BR112022020850A2 - POST-TRACTION TUBE FOUNDATION AND ASSEMBLY METHOD - Google Patents

POST-TRACTION TUBE FOUNDATION AND ASSEMBLY METHOD

Info

Publication number
BR112022020850A2
BR112022020850A2 BR112022020850A BR112022020850A BR112022020850A2 BR 112022020850 A2 BR112022020850 A2 BR 112022020850A2 BR 112022020850 A BR112022020850 A BR 112022020850A BR 112022020850 A BR112022020850 A BR 112022020850A BR 112022020850 A2 BR112022020850 A2 BR 112022020850A2
Authority
BR
Brazil
Prior art keywords
cmp
post
tube foundation
concrete base
tubular concrete
Prior art date
Application number
BR112022020850A
Other languages
Portuguese (pt)
Inventor
Huo Hongbin
Bong Bill
Original Assignee
Rrc Power & Energy Llc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US16/850,864 external-priority patent/US11085165B2/en
Application filed by Rrc Power & Energy Llc filed Critical Rrc Power & Energy Llc
Publication of BR112022020850A2 publication Critical patent/BR112022020850A2/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • E02D27/425Foundations for poles, masts or chimneys specially adapted for wind motors masts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/58Prestressed concrete piles
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Foundations (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

FUNDAÇÃO DE TUBO DE PÓS-TRAÇÃO E MÉTODO DE MONTAGEM DA MESMA. É descrita no presente documento uma fundação de tubo pós-tracionado para suportar uma estrutura submetida a altas forças de recalque. A fundação de tubo pós-tracionado inclui um CMP externo, um CMP interno e uma base de concreto tubular posicionada entre o CMP interno e o CMP externo. O CMP externo inclui uma superfície interna que define uma cavidade que se estende entre uma primeira extremidade aberta e uma segunda extremidade aberta oposta. O CMP externo é posicionado dentro de um furo escavado definido ao longo de uma superfície do solo. O CMP interno é posicionado dentro da cavidade do CMP externo de modo que um espaço anular seja definido entre o CMP interno e o CMP externo. A base de concreto tubular é posicionada dentro do espaço anular definido entre o CMP interno e o CMP externo. Uma pluralidade de vigas de contraventamento estende-se radialmente para fora da base de concreto tubular.POST-TRACTION TUBE FOUNDATION AND METHOD OF ASSEMBLY THE SAME. A post-tensioned tube foundation is described in this document to support a structure subjected to high settlement forces. The post-tensioned tube foundation includes an outer CMP, an inner CMP, and a tubular concrete base positioned between the inner CMP and outer CMP. The outer CMP includes an inner surface defining a cavity extending between a first open end and an opposing second open end. The external CMP is positioned within an excavated hole defined along a ground surface. The inner CMP is positioned within the cavity of the outer CMP so that an annular space is defined between the inner CMP and the outer CMP. The tubular concrete base is positioned within the annular space defined between the inner CMP and the outer CMP. A plurality of bracing beams extend radially outward from the tubular concrete base.

BR112022020850A 2020-04-16 2021-03-19 POST-TRACTION TUBE FOUNDATION AND ASSEMBLY METHOD BR112022020850A2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US16/850,864 US11085165B2 (en) 2018-04-19 2020-04-16 Post-tension tube foundation and method of assembling same
PCT/US2021/023075 WO2021211256A1 (en) 2020-04-16 2021-03-19 Post-tension tube foundation and method of assembling same

Publications (1)

Publication Number Publication Date
BR112022020850A2 true BR112022020850A2 (en) 2022-11-29

Family

ID=78084726

Family Applications (1)

Application Number Title Priority Date Filing Date
BR112022020850A BR112022020850A2 (en) 2020-04-16 2021-03-19 POST-TRACTION TUBE FOUNDATION AND ASSEMBLY METHOD

Country Status (5)

Country Link
CN (1) CN115768953A (en)
AU (2) AU2021255455B2 (en)
BR (1) BR112022020850A2 (en)
CA (1) CA3180149A1 (en)
WO (1) WO2021211256A1 (en)

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5586417A (en) * 1994-11-23 1996-12-24 Henderson; Allan P. Tensionless pier foundation

Also Published As

Publication number Publication date
CA3180149A1 (en) 2021-10-21
AU2024202789A1 (en) 2024-05-16
AU2021255455B2 (en) 2024-05-23
WO2021211256A1 (en) 2021-10-21
AU2021255455A1 (en) 2022-11-03
CN115768953A (en) 2023-03-07

Similar Documents

Publication Publication Date Title
PH12021550458A1 (en) Pile-bottom grouting cavity and method for using same, and cast-in-place pile body and method for constructing same
CN109630135B (en) Tunnel construction method for system support
KR101641467B1 (en) Ground anchor construction method for anchoring area extended improvement using extended excavation agitator
JP6063714B2 (en) Method for creating expandable steel pipe pile and pile structure
BR112022020850A2 (en) POST-TRACTION TUBE FOUNDATION AND ASSEMBLY METHOD
KR101016699B1 (en) Expandable Hammer
DK2839083T3 (en) pile shoe
CN106193044A (en) A kind of body segmenting slip casting method
CN110725303B (en) Construction method of oblique stressed body of rigid insert combined with guniting stirring reinforcing body
CN102953744A (en) Hollow grouting yielding anchor rod
KR101813579B1 (en) Pre-loading apparatus for pile and pre-loading method using the same
JP6493736B2 (en) Tunnel segment diameter reducing device, tunnel lining structure, and freeze expansion countermeasure method
BR112018011001A2 (en) downhole system
DE3061839D1 (en) Method of constructing a lined tunnel, and lining segment therefor
CO2020000470A2 (en) Extendable Casings and Related Methods for Building a Ductile Support Pillar
SE543972C2 (en) Foundation for a tower of a wind turbine and a method for constructing such foundation
BR9904804A (en) Multipart pin for removable strut
KR20110005577A (en) Pre-stressing tunneling method using presupport concept and thereof apparatus
JP2016027231A (en) Installation foundation pile, foundation pile for installing solar panel, installation method of foundation pile and installation method of foundation pile of solar panel
BR112023026688A2 (en) RING BARRIER
KR20090019189A (en) A extension anchor
KR20170133673A (en) Pile grouting device for enhanced friction of skin
CN210289210U (en) Safety protection device for hole forming of manual hole digging pile
CA2934103A1 (en) Drive point for a pile
BR112023018919A2 (en) EXPANDABLE METAL WEDGE RING FOR USE WITH A SEAL SET