Improvement of or relating to the roof in coal mines or other underground works

Info

Publication number
BE463527A
BE463527A BE463527A BE463527A BE463527A BE 463527 A BE463527 A BE 463527A BE 463527 A BE463527 A BE 463527A BE 463527 A BE463527 A BE 463527A BE 463527 A BE463527 A BE 463527A
Authority
BE
Belgium
Prior art keywords
roof
bolts
support
girders
iii
Prior art date
Application number
BE463527A
Other languages
Dutch (nl)
Inventor
Zako Sytse Beijl
Original Assignee
Beijl Zako
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijl Zako filed Critical Beijl Zako
Publication of BE463527A publication Critical patent/BE463527A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/006Lining anchored in the rock

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Description

  

   <Desc/Clms Page number 1> 
 



  "Verbetering van of met betrekking tot het Da.k in Steenkolen- mynen of andere ondergrondsche Werken". 



   Deze uitvinding heeft betrekking op het dak in steenkolen- mynen of andere ondergrondsche werken. Zooals bekend is,zyn de ondergrondsche lagen, zoowel die,welke moet worden ontgonnen worden, als die, waaruit het dak bestaat, .samengedrukt en nemen niet hun natuurlyk volumen in, d.w.z. de ruimte, welke zy zouden opvullen in ontspannen toestand. Dit is niet slechts veroorzaakt door het gewicht van hetgeen ze in verticalen zin overdekt,maar , een dergelyke samendrukking vond ook plaats in horizontalen zin ten deele tengevolge van inkrimping van den aardkorst. Een hol- te ergens in zulke gesteentelagen gemaakt,geeft gelegenheid aan de daarin opgesloten elastische energie tot het verrichten van arbeid door plaatselyke ontspanning. 



   Voor de veiligheid van hen, die ondergronds werkzaam zyn, is het vereischt,om zoo lang mogelyk beweging in het dak te voor- komen, die het gevolg moet zyn van. het wegnemen van een hoeveel- heid mineraal. Tot heden poogde   iaen   steeds dit   door middel   van 

 <Desc/Clms Page number 2> 

 stutten alleen, aangebracht tegen de onderzyde van het dak, waarby de neerwaarts gerichte druk   gewoonlyk   op den vloer of in sommige   gevallen '   een deel der minerale afzetting, welks ontginning nog niet was   geschied,wordt overgebracht.   



   Tiet doel van de onderhavige uitvinding is het beletten van de vrye ontspanning der samengedrukte   aardlagen   door toepassing van middelen,welke deze in de lagen   aanwezige   vormverandering in stand houden en dus de gespannen toestand, waarin deze lagen verkeeren,bestendigen. 



   De uitvinding omvat dus de werkwyze tot beveiliging van een dak in een ondergronds'che ruimte of werkplaats, heb- bende een   gelaagd   dak,zooals voorkomende in een steenkolenmyn door de betreffende lagen over een bepaalde dikte te verster- ken met  behulp   van   middelen,die   in gespannen toestand   zynde,   deze lagen   inklemmen.   



   Deze uitvinding kan   uitgevoerd   worden op een   wyze,be-     staande   in het boren van gaten in de daklagen over een afstand van   zepge   75 centimeter en daarin bouten te plaatsen, die de reeks doorboorde lagen inklemmen. De plaats dezer boor-- gaten en hun onderlinge afstand zullen moeten worden bepaald in overeenstemming met de voor stutten geldende bepalingen. 



   Zyn de bouten eenmaal   geplaatst,dan   kan   overgegaan   wor- den tot het wegruimen van   liet   mineraal,dat vooraf reeds kan zyn losgebroken of   uitgeschoten,waarna   een nieuwe cyclus van werkzaamheden aangevangen kan worden en uitgevoerd zonder dat daarby gevaar voor den mynwerker zal bestaan. 



     Vroeger   werd reeds   voorgesteld   om in tunnels er, soortge-   lyke   ondergrondsche werken bestemd voor geleiding van water naar krachtwerken, den wand te bekleeden met gewapend beton en deze deklaag teverbinden   aarpinnen   van   cementmortel,die   in willekeurig geboorde   gaten   rondom de dwarsdoorsnede van de tunnel was geperst, nadat hierin vooraf hakkelbouten geplaatst   waren.   De   boorgaten   hierby waren geplaatst ongeacht de   gelaagd-   heid van het   gesteente.Bovendien   was er in dit geval geen spra- 

 <Desc/Clms Page number 3> 

 ke van beletten van vrye ontspanning van gesteentelagen,Der- halve worden in deze vermelde werkwyze geen middelen toege- past, die werkzaam zyn,

   doordat zy zelf in gespannen toestand verkeeren,. Het vraagstuk,waarnaar verwezen werd, was dan ook het bieden van weerstand op juiste wyze tegen druk,die uit- gaat van uit de tunnel zelve.. 



   Door middel van de onderhavige uitvinding kunnen de on- middelyke   gesteèntelagen,hetzy   tydelyk,hetzy duurzaam in een versterkten toestand gehouden worden, waardoor ontspanning en daaruit mogelyk voortkomende ontbinding.dezer daklagen wordt voorkomen, alsook,dat deze onderling langs hunne laagvalkken van elkaar kunnen   afwyken.Inderdaad   wordt eene opeenvolgende reeks gesteentelagen vereenigd tot een dikken samengestelden ligger,overeenkomende met een balk uit planken d.oor een tim- merman vervaa,rdigd met behulp van spykers,bouten,schroeven of veeren, waardoor   wedérzydsch   verschuiven van twee aaneenslui- tende lagen-zoodra zulk een balk doorbuigt ten gevolge van een- nen   last,voorkomen     wordt.Er   bestaat echter dit voorname ver-   schil,

  dat   de onderdeelen van dit voorbeeld -de planken- niet gelyk de gesteente lagen in een vooraf-veroorzaakten gespannen toestand verkeeren. Dit is een factor,die een bykomstig belang dezer uitvinding beduidt. 



   De uitvinding wordt door de toegevoegde teekeningen nader   verduidelykt:     Fig.l   is een loodrechte doorsnede van een gedeelte van een versterkt dak volgens de lyn I-I in   fig.2.   



   Fig.2. is een horizontale doorsnede daarvan volgens de lyn II-II in   fig.l.   



   Fig.3 is een dwarsdoorsnede daarvan volgens de lyn   111-111   in fig.2. 



   Fig.4 is een doorsnede overeenkomstig fig.l,doch op kleiner schaal, weergevende hoe de $varsterking in het algemeen wordt aan-   ;   gebracht in een galory,b.v. by   pylerbouw.   



   Fig.4 is een horizontale projectie van fig.4 gezien vanaf 

 <Desc/Clms Page number 4> 

 
 EMI4.1 
 den onderkant van ''iet dak en op de ,:,lf-3.8 schaal. 



  :e9. .3 S 18 8C:" verticale doorsnede a8l1toon:u.::,s Of ','iel :::; ''j'yze bedoelde dakversterking aangebracht kan worden 0 or" '..::br8 C"". b"- .{j\-rr0' aan o :;m voortschrydend front. De figuren 1'Ct:""'1Jl1 be- tret'kirg op de Engelsche werkwyze 1ILoJ::;:-\lalllf ,maar het daarnede v0:'í:Ll3.G'.e',''i:C 1)C,:¯,-in.Sel geldt evenzoo voor de \78rl:vll'?,n op 'T¯et 11 11 If 11 :":uro)eesc}:e vasteland -Tailles c".assantes of Tailles :.10:1tor..tes'- in '' e' r" i lc. 



  ;>'ig. '7 ifs een )let"te j;rond behoorende by fip.6. 



  3¯ J. 8 en z zyn overeenkomstig  i ;.6 doch geven latere tyd- 8tilen weer van bet werk. 



  Vei--r,7zer,de nosr . 3¯.1 tot en :":1et 5 in de eerste plaats zoozyn de bouten -1- van passende lengte in gaten van bet dak ge-,)1?atst,-,-jelke vooraf op den juisten ouderlingen afstand zyn geboord. De top-einden zyn niet   zichtbaar.Zy   zyn voorzien van   middelen,welke   van-zelf het boveneinde van deze bouten aan den 
 EMI4.2 
 binnenkant van het boorgat stevig aanklemnen,indien de kop -8- aan bet andere einde wordt rondgedraaid.Daardoor wordt bet   ge-   heele anker gespannen. 



     Bedoelde   ankers kunnen aan hun topeinde een   uitzetbaar   schild   dragen,hetgeen   zich door draaien onderaan -8- opent en 
 EMI4.3 
 daardoor het t vastkle,¯:nen veroorzaakt. 



   Een gegolfde steunplaat wordt tegen het dak   aangeschroefd,   rustende op een   vlakke   steunring door de zelfde draoiende bewe- ging van den   kop     -8-. Daardoor   wordt de druk gelyk verdeeld o- 
 EMI4.4 
 ver de golvingen der eerste steunplaat -2-. Twee zadelvorrnig omgebogen staven-4- rusten in de golven van -2- aan   weerszyden   van bout -1-. Deze ronde staven zyn aan hun einden horizontaal omgebogen,waardoor ze een gegolfde   plaat,werkende   als dwarslig- ,ger -5- ondersteunen. Een dergelyke dwarsligger rust dus op de   za.delyzers   van twee opeenvolgende ankers. 
 EMI4.5 
 



  Over deze pgejjol fde dwarslig:;:ers 'Norden l8Dgsli,>:\(;ers vlan het zelfde maaksel geschoven-6-. In fig.5   blyken   deze   drie   
 EMI4.6 
 dwarsliggers -5- te overbruggenhet kan echter ook maar 2 en eveneens meer dan 3   zyn,al   naar zulks gewenscht wordt geacht. 

 <Desc/Clms Page number 5> 

 



   Het is gewenscht, om de langsliggers -6- zoo naby moge- lyk aan de bouten de plaatsen, als zulks door de deelen 2,3 en 4 mogelyk is. Een langsligger,die langs de kool aan den zywand geplaatst wordt, zy ook daaraan zoo dicht mogelyk,waar- by dan een kort stuk van het zelfde maaksel -10- als steun kan dienen.Dit laatste rust dan met een uiteinde in een uithol- ling in de kolenlaag langs het da.kvlak aangebracht.Een en an- der wordt door de figuren 4 en 5   verduidelykt.   



   Een overzicht van het verloop der werkzaamheden zal   thans   beschreven worden voor een geval als het   Britsche   "Long-Wall", welke beschryving uiteraard eveneens geldt v,oor   s'oortgelyke   werkwyzen elders zy het met volledige opvulling,of met geheel weglaten daarvan. De Britsche methode ligt juist daar   tusscha   
Fig,. 6 tot en met 9 geven verschillende standen weer van het koolfront in een tydsverloop van een etmaal,   gedurende,   hetwelk eenreeks verschillende handelingen achtereenvolgens tot uitvoering wordt. gebracht. 



   De bouten worden geplaatst in ryen   evenwydig   aan het koolfront op onderlingen afstand van 4 voet zes   duimHierin   staan de bouten zelf b.v. vyf voet uiteen. Bedoelde ryen zyn achtereenvolgens aangeduid door A, B,C,D, en E. De bouten zyn twee voet zes duim lang.

   Zooals uit   fig.7     blykt,waarin   ter wil- le van de duidelykheid de deelen 2,3 en 4 zyn   weggelaten,zyn   er vier langsliggers -6- tusschen twee opeenvolgende ankers -l- naby het werkfront,doch slechts 2 ervan aan de zyde der opvulling, of de open leeg-gehaalde   ruimte..   Terloops mag op- gemerkt worden,dat uit   fig.7   blykt hoe dwars- en langsliggers door vaste verbinding van korte stukken gegolfde plaat ononder- broken liggers vormen kunnen, die ondersteuning geven over elke   willekeurigen   afstand. 



   De maagdelyke kool is aangeduid door-11- en het kool- front met -12-. De opvulling   (Englsch   "pack") -13- is aange- bracht naarmate de ontginning voortgaat. Zulks geldt natuurlyk ook, wanneer de leeggehaalde ruimte volledig wordt   opgevuld.   



  Een transportband of schudgoot-14- is evenwydig aan het kool- front opgesteld. 

 <Desc/Clms Page number 6> 

 



     Gedurende   den   nachtdienst   wordt een sleuf-15- in de kool gesneden ter hoogte ven den vloer en daar,waar ze nog mochten ontbreken van den vorigen dienst,gaten in het dak ge- 
 EMI6.1 
 boord achter en voor de sleufmach3¯ne.5outen worden geplaatst met toebehooren als hiervoor beschreven. Ook worden de steenen 
 EMI6.2 
 'mallen ( "Packs" ) -13- ter bescherming van de galeryen, verlengi, in geval niet   volledige  opvulling plaats vindt. Fig. 6 en 7 
 EMI6.3 
 geven het beeld weer,dat de werkplaats biedt aan het einde van den nachtdienst. 



   Gedurende den   dag   dienst breken de houwers de   kool   uit en brengen de langsliggers vooruit,waarvan de voor-einden langs, de daklyn van het nieuwe koolfront worden geplaatst in de kool. 



  De eindtoestand van dezen dienst wordt dus   gelyk   fig.8   aangeeft.   



  Het blykt dus,dat liet koolfront over één strook vooruit is ge-   komen     vergeleken   by   fig.6.   



   Het werk van den middagploeg omvat verschillende werk- 
 EMI6.4 
 zaamt.ec1en.In den 3ritschen mynbouw zal dit wezen "stri,)-"ing of the roads", d.i. uitschieten van gesteente uit het dak der "-,9 l e r- .7er,.By den nwnbouw op het veste land zal het zyn het aan-   brengen   van de geheele opvulling. Een nieuwe ry   boor'-aten   langs 
 EMI6.5 
 de nieuwe frontlyn, d.i. ry E,kan gelyktydig en zonder weder-   keerige   stoornis voor het andere werk worden geplaatst,waarna de ankers en   dwarsliggers   evenwydig aan het front aangebracht   worden.Mocht   men met dat boren der gaten niet tydig gereed ko- men,dan kan daarmede tydens den nachtdienst worden voortgegaan, 
 EMI6.6 
 daar dit de sleufwerkzaa.:1lheden niet behoeft te belemmeren. 



  Een verdere handeling zal zyn het verplaatsen van de schudgoot -14- of viel trans90rtband.Kloswibfendie de nacht- dienst behoeft ter plaatsing in de door dezen te snyden sleuf, 
 EMI6.7 
 worden langs -14-op de vereischte afstanden beschikbaar gelegd, De   achterste   ry ankerbouten,dus van   ry   A worden terug gewonnen onder dekking van de achterwaarts uitstekende langsliggers. Het   spreekt   van zelf,dat by volledige opvulling bet terugwinnen de- zer ankers nog met minder moeite kan geschieden. 



   Fig. 9 geeft aan hoe de werkplaats aan het einde van den 

 <Desc/Clms Page number 7> 

 namiddagdienst. 



   Het is duidelyk uit de teekeningen te zien,hoe de arbeiders door de vóóruitstekende langsliggers besch.ermd zullen wezen ty- dens het boren en verder door het geheele web van staal.   Terwyl   ook tydens het herwinnen der versterkende ankers de achteruit- stekende langsliggers bescherming geven. 



   Ofschoon   de .teekening   aangeeft,dat de ankers   gelyke   leng- te hebben, kan het wel wenschelyk geacht worden,om sommige bou- ten langer te maken dan andere.By voorbeeld wanneer de verster- king van meer blyvenden aard is b.v. in galeryen. 



   Ook kan men het aantal langsliggers vergrooten, indien de geaardheid of plaatselyke toestand van het dak daartoe aanlei- ding mocht geven. Ten slotte kan men over de dwarsliggers nog klein rondhout plaatsen,doch by tydig toegepaste versterking zal dit alles niet noodig zyn. 



   Een van de byzondere voordeelen der voorgestelde werkwy- ze is,dat de bouten en andere hulpmiddelen ter versteviging van het dak over de geheele lengte der ankers door gesteente omringd zyn en daardoor behoed worden tegen doorbuigen of knik, zooals   regelmatig   plaats vindt by gebruik van houten stutten,. 



  Deze zyn bovendien onderhevig aan slippen ten gevolge van een- zydige belasting,juist op het oogenblik,dat de grootste stabi- liteit wordt vereischt. Zelfs indien een kleine verplaatsing in'de daklagen plaats vindt, nadat de versterking is aangebracht, op de wyze zooals door de uitvinding verlangd wordt,zullen de ankers de daklagen te zamen houden en daadwerkelyk elken val van gesteente uit het dak voorkomen,, 
Mocht soms hier of daar een bout te kortschieten in span- kracht,dan zal het geheele web van. dwarsliggers en langsliggers, werkende als een aaneengesloten geheel, in staat zyn het betref- fende deel van het dak mede te ondersteunen, doordat de overige bouten hun dienst zullen doen. 



   Een ander   groot   voordeel verbonden aan deze wyze van   on-   dersteuning van het dak is hierin   gelegen,dat   de betreffende mid- delen toegepast kunnen worden onmiddelyk, nadat het mineraal is los- 

 <Desc/Clms Page number 8> 

 gebroken en alvorens het te laden en vervoeren,d.w.z. zoodra een nieuw deel van het dak en een nieuw koolfront zyn bloot- gelegd en alvorens verzakking van het dak kan zyn ingetreden. 



  De afwezigheid van stutten is voorts een groot voordeel, daar hetgeheele werkfront vry van   belemmeringen   is. 



   Een verder voordeel is, dat de dwars- en langsliggers en   steunplaten   steeds in roeden staat kunnen   morden   herwonnen,   terwyl   by gebruik van uitzetbare schilden de geheele verster- kende ankers eveneens teruggewonnen kunnen   worden,terwyl   dan het dak   veroorloofd   wordt om door te zakken op de vulling,of wel in de leege ruimte en zulks op   tydstippen   gewenscht en   geregeld   naar de behoeften der ontginning en op regelmatige wyze. 



   Indien men   'foor   de eerste maal de uitvinding toepassen wil,zal het mogelyk zyn, dat de mynwerker,gewoon   zynde   aan een werkplaats van stutten voorzien, zich onbehaaglyk kan gevoe- len en in gevaar,indien hy een open werkplaats zou betreden. 



  In een   dergelyk   geval kunnen schyn-stutten worden   geplaatst,   nadat de versterking is aangebracht met het web van liggers. 



  Hiermede wordt bedoeld stutten geplaatst onder de ankers,maar zoodanig,dat ze   geheel   geen dienst doen, doch   mocht   de verster- king bezwyken,dan kan het dak zich op die schynstutten zetten-. 



  Een   geval, dat   zich blykens voorgaande uiteenzetting niet zal kunnenvoordoen, doch dergelyke schyn-stutten kunnen als zicht- bare middelen geruststelling geven, welke voorloopig noodig kan zyn. Ma verloop van tyd echter zal de mynwerker bemerken,dat zulke stutten geen dienst doen en dus practisch nuttelóos zyn. 



  Vanaf dat oogenblik, zal hy zelf er afstand van willen doen. 



   Nog een voordeel is, dat de reactie van eenige daling van het dak, wanneer dit is versterkt op de beschreven wyze,niet on- middelyk overgebracht wordt op den vloer,zooals steeds geschiedt door stutten,waardoor plaatselyk druk op den vloer plaats vindt en omgekeerd en zulks op zeer onregelmatige wyze. Deze plaat- selyke en onregelmatige druk heeft een zeer ongunstigen invloed op het verschynsel "convergentie" (Dit is het elkaar benaderen 

 <Desc/Clms Page number 9> 

 van dak en vloer in de galeryen, hetgeen in het byzonder by den 
Britschen steenkolenmynbouw tot uiting   komt.Hierdoor   ontstaan in die mynen de onaangename gevolgen voor het voeren van eene regelmatige ontginning,in bet byzonder waar vlakke lagen zyn. 



   Nog een ander voordeel dezer uitvinding komt naar voren in het geval,dat lagen, die reeds geheel of gedeeltelyk ontspan- nen zyn en zelfs plaatselyke afscheiding tusschen twee opeen- volgende gesteentelagen in het dak. heeft plaats gevonden.In een dusdanig geval   zullen   de versterkende ankers en bykomstige on- derdeelen,die zoowel beide gescheiden lagen,als de   daartusschen   ontstane opening doorkruisen,zich   verzetten   tegen elke verdere- zydelingsche uitbreiding dezer   ruimteen   den toestand bestendi- gen. 



   Eindelyk kan nog het voordeel vermeld worden, dat moch- ten verticale stompen van fossiele boomen in het dak van steen- kolenlagen voorkomen, of   'vlak .   liggende resten daarvan,waarvan de eersten, bekend als   "klokken"   zeer door den mynwerker worden gevreesd,dan   zullen.deze   niet uit een'dusdanig versterkt dak vallen,doch hunne oorspronkelyke plaats behouden, vast in den greep der   zydelingsché   drukkrachten, welke door de versterking geen gelegenheid krygen tot ontspanning. Het kan zelfs voorko- men, dat zonder bezwaar door dergelyke insluitsels geboord   wordt,   indien zulks voor de plaatsing van ankers noodig is.



   <Desc / Clms Page number 1>
 



  "Improvement of or relating to the Da.k in Coal Mines or Other Underground Works".



   This invention relates to the roof in coal mines or other underground works. As is known, the subterranean strata, both those to be mined and those of which the roof consists, are compressed and do not occupy their natural volumes, that is, the space they would fill in relaxed condition. This is due not only to the weight of what it covers in a vertical sense, but such compression also took place horizontally in part due to the contraction of the crust. A cavity created somewhere in such rock layers allows the contained elastic energy to perform work through local relaxation.



   For the safety of those who work underground, it is required to prevent movement in the roof for as long as possible, which must be the result of. removing an amount of mineral. Until now, iaen has always tried to do this by means of

 <Desc / Clms Page number 2>

 struts only, placed against the bottom of the roof, by which the downward pressure is usually transferred to the floor or in some cases some of the mineral deposit, which had not yet been exploited.



   The object of the present invention is to prevent the free relaxation of the compressed earth layers by the use of means which maintain this change in shape present in the layers and thus perpetuate the stressed state in which these layers are present.



   The invention thus encompasses the method of securing a roof in an underground space or workshop, having a layered roof, such as occurs in a coal mine, by reinforcing the respective layers over a certain thickness by means of means which in a tense state, clamping these layers.



   This invention can be carried out in a manner consisting of drilling holes in the roof layers a distance of about 75 centimeters and placing therein bolts clamping the series of pierced layers. The location and spacing of these drill holes will have to be determined in accordance with the regulations applicable to shoring.



   Once the bolts have been placed, it is possible to proceed to the removal of the mineral, which may have already broken loose or spilled out in advance, after which a new cycle of activities can be started and carried out without there being any danger to the worker.



     In the past it was proposed to clad the wall in tunnels, similar underground works intended for the conduction of water to power works, with reinforced concrete and to connect this covering layer to pins of cement mortar, which had been pressed into randomly drilled holes around the cross-section of the tunnel. , after previously placed hacking bolts. The boreholes here were placed regardless of the layering of the rock, and in this case there was no spatter.

 <Desc / Clms Page number 3>

 to prevent free relaxation of rock layers. Therefore, no agents are applied in this method which are effective,

   because they themselves are in a tense state. The issue referred to, therefore, was to properly resist pressure emanating from the tunnel itself.



   By means of the present invention, the instant gestation layers, hetzy tydely, hetzy, can be permanently maintained in a reinforced state, so that relaxation and possibly resulting decomposition of these roof layers is prevented, as well as their ability to diverge from each other along their base layers. Indeed, a successive series of rock layers is joined together to form a thick composite beam, corresponding to a beam of planks fabricated by a carpenter with the help of spykers, bolts, screws or springs, thereby shifting two contiguous layers. - as soon as such a beam deflects as a result of a load, is prevented. However, there is this major difference,

  that the parts of this example - the planks - do not even move the rock layers in a pre-induced stressed state. This is a factor which is of crucial importance to this invention.



   The invention is further illustrated by the accompanying drawings: Fig. 1 is a perpendicular section of a portion of a reinforced roof along line I-I in Fig. 2.



   Fig. 2. is a horizontal section thereof along line II-II in FIG.



   Fig. 3 is a cross-sectional view thereof according to lyn 111-111 in Fig. 2.



   Fig. 4 is a cross-sectional view similar to Fig. 1, but on a smaller scale, showing how the V gain is generally applied; brought into a galory, e.g. by pylerbouw.



   Fig. 4 is a horizontal projection of Fig. 4 as seen from

 <Desc / Clms Page number 4>

 
 EMI4.1
 the underside of the roof and on the lf-3.8 scale.



  : e9. .3 S 18 8C: "vertical section a8l1toon: u. ::, s Or ',' iel :::; '' your intended roof reinforcement can be applied 0 or" '.. :: br8 C "". b "-. {j \ -rr0 'on o:; m progressive front. Figures 1'Ct:" "' 1Jl1 bet'kirg on the English working method 1ILoJ ::;: - \ lalllf, but the following v0 : 'í: Ll3.G'.e', '' i: C 1) C,: ¯, -in.Sel also applies to the \ 78rl: vll '?, n on' T¯et 11 11 If 11: ": uro) eesc}: e mainland -Tailles c" .assantes or Tailles: .10: 1tor..tes'- in '' e 'r "i lc.



  ;> 'ig. '7 ifs a) let "to j; around belonging by fip.6.



  31 J 8 and Z are similar to I. 6 but represent later times of the work.



  Vei - r, 7zer, the nosr. 3¯.1 to: ": 1et 5 in the first place if the bolts -1- of suitable length are drilled into holes in the roof, -, - which have been drilled beforehand at the proper distance. The top ends are not visible. They are provided with means which themselves connect the top end of these bolts.
 EMI4.2
 firmly clamp the inside of the borehole when the head -8- is rotated at the other end. This will tension the entire anchor.



     Said anchors can carry an expandable shield at their top end, which opens by turning at the bottom -8- and
 EMI4.3
 thereby causing it to become stuck.



   A corrugated support plate is screwed to the roof, resting on a flat support ring by the same rotational movement of the head -8-. As a result, the pressure is evenly distributed over
 EMI4.4
 far the undulations of the first supporting plate -2-. Two saddle-shaped bent rods 4- rest in the waves of -2- on either side of bolt -1-. These round bars are bent horizontally at their ends, so that they support a corrugated plate, acting as a cross-beam, ger -5-. Such a sleeper therefore rests on the slashers of two successive anchors.
 EMI4.5
 



  Over this pgejjol fde transverse:;: ers' Norden l8Dgsli,>: \ (; ers vlan the same fabric pushed-6-. In fig.5 these three
 EMI4.6
 to bridge sleepers -5-, however, it can be as little as 2 and also more than 3, as deemed desirable.

 <Desc / Clms Page number 5>

 



   It is desirable to place the longitudinal beams -6- on the bolts as closely as possible, if this is possible through the parts 2, 3 and 4. A longitudinal beam, which is placed along the coal on the side wall, is also as close as possible to it, whereby a short piece of the same fabric can serve as a support. The latter then rests with one end in a hollowed-out. In the coal seam along the surface. One and the other is illustrated by Figures 4 and 5.



   An overview of the course of the activities will now be described for a case such as the British "Long-Wall", which description of course also applies to similar methods elsewhere, with complete filling or with complete omission thereof. The British method lies just there in between
FIG. 6 to 9 show different positions of the coal front in a period of 24 hours, during which a series of different actions are carried out in succession. brought.



   The bolts are placed in rows equal to the carbon front at a mutual distance of 4 feet six inches. This contains the bolts themselves e.g. five feet apart. The said rows are indicated successively by A, B, C, D, and E. The bolts are two feet six inches long.

   As shown in FIG. 7, in which parts 2, 3 and 4 have been omitted for clarity, there are four longitudinal girders -6- between two successive anchors -l- at the working front, but only 2 of them on the side. of the filling, or the open-emptied space .. It may be noted in passing that from fig. 7 shows how cross and longitudinal beams can form continuous beams by fixed connection of short lengths of corrugated plate, which provide support over each arbitrary distance.



   The virgin cabbage is indicated by -11- and the cabbage front by -12-. The fill (English "pack") -13- is applied as the mining continues. Of course, this also applies when the emptied space is completely filled.



  A conveyor belt or shaking chute-14- is disposed equally to the coal front.

 <Desc / Clms Page number 6>

 



     During the night shift, a trench is cut in the coal at the level of the floor and where they might still be missing from the previous shift, holes are made in the roof.
 EMI6.1
 board behind and in front of the slot machine.5bolts are placed with accessories as described above. Also become the stones
 EMI6.2
 "Packs" -13- to protect the galleries, extension, in case incomplete filling takes place. FIG. 6 and 7
 EMI6.3
 represent the picture that the workshop offers at the end of the night shift.



   During the day of service, the hackers break out the coal and advance the stringers, the front ends of which are placed in the coal along the roof of the new coal front.



  The end state of this service is thus indicated in FIG.



  So it appears that the coal front has advanced by one strip compared to Fig. 6.



   The work of the afternoon shift includes various work-
 EMI6.4
 zaamt.ec1en.In 3ritschen mynbouw this being will be "stri,) -" ing of the roads ", ie rock out of the roof of the" -, 9 le r- .7er,. By the new construction on the fortress land will it is the application of the entire filling. A new ry bor'-ate along
 EMI6.5
 the new frontlyn, di ry E, can be placed simultaneously and without recurrent disturbance in front of the other work, after which the anchors and sleepers are placed evenly at the front. If the drilling of the holes is not completed in due time, then can it be continued during the night shift,
 EMI6.6
 as this need not impede the trench work.



  A further action will be the displacement of the shaking chute -14- or the transverse belt. Klosswibfs which need the night shift for placement in the trench to be cut by this,
 EMI6.7
 are laid along -14-at the required distances available. The rear ry anchor bolts, ie from ry A, are recovered under cover of the rearward protruding stringers. It goes without saying that full backfilling means that these anchors can be recovered with even less effort.



   FIG. 9 shows how the workshop is at the end of the den

 <Desc / Clms Page number 7>

 afternoon service.



   It can be clearly seen from the drawings how the workers will be protected by the protruding longitudinal beams during drilling and further through the whole web of steel. Terwyl also provides protection to the protruding stringers during the recovery of the reinforcing anchors.



   Although the drawing indicates that the anchors are of equal length, it may be considered desirable to make some bolts longer than others. For example, when the reinforcement is of a more limited nature, e.g. in galleries.



   The number of longitudinal beams can also be increased if the nature or local condition of the roof should give cause for this. Finally, small round timber can be placed over the sleepers, but all this will not be necessary by means of reinforcement applied regularly.



   One of the special advantages of the proposed method is that the bolts and other aids for strengthening the roof are surrounded by rock along the entire length of the anchors and are thereby protected against bending or kinking, as is often the case with the use of wood. props ,.



  They are moreover susceptible to slipping due to uniform loading, just at the moment when greatest stability is required. Even if a small displacement in the roof layers takes place after the reinforcement has been applied, in the manner required by the invention, the anchors will hold the roof layers together and prevent any actual fall of rock from the roof.
If sometimes here or there a bolt falls short in tension, then the whole web will disappear. sleepers and longitudinal girders, acting as a continuous whole, are able to support the relevant part of the roof, because the other bolts will do their service.



   Another great advantage associated with this method of supporting the roof is that the means in question can be applied immediately after the mineral has been released.

 <Desc / Clms Page number 8>

 broken and before loading and transporting, i.e. as soon as a new part of the roof and a new carbon front have been exposed and before subsidence of the roof can occur.



  The absence of props is also a great advantage, as the entire working front is free from obstacles.



   A further advantage is that the cross and longitudinal girders and support plates can always be regained in rods, while by using expandable shields the entire reinforcing anchors can also be recovered, while the roof is allowed to sag on the roof. filling, or in the empty space and this is desired at times and regularly according to the needs of the exploitation and in a regular manner.



   If one wishes to apply the invention for the first time, it will be possible that the myworker, simply providing props to a workshop, may feel uncomfortable and in danger if he were to enter an open workplace.



  In such a case, beam struts can be placed after the reinforcement has been applied with the web of girders.



  By this is meant struts placed under the anchors, but in such a way that they are of no use at all, but should the reinforcement fail, the roof can set itself on those struts.



  A case which will not arise in the foregoing statement, but such schyn-struts can provide as visible means reassurance, which may be temporarily needed. At the end of time, however, the myworker will find that such props are of no use and are therefore practically useless.



  From that moment on, he himself will want to part with it.



   A further advantage is that the reaction of any lowering of the roof, when enhanced in the manner described, is not immediately transferred to the floor, as is always done by struts, causing local pressure on the floor and vice versa. and this in a very irregular manner. This local and irregular pressure has a very unfavorable influence on the phenomenon of "convergence" (This is the approximation

 <Desc / Clms Page number 9>

 of the roof and floor in the galleries, which is in particular by den
British coal mining is reflected, and this gives rise in those mines to the unpleasant consequences for the conduct of regular mining, especially where there are flat layers.



   Yet another advantage of this invention emerges in the case of layers which are already fully or partially relaxed and even localized separation between two successive rock layers in the roof. In such a case, the reinforcing anchors and accessory parts, which both intersect both separated layers and the gap created between them, will resist any further partial expansion of these spaces and perpetuate the condition.



   Finally, the advantage can be mentioned that vertical stumps of fossil trees may appear in the roof of coal seams, or even. remaining remains thereof, the first of which, known as "bells", are much feared by the mineworker, then they will not fall from such a reinforced roof, but retain their original place, stuck in the grip of the self-compressing forces generated by the reinforcement no opportunity to relax. It may even happen that such inclusions are drilled without objection, if this is necessary for the placement of anchors.

 

Claims (1)

Na aldus in het byzonder den aard en wyze van uitvoering der uitvinding te hebben beschreven,worden de navolgende con- clu,sies getrokken: Conclusies.. Having thus specifically described the nature and method of carrying out the invention, the following conclusions are drawn: Conclusions .. I. Werkwyze ter versterking en beveiliging van een dak in een ondergrondsch werk,zooals b.v. een steenkolenmyn,met het kenmerk,dat een reeks opeenvolgende gesteentelagen vast aan- eengeregen wordt door hulpmiddelen in gespannen toestand. I. Method of strengthening and securing a roof in an underground work, such as e.g. a coal mine, characterized in that a series of consecutive rock layers are strung together by means in a tense state. II. Werkwyze volgens conclusie -I- met het kenmerk, dat bouten geplaatst- worden in gaten daartoe in het dak geboord, waarin zy tegen den wand aan het boveneinde worden vastgeklemd, zoodra zy worden aangeschroefd, terwyl steunplaten,steunringen <Desc/Clms Page number 10> en soortgel-ke hulpmiddelen aangebracht worden,dienende om het dak aan het beneden einde der bouten te steunen. II. Method according to claim 1, characterized in that bolts are placed in holes drilled in the roof for this purpose, in which they are clamped against the wall at the top end, as soon as they are screwed on, terwyl support plates, support rings. <Desc / Clms Page number 10> and similar aids are provided serving to support the roof at the lower end of the bolts. III. Werkwyze volgens conclusie -II- met het kenmerk,datlig- gers aan de bouten worden opgehangen in evenwydige ryen en dat daarover andere liggers dwars worden aangebracht. III. Method according to claim -II- characterized in that girders are suspended from the bolts in evenly spaced rows and that other girders are arranged transversely thereover. IV. Werkwyze volgens conclusie -III- met hetkenmerk,dat liggers van gegolfde plaat en kruiselings daarover aangebrach- te liggers van gegolfde plaat,rustende op de eerste, die voor- zien zyn van middelen,waardoor zy worden ondersteund door bouten,welke in het dak bevestigd zyn. IV. Method according to claim III, characterized in that corrugated sheet girders and corrugated sheet girders disposed crosswise thereon, resting on the former, are provided with means supporting them by bolts fixed in the roof. his. V. Werkwyze volgens conclusie-IV- met het kenmerk,datsom- mige bouten langer zyn dan de overigen. Method according to claim IV, characterized in that some of the bolts are longer than the others. VI. Werkwyze volgens conclusies-IV & V- met bet kenmerk, dat elke bout een steunplaat draagt met golvingen,waarin twee zadel-hoekyzers rusten aan elke zyde van de bout,wier golvin- gen de gegolfde liggers in hunne eigen golvingen ondersteunen. VI. Method according to claims IV & V- characterized in that each bolt carries a support plate with corrugations in which two saddle angles rest on each side of the bolt, whose corrugations support the corrugated beams in their own corrugations. VII. Werkwyze volgens conclusie - III- met het kenmerk,dat het geheele stelsel van versterking van het dak zich in voor- waartsche richting beweegt in verband met den voortgang van het werkfront, en de onderdeelen van het stelsel aan het achtereinde geleidelyk worden weg-genomen en voor verder gebruik bestemd. VII. Method according to claim III, characterized in that the whole system of reinforcement of the roof moves in a forward direction in relation to the progress of the working front, and the parts of the system at the rear end are gradually removed and intended for further use. VIII. Werkwyze volgens bovenstaande conclusies, waarvan de kenmerken in de teekeningen 1 Tot en met 5 en 6 tot en met 9 metbetrekking tot steenkolenmynbouw zyn uitgebeeld. den 28-on November, 1944. VIII. Method according to the above claims, the features of which are depicted in the drawings 1 to 5 and 6 to 9 relating to coal mining. November 28th, 1944.
BE463527A 1941-12-16 1944-11-20 Improvement of or relating to the roof in coal mines or other underground works BE463527A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB16235/41A GB554077A (en) 1941-12-16 1941-12-16 Improvements in or relating to the roofs of colliery or other workings

Publications (1)

Publication Number Publication Date
BE463527A true BE463527A (en) 1946-06-29

Family

ID=40150636

Family Applications (1)

Application Number Title Priority Date Filing Date
BE463527A BE463527A (en) 1941-12-16 1944-11-20 Improvement of or relating to the roof in coal mines or other underground works

Country Status (4)

Country Link
US (1) US2398130A (en)
BE (1) BE463527A (en)
FR (1) FR944001A (en)
GB (1) GB554077A (en)

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2442113A (en) * 1945-05-25 1948-05-25 Beijl Zako Sytse Tunnelling and like subterranean operations
DE1025365B (en) * 1952-04-10 1958-03-06 Bochumer Eisen Heintzmann Anchor support
US2771746A (en) * 1952-05-05 1956-11-27 Fischer August Anchor structure for mines, tunnels and the like
US2748594A (en) * 1952-11-04 1956-06-05 Lukens Steel Co Roof bolt
US2729065A (en) * 1953-06-26 1956-01-03 Jack R Kennedy Adjustable prefabricated metal overcast
DE924624C (en) * 1953-08-12 1955-03-07 Consolidation Bergbau Ag Borehole anchor designed as a tie rod for pit lining
DE1008233B (en) * 1954-09-09 1957-05-16 Bergbaustahl G M B H Anchor support
DE1115206B (en) * 1956-02-27 1961-10-19 Bergbaustahl G M B H Anchor support
US3163012A (en) * 1961-01-18 1964-12-29 Joseph B Dempscy Mine roof bolt installation
US3427811A (en) * 1967-03-22 1969-02-18 Claude C White Mine roof support system
US4091628A (en) * 1976-09-27 1978-05-30 Jay Hilary Kelley Prestressed elastic arched mine roof support
ZA838486B (en) * 1982-11-16 1984-06-27 Tucker Michael C A method and apparatus for reinforcing and consolidating earth structures
US5222837A (en) * 1991-12-19 1993-06-29 Phillips Connie L Mine roof channel clamp
US5385433A (en) * 1993-05-14 1995-01-31 Jennmar Corporation Bearing plate
US5292209A (en) * 1993-05-14 1994-03-08 Jennmar Corporation Bearing plate
CN110486069B (en) * 2019-09-10 2020-11-03 华北科技学院 Large-mining-height coal wall caving control structure based on flexible reinforcement and construction equipment

Also Published As

Publication number Publication date
FR944001A (en) 1949-03-24
GB554077A (en) 1943-06-18
US2398130A (en) 1946-04-09

Similar Documents

Publication Publication Date Title
BE463527A (en) Improvement of or relating to the roof in coal mines or other underground works
Fookes et al. Stabilization and control of local rock falls and degrading rock slopes
Malan et al. Rockburst support in shallow-dipping tabular stopes at great depth
EA027129B1 (en) Undercut excavation method with continuous concrete floors
RU2125652C1 (en) Method of extracting operations
US2388624A (en) Cantilever retaining wall structure and method of making the same
RU2172837C2 (en) Method of protection of in-bed mine workings
RU2055211C1 (en) Combined timbering for excavating drifts
SU400704A1 (en) COMBINED SYSTEM FOR THE DEVELOPMENT OF POWERFUL RIGHT STRAAMS
Chopra et al. Case Studies of Railway Tunnelling on Udhampur—Katra Section
SU58469A1 (en) Device to protect people working in the face from the dam rock
SU989083A1 (en) Method of driving large-section workings
RU2068962C1 (en) Method for vibration-borehole effect on rock to decrease the danger of release
SU1146459A1 (en) Method of supporting mine workings in thick horizontal seams capable of rock bursts
SU1004640A1 (en) Method of erecting man-made pillar when working sloping ore bodies and rod for erecting man-made pillar
RU2086765C1 (en) Method of preparing to mining flat-lying coal seam
SU621879A1 (en) Method of excavating orebodies
RU1774020C (en) Method of erecting underground large-section facility
SU1145149A1 (en) Method of supporting a longwall in areas of unsafe roof strata of rock
Latilla et al. Shortwall Facebreak Beneath a Dolerite Sill-Learning Points From a Recent Event At Matla Coal Mine
SU920221A1 (en) Filling-in partition for high-ceiling mine workings
RU2190100C2 (en) Blast-proof stopping
SU756046A1 (en) Partition for shuttering flowing filling massif
Margottini Recovery of the Buddha's niches and cliff in Bamiyan (Central Afghanistan) after the Taliban destruction of 2001
UA124652U (en) A METHOD OF PROVIDING THE SUSTAINABILITY OF LINK PRODUCTS USED AGAIN