BRPI0520693A2 - método para otimização de produção em escala de campo - Google Patents

método para otimização de produção em escala de campo

Info

Publication number
BRPI0520693A2
BRPI0520693A2 BRPI0520693-6A BRPI0520693A BRPI0520693A2 BR PI0520693 A2 BRPI0520693 A2 BR PI0520693A2 BR PI0520693 A BRPI0520693 A BR PI0520693A BR PI0520693 A2 BRPI0520693 A2 BR PI0520693A2
Authority
BR
Brazil
Prior art keywords
objective function
fluid
scale production
system equations
production optimization
Prior art date
Application number
BRPI0520693-6A
Other languages
English (en)
Inventor
Baris Guyaguller
James Thomas Byer
Original Assignee
Chevron Usa Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chevron Usa Inc filed Critical Chevron Usa Inc
Publication of BRPI0520693A2 publication Critical patent/BRPI0520693A2/pt

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/14Obtaining from a multiple-zone well

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Feedback Control In General (AREA)

Abstract

MéTODO PARA OTIMIZAçãO DE PRODUçãO EM ESCALA DE CAMPO. é descrito um método para melhorar a alocação de vazões de fluido entre uma pluralidade de furos de poços em comunicação fluida com pelo menos um reservatório subterrâneo (24). Uma função objetivo e equações de sistema são gerados, os quais utilizam penalidades por violação de restrição com restrições leves. As restrições leves são restrições que podem ser violadas, se necessário, para chegar a uma solução viável para otimizar a função objetivo e as equações do sistema. As vazões de fluido são então alocadas entre os furos de poços (30) determinadas pela otimização da função objetivo e equações de sistema. Vazões de fluido entre furos de poços (30), particularmente aquelas que apresentam características de fluido similares, podem ser relacionadas entre si. Vazões iniciais de componentes (óleo, gás e água) e pressões nos friros de poços (30) podem ser determinadas por uma corrida de simulação inicial.
BRPI0520693-6A 2005-11-21 2005-11-21 método para otimização de produção em escala de campo BRPI0520693A2 (pt)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/US2005/042470 WO2007058662A1 (en) 2005-11-21 2005-11-21 Method for field scale production optimization

Publications (1)

Publication Number Publication Date
BRPI0520693A2 true BRPI0520693A2 (pt) 2009-06-13

Family

ID=38048944

Family Applications (1)

Application Number Title Priority Date Filing Date
BRPI0520693-6A BRPI0520693A2 (pt) 2005-11-21 2005-11-21 método para otimização de produção em escala de campo

Country Status (8)

Country Link
EP (1) EP1955253A4 (pt)
CN (1) CN101361080B (pt)
AU (1) AU2005338352B2 (pt)
BR (1) BRPI0520693A2 (pt)
CA (1) CA2630411C (pt)
EA (1) EA014140B1 (pt)
NO (1) NO20082622L (pt)
WO (1) WO2007058662A1 (pt)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8682589B2 (en) * 1998-12-21 2014-03-25 Baker Hughes Incorporated Apparatus and method for managing supply of additive at wellsites
CA2442596A1 (en) 2001-04-24 2002-10-31 Exxonmobil Upstream Research Company Method for enhancing production allocation in an integrated reservoir and surface flow system
BRPI0909440A2 (pt) 2008-04-17 2015-12-15 Exxonmobil Upstream Res Co métodos para planejamento de desenvolvimento de reservatório, para suporte de decisão com relação de desenvolvimento de recursos petrolíferos, para planejamento de desenvolvimento de otimização para um reservatório com base em um computador, e para produzir hidrocarbonetos de um reservatório subterrâneo.
EP2291761A4 (en) 2008-04-18 2013-01-16 Exxonmobil Upstream Res Co MARKOV DECISION-MAKING DECISION-MAKING ASSISTANCE TOOL FOR TANK DEVELOPMENT PLANNING
EP2291799A4 (en) 2008-04-21 2013-01-16 Exxonmobil Upstream Res Co DECISION SUPPORT TOOL BASED ON STOCHASTIC PROGRAMMING FOR TANK DEVELOPMENT PLANNING
EP2811107A1 (en) * 2013-06-06 2014-12-10 Repsol, S.A. Method for selecting and optimizing oil field controls for production plateau
CA2937913C (en) * 2014-03-12 2018-12-11 Landmark Graphics Corporation Simplified compositional models for calculating properties of mixed fluids in a common surface network
WO2015138805A1 (en) * 2014-03-12 2015-09-17 Landmark Graphics Corporation Modified black oil model for calculating mixing of different fluids in a common surface network
CN106574830B (zh) * 2014-04-22 2019-06-11 博拉斯特运动有限公司 使用软约束和惩罚函数初始化惯性传感器
CN108229713B (zh) * 2016-12-09 2021-11-12 中国石油化工股份有限公司 断块油藏多层合采方案优化设计方法
CN108729911A (zh) * 2017-04-24 2018-11-02 通用电气公司 用于资源生产系统的优化装置、系统和方法
US11808117B2 (en) 2018-02-02 2023-11-07 Schlumberger Technology Corporation Method for obtaining unique constraints to adjust flow control in a wellbore
US11269098B2 (en) 2018-08-31 2022-03-08 Halliburton Energy Services, Inc. Sparse deconvolution and inversion for formation properties

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5305209A (en) * 1991-01-31 1994-04-19 Amoco Corporation Method for characterizing subterranean reservoirs
CA2329719C (en) * 1998-05-04 2005-12-27 Schlumberger Canada Limited Near wellbore modeling method and apparatus
US6980940B1 (en) * 2000-02-22 2005-12-27 Schlumberger Technology Corp. Intergrated reservoir optimization
AU5902801A (en) * 2000-04-14 2001-10-30 Lockheed Corp Method of determining boundary interface changes in a natural resource deposit
ATE377137T1 (de) * 2000-09-12 2007-11-15 Schlumberger Technology Bv Untersuchung von mehrschichtigen lagerstätten
CA2442596A1 (en) * 2001-04-24 2002-10-31 Exxonmobil Upstream Research Company Method for enhancing production allocation in an integrated reservoir and surface flow system
US7487133B2 (en) * 2002-09-19 2009-02-03 Global Nuclear Fuel - Americas, Llc Method and apparatus for adaptively determining weight factors within the context of an objective function
AU2003276456A1 (en) * 2002-11-15 2004-06-15 Schlumberger Technology B.V. Optimizing well system models
US7337660B2 (en) * 2004-05-12 2008-03-04 Halliburton Energy Services, Inc. Method and system for reservoir characterization in connection with drilling operations
US7809537B2 (en) * 2004-10-15 2010-10-05 Saudi Arabian Oil Company Generalized well management in parallel reservoir simulation

Also Published As

Publication number Publication date
CA2630411A1 (en) 2007-05-24
EA014140B1 (ru) 2010-10-29
EA200801405A1 (ru) 2009-12-30
EP1955253A1 (en) 2008-08-13
WO2007058662A1 (en) 2007-05-24
AU2005338352A1 (en) 2007-05-24
CA2630411C (en) 2015-04-21
CN101361080A (zh) 2009-02-04
CN101361080B (zh) 2011-12-14
EP1955253A4 (en) 2016-03-30
NO20082622L (no) 2008-08-13
AU2005338352B2 (en) 2012-05-24

Similar Documents

Publication Publication Date Title
BRPI0520693A2 (pt) método para otimização de produção em escala de campo
BR112014031769A2 (pt) transmissor de variável de processo, e, método de medir uma pressão de um fluido de processo
AR080456A1 (es) Fluidos de perforacion inversa que tienen reologia mejorada y metodos para perforar pozos
AR047650A1 (es) Fluidos para el mantenimiento de las perforaciones de pozos que contienen compuestos termicamente activados para lograr la viscosidad adecuada y metodos para utilizarlos
NO20081666L (no) Simuleringssystem og -fremgangsmate
BR112012027576A2 (pt) método, e aparelho
BRPI0518030A (pt) compostos de metino e de antraquinona copolimerizáveis e artigos que os contêm
BR0113371A (pt) Método e ferramenta de poço para enchimento com cascalho de um poço utilizando fluidos de baixa viscosidade
NO20075120L (no) Anvendelse av direkte epoksyemulsjoner for borehullstabilisering
BR112013013017A2 (pt) utilização de copolímero de associação hidrofobicamente como aditivo em aplicações de campos de petróleo específicas
BR112012028782A2 (pt) sistemas e métodos para a secagem de cascalhos de perfuração
NO20063029L (no) Fremgangsmate for skumming av en hydrokarbonborevaeske og for produksjon av lette hydrokarbonfluider
DK1809860T3 (da) Sikkerhedsventil
BR112015005804A2 (pt) sistema de fluxo de fluido pressurizado possuindo múltiplas câmaras de trabalho para um martelo de perfuração dentro do poço e martelos para dentro de poço de circulação normal e reversa
BRPI0503647A (pt) amortecedor tendo um batente hidráulico
PE20100021A1 (es) Unidad vibratoria para sistemas de perforacion
BRPI0410535A (pt) métodos para estabilização de uma formação subterránea, e de redução da produção de particulados e água de uma formação subterránea.
ATE449829T1 (de) Bohrspülung enthaltend hydrophobin
NO20084146L (no) Nedihullsverktoyenhet
GB2491764A (en) Tubing hanger running tool with integrated landing features
BRPI0509252A (pt) processo para o tratamento de fluidos originários de campos petrolìferos submarinos e unidade de produção flutuante
BRPI0704007A (pt) absorvedor de choque para um trem de aterrissagem de aeronave, e, trem de aterrissagem
SG156593A1 (en) Downhole gravitational water separator
NO20081317L (no) System og fremgangsmate for styring av fluidstrommen i grenbronner
BR112015025755A2 (pt) modelagem bacia para reservatório

Legal Events

Date Code Title Description
B06G Technical and formal requirements: other requirements [chapter 6.7 patent gazette]

Free format text: SOLICITA-SE A REGULARIZACAO DA PROCURACAO, UMA VEZ QUE BASEADO NO ARTIGO 216 1O DA LPI, O DOCUMENTO DE PROCURACAO DEVE SER APRESENTADO EM SUA FORMA AUTENTICADA; OU SEGUNDO O PARECER DA PROCURADORIA NO 074/93, DEVE CONSTAR UMA DECLARACAO DE VERACIDADE, A QUAL DEVE SER ASSINADA POR UMA PESSOA DEVIDAMENTE AUTORIZADA A REPRESENTAR O INTERESSADO, DEVENDO A MESMA CONSTAR NO INSTRUMENTO DE PROCURACAO, OU NO SEU SUBSTABELECIMENTO.

B08E Application fees: payment of additional fee required [chapter 8.5 patent gazette]

Free format text: COMPLEMENTAR A 4A ANUIDADE; COMPROVAR O RECOLHIMENTO DAS 3A E 5A ANUIDADES.

B08H Application fees: decision cancelled [chapter 8.8 patent gazette]

Free format text: REFERENTE A DESPACHO 8.5 NA RPI 2160 DE 29/05/2012.

B08F Application dismissed because of non-payment of annual fees [chapter 8.6 patent gazette]

Free format text: REFERENTE A 3A ANUIDADE.

B08G Application fees: restoration [chapter 8.7 patent gazette]
B08F Application dismissed because of non-payment of annual fees [chapter 8.6 patent gazette]
B08K Patent lapsed as no evidence of payment of the annual fee has been furnished to inpi [chapter 8.11 patent gazette]