BR112022002607A2 - Sistema de sinal de trem e método de ligação para o mesmo - Google Patents

Sistema de sinal de trem e método de ligação para o mesmo

Info

Publication number
BR112022002607A2
BR112022002607A2 BR112022002607A BR112022002607A BR112022002607A2 BR 112022002607 A2 BR112022002607 A2 BR 112022002607A2 BR 112022002607 A BR112022002607 A BR 112022002607A BR 112022002607 A BR112022002607 A BR 112022002607A BR 112022002607 A2 BR112022002607 A2 BR 112022002607A2
Authority
BR
Brazil
Prior art keywords
subsystem
same
signal system
train signal
interface
Prior art date
Application number
BR112022002607A
Other languages
English (en)
Inventor
Bing Hui
Chunmei Pan
Haijun Huang
Xuelian Tao
Original Assignee
Byd Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Byd Co Ltd filed Critical Byd Co Ltd
Publication of BR112022002607A2 publication Critical patent/BR112022002607A2/pt

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L15/00Indicators provided on the vehicle or train for signalling purposes
    • B61L15/0018Communication with or on the vehicle or train
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/60Testing or simulation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/20Trackside control of safe travel of vehicle or train, e.g. braking curve calculation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/50Trackside diagnosis or maintenance, e.g. software upgrades
    • B61L27/53Trackside diagnosis or maintenance, e.g. software upgrades for trackside elements or systems, e.g. trackside supervision of trackside control system conditions
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/50Trackside diagnosis or maintenance, e.g. software upgrades
    • B61L27/57Trackside diagnosis or maintenance, e.g. software upgrades for vehicles or trains, e.g. trackside supervision of train conditions
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/20Trackside control of safe travel of vehicle or train, e.g. braking curve calculation
    • B61L2027/204Trackside control of safe travel of vehicle or train, e.g. braking curve calculation using Communication-based Train Control [CBTC]

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Biomedical Technology (AREA)
  • General Health & Medical Sciences (AREA)
  • Train Traffic Observation, Control, And Security (AREA)
  • Communication Control (AREA)
  • Small-Scale Networks (AREA)

Abstract

sistema de sinal de trem e método de ligação para o mesmo. a presente divulgação se refere ao campo de tecnologias de comunicação, e provê um sistema de sinal de trem e um método de ligação para o mesmo. o sistema inclui: um primeiro subsistema; um segundo subsistema, construído por uma estrutura de lua; e uma plataforma de controle, configurada para realizar a comunicação com o primeiro subsistema usando uma primeira interface, realizar a comunicação com o segundo subsistema usando uma segunda interface, e transmitir uma instrução de script de lua para o segundo subsistema usando a segunda interface, de forma que o segundo subsistema executa a instrução de script de lua.
BR112022002607A 2019-08-14 2020-08-12 Sistema de sinal de trem e método de ligação para o mesmo BR112022002607A2 (pt)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201910748535.XA CN112389506A (zh) 2019-08-14 2019-08-14 列车信号系统及其联动方法
PCT/CN2020/108730 WO2021027852A1 (zh) 2019-08-14 2020-08-12 列车信号系统及其联动方法

Publications (1)

Publication Number Publication Date
BR112022002607A2 true BR112022002607A2 (pt) 2022-05-03

Family

ID=74570900

Family Applications (1)

Application Number Title Priority Date Filing Date
BR112022002607A BR112022002607A2 (pt) 2019-08-14 2020-08-12 Sistema de sinal de trem e método de ligação para o mesmo

Country Status (4)

Country Link
US (1) US11958511B2 (pt)
CN (1) CN112389506A (pt)
BR (1) BR112022002607A2 (pt)
WO (1) WO2021027852A1 (pt)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114524007B (zh) * 2022-02-07 2023-03-21 北京交通大学 一种磁浮运行控制数字孪生系统

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6907546B1 (en) * 2000-03-27 2005-06-14 Accenture Llp Language-driven interface for an automated testing framework
CN102012809B (zh) * 2010-11-10 2013-03-13 国电南瑞科技股份有限公司 一种综合监控联动模块设计和实现方法
CN105139714B (zh) * 2015-10-10 2017-08-25 国电南瑞科技股份有限公司 一种电气化铁路牵引变电所的可视化仿真培训系统及方法
US9828013B2 (en) * 2015-11-09 2017-11-28 Electro-Motive Diesel, Inc. Train asset availability and reliability management system
CN106251385B (zh) * 2016-07-20 2019-01-18 南京师范大学 脚本驱动的层次化图形构造方法
CN106672031B (zh) * 2016-12-09 2018-09-21 交控科技股份有限公司 一种列车的全自动静态测试方法及系统
CN109086197A (zh) * 2017-06-14 2018-12-25 上海申通地铁集团有限公司 城市轨道交通cbtc系统的验收测试方法及系统
ES2813562T3 (es) * 2017-11-09 2021-03-24 Siemens Mobility S A S Sistema y procedimiento para proteger una comunicación entre una baliza y un vehículo guiado contra la diafonía
CN110015321B (zh) * 2018-01-08 2021-02-23 比亚迪股份有限公司 列车控制方法、装置和系统
CN109343339A (zh) * 2018-09-29 2019-02-15 国电南瑞科技股份有限公司 一种综合监控系统bas专业设备自动调节实现方法
CN109656820B (zh) * 2018-12-10 2022-02-22 中国铁道科学研究院集团有限公司通信信号研究所 基于cbtc的智能自动化测试系统

Also Published As

Publication number Publication date
US11958511B2 (en) 2024-04-16
WO2021027852A1 (zh) 2021-02-18
US20220297731A1 (en) 2022-09-22
CN112389506A (zh) 2021-02-23

Similar Documents

Publication Publication Date Title
BR112015032444A2 (pt) método para diagnosticar uma falha do sistema estabilizador horizontal em uma aeronave
WO2015126529A9 (en) Method & apparatus for a train control system
BRPI0715266A8 (pt) sistema de transferência de aeronaves sem comando humano e método para transferir uma aeronave
BR112022009581A2 (pt) Trem e método de controle, aparelho de controle e controlador de bordo de veículo para o mesmo
BR112015032888A2 (pt) sistemas e métodos para criar e implementar um agente ou sistema de inteligência artificial
BR112015007281A2 (pt) interface de controle manual para controlar automaticamente uma locomotiva; sistema de interface de controle manual; método para controlar automaticamente uma locomotiva; e unidade de interface de controle para controlar automaticamente uma locomotiva
BR112013028973A2 (pt) sistema para comunicação de dados submarinos e métodos para execução de uma comunicação de dados
BR112013016232A2 (pt) método e sistema de programação de veículo remoto
BR112012025681A2 (pt) sistema e método para personalizar operações em tempo real em uma interface
BR112014030607A2 (pt) métodos e aparelhos para controlar e/ou monitorar um atuador pneumático
BR112013003622A2 (pt) nó de posicionamento, equipamento de usuário e métodos dos mesmos
WO2012103245A3 (en) Guest instruction block with near branching and far branching sequence construction to native instruction block
BR112016024955A2 (pt) aparelho de apresentação de informação e método de apresentação de informação
BR112013021548A2 (pt) método e dispositivo para implementação de migração de memória
BR112013009977A2 (pt) sistemas implementados por computador e métodos para transmitir desempenho de inundação de água de um sistema de reservatório de petróleo utilizando uma metodologia empírica-analítica híbrida
BR112015032552A2 (pt) terminal de transmissão, programa, método de exibição de imagem e sistema de transmissão
BR112016024187A2 (pt) sistema sensor de fibra óptica, e, método para a determinação de uma localização de uma perturbação
BR112013016632A2 (pt) método e dispositivo para controlar acesso a um sistema computador
BR112015014894A2 (pt) método para geração de açúcar a partir de biomassa, e, sistema para o tratamento de biomassa
BR112012028521A2 (pt) sistema e método para captura e tradução de gravação em relevo de braille
BR112017026530A2 (pt) aparelhos, métodos e sistemas para cultivar uma microcultura que envolvem um dispositivo de acoplamento flutuante
BR102013018764B8 (pt) Toner e agente de revelação
BR112017020685A2 (pt) método e sistema para estimar um estado de um sistema de perfuração rotativo orientável, e, sistema de perfuração rotativo orientável com estimativa de estado
BR112014031979A8 (pt) sistema de ultrassom para diagnóstico que produz imagens do fluxo em cores da velocidade do fluxo ou movimento
NZ601686A (en) System and method for printer emulation