AU2022202554A1 AU2022202554A AU2022202554A AU2022202554A1 AU 2022202554 A1 AU2022202554 A1 AU 2022202554A1 AU 2022202554 A AU2022202554 A AU 2022202554A AU 2022202554 A AU2022202554 A AU 2022202554A AU 2022202554 A1 AU2022202554 A1 AU 2022202554A1
Authority
AU
Australia
Prior art keywords
crane
hydraulic
components
hydraulic actuators
movements
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
AU2022202554A
Inventor
Pelle Gustafsson
Marcus RÖSTH
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hiab AB
Original Assignee
Hiab AB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hiab AB filed Critical Hiab AB
Publication of AU2022202554A1 publication Critical patent/AU2022202554A1/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/16Applications of indicating, registering, or weighing devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/18Control systems or devices
    • B66C13/20Control systems or devices for non-electric drives
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C15/00Safety gear
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/54Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes with pneumatic or hydraulic motors, e.g. for actuating jib-cranes on tractors

Abstract

A crane (2) arranged to be mounted to e.g. a vehicle (4), comprising a crane boom system, comprising crane components (6) that includes a crane tip (8) arranged at a free end of an outermost crane boom; a system (10) of hydraulic actuators of the crane boom system 5 arranged to be operated by hydraulic fluid with a hydraulic flow, the hydraulic fluid being discharged from a hydraulic pump (12) at a variable working pressure and wherein the hydraulic actuators are further arranged to apply movements to the crane boom system in response to received driving instructions (14); a sensor system (16); a control interface (20) arranged to receive a set of operating instructions, defining wanted movements of the 10 crane components, and a crane controller (24) configured to generate driving instructions (14) to be applied by the system (10) of hydraulic actuators of the crane boom system based on the received set of operating instructions defining wanted movements of the crane components. The crane controller (24) is further configured to estimate a pressure level of a required working pressure of the hydraulic pump (12) and a required flow level 15 of each of the hydraulic actuators for the wanted movements of the crane components (6), based on the generated sensor signals (18) and/or predetermined operation conditions, and to estimate a waste contribution measure for the wanted movements of the crane components (6). If the estimated waste contribution measure is larger than a predetermined level, the crane controller (24) is configured to generate an energy 20 consumption status signal (30) indicating that the present crane operations are inefficient from an energy consumption perspective. (Figure 5) 2 4 8 6 FIG. 4 2 6 10 26 28 14 -1 32 34 . _ _ ____I FIG. 5

Description

4 8
6
FIG. 4
2
6 10 26 28
14
-1 32 34 . _ _ ____I
FIG. 5
An energy efficient crane, and a method of the crane
Technical field The present disclosure relates to a crane and a method of a crane, and particularly a crane intended to work more energy efficient than presently used cranes which is particularly advantageous if the crane is a hydraulic crane with an electric power source.
Background Operating multiple functions of a crane at the same time is today regarded as showing skills as a crane operator. From an energy efficiency point of view this is however not necessarily preferred as it might generate a lot of waste energy. Waste energy here being defined as supplied energy to the hydraulic system that is not used for movements of crane components. The waste energy is not only unwanted because it increases the amount of energy that is needed for the system without performing any actual movements of the crane components, it is furthermore a disadvantage in that waste energy is dissipated as heat which increases the temperature of the hydraulic fluid in the system. The temperature increase degrades the quality of the hydraulic fluid and hence affects the service frequency of the system. Thus, by reducing the waste energy the effects of these associated problems will also be reduced.
It has been noted that a part of the consumed energy by the crane system is not actively used for the movements of the crane components but is waste energy, as an effect of operating multiple functions at the same time. This has a big impact on for example crane systems with an electric power source, as it affects the available operation time of e.g. a battery or a fuel cell before recharging or refilling with hydrogen. If the waste energy is reduced the operating lifetime in between charging of the battery may be improved, or smaller batteries may be used reducing the cost and weight of the system on the truck. An improved solution is hence needed addressing a way to reduce the waste of energy.
As can be seen in the examples discussed in the detailed part of the description, the waste energy may even be larger than the useful energy that is used for actually moving the crane components. This is due to the fact that if one function demands a high pressure, that high pressure will then be the system pressure for all functions. If a concurrently used crane function only requires low pressure but high flow, a large portion of waste energy will be the result.
In the following some patent documents in the technical field of controlling loading and unloading procedures of a crane will be identified and briefly discussed.
US20190308851A1 discloses a crane arrangement mounted on a vehicle. The crane arrangement comprising a first boom connected to the first column and a second boom connected to the first boom. A hydraulic system is configured to move the crane boom by a hydraulic actuator. The hydraulic flow is dumped into a reservoir if measured pressure of the hydraulic system is higher than a maximum working pressure. US20140060030A1 discloses a crane system on a vehicle and a controller is provided configured to move a work tool in accordance with an operator instruction received via an input device. Accumulator pressure is stored which is associated with the movement of an actuator which is further compared with the current pressure measured by the sensors. An alert is generated if the measured value is not in the range of a threshold value. W02019206774A1 discloses a truck mounted crane system wherein, the crane system comprises multiple booms connected to each other and the crane is a mobile crane. The hydraulic actuator of the crane boom system is operated by hydraulic fluid flow where the fluid is discharged from the pump using an electric motor. Further, it discloses that the required pressure is measured for the desired movement of the boom, and a computing device collects the data from the pressure sensor to control the pressure of hydraulic drives. US20170268541A1 discloses a crane system with a lifting arm, and a crane maneuvering handle is provided to control the displacement of the first hydraulic power to move the arm. Further, when pressure detected by the first pressure sensor reaches a predetermined minimum working pressure then the hydraulic flow is cut-off to increase the efficiency of the crane system.
The present invention relates to cranes and evaluating the operation performance of the crane, in particular in terms of energy efficiency. The main object of the invention is to reduce waste energy and hence save energy in crane applications, and a more specific object is to achieve a more energy efficient operation of the crane.
Summary The above-mentioned objects are achieved by the present invention according to the independent claims.
Preferred embodiments are set forth in the dependent claims.
According to the invention, an estimated waste contribution measure is determined, that is the difference between the working pressure of the hydraulic pump and the estimated pressure levels multiplied by the estimated required flow level of each of the hydraulic actuators for each of the wanted movements of the crane components. The estimated waste contribution measure is hence an estimation of the hydraulic power that is wasted by the system, i.e. not utilized for active movements of the boom system.
According to one embodiment, a crane controller is further arranged to identify, in response to determining that the estimated waste contribution measure is larger than the predetermined level, at least one of the hydraulic actuators as a suggested crane function to deactivate for the crane operator via a control interface. The suggested crane function to deactivate may be communicated back to the operator via an input unit on e.g. a display.
As an alternative to being controlled by an operator using an input unit, the present invention may further also be implemented on a crane with a control interface comprising a communication interface to an autonomous system controlling the crane and optionally also the vehicle that the crane is mounted to. In that case an external monitoring service would monitor and evaluate the performance of the crane and the autonomous system in addition to, or instead of, monitoring and evaluating the operation skills of an operator.
The main advantage achieved by the crane disclosed herein, is the energy saving by reducing waste energy. This is a significant advantage especially for electrically operated cranes where less energy consumption equals longer use time for the customer between charging or a smaller and then a less costly battery with same use time.
Another advantage of the solution applied by the present invention is that it does not require any extra sensors or other hardware, as it is a pure software solution which means that it may be implemented in existing products and hardware.
One further advantage of the crane according to the present invention is that feedback may be provided to the operator regarding the present status of the waste energy and preferably to generate an alert to the driver when inefficient operation is detected and hence encouraging a more energy efficient operation strategy.
Brief description of the drawings Figures 1-3 are graphs illustrating advantageous aspects of the present invention. Figure 4 is a schematic illustration of a vehicle provided with a crane according to the present invention. Figure 5 is a schematic block diagram illustrating the crane according to the present invention. Figure 6 is a flow diagram illustrating the method according to the present invention.
Detailed description The crane and method will now be described in detail with references to the appended figures. Throughout the figures the same, or similar, items have the same reference signs. Moreover, the items and the figures are not necessarily to scale, emphasis instead being placed upon illustrating the principles of the invention.
When operating multiple functions of a crane at the same time, the function that requires the largest pressure determines the working pressure level of the hydraulic pump. This implies that there will be a waste component if also other crane functions, requiring a lower working pressure, are activated at the same time. The waste component will further be dependent on the flow requirement of the other crane functions, as the hydraulic power supplied to the system is further dependent on the flow of the hydraulic fluid. A portion of the consumed energy of the hydraulic system is hence waste, i.e. not used for moving the crane components, if operating multiple functions at the same time that are not matched in terms of working pressure and to some extent flow.
As can be seen in the examples discussed below with references to figures 1-3, the waste energy may even be larger than the useful energy that is used for actually moving the crane components. This is due to the fact that if one function demands a high pressure, that high pressure will then be the system pressure for all functions. If a concurrently used crane function only requires low pressure but high flow, a large portion of waste energy will be the result.
Figures 1-3 are graphs illustrating the energy consumption during use of an exemplary crane provided with an inner boom (IB), an outer boom (GB), and an extension (EXT). In the figures also the energy consumption during slewing (SLEW) is illustrated. The required energy for the movements is shown by dashed areas, and energy waste is shown by dotted areas. The consumed energy of the hydraulic system is the sum of the required energy for the movements and the waste energy. In the figures the Y-axis designates pressure and the X-axis designates flow.
In figure 1 an energy consumption graph is shown, where multiple crane functions are operated simultaneously. In figure 1, the inner boom (IB) requires high pressure and the extension (EXT) requires high flow but low pressure. The waste energy for the extension function is larger than the amount of energy used for the actual movements. This happens when all functions are simultaneously driven without taking waste energy into account. In this example the total input is 49.6kW, and the waste is 30.8kW, i.e. the waste energy is 164.44% of the useful energy.
By not operating the inner boom (IB) function (which is the function requiring the highest pressure) at the same time as the slewing (SLEW), outer boom (OB) and extensions (EXT), the waste energy may be decreased from 30.8 kW to 12.9kW in this specific example, see figure 2, where the inner boom (IB) is activated at another point in time and is not illustrated in figure 2. Here, the total energy input is 28.3kW, and the waste energy is 12.9kW, i.e. 83.78% of the useful energy.
The waste energy may be further decreased to 1.3 kW in another specific case, by also refraining from operating the outer boom (GB), see figure 3 (the outer boom function is hence not illustrated in figure 3 as it is activated individually at another point in time). In this case the total input energy is 14.2kW, and the waste energy is 1.3kW, i.e. 9.68% of the useful energy.
From these examples one can see that simultaneous use of a function with a high pressure demand and a function requiring a low pressure but a high flow should be avoided to reduce energy waste. For automatic crane functions where the target position of the crane tip, or the target geometry of the crane components, is known and the movements of individual crane functions are planned by a crane controller this aspect may be taken into account when planning the movement scheme to reach a target.
The energy supplied by the hydraulic pump to the crane system is dependent on the hydraulic power, which is calculated by the pressure multiplied by the flow supplied by the pump. The different hydraulic cylinders used for crane functions like the slewing of the crane, the first boom movement, the second boom movement and the extension/retraction of a second boom telescopic boom system, have different working requirements in terms of pressure and flow. The required pressure may further be dependent on the load and the position of the respective crane components but may be monitored using pressure sensors and further estimated for future movements based on input from the pressure sensors and/or known parameters of the planned movements.
The simplest version of an energy efficient path planner would be moving only one crane function at a time to reach the target angle or length to reach the target position or geometry. As an example, first slew, then the first boom, then the second boom, and then finish by moving the extensions. By doing so we would not get any energy waste at all. However, the time for completing the movement would be considerably longer than compared to the normal case with simultaneous multiple functions and the crane components would likely hit either the vehicle or some obstacles in the environment.
So to solve these issues, the path planner must be smarter, the easiest method is to move the known high pressure functions first, normally the first and the second boom which pressures can be assumed high, or measured.
Example on a path: Use available flow to move first and second booms to its goal angles for reaching the target position, move slew as fast as possible to its goal angle, and at same time drive extension, but prioritize flow to slew to reach target as fast as possible, and move extension to target position.
To reach the target position it is likely that practical issues like the bending of the boom system etc. will require a slight repositioning of the crane tip close to target to reach it exactly. This may be performed as a final adjustment, or if these factors are known from the start, they may be further taken into consideration when planning the movements.
The above-described planner is a "simple" example of the planner to illustrate the crane and method as defined by the appended claims. If this should be implemented in a product, more complex approach in the planner could further take into account effects of bending, pressures, flow needs, the distance from start to end position when planning a path which is as efficient as possible but not slowing down the crane.
With references to figures 4 and 5, the present invention will now be described in detail. Thus, the present invention relates to a crane 2 arranged to be mounted to e.g. a vehicle 4, or any other object, e.g. a boat, a building, a wind turbine. The crane comprises a crane boom system, comprising crane components 6 that includes a crane tip 8 arranged at a free end of an outermost crane boom. More particularly, the crane components 6 may comprise a crane column arranged to rotate, or slew, around a vertical axis perpendicular to the plane of the vehicle, a first (inner) boom connected to the crane column, and a second (outer) telescopic boom connected to the first boom and provided with one or more extensions. Additional components, such as additional telescopic booms (also referred to as jibs) or crane tool may form part of the crane components.
Furthermore, the crane comprises a system 10 of hydraulic actuators of the crane boom system arranged to be operated by hydraulic fluid with a hydraulic flow, where the hydraulic fluid being discharged from a hydraulic pump 12 at a variable working pressure. The hydraulic actuators are further arranged to apply movements to the crane boom system such that the crane tip 8 is moved from a current position to a target position in response to received driving instructions 14.
The crane also comprises a sensor system 16 configured to monitor current positions of the crane components, and operating conditions of the system 10 of hydraulic actuators, and to generate sensor signals 18 in response to the monitored current positions and operating conditions. Thus, the sensor system is configured to monitor current positions of the crane components, and comprises sensors arranged to measure e.g. an angle of a crane boom compared to a reference plane, or the extension length of the telescopic boom. The sensor system is also configured to monitor the operating conditions of the system of the hydraulic actuators and the hydraulic pump, and to generate sensor signals in response to measured pressures and flows at specific parts of the hydraulic system. The sensor system is hence used to monitor current positions and operating conditions of the crane.
In addition the crane comprises a control interface 20 arranged to receive an operating instruction, preferably from an input unit 22, defining wanted movements of the crane components.
The crane also comprises a crane controller 24 configured to generate driving instructions 14 to be applied to the system 10 of hydraulic actuators of the crane boom system based on the received set of operating instructions defining wanted movements of the crane components.
The input unit 22, e.g. a maneuvering unit, may be used by an operator to operate the crane, remotely or at the site of the working assignment for the crane. The control interface of the crane may alternatively comprise an interface to an autonomous system controlling the crane and optionally also the vehicle that the crane is mounted to. As an example, the crane operator may by pulling a first and a second lever at the maneuvering unit, generate operating instructions for raising the first boom of the crane and at the same time extending the second boom telescopic extensions. The operation instructions will be received over the control interface and the crane controller will generate driving instructions to be applied to the hydraulic system so that the hydraulic cylinders of the first boom and extension cylinders are supplied with hydraulic fluid accordingly.
The crane controller 24 is further configured to estimate a pressure level of a required working pressure of the hydraulic pump 12 and required flow level of each of the hydraulic actuators for the wanted movements of the crane components 6, based on the generated sensor signals 18 and/or predetermined operating conditions. The crane controller 24 is also configured to estimate a waste contribution measure for the wanted movements of the crane components 6, based on the difference between the working pressure of the hydraulic pump 12 and the estimated pressure levels and further the estimated required flow level, of each of the hydraulic actuators for the wanted movements of the crane components 6. The waste contribution measure is a measure of the energy waste if the wanted movements of the crane components are performed in comparison to the energy required for each of the involved hydraulic actuators at specific point of time.
The crane controller 24 is then configured to compare the estimated waste contribution measure to a predetermined level, and in response to determining that the estimated waste contribution measure is larger than the predetermined level, the crane controller 24 is configured to generate an energy consumption status signal 30 indicating that the present crane operations are inefficient from an energy consumption perspective. The energy consumption signal 30 indicates when the present crane operation are inefficient, and may also be configured to indicate when the crane operation again is efficient from an energy consumption perspective, e.g. as a result of changed input operation instructions from the operator. Thereby a positive feedback to the operator will be available. The values of the energy consumption status signal 30 may be stored over time and then be available for further analysis.
According to one embodiment, the predetermined level is a predefined percentage of the hydraulic power required for the wanted movements of the crane components 6. The predetermined level may be in the range of 25%-50% of the hydraulic power required for the wanted movements. As an alternative, the waste contribution measure may be a constant, configurable by e.g. the operator, the fleet manager, or preset when installing the crane on e.g. the vehicle.
The energy supplied by the hydraulic pump to the crane components is defined as the integral of the hydraulic power over a time period of operation. The hydraulic power is calculated by the pressure multiplied by the flow supplied by the pump. The different hydraulic cylinders used for crane functions like the slewing of the crane, the first boom movement, the second boom movement and the extension/retraction of the second boom telescopic boom system, have different working requirements in terms of pressure and flow. The required pressure may further be dependent on the load and the position of the respective crane components but may be monitored using pressure sensors and further estimated for future movements based on input from the pressure sensors and/or known parameters of the planned movements.
In a further embodiment, the control interface 20 is configured to generate an alert signal 32 if the energy consumption status signal 30 is generated, and that the alert signal 32 is an optical signal, an acoustic signal, and/or a tactile signal. Preferably, the input unit 22 is a maneuvering unit 22 to be operated by the operator and wherein the alert signal 32 (indicated as a dashed arrow in figure 5) to the operator is transmitted by a visual, audio, or tactile communication means through the maneuvering unit 22. The crane interface 20 may further be arranged to receive an operation mode instruction, e.g. from the operator, in response to which the crane controller is arranged to refrain from generating the energy consumption status signal.
In another embodiment, the crane controller 24 is further configured to identify, in response to determining that the estimated waste contribution measure is larger than the predetermined level, at least one of the hydraulic actuators as a suggested crane function to deactivate, or to reduce energy consumption of, for a crane operator via the control interface 20. The suggested crane function to deactivate, or to reduce energy consumption of, is preferably identified as a crane function with a low estimated pressure level and a high estimated flow level relative to the other hydraulic actuators or as a crane function with a high pressure relative to the other hydraulic actuators. The suggested crane function is preferably indicated and presented to the crane operator via the input unit 22 and the operator may then adjust the crane operation accordingly.
The crane interface 20 may be further arranged to receive an instruction for the crane controller to enter in an energy efficiency alert mode. In the energy efficiency alert mode feedback to the operator will be generated to encourage the operator to operate the crane in an energy efficient manner. This would give the operator of the crane the opportunity to decide when to operate the crane according to the invention, and when to selectively operate the crane in a normal mode according to what is known in the art.
In another embodiment, the crane further comprises a communication interface 34 for transmitting crane operation data to a crane monitoring service, and that the crane controller 24 is further configured to transmit the generated energy consumption status signal 30 to the crane monitoring service via the communication interface. The optional communication interface 34 is indicated in figure 5 as a dashed box. The communication may be performed using any available wireless communication protocol, e.g. via Bluetooth, Internet.
The crane controller may be implemented by one or many processing units. These processing unit may have different dedicated tasks, e.g. by so-called edge computing. Edge computing is a distributed computing method that brings computation and data storage closer to the location where it is needed, in order to improve response times and save bandwidth. As an example, one processing unit may perform the actual control of the crane, and another may perform calculations and analysis by extracting data from the crane operation procedures, that advantageously may be communicated to an external crane monitoring service.
According to another embodiment, the crane comprises at least one electric motor 26 arranged to be powered by a battery system 28, and/or a fuel cell, and further being arranged to drive the hydraulic pump 12. The electrical energy from the battery system to the electric motor is illustrated by a bold arrow in figure 5, which also indicates the driving power to the hydraulic pump. As an alternative, the hydraulic pump is driven by a diesel engine on the vehicle.
According to the present invention a vehicle 4 is provided, that comprises a crane 2 as described above.
The present invention also relates to a method of a crane 2 arranged to be mounted to e.g. a vehicle 4. The crane has been described in detail above and it is herein referred to that description. The method will now be described with references to the flow diagram shown in figure 6.
The method comprises: A - Estimating a pressure level of the required working pressure of the hydraulic pump and a required flow level of each of the hydraulic actuators for the wanted movements of the crane components, based on the generated sensor signals and/or predetermined operation conditions. B - Estimating a waste contribution measure for the wanted movements of the crane components, based on the difference between the working pressure of the hydraulic pump and the estimated pressure levels and further the estimated required flow level, of each of the hydraulic actuators for the wanted movements of the crane components. C - Comparing the estimated waste contribution measure to a predetermined level, and in response to determining that the estimated waste contribution measure is larger than the predetermined level, the method further comprises: D - Generating an energy consumption status signal indicating that the present crane operations are inefficient from an energy consumption perspective.
In the following, some embodiments of the method are listed. These have the same technical features and advantages as for the corresponding features of the crane described above. Consequently, these technical features and advantages are not repeated or explained anew in order to avoid unnecessary repetition.
Preferably, the predetermined level is a predefined percentage of the hydraulic power required for the wanted movements of the crane components.
In a further embodiment, the method comprises generating an alert signal if the energy consumption status signal is generated, and that the alert signal is an optical signal, an acoustic signal, and/or a tactile signal.
In still another embodiment, the method comprises identifying, in response to determining that the estimated waste contribution measure is larger than the predetermined level, at least one of the hydraulic actuators as a suggested crane function to deactivate, or to reduce energy consumption of, for a crane operator via the control interface. The suggested crane function to deactivate, or to reduce energy consumption of, is preferably identified as a crane function with a low estimated pressure level and a high estimated flow level relative to the other hydraulic actuators or as a crane function with a high pressure relative to the other hydraulic actuators.
In another embodiment, the method comprises transmitting crane operation data to a crane monitoring service, and transmitting the generated energy consumption status signal to the crane monitoring service via a communication interface.
The present invention is not limited to the above-described preferred embodiments. Various alternatives, modifications and equivalents may be used. Therefore, the above embodiments should not be taken as limiting the scope of the invention, which is defined by the appending claims.

Claims (15)

  1. Claims 1. A crane (2) arranged to be mounted to e.g. a vehicle (4), the crane comprising: - a crane boom system, comprising crane components (6) that includes a crane tip (8) arranged at a free end of an outermost crane boom;
    - a system (10) of hydraulic actuators of the crane boom system arranged to be operated by hydraulic fluid with a hydraulic flow, the hydraulic fluid being discharged from a hydraulic pump (12) at a variable working pressure and wherein the hydraulic actuators are further arranged to apply movements to the crane boom system in response to received driving instructions (14); - a sensor system (16) configured to monitor current positions of the crane components, and, operating conditions of the system (10) of hydraulic actuators, and to generate sensor signals (18) in response to the monitored current positions and operating conditions; - a control interface (20) arranged to receive a set of operating instructions, defining wanted movements of the crane components, and - a crane controller (24) configured to generate driving instructions (14) to be applied by the system (10) of hydraulic actuators of the crane boom system based on the received set of operating instructions defining wanted movements of the crane components, c h a r a c t e r i z e d i n that the crane controller (24) is further configured to estimate a pressure level of a required working pressure of the hydraulic pump (12) and a required flow level of each of the hydraulic actuators for the wanted movements of the crane components (6), based on the generated sensor signals (18) and/or predetermined operation conditions, and to estimate a waste contribution measure for the wanted movements of the crane
    components (6), based on the difference between the working pressure of the hydraulic pump (12) and the estimated pressure levels and further the estimated required flow level, of each of the hydraulic actuators for the wanted movements of the crane components (6), wherein the crane controller (24) is configured to compare the estimated waste contribution measure to a predetermined level, and in response to determining that the estimated waste contribution measure is larger than the predetermined level, the crane controller (24) is configured to generate an energy consumption status signal (30) indicating that the present crane operations are inefficient from an energy consumption perspective.
  2. 2. The crane (2) according to claim 1, wherein said predetermined level is a predefined percentage of the hydraulic power required for the wanted movements of the crane components (6).
  3. 3. The crane (2) according to claim 1 or 2, wherein said control interface (20) is configured to generate an alert signal (32) if said energy consumption status signal (30) is generated, and that said alert signal (32) is an optical signal, an acoustic signal, and/or a tactile signal.
  4. 4. The crane (2) according to claim 3, wherein the control interface (20) comprises a maneuvering unit (22) to be operated by the operator and wherein the alert signal (32) to the operator is transmitted by a visual, audio, or tactile communication means through the maneuvering unit (22).
  5. 5. The crane (2) according to any of claims 1-4, wherein the crane controller (24) is further configured to identify, in response to determining that the estimated waste contribution measure is larger than the predetermined level, at least one of the hydraulic actuators as a suggested crane function to deactivate, or to reduce energy consumption of, for a crane operator via the control interface (20).
  6. 6. The crane (2) according to claim 5, wherein the suggested crane function to deactivate, or to reduce energy consumption of, is identified as a crane function with a low estimated pressure level and a high estimated flow level relative to the other hydraulic actuators or as a crane function with a high pressure relative to the other hydraulic actuators.
  7. 7. The crane (2) according to any of claims 1-6, further comprising a communication interface (34) for transmitting crane operation data to a crane monitoring service, wherein the crane controller (24) is further configured to transmit said generated energy consumption status signal (30) to the crane monitoring service via the communication interface.
  8. 8. The crane (2) according to any of claims 1-7, further comprising at least one electric motor (26) arranged to be powered by a battery system (28) or a fuel cell and further being arranged to drive the hydraulic pump (12).
  9. 9. A method of a crane arranged to be mounted to a vehicle, the crane comprising: - a crane boom system, comprising crane components (6) that includes a crane tip (8) arranged at a free end of an outermost crane boom; - a system (10) of hydraulic actuators of the crane boom system arranged to be operated by hydraulic fluid with a hydraulic flow, the hydraulic fluid being discharged from a hydraulic pump (12) at a variable working pressure and wherein the hydraulic actuators are further arranged to apply movements to the crane boom system in response to received driving instructions (14); - a sensor system (16) configured to monitor current positions of the crane components, and, operating conditions of the system (10) of hydraulic actuators, and to generate sensor signals (18) in response to the monitored current positions and operating conditions; - a control interface (20) arranged to receive a set of operating instructions, defining wanted movements of the crane components, and - a crane controller (24) configured to generate driving instructions (14) to be applied by the system (10) of hydraulic actuators of the crane boom system based on the received set of operating instructions defining wanted movements of the crane components, c h a r a c t e r i z e d i n that the method comprises: A - estimating a pressure level of the required working pressure of the hydraulic pump and a required flow level of each of the hydraulic actuators for the wanted movements of the crane components, based on the generated sensor signals and/or predetermined operation conditions, B - estimating a waste contribution measure for the wanted movements of the crane components, based on the difference between the working pressure of the hydraulic pump and the estimated pressure levels and further the estimated required flow level, of each of the hydraulic actuators for the wanted movements of the crane components,
    C - comparing the estimated waste contribution measure to a predetermined level, and in response to determining that the estimated waste contribution measure is larger than the predetermined level, the method further comprises: D - generating an energy consumption status signal indicating that the present crane operations are inefficient from an energy consumption perspective.
  10. 10. The method according to claim 9, wherein said predetermined level is a predefined percentage of the hydraulic power required for the wanted movements of the crane components.
  11. 11. The method according to claim 9 or 10, comprising generating an alert signal if said energy consumption status signal is generated, and that said alert signal is an optical signal, an acoustic signal, and/or a tactile signal.
  12. 12. The method according to any of claims 9-11, comprising identifying, in response to determining that the estimated waste contribution measure is larger than the predetermined level, at least one of the hydraulic actuators as a suggested crane function to deactivate, or to reduce energy consumption of, for a crane operator via the control interface.
  13. 13. The method according to claim 12, wherein the suggested crane function to deactivate, or to reduce energy consumption of, is identified as a crane function with a low estimated pressure level and a high estimated flow level relative to the other hydraulic actuators or as a crane function with a high pressure relative to the other hydraulic actuators.
  14. 14. The method according to any of claims 9-13, comprising transmitting crane operation data to a crane monitoring service, and transmitting said generated energy
    consumption status signal to the crane monitoring service via a mobile communication interface.
  15. 15. A vehicle (4) comprising a crane (2) according to any of claims 1-8.
AU2022202554A 2021-05-04 2022-04-19 An energy efficient crane, and a method of the crane Pending AU2022202554A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
EP21172008.1A EP4086216B1 (en) 2021-05-04 2021-05-04 An energy efficient crane, and a method of the crane
EP21172008.1 2021-05-04

Publications (1)

Publication Number Publication Date
AU2022202554A1 true AU2022202554A1 (en) 2022-11-24

Family

ID=75801465

Family Applications (1)

Application Number Title Priority Date Filing Date
AU2022202554A Pending AU2022202554A1 (en) 2021-05-04 2022-04-19 An energy efficient crane, and a method of the crane

Country Status (2)

Country Link
EP (1) EP4086216B1 (en)
AU (1) AU2022202554A1 (en)

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140060030A1 (en) 2012-08-31 2014-03-06 Caterpillar Inc. Hydraulic accumulator health monitor
EP3225855B1 (en) 2014-11-24 2021-08-25 Xuzhou Heavy Machinery Co., Ltd. Method and system for recovering and utilizing duty energy of crane, and crane
DK3257805T3 (en) 2016-06-13 2019-04-01 Cargotec Patenter Ab HYDRAULIC CRANE
DE102018206271A1 (en) 2018-04-24 2019-10-24 Putzmeister Engineering Gmbh Method for controlling the movement of a mast and working machine

Also Published As

Publication number Publication date
CN115285857A (en) 2022-11-04
EP4086216A1 (en) 2022-11-09
EP4086216B1 (en) 2023-11-29
EP4086216C0 (en) 2023-11-29

Similar Documents

Publication Publication Date Title
EP2851475B1 (en) Hybrid construction machinery
US9739036B2 (en) Automatic control system and method for joystick control-based construction equipment
US20170291501A1 (en) Hybrid Construction Machinery
EP2517921A2 (en) System and method for charging capacitors of an electric vehicle
CN107848773B (en) Crane and method for controlling crane
KR101749515B1 (en) Apparatus for controlling velocity of motor and method thereof
US20220412054A1 (en) Shovel, information processing apparatus, and recording medium
US11629480B2 (en) Working equipment with electrically powered hydraulically operated arm arrangement
EP4086216B1 (en) An energy efficient crane, and a method of the crane
US11851846B2 (en) Excavator
EP4086215B1 (en) An energy efficient crane, and a method of the crane
JP5616086B2 (en) Generator drive control device for crane mounted on vehicle
CN115285857B (en) Energy-saving crane and crane method
US7665971B1 (en) Method of obtaining required power on demand from an engine
US10570585B2 (en) Control device and control method for construction machine
EP4086214B1 (en) A crane, and a method of a crane
CN102016187A (en) Method of controlling a hydraulic system
JP2012158890A (en) Drive control device for working machine
GB2518413A (en) Anti-lug and anti-stall control unit
CN111439252B (en) Hybrid vehicle, torque control method, storage medium, and transmission controller
JP6493648B1 (en) Crane truck
JP7445473B2 (en) excavator
US20180258899A1 (en) Work machine and engine stopping control device
JP2023142206A (en) Electric shovel, display device, and program
KR20130002463A (en) Electric forklift hydraulic pump system to control the way