Seismic support devices are provided according to a preferred but not exclusive mode (seismic insulators):

- suportes de neoprene reforçados ou similares, de conformidade com as tecnologiasconsolidadas, dispostos diretamente sobre as fundações, assim sendo quatro abaixodas impostas dos arcos e quatro dispostos abaixo das extremidades dos travessõescontínuos no todo, oito suportes sísmicos. Desta forma, é conseguido umisolamento sísmico de toda a estrutura.- Reinforced or similar reinforced neoprene mounts conforming to solid technologies arranged directly on the foundations, such as four imposed lower arches and four arranged below the ends of the continuous cross members, eight seismic mounts. In this way, seismic isolation of the entire structure is achieved.

No caso de solos soltos, se passíveis da liquefação causadapor uma ação sísmica, são previstas fundações flutuantes ocos de modo a que, em uso,a pressão litostática ao nível do plano das fundações iguala a ação de pressão em ditoplano. Isto implica na compensação dos deslocamentos verticais das fundações no sololiqüefeito. Por fim, e de modo a compensar os deslizamentos (deslocamentos horizontais[drift]) das fundações flutuantes e assim de toda a estrutura causada pelo vento quepode aparecer após um terremoto, é prevista a colocação de diafragmas verticais planosao redor de ao menos duas destas fundações flutuantes, posicionados sob as impostasdos arcos, em para cada margem. Os ditos diafragmas podem se estender emprofundidades a ponto de alcançar solos não passíveis de liquefação e para penetrarnestes com uma margem adequada de profundidade de fixação.In the case of loose soils, if liquefied by seismic action, hollow floating foundations are provided such that, in use, the lithostatic pressure at the level of the foundations equals the pressure action in dithoplane. This implies offsetting the vertical displacements of the foundations in the solid. Finally, and in order to compensate for the drift of the floating foundations and thus of the entire structure caused by wind that may appear after an earthquake, it is envisaged to place flat vertical diaphragms around at least two of these foundations. floating, positioned under the imposed arches, on to each bank. Said diaphragms may extend into depths to the extent that they reach non-liquefying soils and to penetrate them with an adequate depth of attachment depth.

O vão vertical entre o extradorso horizontal das fundações eo intradorso horizontal dos suportes da estrutura é tal que garante, com uma margemadequada, a entrada de uma pessoa e de dispositivos robóticos. Assim segue que,tendencialmente, tal vão corresponde também à altura dos isolantes sísmicos, dispostospreferencialmente em algumas linhas, e distanciados de modo a garantir a possibilidadede um homem e de equipamentos, principalmente com o objetivo de realizar amanutenção total ou parcial dos isolantes, tanto pela obsolescência quanto pelo dano dequalquer natureza.The vertical gap between the horizontal extraction of the foundations and the horizontal intrusion of the structure supports is such that it ensures, with a marbled design, the entry of one person and robotic devices. It follows that, tending, this gap also corresponds to the height of the seismic insulators, preferably arranged in some lines, and spaced to ensure the possibility of a man and equipment, especially with the purpose of performing the total or partial maintenance of the insulators, both by obsolescence as for the damage of any nature.

Para este propósito, cada fundação é equipada, em seusextradorsos, com um grupo de macacos de deslocamento vertical curtos, com umpequeno tamanho vertical mas com uma grande capacidade (macacos planos) dispostosno topo dos suportes com altura suficiente para garantir o contato dos macacos com ointradorso dos suportes. A sua ativação sincronizada permite elevar toda a estrutura porum tempo praticamente ilimitado, e permite, portanto, a remoção e a substituição dosisolantes não operacionais e por fim o abaixamento progressivo de toda a estrutura,restaurando assim a sua configuração normal de uso.For this purpose, each foundation is equipped with a group of short vertical displacement jacks of small vertical size but large capacity (flat jacks) arranged at the top of the supports high enough to ensure contact of the jacks with the inside. the brackets. Its synchronized activation allows the entire structure to be raised for almost unlimited time, and thus allows the removal and replacement of non-operational insulators and ultimately the progressive lowering of the entire structure, thus restoring its normal use configuration.

O empuxo do arco é completamente equilibrado por tirantesparalelos horizontais, um ou mais, de preferência mas não limitadamente a dois paracada arco, independentes do piso e fixados nas impostas de ditos arcos.The thrust of the bow is completely balanced by horizontal parallel risers, one or more, preferably but not limited to two single bow, independent of the floor and fixed in the imposition of said arches.

A construção é realizada de acordo com as seguintesetapas principais, a partir de cada uma das duas margens e preferencialmente de formasincronizada:The construction is carried out according to the following main steps, starting from each of the two margins and preferably in synchronized forms:

- construção dos cabos de ancoragem com o solo, das fundações dos arcos e dospossíveis diafragmas antideslizamentos verticais, não necessários para o caso desolos não passives de liquefação, tipicamente rochoso. Neste último caso, asfundações podem ser sólidas ao invés de fundações ocas;- construction of the ground anchor lines, the foundations of the arches and the possible non-slip vertical diaphragms, not necessary for non-liquefying, typically rocky, desolation. In the latter case, the foundations may be solid rather than hollow foundations;

- instalação dos andaimes para a construção dos travessões contínuos;- installation of scaffolding for the construction of continuous bars;

- instalação dos isolantes sísmicos e dos macacos planos;- installation of seismic insulators and flat jacks;

- construção segmentada dos travessões contínuos através de diversas técnicas deiçamento pesado, possivelmente combinadas com o uso de helicópteros para cargaspesadas, os quais atualmente podem levantar e transportar cargas de 20 t. Dentro deuma lógica de otimização global dos custos, poderia ser proposto projetarhelicópteros dedicados e com uma capacidade ainda maior. De forma concorrente, aconstrução, dentro dos travessões contínuos, por pisos pertencentes a estestravessões contínuos;- segmented construction of the continuous crosspieces through various heavy lifting techniques, possibly combined with the use of heavy-duty helicopters, which can currently lift and transport 20 t loads. Within a logic of global cost optimization, it could be proposed to design dedicated and larger capacity helicopters. Concurrently, the construction, within continuous indents, of floors belonging to continuous indentations;

- instalação de batentes provisórios nos extradorsos das fundações, preparados paracompensar os deslocamentos transversais e/ou longitudinais, causados pelo vento,nas estruturas superiores (travessões e arcos) com relação às fundações, comomelhor explicado à diante;- installation of temporary stops on the foundation extractors, prepared to compensate for transverse and / or longitudinal wind displacements in the upper structures (crosspieces and arches) in relation to the foundations, as explained below;

- construção segmentada sincronizada, no modo em balanço, dos semi-arcos até asua união da chave de fechamento;- synchronized segmented construction, in swing mode, of the half-arcs to their union of the closing switch;

Esta modalidade de construção é possível devida à ação docontrapeso e de alavanca dos travessões contínuos e dos cabos em ancoragem, e éuma das características principais da invenção.This type of construction is possible due to the counterweight and lever action of continuous struts and anchor ropes, and is one of the main features of the invention.

Então se trata de equilibrar o grande momento de rotaçãoou deslocamento, induzido pela ação do semi-arco no modo em balanço, o qual em geralpode ser muito maior que a ação de estabilização apenas do travessão contínuo,portanto que pode ser combinada com a ação de contrapeso do cabo de ancoragemvertical e, possivelmente, com o peso das fundações.Uma modalidade preferencial, mas não exclusiva, decolocação dos seguimentos prevê o seu manuseio através de um guindaste móvel o qualse desloca por sobre uma cremalheira posicionada no extradorso do semi-arco e dosemi-arco.So it is a matter of balancing the great moment of rotation or displacement, induced by the action of the semi-arc in swing mode, which in general can be much larger than the stabilizing action of the continuous beam only, so it can be combined with the action of counterweight of the vertical anchor line and, possibly, the weight of the foundations. A preferred but not exclusive mode of relocation provides for handling by means of a mobile crane which moves over a rack positioned on the half-arch extractor and dosemi-bow.

Os segmentos podem ser alçados diretamente dasmargens, a partir de pátios de pré-fabricação possivelmente dispostos próximos aostravessões contínuos. Desta forma, é evitada qualquer interferência com a navegação.The segments can be raised directly from the margins, from prefabricated yards possibly arranged near the continuous crossings. In this way any interference with navigation is avoided.

- instalação concomitante das treliças transversais que conectam os dois arcosgêmeos, ditas treliças sendo fabricadas e montadas em terra, entre os travessõescontínuos.- Concomitant installation of the transverse trusses that connect the two twin arcs, said trusses being fabricated and mounted on land, between the continuous crosspieces.

A dita instalação é caracterizada por uma alimentaçãoprogressiva das treliças, lateralmente equipada com pinhões motorizados auto-propulsados, que se deslocam nas cremalheiras fixadas nos arcos.This installation is characterized by a progressive feeding of the trusses, laterally equipped with self-propelled motorized pinions, which move in the racks fixed in the arches.

Esta modalidade de operação (cremalheira e pinhão) étransferida pelas tecnologias aplicadas dos equipamentos de perfuração encamisadosrelativas à indústria petrolífera em mar aberto.This mode of operation (rack and pinion) is transferred by the applied technologies of jacketed drilling rigs related to the offshore oil industry.

- remoção dos andaimes provisórios dos travessões contínuos, sendo ditos travessõesauto portantes;- removal of provisional scaffolding from continuous struts, said struts being self-supporting;

- instalação, na chave de fechamento, dos grupos de macacos e das placas dotadasde fendas.- installation on the locking switch of the jack groups and slotted plates.

De acordo com a variante supra citada : a continuidadeestrutural na chave de fechamento e instalação dos macacos nas extremidades dostirantes.According to the aforementioned variant: the structural continuity in the locking switch and installation of the jacks on the toe ends.

- instalação dos cabos verticais, manuseados por carreteis provisórios atuantes nointradorso dos semi-arcos;- installation of the vertical cables, handled by provisional reels acting on the intro of the semi-arches;

- instalação dos tirantes, já equipados com os seus terminais, arrastando-os a partirdas margens, mantendo-os na disposição sub horizontal por meio dos cabos verticaise em um nível tal a não interferir com a navegação;- installation of the risers, already equipped with their terminals, by dragging them from the edges, keeping them in the sub-horizontal arrangement by means of the vertical cables at such a level as not to interfere with navigation;

- fixar os tirantes com os correspondentes pontos de ancoragem dispostos na verticaldas impostas dos arcos;- secure the tie rods with the corresponding anchor points arranged vertically from the arches;

- eliminar o abaulamento pelo próprio peso dos tirantes, por meio de cabos subverticais provisórios (possivelmente também alguns dentre os cabos verticais);- eliminate bulging by the weight of the risers by means of temporary sub-vertical cables (possibly also some of the vertical cables);

- tensionar os tirantes através da ativação dos macacos, com a conseqüenteeliminação do momento de flexão, agindo nas impostas dos arcos e a ativação dareação compressiva permanente das fundações dispostas nas extremidades dostravessões contínuos.- Tensioning the risers through the activation of the jacks, with the consequent elimination of the bending moment, acting on the arches and the permanent compressive activation of the foundations arranged at the ends of the continuous crossings.

A tensão é progressiva para verificar e para garantir, com ospossíveis dispositivos batentes unilaterais provisórios, o projeto de posicionamento daestrutura com relação às fundações. Esta função pode ser realizada através dosbatentes provisórios supra citados. Ditos batentes também têm a função de reagir contrapossíveis deslocamentos da estrutura, sobre os isolantes sísmicos, durante a longa fasetemporária precedente à fixação dos isolantes sísmicos nas suas extremidades de topopor meio de colares e de garras verticais.The tension is progressive to check and to guarantee, with the possible provisional unilateral stop devices, the structure positioning project with respect to the foundations. This function can be performed using the above provisional keys. Said stops also have the function of reacting possible shifts of the structure over the seismic insulators during the long time prior to the fixation of the seismic insulators at their top end by means of collars and vertical claws.

Isto é possível uma vez que os tirantes sofremelongamentos relevantes em absoluto, devido ao grande comprimento dos ditos tirantes,de forma a que o deslocamento dos suportes sobre isolantes sísmicos pode ser muitomaior que a altura de ditos isolantes. Podem se seguir grandes flexões dos isolantes,induzidas pelas forças de fricção horizontais, não compatível com o objetivo de ditosisolantes, o que poderia ser drasticamente atenuado pelo revestimento dos intradorsosdos suportes com uma folha de material liso, com uma espessura conveniente e comuma coeficiente de fricção muito baixo, tal como preferencialmente, mas não de formarestritiva, de teflon.This is possible since the risers undergo significant lengths at all, due to the long length of said risers, so that the displacement of the supports on seismic insulators can be much greater than the height of said insulators. Large bending of the insulators, induced by horizontal frictional forces, not compatible with the purpose of ditosisolators, may be followed, which could be drastically mitigated by coating the substrate intruders with a sheet of smooth material of a suitable thickness and with a coefficient of friction. very low, such as preferably, but not restrictively, teflon.

- fixação dos isolantes sísmicos nas superfícies de suporte horizontal sobrepostas pormeio de colares dispostos nos batentes de ditos isolantes e fixados por parafusosverticais que firam as ditas superfícies e penetram, para cima, nos suportes da ponte;fixing the seismic insulators to the horizontal support surfaces overlapped by collars arranged on the stops of said insulators and fixed by vertical bolts which fix said surfaces and penetrate upwards into the bridge supports;

- remoção dos batentes provisórios;- removal of temporary stops;

- ação de liberação e soltura dos cabos de ancoragem, feita apesar da reação decompressão induzida e garantida pela ação permanente dos macacos.- Release and release action of the anchor lines, made despite the induced decompression reaction and guaranteed by the permanent action of the jacks.

A liberação é feita de forma prudente uma vez que umapossível liquefação do solo poderia transferir o peso do cabo e do seu bulbo deancoragem para o travessão contínuo e, por conseqüência, para as fundaçõesflutuantes, que poderia ser projetada considerando também este peso adicional. Além domais, faz sentido avaliar os prós e os contras desta possibilidade.Release is prudent since a possible liquefaction of the soil could transfer the weight of the cable and its anchor bulb to the continuous transom and, consequently, to the floating foundations, which could also be designed considering this additional weight. Moreover, it makes sense to evaluate the pros and cons of this possibility.

- instalação do piso, através da montagem dos segmentos alçados a partir de umabarcaça, disposta próxima à margem, através de uma conveniente ação combinadaentre guindastes e gruas moveis, os ditos segmentos sendo engatados nos cabosverticais e fixados, através de soldagem ou por parafusos, no piso já instalado. Destaforma, é garantida a navegabilidade na massa de água mesmo nesta fase;- installation of the floor by mounting the raised segments from a barge, arranged close to the bank, by a convenient combined action between cranes and mobile cranes, said segments being attached to the vertical cables and fixed by welding or bolts to the floor already installed. In this way navigability in the water body is guaranteed even at this stage;

- instalação concomitante das diversas treliças transversais horizontais que conectamos dois pisos, através de modalidades similares às utilizadas para os arcos.- Concomitant installation of the various horizontal transverse trusses that connect two floors, through similar modalities to those used for the arches.

Os pisos, diretamente suportados pelos arcos através doscabos verticais, se encontra em continuidades estrutural e funcional com o piso dispostodentro dos travessões contínuos e suportados por estes. O piso, em seu todo, de acordocom uma variante preferida mas não exclusiva, não se comporta como um tirante, deforma que este deve ser independente tanto dos tirantes quanto das estruturas desuporte principais como um todo, isto é, os arcos e os travessões contínuos, com relaçãoao que, portanto, o dito piso deve estar apto a expandir longitudinalmente, exceto por terpontos fixos no interior de ditos travessões contínuos, de modo a evitar os movimentoslongitudinais descontrolados, permanecendo assim apenas os possíveis deslocamentoslongitudinais relativos causados pelas expansões térmicas distintas.The floors, directly supported by the arches through the vertical heads, are in structural and functional continuities with the floor having within and sustaining the continuous crossbars. The floor as a whole, with a preferred but not exclusive variant, does not behave like a tie rod, so it must be independent of both the tie rods and the main supporting structures as a whole, ie the continuous arches and struts. , with respect to which, therefore, said floor must be able to expand longitudinally, except for fixed points within said continuous indents, in order to avoid the uncontrolled longitudinal movements, thus remaining only the possible relative longitudinal displacements caused by the distinct thermal expansions.

- transferência do peso dos tirantes dos cabos provisórios para as hastes de suportevertical especiais, posicionadas dos lados dos pisos e equipadas com colares e selasde ajuste para controlar e manter os tirantes sem dar lugar a restrições anômalas nostirantes ou nos pisos;- transferring the weight of the provisional cable ties to the special vertical support rods, positioned on the sides of the floors and fitted with collars and adjustment saddles to control and maintain the wires without giving rise to anomalous nostalgic or floor restrictions;

- instalação das hastes anti deslizamento;- installation of anti-slip rods;

- construção das rampas ligadas nas infra-estruturas rodoviária e ferroviária existentes;- construction of connected ramps on existing road and rail infrastructure;

- ajuste do acabamento e dos trilhos; teste e abertura da ponte para o trafego.- adjustment of finish and rails; test and bridge opening for traffic.

BREVE DESCRIÇÃO DOS DESENHOSBRIEF DESCRIPTION OF DRAWINGS

A invenção será ora melhor explicada através dos desenhosem anexo, os quais ilustram algumas formas preferenciais de realização prática, trazidasapenas como uma forma de exemplificação, mas não restritiva, enquanto que algumasvariantes técnicas e de construção sempre podem ser realizadas sem com isto escapardo âmbito desta invenção.The invention will now be further explained by way of the accompanying drawings, which illustrate some preferred embodiments, which are merely exemplary, but not restrictive, while some technical and constructional variations can always be realized without thereby departing from the scope of this invention. .

Em ditas figuras:In said figures:

- A figura 1 mostra uma vista lateral da ponte em arco protendida. Na parte de cima émostrada uma variante do travessão contínuo, inserido dentro de um túnel e sem ocontrapeso;- Figure 1 shows a side view of the prestressed arch bridge. At the top is shown a variant of the continuous transom, inserted into a tunnel and without the counterweight;

- A figura 2 mostra uma vista em planta de da ponte em arco protendida da figura 1. Àesquerda do eixo de simetria é mostrado um extradorso da estrutura, no ladoesquerdo do eixo de simetria é mostrado o piso, os cabos verticais de suporte e astreliças horizontais de dito piso, e além disto os dois travessões contínuos dentro docorrespondente túnel;- Figure 2 shows a plan view of the prestressed arch bridge of figure 1. On the left of the symmetry axis is shown an extraction of the structure, on the left side of the symmetry axis is shown the floor, the vertical support cables and horizontal astrellars. of said floor, and furthermore the two continuous indents within the corresponding tunnel;

- A figura 3 mostra uma vista em seção transversal da ponte em arco protendida, feitade acordo com a seção AA da figura 1 e da figura 2;Figure 3 shows a cross-sectional view of the prestressed arch bridge made in accordance with section AA of Figure 1 and Figure 2;

- A figura 5 mostra uma seção transversal genérica de um dos dois pisos ampliandoum detalhe da figura 3;Figure 5 shows a generic cross section of one of the two floors enlarging a detail of Figure 3;

- As figuras 5bis e 5ter mostram duas modalidades de realização das rampashelicoidais;Figures 5bis and 5ter show two embodiments of the rampashelicoids;

- As figuras 4, 6, 7, 8, 9 e 10 mostram seções transversais significativas da estruturaprincipal de suporte (arco e travessão contínuo), do piso em seu interior e daindependência estrutural de dito piso em relação às estruturas de suporte;Figures 4, 6, 7, 8, 9 and 10 show significant cross sections of the main support structure (arc and continuous crossbar), the floor inside and the structural dependence of said floor relative to the support structures;

- A figura 11 mostra uma condição de tensão ocorrendo na estrutura devido à força Sinduzida pelos macacos, o que induz uma força de extensão de equilíbrio igual notirante e uma forma de compressão na chave de fechamento. Ainda mais, tambémsão mostradas as reações verticais, de sinal igual e oposto, agindo nos suportes eglobalmente equilibrando as condições restritivas induzidas pelos macacos em toda aestrutura;Figure 11 shows a stress condition occurring in the structure due to the monkey-induced force, which induces a noticeable equal equilibrium extension force and a form of compression in the closing switch. Further, the same and opposite vertical reactions acting on the supports and also balancing the restrictive conditions induced by apes throughout the structure are also shown;

As figuras 12, 13 e 14 mostram uma modalidade de realização (versão flutuante) dafundação de contrapeso anti-sísmica disposta na extremidade do travessão contínuo,e dos dispositivos de conexão de dita fundação ao dito travessão (cabo deancoragem e isolantes sísmicos, feitos de neoprene reforçado ou de algum materialequivalente). Além disto, são mostrados os batentes provisórios e o nicho dealojamento do cabo de ancoragem;Figures 12, 13 and 14 show an embodiment (floating version) of the anti-seismic counterweight foundation disposed at the end of the continuous member, and the devices connecting said foundation to said member (anchor cable and seismic insulators made of neoprene reinforced material or any equivalent material). In addition, the temporary stops and the anchor line housing niche are shown;

A figura 15 mostra a disposição dos isolantes sísmicos e dos macacos planos nosextradorsos das fundações;Figure 15 shows the arrangement of seismic insulators and flat jacks on foundation extrusions;

As figuras 16, 17 e 18 mostram, de forma esquemática, uma variante (varianteflutuante) da fundação sísmica principal, consistindo principalmente dos isolantessísmicos feitos de neoprene reforçado ou de um material equivalente, interpostosentre a fundação e a estrutura. Estes mostram também os diafragmas antideslizantes e os batentes provisórios;Figures 16, 17 and 18 schematically show a variant (floating variant) of the main seismic foundation consisting mainly of seismic isolates made of reinforced neoprene or an equivalent material interposed between the foundation and the structure. These also show the non-slip diaphragms and the temporary stops;

A figura 19 mostra a colocação proposta para os diafragmas anti deslizantesverticais;Figure 19 shows the proposed placement for the non-slip vertical diaphragms;

A figura 20 mostra a construção no modo em balanço, isto é, sem os andaimes, dossemi-arcos e com o auxilio da grua móvel representada em duas posiçõessubseqüentes (não simultâneas);Figure 20 shows the construction in cantilever mode, that is, without the scaffolding, semi-arches and with the aid of the mobile crane represented in two subsequent (non-simultaneous) positions;

As figuras 21 e 22 mostram alguns reforços provisórios pré tensionamento ajustadospara contrabalançar as forças de flexão fortes que agem nos semi-arcos durante aconstrução destes no modo em balanço. Esta é uma opção alternativa que permite aredução do peso de ditos semi-arcos e que ainda permite reciclar os ditos reforçosprovisórios após o final da construção dos semi-arcos, a sua união com a chave defechamento, e a subseqüente ação de extensão nos tirantes e a otimização seguinteda linha de pressão. Os reforços removidos podem então ser reciclados,preferencialmente, mas não restritivamente, na forma dos cabos verticais e dostirantes para as treliças. O possível uso de materiais inovadores para os ditosreforços pode implicar em uma redução global de peso substancial para toda aestrutura, na lógica do reforço seletivo;Figures 21 and 22 show some pre-tensioned provisional reinforcements adjusted to counterbalance the strong bending forces acting on the half arches during their construction in the swing mode. This is an alternative option that allows the reduction of the weight of said half-arches and still allows to recycle said provisional reinforcements after the construction of the half-arches, their union with the locking key, and the subsequent extension action on the risers and optimization follows the pressure line. The removed reinforcements may then be recycled, preferably, but not restrictively, in the form of vertical and backward truss cables. The possible use of innovative materials for these reinforcements may imply a substantial overall weight reduction for the entire structure, in the logic of selective reinforcement;

As figuras 23, 24, 25, 26 e 27 mostram a instalação das treliças dos semi-arcos, pré-fabricadas no pátio em terra, equipada com pinhões motorizados, auto-propelidos eavançando sobre algumas cremalheiras dispostas nos lados internos dos semi-arcos,de forma sincronizada com o avanço da construção segmentada dos semi-arcos;As figuras 28, 29, 30 e 31 mostram as características das chapas fendidasposicionadas na chave de fechamento para compensar os relativos deslocamentosvertical e transversal entre as extremidades dos semi-arcos que ficam de frente umapara a outra em dita chave de fechamento, enquanto que as ditas chapas permitemrelativos deslocamentos horizontais longitudinais, nominalmente paralelos aos planosdos arcos, e também relativas rotações das extremidades dos semi-arcos. Tudo istopermite que os macacos dispostos na chave de fechamento induzam a condiçãorestritiva necessária, consistindo principalmente na mudança do vão horizontallongitudinal entre as extremidades dos semi-arcos;Figures 23, 24, 25, 26 and 27 show the installation of prefabricated semi-arch trusses in the on-site courtyard, equipped with self-propelled motorized pinions and advancing over some racks disposed on the inner sides of the semi-archs. synchronized with the advancement of the segmented construction of the half-arches; Figures 28, 29, 30 and 31 show the characteristics of the slotted plates positioned on the locking key to compensate for relative vertical and transverse displacements between the ends of the half-arches facing each other in said lock key, while said plates allow relative longitudinal horizontal displacements, nominally parallel to the planes of the arches, and also relative rotations of the ends of the half arcs. All this allows the jacks arranged in the closing switch to induce the necessary restrictive condition, consisting mainly of the change of the horizontal-longitudinal span between the ends of the half-arches;

As figuras 29 e 30 mostram a configuração do grupo de macacos dispostos na chavede fechamento;Figures 29 and 30 show the configuration of the group of jacks arranged in the locking key;

As figuras 32 e 33 mostram uma modalidade alternativa conferindo exclusivamenteaos macacos, com uma configuração conveniente, o controle dos relativosdeslocamentos na chave de fechamento, portanto abolindo as placas fendidas;Figures 32 and 33 show an alternative embodiment conferring exclusively on the jacks, with a convenient configuration, the control of relative displacements in the closing switch, thus abolishing the slit plates;

As figuras 34 e 35 mostram a instalação das treliças auto moventes dos pisos,realizada através de uma modalidade similar àquelas já descritas para as treliças dossemi-arcos;Figures 34 and 35 show the installation of the self-moving floor trusses, carried out in a similar manner to those already described for the semi-arch trusses;

As figuras 36 e 37 mostram as modalidades de instalação dos tirantes com o auxiliodos carretéis de enrolamento e dos cabos piloto;Figures 36 and 37 show the installation modalities of the rods with the aid of winding spools and pilot cables;

- As figuras 38, 39 e 40 mostram a configuração do grupo de macacos dispostos nasextremidades dos tirantes, de acordo com uma variante desta invenção;Figures 38, 39 and 40 show the configuration of the group of jacks disposed at the ends of the risers according to a variant of this invention;

- As figuras 41 e 42 mostram as modalidades de fixação dos terminais dos tirantes;Figures 41 and 42 show the modalities of fastening the tie rods;

- As figuras 43 e 44 mostram a construção em segmentos do piso e o engate dos seussegmentos com os cabos verticais correspondentes, realizada por meio das barcaçasque transportam os ditos segmentos e que são ancoradas próximas da margem. Apartir destas barcaças, e com uma ação combinada conveniente dos guindastes automotores, os segmentos são içados e movidos ao longo do intradorso do piso jáconstruído, até o seu lugar final no qual estes são engatados nos cabos verticais,então conectados por meio de soldagem, porcas ou outras operações equivalentesno piso já construído. E assim por diante até a finalização do piso;Figures 43 and 44 show the construction in segments of the floor and the engagement of its segments with the corresponding vertical cables, carried out by barges carrying said segments and which are anchored close to the bank. From these barges, and with a convenient combined action of the self-propelled cranes, the segments are lifted and moved along the already constructed floor sill to their final place where they are hooked into the vertical cables, then connected by welding, nuts. or other equivalent operations on the floor already built. And so on until the floor is finished;

- As figuras 45, 46, 47 e 48 mostram as hastes interpostas entre os arcos e o piso, nocentro do vão e nos quartos do dito vão livre, para integrar a ação dos cabos verticaisvoltada para contrapor a oscilação de ditos pisos; eFigures 45, 46, 47 and 48 show the rods interposed between the arches and the floor, in the center of the room and in the rooms of said free space, to integrate the action of the vertical cables turned to counteract the oscillation of said floors; and

- As figuras 49, 50 51, 52, 53 e 54 mostram as etapas principais da construção daestrutura, até a sua finalização e abertura para o trafego.Figures 49, 50 51, 52, 53 and 54 show the main steps of the construction of the structure, until its completion and opening for traffic.

De forma mais detalhada, e com relação às figuras 1 e 2, aestrutura resultante é composta principalmente por dois semi-arcos 1, pelos travessõescontínuos 2, pelos pisos ou pistas 3 presos nos semi-arcos 1 por meio dos cabosverticais 4, assim como pelos tirantes 5 dispostos no mesmo nível das pistas 3 e fixados,em suas extremidades 6, nas impostas dos semi-arcos 1. A estrutura pode ser estendida,nas extremidades dos travessões contínuos 2, nas rampas helicoidais 7, as quaisconstituem uma modalidade preferencial, mas não exclusiva, para ligar as pistasrodoviárias e os trilhos com as infra-estruturas similares existentes. A estrutura ésuportada, de preferência, mas não exclusivamente, por fundações dispostas na costa,as fundações principais 8 e as fundações exteriores 9, na variante com as fundaçõesocas flutuantes e/ou na variante com fundações sólidas, ambas equipadas no extradorsoatravés de suportes de neoprene reforçados ou similares 10 (isolantes sísmicos).In more detail, and with respect to FIGS. 1 and 2, the resulting structure is comprised mainly of two half-arches 1, continuous cross-sections 2, floors or runways 3 attached to half-arches 1 by means of vertical cables 4, as well as risers 5 arranged at the same level as runways 3 and fixed at their ends 6 to the half-arches imposts 1. The frame can be extended at the ends of the continuous struts 2 to the helical ramps 7 which constitute a preferred embodiment but not exclusively for connecting road lanes and tracks with existing similar infrastructures. The structure is preferably but not exclusively supported by foundations laid on the coast, main foundations 8 and outer foundations 9 in the variant with floating foundations and / or variant with solid foundations, both equipped on the extractor through neoprene supports. reinforced or similar 10 (seismic insulators).

Os cabos de ancoragem 11, dispostos nas extremidadesdos travessões contínuos 2, contribuem decisivamente para a estabilidade contra ainclinação ou basculamento do sistema composto por ditos travessões contínuos 2 esemi-arcos 1, durante a construção dos ditos semi-arcos no modo em balanço.The anchor lines 11, disposed at the ends of the continuous struts 2, contribute decisively to the stability against tilting or tilting of the system consisting of said continuous strands 2 and half-strands 1 during the construction of said half-arches in swing mode.

A possível presença de um terreno 12 natural elevado,próximo da estrutura, pode ser conveniente para se estender os travessões contínuos 2para dentro do terreno elevado 12 por meio de túneis 13 os quais podem oferecer, comouma alternativa aos cabos de ancoragem 11, uma contra reação equivalente.The possible presence of a raised natural terrain 12 near the structure may be convenient for extending the continuous struts 2 into the raised terrain 12 by means of tunnels 13 which may provide, as an alternative to the anchor lines 11, a counter reaction equivalent.

Uma arquitetura preferencial, mas não exclusiva, mostradadas figuras 1 e 2 da ponte em arco, é dividida em dois arcos 1 planos, verticais,paralelos, e dispostos lado a lado, e afastados ao nível das juntas de suporte 14 e, nachave fechamento, com as juntas 15, ligadas pelas treliças 16 e 16', conformadas comoestruturas armadas ou como estruturas em forma de caixa leve, ou em outros formatos.A preferred, but not exclusive, architecture shown in Figures 1 and 2 of the arch bridge is divided into two planes 1, vertical, parallel, arranged side by side, spaced apart at the support joints 14 and, at the closing, with the joints 15, connected by the trusses 16 and 16 ', formed as reinforced structures or as light box or other shapes.

Os travessões contínuos 2, conformados como estruturasarmadas, ou como estruturas em forma de caixa leve, ou em outros formatos formam,preferencialmente, mas não necessariamente, um desenvolvimento único na extensãoentre as juntas de suporte 14 e as juntas de suporte 17 dispostas sobre os cabos deancoragem 11 (figuras 12, 13 e 14).The continuous struts 2, formed as armored structures, or as light box or other shaped structures, preferably, but not necessarily, form a unique development in the extent between the support joints 14 and the support joints 17 disposed on the cables. anchor 11 (Figures 12, 13 and 14).

Internamente aos travessões, o piso 3 é estendido tantoquanto necessário para alcançar as pistas helicoidais 7.Internally to the crossbars, the floor 3 is extended as far as necessary to reach the helical runways 7.

De forma simples, toda a estrutura poderia ser suportadaem oito pontos, sobre um mesmo número de fundações, todas estas dispostas nasmargens, quatro em cada margem, duas para as juntas de suporte 14 nas impostas dossemi-arcos 1 e duas nas juntas de suporte 17, nas extremidades dos travessõescontínuos 2.Simply put, the entire structure could be supported at eight points on the same number of foundations, all of which are arranged in the margins, four on each edge, two for the support joints 14 in the imposed half-joints 1 and two in the support joints 17. , at the ends of the continuous bars 2.

Os dois pisos 3, ou pistas, ligados pelas treliças 56 e 56',são suportados pelos arcos 1 através de cabos verticais 4; ditos pisos são portantodispostos em uma projeção vertical de ditos arcos 1, então se estendem para dentro dostravessões contínuos 2 e alcançam as rampas 7 das figuras 5bis e 5ter, as quaismostram algumas modalidades de ligação entre os pisos 3 e a infra-estrutura restante.The two floors 3, or runways, connected by the trusses 56 and 56 ', are supported by the arches 1 through vertical cables 4; said floors are therefore arranged in a vertical projection of said arcs 1, then extend into continuous crossings 2 and reach the ramps 7 of figures 5bis and 5ter, which show some modalities of connection between the floors 3 and the remaining infrastructure.

De acordo com uma arquitetura preferencial, mas nãoexclusiva, os ditos pisos 3 são feitos com uma estrutura em forma de caixa, internamentecom treliças, tal como o quanto mostrado nas figuras 5, 6, 7, 8, 9 e 10, relativas ásseções transversais AA-BB-CC nos semi-arcos 1, a seção DD nos suportes 14, a seçãoEE nos travessões contínuos 2 e a seção FF nos suportes 17.According to a preferred but non-exclusive architecture, said floors 3 are made with a box-like structure, internally with trusses, as shown in figures 5, 6, 7, 8, 9 and 10, relative to the transverse sections AA -BB-CC on half-arcs 1, section DD on brackets 14, sectionEE on continuous dashes 2 and section FF on brackets 17.

As figuras 5, 6, 7, 8, 9 e 10 mostram a posição das cargasem deslocamento, com as rodoviárias 18 em deslocamento sobre o extradorso do piso 3,e as ferroviárias 19 se deslocando sobre o intradorso do dito piso 3.Figures 5, 6, 7, 8, 9 and 10 show the position of the moving loads, with the road 18 moving over the floor 3 and the rail 19 moving over the floor 3.

Além disto, as figuras 3, 4 e 5 mostram as posições doscabos verticais 4 que suportam o piso 3 e as treliças 66' dispostas no centro do vão enos quartos de dito vão.In addition, figures 3, 4 and 5 show the positions of the vertical heads 4 that support the floor 3 and the trusses 66 'arranged in the center of the gap and the quarters of said gap.

A figura 6 antecipa alguns detalhes das treliças 16 e 56descritas com mais detalhes nas figuras seguintes.Figure 6 anticipates some details of trusses 16 and 56 described in more detail in the following figures.

Em relação ao aspecto estático, os empuxos induzidos nosarcos 1 pelo piso 3 e pelas cargas em deslocamento 18 e 19 neste contido, sãointeiramente contrabalançados ou neutralizados pelos tirantes 5 horizontais, os quaispodem contrabalançar também aqueles induzidos pelo próprio peso dos ditos arcos 1, deacordo com uma variante preferencial, mas não exclusiva, desta ponte em arcoprotendida.In relation to the static aspect, the pulls induced in the arches 1 by the floor 3 and the shifting loads 18 and 19 contained therein are entirely counterbalanced or neutralized by the horizontal risers 5, which can also counterbalance those induced by the weight of said arches 1, according to a preferred but not exclusive variant of this archprotected bridge.

Desta forma, e portanto é possível evitar que os pisos 3sejam submetidos a forças axiais horizontais permanentes relevantes.In this way, and therefore it is possible to prevent the floors 3 from being subjected to relevant permanent horizontal axial forces.

Se, ao invés disto, deseja-se obter um comportamentocomo o de um arco com três juntas, isto é, uma junta 15 dupla na chave de fechamento(um para cada arco), uma junta de suporte 14 dupla (uma para cada arco) em umamargem e uma outra junta de suporte 14 dupla na outra margem, é possível induzir, apósa instalação dos tirantes 5, forças horizontais na chave de fechamento 15 por meio demacacos hidráulicos com capacidade adequada, ou através de meios equivalentes,equilibradas por forças de tensão iguais que agem nos tirantes 5, tal como o quantomostrado através da figura 11. Desta forma, é possível obter-se uma linha de pressãomais centralizada, particularmente reduzindo os grandes momentos de flexão que agemnas impostas dos arcos 1 e que são induzidos pelo seu próprio peso.If, instead, one wants to behave like a bow with three joints, that is, a double joint 15 in the closing switch (one for each arc), a double support joint 14 (one for each arc) at one edge and another double support joint 14 at the other edge, it is possible to induce, after the installation of tie rods 5, horizontal forces on the locking key 15 by means of suitable capacity hydraulic jacks, or by equivalent means, balanced by tension forces. acting on the risers 5, such as the amount shown in Fig. 11. In this way a more centralized pressure line can be obtained, particularly by reducing the large bending moments imposed by the arcs 1 and which are induced by their own Weight.

Os maçados hidráulicos, ou sistemas equivalentes, podemser permanentemente ativos na junta 15 e podem ser inseridos em um sistema integradoque se estende por toda a ponte, junto com sensores, ou outros dispositivos, para omonitoramento global da estrutura, de modo a otimizar a condição de tensão quecontrabalança dinamicamente a variação das forças externas induzidas principalmentepelas cargas rodantes, pelo vento, pelos terremotos, pelas variações térmicas, peladeformação dos materiais, pelas composições diferenciadas do solo ou por outrosfatores ambientais.As figuras 12, 13 e 14 mostram uma modalidade derealização da fundação-contrapeso equipada com um cabo de ancoragem 11, o qualsuporta e/ou mantém o travessão contínuo 2 em sua extremidade externa, isto é, na qualo dito travessão está unido com as pistas 7. Além do mais, são mostrados os batentesprovisórios 20 para ajustar o contrabalanço, antes da ativação dos tirantes, os possíveisdeslocamentos longitudinais e/ou transversais induzidos pelo vento, devido a umacondição temporária de possíveis deslizamentos de toda a estrutura nos isolantessísmicos, ainda não fixados em seus topos, por meio de pregos e colares, na estruturasupra.Hydraulic pallets, or equivalent systems, can be permanently active in joint 15 and can be inserted into an integrated system that extends across the bridge, along with sensors, or other devices, for overall frame monitoring to optimize the condition of the bridge. dynamically compensating for the variation of external forces induced mainly by rolling loads, wind, earthquakes, thermal variations, material deformation, differentiated soil compositions or other environmental factors. Figures 12, 13 and 14 show a mode of foundation realization. A counterweight fitted with an anchor line 11 which supports and / or holds the continuous cross member 2 at its outer end, ie where said cross member is joined with raceways 7. In addition, the provisional stops 20 for adjusting are shown. counterbalance, before activating the risers, the possible long displacements Itudinal and / or transverse winds induced due to a temporary condition of possible slippages of the entire structure in the seismic isolates, not yet fixed to their tops by means of nails and collars, in the superstructure.

A fundação-contrapeso, de acordo com esta modalidade,pode ser realizada, preferencialmente, mas não restritivamente, compondo a ação decontrapeso de um cabo de ancoragem 11 vertical ancorado no solo através do bulbo .21,realizado através de tecnologia conhecida, por meio da injeção de argamassa de cimentocom quantidades e profundidade suficientes, com aquela da fundação 9 mostrada nosdesenhos como uma fundação oca flutuante, mas substancialmente similar àquela sólidafornecida para os sólidos não sujeitos a liquefação, tipicamente de rochas.The counterweight foundation, according to this embodiment, may be performed, preferably, but not restrictively, by composing the counterweight action of a vertical anchor line 11 grounded through the bulb .21, realized by known technology, by means of injection of cementitious mortar with sufficient quantities and depth, with that of foundation 9 shown in the drawings as a floating hollow foundation, but substantially similar to that solid provided for non-liquefied solids, typically of rocks.

A figura 15 mostra o padrão para os isolantes sísmicos 10,suportados pelos embasamentos 22, contornados no topo pelos colares 23 fixados nointradorso dos suportes da estrutura por meio de garras verticais 24 que penetram nafolha 25 lisa. Ditos embasamentos 22 apresentam uma altura condicionada pelaotimização dos isolantes 10 e pelos requisitos de praticidade para o espaço livreinterposto entre o extradorso da fundação e o intradorso da estrutura. As linhas regularesdos isolantes 10 são interpostas por linhas regulares de macacos hidráulicos 26suportados pelos embasamentos 27. A parte superior da figura mostra o conjunto emuso e a parte inferior desta mostra a operação de levantamento da ponte, através daativação dos macacos planos.Figure 15 shows the pattern for seismic insulators 10, supported by the basements 22, contoured at the top by the collars 23 fixed to the inside of the frame supports by vertical jaws 24 which penetrate the smooth sheet 25. Said basements 22 have a height conditioned by the optimization of the insulators 10 and by the practicality requirements for the free space interposed between the foundation extrusion and the structure intrusion. The regular lines of the insulators 10 are interposed by regular lines of hydraulic jacks 26 supported by the pillars 27. The upper part of the figure shows the set in use and the lower part of this shows the bridge lifting operation by activating the flat jacks.

As figuras 16, 17 e 18 mostram uma modalidade derealização para as fundações 8 ocas flutuantes, as quais suportam diretamente os arcos1 e parte dos travessões contínuos 2, através das juntas de suporte 14 (figura 1),realizada por meio de isolantes sísmicos 10. Os diafragmas verticais 28 que envolvem asfundações 8 ocas flutuantes são necessários apenas para estas fundações flutuantes,com função antideslizamento, sendo inseridos no solo não liqüefeito 29. Também sãomostrados os batentes provisórios 20, cuja função já foi descrita acima.Figures 16, 17 and 18 show a realization embodiment for the floating hollow foundations 8, which directly support the arcs1 and part of the continuous struts 2, through the support joints 14 (figure 1), made by seismic insulators 10. Vertical diaphragms 28 involving floating hollow foundations 8 are required only for these non-sliding floating foundations and are inserted into the non-liquefied soil 29. Provisional stops 20, whose function has already been described above, are also shown.

A figura 19 mostra o plano das oito fundações, indicando asfundações principais 8, duas das quais contornadas ou envolvidas pelos diafragmas antideslizamento 28, e as fundações exteriores 9. Entre as fundações principais 8 émostrado o fluxo de água 30.Figure 19 shows the plane of the eight foundations, indicating the main foundations 8, two of which are circumvented or surrounded by the anti-slip diaphragms 28, and the outer foundations 9. Between the main foundations 8 the water flow 30 is shown.

A figura 20 mostra as modalidades de levantamento,transferência e instalação dos segmentos 31 previstos para a construção no modo embalanço dos semi-arcos 1, através de um guindaste auto-propelido 32, equipado com umbraço rotatório que permite a este levantar os segmentos pré-fabricados do pátio deprodução próximo aos travessões contínuos 2. O dito guindaste de desloca por sobreuma cremalheira instalada no extradorso dos travessões contínuos 2 e nos semi-arcos 1.Figure 20 shows the lifting, transfer and installation modalities of the segments 31 foreseen for the semi-arch wrap-up construction 1, by means of a self-propelled crane 32, equipped with a rotating arm allowing it to lift the pre-segments. manufactured from the production yard next to the continuous bars 2. Said crane moves on a rack installed on the extractor of the continuous bars 2 and the half-arches 1.

Esta modalidade de instalação preferencial dos segmentosThis preferred mode of installation of the segments

evita interferências com a navegação.avoids interference with navigation.

A figura 21 mostra uma primeira configuração dos cabosFigure 21 shows a first cable configuration.

pré-tensionados 34, os quais são estendidos até a extremidade exterior 35 do últimosegmento 36 instalado, convenientemente tensionado e fixado. Estes são cabos comcomprimentos diferentes, estendidos a partir de uma extremidade comum 37.Obviamente, os mais longos são estendidos desde a extremidade comum 37 até a chavede fechamento 15 do arco.pre-tensioned 34 which are extended to the outer end 35 of the last installed segment 36, conveniently tensioned and secured. These are cables of different lengths, extended from one common end 37. Obviously, the longest are extended from the common end 37 to the arc lock 15.

A figura 22 mostra uma segunda configuração para oscabos pré-tensionados 38, fixados na extremidade 39 de um segmento específico 40,com um trecho adicional 41 de cabo estendido por todo o segmento seguinte 42 e ligadono dispositivo de ancoragem 39 do segmento anterior 40. A conexão no dispositivo deancoragem 39 implica no uso de juntas especiais, realizadas através de tecnologiasconhecidas.Fig. 22 shows a second configuration for pre-tensioned strands 38, fixed to the end 39 of a specific segment 40, with an additional cable stretch 41 extending throughout the next segment 42 and attached to the anterior segment anchor 39. A Connection to the anchor device 39 implies the use of special joints made by known technologies.

Para qualquer das modalidades propostas e ilustradasrespectivamente pelas figuras 21 e 22, pode-se supor a reutilização destes cabos 34 e38, sujeita a sua remoção após o tensionamento dos tirantes 5, como os cabos verticais4 que suportam o piso 3 e como os componentes das treliças ou amarras horizontais 56'(figuras 34 e 35).For any of the embodiments proposed and illustrated respectively by FIGS. 21 and 22, reuse of these cables 34 and 38 may be assumed, subject to their removal after tensioning of the risers 5, such as the vertical cables4 supporting the floor 3 and the components of the trusses. or horizontal lashings 56 '(figures 34 and 35).

As figuras 23, 24, 25, 26 e 27 mostram as modalidades deinstalação entre os semi-arcos 1 e as treliças articuladas 16 e 16', pré-fabricadas emterra, entre os travessões contínuos 2, lateralmente equipados com pinhões 43 atuadospor motores 44 (preferencialmente elétricos) coaxiais a ditas treliças, e realizado o seuavanço ao longo das cremalheiras 45 de forma a que estes podem ser dispostospróximos das extremidades dos semi-arcos 1 em progresso, assumindo desta forma umaação permanente de enrijecimento ou fortificação de ditos semi-arcos 1 para melhorcontrapor a ação do vento também durante a construção no modo em balanço de ditossemi-arcos. Além do mais, devem ser previstos dispositivos de fixação (entre cadaoperação de avanço e a próxima) entre os pinhões 43 e os semi-arcos 1. Tal operaçãode fixação será definitiva após o término dos semi-arcos e das suas junções na chave defechamento.Figures 23, 24, 25, 26 and 27 show the modalities of installation between the half-arches 1 and the prefabricated articulated trusses 16 and 16 ', between the continuous bars 2, laterally equipped with pinions 43 actuated by motors 44 ( preferably electric) coaxial to said trusses, and advanced along the racks 45 so that they can be arranged near the ends of the half-arches 1 in progress, thereby assuming a permanent stiffening or fortification of said half-arches 1 to better counteract wind action also during construction in diosemi-arc swing mode. In addition, clamping devices (between each forward and next operation) shall be provided between pinions 43 and half-arches 1. Such clamping operation shall be final after the end of the half-arches and their joints in the closing switch.

As figuras 28, 29, 30 e 31 mostram uma modalidade derealização preferencial, mas não restritiva, das juntas 15 dispostas na chave defechamento. Esta é a mesma caso em dita chave de fechamento sejam instalados osmacacos 46, tal como ilustrado nas figuras 29 e 30.Figures 28, 29, 30 and 31 show a preferred but non-restrictive embodiment of the joints 15 arranged in the locking key. This is the same case in which a locking switch is fitted with jacks 46 as illustrated in figures 29 and 30.

Cada uma dentre as duas juntas gêmeas 15 é composta deum sistema de chapas verticais 47 fixadas, e em continuidade, com os semi-arcos 1, ede chapas horizontais 48 unidas nos semi-arcos 1 através de juntas auxiliares 49. Todasestas chapas são equipadas com fendas 50 e pinos cilíndricos 51, e são acopladas deacordo com uma modalidade macho-fêmea.Each of the two twin joints 15 is comprised of a system of fixed vertical plates 47, and in continuity with half-arches 1, and horizontal plates 48 joined at half-arches 1 by auxiliary joints 49. All these plates are equipped with slots 50 and cylindrical pins 51, and are coupled according to a male-female embodiment.

As chapas fêmeas são duplas, equipadas com fendas 50 enão com os pinos 51; as chapas macho são simples e equipadas com pinos 51, mas nãocom as fendas 50. Os ditos pinos entram nas fendas sem folga transversal, bloqueandodesta forma os relativos deslocamentos transversais potenciais em ditas fendas. Aschapas verticais 47, equipadas com fendas horizontais, bloqueiam assim os relativosdeslocamentos verticais entre as duas extremidades dos semi-arcos 1 que ficam defrente um para o outro nas juntas gêmeas 15.The female plates are double, equipped with slots 50 and not with pins 51; the male plates are simple and equipped with pins 51, but not with slots 50. Said pins enter the slots without transverse clearance, thereby blocking the relative potential transverse displacements in said slots. Upright plates 47, equipped with horizontal slots, thus block the relative vertical displacements between the two ends of the half-arches 1 facing each other at the twin joints 15.

As chapas horizontais 48, equipadas com fendaslongitudinais, bloqueiam, de forma similar, os relativos deslocamentos transversaishorizontais. Deste modo, os relativos deslocamentos longitudinais horizontaispermanecem livres, sujeitos ao comprimento das fendas, o que impõem um limitesuperior aos ditos deslocamentos, compatível com o percurso dos macacos que controla,de forma indireta e deste modo, a tensão nos tirantes e portanto o seu alongamento.The horizontal plates 48, equipped with longitudinal slits, similarly block relative horizontal transverse displacements. Thus, the relative horizontal longitudinal displacements remain free, subject to the length of the slits, which imposes a higher limit than said displacements, compatible with the monkey's path that indirectly and thus controls the tension on the risers and therefore their elongation. .

Além disto, a relativa rotação ao redor do eixo horizontal transversal permanece livre,compatível com a configuração de todas as fendas e auxiliado pelas juntas auxiliares 49,com as quais as placas horizontais 48 são equipadas. Assim sendo, é permitida a funçãode junta para as juntas gêmeas 15, de modo a que a linha de pressão resultecentralizada na chave de fechamento. Os pinos 51 são submetidos a tensões decisalhamento induzidas pelos deslocamentos relativos articulados por ditos pinos. Asextremidades de ditos pinos são equipadas com cabeças 52 dando-lhes a forma degrandes parafusos, particularmente aptos a reduzir o vão entre as ditas cabeças e asditas chapas.In addition, the relative rotation around the transverse horizontal axis remains free, compatible with the configuration of all slots and aided by the auxiliary joints 49, with which the horizontal plates 48 are fitted. Thus, the joint function for the twin joints 15 is allowed, so that the pressure line results in the closing switch. Pins 51 are subjected to shear stresses induced by relative displacements articulated by said pins. The ends of said pins are equipped with heads 52 in the form of large screws, particularly capable of reducing the gap between said heads and said plates.

As rotações relativas ao redor dos eixos verticais dasextremidades dos semi-arcos 1, induzidas tendencialmente pelas forças horizontais,transversais à ponte tais como do vento, são compensadas pela indução em cada umadas juntas 15 gêmeas, por meio dos macacos 46, de diferentes empuxos longitudinaishorizontais, suficientes para induzir um momento de reação de sinal oposto àquele domomento induzido pelas forças transversais externas.The relative rotations around the vertical axes of the ends of the half-arcs 1, induced by the horizontal forces, transverse to the bridge such as wind, are compensated by the induction at each of the twin joints by means of the jacks 46 of different horizontal longitudinal thrusts. , sufficient to induce a signal reaction moment opposite to that domination induced by external transverse forces.

As figuras 29 e 30 mostram a configuração dos macacos 46dispostos nas chaves gêmeas 15 e inseridos no sistema de chapas fendidas 47 e 48, emque cada um dos macacos integra a ação de controle da condição de estresse na chavede fechamento. As ditas chapas fendidas garantem principalmente que os macacospodem estar em condição de induzir apenas forças axiais, enquanto que os macacostransversais são diretamente contra atuados pelas próprias chapas fendidas. Aconfiguração preferencial, mas não restritiva, escolhida fornece dois grupos de macacoscilíndricos [bottle Jack] dispostos de forma em eixos horizontal longitudinal e paralelo, umpara cada par de semi-arcos 1. Os seus braços 53 atuam através de duas extremidades54 nos semi-arcos 1 opostos. Portanto, tratam-se de dois grupos independentes, umpara cada junta 15 gêmea. Cada um dos macacos pode então ser independente detodos os demais, de forma a estar apto a obter por vontade, localmente ou globalmente,a força resultante total de ambos os grupos.Figures 29 and 30 show the configuration of the jacks 46 arranged in the twin keys 15 and inserted into the slotted plate system 47 and 48, in which each of the jacks integrates the stress condition control action in the locking key. Said slit plates mainly guarantee that the macaques can be able to induce only axial forces, while the cross-sectional macaques are directly counteractuated by the slit plates themselves. The preferred but not restrictive configuration chosen provides two groups of bottle jack arranged in longitudinal and parallel horizontal axes, one for each pair of halfarches 1. Their arms 53 act through two ends54 in the halfarches 1 opposites. Therefore, these are two independent groups, one for each twin joint. Each of the monkeys can then be independent of all the others, so as to be able to willingly obtain, locally or globally, the total resulting strength of both groups.

Os dois grupos podem então, em particular, induzir, deforma síncrona, duas forças diferentes, condição necessária para induzir um momento nachave de fechamento apta a contrabalançar as formas transversais do vento.The two groups can then, in particular, synchronously induce two different forces, which is a necessary condition for inducing a key closing moment capable of counteracting the transverse shapes of the wind.

Assim, e dentro do mesmo grupo, é possível diferenciar asforças entre os diversos macacos de forma a que, em particular, as forças no extradorsosejam diferentes daquelas no intradorso, permitindo então eliminar a rotação relativa nachave de fechamento entre os semi-arcos 1.Thus, within the same group, it is possible to differentiate the forces between the various monkeys so that, in particular, the forces on the extractor are different from those on the intruder, thus allowing to eliminate the relative rotation of the closing key between the half-arcs 1.

Uma redundância adequada no número total de macacospodem, além disto, contrapor possíveis falhas aptas a desabilitar alguns dos macacos. Onúmero de macacos nas figuras 29 e 30 é dado apenas como uma indicação. Além domais, pode ser escolhida uma alternativa radical, permitindo a remoção de todas asplacas fendidas e transferindo exclusivamente para os macacos, configurados de formaconveniente, o controle total dos relativos deslocamentos na chave de fechamento. Tudoisto é particularmente realizado através de um sistema conveniente de pares bifurcadosde macacos 55 dispostos parcialmente verticais e parcialmente horizontais, tal comoilustrado através das figuras 32 e 33.Proper redundancy in the total number of monkeys can also counteract potential failures that could disable some of the monkeys. The number of monkeys in figures 29 and 30 is given as an indication only. Moreover, a radical alternative can be chosen, allowing removal of all cracked plates and transferring exclusively to the conveniently configured jacks full control of the relative displacements in the closing switch. This is particularly accomplished by a convenient system of partially vertical and partially horizontal monkey-forked pairs 55, as illustrated by Figures 32 and 33.

Os ditos pares tem a função principal de bloquear osrelativos deslocamentos horizontais e verticais, através de uma diferenciaçãoconveniente na projeção dos aríetes correspondentes de modo a induzir forçascontrapostas transversais.Said pairs have the main function of blocking the relative horizontal and vertical displacements, through a convenient differentiation in the projection of the corresponding rams in order to induce transverse opposing forces.

As figuras 34 e 35 mostram a instalação das treliças 56 e56' auto propelidas motorizadas no plano horizontal dos pisos 3, realizada commodalidades similares àquelas fornecidas para as treliças dos semi-arcos 1. Além disto,e neste caso, as ditas treliças são pré-fabricadas e montadas em terra e transferidasatravés de cremalheiras 57 e dos pinhões motorizados 43 para a posição mais avançadae sincronizada com o avanço da instalação do piso 3.Figures 34 and 35 show the installation of motorized self-propelled trusses 56 and 56 'in the horizontal plane of the floors 3, realized similar commodities to those provided for the half-arch trusses 1. In addition, in this case, said trusses are pre-arranged. manufactured and mounted on the ground and transferred through racks 57 and motorized pinions 43 to the most advanced position and synchronized with the advance of the floor installation 3.

As figuras 36 e 37 mostram as modalidades de instalaçãodos tirantes com o auxílio de carretéis de enrolamento e cabos piloto. A figura 36 mostrao avanço do tirante 5, arrastado pelo cabo piloto 58 enrolado no carretei 59, o dito tirantesendo em seguida desenrolado do carretei 60, disposto ao lado do travessão contínuo 2,desviado para o interior da abertura 61, inserido no túnel 62 mostrado pelas figuras 38,39 e 40, arrastado para o exterior do arco 1, acoplado nos cabos verticais 4 eprogressivamente transferido para a abertura 63, sendo então sucessivamente fixado,nas aberturas 61 e 63, nas cangas 64 e 65, tal como ilustrado na figura 37.Figures 36 and 37 show the installation modalities of the rods with the help of winding spools and pilot cables. Fig. 36 shows the advance of the rod 5, drawn by the pilot cable 58 wound on the reel 59, said then unwound rod of the reel 60, disposed on the side of the continuous beam 2, deflected into the opening 61, inserted in the tunnel 62 shown 38,39 and 40, dragged outwardly of the bow 1, coupled to the vertical cables 4 and progressively transferred to the opening 63, and then successively attached to the openings 61 and 63, to the sleeves 64 and 65, as shown in the figure 37

As figuras 38, 39 e 40 mostram uma modalidade alternativapara a extensão ou tensionamento dos tirantes e para o controle deste tensionamentoem uso. Os grupos de macacos 46 são instalados nas extremidades dos tirantes 5, cujasextremidades 6 são fixadas nas cangas 64 as quais agem diretamente nos aríetes 53. Onúmero de macacos cilíndricos mostrado na figura é apenas uma indicação, e pode sercaracterizado por uma redundância adequada.Figures 38, 39 and 40 show an alternative embodiment for the extension or tensioning of the tie rods and for the control of this tensioning in use. Jack groups 46 are installed at the ends of tie rods 5, the ends of which 6 are attached to sleeves 64 which act directly on rams 53. The number of cylindrical jacks shown in the figure is only an indication, and may be characterized by proper redundancy.

Contudo, a dita modalidade alternativa implica ou nacontinuidade estrutural da chave de fechamento (eliminação da junta 15) ou na presençade outros grupos de macacos, tal como o quanto ilustrado nas figuras 29, 30, 31, 32 e33. Neste último caso, existem assim dois sistemas complementares de macacos,parcialmente na chave de fechamento 15 e parcialmente nas extremidades 6 dostirantes. O aumento da complexidade operacional que segue pode ser compensada poruma por uma reatividade mais efetiva do sistema.However, said alternative embodiment implies either the structural continuity of the lock key (deletion of the joint 15) or the presence of other monkey groups, as illustrated in Figures 29, 30, 31, 32 and 33. In the latter case, there are thus two complementary monkey systems, partly on the locking key 15 and partly on the backward ends 6. The increase in operational complexity that follows can be offset by a more effective system reactivity.

Os ditos grupos são alojados dentro das aberturas 61,dispostos ao lado do semi-arco 1 e posicionados aproximadamente na vertical da juntade suporte 14. Após a instalação dos macacos em dita abertura 61, é possível realizar oseu tensionamento. Apenas um grupo de macacos é previsto para cada tirante 5. Após ainstalação seguinte do piso 3, o tirante 5 será deitado sobre os braços guia 66projetando-se para cima a partir de dito piso 3 por todo o seu comprimento exposto,eliminando desta forma o grande peso próprio dos ditos tirantes.Said groups are housed within the openings 61, disposed next to the half-arc 1 and positioned approximately vertical of the support joint 14. After installation of the jacks in said opening 61, it is possible to perform their tensioning. Only one group of jacks is provided for each tie 5. After the next installation of floor 3, tie 5 will be laid on the guide arms 66 projecting upwards from said floor 3 for its entire exposed length, thereby eliminating the great own weight of the said risers.

Tudo isto garante uma efetividade muito maior para a açãodos macacos, reduzindo consideravelmente as forças necessárias para que se obtenha aelongação elástica prescrita para os tirantes 5.All of this ensures much greater effectiveness for the action of jacks, considerably reducing the forces required to obtain the elastic elongation prescribed for the tie rods 5.

As figuras 41 e 42 mostram as modalidades de fixação dosterminais 6 dos tirantes 5 nas cangas 65 dispostas dentro da abertura 53.Figures 41 and 42 show the modalities of fastening the terminal 6 of the tie rods 5 to the sleeves 65 disposed within the opening 53.

As figuras 43 e 44 mostram a instalação dos pisos 3 atravésda montagem dos segmentos 67.Figures 43 and 44 show the installation of floors 3 by mounting segments 67.

Cada segmento é alçado de uma barca 68, ancoradapróxima ao banco 69, por meio de um garfo de contrapeso 70, alçado por meio deguinchos 71 dispostos no intradorso já montado do piso. Ditos guinchos se posicionamna vertical do local designado para o dito segmento 67, no qual uma grua móvel 72, quese desloca por sobre o extradorso do piso 3 e entre o par de cabos verticais, pega osegmento 67 e libera o garfo 70, o qual pode ser reposicionado sobre a barca 68 para apróxima operação.Each segment is raised from a barge 68, anchored close to the seat 69, by means of a counterweight fork 70, raised by means of hooks 71 arranged on the already mounted floor sill. Said winches are positioned vertically from the location designated for said segment 67, in which a mobile crane 72, which travels over the floor extractor 3 and between the pair of vertical cables, picks up the segment 67 and releases the fork 70, which can be repositioned on barge 68 for further operation.

A grua móvel 72 então alça e desloca o segmento 67 paracima de sua posição final, na qual está será fixada nos cabos verticais 4 e presa nosegmento precedente por soldagem ou parafuso, ou através de outros meios. Após afinalização da instalação do piso 3, é possível deitar o tirante 5 nos braços guia 66mostrados nas figuras 38, 40, 41 e 42, por meio de um cabo subvertical provisório, assimtransferindo o peso dos tirantes para o piso e indiretamente para os semi-arcos 1.Mobile crane 72 then lifts and moves segment 67 upwards from its final position, where it is to be fixed to the vertical cables 4 and secured to the preceding segment by welding or screwing, or by other means. Upon completion of the installation of the floor 3, it is possible to lay the tie rod 5 on the guide arms 66 shown in figures 38, 40, 41 and 42, by means of a provisional subvertical cable, thus transferring the weight of the tie rods to the floor and indirectly to the semi- bows 1.

As figuras 45, 46, 47 e 48 mostram as hastes leves 73presas nos semi-arcos 1 e inseridas abaixo, em cavidades coaxiais 74 que se projetampara fora a partir do extradorso do piso 3. Entre a extremidade inferior da haste e o fundoda cavidade é previsto um vão que aloja uma mola de medição 75, a qual permitetransferir gradualmente para a haste a força axial induzida pelo potencial deslocamentopara cima do piso, induzido pela oscilação, a qual assim pode ser eliminada.Figures 45, 46, 47 and 48 show the light rods 73 secured in the half arches 1 and inserted below into coaxial cavities 74 protruding outward from the floor extractor 3. Between the lower end of the rod and the cavity bottom is A span is provided which houses a metering spring 75, which allows the axial force induced by the oscillating potential above the floor to be gradually transferred to the rod, which can thus be eliminated.

A haste, no caso de uma oscilação incipiente, se comportacomo uma escora, de forma que esta precisa de uma treliça 76 apropriada contra ainstabilidade lateral. Na ausência da oscilação, as hastes são submetidas apenas àsforças de compressão induzidas pelo seu próprio peso, uma vez que elas sãosimplesmente mantidas através da sua extremidade superior.The rod, in the event of incipient oscillation, behaves like a strut, so that it needs an appropriate truss 76 against lateral instability. In the absence of oscillation, the rods are subjected only to their own weight-induced compression forces, as they are simply maintained through their upper extremity.

Os cabos verticais 4 bloqueiam, como já dito, osdeslocamentos para baixo induzidos pela oscilação.The vertical cables 4 block, as already mentioned, the oscillation-induced downward shifts.

As ditas hastes são dispostas no centro do vão, isto é, decada lado da chave de fechamento e próximas a dita chave de fechamento, além de nosquartos do vão livre, tal como o quanto listrado pela figura 48.Said rods are arranged in the center of the span, that is, on each side of the locking key and close to said locking key, in addition to the spaces of the clearance, such as how striped by Figure 48.

Além disto, os tirantes 5, por meio dos braços guia 66,auxiliam na eliminação da oscilação, na medida da maior força aplicada nos tirantes e deseu módulo elástico.In addition, the risers 5, by means of the guide arms 66, assist in the elimination of oscillation as the greatest force applied to the risers and its elastic module.

As figuras 49, 50, 51, 52, 53 e 54 mostram as modalidadesde construção da ponte em arco em uma seqüência cronológica, e com relação aos seusaspectos principais. A construção é realizada com tendência sincronizada e simetria emrelação às duas margens. De forma mais detalhada:Figures 49, 50, 51, 52, 53 and 54 show the modalities of arch bridge construction in a chronological sequence, and with respect to their main aspects. The construction is performed with synchronized tendency and symmetry in relation to the two margins. In more detail:

A figura 49 mostra a construção tendencialmenteconcomitante, em cada margem, das fundações principais, mostradas nas figuras 16, 17e 18, e das fundações de contrapeso mostradas pelas figuras 12, 13 e 14.Figure 49 shows the concomitant trend construction at each margin of the main foundations shown in figures 16, 17 and 18, and counterweight foundations shown in figures 12, 13 and 14.

A figura 50 mostra a construção dos travessões contínuos 2e dos respectivos trechos do piso 3.Figure 50 shows the construction of the continuous struts 2e of the respective floor sections 3.

A figura 51 mostra a construção, no modo em balanço, dossemi-arcos 1 realizada através das modalidades mostradas nas figuras 20, 21 e 22.A figura 52 mostra a finalização dos semi-arcos 1 até a suajunção na chave de fechamento 15, dos cabos verticais 4 e a instalação de dita chave defechamento dos macacos de neutralização, e ainda mais a instalação do tirante 5 atravésdas modalidades necessárias para evitar qualquer interferência com a navegação nocorpo de água 30.Fig. 51 shows the semi-arc construction of the semi-arcs 1 carried out by the embodiments shown in Figs. 20, 21 and 22. Fig. 52 shows the completion of the semi-arcs 1 to their fitting in the lock key 15 of the vertical cables 4 and the installation of said locking switch of the neutralizing jacks, and further the installation of the tie rod 5 through the necessary modalities to avoid any interference with the navigation of the water body 30.

Além disto, esta mostra a configuração da ponte com ostirantes 5 em sua disposição final, após o seu tensionamento pelos macacos instaladosna chave de fechamento 15 (ou, de acordo com uma modalidade alternativa já descrita,instalado na extremidade do tirante) e mantidos em uma disposição horizontal peloscabos verticais instalados nesta fase, ou através dos cabos subverticais provisóriosajustados para eliminar o arqueamento que o próprio peso dos tirantes 5 induz em ditostirantes.In addition, it shows the configuration of the ostentatious bridge 5 in its final arrangement after its tensioning by the jacks installed on the locking key 15 (or, according to an alternative embodiment already described, installed at the end of the tie rod) and kept in a horizontal arrangement by the vertical cables installed at this stage, or by means of the provisional sub-vertical cables adjusted to eliminate the bending that the very weight of the risers 5 induces in risers.

A figura 53 mostra a construção por meio dos segmentos 67do piso 3, realizada através das modalidades já mostradas pelas figuras 43 e 44, além daconstrução das rampas helicoidais 7 nas extremidades da ponte.Fig. 53 shows the construction by means of segments 67 of the floor 3, carried out through the embodiments already shown by Figs. 43 and 44, in addition to the construction of the helical ramps 7 at the bridge ends.

Modalidades similares permitem alçar e dispor, ao mesmotempo, as treliças 56 e 56', de forma coplanar em relação ao piso 3 (figuras 34 e 35).Nesta etapa conjunta, é realizada a união mutua dos segmentos 67 do piso 3 (figura 43),o dito piso sendo então feito de forma monolítica e unido nas treliças horizontais 56 e 56'.Similar arrangements allow the trusses 56 and 56 'to be raised and arranged at the same time in relation to the floor 3 (figures 34 and 35). In this joint step, the segments 67 of the floor 3 are mutually joined (figure 43 ), said floor being then made monolithically and joined at the horizontal trusses 56 and 56 '.

A figura 54 mostra a ponte em arco já acabada, pronta paraos testes e abertura para o tráfego, após a instalação dos trilhos e o acabamento, talcomo pavimentação, trilhos, postes de iluminação, e das diversas infra estruturastecnológicas.Figure 54 shows the finished arch bridge ready for testing and opening for traffic after the installation of the rails and finishing, such as paving, rails, lampposts, and various infrastructural technologies.

Claims (39)

1. Ponte em arco de vão único, incluindo dois arcos (1)gêmeos, planos, verticais e paralelos, a ponte sendo caracterizada pelo fato de serequipada com atuadores (46, 55) ajustados para tensionar ao menos alguns doselementos que compõem a dita ponte.1. Single span arch bridge, including two twin (1) planes, vertical and parallel, the bridge being characterized by the fact that it is equipped with actuators (46, 55) adjusted to tension at least some of the elements that make up said bridge. . 2. Ponte, de acordo com a reivindicação 1, caracterizadapelo fato na qual estão incluídos dois arcos (1) gêmeos, planos, verticais e paralelos,sendo cada arco (1) divisível em dois semi-arcos; e na qual cada um dos semi-arcos (1)apresenta, na chave de fechamento no centro do vão entre os dois semi-arcos, umarespectiva junta (15) incluindo, por sua vez, os atuadores (46, 55), os quais produzemforças permanentes variáveis nos respectivos semi-arcos.Bridge according to Claim 1, characterized in that it includes two twin (1) planes, vertical and parallel, each arch (1) being divisible into two half-arches; and in which each of the half-arches (1) has, in the closing spanner in the center of the gap between the two half-arcs, a respective joint (15) including, in turn, the actuators (46, 55), which produce variable permanent forces in the respective half arches. 3. Ponte, de acordo com a reivindicação 1, caracterizadapelo fato na qual existem alguns atuadores (46) nas extremidades dos tirantes (5), cujosterminais (6) são fixados em algumas cangas (64) nas quais agem diretamente algunsaríetes (53) de ditos atuadores (46).Bridge according to Claim 1, characterized by the fact that there are some actuators (46) at the ends of the tie rods (5), whose terminals (6) are fixed to some sleeves (64) in which some rams (53) act directly. said actuators (46). 4. Ponte, de acordo com a reivindicação 2, caracterizadapelo fato na qual as forças horizontais variáveis permanentes produzidas pelos atuadores(46) são equilibradas por forças de tração horizontais iguais que agem nos tirantes (5).Bridge according to claim 2, characterized in that the permanent variable horizontal forces produced by the actuators (46) are balanced by equal horizontal tensile forces acting on the tie rods (5). 5. Ponte, de acordo com a reivindicação 4, caracterizadapelo fato na qual os ditos tirantes (5) são dispostos ao nível dos pisos (3).Bridge according to Claim 4, characterized in that said tie rods (5) are arranged at floor level (3). 6. Ponte, de acordo com as reivindicações 2 ou 3,caracterizada pelo fato na qual cada uma das duas juntas (15) incorpora um sistema dechapas verticais (47) fixadas e em continuidade com os semi-arcos, e de chapas verticais(48) unidas nos semi-arcos através de algumas juntas auxiliares (49); as ditas chapas(47, 48) sendo equipadas com fendas (50) e pinos cilíndricos (51); as ditas chapas (47,-48) sendo acopladas umas com as outras de acordo com uma modalidade macho-femea.Bridge according to Claim 2 or 3, characterized in that each of the two joints (15) incorporates a system of vertical plates (47) fixed in continuity with the half-arches and vertical plates (48). ) joined in the half-arches through some auxiliary joints (49); said plates (47, 48) being equipped with slots (50) and cylindrical pins (51); said plates (47, -48) being coupled together according to a male-female embodiment. 7. Ponte, de acordo com a reivindicação 6, caracterizadapelo fato na qual as chapas fêmeas (47, 48) são duplas e são equipadas com fendas(50) e não com pinos (51); enquanto que as placas macho (47, 48) são simples e sãodotadas com pinos (51) correspondentes, mas não com fendas (50); os ditos pinos (51)sendo inseridos em ditas fendas (50) através de um vão transversal de modo acompensar os relativos deslocamentos transversais a ditas fendas (50).Bridge according to claim 6, characterized in that the female plates (47, 48) are double and are equipped with slots (50) and not with pins (51); whereas the male plates (47, 48) are simple and are provided with corresponding pins (51) but not with slots (50); said pins (51) being inserted into said slots (50) through a transverse gap to compensate for relative transverse displacements to said slots (50). 8. Ponte, de acordo com a reivindicação 7, caracterizadapelo fato na qual as chapas verticais (47), equipadas com as fendas horizontais (50),compensam alguns relativos movimentos verticais entre as duas extremidades dos semi-arcos que ficam de frente um para o outro na chave de fechamento (15).Bridge according to Claim 7, characterized in that the vertical plates (47) fitted with the horizontal slots (50) compensate for some relative vertical movements between the two ends of the half-arches facing one another. the other on the closing switch (15). 9. Ponte, de acordo com as reivindicações 7 ou 8,caracterizada pelo fato na qual as placas horizontais (48), equipadas com as fendashorizontais (50), compensam, de forma similar, os relativos deslocamentos horizontaistransversais, estando assim livres os relativos deslocamentos horizontais longitudinais,compatíveis com o comprimento das fendas (50), o que impõe um limite superior aosditos deslocamentos, e compatível com o deslocamento dos atuadores (46) os quais,desta forma, controlam indiretamente a força de tração nos tirantes (5) e portanto a suaelongação.Bridge according to Claim 7 or 8, characterized in that the horizontal plates (48), equipped with the horizontal slits (50), similarly compensate for the relative transverse horizontal displacements and thus the relative displacements are free. longitudinal lines, compatible with the length of the slots (50), which imposes an upper limit on said displacements, and compatible with the displacement of the actuators (46) which thus indirectly control the tensile force on the risers (5) and therefore its elongation. 10. Ponte, de acordo com a reivindicação 9, caracterizadapelo fato na qual também está livre a rotação relativa a um eixo transversal horizontal,compatível com a disposição de todas as fendas (50) e de acordo com as fendasauxiliares (49), com as quais são equipadas as chapas horizontais (48).Bridge according to Claim 9, characterized in that the rotation relative to a horizontal transverse axis, compatible with the arrangement of all slots (50) and according to the auxiliary slots (49), is also free. which the horizontal plates are fitted (48). 11. Ponte, de acordo com a reivindicação 2, caracterizadapelo fato na qual os ditos atuadores (46) são montados em dois grupos independentes,um para cada uma das juntas (15) gêmeas, e apresentando uma disposição longitudinalhorizontal com eixos paralelos, um grupo para cada par de semi-arcos, cada aríete (53)dos atuadores (46) atuando, através da extremidade (54) no semi-arco oposto.Bridge according to claim 2, characterized in that said actuators (46) are mounted in two independent groups, one for each of the twin joints (15), and having a longitudinal-horizontal arrangement with parallel axes, one group for each pair of half-arcs, each ram (53) of the actuators (46) acting through the end (54) in the opposite half-arc. 12. Ponte, de acordo com a reivindicação 11, caracterizadapelo fato na qual os dois grupos realizam conjuntamente duas forças diferentes, condiçãonecessária para formar um par na chave de fechamento ajustada para equilibrar asforças transversais do vento.Bridge according to Claim 11, characterized in that the two groups jointly carry out two different forces, which is necessary to form a pair in the locking switch adjusted to balance the transverse wind forces. 13. Ponte, de acordo com as reivindicações 11 ou 12,caracterizada pelo fato na qual, em um mesmo grupo, as forças dos diversos atuadores(46) são diferentes umas das outras, de forma que as forças que agem nos extradorsossão diferentes daquelas que agem nos intradorsos, assim permitindo o cancelamento darelativa rotação na chave de fechamento dos semi-arcos.Bridge according to claim 11 or 12, characterized in that, in the same group, the forces of the various actuators (46) are different from each other, so that the forces acting on the pullers are different from those which they act on the intruders, thus allowing the cancellation of the rotating switch on the half-arch closing switch. 14. Ponte, de acordo com as reivindicações 2 ou 3,caracterizada pelo fato na qual existe um sistema que incorpora, na junta (15), umapluralidade de pares de atuadores (55) bifurcados, dispostos parcialmente verticais eparcialmente horizontais para bloquear os relativos deslocamentos horizontais e verticais,ainda mais qualquer que seja a rotação relativa, convenientemente diferenciando odeslocamento dos aríetes correspondentes para induzir as forças antagônicastransversais; este sistema pode substituir total ou parcialmente o sistema de chapas (47,-48), juntas auxiliares (49), fendas (50) e pinos (51).Bridge according to Claim 2 or 3, characterized in that there is a system incorporating in the joint (15) a plurality of bifurcated pairs of actuators (55) arranged partially vertical and partially horizontal to block relative displacements. horizontal and vertical, even more so whatever the relative rotation, conveniently differentiating the displacement of the corresponding ram to induce the transverse antagonistic forces; This system can totally or partially replace the system of plates (47, -48), auxiliary joints (49), slots (50) and pins (51). 15. Ponte, de acordo com uma qualquer dentre asreivindicações 1 a 14, caracterizada pelo fato na qual os ditos arcos (1) são conectados,um no outro, por treliças (16, 16'); esta configuração das ditas treliças não é Iimitativa etambém poderia ser diferente.Bridge according to any one of claims 1 to 14, characterized in that said arches (1) are connected together by trusses (16, 16 '); This configuration of these trusses is not limiting and could also be different. 16. Ponte, de acordo com uma qualquer dentre asreivindicações 1 a 15, caracterizada pelo fato na qual a cada arco (1) pertence um piso(3) correspondente engatado em dito arco através de correspondentes cabos verticais (4).Bridge according to any one of claims 1 to 15, characterized in that to each arch (1) belongs a corresponding floor (3) engaged in said arch by corresponding vertical cables (4). 17. Ponte, de acordo com a reivindicação 16, caracterizadapelo fato na qual os dois pisos (3) são conectados um ao outro por treliças (56, 56'). Estaconfiguração das ditas treliças não é Iimitativa e também poderia ser diferente.Bridge according to claim 16, characterized in that the two floors (3) are connected to each other by trusses (56, 56 '). This configuration of these trusses is not imitative and could also be different. 18. Ponte, de acordo com as reivindicações 16 ou 17,caracterizada pelo fato na qual ambos os pisos (3) contribuem com a rigidez totaltransversal horizontal da ponte com o auxilio das treliças (56, 56').Bridge according to claim 16 or 17, characterized in that both floors (3) contribute to the horizontal total transverse stiffness of the bridge with the aid of the trusses (56, 56 '). 19. Ponte, de acordo com uma qualquer dentre asreivindicações 1 a 18, caracterizada pelo fato na qual existe uma pluralidade de hastesde treliça (73) engatadas nos semi-arcos e inseridas abaixo em cavidades coaxiais (74)projetando-se para cima a partir do extradorso dos pisos (3), sendo que entre aextremidade inferior de cada haste (73) e o fundo da correspondente cavidade axial (74)existe um vão que aloja uma mola medida (75) a qual permite a transferência gradual acada uma das hastes (73) da força axial de compressão induzida pelo deslocamentopotencial para cima do piso correspondente (3), ajustada para contrabalançar ainstabilidade aero-elástica (oscilação).Bridge according to any one of claims 1 to 18, characterized in that there is a plurality of truss rods (73) engaged in the half-arches and inserted below into coaxial cavities (74) projecting upwards from between the lower end of each rod (73) and the bottom of the corresponding axial cavity (74) there is a gap housing a measured spring (75) which allows the gradual transfer of each rod (73) the axial compression force induced by the corresponding upward potential displacement of the corresponding floor (3), adjusted to counteract the aeroelastic instability (oscillation). 20. Ponte, de acordo com a reivindicação 19, caracterizadapelo fato na qual cada piso (3), em sua totalidade, é independente tanto dos tirantes (5)quanto dos arcos (1) e dos travessões contínuos (2), com relação aos quais, então, o ditopiso (3) podem se deslocar devido, por exemplo, as dilatações térmicas, exceto um pontofixo disposto em um dentre os dois travessões contínuos (2).Bridge according to claim 19, characterized in that each floor (3) as a whole is independent of both the risers (5), the arches (1) and the continuous crossings (2) with respect to the which, then, the diptych (3) may shift due, for example, to thermal expansion, except for a dotfix arranged in one of the two continuous dashes (2). 21. Ponte, de acordo com as reivindicações 19 ou 20,caracterizada pelo fato na qual as hastes (73) são dispostas no centro do vão,nominalmente nos dois lados da junta (15), além de nos quartos do vão.Bridge according to claim 19 or 20, characterized in that the rods (73) are arranged in the center of the span, nominally on both sides of the joint (15), and in the quarters of the span. 22. Ponte, de acordo com uma qualquer dentre asreivindicações precedentes, caracterizada pelo fato na qual esta apresenta oitofundações (8, 9), quatro fundações (8) próximas das margens como suportes para osarcos (1), e quatro fundações (9) nas extremidades externas dos quatro travessõescontínuos (2).22. Bridge, according to any one of the preceding claims, characterized in that it has eight foundations (8, 9), four foundations (8) near the banks as supports for the arches (1), and four foundations (9) in the outer ends of the four continuous dashes (2). 23. Ponte, de acordo com a reivindicação 22, caracterizadapelo fato na qual cada fundação (8, 9) é equipada com ao menos um isolante sísmico (10).Bridge according to claim 22, characterized in that each foundation (8, 9) is equipped with at least one seismic insulator (10). 24. Ponte, de acordo com a reivindicação 23, caracterizadapelo fato na qual cada isolante sísmico (10) inclui uma placa feita, preferencialmente masnão exclusivamente, de materiais elastoméricos reforçados.Bridge according to Claim 23, characterized in that each seismic insulator (10) includes a plate made preferably, but not exclusively, of reinforced elastomeric materials. 25. Ponte, de acordo com uma qualquer dentre asreivindicações de 22 a 24, caracterizada pelo fato na qual ao menos uma dentre as oitofundações (8, 9), em solos sujeitos a liquefação, é uma fundação flutuante oca, projetadapara transferir para o solo, em uso, ao nível da imposta da fundação, a mesma pressãovertical que age antes da escavação do solo, devido ao próprio solo.25. Bridge according to any one of claims 22 to 24, characterized in that at least one of the eight foundations (8, 9) in soils subject to liquefaction is a hollow floating foundation designed to transfer to the ground. , in use, at the level of the foundation impost, the same vertical pressure that acts before the excavation of the soil, due to the soil itself. 26. Ponte, de acordo com a reivindicação 25, caracterizadapelo fato na qual ao menos duas fundações flutuantes ocas, uma em cada margem, sãoequipadas com diafragmas verticais anti deslizamentos (28), fixados no solo não passívelde liqüefazer (29).Bridge according to claim 25, characterized in that at least two hollow floating foundations, one on each bank, are equipped with non-slip vertical diaphragms (28) fixed to the non-liquefying ground (29). 27. Ponte, de acordo com a reivindicação 26, caracterizadapelo fato na qual cada fundação (8, 9) é equipada com dispositivos de içamento (26)ajustados para levantar toda a ponte de modo a permitir a substituição dos isolantessísmicos (10).Bridge according to Claim 26, characterized in that each foundation (8, 9) is equipped with lifting devices (26) set to lift the entire bridge to allow replacement of seismic isolators (10). 28. Ponte, de acordo com uma qualquer dentre asreivindicações 1 27, caracterizada pelo fato na qual as ações dos atuadores (46, 55) sãomoduladas através de um sistema de controle com retro alimentação, agindo em temporeal em ditos atuadores (46, 55) dependendo da variação nas cargas vivas,principalmente dos veículos que cruzam a ponte e/ou do vento, de modo a se conseguira otimização da linha de pressão, em particular até um momento de flexão igual a zeronas impostas do arco (1).28. Bridge according to any one of claims 1 27, characterized in that the actions of the actuators (46, 55) are modulated through a feedback control system acting in a temporary manner on said actuators (46, 55). depending on the variation in live loads, especially of vehicles crossing the bridge and / or wind, in order to optimize the pressure line, in particular up to a bending moment equal to imposed zerones of the arc (1). 29. Ponte, de acordo com a reivindicação 28,caracterizada pelo fato na qual o dito sistema de controle com retro alimentação é umsistema integrado que se estende por toda a ponte, incorporando os atuadores (46, 55),sensores ou outros dispositivos para o monitoramento global da estrutura, de modo aconseguir a otimização da condição de tensão em dita estrutura que afrontadinamicamente as variações nas forças externas principalmente devidas as cargasrodantes, aos ventos, aos terremotos, as variações térmicas, a deformação dosmateriais, aos ajustes do solo e a outros fatores ambientais.A bridge according to claim 28, characterized in that said feedback control system is an integrated system extending across the bridge incorporating actuators (46, 55), sensors or other devices for global monitoring of the structure, so as to advise the optimization of the stress condition in said structure that unaccountably changes in external forces mainly due to loads, winds, earthquakes, thermal variations, deformation of materials, soil adjustments and other environmental factors. 30. Ponte, de acordo com uma qualquer dentre asreivindicações 1 a 29, caracterizada pelo fato na qual a largura total de dita ponte e ovão entre os arcos (1) são proporcionais ao comprimento do vão livre único, com aconseqüente grande rigidez transversal para cada vão livre, mesmo que grande.A bridge according to any one of claims 1 to 29, characterized in that the total width of said bridge and the oval between the arches (1) is proportional to the length of the single clearance, with consequent great transverse stiffness for each one. go free, even big. 31. Ponte, de acordo com uma qualquer dentre asreivindicações 1 30, caracterizada pelo fato na qual ao menos um dentre os travessõescontínuos (2) se estende para dentro de terrenos altos (12) contíguos e é inserido em umtúnel (13) cujo topo e base fixam as extremidades do dito travessão através de isolantessísmicos (10), ao invés dos cabos de ancoragem (11).31. Bridge according to any one of claims 1 30, characterized in that at least one of the continuous crossings (2) extends into adjoining high ground (12) and is inserted into a tunnel (13) whose top and base fixes the ends of said crossbar by insulating seismic (10), instead of the anchor lines (11). 32. Ponte, de acordo com uma qualquer dentre asreivindicações de 5 a 31, caracterizada pelo fato na qual os braços guia (66) sãodispostos entre os tirantes (5) e os pisos (3), assim os tirantes (5) interagem com osbraços guia (66) e, devido as grandes forças de tração as quais os tirantes (5) sãosubmetidos, auxiliam na proteção dos pisos (3) contra as instabilidades aero-elásticas,interrompendo os deslocamentos para cima de ditos pisos (3), e assim auxiliando ashastes (73).Bridge according to any one of claims 5 to 31, characterized in that the guide arms (66) are arranged between the risers (5) and the floors (3), thus the risers (5) interact with the arms. guide (66) and, due to the high tensile forces to which the tie rods (5) are subjected, help to protect the floors (3) against aero-elastic instabilities, interrupting the upward displacement of said floors (3), and thus assisting ashastes (73). 33. Método para realizar a construção de uma ponte emarco de vai livre único, caracterizado pelo fato do método incluir as seguintes etapas,em cada uma das duas margens e tendencialmente de forma sincronizada:- construção dos cabos de ancoragem (11, 21), das fundações (8) para os arcos (1),io das fundações (9) para os travessões contínuos (2) e possivelmente dos diafragmas(28) verticais anti deslizamentos;- colocação dos andaimes para a construção dos travessões contínuos (2);- colocação dos isolantes sísmicos (10) e dos dispositivos de içamento (26);- construção dos travessões contínuos (2) dos arcos (1);- construção concomitante, dentro dos travessões contínuos (2), dos pisos (3)pertencentes a ditos travessões contínuos (2);- colocação dos batentes provisórios (20) no extradorso das fundações, ajustado paracompensar os deslocamentos transversais e/ou longitudinais, devidos ao vento, dasestruturas sobrepostas (travessões e arcos) em relação a ditas fundações;- construção segmentada no modo em balanço por meio dos segmentos (31) dossemi-arcos (1), de forma sincronizada, até a sua união na chave de fechamento; epossível colocação concomitante dos cabos de pré-tensionamento (34, 38);- colocação concomitante das treliças (16, 16') transversais pré-fabricadas, conectandoos dois arcos (1) gêmeos; a colocação realiza um movimento progressivo para afrente das treliças transversais (16, 16'), através de pinhões motorizados (43) automoventes engatados com as cremalheiras (45) dispostas nos mesmos ditos arcos (1);- remoção dos andaimes provisórios para os travessões contínuos (2);- colocação da chave de fechamento (15), dos atuadores (46) e da chapas (47, 48),equipadas com fendas (50) e pinos (51); ou alternativamente apenas dos atuadores(46) e (55);- colocação dos cabos verticais (4), transportados por guindastes provisório que sedeslocam pelos intradorsos dos semi-arcos;- colocação dos tirantes (5), já equipados com os terminais (6), desalinhando edesenrolando os ditos tirantes a partir da margem, mantendo-os em uma disposiçãosub horizontal através dos cabos verticais (4);- fixação dos tirantes (5) nos correspondentes pontos de ancoragem dispostospróximos à vertical das impostas dos arcos (1);- ajuste do abaulamento devido ao peso dos tirantes (5) em zero, através de cabos subverticais provisórios;- tensionamento dos tirantes (5) por meio dos atuadores (46) com o seguinte ajuste emzero do momento de torção das impostas dos arcos (1), e ativação de uma reaçãopermanente de compressão nas fundações dispostas nas extremidades (9) dostravessões contínuos (2);- fixação dos isolantes sísmicos (10) nas superfícies horizontais de suportesobrepostas;- liberação e remoção dos cabos provisórios (34, 38) de pré tensionamento, tornadosinúteis devida a reação de compressão induzida e garantida pela ação permanentedos atuadores (46);- colocação do piso (3) através da montagem dos segmentos (67), alçados por meio dedispositivos de alçamento (70, 71, 72), os ditos segmentos (67) sendo unido ao piso(3) já montado e aos cabos verticais (4) devidos;- colocação concomitante das treliças horizontais transversais (56, 56') que conectamos dois pisos (3), através de modalidades similares àquelas já consideradas para osarcos (1);- transferência do peso dos tirantes (5) dos cabos sub verticais provisórios para ossuportes verticais (66) convenientes, dispostos nos lados dos pisos (3);- colocação de uma pluralidade de hastes (73);- construção das rampas (7) que ligam as infra-estruturas da rodovia e da ferrovia;remoção dos batentes provisórios (20);- colocação dos acabamentos e dos trilhos, testes e abertura ao trêfego.33. Method for carrying out the construction of a single free span bridge, characterized in that the method includes the following steps, on each of the two banks and tending in a synchronized manner: - construction of the anchor lines (11, 21); from the foundations (8) to the arches (1), to the foundations (9) to the continuous struts (2) and possibly the non-slip vertical diaphragms (28) - laying the scaffolding for the construction of the continuous struts (2); - placement of seismic insulators (10) and lifting devices (26) - construction of continuous cross member (2) of the arches (1) - concomitant construction, within continuous member (2), of floors (3) belonging to continuous struts (2), - placing the temporary stops (20) on the foundation extractor, adjusted to compensate for the transverse and / or longitudinal displacements due to the wind of the overlapping structures (struts and arches) in relation to - Segmented construction in cantilever mode by means of the semi-arched segments (31) synchronously until they are joined to the closing switch; possible concomitant placement of pre-tensioning cables (34, 38) - concomitant placement of prefabricated transverse trusses (16, 16 '), connecting two twin arches (1); the placement carries out a progressive movement towards the transverse trusses (16, 16 ') by means of self-propelled motorized pinions (43) engaged with the racks (45) arranged on the same arches (1) - removal of the provisional scaffolding for the cross members - Inserting the locking key (15), the actuators (46) and the plates (47, 48), equipped with slots (50) and pins (51); or alternatively only of the actuators (46) and (55) - laying of the vertical cables (4) carried by provisional cranes which move through the half-arm intruders - laying of the tie rods (5), already fitted with the terminals (6 ) by misaligning and unwinding said tie rods from the margin, keeping them in a horizontal arrangement by means of the vertical cables (4), - securing the tie rods (5) at the corresponding anchor points arranged proximal to the vertical ones of the arches (1); - adjustment of the bulging due to the weight of the risers (5) to zero by means of temporary subverse cables - tensioning of the risers (5) by means of the actuators (46) with the following zero adjustment of the twisting moment of the arches (1) ), and activation of a permanent compression reaction on the foundations arranged at the ends (9) of the continuous struts (2) - fixing the seismic insulators (10) on the horizontal surfaces of overlapping supports; the removal and removal of the provisional pre-tensioning cables (34, 38), rendered useless due to the induced compression reaction and guaranteed by the permanent action of the actuators (46) - laying of the floor (3) by mounting the segments (67), raised by means (70, 71, 72), said segments (67) being joined to the floor (3) already assembled and to the vertical cables (4) due - concomitant placement of the transverse horizontal trusses (56, 56 ') which We connect two floors (3) using similar modalities to those already considered for the arches (1) - Transfer the weight of the risers (5) from the provisional sub-vertical cables to the convenient vertical supports (66), arranged on the sides of the floors (3). - laying of a plurality of rods (73) - construction of the ramps (7) connecting the road and rail infrastructure, removal of the temporary stops (20) - laying of the finishes and rails, testing and opening to traffic. 34. Método para realizar a construção de uma ponte, deacordo com as reivindicações 14 e 33, caracterizado pelo fato no qual a colocação dosatuadores (46) é feita, também ou exclusivamente, nas extremidades (6) dos tirantes (5).Method for carrying out a bridge construction according to claims 14 and 33, characterized in that the placement of the tumblers (46) is also or exclusively fitted to the ends (6) of the tie rods (5). 35. Método para realizar a construção de uma ponte, deacordo com as reivindicações 33 ou 34, caracterizado pelo fato no qual a fase decolocação dos segmentos (31) é realizada por uma grua móvel (32) que se desloca porsobre uma cremalheira (33) disposta no extradorso dos semi-arcos, e possivelmentesobre o travessão contínuo.A method of carrying out a bridge according to claim 33 or 34, characterized in that the relocation phase of the segments (31) is carried out by a mobile crane (32) which moves over a rack (33). disposed on the extruder of the half-arches, and possibly on the continuous transom. 36. Método para realizar a construção dos pisos (3),caracterizado pelo fato de que é através da operação segmentada dos segmentos (67)alçados pelas gruas moveis (70, 72) suportadas pelo piso já construído, seminterferência na navegação.36. Method for carrying out the construction of the floors (3), characterized in that it is through the segmented operation of the segments (67) raised by the mobile cranes (70, 72) supported by the floor already built, without interference with navigation. 37. Método para realizar a construção de uma ponte, deacordo com uma qualquer dentre as reivindicações de 33 a 36, caracterizado pelo fatono qual cada um dos semi-arcos é construído como uma estrutura em cantiléver autoportante, sem o auxilio de torres provisórias e de cabos provisórios de suporte ou deoutros dispositivos externos, sem interferir com a navegação.A method of constructing a bridge according to any one of claims 33 to 36, wherein the half-arch is constructed as a self-supporting cantilever structure without the aid of temporary towers and temporary support cables or other external devices without interfering with navigation. 38. Método para realizar a construção de uma ponte, deacordo com uma qualquer dentre as reivindicações de 33 a 37, caracterizado pelo fatono qual é realizado o deslocamento das treliças (16, 16") dos semi-arcos (1) e dastreliças (56, 56') dos pisos (3) através da montagem em terra de ditas treliças e do seumovimento progressivo para a frente, sincronizado com uma das correspondentesestruturas de suporte, arcos (1) e pisos (3), o dito movimento sendo atuado por umcomposto de cremalheiras (45) e (57) e pinhões motorizados (43); as ditas treliças sendoentão fixadas nas correspondentes estruturas de suporte, arcos (1) e pisos (3), apósalcançarem a posição final próxima ao centro do vão livre.38. A method of constructing a bridge according to any one of claims 33 to 37, characterized in that the beam is displaced by the trusses (16, 16 ") of the half-arches (1) and the trusses (56). , 56 ') of the floors (3) through the ground mounting of said trusses and their progressive forward movement, synchronized with one of the corresponding support structures, arches (1) and floors (3), said movement being actuated by a compound of racks (45) and (57) and motorized pinions (43), said trusses being then fixed to the corresponding support structures, arches (1) and floors (3) after reaching the final position near the center of the free span. 39. Método para realizar a construção de uma ponte, deacordo com uma qualquer dentre as reivindicações de 33 a 38, caracterizado pelo fatono qual a construção no modo auto portante dos semi-arcos (1) é combinada com a açãode pré tensionamento dos cabos (34) ou (38), removíveis e recicláveis como oselementos tensionáveis das treliças dos pisos (3), ou como os cabos verticais (4), apóster realizado a união da chave de fechamento dos semi-arcos (1) e o tensionamento dostirantes (5).Method for carrying out a bridge construction according to any one of claims 33 to 38, characterized in that the self-supporting construction of the half-arches (1) is combined with the pre-tensioning action of the cables ( 34) or (38), removable and recyclable as the tensioning elements of the floor trusses (3), or as the vertical cables (4), after the closing of the half-arcing locking key (1) and the tensioning (4) 5).
BRPI0706980-4A 2006-02-07 2007-01-29 single span free span suspended bridge BRPI0706980A2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
ITMO2006A000039 2006-02-07
ITMO20060039 ITMO20060039A1 (en) 2006-02-07 2006-02-07 SINGLE-WAY BRIDGE, ALSO OF GREAT LIGHT, LOW-BOW ARCH, SUITABLE FOR THE TRANSIT OF THE MOST HEAVY TRAINS, COMPLETELY ISISMICALLY INSULATED, INSENSITIVE TO THE LIQUEFACTION OF THE SOIL, NOT SUBJECT TO AEROELASTIC, SUSCEPTIBLE INSTABILITY
PCT/IT2007/000057 WO2007091285A1 (en) 2006-02-07 2007-01-29 Single span suspended deck arch bridge

Publications (1)

Publication Number Publication Date
BRPI0706980A2 true BRPI0706980A2 (en) 2011-04-12

Family

ID=38017020

Family Applications (1)

Application Number Title Priority Date Filing Date
BRPI0706980-4A BRPI0706980A2 (en) 2006-02-07 2007-01-29 single span free span suspended bridge

Country Status (5)

Country Link
CN (1) CN101379246B (en)
BR (1) BRPI0706980A2 (en)
IT (1) ITMO20060039A1 (en)
MA (1) MA30263B1 (en)
WO (1) WO2007091285A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111041969A (en) * 2019-12-31 2020-04-21 深圳市桥博设计研究院有限公司 Large-span combined arch bridge based on bending design theory and design and construction method
CN114809310A (en) * 2022-06-24 2022-07-29 天津医科大学 Large-span steel truss high-altitude integral variable-angle jacking construction method

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2389191B1 (en) * 2009-12-18 2013-07-26 Mauro BASCHIERI ARCH BRIDGE OF A SINGLE SECTION.
CN102175443B (en) * 2011-02-21 2012-07-04 北京市市政工程研究院 Device and method for non-destructively testing capacity of overbridge railings
CN102864840B (en) * 2012-10-15 2014-07-02 江苏科技大学 Pre-stressed steel frame for exerting pre-stress by support displacement method and fabrication method of pre-stressed steel frame
CN106758744B (en) * 2016-12-14 2018-06-12 郑卫忠 A kind of integrated bridge and bridge material
CN106758749B (en) * 2017-02-28 2019-05-14 广西大学 Continuous cable arch bridge
CN108086694A (en) * 2017-11-02 2018-05-29 广东精工钢结构有限公司 A kind of building iron knot abnormity component makes moulding bed
CN107842032B (en) * 2017-12-20 2023-06-23 广西大学 Large-span arch bridge foundation
CN109556847B (en) * 2018-12-17 2020-10-16 交通运输部公路科学研究所 Novel damage monitoring system for simply supported beam bridge structure
CN110593076B (en) * 2019-09-29 2021-05-28 广西路桥工程集团有限公司 Steel pipe concrete tied arch bridge hunch seat horizontal displacement monitoring and control system
CN111625893B (en) * 2020-05-28 2022-12-16 广西大学 Dynamic deviation-correcting arch rib inclined pull buckle hanging and splicing method
CN111877121A (en) * 2020-07-21 2020-11-03 詹刚毅 Novel tied arch bridge structure and auxiliary tied bar arrangement method
CN113430906B (en) * 2021-05-27 2022-11-15 安徽省智慧交通科技有限责任公司 Steel construction concatenation bridge
CN115048700B (en) * 2022-06-18 2023-05-16 广东鼎耀工程技术有限公司 Construction project construction feasibility analysis and assessment method based on multidimensional data
CN117470427B (en) * 2023-12-25 2024-02-23 贵州路桥集团有限公司 Horizontal stress measurement method for main arch ring during one-way erection of arch bridge deck

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE865605C (en) * 1940-11-23 1953-02-02 Franz Dr Ing E H Dischinger Clamped arched disc bridge made of reinforced concrete
FR978962A (en) * 1942-12-28 1951-04-20 Straight girder reinforced concrete deck bridge
GB693467A (en) * 1948-09-13 1953-07-01 Archibald Milne Hamilton Improvements in and relating to structures and structural elements
DE802164C (en) * 1949-10-27 1951-02-05 Albert Kaiser Process for the gradual production of vaults
JP2000045231A (en) * 1998-07-30 2000-02-15 Taisei Corp Erection method for arch bridge
CN2637552Y (en) * 2003-08-21 2004-09-01 江苏法尔胜新日制铁缆索有限公司 High leak tightness anchor unit assemblage for hanger rod or slope draw rope cable

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111041969A (en) * 2019-12-31 2020-04-21 深圳市桥博设计研究院有限公司 Large-span combined arch bridge based on bending design theory and design and construction method
CN111041969B (en) * 2019-12-31 2021-11-26 深圳市桥博设计研究院有限公司 Large-span combined arch bridge based on bending design theory and design and construction method
CN114809310A (en) * 2022-06-24 2022-07-29 天津医科大学 Large-span steel truss high-altitude integral variable-angle jacking construction method
CN114809310B (en) * 2022-06-24 2022-09-27 天津医科大学 Large-span steel truss high-altitude integral variable-angle jacking construction method

Also Published As

Publication number Publication date
MA30263B1 (en) 2009-03-02
ITMO20060039A1 (en) 2007-08-08
CN101379246A (en) 2009-03-04
CN101379246B (en) 2012-03-28
WO2007091285A1 (en) 2007-08-16

Similar Documents

Publication Publication Date Title
BRPI0706980A2 (en) single span free span suspended bridge
CN104612058B (en) A kind of construction method of buckstay flexible arch bridge
CN106939553B (en) A kind of Steel Bridge Deck and steel box arch rib installation method
KR101026014B1 (en) Bridge deck construction method by means of pulling jack on the water
US6129484A (en) Prefabricated structure for the construction of overhead or underground works
CN111676846B (en) Construction method for dismantling truss type combined arch bridge
CN106522112A (en) Cable-stayed bridge side span beam section erecting system and method thereof
CN107246016A (en) A kind of suspension type inner support system and foundation ditch construction method suitable for base pit engineering
CN112695696A (en) Integrated construction equipment for superstructure of high-pile wharf and construction method thereof
CN107604804B (en) Multi-tower cable-stayed bridge with common-rail and laminated layers
CN110042757B (en) Synchronous installation construction method for arched girders of three-main-girder steel-girder arch bridge
CN103147405B (en) Method for erecting steel girder of cable-stayed bridge with diagonal main trusses
CN101289836A (en) Auxiliary erection method of horizontal cable of steel truss arched bridge
CN102561192B (en) Building method for mound-free suspension bridge
CN206538687U (en) Cable-stayed bridge end bay beam section construction system
CN112211112A (en) Steel box girder installation method adopting double-guide-girder erection machine on existing bridge
CN110735394A (en) Cable tower structure and construction method thereof
CN111945572B (en) Multi-connected arch bridge erecting machine and multi-connected arch bridge erecting method
CN113668399B (en) Construction method of half-through tied steel box arch bridge
CN215329670U (en) Integrated construction equipment for superstructure of high-pile wharf
ES2389191B1 (en) ARCH BRIDGE OF A SINGLE SECTION.
CN112359729A (en) Subway-striding walking type pushing construction method for single-hole large-span steel box girder
CN114703735B (en) Multi-span upper bearing type continuous arch bridge vault structure
CN220117164U (en) Simply supported sliding type drilling platform
CN216379104U (en) Prestressed pontoon bridge temporary bridge

Legal Events

Date Code Title Description
B07A Application suspended after technical examination (opinion) [chapter 7.1 patent gazette]
B09B Patent application refused [chapter 9.2 patent gazette]
B09B Patent application refused [chapter 9.2 patent gazette]