BR0107052A - Processo de fratura de reservatório em tempo real - Google Patents

Processo de fratura de reservatório em tempo real

Info

Publication number
BR0107052A
BR0107052A BR0107052-5A BR0107052A BR0107052A BR 0107052 A BR0107052 A BR 0107052A BR 0107052 A BR0107052 A BR 0107052A BR 0107052 A BR0107052 A BR 0107052A
Authority
BR
Brazil
Prior art keywords
fluid
time
real
compound
reservoir
Prior art date
Application number
BR0107052-5A
Other languages
English (en)
Other versions
BR0107052B1 (pt
Inventor
George Scott Iii
Gary L Covatch
Original Assignee
George L Scott Iii
Gary L Covatch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=26926249&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=BR0107052(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by George L Scott Iii, Gary L Covatch filed Critical George L Scott Iii
Publication of BR0107052A publication Critical patent/BR0107052A/pt
Publication of BR0107052B1 publication Critical patent/BR0107052B1/pt

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • E21B43/267Methods for stimulating production by forming crevices or fractures reinforcing fractures by propping
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • E21B43/2605Methods for stimulating production by forming crevices or fractures using gas or liquefied gas
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/10Locating fluid leaks, intrusions or movements
    • E21B47/11Locating fluid leaks, intrusions or movements using tracers; using radioactivity

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geophysics (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Debugging And Monitoring (AREA)

Abstract

"PROCESSO DE FRATURA DE RESERVATóRIO EM TEMPO REAL". São descritos métodos para a fratura hidráulica de formações de reservatórios subterrâneos usando várias combinações de fluido gelificado, nitrogênio, e componentes à base de dióxido de carbono, em associação com o agente de escoramento e outros aditivos. Os componentes básicos selecionados são bombeados a tubulação do furo do poço abaixo, enquanto que outros componentes básicos selecionados são bombeados simultaneamente tubulação e anel tubular do furo do poço abaixo, para mistura furo abaixo em um fluido de fratura composto na região furo abaixo do furo do poço próxima ao reservatório objeto. Desse modo, as variações podem ser feitas a tempo na composição do fluido composto e nas propriedades do fluido, substancialmente imediatamente antes da entrada do fluido composto na formação. Essas modificações em tempo real podem ser feitas para detectar, antecipadamente, prontamente, as ocorrências de blindagem e podem facilitar as composições dos fluidos compostos, que são, de outro modo, freq³entemente indesejáveis para bombear da superfície. Tais combinações de fluidos compostos incluem as fases componentes de cada um de dióxido de carbono, nitrogênio e um fluido de base. As concentrações do agente de escoramento dentro do fluido composto que entra na formação pode ser feita em tempo real sem o tempo de retardo para o volume do poço do furo inerente nos métodos da técnica anterior.
BRPI0107052-5A 2000-09-15 2001-09-14 método para fraturar hidraulicamente uma formação subterránea. BR0107052B1 (pt)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US23271700P 2000-09-15 2000-09-15
US09/844,951 US6439310B1 (en) 2000-09-15 2001-04-27 Real-time reservoir fracturing process

Publications (2)

Publication Number Publication Date
BR0107052A true BR0107052A (pt) 2003-01-07
BR0107052B1 BR0107052B1 (pt) 2010-09-08

Family

ID=26926249

Family Applications (1)

Application Number Title Priority Date Filing Date
BRPI0107052-5A BR0107052B1 (pt) 2000-09-15 2001-09-14 método para fraturar hidraulicamente uma formação subterránea.

Country Status (5)

Country Link
US (1) US6439310B1 (pt)
AU (1) AU2001295037A1 (pt)
BR (1) BR0107052B1 (pt)
CA (1) CA2422509C (pt)
WO (1) WO2002023010A1 (pt)

Families Citing this family (96)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7426961B2 (en) * 2002-09-03 2008-09-23 Bj Services Company Method of treating subterranean formations with porous particulate materials
US6795773B2 (en) * 2001-09-07 2004-09-21 Halliburton Energy Services, Inc. Well completion method, including integrated approach for fracture optimization
US6719054B2 (en) * 2001-09-28 2004-04-13 Halliburton Energy Services, Inc. Method for acid stimulating a subterranean well formation for improving hydrocarbon production
US6938690B2 (en) 2001-09-28 2005-09-06 Halliburton Energy Services, Inc. Downhole tool and method for fracturing a subterranean well formation
US6725933B2 (en) * 2001-09-28 2004-04-27 Halliburton Energy Services, Inc. Method and apparatus for acidizing a subterranean well formation for improving hydrocarbon production
US6662874B2 (en) * 2001-09-28 2003-12-16 Halliburton Energy Services, Inc. System and method for fracturing a subterranean well formation for improving hydrocarbon production
WO2003067025A2 (en) * 2002-02-01 2003-08-14 Regents Of The University Of Minnesota Interpretation and design of hydraulic fracturing treatments
US6691780B2 (en) * 2002-04-18 2004-02-17 Halliburton Energy Services, Inc. Tracking of particulate flowback in subterranean wells
GB2408279B (en) * 2002-09-03 2006-12-20 Bj Services Co Method of treating subterranean formations with porous ceramic particulate materials
US20060058197A1 (en) * 2004-09-15 2006-03-16 Brown J E Selective fracture face dissolution
CA2644213C (en) * 2003-03-18 2013-10-15 Bj Services Company Method of treating subterranean formations using mixed density proppants or sequential proppant stages
US7036597B2 (en) * 2003-08-28 2006-05-02 Halliburton Energy Services, Inc. Systems and methods for treating a subterranean formation using carbon dioxide and a crosslinked fracturing fluid
US8126689B2 (en) * 2003-12-04 2012-02-28 Halliburton Energy Services, Inc. Methods for geomechanical fracture modeling
US20050173116A1 (en) 2004-02-10 2005-08-11 Nguyen Philip D. Resin compositions and methods of using resin compositions to control proppant flow-back
US7211547B2 (en) 2004-03-03 2007-05-01 Halliburton Energy Services, Inc. Resin compositions and methods of using such resin compositions in subterranean applications
US7299875B2 (en) 2004-06-08 2007-11-27 Halliburton Energy Services, Inc. Methods for controlling particulate migration
US7757768B2 (en) 2004-10-08 2010-07-20 Halliburton Energy Services, Inc. Method and composition for enhancing coverage and displacement of treatment fluids into subterranean formations
US7883740B2 (en) 2004-12-12 2011-02-08 Halliburton Energy Services, Inc. Low-quality particulates and methods of making and using improved low-quality particulates
US7491682B2 (en) * 2004-12-15 2009-02-17 Bj Services Company Method of inhibiting or controlling formation of inorganic scales
US7781380B2 (en) * 2005-01-24 2010-08-24 Schlumberger Technology Corporation Methods of treating subterranean formations with heteropolysaccharides based fluids
US7673686B2 (en) 2005-03-29 2010-03-09 Halliburton Energy Services, Inc. Method of stabilizing unconsolidated formation for sand control
US7987908B2 (en) * 2005-04-25 2011-08-02 Weatherford/Lamb, Inc. Well treatment using a progressive cavity pump
US7318474B2 (en) 2005-07-11 2008-01-15 Halliburton Energy Services, Inc. Methods and compositions for controlling formation fines and reducing proppant flow-back
US7926591B2 (en) 2006-02-10 2011-04-19 Halliburton Energy Services, Inc. Aqueous-based emulsified consolidating agents suitable for use in drill-in applications
US7819192B2 (en) 2006-02-10 2010-10-26 Halliburton Energy Services, Inc. Consolidating agent emulsions and associated methods
US8613320B2 (en) 2006-02-10 2013-12-24 Halliburton Energy Services, Inc. Compositions and applications of resins in treating subterranean formations
US7665517B2 (en) 2006-02-15 2010-02-23 Halliburton Energy Services, Inc. Methods of cleaning sand control screens and gravel packs
US20070293404A1 (en) * 2006-06-15 2007-12-20 Hutchins Richard D Subterranean Treatment Methods using Methanol Containing Foams
US7500521B2 (en) * 2006-07-06 2009-03-10 Halliburton Energy Services, Inc. Methods of enhancing uniform placement of a resin in a subterranean formation
US7673507B2 (en) * 2007-01-04 2010-03-09 Halliburton Energy Services, Inc. Real time viscometer
US7934557B2 (en) 2007-02-15 2011-05-03 Halliburton Energy Services, Inc. Methods of completing wells for controlling water and particulate production
US8697610B2 (en) * 2007-05-11 2014-04-15 Schlumberger Technology Corporation Well treatment with complexed metal crosslinkers
US8960293B2 (en) * 2007-05-30 2015-02-24 Schlumberger Technology Corporation Method of propping agent delivery to the well
US20090087912A1 (en) * 2007-09-28 2009-04-02 Shlumberger Technology Corporation Tagged particles for downhole application
US20090087911A1 (en) * 2007-09-28 2009-04-02 Schlumberger Technology Corporation Coded optical emission particles for subsurface use
US7832257B2 (en) 2007-10-05 2010-11-16 Halliburton Energy Services Inc. Determining fluid rheological properties
US7950455B2 (en) * 2008-01-14 2011-05-31 Baker Hughes Incorporated Non-spherical well treating particulates and methods of using the same
US8853135B2 (en) * 2008-05-07 2014-10-07 Schlumberger Technology Corporation Method for treating wellbore in a subterranean formation with high density brines and complexed metal crosslinkers
US8439116B2 (en) * 2009-07-24 2013-05-14 Halliburton Energy Services, Inc. Method for inducing fracture complexity in hydraulically fractured horizontal well completions
US8960292B2 (en) * 2008-08-22 2015-02-24 Halliburton Energy Services, Inc. High rate stimulation method for deep, large bore completions
US8205675B2 (en) * 2008-10-09 2012-06-26 Baker Hughes Incorporated Method of enhancing fracture conductivity
US9016376B2 (en) 2012-08-06 2015-04-28 Halliburton Energy Services, Inc. Method and wellbore servicing apparatus for production completion of an oil and gas well
US9796918B2 (en) * 2013-01-30 2017-10-24 Halliburton Energy Services, Inc. Wellbore servicing fluids and methods of making and using same
US8887803B2 (en) 2012-04-09 2014-11-18 Halliburton Energy Services, Inc. Multi-interval wellbore treatment method
US8631872B2 (en) * 2009-09-24 2014-01-21 Halliburton Energy Services, Inc. Complex fracturing using a straddle packer in a horizontal wellbore
US7762329B1 (en) 2009-01-27 2010-07-27 Halliburton Energy Services, Inc. Methods for servicing well bores with hardenable resin compositions
US8104539B2 (en) * 2009-10-21 2012-01-31 Halliburton Energy Services Inc. Bottom hole assembly for subterranean operations
US8474313B2 (en) * 2010-03-23 2013-07-02 Saudi Arabian Oil Company Process for testing a sample of hydraulic fracturing fluid
US9010430B2 (en) 2010-07-19 2015-04-21 Baker Hughes Incorporated Method of using shaped compressed pellets in treating a well
US9976070B2 (en) 2010-07-19 2018-05-22 Baker Hughes, A Ge Company, Llc Method of using shaped compressed pellets in well treatment operations
US10822536B2 (en) 2010-07-19 2020-11-03 Baker Hughes, A Ge Company, Llc Method of using a screen containing a composite for release of well treatment agent into a well
US9618652B2 (en) 2011-11-04 2017-04-11 Schlumberger Technology Corporation Method of calibrating fracture geometry to microseismic events
CA2915625C (en) 2011-03-11 2021-08-03 Schlumberger Canada Limited Method of calibrating fracture geometry to microseismic events
US8664168B2 (en) 2011-03-30 2014-03-04 Baker Hughes Incorporated Method of using composites in the treatment of wells
CN104040376B (zh) * 2011-10-11 2017-10-24 普拉德研究及开发股份有限公司 用于执行增产作业的系统和方法
US10422208B2 (en) 2011-11-04 2019-09-24 Schlumberger Technology Corporation Stacked height growth fracture modeling
WO2013067363A1 (en) * 2011-11-04 2013-05-10 Schlumberger Canada Limited Modeling of interaction of hydraulic fractures in complex fracture networks
US9920610B2 (en) 2012-06-26 2018-03-20 Baker Hughes, A Ge Company, Llc Method of using diverter and proppant mixture
US10041327B2 (en) 2012-06-26 2018-08-07 Baker Hughes, A Ge Company, Llc Diverting systems for use in low temperature well treatment operations
US8342246B2 (en) 2012-01-26 2013-01-01 Expansion Energy, Llc Fracturing systems and methods utilyzing metacritical phase natural gas
US9316098B2 (en) 2012-01-26 2016-04-19 Expansion Energy Llc Non-hydraulic fracturing and cold foam proppant delivery systems, methods, and processes
CA3190714A1 (en) 2012-05-14 2013-11-14 Step Energy Services Ltd. Hybrid lpg frac
US10988678B2 (en) 2012-06-26 2021-04-27 Baker Hughes, A Ge Company, Llc Well treatment operations using diverting system
HUE040215T2 (hu) 2012-06-26 2019-02-28 Baker Hughes A Ge Co Llc Eljárás hidraulikus repedéshálózat fejlesztésére
US11111766B2 (en) 2012-06-26 2021-09-07 Baker Hughes Holdings Llc Methods of improving hydraulic fracture network
AU2013280404B2 (en) 2012-06-26 2017-02-02 Baker Hughes Incorporated Method of using phthalic and terephthalic acids and derivatives thereof in well treatment operations
US9133700B2 (en) 2012-11-30 2015-09-15 General Electric Company CO2 fracturing system and method of use
US9429006B2 (en) 2013-03-01 2016-08-30 Baker Hughes Incorporated Method of enhancing fracture conductivity
CN105102758A (zh) * 2013-04-08 2015-11-25 膨胀能量有限责任公司 非水力压裂和冷泡沫支撑剂输送系统、方法和过程
US8833456B1 (en) * 2013-05-10 2014-09-16 Seawater Technologies, LLC Seawater transportation for utilization in hydrocarbon-related processes including pipeline transportation
US10125592B2 (en) * 2013-08-08 2018-11-13 Halliburton Energy Services, Inc. Methods and systems for treatment of subterranean formations
US9587167B2 (en) * 2013-10-18 2017-03-07 Chemical Flooding Technologies, LLC For storage of surfactant concentrate solution
WO2015112996A1 (en) 2014-01-27 2015-07-30 The Regents Of The University Of Michigan Interrogating subterranean hydraulic fractures using magnetoelastic resonators
WO2016014310A1 (en) 2014-07-23 2016-01-28 Baker Hughes Incorporated Composite comprising well treatment agent and/or a tracer adhered onto a calcined substrate of a metal oxide coated core and a method of using the same
AU2015301423B2 (en) 2014-08-15 2019-01-17 Baker Hughes, A Ge Company, Llc Diverting systems for use in well treatment operations
US9914872B2 (en) 2014-10-31 2018-03-13 Chevron U.S.A. Inc. Proppants
CN105986802B (zh) * 2015-02-13 2018-12-25 中国石油天然气股份有限公司 井下压裂的方法
WO2017095407A1 (en) 2015-12-02 2017-06-08 Halliburton Energy Services, Inc. Method of fracturing a formation
US10641083B2 (en) 2016-06-02 2020-05-05 Baker Hughes, A Ge Company, Llc Method of monitoring fluid flow from a reservoir using well treatment agents
US10413966B2 (en) 2016-06-20 2019-09-17 Baker Hughes, A Ge Company, Llc Nanoparticles having magnetic core encapsulated by carbon shell and composites of the same
US11365617B1 (en) 2017-01-24 2022-06-21 Devon Energy Corporation Systems and methods for controlling fracturing operations using monitor well pressure
US11028679B1 (en) 2017-01-24 2021-06-08 Devon Energy Corporation Systems and methods for controlling fracturing operations using monitor well pressure
US11254861B2 (en) 2017-07-13 2022-02-22 Baker Hughes Holdings Llc Delivery system for oil-soluble well treatment agents and methods of using the same
EP3704206A1 (en) 2017-11-03 2020-09-09 Baker Hughes Holdings Llc Treatment methods using aqueous fluids containing oil-soluble treatment agents
CN109138959B (zh) * 2018-08-07 2020-06-19 中国石油大学(北京) 一种超临界co2聚能压裂方法
CN109209330A (zh) * 2018-11-16 2019-01-15 中国石油大学(北京) 一种造地层裂缝的方法及装置
WO2020251578A1 (en) * 2019-06-13 2020-12-17 Halliburton Energy Services, Inc. Multi-component downhole treatment
US10989035B2 (en) * 2019-06-20 2021-04-27 Halliburton Energy Services, Inc. Proppant ramp-up for cluster efficiency
CN110541696A (zh) * 2019-07-15 2019-12-06 河南理工大学 一种油气井二氧化碳爆破-水力压裂改造增产方法
CN110485985B (zh) * 2019-08-28 2021-10-29 太原理工大学 一种提高煤层压裂效果的方法
US11319790B2 (en) 2019-10-30 2022-05-03 Halliburton Energy Services, Inc. Proppant ramp up decision making
US10961444B1 (en) 2019-11-01 2021-03-30 Baker Hughes Oilfield Operations Llc Method of using coated composites containing delayed release agent in a well treatment operation
CN113027407B (zh) * 2021-04-21 2022-04-05 太原理工大学 一种泡沫-气体复合分段压裂地层方法
US11859490B2 (en) 2021-08-19 2024-01-02 Devon Energy Corporation Systems and methods for monitoring fracturing operations using monitor well flow
CN113563860B (zh) * 2021-08-22 2022-04-26 大庆永铸石油技术开发有限公司 页岩油藏用滑溜水压裂液体系制备方法及其泵注方法
CN116044366B (zh) * 2022-12-28 2023-09-22 捷贝通石油技术集团股份有限公司 油气储层射孔、压裂及生产阶段长效示踪实时监测方法

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2869642A (en) * 1954-09-14 1959-01-20 Texas Co Method of treating subsurface formations
US2947869A (en) * 1954-10-22 1960-08-02 Texaco Inc Method of studying subsurface formations
US3602308A (en) * 1969-08-26 1971-08-31 Amoco Prod Co Hydraulically fracturing an isolated zone of an unconsolidated formation
US4228885A (en) * 1979-01-29 1980-10-21 Cavalleri Charles G Coin operated electric timer automatic electric candle
US4228855A (en) * 1979-06-22 1980-10-21 Texaco Inc. Method of injectivity profile logging for two phase flow
US4627495A (en) * 1985-04-04 1986-12-09 Halliburton Company Method for stimulation of wells with carbon dioxide or nitrogen based fluids containing high proppant concentrations
US5069283A (en) 1989-08-02 1991-12-03 The Western Company Of North America Fracturing process using carbon dioxide and nitrogen
US5635712A (en) 1995-05-04 1997-06-03 Halliburton Company Method for monitoring the hydraulic fracturing of a subterranean formation
US5595245A (en) 1995-08-04 1997-01-21 Scott, Iii; George L. Systems of injecting phenolic resin activator during subsurface fracture stimulation for enhanced oil recovery

Also Published As

Publication number Publication date
CA2422509A1 (en) 2002-03-21
WO2002023010A1 (en) 2002-03-21
BR0107052B1 (pt) 2010-09-08
AU2001295037A1 (en) 2002-03-26
US6439310B1 (en) 2002-08-27
CA2422509C (en) 2010-02-09

Similar Documents

Publication Publication Date Title
BR0107052A (pt) Processo de fratura de reservatório em tempo real
EA200100914A1 (ru) Цементирующие составы и способы применения таких составов для цементирования нефтяных скважин или подобных сооружений
WO2007054670A3 (en) Compositions comprising melt-processed inorganic fibers and methods of using such compositions
WO2004013448A3 (en) Method for using coconut coir as a lost circulation material for well drilling
BR112012014932A2 (pt) método de fratura de formações subterrâneas com fluido reticulado
EA200200226A1 (ru) Способ и устройство для получения данных в скважине для добычи углеводородного сырья во время ее работы
BR0311145A (pt) Método para conduzir uma operação de perfuração em uma formação subterrânea, fluido de perfuração de gel frágil, e, métodos para reduzir a perda de fluido de perfuração ao interior de uma formação subterrânea, para eliminar ou evitar o caimento durante operações de perfuração e para preparar um fluido de perfuração
BR0108612B1 (pt) fluido viscoso para uso em operações de furo de sondagem, método de fraturamento de formação subterránea e método para reduzir a quantidade de água produzida de uma formação de produção de óleo subterránea.
BR0207484A (pt) Composições viscoelásticas
MY122420A (en) Compositions for use in well construction, repair and/or abandonment
AR017412A1 (es) Metodo para mejorar la estabilidad termica de un fluido de perforacion y servicio de pozos de base acuosa y fluido de perforacion y servicio de pozos de base acuosa.
BR0212608A (pt) Montagem e método de furo de fundo de subescareamento dirigìvel
BR0308722A (pt) Método e pelota de vedação de uma zona subterrânea penetrada através de um furo de poço para restabelecer a circulação perdida
CA2630319A1 (en) Methods of consolidating unconsolidated particulates in subterranean formations
RU94017659A (ru) Способ получения множественных разрывов в буровой скважине
EP0857852A3 (en) Method for horizontal directional drilling of rock formations
BRPI0406816A (pt) Aditivos para cimento de sólidos grandes bombeáveis
ES2119230T3 (es) Procedimiento y aparato para perforar pozos horizontales.
BR0318140A (pt) Método para perfuração e completação de poços
BR0304209A (pt) Método de uniformemente introduzir um fluido de tratamento em uma zona de produção subterrânea penetrada por um furo de poço
BRPI0809395A2 (pt) método de tratamento de formações subterráneas pela hidrólise in-situ de ésteres de ácidos orgánicos
PE20030841A1 (es) Metodo y composicion para modificar la permeabilidad al agua de una formacion subterranea
ATE426009T1 (de) Selbsterzeugende bohrschaume
ATE423268T1 (de) Verfahren und anordnung zum zirkulieren von flüssigkeiten in bohrlochsystemen
CA2259575A1 (en) Use of oil and gas field chemicals

Legal Events

Date Code Title Description
B06A Patent application procedure suspended [chapter 6.1 patent gazette]
B09A Decision: intention to grant [chapter 9.1 patent gazette]
B16A Patent or certificate of addition of invention granted [chapter 16.1 patent gazette]

Free format text: PRAZO DE VALIDADE: 20 (VINTE) ANOS CONTADOS A PARTIR DE 14/09/2001, OBSERVADAS AS CONDICOES LEGAIS.

B24C Patent annual fee: request for for restoration

Free format text: REFERENTE A 11A ANUIDADE.

B24H Lapse because of non-payment of annual fees (definitively: art 78 iv lpi)
B24F Patent annual fee: publication cancelled

Free format text: ANULADA A PUBLICACAO CODIGO 24.8 NA RPI NO 2259 DE 22/04/2014 POR TER SIDO INDEVIDA.

B21F Lapse acc. art. 78, item iv - on non-payment of the annual fees in time

Free format text: REFERENTE A 11A ANUIDADE.

B24J Lapse because of non-payment of annual fees (definitively: art 78 iv lpi, resolution 113/2013 art. 12)

Free format text: EM VIRTUDE DA EXTINCAO PUBLICADA NA RPI 2607 DE 22-12-2020 E CONSIDERANDO AUSENCIA DE MANIFESTACAO DENTRO DOS PRAZOS LEGAIS, INFORMO QUE CABE SER MANTIDA A EXTINCAO DA PATENTE E SEUS CERTIFICADOS, CONFORME O DISPOSTO NO ARTIGO 12, DA RESOLUCAO 113/2013.