AU655245B2 - Method for cleaning molten metal - Google Patents

Method for cleaning molten metal Download PDF

Info

Publication number
AU655245B2
AU655245B2 AU13976/92A AU1397692A AU655245B2 AU 655245 B2 AU655245 B2 AU 655245B2 AU 13976/92 A AU13976/92 A AU 13976/92A AU 1397692 A AU1397692 A AU 1397692A AU 655245 B2 AU655245 B2 AU 655245B2
Authority
AU
Australia
Prior art keywords
pressure
molten metal
gas
vessel
torr
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
AU13976/92A
Other versions
AU1397692A (en
Inventor
Toshio Ishii
Yoshiteru Kikuchi
Hidetoshi Matsuno
Shunichi Sugiyama
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Engineering Corp
Original Assignee
NKK Corp
Nippon Kokan Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from JP63250807A external-priority patent/JPH0742524B2/en
Priority claimed from JP25080688A external-priority patent/JP2718096B2/en
Priority claimed from JP1031105A external-priority patent/JPH02211974A/en
Application filed by NKK Corp, Nippon Kokan Ltd filed Critical NKK Corp
Publication of AU1397692A publication Critical patent/AU1397692A/en
Application granted granted Critical
Publication of AU655245B2 publication Critical patent/AU655245B2/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22BPRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
    • C22B1/00Preliminary treatment of ores or scrap
    • C22B1/02Roasting processes
    • C22B1/04Blast roasting
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C7/00Treating molten ferrous alloys, e.g. steel, not covered by groups C21C1/00 - C21C5/00
    • C21C7/10Handling in a vacuum
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C7/00Treating molten ferrous alloys, e.g. steel, not covered by groups C21C1/00 - C21C5/00
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C7/00Treating molten ferrous alloys, e.g. steel, not covered by groups C21C1/00 - C21C5/00
    • C21C7/0081Treating and handling under pressure
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22BPRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
    • C22B9/00General processes of refining or remelting of metals; Apparatus for electroslag or arc remelting of metals
    • C22B9/05Refining by treating with gases, e.g. gas flushing also refining by means of a material generating gas in situ

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Organic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Treatment Of Steel In Its Molten State (AREA)
  • Manufacture And Refinement Of Metals (AREA)
  • Casting Support Devices, Ladles, And Melt Control Thereby (AREA)

Description

D
AUSTRALIA
Patents Act 1990 424
ORIGINAL
COMPLETE SPECIFICATION STANDARD PATENT Invention Title: METHOD FOR CLEANING MOLTEN METAL The following statement is a full description of this invention, including the best method of performing it known to me:-
I
*o 0 *400 0 @0 4r 4 *I trt 4r Itt tblt 1
I
41 METHOD FOR CLEANING MOLTEN METAL Background of the Invention Field of the Invention The present invention relates to a method for cleaning molten metal, and more particularly to a method for obtaining clean mol Iten metal by making nonmetallic inclusions rise to the surface of the molten metal and removing the nonmetallic inclusions from the molten metal.
Description of the Related Arts Since nclusions for example, alumina inclusions in S molten steel being suspended in molten metal are a cause of producing defects of quality of products, various methods for decreasing or removing the inclusions in molten steel have been proposed.
Out of methods having been very often used as Liii 5 d" ci ~7 oU IIIIJd. a v cIy i cLL:: i lt: lIUUs, 1o CI l IjUL U UUI a method for removing inclusions from molten metal, wherein molten metal is bubbled by blowing inert gas from the bottom of a vessel into the molten metal under atmospheric 20 pressure, gas bubbles thus produced trap the inclusions in the molten metal and the inclusions are removed after the inclusions have risen to the surface of the molten metal.
In the case of manufacturing a high quality steel, there is a need for limiting the total amount of oxygen in -1
A
cl ii: i-
I
o oe *r o, omm.
em
C
t *r 0 me, 44I molten steel to 15 ppm or less. There, however, occurs a problem such that molten metal cannot be cleaned to more than ordinary norms of cleanness by the use of the above-mentioned method. Therefore, a new method for cleaning molten metal has been expected to be developed.
That is, there have been difficulties in the prior art bubbling method in that a bubbling zone was limited to a zone which widened from a gas blow opening of the bottom of a vessel upwardly in the form of V and it was difficult to bubble molten steel from the entire vessel due to a limit of a gas blowing method. Moreover, there have been problems such that, since sizes of produced bubbles were large, molten metal flows as if it went around the bubbles during rising of the bubbles, fine inclusions move together with a flow of the molten metal, avoiding those bubbles, and, in consequence, the fine inclusions were hard to be trapped by the bubbles.
To overcome the above-mentioned difficulties, the present inventors propose the following method: In this method, molten metal under elevated pressure is bubbled by a gas soluble in the molten metal, inclusions being suspended in the molten metal are trapped by gas bubbles produced by bubbling and by fine gas bubbles produced by reducing the pressure on pressurized molten metal. After the inclusions have risen to the surface of the molten metal, said inclusions are removed. Ordinary inclusions are trapped by first bubbling. Said trapped -2i
I-
L
ia, V 4, MOM
I
I-i £4 &i I it 4' 4 441' 4 4 ii 4 1444 r tt inclusions rise to the surface of the molten steel. On the other hand, since pressurized molten metal is bubbled, a large amount of bubbling gas dissolves in the molten metal.
Thereafter, gas having dissolved in the molten metal appears as fine'gas bubbles from the entire zone of the molten metal by rapidly reducing a pressure inside a vessel.
During the bubbling, the finf. inclusions are trapped by the bubbles and rise to the surface of the molten metal with the bubbles.
The above-mentioned method is very effective in removal of the inclusions in the molten metal. However, since the molten metal is pressurized at the initial stage of a processing step, some portion of the bubbling gas having once dissolved in the molten metal appears as fine gas bubbles during the reduction of the pressure on the molten metal, but the rest of the gas remains dissolved in the molten metal. Accordingly, one more processing step for degassing the molten metal is required after the above-mentioned processing of the gas has been carried out.
20 Therefore, there have been problems in that degassing capacity and the number of processing steps had to be increased. In addition, a cost for equipment increased because of the use of a pressure vessel.
Summary of the Invention It is an object of the present invention to provide a method for cleaning molten metal under reduced pressure -3- 2, i i -i- C-! 'icl
II
4Q) '4OO o 4 4 4 C c CC C r itr ,:herein the above-mentioned bubbling method is improved, any pressure vessel is not used, and degassing of the molten metal is carried out in the same vessel as that of bubbling method.
To accomplish the said object, the present invention provides a method for cleaning molten metal comprising the steps of: keeping a pressure inside a vessel having molten metal therein at a pressure of Ps of atmospheric pressure or less; bubbling the molten metal in the vessel by gas soluble in the molten metal, a portion of said gas dissolving in the molten metal and the rest of said gas converting to gas bubbles; and reducing rapidly the pressure in the vessel to pressure PE, fine gas bubbles being produced in the molten metal in the vessel, nonmetallic inclusions being trapped by said fine gas bubbles and by gas bubbles produced by bubbling and rising to the surface of the molten metal, and gas 20 dissolved in the molten metal being removed.
In the method of the present invention, the molten metal is not processed under elevated pressure as in the prior art method. The molten metal is processed under reduced pressure after the molten metal has been bubbled by blowing .gas soluble in the molten metal at atmospheric pressure or less. Particularly, in this processing under reduced pressure, not only the fine gas bubbles are simply 34 -4i 1 i i, 'a ~Q a a 6h a1 produced, but also said bubbling gas remaining dissolved in the molten metal is removed together with the fine gas bubbles.
The above objects and other objects and advantages of the present invention will become apparaent from the detailed description to follow, taken in connection with the appended drawings.
Brief Description of the Drawings Fig.1 is a graphical representation showing the relation between a pressure inside a vessel during bubbling of molten metal by blowing nitrogen gas into the molten metal and a pressure inside the vessel during degassing of the molten metal according to the present invention; Fig.2 is a vertical sectional view illustrating a refining apparatus for a ladle which carries out VOP, processing according to the present invention; Fig.3 is a vertical sectional view illustrating a refining apparatus for a ladle which carries out VAD 20 processing according to the present invention; Figs. 4 and 5 are explanatory view of a gas tight vessel having a horizontal rotation axis capable of rotating according to the present invention; Fig.6 is a graphical representation showing a change of the total amount of oxygen in the molten steel with the lapse of time according to the present invention; Fig.7 is an explanatory view designating another 41 44i a 44 661I 0£I 1406 0 ar c, -~t~J a )r-J 8n 4 400 "9 0 41 Sr I example of the present invention wherein the same apparatus as in Fig.4 is used.
Fig.8 is a graphical representation showing the total amount of oxygen in the molten steel in another example different from Fig.6; and Figs.9 and 10 are explanatory views designating a vessel of rectangular parallelepiped having a gate therein.
Description of the Preferred Embodiment Preferred Embodiment-1 Fig.1 shows a result of having studied the case when molten steel was used as molten metal and nitrogen as gas soluble in the molten steel. Namely, Fig.1 is a graphical representation designating preferable zones out of coordinates of pressure Ps of atmosphere inside a vessel, 15 under which the molten metal is bubbled by blowing said gas into the molten metal, and of reduced pressure PE of atmosphere inside the vessel. Units of Ps and PE are Torr.
Zone B shown with oblique lines is a preferable zone. Zone A shown with crossing lines is more preferable zone. The zone B is a zone where the inclusions decrease. However, since the content of nitrogen CN in the molten steel poses problems depending on steel species, a denitrification step is sometimes required after processing of the molten steel under reduced pressure.
In Fig.1, a boundary (D between the zones A and B, namely, PE 40 Torr is determined in such a manner as 4 1 -6d N] 450 (PN) 1 2 Units of [N 3 and PN are ppm and atm, respectively.
The allowable largest value of CN is estimated at 100 ppm.
CN 100 is obtained. N 5 100 is substituted for the equation and the pressure unit is converted from atm ea 10 to Torr, PN 38 Torr is obtained. PE 40 Torr is o o o oo obtained by rounding PN 5 38 Torr.
SLine passing the iower ends of the zone B is 06664: determined for the following reason: The amount of nitrogen removed from the mollen steel which was required for trapping the inclusions and making the inclusions rise to the surface of the molten steel needed to be 50 ppm or more by experience of the present *1 inventors. The amount of removed nitrogen is the difference between (N 3 s and (N E N s is the initial contentet 20 of nitrogen increased by bubbling the molten steel by blowing nitrogen into the molten steel. (N E is the final content of nitrogen decreased by degassing the molten steel under reduced pressure. That is to say, the line is determined by the use of the following equation obtained by -7i
C
i2r putting said equation into [N s CN E 50 and representing pressures in Torr: (Ps /2
(PE)
2 3.06 (2) /hB' L' V 0S0 to o oft 00 o 0 9 90 0 af t I I 4 It
~I
Cr I C Cr crI 'i'C CC I
I
The intersection point where the line crossed the line (2 was 40, 88 in coordinates PE, Ps PE 40 being substituted for the equation Further, in the case PE is less than 75 Torr in the equation it takes much time to make an equilibrium state between the pressure PN and the content (N and this is ineffective. PE of less than 10 Torr is considered difficult to apply. As a result, the line passing the lower ends of the zone A was determined by connecting the point 0, 75 with the point 40, 88 More preferable zone A is two-dimensional rectangular coordinates, whose ordinate is Ps Torr and whose abscissa is PE Torr. The zone A is enclosed with Ps=760, PE=0 and point (40, 88) and 75) represented with (PE, Ps). The preferable zone B is two-dimensional rectangular coordinates, whose ordinate is Ps Torr and whose abscissa is PE. The zone B. is enclosed with Ps=760, and (Ps) (P
E
)l/ 2 3.06 Out of the zone B, a zone enclosed with Ps=760, PE=40, PE=400 and (Ps) 1 2
(PE)
1 2 3.06 is more preferable in the two-dimensional rectangular coordinates, whose ordinate is Ps Torr and whose abscissa is PE Torr. Further, a zone enclosed with Ps=760, PE=200 and (Ps) 1 2
(PE)
2 3.06 is most desired.
-8- Exampl -1 An example of the present invention will be described with specific reference to the appended drawings. Fig.2 is a vertical sectional view illustrating a refining apparatus for a ladle having been used for the example of the present invention. In the drawings, referential numeral 30 denotes a gas tight vessel. Ladle 32 of 50 ton capacity, into which molten steel 31 is charged, is put into the vessel. Cover 33 of the gas tight vessel 30 is arranged in a removable state.
Lance 34 is fixed to the cover to be used for VOD Vacuum Oxygen Decarbonization Referential numeral 36 denotes an exhaust opening for making the gas tight vessel vacuum.
.0 Referential numeral 36 denotes a porous plug for blowing gas into the molten steel, which is arranged at the bottom of 15 the ladle.
B t t of molten steel charged into the ladle 32 was kept at 1660 "C and at 300 Torr in said gas tight vessel. 6 Nm 3 of N 2 was blown into the molten steel from the bottom of the t ladle 32 for 10 min. Then, cover 33 was changed for another cover 38 having three electrodes as shown in Fig.3 to carry t i t s out VAD vacuum arc degassing Pressure in the vessel was rapidly reduced to 1 Torr,a heat compensation being made for the molten steel by means of said electrodes 37, and the pressure of 1 Torr was kept for 20 min. At the same time, the molten steel was bubbled by Ar gas blown into the molten steel from the bottom of the ladle at 150 N 2/min. A black point shown in Fig.1 corresponds to the Example-1.
-9- ~P~tent Attorneys for nd o behalf of the applicant. 035070 020492 ~j~i The content of the molten steel obtained by processing of the molten steel in said Example-i will be shown in Table 1. Example-2 shown in this Table will be described later. Results obtained in the case of using the prior art pressure elevation and reduction method Control-1 wherein molten steel was degassed under reduced pressure after the molten steel had been bubbled by N 2 gas under elevated pressure of more than atmospheric pressure and an Ar gas bubbling method Control-2 are shown as contro!s in Table 1. In the pressure elevation and reduction method, the pressure in the vessel was increased to 3 atm during blowing of N 2 gas and then reduced to 100 Torr during reduction of the pressure. As for other cnoditions, the 00 0 molten steel was processed under the same conditions as 15 thosa of the example of the present invention. Ar gas, 0,b00 0 0 however, was not blown into the molten steel during pressure reduction.
In the Ar gas bubbling method, 50 t of molten steel was kept at 0.5 to I Torr in a vacuous ladle and bubbled by Ar gas blown into the molten steel from the bottom of the ladle at a rate of 150 NJQ/min for 20 min.
1'04 i
V;
Table 1 Time,(min) Sol Al T. T.
after C Si Mn P S (N) Pressure ppm ppm Reduction 0 0.13 0.32 1.12 0.023 0.006 0.048 42 147 Example-1 12 0 0.13 0.31 1.12 0.023 0.006 0.047 8 38 0.13 0.31 1.12 0.023 0.006 0.047 7 31 0 0.14 0.33 1.14 0.021 0.005 0.049 42 147 Example-2 10 0.14 0.32 1.13 0.021 0.005 0.047 7 20 0.14 0.32 1.13 0.021 0.005 0.047 5 Control-i 0 0.13 0.33 1.13 0.020 0.005 0.050 41 632 Pressure Elevation 10 0.13 0.32 1.13 0.020 0.005 0.048 9 279 and Reduction Method 20 0.13 0.32 1.13 0.020 0.005 0.047 9 162 Control-2 0 0.12 0.33 1.15 0.018 0.005 0.054 42 Ar Gas Bubbling 10 0.12 0.32 1.14 0.018 0.005 0.054 24 19 Method 0.12 0.31 1.15 0.018 0.005 0.052 18 18 o a@ 00 0 044 o, o 0 0@ 0 *0044 -11- N il metal in the vessel, nonimeLai i u i IUn1uoi said fine gas bubbles and by gas bubbles produced by bubbling .nd rising to the surface of the molten metal, and gas dissolved in the molten metal being removed.
/2 1 J i In Table 1, when Example-1 is compared with Control-1 or Control-2 relative to the total amount of oxygen T.(0O and the total amount of nitrogen in the molten steel min later after the pressure reduction,T.(0) in Example-i decreased and T. N] greatly decreased in comparison with the pressure elevation and reduction method. In comparison with the Ar gas bubbling method, it is recognized that T.(0) decreased. In this case, the amount of nitrogen increased slightly by blowing nitrogen gas, but such does not pose any specific problem except for specific cases.
Preferred Embodiment-2 When the molten steel is stirred by blowing inert gas into the molten steel under reduced pressure as in the S Example-1, soluble gas is remarkably removed from the molten steel and the amount of nitrogen decreased to the extent enough to be able to be put to practical use inspite of bubbling of the soluble gas in comparison with Control-1 and Control-2 in Table 1. The soluble gas, however, is removed during the pressure reduction and, at the same at 20 time, the occurrence of fine gas bubbles is also decreased.
Accordingly, it is thought that the effect of rising and 4, 7 separation of nonmetallic inclusions decreases with the lapse of time. Therefore, it is intended in Example-2 to keep the effect of the rising and separation of the nonmetallic inclusions by blowing the soluble gas together with the inert gas during the pressure reduction.
-12- Examp I e-2 An example of the present invention will be described specifically. As in Example-i, a refining apparatus for a ladle as shown in Figs.2 and 3 was used. Soluble gas was blown into molten steel before a pressure reduction, 50 t of molten steel being kept at 1660 C and at 300 Torr. 6 Nm 3 of N 2 gas was blown from the bottom of the ladle as shown in Fig.2 into the molten steel by means of a porous plug for min. Then, cover 33 was changed for cover 38. Heat compensation was made for the molten steel by the use of arc heat of electrodes. Pressure in the ladle was rapidly 0.0 reduced to 1 Torr and the pressure of 1 Torr was kept for min. The molten steel was bubbled by blowing Ar gas as inert gas together with N 2 gas from the bottom of .the ladle A t 15 at a rate of 150 NI/min. Flow of N 2 gas was decreased to 0 zero in the last five minutes as shown in Table 2 so as to make the amount of soluble gas as small as possible.
At i 4 S. If tl 4- 1 -13-
A.
i -i
I
B:I
1-ct i4' 14K Table 2 Time after Pressure Reduction 0 10 10 15 15 Amount of Gas Blown into Molten Steel Ni/min 150 a 0 0 444. 9 0D 0*4 0 0 O 0 04 9 a #4lr 4 4
I
4 t The components of molten steel which were obtained as 10 a result of having processed the molten steel in Example-2 will be shown in Table 1. When Example-2 is compared with Example-1 in this Table, it is recognized that was decreased by blowing nitrogen into the molten steel under reduced pressure while was increased slightly.
15 The soluble gas is removed by pressure reduction in Preferred Embodiment-1 and Preferred Embodiment-2. However, in case a depth of a mscten metal bath is large, a static pressure in a bottom portion of the molten metal bath becomes large. In consequence, it becomes difficult to degass the molten steel by the use of only processing of molten steel under reduced pressure. Specifically, when the depth of the molten steel is 1.5 m or more, the above- -14-
I
i
I
I;
L-
i *Q S
SI
rt 4 mentioned tendency became remarkable. To degass the molten metal in the bottom portion of the molten metal bath of large depth, it is thought to turn a gas tight vessel having the molten metal therein upside down and to greatly stir'said molten metal under reduced pressure. This example will be described according to Example-3 and Example-4 shown below with specific reference to Figs.4 to 8.
Example-3 Fig.4 shows an example of a gas tight vessel 1 being able to be turned upside down with horizontal rotaton axis in a central portion thereof. Said gas tight vessel 1 is made cylindrical by tightly jointing vessel la and vessel lb each of which has a form of a ladle of 2 m in diameter and 3 m in height. Gas blow opening 11 is positioned on an end face of the vessel lb. Exhaust opening for exhausting an atmospheric gas from vessel 1 is arranged in joint portion 13 of the vessels la and lb.
In this example, molten steel was cleaned by the use of the gas tight vessel 1 constituted with the vessels la and lb as described above. 50 t of molten steel 31 was charged into the vessel lb. Another vessel la was tightly jointed to the vessel lb from above to form the vessel 1. Then, N 2 gas was blown into the vessel 1 through the gas blow opening 11 at a rate of 100 N I/min to bubble the molten steel 31.
Gas was exhausted from the vessel 1 through said gas exhaust opening 12 so that the pressure inside the gas tight vessel 1 :~c~-ii ~~97rIk/ s 1
A
1 could not exceed a predetermined pressure. 20 minutes later, bubbling was stopped. In the above-mentioned state, the inside of the gas tight vessel 1 was made vacuous through said exhaust opening 12 with the use of a vacuum pump not shown so that the pressure inside the vessel 1 could be reduced to 10-2 Torr. When this degree of vacuum was kept,N 2 having dissolved in the molten steel 31 appeared as fine gas bubbles which trapped fine inclusions in the molten steel 31 and made the fine inclusions rise to the surface of the molten steel.
5 minutes later after this, the gas tight vessel was turned counterclockwise at 180 as shown in Fig.5 and was oO« made to be in the upsidedown state as shown in Fig.4. Since a portion of the molten steel bath which had been in a deep 15 position and had been under large static pressure was changed for a portion of molten steel bath of small depth, a static pressure decreased rapidly and a large amount of I fine gas bubbles were produced from the portion of the molten steel bath of small depth. After the molten steel had been left in this state for 5 minutes, the gas tight vessel was turned clockwise at 180" to be again in the state of Fig.4. In this case, the molten steel 31 was again 4 stirred. Moreover, since the portion of the molten steel bath of large depth was changed for the portion of the molten steel bath of small depth, pressure on the portion of the molten steel bath having been under large static pressure was rapidly reduced, N 2 gas having remained in the -16i molten steel 31 appeared as fine gas bubbles. The molten steel was left in this state for 5 minutes. A vacuum pump was driven to keep the degree of vacuum at 10 -2 Torr during the pressure reduction.
Fig.6 shows a change of the total amount of oxygn in the molten steel 31 with the lapse of time in the example.
According to Fig.6, the total amount of oxygen -in the molten steel could be decreased from initial 80 ppm to final 12 ppm.
Example-4 An apparatus used for this method was the apparatus 4 f having been used in Example-3 as shown in Fig.4. As in t. ,c Example-3, after molten steel had been kept in the gas tight vessel 1 and bubbled by blowing N 2 gas into the molten steel through gas blow opening 11 positioned in the bottom of the vessel 1, pressure inside the gas tight vessel was reduced to 10- 2 Torr by evacuating the gas tight vessel and the vacuum was kept. After the degree of vacuum had been kept for 5 min,the gas tight vessel 1 was turned at 90* with 20 central horizontal rotation axis 10 in a central portion thereof. The gas tight vessel 1 came to be in the state ji such that a longitudinal direction of the gas tight vessel of cylindrical shape was kept horizontally. Therefore, an area of bath of the molten steel 31 became large and a depth i of the entire molten steel bath became small. As a result, a static pressure on a portion of the molten steel -17- I reduced pressure, not only the fine gas bubbles are simply -4- 31 which had been in a deep portion was reduced and fine gas bubbles began to be actively produced.
Fig.8 is a graphical representation designating a change'of the total amount of oxygen in the molten steel 31 which 4as processed by the above-mentioned degassing method wherein the depth of the molten steel bath was made small. As shown in Fig.8, it is understood that the degassing method is highly effective in processing of the molten steel since T. in the molten steel was decreased from initial 80 ppm to final 15 ppm. In Example-3 wherein the gas tight vessel 1 was turned to 180" when rotation of the gas tight vessel 1 was stopped for a while at the position where the vessel was turned to 90 0 the effect of turning the gas tight vessel 1 at 180" and 90 can be obtained.
Fig.9 is a schematic illustration showing another example of a method for promoting degassing of molten steel by making a depth of molten steel bath small. In this example, gas tight vessel 2 of parallelepiped of 3 m in j width, 3 m in height and 8 m in length was used. Removable i gate 3 of 3 m in length, 2.3 m in width and 0.5 m in thickness was arranged inside the gas tight vessel 2. The inside of the gas tight vessel 2 was divided into two i chambers 2a and 2b. In the drawing, referential numeral 22 denotes an exhaust opening for exhausting inside atmosphere -18which is arranged in a ceiling of the gas tight vessel 2, 21 a gas injection opening arranged in the bottom of the chamber 2a, 23 an exit port for outflow of the molten steel which is arranged in the bottom of the chamber 2b and 24 an inlet for inflow of the molten steel which is arranged in a ceiling of the chamber 2a. Said gas injection opening 21 and said inlet for inflow of the molten steel are arranged so that they can he opened or closed i' necessary.
A method for cleaning molten steel by the use of the 1o gas tight vessel 2 constituted in such a manner as described above will be described. In Pig.9, gate 3 is positioned *too2 m away from the left face of the gas tight vessel 2.
Approximately 90 t of molten steel 31 is charged through the .:11 inlet 23 for inflow of the molten steel into one chamber 2a from the other chamber 2b by the gate 3. During charging of the molten steel, the exit port 23 for outflow of the molten steel is closed. The volume of the molten steel 31 comes to be 12 m 3 of 3 m in length, 2 m in width and 2 m in depth. N 2 gas is blown through the gas blow openin,. 21 at a rate of 100 N S /min and the molten steel 3 is bubbled by N 2 gas. During bubbling, the inside atmosphere is simultaneously exhausted through said gas Sexhaust opening 22 so that there cannot be any excessive pressure inside the gas tight vessel. The bubbling of the molten steel i s stopped 20 minutes later and the inside of the gas tight vessel 2 is evacuated th',,ough said gas exhaust opening 22 by the use of a vacuum pump (not shown An -19 opening is made 'etween the bottom face and the lower ends of the gate 3 by lifting the gate 3 upwardly as shown in when the pressure inside the gas tight vessel 2 is reduced to 10- 2 Torr. Then, the molten steel having been stemmed by said gate 3 spreads in the whole vessel 2. As a result, the depth of the molten steel 31 having been 2 m initially comes to be 0.5 m.
Since the depth of the molten steel becomes rapidly small and the area of the surface of the molten steel bath widens, fine gas bubbles are actively produced. When the molten steel 31 is discharged by opening the exit port 23 l for outflow of the molten steel, approximately the total Samount of the molten steel flowed out of the vessel 2 a Stf, quarter of an hour later.
S 15 It is clearly understood that the above-mention;ed method is highly effective in cleaning of molten steel since the total amount of oxygen was decreased from initial ppm to final 12 ppm as a result of having cleaned the molten steel in such a manner as described above.
r

Claims (9)

1. A method for cleaning molten metal comprising the steps of: keeping a pressure inside a vessel having molten metal therein at a pressure of Ps of atmospheric pressure or less; bubbling the molten metal in the vessel by gas soluble in the molten metal, a portion of said gas dissolving in the molten metal and the rest of said gas converting to gas bubbles; and reducing rapidly the pressure in the vessel to pressure PE, fine gas bubbles being produced in the molten S metal in the vessel, nonmetallic inclusions being trapped by said fine gas bubbles and by gas bubbles produced by bubbling and rising to the surface of the molten metal, and gas dissolved in the molten metal being removed.
2. The method of claim 1, wherein said pressure Ps in t, the step of keeping a presssure and said pressure PE in the step of reducing the pressure are pressures Ps and PE of "ri* atmosphere inside the vessel in a zone enclosed with Ps=760, and (Ps)1 2 -(PE) 1 2
3.06 in two-dimensional J rectangular coordinates, whose ordinate is Ps Torr and whose abscissa is PE Torr. 3. The method of claim 2, wherein said pressure Ps and said pressure PE are pressures Ps and PE of atmosphere 1 -21- i!,r inside the vessel in a zone enclosed with Ps=760, PE=400 and (PE)1/ 2 3.06 in the two-dimensional rectangular coordinates, whose ordinate is Ps Torr and whose abscissa is PE Torr.
4. The method of claim 3, wherein said pressure Ps and said pressure PE are pressures Ps and PE of atmosphere inside the vessel in a zone enclosed with Ps=760, PE=200 and (Ps) 1 2 (PE) 2 3.06 in the two-dimensional rectangular coordinates, whose ordinate is Ps Torr and whose abscissa is PE Torr. 'I 't The method of claim 1, wherein the pressure Ps in the step of keeping a presssure and the pressure PE in the step of reducing the pressure are pressures Ps and PE Of atmosphere inside the vessel in a zone enclosed with Ps=760, PE=0 and a line connecting points (40,88) and (0,75) represented with coordinates (PE, Ps) in the two- dimensioanl rectangular coordinates, whose ordinate is Ps Torr and whose abscissa is P Torr.
I
6. The method of claim 1, wherein said gas soluble in the molten metal in the step of bubbling is N 2
7. The method of claim 1, wherein .said step of reducing the pressure include, stirring said molten metal by blowing inert gas into molten metal. -22- c h-
8. The method of claim 1, wherein said step of reducing the pressure includes bubbling the molten metal by blowing the gas soluble in the molten metal.
9. The method of claim 1, wherein said step of reducing the pressure includes turning a gas tight -'essel having the molten metal therein, molten metal in a deep portion of molten metal bath moving to a portion on the side of the surface of the molten bath. The method of claim 1, wherein said step of reducing the pressure includes decreasing a depth of the molten metal bath held in the gas tight vessel. Dated this 2nd day of April 1992 I I i NKK CORPOPATION By Its Patent Attorneys GRIFFITH HACK CO Fellows Institute of Patent Attorneys of Australia. -23- b dl 1
AU13976/92A 1988-10-06 1992-04-02 Method for cleaning molten metal Ceased AU655245B2 (en)

Applications Claiming Priority (6)

Application Number Priority Date Filing Date Title
JP63-250807 1988-10-06
JP63250807A JPH0742524B2 (en) 1988-10-06 1988-10-06 Method for cleaning molten metal
JP63-250806 1988-10-06
JP25080688A JP2718096B2 (en) 1988-10-06 1988-10-06 Vacuum cleaning method for molten metal
JP1031105A JPH02211974A (en) 1988-01-21 1989-02-13 Method for purifying molten metal by reduction of pressure
JP1-31105 1989-02-13

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
AU42457/89A Division AU4245789A (en) 1988-10-06 1989-10-02 Method for cleaning molten metal

Publications (2)

Publication Number Publication Date
AU1397692A AU1397692A (en) 1992-05-28
AU655245B2 true AU655245B2 (en) 1994-12-08

Family

ID=27287204

Family Applications (2)

Application Number Title Priority Date Filing Date
AU42457/89A Abandoned AU4245789A (en) 1988-10-06 1989-10-02 Method for cleaning molten metal
AU13976/92A Ceased AU655245B2 (en) 1988-10-06 1992-04-02 Method for cleaning molten metal

Family Applications Before (1)

Application Number Title Priority Date Filing Date
AU42457/89A Abandoned AU4245789A (en) 1988-10-06 1989-10-02 Method for cleaning molten metal

Country Status (6)

Country Link
EP (1) EP0362851B1 (en)
KR (1) KR920006578B1 (en)
AU (2) AU4245789A (en)
BR (1) BR8905068A (en)
CA (1) CA1339703C (en)
DE (1) DE68905741T2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5004495A (en) * 1990-02-05 1991-04-02 Labate M D Method for producing ultra clean steel

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3743500A (en) * 1968-01-10 1973-07-03 Air Liquide Non-polluting method and apparatus for purifying aluminum and aluminum-containing alloys
US4647306A (en) * 1984-07-20 1987-03-03 Klockner Cra Technologie Gmbh Process for the treatment of metal melts with scavenging gas
US4780134A (en) * 1986-09-23 1988-10-25 A. Finkl & Sons Co. Simplified method and apparatus for treating molten steel

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3635696A (en) * 1968-05-21 1972-01-18 Finkl & Sons Co Treatment of molten metal using arc heat and vacuum
DE2710577A1 (en) * 1977-03-11 1978-09-14 Thyssen Edelstahlwerke Ag METHOD OF REFRESHING STEEL
GB2162604B (en) * 1984-07-30 1988-05-25 Teves Gmbh Alfred Braking pressure generator for a hydraulic brake system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3743500A (en) * 1968-01-10 1973-07-03 Air Liquide Non-polluting method and apparatus for purifying aluminum and aluminum-containing alloys
US4647306A (en) * 1984-07-20 1987-03-03 Klockner Cra Technologie Gmbh Process for the treatment of metal melts with scavenging gas
US4780134A (en) * 1986-09-23 1988-10-25 A. Finkl & Sons Co. Simplified method and apparatus for treating molten steel

Also Published As

Publication number Publication date
KR920006578B1 (en) 1992-08-10
KR900006541A (en) 1990-05-08
EP0362851B1 (en) 1993-03-31
AU4245789A (en) 1990-08-16
DE68905741D1 (en) 1993-05-06
BR8905068A (en) 1990-05-08
EP0362851A3 (en) 1990-06-20
DE68905741T2 (en) 1993-09-23
AU1397692A (en) 1992-05-28
EP0362851A2 (en) 1990-04-11
CA1339703C (en) 1998-03-10

Similar Documents

Publication Publication Date Title
AU655245B2 (en) Method for cleaning molten metal
CA1238788A (en) Method and apparatus for controlled melt refining
JPH01188619A (en) Method for rh vacuum degasification
JP4096635B2 (en) Molten metal refining apparatus and method, and fine bubble generating apparatus
JP3654181B2 (en) Method for refining molten metal
RU2046149C1 (en) Method of vacuum refining of metal and apparatus for performing the same
JP2007231410A (en) Method for producing high cleanliness steel
KR100226917B1 (en) The manufacturing method of high purification steel for two piece can
KR102241751B1 (en) Apparatus for treating molten steel and method for reating molten steel
JP2718097B2 (en) Vacuum cleaning method for molten metal using two-tiered container
JP2718096B2 (en) Vacuum cleaning method for molten metal
JPH05271748A (en) Vacuum degassing method
JPH0754034A (en) Production of ultralow carbon steel
JPH01284476A (en) Device for cleaning molten metal
JPH0741835A (en) Method for vacuum-refining molten steel by gas injection
JP2629225B2 (en) Method for cleaning molten metal
SU779410A1 (en) Method of vacuum treatment in spray
JPH05263123A (en) Continuous vacuum degassing apparatus
JPH08120324A (en) Apparatus and method for vacuum-refining molten steel
JPH06116624A (en) Method for vacuum-refining molten steel
JPH0299264A (en) Method for cleaning molten metal
JPH0847752A (en) Method for cleaning molten steel in tundish
JP2002030326A (en) Vacuum degassing apparatus
JPH08109421A (en) Cleaning of molten metal
JPH01181953A (en) Apparatus for cleaning molten metal