BR202019027665U2 - PRE-MOLDED ARTIFACT IN BLOCK FORMAT FOR POOL CONSTRUCTION - Google Patents
PRE-MOLDED ARTIFACT IN BLOCK FORMAT FOR POOL CONSTRUCTION Download PDFInfo
- Publication number
- BR202019027665U2 BR202019027665U2 BR202019027665-2U BR202019027665U BR202019027665U2 BR 202019027665 U2 BR202019027665 U2 BR 202019027665U2 BR 202019027665 U BR202019027665 U BR 202019027665U BR 202019027665 U2 BR202019027665 U2 BR 202019027665U2
- Authority
- BR
- Brazil
- Prior art keywords
- block
- construction
- pool
- molded
- artifact
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H4/00—Swimming or splash baths or pools
- E04H4/0075—Swimming or splash baths or pools made of concrete
- E04H4/0081—Swimming or splash baths or pools made of concrete with walls and floor cast in situ
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/84—Walls made by casting, pouring, or tamping in situ
- E04B2/86—Walls made by casting, pouring, or tamping in situ made in permanent forms
- E04B2/8623—Walls made by casting, pouring, or tamping in situ made in permanent forms with spacers and at least one form leaf being monolithic
- E04B2/8629—Walls made by casting, pouring, or tamping in situ made in permanent forms with spacers and at least one form leaf being monolithic with both form leaves and spacers being monolithic
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C1/00—Building elements of block or other shape for the construction of parts of buildings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
Abstract
artefato pré-moldado em formato de bloco para construção de piscinas. compreende a presente patente de modelo de utilidade de um artefato prémoldado em formato de bloco para construção de piscinas, cujo projeto possibilita a realização da sua montagem com a inclusão das ferragens sem a utilização de madeiramento, desenvolvido, para no caso da piscina de blocos para vinil ou cerâmica, onde a sua montagem é a utilização das peças uma em cima da outra sem a necessidade de encher na hora, e será colocado um do lado do outro, descer uma metade e colocar em volta do lugar das colunas, descer a outra metade colocando de frente para outra e passar os tirantes para fixar uma metade na outro, utilizando massa feita para assentar tijolos ou cola pronta de assentamento de tijolos industrializada com 1 cm de largura.pre-molded block-shaped artifact for swimming pool construction. comprises the present patent for a utility model of a pre-molded artifact in the form of a block for the construction of swimming pools, whose project allows its assembly to be carried out with the inclusion of the hardware without the use of wood, developed, in the case of the block pool for vinyl or ceramic, where its assembly is the use of the pieces one on top of the other without the need to fill it at the time, and it will be placed side by side, lower one half and place around the place of the columns, lower the other putting half facing each other and passing the tie rods to fix one half to the other, using putty made to lay bricks or ready-made glue for laying industrialized bricks 1 cm wide.
Description
01 - Refere-se a presente patente de modelo de utilidade de um artefato prémoldado em formato de bloco para construção de piscinas, cujo projeto possibilita a realização da sua montagem com a inclusão das ferragens sem a utilização de madeiramento.01 - This patent refers to the utility model of a pre-molded artifact in block format for the construction of swimming pools, whose design allows for its assembly with the inclusion of hardware without the use of woodwork.
02 - Como já é do conhecimento geral, as piscinas construídas a partir do método convencional, por ser construída “in loco” segue determinadas etapas, aonde após a escolha do local, a escavação, a parte estrutural, que inclui toda a instalação hidráulica, é construída a partir de brocas de concreto que recebem pilares dotados de barras de ferro, cintas metálicas de amarração, sendo que o espaço entre eles é preenchido com blocos de cimento preferencialmente vazados, recebendo posteriormente uma camada de material tipo reboco e cerâmicas para o acabamento.02 - As is well known, swimming pools built using the conventional method, as they are built "in loco", follow certain steps, where after choosing the location, the excavation, the structural part, which includes the entire hydraulic installation, it is built from concrete drills that receive pillars equipped with iron bars, metal mooring straps, and the space between them is filled with cement blocks, preferably hollow, subsequently receiving a layer of plaster-type material and ceramics for finishing .
03 - Nas piscinas de cerâmicas, onde as mesmas são construídas através do método de bloco cheio ou concreto armado, onde no caso do bloco cheio, o construtor tem que subir os mesmos alinhando, enchendo com concreto estrutural que demanda muito tempo, depois de uma certa altura, tem que parar para enformar as colunas de ferro, demanda de forma e um bom conhecimento e tempo, isso é efetuado geralmente no fim do dia para poder dar tempo do concreto secar para desenformar, e recomeçar o processo novamente, no final da altura definida ou profundidade, dar o desconto da cinta, colocar a coluna de ferro no local, enformar com madeira e encher com concreto estrutural, após a secagem do concreto desenformar e retirar toda a madeira, pregos e arames e iniciar o processo de chapisco com uma mistura de areia e cimento, sendo a mistura rala em forma de mingau e fazer a aplicação com tempo de cura de 24 horas, depois da secagem começar a aplicação do embolso ou reboco. Depois do processo de reboco esperar de 14 a 28 dias para iniciar o processo de impermeabilização, e isso atrasa toda a obra, pois na maioria da comercialização de piscinas, são entregues somente com um metro de piso grosso em volta, depois do processo de impermeabilização, vem o teste de estanqueidade, para depois iniciar a colocação das pastilhas ou cerâmicas, e por fim o rejunte especial pata piscinas.03 - In ceramic pools, where they are built using the full block or reinforced concrete method, where in the case of the full block, the builder has to raise them by aligning, filling with structural concrete that takes a long time, after a At a certain point, you have to stop to shape the iron columns, it demands shape and good knowledge and time, this is usually done at the end of the day to allow time for the concrete to dry to unmold, and start the process again, at the end of the defined height or depth, discount the strap, place the iron column in place, shape with wood and fill with structural concrete, after drying the concrete, unmold and remove all wood, nails and wires and start the roughcast process with a mixture of sand and cement, the mixture being thin in the form of mush and apply with a curing time of 24 hours, after drying begin applying the pocket or plaster. After the plastering process, wait 14 to 28 days to start the waterproofing process, and this delays the entire work, as in most pool sales, they are only delivered with one meter of thick floor around, after the waterproofing process , comes the tightness test, to then start placing the tiles or ceramics, and finally the special grout for swimming pools.
04 - Já no método do concreto armado, o construtor tem que passar toda a ferragem trançando umas nas outras e respeitando o espaçamento exigido nos cálculos e demanda muito tempo, após esse processo de enformar todo a estrutura ou compensado ou formas prontas, no caso do compensado tem que prender bem as madeiras e escoras pois o concreto e muito pesado e pode abrir as formas e perder todo o serviço para um profissional mau capacitado. Já no caso das formas prontas e mais rápido mais o preço da locação ou fabricação é muito elevado. Depois de tudo pronto enche com concreto estrutural, tem que molhar todos os dias e o tempo de cura e de 28 dias, pois neste processo tem à mesma necessidade da aplicação da impermeabilização, e os passos seguintes serão os mesmos da utilizada na construção feita por blocos cheios.04 - In the reinforced concrete method, the builder has to spend all the hardware braiding each other and respecting the spacing required in the calculations and it takes a long time, after this process of shaping the entire structure or plywood or ready-made forms, in the case of plywood has to hold the wood and props well because the concrete is very heavy and can open the forms and lose all the work to a poorly qualified professional. In the case of ready-made and faster forms, the lease or manufacturing price is very high. After everything is ready, fill it with structural concrete, water it every day and the curing time is 28 days, because in this process there is the same need for the application of waterproofing, and the next steps will be the same as those used in the construction made by full blocks.
05 - Para a construção de piscinas em vinil utilizando o bloco cheio, o construtor tem que subir os mesmos alinhando, e os mesmos tempo enchendo com concreto estrutural que demanda muito tempo. Depois de uma certa altura tem que parar para enformar as colunas de ferro, demanda a montagem de forma e um bom conhecimento e tempo isso e feito geralmente no fim do dia para poder dar tempo do concreto secar para desenformar, e recomeçar o processo novamente, no final da altura definida ou profundidade dar desconto da cinta, colocar a coluna de ferro no local, enformar com madeira e encher com concreto estrutural, e após a secagem do concreto desenformar, retirar toda madeira, pregos e arames, e iniciar o processo de chapisco uma mistura de areia e cimento, sendo a mistura rala em forma de mingau e fazer a aplicação tempo de cura de 24 horas, depois da secagem começar a aplicação do embolso ou reboco, depois disto vem a instalação do vinil sendo um processo mais rápido do cerâmica.05 - For the construction of vinyl swimming pools using the full block, the builder has to climb them aligning, and the same time filling with structural concrete that takes a lot of time. After a certain time, you have to stop to shape the iron columns, it requires assembling the shape and a good knowledge and time. This is usually done at the end of the day to allow time for the concrete to dry to unmold, and start the process again, at the end of the defined height or depth, discount the strap, place the iron column in place, shape with wood and fill with structural concrete, and after drying the concrete, unmold, remove all wood, nails and wires, and start the process of roughcast a mixture of sand and cement, the mixture being thin in the form of porridge and apply a curing time of 24 hours, after drying start the application of the pocket or plaster, after that comes the installation of the vinyl being a faster process of ceramics.
06 - No estado da técnica a PI 9815509-1, descreve um painel para a construção de tanques de piscinas, que apresenta uma estrutura pré-fabricada de forma retangular, com um quadro periférico que delimita abas verticais de união com os painéis adjacentes notável pelo fato de que uma das abas verticais apresenta, por um lado na totalidade de sua altura, meios de centragem e de estanqueidade constituídos por um perfilado que excede da face externa da aba considerada, e que apresenta lateralmente um lábio de estanqueidade, operando junto com uma forma vazada complementar, e que a outra aba apresenta perfilado e a forma vazada apresentando uma seção transversal triangular, meios de junção rápida engatável que operam juntos com meios complementares que a outra aba apresenta.06 - In the prior art, PI 9815509-1 describes a panel for the construction of swimming pool tanks, which has a prefabricated structure of rectangular shape, with a peripheral frame that delimits vertical flaps joining the adjacent panels, notable for its fact that one of the vertical flaps has, on the one hand, in its entirety, centering and sealing means consisting of a profile that exceeds the external face of the considered flap, and that laterally has a sealing lip, operating together with a complementary hollow shape, and that the other tab has a profile, and the hollow shape having a triangular cross section, quick-engaging means of engagement that operate together with complementary means that the other tab has.
07 - A PI 0411599-6 de 09/06/2004, descreve um painel para construção de um tanque de piscina, obtido por um processo de injeção compressão de um material plástico reciclado, na forma quadrangular plana ou arqueada, retilínea segundo as suas dimensões, onde uma das faces apresenta nervuras de rigidez.07 - PI 0411599-6 of 06/09/2004, describes a panel for the construction of a swimming pool, obtained by an injection-compression process of a recycled plastic material, in a flat or arched quadrangular shape, rectilinear according to its dimensions , where one of the faces has stiffness ribs.
08 - A PI 0403123-7 de 02/08/2004, apresenta um método para construção de piscina, tanques e correlatos, desenvolvido com o propósito de diminuir o tempo de execução, apresentando etapas que compõe elementos dotados de estrutura pré-moldada, de modo promover maior facilidade de execução.08 - PI 0403123-7 of 08/02/2004, presents a method for the construction of a swimming pool, tanks and the like, developed with the purpose of reducing the execution time, presenting steps that make up elements with pre-molded structure, of way to promote greater ease of execution.
09- A PI 0703577-2 de 11/10/2007, descreve um método de construção de piscina e respectivo bloco, apresentando a montagem de blocos entre ferros, que possibilita a conformação de paredes, cortinas de concreto que dispensam a utilização de madeiramento, utilizando um modelo de bloco em “H”, definindo duas plataformas equidistantes, com um elemento de união central, conformando trechos vazados, semi-oblongos e opostos entre si.09- PI 0703577-2 of 10/11/2007, describes a method of construction of a swimming pool and its block, presenting the assembly of blocks between irons, which allows the conformation of walls, concrete curtains that do not require the use of wood, using an “H” block model, defining two equidistant platforms, with a central union element, forming hollow sections, semi-oblong and opposite to each other.
10 - O artefato pré-moldado em formato de bloco para construção de piscinas, foi desenvolvido, para no caso da piscina de blocos para vinil ou cerâmica, no lugar de subir os blocos e enchendo ao mesmo tempo no processo normal construído por blocos, a sua montagem é efetuada através da colocação das peças em frente uma da outra, e em cima da outra sem a necessidade de encher na hora, e será colocado uma do lado do outra, descer uma metade e colocar em volta do lugar das colunas, descer a outra metade colocando de frente para outra e passar os tirantes para fixar uma metade na outro, e repetir os passos sucessivamente.10 - The pre-molded artifact in the form of a block for building swimming pools, was developed, for the case of a vinyl or ceramic block pool, instead of raising the blocks and filling at the same time in the normal process built by blocks, the its assembly is carried out by placing the pieces in front of each other, and on top of the other without the need to fill it at the time, and will be placed one side of the other, lower one half and place around the place of the columns, lower placing the other half facing each other and passing the braces to fix one half to the other, and repeating the steps successively.
11 - No caso da piscina de concreto armado eliminaremos as etapas das montagem ferragens e formas, dispensando assim madeiras, pregos e arames ou aluguel de formas o tempo de mão de obra será reduzido em 90%, montando uma peça sobre a outra sem a necessidade de enchimento na hora, nos dois casos será utilizado massa feita para assentar tijolos ou cola pronta de assentamento de tijolos industrializada com 1 cm de largura.11 - In the case of the reinforced concrete pool, we will eliminate the steps of assembling hardware and forms, thus dispensing with wood, nails and wires or form rental, the labor time will be reduced by 90%, assembling one piece over the other without the need of filling at the time, in both cases, mass made to lay bricks or ready-made glue for laying industrialized bricks with 1 cm in width will be used.
12 - Na construção da piscina de blocos em algum momento da obra será necessário enformar as vigas e pilares, isso não será necessário pois o próprio bloco bi partido acomodara as ferragens tanto na horizontal quanto na vertical, dispensando assim madeiras, pregos e arames, como também tempo. Isso serve para os dois casos de construção. Pois mesmo utilizando os blocos bi partidos, ainda será necessário a utilização de vigas e pilares.12 - In the construction of the block pool, at some point during the work it will be necessary to shape the beams and pillars, this will not be necessary as the bi-partite block itself will accommodate the hardware both horizontally and vertically, thus dispensing with wood, nails and wires, such as also time. This works for both construction cases. Because even using the bi-partition blocks, it will still be necessary to use beams and pillars.
13 - Outra vantagem do nosso produto em cima dos métodos de construção antigos, será no caso da piscina de blocos para receber o vinil, tem à necessidade de chapisco e reboco que gasta muito tempo e mão de obra, nossos blocos já vem com a superfície acabada não necessitando de reboco, além do caso de ser uma piscina à ser feita de cerâmica, terá que esperar o tempo de cura do reboco de 14 a 28 dias para começar o processo de impermeabilização, como também na piscina de concreto armado o mesmo só poderá começar o processo após 28 dias de cura. Já com o nosso produto o mesmo será entregue para construção de piscina de cerâmica com o tempo superior à 28 dias como também será acrescentado o produto de impermeabilização para concreto na confecção do bloco. Podendo o mesmo ser assentando com produtos para rebocos, que irá impermeabilizar as junta de união dos blocos, sendo que após o enchimento do centro dos blocos com concreto após 1 dia já poderá ser feita as de mãos de impermeabilizante de escolha do construtor.13 - Another advantage of our product over the old construction methods, will be in the case of the block pool to receive the vinyl, it has the need for roughcast and plaster that takes a lot of time and labor, our blocks already come with the surface finished without needing plaster, in addition to the case of a pool to be made of ceramic, you will have to wait for the plaster curing time of 14 to 28 days to start the waterproofing process, as well as in the reinforced concrete pool it is only may start the process after 28 days of cure. With our product, it will be delivered for the construction of a ceramic swimming pool with a time of more than 28 days, as well as the addition of the waterproofing product for concrete in the making of the block. The same can be laid with products for rendering, which will waterproof the joints of the blocks, and after filling the center of the blocks with concrete, after 1 day, the waterproofing of the builder's choice can already be done.
14 - A confecção dos pré- fabricados terá uma malha de ferro de 4,2 com espaçamento de 5 a 10 cm, cimento de secagem rápida CP V ARY e furos que será canal para introdução de tirante para travar as duas fases do bloco com também as escoras especialmente fabricadas para este tipo de construção, será retirado as porcas e arruelas para retirada das escoras e depois as mesmas serão recolocados e tampando o orifício com produtos para piscinas de cerâmica e massa de reboco para piscinas de vinil.14 - The manufacture of pre-fabricated items will have a 4.2 iron mesh with a spacing of 5 to 10 cm, CP V ARY fast drying cement and holes that will be a channel for the introduction of a tie to lock the two phases of the block with also the struts specially manufactured for this type of construction, the nuts and washers will be removed to remove the struts and then they will be replaced and covering the hole with products for ceramic swimming pools and plastering putty for vinyl swimming pools.
15 - O artefato pré-moldado em formato de bloco para construção de piscinas, objeto desta patente de utilidade, pode ser mais bem compreendido reportando as figuras, que integram este relatório descritivo, que não restringe sua configuração quanto as suas dimensões, proporções e eventuais tipos de acabamentos inseridos e nem o alcance de sua aplicação pratica, onde:
- • A figura 1 representa uma vista em perspectiva do bloco.
- • A figura 2 representa uma vista superior do bloco.
- • A figura 3 representa uma vista frontal do bloco.
- • A figura 4 representa uma vista superior dos bloco alinhados paralelamente em alusão a montagem da parede da piscina.
- • A figura 5 representa uma vista em perspectiva do bloco de canto.
- • A figura 6 representa uma vista superior do bloco de canto.
- • A figura 7 representa uma vista frontal de uma variação do modelo do bloco com ressaltos para a acomodação das ferragens.
- • A figura 8 representa um fluxograma de montagem.
- • Figure 1 represents a perspective view of the block.
- • Figure 2 represents a top view of the block.
- • Figure 3 represents a front view of the block.
- • Figure 4 represents a top view of the blocks aligned parallel to the pool wall assembly.
- • Figure 5 represents a perspective view of the corner block.
- • Figure 6 represents a top view of the corner block.
- • Figure 7 represents a front view of a variation of the block model with protrusions for fitting the hardware.
- • Figure 8 represents an assembly flowchart.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
BR202019027665-2U BR202019027665U2 (en) | 2019-12-23 | 2019-12-23 | PRE-MOLDED ARTIFACT IN BLOCK FORMAT FOR POOL CONSTRUCTION |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
BR202019027665-2U BR202019027665U2 (en) | 2019-12-23 | 2019-12-23 | PRE-MOLDED ARTIFACT IN BLOCK FORMAT FOR POOL CONSTRUCTION |
Publications (1)
Publication Number | Publication Date |
---|---|
BR202019027665U2 true BR202019027665U2 (en) | 2021-07-06 |
Family
ID=77316794
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
BR202019027665-2U BR202019027665U2 (en) | 2019-12-23 | 2019-12-23 | PRE-MOLDED ARTIFACT IN BLOCK FORMAT FOR POOL CONSTRUCTION |
Country Status (1)
Country | Link |
---|---|
BR (1) | BR202019027665U2 (en) |
-
2019
- 2019-12-23 BR BR202019027665-2U patent/BR202019027665U2/en not_active IP Right Cessation
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US2920475A (en) | Building panel | |
US2043697A (en) | Building structure | |
US2105613A (en) | Fabricated brick construction | |
US2208589A (en) | Building material and method | |
US8955282B2 (en) | Soloarmar construction engineering system | |
US1717546A (en) | Method of building construction and resulting product | |
RU2561135C2 (en) | Retained formwork package, method of its assembly and method of construction of monolithic walls of building and structure in retained formwork of modular elements | |
BR202019027665U2 (en) | PRE-MOLDED ARTIFACT IN BLOCK FORMAT FOR POOL CONSTRUCTION | |
RU165441U1 (en) | BLOCK FORMWORK | |
USRE21905E (en) | Building construction | |
US1053646A (en) | Building construction. | |
US1500377A (en) | Wall construction | |
CN210316179U (en) | Assembled building block and assembled building block lock anchor wall building system | |
US2139907A (en) | Building construction | |
US1517244A (en) | Method of building construction | |
US723175A (en) | Construction of buildings. | |
US1061918A (en) | Wall construction. | |
TWM580602U (en) | Water-stop foundation assembly fastener | |
BRPI1106446B1 (en) | masonry with pre-fixed blocks before the insertion of the cement mix and construction process with molded masonry | |
US2762105A (en) | Sectional concrete forms | |
RU163463U1 (en) | FENCE | |
BR102017002979A2 (en) | precast wall panels | |
TWM615162U (en) | Improved structure of building formwork | |
WO2022236390A1 (en) | Modular blocks made from concrete or plaster panels | |
WO2014028986A1 (en) | Ceramic panel construction system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
B03A | Publication of a patent application or of a certificate of addition of invention [chapter 3.1 patent gazette] | ||
B08F | Application dismissed because of non-payment of annual fees [chapter 8.6 patent gazette] |
Free format text: REFERENTE A 3A ANUIDADE. |
|
B08K | Patent lapsed as no evidence of payment of the annual fee has been furnished to inpi [chapter 8.11 patent gazette] |
Free format text: EM VIRTUDE DO ARQUIVAMENTO PUBLICADO NA RPI 2718 DE 07-02-2023 E CONSIDERANDO AUSENCIA DE MANIFESTACAO DENTRO DOS PRAZOS LEGAIS, INFORMO QUE CABE SER MANTIDO O ARQUIVAMENTO DO PEDIDO DE PATENTE, CONFORME O DISPOSTO NO ARTIGO 12, DA RESOLUCAO 113/2013. |