BR102013030315A8 - sistema de controle de produção para um poço submerso e método para desativar um sistema de controle de produção para um poço submerso - Google Patents
sistema de controle de produção para um poço submerso e método para desativar um sistema de controle de produção para um poço submersoInfo
- Publication number
- BR102013030315A8 BR102013030315A8 BR102013030315A BR102013030315A BR102013030315A8 BR 102013030315 A8 BR102013030315 A8 BR 102013030315A8 BR 102013030315 A BR102013030315 A BR 102013030315A BR 102013030315 A BR102013030315 A BR 102013030315A BR 102013030315 A8 BR102013030315 A8 BR 102013030315A8
- Authority
- BR
- Brazil
- Prior art keywords
- control system
- production control
- well
- submerged well
- control valve
- Prior art date
Links
- 238000004519 manufacturing process Methods 0.000 title abstract 5
- 238000000034 method Methods 0.000 title abstract 2
- 239000012530 fluid Substances 0.000 abstract 3
- 238000004146 energy storage Methods 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
- E21B33/035—Well heads; Setting-up thereof specially adapted for underwater installations
- E21B33/0355—Control systems, e.g. hydraulic, pneumatic, electric, acoustic, for submerged well heads
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/16—Control means therefor being outside the borehole
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10—TECHNICAL SUBJECTS COVERED BY FORMER USPC
- Y10T—TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
- Y10T137/00—Fluid handling
- Y10T137/0318—Processes
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10—TECHNICAL SUBJECTS COVERED BY FORMER USPC
- Y10T—TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
- Y10T137/00—Fluid handling
- Y10T137/8593—Systems
- Y10T137/86389—Programmer or timer
- Y10T137/86445—Plural, sequential, valve actuations
Abstract
sistema de controle de produção para um poço submerso e método para desativar um sistema de controle de produção para um poço submerso. trata-se de um sistema de controle de produção para um poço submerso que compreende: primeiros meios operados eletricamente (16) para abastecer o primeiro fluido hidráulico, para abrir uma primeira válvula de controle (18) do poço; segundos meios operados eletricamente (22) para abastecer o segundo fluido hidráulico a uma pressão mais alta que o dito primeiro fluido, para abrir uma válvula de controle adicional (23) do poço; circuitos eletrônicos (semi) para fornecer energia elétrica para operar os ditos primeiro e segundo meios; e meios para controlar a sequência de fechamento das ditas válvulas de controle como uma consequência de uma perda de energia elétrica dos ditos circuitos eletrônicos. os meios de controle compreendem: meios de armazenamento de energia elétrica (4); meios de detecção (9) responsivos à dita perda de energia a partir dos ditos circuitos eletrônicos; e meios (7, 8) acoplados com os ditos meios de detecção para uso da energia elétrica a partir dos ditos meios de armazenamento para manter a dita válvula de controle adicional aberta por um período após o fechamento da dita primeira válvula de controle e fechá-la após o dito período.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP12194758.4A EP2738348B1 (en) | 2012-11-29 | 2012-11-29 | Shutting down an underwater fluid production well |
Publications (2)
Publication Number | Publication Date |
---|---|
BR102013030315A2 BR102013030315A2 (pt) | 2015-10-20 |
BR102013030315A8 true BR102013030315A8 (pt) | 2015-12-22 |
Family
ID=47294700
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
BR102013030315A BR102013030315A8 (pt) | 2012-11-29 | 2013-11-26 | sistema de controle de produção para um poço submerso e método para desativar um sistema de controle de produção para um poço submerso |
Country Status (6)
Country | Link |
---|---|
US (1) | US9297235B2 (pt) |
EP (1) | EP2738348B1 (pt) |
CN (1) | CN103850665A (pt) |
AU (1) | AU2013260717B2 (pt) |
BR (1) | BR102013030315A8 (pt) |
SG (1) | SG2013087630A (pt) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2541192B (en) * | 2015-08-10 | 2021-09-15 | Ge Oil & Gas Uk Ltd | Safety node |
NO342043B1 (en) | 2015-12-08 | 2018-03-19 | Aker Solutions As | Workover Safety System |
GB2545197B (en) * | 2015-12-08 | 2019-02-20 | Aker Solutions As | Workover safety system |
NO343693B1 (en) * | 2017-06-14 | 2019-05-13 | Fmc Kongsberg Subsea As | Electric power and communication module |
CN114371662A (zh) * | 2021-12-10 | 2022-04-19 | 济宁金水科技有限公司 | 一种自来水厂水源井自动调度方法 |
Family Cites Families (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB8805744D0 (en) * | 1988-03-10 | 1988-04-07 | British Petroleum Co Plc | Mechanical fail-safe release actuator system |
US5335730A (en) * | 1991-09-03 | 1994-08-09 | Cotham Iii Heman C | Method for wellhead control |
US5497653A (en) * | 1992-09-21 | 1996-03-12 | General Electric Company | Method and system for detecting significant hydraulic leaks |
US5732776A (en) * | 1995-02-09 | 1998-03-31 | Baker Hughes Incorporated | Downhole production well control system and method |
US6351360B1 (en) * | 1999-09-20 | 2002-02-26 | National Semiconductor Corporation | Apparatus for selective shutdown of devices of an integrated circuit in response to thermal fault detection |
NO312376B1 (no) * | 2000-05-16 | 2002-04-29 | Kongsberg Offshore As | Fremgangsmåte og anordning for styring av ventiler av en undervannsinstallasjon |
US6789621B2 (en) * | 2000-08-03 | 2004-09-14 | Schlumberger Technology Corporation | Intelligent well system and method |
GB2452948B (en) * | 2007-09-20 | 2012-02-22 | Vetco Gray Controls Ltd | Shutdown system |
WO2009146206A2 (en) * | 2008-04-18 | 2009-12-03 | Schlumberger Canada Limited | Subsea tree safety control system |
EP2236999B1 (de) * | 2009-04-01 | 2020-11-18 | VEGA Grieshaber KG | Feldgerät mit zwei Prozessoren |
US8839868B2 (en) * | 2009-10-02 | 2014-09-23 | Schlumberger Technology Corporation | Subsea control system with interchangeable mandrel |
US8708054B2 (en) * | 2009-12-09 | 2014-04-29 | Schlumberger Technology Corporation | Dual path subsea control system |
GB2479915B (en) * | 2010-04-29 | 2016-03-23 | Ge Oil & Gas Uk Ltd | Well production shut down |
US20120006559A1 (en) * | 2010-07-09 | 2012-01-12 | Brite Alan D | Submergible oil well sealing device with valves and method for installing a submergible oil well sealing device and resuming oil production |
US8181704B2 (en) * | 2010-09-16 | 2012-05-22 | Vetco Gray Inc. | Riser emergency disconnect control system |
EP2447798B1 (en) * | 2010-10-26 | 2014-07-23 | Vetco Gray Controls Limited | Testing a control system including a valve |
US8746346B2 (en) * | 2010-12-29 | 2014-06-10 | Vetco Gray Inc. | Subsea tree workover control system |
US20150021035A1 (en) * | 2013-07-22 | 2015-01-22 | Vetco Gray U.K., Limited | Tubing head spool actuation through landing string |
-
2012
- 2012-11-29 EP EP12194758.4A patent/EP2738348B1/en active Active
-
2013
- 2013-11-22 AU AU2013260717A patent/AU2013260717B2/en active Active
- 2013-11-26 SG SG2013087630A patent/SG2013087630A/en unknown
- 2013-11-26 BR BR102013030315A patent/BR102013030315A8/pt not_active Application Discontinuation
- 2013-11-27 US US14/091,695 patent/US9297235B2/en active Active
- 2013-11-29 CN CN201310621230.5A patent/CN103850665A/zh active Pending
Also Published As
Publication number | Publication date |
---|---|
US9297235B2 (en) | 2016-03-29 |
EP2738348A1 (en) | 2014-06-04 |
AU2013260717B2 (en) | 2017-01-05 |
EP2738348B1 (en) | 2017-09-20 |
US20140144515A1 (en) | 2014-05-29 |
BR102013030315A2 (pt) | 2015-10-20 |
CN103850665A (zh) | 2014-06-11 |
SG2013087630A (en) | 2014-06-27 |
AU2013260717A1 (en) | 2014-06-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
BR102013030315A8 (pt) | sistema de controle de produção para um poço submerso e método para desativar um sistema de controle de produção para um poço submerso | |
BR102013011077A8 (pt) | Unidade de controle eletrônico para controlar e monitorar uma bomba e sistema para controlar uma bomba | |
BR112015022543A2 (pt) | arranjo de locomotiva, método para controlar uma locomotiva, mídia de armazenamento legível por computador e kit de aperfeiçoamento para uma locomotiva | |
BR112015003884A2 (pt) | sistema de bomba para a extração de leite; e método para uso em um sistema de bomba para a extração de leite | |
BR112013030631A2 (pt) | dispositivo automático de busca de velocidade e método para um teste de curso parcial de uma válvula de controle | |
BR112014001036A2 (pt) | aparelho, método e sistema de destilação de vapor d'água | |
BR112014012266A2 (pt) | método para reduzir perda de material e sistema | |
BR112015001614A2 (pt) | método e sistema de controle de terminal de usuário | |
BR112015013418A2 (pt) | sistema de controle coordenado sem sensor | |
BR112015029801A2 (pt) | método e aparelho para a administração de fornecimento de fluido em um sistema de controle de processo | |
BR112014026187A2 (pt) | sistema de previsão de atuador | |
BR112013000735A2 (pt) | controlador robótico e método para controlar a posição de várias superfícies solares | |
BR112013022798A2 (pt) | sistema de bomba | |
BR112013005939A2 (pt) | sistema para controlar fluxo em um furo de poço, sistema para controlar o fluxo, e método para controlar fluxo em um furo de poço. | |
BR112014030607A2 (pt) | métodos e aparelhos para controlar e/ou monitorar um atuador pneumático | |
BR112013023212A2 (pt) | Método e aparelho para controlar conversores lcl usando técnicas de cancelamento de tensões assimétricas | |
BR112015020440B8 (pt) | Válvula de controle com recuperação de energia | |
BR112012011254A2 (pt) | sistema de válvula boia para um sistema de umidificação respiratória | |
BR112012018802A2 (pt) | disposição e processo para otimizar a operação de uma rede de abastecimento | |
BR112012014171A8 (pt) | Controlador para uma disposição de iluminação, sistema de iluminação e método de controlar uma disposição de iluminação | |
NO20151677A1 (en) | Workover Safety System | |
BR112016001848A2 (pt) | aparelho para evacuar um sistema, dispositivo de bomba para mama, e, método para controlar um dispositivo de bomba para mama | |
ES2403334R1 (es) | Sistemas y métodos de arranque para calderas solares | |
BR112014028664A2 (pt) | sistema de bomba tira leite | |
BR112015001791A2 (pt) | arranjo de controle de fluxo |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
B03A | Publication of a patent application or of a certificate of addition of invention [chapter 3.1 patent gazette] | ||
B03H | Publication of an application: rectification [chapter 3.8 patent gazette] |
Free format text: REFERENTE A RPI 2337 DE 20/10/2015, QUANTO AOS ITENS (71 E 30). |
|
B25A | Requested transfer of rights approved |
Owner name: GE OIL AND GAS UK LIMITED (GB) |
|
B06F | Objections, documents and/or translations needed after an examination request according [chapter 6.6 patent gazette] | ||
B06U | Preliminary requirement: requests with searches performed by other patent offices: procedure suspended [chapter 6.21 patent gazette] | ||
B11B | Dismissal acc. art. 36, par 1 of ipl - no reply within 90 days to fullfil the necessary requirements |