BR112015017228B8 - Sistema de medição para monitoramento contínuo de uma bucha de alta tensão - Google Patents

Sistema de medição para monitoramento contínuo de uma bucha de alta tensão

Info

Publication number
BR112015017228B8
BR112015017228B8 BR112015017228A BR112015017228A BR112015017228B8 BR 112015017228 B8 BR112015017228 B8 BR 112015017228B8 BR 112015017228 A BR112015017228 A BR 112015017228A BR 112015017228 A BR112015017228 A BR 112015017228A BR 112015017228 B8 BR112015017228 B8 BR 112015017228B8
Authority
BR
Brazil
Prior art keywords
stage
protective
measuring
connection
responds
Prior art date
Application number
BR112015017228A
Other languages
English (en)
Other versions
BR112015017228B1 (pt
BR112015017228A2 (pt
Inventor
Kutzner Rüdiger
Weber Marc
Original Assignee
Siemens Ag
Siemens Energy Global Gmbh & Co Kg
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens Ag, Siemens Energy Global Gmbh & Co Kg filed Critical Siemens Ag
Publication of BR112015017228A2 publication Critical patent/BR112015017228A2/pt
Publication of BR112015017228B1 publication Critical patent/BR112015017228B1/pt
Publication of BR112015017228B8 publication Critical patent/BR112015017228B8/pt

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/12Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing
    • G01R31/1227Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing of components, parts or materials
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R1/00Details of instruments or arrangements of the types included in groups G01R5/00 - G01R13/00 and G01R31/00
    • G01R1/36Overload-protection arrangements or circuits for electric measuring instruments
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R19/00Arrangements for measuring currents or voltages or for indicating presence or sign thereof
    • G01R19/0092Arrangements for measuring currents or voltages or for indicating presence or sign thereof measuring current only

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Emergency Protection Circuit Devices (AREA)
  • Measuring Instrument Details And Bridges, And Automatic Balancing Devices (AREA)

Abstract

SISTEMA DE MEDIÇÃO PARA MONITORAMENTO CONTÍNUO DE UMA BUCHA DE ALTA TENSÃO. Sistema de medição para monitorar continuamente uma bucha de alta voltagem. Se as medições para monitoramento forem continuamente realizadas na conexão de medição de uma bucha de alta voltagem, a conexão de medição deve ser protegida contra a perda de carga. Para essa finalidade, um sistema de medição que garante a proteção segura de múltiplos estágios é especificado. Um sistema de medição de acordo com a invenção consiste de um circuito de medição, um plugue de conexão, um cabo de conexão, e um circuito protetor de três estágios. Quando voltagens excessivas ocorrerem na conexão de medição, cada estágio do circuito de proteção pode produzir um curto circuito na conexão de medição e, dessa forma, limita a voltagem na conexão de medição. Um primeiro estágio protetor responde em uma voltagem de resposta U1, e um segundo estágio protetor conectado entre o primeiro estágio protetor e a conexão de medição responde em uma voltagem de resposta U2. U2 é superior a U1. Adicionalmente, os primeiro e segundo estágios protetores são desacoplados por um filtro de passa baixa no primeiro estágio protetor. Dessa forma, o primeiro estágio responde às voltagens excessivas na frequência operacional, e o segundo estágio responde às voltagens excessivas de alta frequência. O terceiro estágio protetor é conectado entre a conexão de medição e o primeiro estágio protetor em paralelo com a conexão de medição.
BR112015017228A 2013-01-23 2014-01-14 Sistema de medição para monitoramento contínuo de uma bucha de alta tensão BR112015017228B8 (pt)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
EP13152296.3A EP2760095A1 (de) 2013-01-23 2013-01-23 Messsystem zur Dauerüberwachung einer Hochspannungsdurchführung
EP13152296.3 2013-01-23
PCT/EP2014/050522 WO2014114516A1 (de) 2013-01-23 2014-01-14 Messsystem zur dauerüberwachung einer hochspannungsdurchführung

Publications (3)

Publication Number Publication Date
BR112015017228A2 BR112015017228A2 (pt) 2017-07-11
BR112015017228B1 BR112015017228B1 (pt) 2021-02-17
BR112015017228B8 true BR112015017228B8 (pt) 2023-04-25

Family

ID=47594577

Family Applications (1)

Application Number Title Priority Date Filing Date
BR112015017228A BR112015017228B8 (pt) 2013-01-23 2014-01-14 Sistema de medição para monitoramento contínuo de uma bucha de alta tensão

Country Status (5)

Country Link
US (1) US9557349B2 (pt)
EP (2) EP2760095A1 (pt)
BR (1) BR112015017228B8 (pt)
CA (1) CA2898791C (pt)
WO (1) WO2014114516A1 (pt)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9482699B2 (en) * 2013-06-18 2016-11-01 Advanced Power Technologies, Llc Method and apparatus for monitoring high voltage bushings safely
CN107209210B (zh) * 2014-12-01 2021-04-30 J·D·沃森 用于高压套管的主动监测系统及其相关方法
DE102015203300A1 (de) * 2015-02-24 2016-08-25 General Electric Technology Gmbh Sensorvorrichtung zur Verbindung mit einem Messanschluss einer kapazitiv gesteuerten Durchführung
DE102016217076B4 (de) 2016-09-08 2018-03-15 Siemens Aktiengesellschaft Kapazitiver Spannungswandler für Hoch- und Mittelspannungen und Verfahren zum Herstellen eines kapazitiven Spannungswandlers
US11460872B2 (en) * 2018-11-20 2022-10-04 G & W Electric Company High voltage measurement system and calibration method
CN110007199B (zh) * 2019-02-14 2020-05-01 重庆大学 固体绝缘材料的电压耐受指数确定方法、装置及智能终端
CN110542838B (zh) * 2019-08-14 2024-01-16 中国南方电网有限责任公司超高压输电公司检修试验中心 一种用于带电容屏的套管芯子破坏性试验系统和方法
EP3876374A1 (en) * 2020-03-03 2021-09-08 ABB Power Grids Switzerland AG Overvoltage protection for hv bushing test tap
US11728641B2 (en) 2022-01-10 2023-08-15 Saudi Arabian Oil Company System and method for controlling and monitoring parallel surge arresters and bushings of a power transformer and motor

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4757263A (en) * 1987-05-01 1988-07-12 Tennessee Valley Authority Insulation power factor alarm monitor
WO2001069272A2 (de) * 2000-03-14 2001-09-20 HSP Hochspannungsgeräte Porz GmbH Vorrichtung und verfahren zur überwachung einer kondensatordurchführung
CN201654071U (zh) * 2009-11-25 2010-11-24 福建和盛高科技产业有限公司 变压器套管末屏的接线端子装置
US8547112B2 (en) * 2010-03-29 2013-10-01 Eduardo Pedrosa Santos Introduced in monitoring system of dielectric state of high voltage equipments with capacitive insulation, such as condensive bushings, current transformers, potential transformers and similar

Also Published As

Publication number Publication date
BR112015017228B1 (pt) 2021-02-17
CA2898791C (en) 2021-03-30
EP2949019B1 (de) 2016-11-30
EP2949019A1 (de) 2015-12-02
US9557349B2 (en) 2017-01-31
CA2898791A1 (en) 2014-07-31
BR112015017228A2 (pt) 2017-07-11
WO2014114516A1 (de) 2014-07-31
US20150355237A1 (en) 2015-12-10
EP2760095A1 (de) 2014-07-30

Similar Documents

Publication Publication Date Title
BR112015017228B8 (pt) Sistema de medição para monitoramento contínuo de uma bucha de alta tensão
BR112015032270A2 (pt) sistema de acoplamento para cabo de fibra óptica
EP3191965A4 (en) LOW POWER DEBUGGING ARCHITECTURE FOR SYSTEMS ON CHIP (SOC) AND SYSTEMS
BR112014017559A2 (pt) bloco adaptador de fibra óptica
BR112014027829A2 (pt) fabricação de nanoporos usando campos elétricos altos
ES2722410T3 (es) Adaptador para dispositivo de acceso a viales
MX2016005440A (es) Estructura de proteccion de bateria.
EP2997387A4 (en) Methods of computing steady-state voltage stability margins of power systems
BR112015031087A2 (pt) sistema de acoplamento de cabo de fibra óptica
SG10201805671WA (en) Breaker design for power system resiliency
BR112015010761A2 (pt) sistema de ressonância magnética (rm), e método para a detecção de temperatura distribuída em um sistema de ressonância magnética (rm)
EP2937706A4 (en) VOLTAGE DETECTING ELEMENT AND BATTERY MODULES COMPRISING THE SAME
GB2530892B (en) Connector pin for coupling power and data ground systems to an aircraft
SI2823545T1 (sl) Razporeditev vezja za spremljanje stanja in beleženje o prenapetostnih zaščitnih napravah ali prenapetostnih zaščitnih sistemih
BR102013031776A8 (pt) sistema de estimativa de parâmetros de voo de uma aeronave e aeronave
BR112014033021A2 (pt) dispositivo de proteção de compartimento de potência, e, método para proteger compartimentos de potência
IN2014DE01357A (pt)
BR112016029700A2 (pt) enrijecedor de dobra
GB201519304D0 (en) Instrumentation line protection and securement system
BR112016024950A2 (pt) montagem de fusível substituível submarina
BR112017004378A2 (pt) ?adaptador óptico para montagem em um receptáculo para acoplar opticamente cabos ópticos conectorizados?
BR212015018712U2 (pt) dispositivo adaptador
BR112013021450A2 (pt) dispositivo de travamento
BR112015011977A2 (pt) membro elétrico genérico configurável
BR112014029684A2 (pt) kit, arranjo solar e método para localizar descontinuidade em um arranjo solar

Legal Events

Date Code Title Description
B06F Objections, documents and/or translations needed after an examination request according [chapter 6.6 patent gazette]
B06U Preliminary requirement: requests with searches performed by other patent offices: procedure suspended [chapter 6.21 patent gazette]
B09A Decision: intention to grant [chapter 9.1 patent gazette]
B16A Patent or certificate of addition of invention granted [chapter 16.1 patent gazette]

Free format text: PRAZO DE VALIDADE: 20 (VINTE) ANOS CONTADOS A PARTIR DE 14/01/2014, OBSERVADAS AS CONDICOES LEGAIS.

B25G Requested change of headquarter approved

Owner name: SIEMENS AKTIENGESELLSCHAFT (DE)

B25A Requested transfer of rights approved

Owner name: SIEMENS ENERGY GLOBAL GMBH AND CO. KG (DE)