AU783350B2 - Strip velocity measurement in rolling mills - Google Patents

Strip velocity measurement in rolling mills Download PDF

Info

Publication number
AU783350B2
AU783350B2 AU21276/01A AU2127601A AU783350B2 AU 783350 B2 AU783350 B2 AU 783350B2 AU 21276/01 A AU21276/01 A AU 21276/01A AU 2127601 A AU2127601 A AU 2127601A AU 783350 B2 AU783350 B2 AU 783350B2
Authority
AU
Australia
Prior art keywords
strip
velocities
uncoiler
estimating
coiler
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
AU21276/01A
Other versions
AU2127601A (en
Inventor
William John Edwards
Minyue Fu
Graham Goodwin
Glen Wallace
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Newcastle Innovation Ltd
Original Assignee
Newcastle Innovation Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from AUPQ4531A external-priority patent/AUPQ453199A0/en
Application filed by Newcastle Innovation Ltd filed Critical Newcastle Innovation Ltd
Priority to AU21276/01A priority Critical patent/AU783350B2/en
Publication of AU2127601A publication Critical patent/AU2127601A/en
Application granted granted Critical
Publication of AU783350B2 publication Critical patent/AU783350B2/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Landscapes

  • Control Of Metal Rolling (AREA)

Description

-1- TITLE: STRIP VELOCITY MEASUREMENT IN ROLLING MILLS FIELD OF THE INVENTION This invention relates to a technique for high precision estimation of strip velocities for rolling mills.
BACKGROUND OF THE INVENTION Any discussion of the prior art throughout the specification should in no way be considered as an admission that such prior art is widely known or forms part of common general knowledge in the field.
A typical rolling mill consists of an uncoiler, one or more mill stands and a coiler. Each mill stand typically has four or more rolls, the inner pair of work rolls reduce the metal strip which passes between them, and the larger diameter backup rolls support the work rolls. Large forces are applied to the rolls so that the thickness of the metal strip is reduced as it passes between the work rolls. The exit thickness is controlled by adjusting the forces applied to, and speed of, the work rolls.
An important problem in rolling mill control is to achieve highly uniform exit thickness while maintaining highly uniform strip tension. However, direct measurement of exit thickness is often made downstream from the work rolls. This measurement is known to be unsuitable for wide-bandwidth control due to inherent transport time delay associated with the physical location of the measurement. Thus, this measurement is typically used for low-bandwidth trim control.
An early technique for overcoming the delay associated with the direct measurement of exit thickness was to combine instantaneous force and position measurements from the work rolls together with a simple spring model for the mill. This led to the so-called "BISRA" gauge for thickness estimation [UK Patent 713,105]. It was discovered later on that the eccentricity of the rolls has significant affects on the accuracy of the estimation. This led to substantial follow-up research aimed at developing an eccentricity-compensated BISRA gauge, such as that described in U.S.
Patent No. 5,691,547.
More recently, an alternative approach to exit thickness estimation has been proposed based on mass-flow balance across the roll gap. More precisely, the product of velocity and thickness of the strip remains constant when it passes through the roll gap -2assuming that the width and density of the strip does not change. This implies that the exit thickness can be estimated using the upstream thickness and velocity, and downstream velocity, if they can be measured or estimated accurately. In some schemes for tandem (multiple stand) mills, it is only necessary to measure the entry strip velocity.
Typical techniques for measuring velocities are pulse-counters mounted to strip contact wheels, or laser-doppler instruments which are very expensive. Strip contact wheels suffer from operational difficulties due to high levels of vibration, coolant flows on the strip, water vapour and surface modulations due to poor flatness.
It is an object of the present invention to overcome or ameliorate at least one of the disadvantages of the prior art, or to provide a useful alternative.
SUMMARY OF THE INVENTION The present invention therefore provides a method of estimating the input and exit strip velocities at the roll gap in a rolling mill of the type having an uncoiler reel, a coiler reel and at least one pair of work rolls positioned therebetween, said method comprising the steps of: measuring the angular velocities of the uncoiler and coiler reels; estimating the initial radii of the uncoiler and coiler reels; and applying the measured and estimated values obtained to calculate estimated velocities of the strip before and after the roll gap.
Unless the context clearly requires otherwise, throughout the description and the claims, the words 'comprise', 'comprising', and the like are to be construed in an inclusive sense as opposed to an exclusive or exhaustive sense; that is to say, in the sense of "including, but not limited to".
WO 01/41947 PCT/AU00/01525 -3- Preferably the radii of the uncoiler and coiler reels are estimated by mathematically modeling the reels taking into account eccentricity effects and inter-wrap gaps.
Preferably the model includes a procedure to estimate initial coil radii using measurements of the surface velocity of the work rolls and an estimate of the slip ratio at the work rolls.
Preferably the estimation of the reel models is formulated as a non-linear least squares problem.
Preferably the said problem is solved using a relaxation algorithm, giving an estimate of uncoiler and coiler radii.
Preferably the method includes adaptive implementation of the relaxation algorithm.
The invention further comprises a method of estimating the exit thickness of strip in a rolling mill by estimating input and exit strip velocities using the method described above, and applying the estimated velocities in a mass flow balance equation.
BRIEF DESCRIPTION OF THE DRAWINGS Notwithstanding any other forms that may fall within its scope, one preferred form of the invention will now be described by way of example only with reference to the accompanying drawing which is a diagrammatic elevation of a strip mill incorporating coiler and uncoiler reels and a pair of work rolls.
DESCRIPTION OF THE PREFERRED EMBODIMENTS The preferred form of the invention will be described with reference to a simplified rolling mill having an uncoiler reel 1, a coiler reel 2 and a single pair of work rolls 3 positioned between the coiler and uncoiler reels. It will be appreciated, however, that the method is equally applicable to more complex rolling mills having additional rolls and WO 01/41947 PCT/AU00/01525 -4multiple stands, and that the metal strip 4 can be moved in the opposite direction by reversing the roles of the coiler and uncoiler reels and reversing the drive on the work rolls 3.
The basis for the soft-sensing technique in the present invention is a simple relationship between the input strip velocity V and the angular velocity f and radius R of the uncoiler: V R A similar relationship holds for the coiler as follows: v wr where v is the exit strip velocity, w and r are the angular velocity and radius of the coiler, respectively.
Straightforward sensitivity analysis shows that the relative error in strip velocity is equal to the sum of the relative error in reel angular velocity and reel radius. Therefore, a desired accuracy of strip velocity estimation requires higher accuracy in the measurement or estimation of angular velocity and radius. High precision measurements for the angular velocity can be obtained using, for example, standard pulse counting devices. However, accurate measurement for the reel radius is not readily available. To overcome this difficulty, a simple model for the reel radius is used. Express the instantaneous uncoiler radius R(t) as R(t) R(t Rb(t) where the term R a above contains two components: a fixed mandrel radius and a component describing the change of radius due to the reel rotation. That is: 10()) R. dr 2« ;r WO 01/41947 PCT/AU00/01525 where rt represents the initial time, t represent the current time, K represents the thickness of each layer which includes the strip thickness and inter-wrap gap. The second term R, in the reel radius model is used to capture eccentricity effects due to mandrel and other factors. This term is approximated using Fourier components as follows: Rb C cos(ie(t)) S, sin(i(t)) where O(t) is the reel angle, m is the number of harmonics significant to the modeling of eccentricity effects, and C, and S, are Fourier coefficients representing the eccentricity effects.
A key observation is that the reel radius in linearly parameterised in terms of the following parameter vector K, C, S,] Similarly, the model for the coiler is given by r(t) r, r, (t) with k ,2 r and r c cos(iO(t)) s sin(i0(t)) i.
The reel radius is linearly parameterised in terms of the following parameter vector c,s Using the above radius models, the prime issue in the strip velocity problem reduces to estimation of the parameter vectors F and y.
WO 01/41947 PCT/AU00/01525 -6- The key to the estimation of these parameters is the mass flow balance at the roll gap. More precisely, the relationship between the input thickness H. the input velocity V, the exit thickness h, and the exit velocity v at the roll gap is given by H(t) V(t) h(t)v(t) Since the thickness measurements are not taken at the roll gap, transport delays need to be taken into account. Due to this, the mass flow balance equation becomes H,(t V(t) h,(t where H, and hm are the measured input thickness and exit thickness, respectively, whereas D(t) and d(t) denote the transport delay from input measuring point to the roll gap and that from the roll gap to the exit measuring point, respectively.
Using the above mass balance equation and the models for reel radii, an entry to exit mass balance error is obtained as follows e(t) Hm(t ft)(R(t) Rb()) -hm(t rb(t)) The radius estimates are linear in the parameter vectors. The following optimisation criterion can be used to estimate the parameter vectors r and y.
min 1 le(r) 11 dr where T represents the window duration for minimisation.
Despite that the error function appears linear in the parameters, the optimisation above is non-linear because the transport delays depend on the strip velocities which in turn depend on the parameter vectors. The present invention uses a relaxation algorithm to solve the optimisation problem. This is to be detailed below.
Step 1: Initialisation of the Reel Radii WO 01/41947 PCT/AU00/01525 -7- The initial reel radii are estimated by ignoring any eccentricity effects, inter-wrap gaps and transport delays between thickness measurements and the roll gap. To aid the estimation of the initial radius of the coiler, we assume that the surface velocity Vi) of the work rolls are measured and that an estimate of average slip ratio s is also available. Using and s, a rough estimate of the exit velocity is given by V/t)(1 The initial radius of the coiler is calculated by solving minf o where r(t o f r)h dr 2jr Once the initial radius of the coiler is estimated, the initial radius of the uncoiler radius can be estimated by balancing the input mass flow and exit mass flow over the time window from t o to t. This is, R(to) can be obtained by solving min f -r(r)o(r)h)dr where i (t)is given as above and I/ f( r
)H
R(t) R(to)- r) dr 2;r Step 2: Initialisation of the transport delays.
The initial estimate for the exit transport delay is calculated using the measurement of the surface velocity of the work rolls, estimate of the average slip ratio and 1, the distance between the roll gap and exit thickness measurement, given by d(to) average{V, (1 s)} The initial estimate for the input transport delay is given by WO 01/41947 PCT/AU00/01525 -8-
L
average{V, (1 H where L is the distance from the input measuring point to the roll gap.
Step 3: Estimation of the eccentricity parameters.
Using the initial estimates of the reel radii, the eccentricity parameters can be estimated by minimising the error function e(t) over the time window from t- T to t. This is done using a standard least-squares method.
Step 4: Estimation of strip velocities.
This is done using the radius models and the measured angular velocities of the reels.
Step 5: Re-estimation of transport delays.
This is done by solving L V(r)dr and I f4d(tv(r)dr Step 6: Recursion.
Repeat Steps 3-5 until the results for strip velocities converge. It is anticipated that only one repetition will be sufficient.
During the operation of the mill, the eccentricity effects, inter-wrap gaps, temperature, elasticity of the metal strip and many other factors may fluctuate, the reel models need to be frequently adjusted. If the required measurements are sampled using a common sampling frequency, it is preferred that the reel models are adjusted at each sampling point. That is, the aforementioned relaxation algorithm needs to be implemented using standard adaptive implementation techniques.
WO 01/41947 PCT/AU00/01525 -9- In this manner, a method of estimating the input and exit strip velocities in a rolling mill is provided which is both inexpensive to implement and robust in operation.
The method does not require the use of any expensive hardware or measuring equipment, relying largely on a simple measurement of angular velocity, typically performed using pulse counting devices which are standard pieces of equipment in coilers and uncoilers and can be assumed to have extremely high accuracy. Furthermore, they are robust in use and inexpensive to provide.

Claims (9)

1. A method of estimating the input and exit strip velocities at the roll gap in a rolling mill of the type having an uncoiler reel, a coiler reel and at least one pair of work rolls positioned therebetween, said method comprising the steps of: measuring the angular velocities of the uncoiler and coiler reels; estimating the initial radii of the uncoiler and coiler reels; and applying the measured and estimated values obtained to calculate estimated velocities of the strip before and after the roll gap.
2. A method as claimed in claim 1 wherein the radii of the uncoiler and coiler reels are estimated by mathematically modelling the reels taking into account eccentricity effects and inter-wrap gaps.
3. A method as claimed in claim 2 wherein the model includes a procedure to estimate initial coil radii using measurements of the surface velocity of the work rolls and an estimate of the slip ratio at the work rolls.
4. A method as claimed in either claim 2 or claim 3 wherein the estimation of the reel models is formulated as a non-linear least squares problem.
A method as claimed in claim 4 wherein the said problem is solved using a relaxation algorithm, giving an estimate of uncoiler and coiler radii.
6. A method as claimed in claim 5 including adaptive implementation of the relaxation algorithm.
7. A method of estimating the exit thickness of strip in a rolling mill by estimating input and exit strip velocities using a method as claimed in any one of the preceding claims and applying the estimated velocities in a mass-flow balance equation.
8. A method of estimating the input and exit strip velocities at the roll gap in a rolling mill substantially as herein described with reference to any one of the embodiments of the invention illustrated in the accompanying drawings and/or examples.
9. A method of estimating the exit thickness of a strip in a rolling mill substantially as herein described with reference to any one of the embodiments of the invention illustrated in the accompanying drawings and/or examples. DATED this 1 1th day of March, 2003 BALDWIN SHELSTON WATERS Attorneys for: THE UNIVERSITY OF NEWCASTLE RESEARCH ASSOCIATES LIMITED
AU21276/01A 1999-12-08 2000-12-08 Strip velocity measurement in rolling mills Ceased AU783350B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AU21276/01A AU783350B2 (en) 1999-12-08 2000-12-08 Strip velocity measurement in rolling mills

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
AUPQ4531A AUPQ453199A0 (en) 1999-12-08 1999-12-08 Strip velocity measurement in rolling mills
AUPQ4531 1999-12-08
AU21276/01A AU783350B2 (en) 1999-12-08 2000-12-08 Strip velocity measurement in rolling mills
PCT/AU2000/001525 WO2001041947A1 (en) 1999-12-08 2000-12-08 Strip velocity measurement in rolling mills

Publications (2)

Publication Number Publication Date
AU2127601A AU2127601A (en) 2001-06-18
AU783350B2 true AU783350B2 (en) 2005-10-20

Family

ID=25618179

Family Applications (1)

Application Number Title Priority Date Filing Date
AU21276/01A Ceased AU783350B2 (en) 1999-12-08 2000-12-08 Strip velocity measurement in rolling mills

Country Status (1)

Country Link
AU (1) AU783350B2 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11169928A (en) * 1997-12-11 1999-06-29 Korea Electron Telecommun Real time simulator for automatic thickness controller in rolling process and simulation modeling method
JPH11267725A (en) * 1998-03-23 1999-10-05 Kawasaki Steel Corp Gage control method for continuous hot rolling machine

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11169928A (en) * 1997-12-11 1999-06-29 Korea Electron Telecommun Real time simulator for automatic thickness controller in rolling process and simulation modeling method
JPH11267725A (en) * 1998-03-23 1999-10-05 Kawasaki Steel Corp Gage control method for continuous hot rolling machine

Also Published As

Publication number Publication date
AU2127601A (en) 2001-06-18

Similar Documents

Publication Publication Date Title
CA1284681C (en) Methods and apparatus for the detection and correction of roll eccentricity in rolling mills
US6668626B2 (en) System and a method for measuring and determining flatness
US3475935A (en) Control apparatus and system for strip rolling
AU783350B2 (en) Strip velocity measurement in rolling mills
EP1239979B1 (en) Strip velocity measurement in rolling mills
JP3201301B2 (en) Method and apparatus for controlling thickness of material to be rolled
JP2007061876A (en) Method for controlling thickness in cold tandem rolling
US6216504B1 (en) Traveling sheet thickness changing method for cold tandem roller
JPH06154829A (en) Method for controlling plate thickness and tension in rolling plate
JP2002172406A (en) Method for correcting plate thickness by rolling mill
Moon et al. Control scheme using forward slip for a multi-stand hot strip rolling mill
AU662486B2 (en) Interstand tension control
US20020194925A1 (en) Method and a device for improving the signal to noise ratio
WO2002070154A1 (en) A system and a method for measuring and determining flatness
KR100558787B1 (en) Elongation control method of steel strip at the temper pass mill
JPH0688056B2 (en) Method of determining the advanced rate in hot finish rolling
JPS6316805A (en) Rolling method
JPS586568B2 (en) Plate thickness control method for skewer type continuous rolling mill
JPS61193716A (en) Control method of rolled plate thickness of strip
JPH0513730B2 (en)
JPS60238010A (en) Device for estimating mill spring constant and plastic coefficient of material in continuous rolling mill
WO1992000817A1 (en) Interstand tension control
JPH0471605B2 (en)
JPS61222623A (en) Detecting method of welded point of strip
JPS638846B2 (en)