BR112014017652A8 - METHOD TO ESTIMATE AN IRRUPT TIME OF THE INJECTED FLUID IN A PRODUCTION WELL, AND, NON-TRANSITIONAL CARRIER AND PROGRAM CARRIER DEVICES - Google Patents

METHOD TO ESTIMATE AN IRRUPT TIME OF THE INJECTED FLUID IN A PRODUCTION WELL, AND, NON-TRANSITIONAL CARRIER AND PROGRAM CARRIER DEVICES

Info

Publication number
BR112014017652A8
BR112014017652A8 BR112014017652A BR112014017652A BR112014017652A8 BR 112014017652 A8 BR112014017652 A8 BR 112014017652A8 BR 112014017652 A BR112014017652 A BR 112014017652A BR 112014017652 A BR112014017652 A BR 112014017652A BR 112014017652 A8 BR112014017652 A8 BR 112014017652A8
Authority
BR
Brazil
Prior art keywords
estimate
production well
irrupt
injected fluid
time
Prior art date
Application number
BR112014017652A
Other languages
Portuguese (pt)
Other versions
BR112014017652A2 (en
Inventor
Maucec Marko
Original Assignee
Landmark Graphics Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Landmark Graphics Corp filed Critical Landmark Graphics Corp
Publication of BR112014017652A2 publication Critical patent/BR112014017652A2/pt
Publication of BR112014017652A8 publication Critical patent/BR112014017652A8/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/10Locating fluid leaks, intrusions or movements
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/20Displacing by water
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/40Controlling or monitoring, e.g. of flood or hurricane; Forecasting, e.g. risk assessment or mapping

Abstract

MÉTODO PARA ESTIMAR UM TEMPO DE IRRUPÇÃO DO FLUIDO INJETADO EM UM POÇO DE PRODUÇÃO, E, DISPOSITIVOS PORTADOR NÃO TRANSITÓRIO E PORTADOR DE PROGRAMA. São descritos sistemas e métodos para estimar tempos de irrupção do fluido injetado nos locais dos poços de produção com base em simulação de propagação de fluido.METHOD TO ESTIMATE AN IRRUPT TIME OF THE INJECTED FLUID IN A PRODUCTION WELL, AND, NON-TRANSIENT AND PROGRAM CARRIER DEVICES. Systems and methods are described to estimate times of eruption of the injected fluid at production well sites based on fluid propagation simulation.

BR112014017652A 2012-02-10 2012-02-10 METHOD TO ESTIMATE AN IRRUPT TIME OF THE INJECTED FLUID IN A PRODUCTION WELL, AND, NON-TRANSITIONAL CARRIER AND PROGRAM CARRIER DEVICES BR112014017652A8 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/US2012/024656 WO2013119248A2 (en) 2012-02-10 2012-02-10 Systems and methods for estimating fluid breakthrough times at producing well locations

Publications (2)

Publication Number Publication Date
BR112014017652A2 BR112014017652A2 (en) 2017-06-20
BR112014017652A8 true BR112014017652A8 (en) 2017-07-11

Family

ID=48948146

Family Applications (1)

Application Number Title Priority Date Filing Date
BR112014017652A BR112014017652A8 (en) 2012-02-10 2012-02-10 METHOD TO ESTIMATE AN IRRUPT TIME OF THE INJECTED FLUID IN A PRODUCTION WELL, AND, NON-TRANSITIONAL CARRIER AND PROGRAM CARRIER DEVICES

Country Status (10)

Country Link
US (1) US20150039276A1 (en)
EP (1) EP2795528A4 (en)
CN (1) CN104067290A (en)
AR (1) AR089973A1 (en)
AU (1) AU2012369161B2 (en)
BR (1) BR112014017652A8 (en)
CA (1) CA2863156A1 (en)
MX (1) MX2014008897A (en)
RU (1) RU2590265C2 (en)
WO (1) WO2013119248A2 (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015112211A1 (en) * 2014-01-24 2015-07-30 Landmark Graphics Corporation Optimized acidizing of a production well near aquifer
US10191182B2 (en) 2015-12-01 2019-01-29 Saudi Arabian Oil Company Accuracy of water break-through time prediction
EP3574291B1 (en) 2017-01-26 2023-12-06 Dassault Systemes Simulia Corp. Multi-phase flow visualizations based on fluid occupation time
US11714040B2 (en) 2018-01-10 2023-08-01 Dassault Systemes Simulia Corp. Determining fluid flow characteristics of porous mediums
US10519768B2 (en) * 2018-02-21 2019-12-31 Saudi Arabian Oil Company Systems and methods for operating hydrocarbon wells to inhibit breakthrough based on reservoir saturation
US11530598B2 (en) 2018-08-21 2022-12-20 Dassault Systemes Simulia Corp. Determination of oil removed by gas via miscible displacement in reservoir rock
CN109902329B (en) * 2018-09-21 2023-06-02 长江大学 Auxiliary history fitting method, system, storage medium and equipment for oil reservoir simulation
US10983233B2 (en) 2019-03-12 2021-04-20 Saudi Arabian Oil Company Method for dynamic calibration and simultaneous closed-loop inversion of simulation models of fractured reservoirs
CA3141706A1 (en) * 2019-05-28 2020-12-03 Schlumberger Canada Limited Streamline based creation of completion design
US11847391B2 (en) 2020-06-29 2023-12-19 Dassault Systemes Simulia Corp. Computer system for simulating physical processes using surface algorithm
US11907625B2 (en) 2020-12-29 2024-02-20 Dassault Systemes Americas Corp. Computer simulation of multi-phase and multi-component fluid flows including physics of under-resolved porous structures
CN117722164B (en) * 2024-02-18 2024-04-16 西南石油大学 Uniform water invasion control method for water-bearing gas reservoir

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2842321B1 (en) * 2002-07-11 2008-12-05 Inst Francais Du Petrole METHOD FOR CONSTRAINING A FIELD OF HETEROGENEOUS PERMEABILITY REPRESENTING A UNDERGROUND RESERVOIR BY DYNAMIC DATA
CA2514516C (en) 2003-03-26 2012-11-20 Exxonmobil Upstream Research Company Performance prediction method for hydrocarbon recovery processes
US20080167849A1 (en) * 2004-06-07 2008-07-10 Brigham Young University Reservoir Simulation
WO2009076149A2 (en) * 2007-12-07 2009-06-18 Landmark Graphics Corporation, A Halliburton Company Systems and methods for utilizing cell based flow simulation results to calculate streamline trajectories
US20100312535A1 (en) * 2009-06-08 2010-12-09 Chevron U.S.A. Inc. Upscaling of flow and transport parameters for simulation of fluid flow in subsurface reservoirs
US8775142B2 (en) * 2010-05-14 2014-07-08 Conocophillips Company Stochastic downscaling algorithm and applications to geological model downscaling
US8646525B2 (en) * 2010-05-26 2014-02-11 Chevron U.S.A. Inc. System and method for enhancing oil recovery from a subterranean reservoir

Also Published As

Publication number Publication date
MX2014008897A (en) 2014-09-22
RU2014130786A (en) 2016-04-10
WO2013119248A3 (en) 2014-04-17
AU2012369161A1 (en) 2014-07-24
RU2590265C2 (en) 2016-07-10
EP2795528A4 (en) 2016-06-29
CA2863156A1 (en) 2013-08-15
BR112014017652A2 (en) 2017-06-20
US20150039276A1 (en) 2015-02-05
EP2795528A2 (en) 2014-10-29
AR089973A1 (en) 2014-10-01
CN104067290A (en) 2014-09-24
AU2012369161B2 (en) 2015-05-28
WO2013119248A2 (en) 2013-08-15

Similar Documents

Publication Publication Date Title
BR112014017652A8 (en) METHOD TO ESTIMATE AN IRRUPT TIME OF THE INJECTED FLUID IN A PRODUCTION WELL, AND, NON-TRANSITIONAL CARRIER AND PROGRAM CARRIER DEVICES
PH12016500510A1 (en) Determination of a display angle of a display
MX347822B (en) Geometrical presentation of fracture planes.
BR112016006470A2 (en) method for predicting a hazard during well drilling operations, and non-transient program-carrying device
EA201691406A1 (en) DETERMINATION OF WAVE FIELD COMPONENTS
BR112016006621A2 (en) method for managing a predetermined risk during drilling operations of a well and tangible non-transient program conveyor device
EA201170472A1 (en) SYSTEMS AND METHODS IMPLEMENTED BY A COMPUTER FOR USE WHEN MODELING THE GEOMECHANICAL SYSTEM OF THE COLLECTOR
AR090762A1 (en) SYSTEMS AND METHODS TO TREAT SUBSUPERFICIAL FORMATIONS CONTAINING FRACTURES
BR112013026513A2 (en) method for the characterization of hydraulic fracture using micro seismic data and non-transient program carrier device
EA201690256A1 (en) SYSTEM AND METHOD FOR PLANNING AREA FOR VEHICLES
BR112017013667A2 (en) apparatus, system and method for determining distance.
MX2015005627A (en) Systems and methods for 3d seismic data depth conversion utilizing artificial neural networks.
BR112013013422A2 (en) method for reducing the reservoir simulator model execution time, and program-carrying device
MX367242B (en) Traceable polymeric additives for use in subterranean formations.
GB2538370A (en) Designing wellbore completion intervals
EA201201285A1 (en) SYSTEMS AND METHODS FOR DETERMINING THE LOCATION OF HORIZONTAL WELLS IN THE LIMITS OF A SET BORDERS
UY34211A (en) ? METHODS AND COMPOSITIONS TO PRODUCE RICE RESISTANT TO ACCESS INHIBITORS ?.
BR112016002519A2 (en) method for surface calibration of a well profiling tool, system, and computer program product
UY34335A (en) ? DEVICES, SYSTEMS, AND METHODS TO PROCESS HETEROGENIC MATERIALS ?.
BR112015028553A2 (en) method for displaying wells and their respective state on an electronic map and non-transient program conveyor device
BR112015011878A2 (en) system, method implemented in processor and article
BR112016000970A2 (en) COATING THICKNESS MEASUREMENT USING ACOUSTIC WAVE CORRELATION
BR112012024888A2 (en) tank wash system
EA201791659A1 (en) COMPUTERIZED METHOD FOR CREATING A MODEL OF THE ENZYMATION PROCESS
WO2013168148A3 (en) A method for dynamic generation and modification of an electronic entity architecture

Legal Events

Date Code Title Description
B08F Application dismissed because of non-payment of annual fees [chapter 8.6 patent gazette]
B08K Patent lapsed as no evidence of payment of the annual fee has been furnished to inpi [chapter 8.11 patent gazette]