BR112012006517A2 - método para controlar a produção de fluído a partir de um furo de poço utilizando um script - Google Patents
método para controlar a produção de fluído a partir de um furo de poço utilizando um scriptInfo
- Publication number
- BR112012006517A2 BR112012006517A2 BR112012006517A BR112012006517A BR112012006517A2 BR 112012006517 A2 BR112012006517 A2 BR 112012006517A2 BR 112012006517 A BR112012006517 A BR 112012006517A BR 112012006517 A BR112012006517 A BR 112012006517A BR 112012006517 A2 BR112012006517 A2 BR 112012006517A2
- Authority
- BR
- Brazil
- Prior art keywords
- script
- wellbore
- configuration
- controlling fluid
- production
- Prior art date
Links
- 238000004519 manufacturing process Methods 0.000 title abstract 6
- 238000000034 method Methods 0.000 title abstract 5
- 239000012530 fluid Substances 0.000 title abstract 4
- 230000004048 modification Effects 0.000 abstract 1
- 238000012986 modification Methods 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Testing And Monitoring For Control Systems (AREA)
- Feedback Control In General (AREA)
- Flow Control (AREA)
- Physical Or Chemical Processes And Apparatus (AREA)
- Stored Programmes (AREA)
Abstract
método para controlar a produção de fluido a partir de um furo de poço utilizando um script. a presente invenção refere-se a um método para controlar fluxo de fluido em um furo de polo contendo vários dispositivos de produção, em que o método inclui as etapas de definir uma primeira configuração de cada dispositivo de produção dentre os vários dispositivos de produção, definir uma alteração em um parâmetro se relacionando com o fluxo de fluído no furo de poço e utilizar um modelo para determinar uma segunda configuração para pelo menos um dentre os vários dispositivos de produção baseado na alteração no parâmetro. o método também inclui a etapa de gerar um script correspondendo à segunda configuração, em que o script é configuração para ser implementado sem modificação, e armazenar o script em um meio de armazenamento adequado.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US12/564,742 | 2009-09-22 | ||
US12/564,742 US9482077B2 (en) | 2009-09-22 | 2009-09-22 | Method for controlling fluid production from a wellbore by using a script |
PCT/US2010/049670 WO2011037925A2 (en) | 2009-09-22 | 2010-09-21 | Method for controlling fluid production from a wellbore by using a script |
Publications (2)
Publication Number | Publication Date |
---|---|
BR112012006517A2 true BR112012006517A2 (pt) | 2016-04-26 |
BR112012006517B1 BR112012006517B1 (pt) | 2019-05-14 |
Family
ID=43757389
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
BR112012006517-3A BR112012006517B1 (pt) | 2009-09-22 | 2010-09-21 | Método para controlar a produção de fluído a partir de um furo de poço utilizando um script |
Country Status (5)
Country | Link |
---|---|
US (1) | US9482077B2 (pt) |
EP (1) | EP2480756B1 (pt) |
BR (1) | BR112012006517B1 (pt) |
DK (1) | DK2480756T3 (pt) |
WO (1) | WO2011037925A2 (pt) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8838390B1 (en) * | 2011-02-17 | 2014-09-16 | Selman and Associates, Ltd. | System for gas detection, well data collection, and real time streaming of well logging data |
US8775088B1 (en) * | 2011-02-17 | 2014-07-08 | Selman and Associates, Ltd. | Method for acquiring and displaying in near real time gas analysis, well data collection, and other well logging data |
US8775087B1 (en) * | 2011-02-17 | 2014-07-08 | Selman and Associates, Ltd. | System for acquiring and displaying in near real time gas analysis, well data collection, and other well logging data |
US9074459B2 (en) * | 2012-08-06 | 2015-07-07 | Landmark Graphics Corporation | System and method for simulation of downhole conditions in a well system |
US9568641B2 (en) * | 2013-03-28 | 2017-02-14 | Halliburton Energy Services, Inc. | In-situ calibration of tools |
US10401808B2 (en) * | 2015-01-28 | 2019-09-03 | Schlumberger Technology Corporation | Methods and computing systems for processing and transforming collected data to improve drilling productivity |
WO2016204752A1 (en) * | 2015-06-17 | 2016-12-22 | Landmark Graphics Corporation | Automated pvt characterization and flow metering |
US10452794B2 (en) * | 2016-08-25 | 2019-10-22 | Baker Hughes, A Ge Company, Llc | Generating a script for performing a well operation job |
US11346215B2 (en) | 2018-01-23 | 2022-05-31 | Baker Hughes Holdings Llc | Methods of evaluating drilling performance, methods of improving drilling performance, and related systems for drilling using such methods |
US11614756B2 (en) * | 2018-11-30 | 2023-03-28 | Halliburton Energy Services, Inc. | Flow rate management for improved recovery |
US10808517B2 (en) | 2018-12-17 | 2020-10-20 | Baker Hughes Holdings Llc | Earth-boring systems and methods for controlling earth-boring systems |
Family Cites Families (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3999607A (en) * | 1976-01-22 | 1976-12-28 | Exxon Research And Engineering Company | Recovery of hydrocarbons from coal |
US5390741A (en) * | 1993-12-21 | 1995-02-21 | Halliburton Company | Remedial treatment methods for coal bed methane wells |
US5706896A (en) * | 1995-02-09 | 1998-01-13 | Baker Hughes Incorporated | Method and apparatus for the remote control and monitoring of production wells |
US6012015A (en) * | 1995-02-09 | 2000-01-04 | Baker Hughes Incorporated | Control model for production wells |
US6434435B1 (en) * | 1997-02-21 | 2002-08-13 | Baker Hughes Incorporated | Application of adaptive object-oriented optimization software to an automatic optimization oilfield hydrocarbon production management system |
US6176323B1 (en) * | 1997-06-27 | 2001-01-23 | Baker Hughes Incorporated | Drilling systems with sensors for determining properties of drilling fluid downhole |
US5992519A (en) * | 1997-09-29 | 1999-11-30 | Schlumberger Technology Corporation | Real time monitoring and control of downhole reservoirs |
GB2376704B (en) | 1998-05-15 | 2003-03-05 | Baker Hughes Inc | Automatic hydrocarbon production management system |
US6282452B1 (en) * | 1998-11-19 | 2001-08-28 | Intelligent Inspection Corporation | Apparatus and method for well management |
US6873267B1 (en) | 1999-09-29 | 2005-03-29 | Weatherford/Lamb, Inc. | Methods and apparatus for monitoring and controlling oil and gas production wells from a remote location |
US6980940B1 (en) * | 2000-02-22 | 2005-12-27 | Schlumberger Technology Corp. | Intergrated reservoir optimization |
GB2382408B (en) * | 2000-06-19 | 2004-06-02 | Halliburton Energy Systems Inc | Apparatus and methods for applying time lapse VSP to monitor a reservoir |
BR0203994B1 (pt) | 2001-02-05 | 2011-10-04 | método e aparelho adaptado para continuamente otimizar sistemas de rede de reservatório, poço e superfìcie. | |
US6968909B2 (en) * | 2002-03-06 | 2005-11-29 | Schlumberger Technology Corporation | Realtime control of a drilling system using the output from combination of an earth model and a drilling process model |
US20050222772A1 (en) * | 2003-01-29 | 2005-10-06 | Koederitz William L | Oil rig choke control systems and methods |
US7730967B2 (en) * | 2004-06-22 | 2010-06-08 | Baker Hughes Incorporated | Drilling wellbores with optimal physical drill string conditions |
US7559373B2 (en) * | 2005-06-02 | 2009-07-14 | Sanjel Corporation | Process for fracturing a subterranean formation |
US8353761B2 (en) * | 2005-08-19 | 2013-01-15 | Bally Gaming, Inc. | Progressive game and processing system thereof |
US20070175633A1 (en) * | 2006-01-30 | 2007-08-02 | Schlumberger Technology Corporation | System and Method for Remote Real-Time Surveillance and Control of Pumped Wells |
US7870899B2 (en) * | 2007-06-18 | 2011-01-18 | Conocophillips Company | Method for utilizing pressure variations as an energy source |
US20100191516A1 (en) * | 2007-09-07 | 2010-07-29 | Benish Timothy G | Well Performance Modeling In A Collaborative Well Planning Environment |
US7942206B2 (en) * | 2007-10-12 | 2011-05-17 | Baker Hughes Incorporated | In-flow control device utilizing a water sensitive media |
US8199166B2 (en) * | 2008-03-14 | 2012-06-12 | Schlumberger Technology Corporation | Visualization techniques for oilfield operations |
-
2009
- 2009-09-22 US US12/564,742 patent/US9482077B2/en active Active
-
2010
- 2010-09-21 DK DK10819337.6T patent/DK2480756T3/da active
- 2010-09-21 BR BR112012006517-3A patent/BR112012006517B1/pt active IP Right Grant
- 2010-09-21 WO PCT/US2010/049670 patent/WO2011037925A2/en active Application Filing
- 2010-09-21 EP EP10819337.6A patent/EP2480756B1/en active Active
Also Published As
Publication number | Publication date |
---|---|
US20110071810A1 (en) | 2011-03-24 |
WO2011037925A3 (en) | 2011-06-30 |
EP2480756A4 (en) | 2014-04-02 |
DK2480756T3 (da) | 2020-03-23 |
US9482077B2 (en) | 2016-11-01 |
EP2480756B1 (en) | 2020-01-01 |
WO2011037925A2 (en) | 2011-03-31 |
BR112012006517B1 (pt) | 2019-05-14 |
EP2480756A2 (en) | 2012-08-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
BR112012006517A2 (pt) | método para controlar a produção de fluído a partir de um furo de poço utilizando um script | |
BR112014010082A2 (pt) | método, sistema de computador e meio não transitório lido por computador armazenando um programa | |
BRPI0820174A2 (pt) | Método para formar um modelo geológico de uma região da terra, programa de computador, computador, meio de armazenagem legível por computador, transmissão de um programa , e, método para perfurar um furo em uma região da terra | |
WO2012148688A3 (en) | A method of providing flow control devices for a production wellbore | |
BR112012029379A2 (pt) | método para a determinação da distribuição de escoamento numa formação tendo um furo de poço formado na mesma, e método para determinar a distribuição de escoamento numa formação tendo um furo de poço formado na mesma | |
HN2011001251U (es) | Bloque de muro de contención de múltiples componentes | |
GB2503136A (en) | Method of minimizing wellbore instability | |
EA201390132A1 (ru) | Система и способ для определения характеристик коллектора | |
WO2011109616A3 (en) | Flow control arrangement and method | |
BRPI0514155A (pt) | ferramenta para regular alcance magnético integrada | |
BR112016011902A2 (pt) | Método e sistema de controle de equipamento de perfuração de fundo de poço, e, meio de armazenamento legível por computador | |
MX2010006749A (es) | Sistemas y metodos para modelar trayectorias de pozos perforados. | |
WO2012119837A3 (en) | Method and system for well and reservoir management in open hole completions as well as method and system for producing crude oil | |
EA201491663A1 (ru) | Измерение потока с использованием индикатора | |
MY155157A (en) | Selective control of flow through a well screen | |
BR112013016699A2 (pt) | método, sistema de computador, e, meio legível por computador | |
BR112014032979A2 (pt) | controle de pressão em operações de perfuração com a posição de estrangulamento determinada por uma curva de cv | |
BR112016018520A2 (pt) | Método e sistema de simulação de produção de fluido, e, meio de armazenamento legível por computador | |
BR112012016313A2 (pt) | método | |
WO2015056218A3 (en) | Process for constructing a well for exploiting a reservoir under a sea-bed or ocean-bed | |
GB2474601A (en) | Streamline flow simulation of a model that provides a representation of fracture corridors | |
MY172254A (en) | High temperature drilling with lower temperature drated tools | |
BR112018001886A2 (pt) | métodos para operar um campo de extração de hidrocarbonetos | |
BR112013030610A2 (pt) | sistema modular de controle para ferramenta de fundo de poço | |
JP2015102367A5 (pt) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
B06T | Formal requirements before examination | ||
B06F | Objections, documents and/or translations needed after an examination request according art. 34 industrial property law | ||
B09A | Decision: intention to grant | ||
B16A | Patent or certificate of addition of invention granted |
Free format text: PRAZO DE VALIDADE: 20 (VINTE) ANOS CONTADOS A PARTIR DE 21/09/2010, OBSERVADAS AS CONDICOES LEGAIS. (CO) 20 (VINTE) ANOS CONTADOS A PARTIR DE 21/09/2010, OBSERVADAS AS CONDICOES LEGAIS |