Restoration and reinforcement of earth-retaining constructions Download PDF

Info

Publication number
BE1010514A4
BE1010514A4 BE9201112A BE9201112A BE1010514A4 BE 1010514 A4 BE1010514 A4 BE 1010514A4 BE 9201112 A BE9201112 A BE 9201112A BE 9201112 A BE9201112 A BE 9201112A BE 1010514 A4 BE1010514 A4 BE 1010514A4
Authority
BE
Belgium
Prior art keywords
earth
retaining
retaining wall
restoration
reinforcement
Prior art date
Application number
BE9201112A
Other languages
Dutch (nl)
Original Assignee
Herbosch Kiere N V
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Herbosch Kiere N V filed Critical Herbosch Kiere N V
Priority to BE9201112A priority Critical patent/BE1010514A4/en
Application granted granted Critical
Publication of BE1010514A4 publication Critical patent/BE1010514A4/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D37/00Repair of damaged foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/06Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
    • E02B3/066Quays

Abstract

The invention described here is intended for the restoration and reinforcement of existing earth-retaining constructions, in such a way that they can meet new and perhaps increased load requirements. The earth-retaining constructions may be either above the surface or under water. In order to meet increased load requirements, new supporting points are made for the existing earth-retaining wall in the ground. A system of jacks is used to apply a "pre-tensioning" force between the new supporting points and the earth-retaining wall. By selecting the level of force applied, the movements of the retaining wall can also be checked, so that areas of settling can be avoided. Construction elements for the retaining wall can also be added, so that the density of the ground can be maintained. All these items of work can be carried out without dismantling and/or interrupting the existing earth-retaining construction.

Description

       

  RESTAURATIE EN VERSTERKING VAN

GRONDKERENDE CONSTRUCTIES

  
 <EMI ID=1.1> 

  
De uitvinding heeft tot doel bestaande grondkerende constructies zodanig te restaureren en te versterken dat ze niet enkel hun functie waarvoor ze origineel ontworpen waren kunnen uitvoeren, maar dat eveneens aan grotere belastings-

  
eisen kan voldaan worden. De grotere belastingseisen kunnen bijvoorbeeld zijn : een grotere hoogte van de grondkering, een grotere bovenbelasting, grotere horizontale krachten en dergelijke. Deze opsomming van voorbeelden is niet limitatief. De bestaande grondkerende constructies kunnen zowel

  
boven als onder water zijn, bijvoorbeeld keermuren langs wegen of kaaimuren. De bestaande grondkeringen kunnen uit staal of beton zijn gebouwd. De uitvinding bestaat uit het aanbrengen van elementen voor de bestaande grondkerende constructie, zodat de versterkte grondkering voldoet aan de

  
nieuw gestelde belastingseisen. Vóór de bestaande grondkering wordert nieuwe steunpunten in de grond gebracht. Tussen de bestaande constructie en deze steunpunten wordt een vijzelsysteem aangebracht, welke een kracht tussen deze beide introduceert. Deze kracht, "voorspankracht", is

  
dermate bepaald, dat t.g.v. de nieuwe belastingen en/of gewijzigde randvoorwaarden, de grondkerende constructie de nodige weerstand kan bieden. 

  
Kenmerken van de uitvinding

  
De toepassing van deze uitvinding kan volledig gerealiseerd worden zonder afbraak of buiten dienst stellen van de bestaande grondkerende constructie. De uitvinding laat uitbreiding toe overeenkomstig de specifieke eisen en

  
karakteristieken van de grondkerende constructie. Zo kan een gronddicht bouwelement vóór de bestaande grondkering worden geplaatst, zodat eveneens de gronddichtheid van de constructie wordt gewaarborgd. Deze gronddichte bouwelementen worden eveneens met het voorspansysteem in de gehele

  
grondkering gefixeerd. De specifieke karakteristieken en onderdelen van de uitvinding zijn :

  
Aanbrengen van een steunpunt in de ondergrond Introductie van een voorspankracht

  
Gronddicht prefabelement in functie van de toestand van de bestaande kaaimuur. 

  
Toepassingen en voorbeelden Figuren 1 & 2

  
Toepassing van de uitvinding bi j een kaaimuur (1) waar, door natuurlijke erosie, de bodem van de rivier geleidelijk is verlaagd, met instabiliteit van de kaaimuur op lange

  
termijn als direct gevolg. Voor de kaaimuur worden profielen (2) geheid met ertussen damplanken (3). Voor de teen van de kaaimuur wordt een betonbalk (4) gegoten. Tussen de profielen en de betonbalk worden de vijzels (5) geplaatst. Met de vijzels wordt de voorspankracht geïntroduceerd,

  
zodat in de toekomst de bewegingen van de kaaimuur gecontroleerd blijven.

  
Fi guren 3 & 4

  
Toepassing van de uitvinding waar een kaaimuur verdiept werd om grotere schepen toe te laten. Voor de bestaande kaaimuur

  
(6) wordt een verticale wand geheid die bestaat uit buispalen (7) e&#65533; damplanken (8). Tussen de geheide wand en de kaaimuur wordt een betonbalk (9) aangebracht met vijzels

  
(10). Met de vijzels wordt een voorspankracht geïntroduceerd die overeenkomt met de extra reactiekracht die aan de

  
teen van de kaaimuur zou ontstaan bij het verdiepen van het dok. Bij het eigenlijke verdiepen zullen dan geen bewegingen meer optreden. 

  
Figuur 5

  
Voorbeeld van een toepassing bij een keermuur naast een ri jweg. De ri jweg (11) wordt verlaagd of achter de keerwand komt een extra bovenbelasting (12). Aan de teen van de keermuur worden profielen (13) in de grond geheid. Tussen

  
de keerwand en de profielen wordt een betonbalk (14) met vijzels (15) geplaatst. Bij bepaalde toepassingen is buiten het stabiliteitsprobleem van de bestaande grondkering eveneens een probleem van gronddichtheid aanwezig. In deze situatie blijft het basisidee van de uitvinding van toepassing, mits gebruik van bijkomende gronddichte bouwelementen.

  
Figuur 6

  
Toepassing bij een kaaimuur bestaande uit beton damplanken

  
(16). De nieuwe belasting ontstaat ten gevolge van de verdieping van het dok en grotere bovenbelasting op het

  
kaaiplateau. Bijkomend wordt de gronddichtheid van de voegen tussen de damplanken hersteld. De nieuwe steunpunten bestaan uit staalprofielen (17) die in de bodem geheid

  
 <EMI ID=2.1> 

  
lementen (18) voor de muur geplaatst. Tussen de profielen

  
en de prefabelementen bevindt zich het vijzelsysteem (19) dat de voorspankracht introduceert. Met de vijzels wordt, voor de verdieping wordt verwezenlijkt, een voorspankracht gegeven die overeenkomt met de extra kracht die op de steunpunten zal komen bij de verdieping. Bij het verdiepen

  
zelf treden bijgevolg geen bewegingen op in de oude kaaimuur. 

  
Figuur 7 & 8

  
Voorbeeld van een toepassing waar de algemene stabiliteit niet meer voldoende was door de overgang van een constant waterpeil op niveau + 4,70 m naar een tijafhankelijk niveau tussen - 1 m en + 5 m. De kaaimuur bestaat uit betonnen

  
damplanken (20) met een betonkesp (21). Voor de kaaimuur worden de betonelementen (22) geplaatst, en stalen profielen

  
(23) in de bodem geheid. Tussen beide worden de vijzels

  
(24) geplaatst en wordt de voorspankracht geïntroduceerd.



  RESTORATION AND REINFORCEMENT OF

GROUNDING CONSTRUCTIONS

  
 <EMI ID = 1.1>

  
The object of the invention is to restore and strengthen existing earth-retaining structures in such a way that they can perform not only their function for which they were originally designed, but also that they can withstand greater load

  
requirements can be met. The greater load requirements can be, for example: a greater height of the earth deflector, a larger top load, greater horizontal forces and the like. This list of examples is not exhaustive. The existing earth retaining structures can both

  
above and under water, for example retaining walls along roads or quay walls. The existing earth barriers can be built from steel or concrete. The invention consists of arranging elements for the existing earth retaining structure, so that the reinforced earth retaining structure meets the

  
newly imposed tax requirements. New supports will be placed in the ground before the existing earth barrier. A jacking system is installed between the existing construction and these supports, which introduces a force between them. This force, "biasing force", is

  
so determined that, due to the new loads and / or changed boundary conditions, the earth-retaining structure can offer the necessary resistance.

  
Features of the invention

  
The application of this invention can be fully realized without demolition or decommissioning of the existing earth retaining structure. The invention allows extension according to the specific requirements and

  
characteristics of the earth retaining structure. For example, a soil-tight building element can be placed in front of the existing earth-retaining structure, so that the soil density of the construction is also guaranteed. These soil-tight building elements are also used with the prestressing system throughout

  
ground barrier fixed. The specific features and parts of the invention are:

  
Installation of a support point in the substrate Introduction of a pre-tensioning force

  
Pre-waterproofing precast element depending on the condition of the existing quay wall.

  
Applications and examples Figures 1 & 2

  
Application of the invention at a quay wall (1) where, due to natural erosion, the bottom of the river has gradually been lowered, with instability of the quay wall at long

  
term as a direct consequence. For the quay wall, profiles (2) are driven with sheet piles (3) in between. A concrete beam (4) is cast in front of the toe of the quay wall. The jacks (5) are placed between the profiles and the concrete beam. The preload force is introduced with the jacks,

  
so that the movements of the quay wall remain controlled in the future.

  
Figures 3 & 4

  
Application of the invention where a quay wall was deepened to allow larger ships. For the existing quay wall

  
(6) a vertical wall is made up consisting of tube piles (7) e &#65533; sheet piles (8). A concrete beam (9) is installed with jacks between the dividing wall and the quay wall

  
(10). A preload force is introduced with the augers, which corresponds to the additional reaction force applied to the

  
toe of the quay wall would arise when deepening the dock. No movements will then occur during the actual deepening.

  
Figure 5

  
Example of an application at a retaining wall next to a road. The road (11) is lowered or an additional top load (12) is installed behind the retaining wall. Profiles (13) are driven into the ground at the toe of the retaining wall. Between

  
a concrete beam (14) with jacks (15) is placed on the retaining wall and the profiles. In certain applications, in addition to the stability problem of the existing earth barrier, a problem of soil density is also present. In this situation, the basic idea of the invention remains applicable, provided that additional soil-tight building elements are used.

  
Figure 6

  
Application for a quay wall consisting of concrete sheet piles

  
(16). The new load arises due to the deepening of the dock and greater top load on it

  
quay platform. In addition, the soil density of the joints between the sheet piles is restored. The new supports consist of steel profiles (17) that are driven into the ground

  
 <EMI ID = 2.1>

  
elements (18) placed in front of the wall. Between the profiles

  
and the precast elements are the jacking system (19) which introduces the prestressing force. Before the depression is realized, the augers provide a pre-tensioning force corresponding to the extra force that will come on the supports at the depression. When deepening

  
consequently, no movements occur in the old quay wall.

  
Figures 7 & 8

  
Example of an application where the general stability was no longer sufficient due to the transition from a constant water level at level + 4.70 m to a tide-dependent level between - 1 m and + 5 m. The quay wall consists of concrete

  
sheet piles (20) with a concrete buckle (21). The concrete elements (22) and steel profiles are placed in front of the quay wall

  
(23) driven into the soil. The mortars are placed between the two

  
(24) and the pretensioning force is introduced.


    

Claims (1)

Conclusie Conclusion De hier beschreven techniek voor restauratie en versterking van grondkerende constructies heeft als voordeel dat aan een bestaande constructie nieuwe belastingseisen kunnen opgelegd worden, zonder dat de grondkering afgebroken dient te worden The technique described here for the restoration and reinforcement of earth-retaining structures has the advantage that new load requirements can be imposed on an existing construction, without having to demolish the earth-retaining structure. of uit gebruik genomen wordt. Mede door het introduceren van de voorspankracht wordt het zettingsgedrag gecontroleerd, zodat gebouwen en andere constructies op de grondkeringen gevrijwaard worden van zettingsschade. Hierdoor ontstaat een economisch alternatief voor het blijven or taken out of use. Partly by introducing the pre-tensioning force, the settlement behavior is controlled, so that buildings and other structures on the ground defenses are protected from settlement damage. This creates an economic alternative to staying gebruiken van de bestaande constructie, i.p.v. afbraak en volledige nieuwbouw. use of the existing construction, instead of demolition and complete new construction.
BE9201112A 1992-12-18 1992-12-18 Restoration and reinforcement of earth-retaining constructions BE1010514A4 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
BE9201112A BE1010514A4 (en) 1992-12-18 1992-12-18 Restoration and reinforcement of earth-retaining constructions

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
BE9201112A BE1010514A4 (en) 1992-12-18 1992-12-18 Restoration and reinforcement of earth-retaining constructions

Publications (1)

Publication Number Publication Date
BE1010514A4 true BE1010514A4 (en) 1998-10-06

Family

ID=3886594

Family Applications (1)

Application Number Title Priority Date Filing Date
BE9201112A BE1010514A4 (en) 1992-12-18 1992-12-18 Restoration and reinforcement of earth-retaining constructions

Country Status (1)

Country Link
BE (1) BE1010514A4 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2969672A1 (en) * 2010-12-24 2012-06-29 Soletanche Freyssinet Method for enhancing resistance of foundation structure of pylon monopode, involves filling volume of trench with material including hydraulic binder to form wall adjacent to foundation structure
CN106854864A (en) * 2015-12-09 2017-06-16 山东港通工程管理咨询有限公司 Port engineering platoon formula prestressed reinforced concrete Big Pipe Pile new construction
EP4098802A1 (en) * 2021-05-25 2022-12-07 Technische Universität Hamburg Geotechnical method and geotechnical arrangement

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60119827A (en) * 1983-11-30 1985-06-27 Natl House Ind Co Ltd Adjustment of height of foundation
GB2219021A (en) * 1988-04-27 1989-11-29 Guardian Piling & Foundations Underpinning of a wall

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60119827A (en) * 1983-11-30 1985-06-27 Natl House Ind Co Ltd Adjustment of height of foundation
GB2219021A (en) * 1988-04-27 1989-11-29 Guardian Piling & Foundations Underpinning of a wall

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
"oude molen rechtgezet met vijzeltechnik", BOUWWERELD, vol. 80, no. 23, 16 November 1984 (1984-11-16), DOETINCHEM,NL, pages 46 - 47, XP002047844 *
DAHLBOKUM: "Verwendung von Großbohrphalen im Wasser- und Hafenbau", BAUMASCHINE UND BAUTECHNIK, vol. 18, no. 6, June 1971 (1971-06-01), XP002047843 *
PATENT ABSTRACTS OF JAPAN vol. 9, no. 275 (M - 426)<1998> 2 November 1985 (1985-11-02) *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2969672A1 (en) * 2010-12-24 2012-06-29 Soletanche Freyssinet Method for enhancing resistance of foundation structure of pylon monopode, involves filling volume of trench with material including hydraulic binder to form wall adjacent to foundation structure
CN106854864A (en) * 2015-12-09 2017-06-16 山东港通工程管理咨询有限公司 Port engineering platoon formula prestressed reinforced concrete Big Pipe Pile new construction
EP4098802A1 (en) * 2021-05-25 2022-12-07 Technische Universität Hamburg Geotechnical method and geotechnical arrangement

Similar Documents

Publication Publication Date Title
US5471811A (en) Combination traffic barrier and retaining wall and method of construction
CN105002835B (en) Underpinning method for lower bridge of open-cut tunnel
CN1177048A (en) Controlled construction method and apparatus for rectifying inclined building
BE1010514A4 (en) Restoration and reinforcement of earth-retaining constructions
FR2746824A1 (en) Bridge roadway caisson
Aikawa et al. Shatin to Central Link cross-harbour railway tunnel in Hong Kong
Berrill et al. Edgecumbe earthquake: reconnaissance report
EP1061177B1 (en) Cantilevered structure for the protection of a communication route
CN212026286U (en) Retaining structure of anti-slide pile and structural pile
CN111074916A (en) Retaining structure of anti-slide pile and structural pile and construction method
Marchand A DEEP BASEMENT IN ALDERSGATE STREET, LONDON. PART 1: CONTRACTOR'S DESIGN AND PLANNING.
Zumrawi et al. Mechanically Stabilized Earth with Steel Reinforcement
EP0514559A1 (en) Transfer of building load via a steelmember, to the ground, by use of a special ramhead
Krebs et al. Foundations for housing on reclaimed mined lands
Hubík et al. Stepped Reinforced Soil Retaining Walls at Railway Corridor Rokycany–Plzeň
RU2013554C1 (en) Sinking structure and method for erection thereof
RU2056478C1 (en) Method for reinforcing bases and foundations on sagging ground in hindered conditions
Okechukwu et al. Reinforced Earth: Principles and Applications in Engineering Construction
Peraza Preventing and dealing with building damage due to underpinning
RU2122091C1 (en) Method of correcting the leaning long walls
WALL 2 DESIGN OF ROADSIDE BARRIER SYSTEMS
RU2045627C1 (en) Wall of underground structure
Gumelar et al. SUGGESTED GUIDELINES FOR DESIGN AND CONSTRUCTION OF SHORT—SPAN BRIDGE ABUTMENTS WITH REINFORCED EARTH SYSTEM
SU1717693A1 (en) Reinforced beam bridge
Duncan et al. Walls—Construction Details

Legal Events

Date Code Title Description
RE Patent lapsed

Owner name: *HERBOSCH-KIERE N.V.

Effective date: 20021231