BR112022011461A2 - Desvio de sistema de controle para armazenamento a frio industrial - Google Patents

Desvio de sistema de controle para armazenamento a frio industrial

Info

Publication number
BR112022011461A2
BR112022011461A2 BR112022011461A BR112022011461A BR112022011461A2 BR 112022011461 A2 BR112022011461 A2 BR 112022011461A2 BR 112022011461 A BR112022011461 A BR 112022011461A BR 112022011461 A BR112022011461 A BR 112022011461A BR 112022011461 A2 BR112022011461 A2 BR 112022011461A2
Authority
BR
Brazil
Prior art keywords
cold storage
control system
industrial cold
bypass
energy consumption
Prior art date
Application number
BR112022011461A
Other languages
English (en)
Inventor
Walsh Daniel
Foley Thomas
crossno Jesse
Kaye Bryan
Original Assignee
CrossnoKaye
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CrossnoKaye filed Critical CrossnoKaye
Publication of BR112022011461A2 publication Critical patent/BR112022011461A2/pt

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/083Shipping
    • G06Q10/0832Special goods or special handling procedures, e.g. handling of hazardous or fragile goods
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/042Programme control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
    • G05B19/0423Input/output
    • G05B19/0425Safety, monitoring
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/042Programme control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
    • G05B19/0426Programming the control sequence
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B11/00Automatic controllers
    • G05B11/01Automatic controllers electric
    • G05B11/36Automatic controllers electric with provision for obtaining particular characteristics, e.g. proportional, integral, differential
    • G05B11/42Automatic controllers electric with provision for obtaining particular characteristics, e.g. proportional, integral, differential for obtaining a characteristic which is both proportional and time-dependent, e.g. P. I., P. I. D.
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/26Pc applications
    • G05B2219/2654Fridge, refrigerator
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Economics (AREA)
  • Automation & Control Theory (AREA)
  • Human Resources & Organizations (AREA)
  • Development Economics (AREA)
  • Quality & Reliability (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Theoretical Computer Science (AREA)
  • Operations Research (AREA)
  • Devices That Are Associated With Refrigeration Equipment (AREA)
  • Air Conditioning Control Device (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Control Of Temperature (AREA)

Abstract

DESVIO DE SISTEMA DE CONTROLE PARA ARMAZENAMENTO A FRIO INDUSTRIAL. Algumas modalidades incluem um sistema de desvio de controle para instalações industriais de armazenamento a frio. Em algumas modalidades, o sistema de desvio de controle inclui um programador de nuvem e um controlador de desvio. O programador de nuvem pode estar localizado em um local remoto. O programador de nuvem pode criar uma prescrição de consumo de energia para um ou mais itens de equipamento de armazenamento a frio na instalação de armazenamento a frio industrial. A prescrição de consumo de energia, por exemplo, pode incluir um nível de consumo de energia desejado para um ou mais itens de equipamento de armazenamento a frio na instalação de armazenamento a frio industrial e o nível de consumo de energia desejado muda ao longo de um período de tempo. O controlador de desvio pode estar localizado na instalação de armazenamento a frio industrial e recebe a prescrição de consumo de energia do programador de nuvem, produz um ponto de ajuste ambiental para um ou mais itens de equipamento e emite o ponto de ajuste ambiental para um dispositivo ou controlador de sistema.
BR112022011461A 2019-12-13 2020-12-14 Desvio de sistema de controle para armazenamento a frio industrial BR112022011461A2 (pt)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201962947848P 2019-12-13 2019-12-13
PCT/US2020/064922 WO2021119612A1 (en) 2019-12-13 2020-12-14 Control system bypassing for industrial cold storage

Publications (1)

Publication Number Publication Date
BR112022011461A2 true BR112022011461A2 (pt) 2022-08-23

Family

ID=76316717

Family Applications (1)

Application Number Title Priority Date Filing Date
BR112022011461A BR112022011461A2 (pt) 2019-12-13 2020-12-14 Desvio de sistema de controle para armazenamento a frio industrial

Country Status (8)

Country Link
US (1) US20210180806A1 (pt)
EP (1) EP4073441A4 (pt)
CN (1) CN114787566A (pt)
AU (1) AU2020401389B2 (pt)
BR (1) BR112022011461A2 (pt)
CA (1) CA3164443A1 (pt)
MX (1) MX2022007291A (pt)
WO (1) WO2021119612A1 (pt)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102549711B1 (ko) * 2022-10-19 2023-06-30 (재)한국건설생활환경시험연구원 물류 센터 에너지 고효율화를 위한 ai 기반 토탈 에너지 관리 시스템

Family Cites Families (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6631622B1 (en) * 2002-03-22 2003-10-14 Whirlpool Corporation Demand side management of freezer systems
BRPI0415919A (pt) * 2003-10-27 2006-12-26 Ben Enis método e sistema para armazenar e usar energia visando a reduzir o custo de energia para o usuário final
US8417391B1 (en) * 2011-12-15 2013-04-09 Restore Nv Automated demand response energy management system
EP2850372B1 (en) * 2012-05-14 2019-05-01 Carrier Corporation Cargo temperature monitoring and control for a refrigerated container
DK3039360T3 (da) * 2013-08-29 2019-08-19 Maersk Line As Computerimplementeret fremgangsmåde overvågning af driften af en kølecontainer til skibsbefragtning
US20150198345A1 (en) * 2014-01-13 2015-07-16 Trane International Inc. Active Energy Budget Control Management
GB2529429B (en) * 2014-08-19 2021-07-21 Origami Energy Ltd Power distribution control system
US20160138856A1 (en) * 2014-11-14 2016-05-19 Jeff Wilson Actively controlled cold-storage system
US10352576B2 (en) * 2016-02-18 2019-07-16 Johnson Controls Technology Company Extremum-seeking control system for a chilled water plant
US10380863B2 (en) * 2017-04-03 2019-08-13 Oneevent Technologies, Inc. System and method for monitoring a building
US10761496B2 (en) * 2017-06-12 2020-09-01 Honeywell International Inc. Apparatus and method for identifying impacts and causes of variability or control giveaway on model-based controller performance
US11274879B2 (en) * 2018-04-23 2022-03-15 Globe Tracker, ApS Multi-sensor closed-loop refrigeration control for freight containers
US10323878B1 (en) * 2018-05-30 2019-06-18 Lineage Logistics, LLC Thermal control system
US10503161B1 (en) * 2018-10-08 2019-12-10 CrossnoKaye Industrial process control coordination and implementation
US11162705B2 (en) * 2019-08-29 2021-11-02 Hitachi-Johnson Controls Air Conditioning, Inc Refrigeration cycle control

Also Published As

Publication number Publication date
EP4073441A1 (en) 2022-10-19
AU2020401389B2 (en) 2023-10-05
US20210180806A1 (en) 2021-06-17
AU2020401389A1 (en) 2022-07-14
EP4073441A4 (en) 2023-12-06
MX2022007291A (es) 2022-10-18
WO2021119612A1 (en) 2021-06-17
CN114787566A (zh) 2022-07-22
CA3164443A1 (en) 2021-06-17

Similar Documents

Publication Publication Date Title
BR112021018057A2 (pt) Aparelho para um dispositivo gerador de aerossol, dispositivo gerador de aerossol, sistema gerador de aerossol, método para um controlador de aparelho, conjunto de instruções legíveis por máquina e meio legível por máquina
BR112018001045A2 (pt) sistema e método para o armazenamento de dados em um ambiente de produção industrial, e artigo de fabricação para operação de um controlador lógico programável inteligente
BR112017019913A2 (pt) dispositivo e método para controlar um aquecedor elétrico para limitar a temperatura de acordo com perfil de temperatura desejado ao longo do tempo
BR112017020127A2 (pt) controle híbrido dinâmico
BR112015022775A2 (pt) prognósticos de válvula baseados em testes laboratoriais
PT2350747E (pt) Sistemas e métodos para controlar eficiência de consumo de energia
BR112018076436A2 (pt) método e aparelho para previsão de temperatura de saída de turbina em turbina a gás
BR112014002751A2 (pt) automação de sistema através de um sistema de alarme
BR112012025984A2 (pt) sistema de distribuição de energia elétrica, dispositivo eletrônico inteligente, e, método de controle de um sistema de distribuição de energia elétrica
BR112022011461A2 (pt) Desvio de sistema de controle para armazenamento a frio industrial
BR112015030729A2 (pt) relé, controlador, e, método para implementar controle distribuído
BR112017009953B8 (pt) Sistema de produção de energia e método para controle automatizado de um sistema de produção de energia
BR112017026547A2 (pt) sistema de controle de gerenciamento de energia, mídia legível em computador de instruções e método de gerenciamento de distribuição de energia dentro de um sistema de geração de energia
MX2022002509A (es) Un metodo y aparato para la gestion de recursos de energia predichos para un complejo de plantas de gas industrial.
BR112022025269A2 (pt) Sistema de controle e proteção para compensador série distribuído
UY36871A (es) Transferencia de datos de instalaciones de energía eólica y parques eólicos a una central de control
IE20210178A3 (en) Machine Learning Techniques For Predictive Prioritization
BR112018006033A2 (pt) controlador de sistema de células a combustível e método associado
Zhanpei et al. Improved particle filter based soft sensing of room cooling load
CY1116329T1 (el) Μια μεθοδος για παρακολουθηση και ελεγχο της χημειας μιας zld διεργασιας σε μοναδες παραγωγης ηλεκτρικης ενεργειας
BR112021006602A2 (pt) coordenação e implementação de controle de processo industrial
Potapov et al. Using neural network for building short) term forecast of electricity load of LLC" oMSK energy retail company
Pulungan et al. A review of solar tracker control strategies
BR112018015868A2 (pt) sistema e método de comando integrado com o tempo real
Lesnykh et al. Problems of the Assessment of Economic Damage Caused by Power Supply Interruption

Legal Events

Date Code Title Description
B06W Patent application suspended after preliminary examination (for patents with searches from other patent authorities) chapter 6.23 patent gazette]