BR112017015911A2 - conexão direta de tubulações através de curvatura adicionada - Google Patents
conexão direta de tubulações através de curvatura adicionadaInfo
- Publication number
- BR112017015911A2 BR112017015911A2 BR112017015911A BR112017015911A BR112017015911A2 BR 112017015911 A2 BR112017015911 A2 BR 112017015911A2 BR 112017015911 A BR112017015911 A BR 112017015911A BR 112017015911 A BR112017015911 A BR 112017015911A BR 112017015911 A2 BR112017015911 A2 BR 112017015911A2
- Authority
- BR
- Brazil
- Prior art keywords
- pipe connection
- direct pipe
- bend
- added
- tensioning
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
- E21B43/0107—Connecting of flow lines to offshore structures
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/12—Laying or reclaiming pipes on or under water
- F16L1/20—Accessories therefor, e.g. floats, weights
- F16L1/24—Floats; Weights
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/26—Repairing or joining pipes on or under water
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
- E21B43/013—Connecting a production flow line to an underwater well head
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/12—Laying or reclaiming pipes on or under water
- F16L1/16—Laying or reclaiming pipes on or under water on the bottom
- F16L1/163—Laying or reclaiming pipes on or under water on the bottom by varying the apparent weight of the pipe during the laying operation
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/12—Laying or reclaiming pipes on or under water
- F16L1/20—Accessories therefor, e.g. floats, weights
- F16L1/23—Pipe tensioning apparatus
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/12—Laying or reclaiming pipes on or under water
- F16L1/20—Accessories therefor, e.g. floats, weights
- F16L1/202—Accessories therefor, e.g. floats, weights fixed on or to vessels
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mechanical Engineering (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Laying Of Electric Cables Or Lines Outside (AREA)
- Supports For Pipes And Cables (AREA)
- Joints Allowing Movement (AREA)
Abstract
método e aparelho para conexão direta de tubulações. um aparelho é fixado a uma porção de uma tubulação 1, o aparelho compreendendo um elemento tensionador 2 e um elemento flutuador 3 fixado ao elemento tensionador 2 de tal modo que, quando submerso, a tubulação 1 é defletida como um resultado de uma força de empuxo do flutuador tensionando o elemento tensionador 2, e ao liberar o elemento flutuador 2, a conexão direta da tubulação é realizada.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB1503069.5 | 2015-02-24 | ||
GB1503069.5A GB2535716B (en) | 2015-02-24 | 2015-02-24 | Direct tie-in of pipelines by added curvature |
PCT/NO2016/050030 WO2016137333A1 (en) | 2015-02-24 | 2016-02-22 | Direct tie-in of pipelines by added curvature |
Publications (2)
Publication Number | Publication Date |
---|---|
BR112017015911A2 true BR112017015911A2 (pt) | 2018-03-27 |
BR112017015911B1 BR112017015911B1 (pt) | 2022-12-06 |
Family
ID=52822092
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
BR112017015911-2A BR112017015911B1 (pt) | 2015-02-24 | 2016-02-22 | Método e sistema de conexão direta de tubulações |
Country Status (9)
Country | Link |
---|---|
US (1) | US10571048B2 (pt) |
AU (1) | AU2016224099B2 (pt) |
BR (1) | BR112017015911B1 (pt) |
CA (1) | CA2976754C (pt) |
GB (1) | GB2535716B (pt) |
MX (1) | MX2017010784A (pt) |
NO (1) | NO20171508A1 (pt) |
RU (1) | RU2696726C2 (pt) |
WO (1) | WO2016137333A1 (pt) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2553320B (en) | 2016-09-01 | 2019-02-06 | Statoil Petroleum As | Marine installation |
GB2584099B (en) * | 2019-05-20 | 2021-10-20 | Equinor Energy As | Direct tie-in of subsea conduits and structures |
GB2587344B (en) * | 2019-09-20 | 2021-09-29 | Equinor Energy As | Subsea mounting of ancillary equipment on an elongate member |
Family Cites Families (56)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1757151A (en) | 1928-03-19 | 1930-05-06 | John B Sunt | Position-indicating and air-supplying device for sunken submarines |
US3060463A (en) | 1959-02-16 | 1962-10-30 | Louis I Pentzien | Segmental pontoon-buoy |
CH368985A (fr) | 1960-05-11 | 1963-04-30 | Francis Wittgenstein Gerard | Procédé d'immersion d'un pipe-line subaquatique et pipe-line immergé par le procédé |
US3330123A (en) | 1964-09-08 | 1967-07-11 | Bell Telephone Labor Inc | Equipment for laying repeaters connected in ocean communication cable |
US3378067A (en) | 1966-05-20 | 1968-04-16 | Mobil Oil Corp | Underwater wellhead |
US3543526A (en) | 1968-05-20 | 1970-12-01 | Westinghouse Electric Corp | Underwater submersible chamber system |
US3482410A (en) | 1968-07-01 | 1969-12-09 | Lockheed Aircraft Corp | Underwater flowline installation |
GB1267022A (pt) | 1969-04-18 | 1972-03-15 | ||
US3641602A (en) | 1969-09-09 | 1972-02-15 | Exxon Research Engineering Co | Single anchor leg single point mooring system |
US3698348A (en) | 1970-09-21 | 1972-10-17 | Subsea Equipment Ass Ltd | Method and apparatus for subsurface towing of flowlines |
US3835655A (en) | 1972-06-27 | 1974-09-17 | Cameron Iron Works Inc | Method and apparatus for connecting subsea flow lines |
US3835656A (en) | 1972-09-01 | 1974-09-17 | Shell Oil Co | Method and apparatus for supplying temporary buoyancy to an underwater pipeline |
US3893305A (en) | 1973-10-01 | 1975-07-08 | Deep Oil Technology Inc | Method of bending a continuous flowline |
MC1001A1 (fr) | 1974-02-18 | 1974-10-18 | Bonacina Jean Claude | Treuil de sécurité pour plongeurs et chasseurs sous-marins |
FR2287002A1 (fr) | 1974-10-03 | 1976-04-30 | Doris Dev Richesse Sous Marine | Dispositif de pose de conduites sous-marines |
FR2312713A1 (fr) | 1975-05-30 | 1976-12-24 | Doris Dev Richesse Sous Marine | Procede et dispositif de mise en place d'une conduite immergee, telle qu'une conduite sous-marine |
IT1048460B (it) | 1975-08-19 | 1980-11-20 | Francisco A | Conduttore sottomarino migliorato per la trasmissione di energia elettrica ad alta tensione in mare profondo |
US4110994A (en) | 1976-01-26 | 1978-09-05 | Poseidon Marketing And Development Co. | Marine pipeline |
JPS52116198A (en) | 1976-03-26 | 1977-09-29 | Kanazawa Tsuushiyou Sangiyou K | Floating wheel |
FR2353002A1 (fr) | 1976-05-25 | 1977-12-23 | Doris Dev Richesse Sous Marine | Dispositif de largage de flotteurs immerges |
US4075862A (en) | 1976-09-15 | 1978-02-28 | Fmc Corporation | Method and apparatus for installing underwater flowlines |
US4135844A (en) | 1977-01-05 | 1979-01-23 | Compagnie Generale pour les Developpments Operationnels des Richesses Sous-Marines "C.G. DORIS" | Laying of underwater pipelines |
FR2384192A1 (fr) | 1977-03-18 | 1978-10-13 | Doris Dev Richesse Sous Marine | Dispositif d'amarrage et de raccordement d'une conduite sous-marine et procede utilisant ledit dispositif |
FR2386757B1 (pt) | 1977-04-04 | 1983-02-04 | Inst Francais Du Petrole | |
FR2391900A1 (fr) | 1977-05-26 | 1978-12-22 | Inst Francais Du Petrole | Methode pour immerger un dispositif de flottabilite negative |
GB1559657A (en) * | 1977-11-29 | 1980-01-23 | Lundh R W | Marine pipeline |
US4225270A (en) * | 1978-05-22 | 1980-09-30 | Maurer Engineering Inc. | Method and apparatus for connecting a flowline to an offshore installation |
US4399601A (en) * | 1980-03-31 | 1983-08-23 | Shell Oil Company | Method of preparing and using a pressure actuated release mechanism |
FR2569744B1 (fr) * | 1984-09-05 | 1986-09-19 | Spie Batignolles | Procede et installation pour installer une canalisation en milieu subaquatique et canalisation ainsi realisee |
US4909670A (en) * | 1989-08-07 | 1990-03-20 | Mcdermott International Inc. | Submarine pipeline span correction by local axial tension release |
US5275510A (en) | 1992-01-16 | 1994-01-04 | Jacob De Baan | Offshore tanker loading system |
NO301732B1 (no) | 1992-06-10 | 1997-12-01 | Aker Norwegian Contractors As | Fremgangsmåte for fremstilling, midlertidig lagring, slep og installasjon av lange rörledninger på havbunnen, samt anordning til bruk ved fremgangsmåtens utförelse |
NL9400517A (nl) | 1994-03-31 | 1995-11-01 | Allseas Eng Bv | Werkwijze en inrichting voor het leggen van een pijpleiding op een onder water gelegen bodem. |
US5683204A (en) | 1996-02-14 | 1997-11-04 | Lawther; Gerald Howard | Apparatus and method for laying underwater pipelines |
NO312265B1 (no) | 1999-05-04 | 2002-04-15 | Statoil Asa | System for oppmåling av innbyrdes avstand og retninger for rörender som skal sammenkobles på sjöbunnen |
US6415828B1 (en) | 2000-07-27 | 2002-07-09 | Fmc Technologies, Inc. | Dual buoy single point mooring and fluid transfer system |
NO314056B1 (no) | 2001-01-19 | 2003-01-20 | Statoil Asa | Fremgangsmåte for legging av en rörledning på sjöbunnen ved kveilemetoden,for kontrollert termisk ekspansjon |
US6558215B1 (en) | 2002-01-30 | 2003-05-06 | Fmc Technologies, Inc. | Flowline termination buoy with counterweight for a single point mooring and fluid transfer system |
US6752100B2 (en) | 2002-05-28 | 2004-06-22 | Shell Oil Company | Apparatuses and methods of deploying and installing subsea equipment |
US7025533B1 (en) | 2004-09-21 | 2006-04-11 | Kellogg Brown & Root, Inc. | Concentrated buoyancy subsea pipeline apparatus and method |
US7963721B2 (en) | 2004-09-21 | 2011-06-21 | Kellogg Brown & Root Llc | Distributed buoyancy subsea pipeline apparatus and method |
FR2886711B1 (fr) | 2005-07-13 | 2008-11-21 | Technip France Sa | Dispositif de regulation du flambement des conduites sous-marines |
FR2889557B1 (fr) | 2005-08-04 | 2008-02-15 | Technip France Sa | Installation sous marine equipee d'une conduite flexible a courbure controlee |
BRPI0907636A2 (pt) | 2008-01-28 | 2015-07-21 | Single Buoy Moorings | Sistema de transferência de hidrocarbonetos, e, estrutura para hidrocarbonetos |
GB2474989B (en) * | 2008-08-21 | 2012-12-12 | Shell Int Research | Subsea structure installation or removal |
IT1394064B1 (it) * | 2009-05-11 | 2012-05-25 | Saipem Spa | Metodo per unire due tratti di una tubazione subacquea atta a giacere sul letto di un corpo d'acqua per convogliare liquidi e/o gas |
WO2011008593A1 (en) * | 2009-07-15 | 2011-01-20 | Shell Oil Company | Mid-water transfer line |
WO2012143671A2 (en) | 2011-04-18 | 2012-10-26 | Magma Global Limited | Subsea conduit system |
GB2492414B (en) | 2011-07-01 | 2013-07-03 | Subsea 7 Norway Nuf | Initiation of lightweight flexible pipelines and umbilicals |
FR2983233B1 (fr) | 2011-11-30 | 2016-01-01 | Saipem Sa | Installation de liaisons fond-surface flexibles multiples sur au moins deux niveaux |
US8708602B2 (en) | 2011-12-29 | 2014-04-29 | Chevron U.S.A. Inc. | System and methods for stabilizing subsea pipeline |
GB2523835B (en) | 2014-03-07 | 2017-10-11 | Subsea 7 Ltd | Transportation and installation of elongate subsea elements |
US10364916B2 (en) | 2014-03-31 | 2019-07-30 | Statoil Petroleum As | Deployment and direct tie-in of subsea pipelines |
AP2017009839A0 (en) | 2014-10-09 | 2017-03-31 | Seahorse Equip Corp | Taut inverted catenary mooring system |
GB2535717B (en) * | 2015-02-24 | 2020-11-25 | Equinor Energy As | Pipeline method and apparatus |
US9797526B2 (en) | 2015-09-16 | 2017-10-24 | Ge Oil & Gas Uk Limited | Riser assembly and method of installing a riser assembly |
-
2015
- 2015-02-24 GB GB1503069.5A patent/GB2535716B/en active Active
-
2016
- 2016-02-22 CA CA2976754A patent/CA2976754C/en active Active
- 2016-02-22 US US15/548,046 patent/US10571048B2/en active Active
- 2016-02-22 RU RU2017129710A patent/RU2696726C2/ru active
- 2016-02-22 BR BR112017015911-2A patent/BR112017015911B1/pt active IP Right Grant
- 2016-02-22 MX MX2017010784A patent/MX2017010784A/es unknown
- 2016-02-22 WO PCT/NO2016/050030 patent/WO2016137333A1/en active Application Filing
- 2016-02-22 AU AU2016224099A patent/AU2016224099B2/en active Active
-
2017
- 2017-09-19 NO NO20171508A patent/NO20171508A1/no unknown
Also Published As
Publication number | Publication date |
---|---|
GB2535716B (en) | 2020-11-25 |
MX2017010784A (es) | 2017-12-04 |
AU2016224099B2 (en) | 2020-11-05 |
US20180017186A1 (en) | 2018-01-18 |
RU2696726C2 (ru) | 2019-08-05 |
GB201503069D0 (en) | 2015-04-08 |
AU2016224099A1 (en) | 2017-08-17 |
CA2976754C (en) | 2024-01-16 |
RU2017129710A (ru) | 2019-03-25 |
RU2017129710A3 (pt) | 2019-06-03 |
BR112017015911B1 (pt) | 2022-12-06 |
GB2535716A (en) | 2016-08-31 |
US10571048B2 (en) | 2020-02-25 |
NO20171508A1 (en) | 2017-09-19 |
CA2976754A1 (en) | 2016-09-01 |
WO2016137333A1 (en) | 2016-09-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
MX2019000854A (es) | Tuberia de mantenimiento y vehiculo de inspeccion. | |
BR112016025021A2 (pt) | ?embarcação de instalação de tubulação, e, método de disposição de carretel marinho? | |
BR112018068061A2 (pt) | montagem de cabeça de poço submarina | |
NZ717494A (en) | Method of inhibiting fouling on a metallic surface using a surface modifying treatment agent | |
BR102016015145A8 (pt) | ?dispositivo de montagem de elemento multitubular? | |
GB2540290A (en) | Deployment and direct tie-in of subsea pipelines | |
BR112016029511B8 (pt) | Método e sistema para posicionamento dinâmico de cabo instrumentado rebocado em água. | |
BR112018006916A2 (pt) | processo para produção de um tubo de parede dupla e tubo de parede dupla | |
BR112016021934A2 (pt) | Processo de hidroformilação | |
BR112017015911A2 (pt) | conexão direta de tubulações através de curvatura adicionada | |
BR112017010613A2 (pt) | carenagem de aleta dupla | |
PL3627027T3 (pl) | Połączenie gwintowe dla rur stalowych | |
GB2540705A (en) | Cable installation tool and method for such installation | |
BR112018016803A2 (pt) | sistema e método para bombear o material a partir de um leito marinho e método de desobstruir um tubo de transferência de riser | |
BR112015020594A2 (pt) | processo de instalação de um elemento alongado em uma extensão de água, dispositivo de instalação de um elemento alongado em uma extensão de água e instalação | |
GB2523636B (en) | Turbomachine assembly comprising two bodies and means for guiding a fluid flowing from one body to the other | |
EP3489387A4 (en) | DEOXIDING AGENT FOR BOILERS AND METHOD FOR DEOXIDATING A BOILER WATER SYSTEM | |
GB201705433D0 (en) | Subsea pipeline buoyancy module | |
MX2017010782A (es) | Metodo y aparato de tuberia. | |
BR112017005174A2 (pt) | inibidor de corrosão biológica para metais | |
BR112017003212A2 (pt) | dispositivo de conexão compreendendo vários tubos concêntricos curvos | |
PE20180965A1 (es) | Dispersiones acuosas de polifosfato de calcio y potasio | |
BR112018010648A8 (pt) | método para melhorar a liberação de ar de um óleo lubrificante em um sistema hidráulico | |
BR112013006566A2 (pt) | remoção de água de antiaglomerante de ldhis | |
DK3394487T3 (da) | Differentialventil til bøjelig undervands-rørledning |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
B06U | Preliminary requirement: requests with searches performed by other patent offices: procedure suspended [chapter 6.21 patent gazette] | ||
B07A | Application suspended after technical examination (opinion) [chapter 7.1 patent gazette] | ||
B09A | Decision: intention to grant [chapter 9.1 patent gazette] | ||
B16A | Patent or certificate of addition of invention granted [chapter 16.1 patent gazette] |
Free format text: PRAZO DE VALIDADE: 20 (VINTE) ANOS CONTADOS A PARTIR DE 22/02/2016, OBSERVADAS AS CONDICOES LEGAIS |
|
B25D | Requested change of name of applicant approved |
Owner name: EQUINOR ENERGY AS (NO) |