AU2016241265A1 - Gateway device, demand response system, and program for gateway device - Google Patents

Gateway device, demand response system, and program for gateway device Download PDF

Info

Publication number
AU2016241265A1
AU2016241265A1 AU2016241265A AU2016241265A AU2016241265A1 AU 2016241265 A1 AU2016241265 A1 AU 2016241265A1 AU 2016241265 A AU2016241265 A AU 2016241265A AU 2016241265 A AU2016241265 A AU 2016241265A AU 2016241265 A1 AU2016241265 A1 AU 2016241265A1
Authority
AU
Australia
Prior art keywords
request
control
target
power amount
demand response
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
AU2016241265A
Other versions
AU2016241265B2 (en
Inventor
Naohiro Fukuda
Yoshiaki Matsumoto
Norio Miyazaki
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Intellectual Property Management Co Ltd
Original Assignee
Panasonic Intellectual Property Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Panasonic Intellectual Property Management Co Ltd filed Critical Panasonic Intellectual Property Management Co Ltd
Publication of AU2016241265A1 publication Critical patent/AU2016241265A1/en
Application granted granted Critical
Publication of AU2016241265B2 publication Critical patent/AU2016241265B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • H02J3/144Demand-response operation of the power transmission or distribution network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04MTELEPHONIC COMMUNICATION
    • H04M11/00Telephonic communication systems specially adapted for combination with other electrical systems
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/50The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
    • H02J2310/56The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads characterised by the condition upon which the selective controlling is based
    • H02J2310/58The condition being electrical
    • H02J2310/60Limiting power consumption in the network or in one section of the network, e.g. load shedding or peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Signal Processing (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Telephonic Communication Services (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

A gateway device (2) is provided with: a storage unit (24) in which is stored a strategy table (243) in which are recorded in advance for each prescribed priority order a plurality of request patterns, each of the patterns having associated therewith a request candidate of interest, a request adjustment power amount, and at least one type of request information including a request of interest, which is a device group, among a plurality of device groups, that is subject to a control request, and a control command to the request of interest; and a conversion process unit (231) for specifying the request pattern in the strategy table (243) having the highest priority ranking among request patterns matching the request adjustment power amount and request candidate of interest specified in a demand response request, and generating a control request including request information for each type of request information extracted from the specified request pattern.

Description

DESCRIPTION
GATEWAY DEVICE, DEMAND RESPONSE SYSTEM, AND PROGRAM FOR
GATEWAY DEVICE
TECHNICAL FIELD
[0001]
The present invention relates to a gateway device, a demand response system, and a program for the gateway device.
BACKGROUND ART
[0002]
There has been known what is called demand response (DR) for stably supplying power by way of a consumer adjusting a power use amount or a power generation amount according to a request from a power supplier. In DR in general, a gateway device which relays communication between a power company or an aggregator and a consumer is present between them (see PTL l). Such a gateway device transmits a control request to a predetermined consumer in accordance with a communication protocol different from that for a DR request transmitted from a supplier in response to the DR request.
Citation List Patent Literature [0003] PTL L Japanese Unexamined Patent Application Publication No. 2002-10532
SUMMARY OF THE INVENTION TECHNICAL PROBLEM
[0004]
However, the technique described in PTL 1 may deteriorate a 1 DR-request satisfied rate due to direct increase in processing load for protocol conversion and in communication traffic in networks, accompanied by increase in the number of consumers which are destinations for transmitting control requests. 5 [0005]
In view of the above problem, the present invention has an object to provide a gateway device, a demand response system, and a program for the gateway device which can increase a DR-request satisfied rate. SOLUTIONS TO PROBLEM 10 [0006]
In order to achieve the above-described object, a gateway device according to an aspect of the present invention is a gateway device which transmits a control request for control of devices to at least one of a plurality of device groups, in response to a demand response request for adjustment of a 15 power amount, the demand response request being transmitted from an aggregator, the gateway device including: a first communication circuit which receives the demand response request from the aggregator in accordance with a first protocol, the demand response request specifying a requested adjustment power amount indicating a power amount by which a current power amount is 20 to be adjusted and a request target candidate which is a device group included in the plurality of device groups and can be a target for the control request; a storage which stores, in advance, a strategy table which stores a plurality of request patterns in which the following are associated with one another for each of predetermined priority ranks: the request target candidate, the 25 requested adjustment power amount, at least one request information item including a request target and a control command to the request target, the request target being a device group which is included in the plurality of device 2 groups and is a target for the control request; a conversion processor which identifies a request pattern having a highest priority rank in the strategy table from among request patterns which match the requested adjustment power amount and the request target candidate specified by the demand response 5 request received by the first communication circuit, and generates, for each of the at least one request information item extracted from the identified request pattern, the control request which includes the request information item; a second communication circuit which transmits the control request generated by the conversion processor to the request target indicated by the request 10 information item included in the control request in accordance with a second protocol different from the first protocol, and receives a response to the control request from the request target; and a learning processor which changes a priority rank of a requested pattern included in the strategy table and identified by the conversion processor, based on the request target received by 15 the second communication circuit.
[0007]
In addition, a demand response system according to an aspect of the present invention includes the gateway device, the aggregator, and the plurality of device groups. 20 [0008]
Furthermore, a program for a gateway device according to an aspect of the present invention is a program for a gateway device including a computer which transmits a control request for control of devices to at least one of a plurality of device groups, in response to a demand response request for 25 adjustment of a power amount, the demand response request being transmitted from an aggregator, the program causing the computer to function as the following: a first communication circuit which receives the demand response 3 request from the aggregator in accordance with a first protocol, the demand response request specifying a requested adjustment power amount indicating a power amount by which a current power amount is to be adjusted and a request target candidate which is a device group included in the plurality of device 5 groups and can be a target for the control request; a storage which stores, in advance, a strategy table which stores a plurality of request patterns in which the following are associated with one another for each of predetermined priority ranks: the request target candidate, the requested adjustment power amount, at least one request information item including a request target and a control 10 command to the request target, the request target being a device group which is included in the plurality of device groups and is a target for the control request; a conversion processor which identifies a request pattern having a highest priority rank in the strategy table from among request patterns which match the requested adjustment power amount and the request target candidate 15 specified by the demand response request received by the first communication circuit, and generates, for each of the at least one request information item extracted from the identified request pattern, the control request which includes the request information item; a second communication circuit which transmits the control request generated by the conversion processor to the 20 request target indicated by the request information item included in the control request in accordance with a second protocol different from the first protocol, and receives a response to the control request from the request target; and a learning processor which changes a priority rank of a requested pattern included in the strategy table and identified by the conversion processor, based 25 on the request target received by the second communication circuit. ADVANTAGEOUS EFFECT OF INVENTION [0009]
According to the present invention, it is possible to provide the gateway device, the demand response system, and the program for the gateway device which can increase a DR-request satisfied rate.
BRIEF DESCRIPTION OF DRAWINGS
[0010] FIG. 1 is a block diagram for illustrating a basic configuration of a demand response system according to an embodiment of the present invention. FIG. 2 illustrates an example of a message table for use in the demand response system according to the embodiment of the present invention. FIG. 3 illustrates an example of a task table for use in the demand response system according to the embodiment of the present invention. FIG. 4 illustrates an example of a strategy table for use in the demand response system according to the embodiment of the present invention. FIG. 5 is a flowchart for illustrating operations in the demand response system according to the embodiment of the present invention. FIG. 6 is a sequence diagram for illustrating operations in the demand response system according to the embodiment of the present invention. FIG. 7 illustrates an example of a configuration of a device group included in the demand response system according to the embodiment of the present invention. FIG. 8 illustrates an example of a strategy table for use in the demand response system according to the embodiment of the present invention. FIG. 9 illustrates an example of a strategy table for use in the demand response system according to the embodiment of the present invention. FIG. 10 illustrates an example of a strategy table for use in the demand response system according to the embodiment of the present invention.
DESCRIPTION OF EXEMPLARY EMBODIMENTS 5
Hereinafter, a gateway device etc. according to this embodiment is described with reference to the drawings. It is to be noted that each of the exemplary embodiments described below illustrates a preferred specific example. Accordingly, the numerical values, shapes, materials, constituent elements, the arrangement and connection of the constituent elements, processes (steps), the processing order of the processes etc. shown in the following exemplary embodiments are mere examples, and therefore do not limit the scope of the present invention. Therefore, among the constituent elements in the following exemplary embodiments, constituent elements not recited in any one of the independent claims that define the most generic concept of the present invention are described as arbitrary constituent elements. It is to be noted that each of the drawings is a schematic diagram, and is not necessarily illustrated precisely.
[0012] EMBODIMENT 1
This embodiment describes a gateway device, a demand response system, and a program for the gateway device which enable increase in a DR-request satisfied rate by introducing a strategy to reduce processing load and communication traffic.
[0013] (Demand response system)
As illustrated in FIG. 1, the demand response system according to this embodiment includes1 aggregator l; gateway device 2; a plurality of device groups 3 each of which is a power consumer; and a power company which is a power supplier. Each of device groups 3 is supplied with power from power company 4 through a not-shown power system. 6
Power company 4 includes management device 41. Management device 41 monitors balance between the amount of power supply from power company 4 and the amount of power consumed by the power consumer. When the power consumption amount increases relatively and the balance with the power supply amount is unlikely to be maintained, management device 41 transmits, to aggregator 1, a power amount adjustment request including a requested power amount by which a current power amount is to be adjusted and a requested period for the adjustment. Management device 41 is connected communicatively to aggregator 1 in accordance with a communication protocol such as automated demand response (OpenADR).
[0015]
Here, requested power amounts include a power use amount and a power generation amount. Adjustment of a power use amount includes reduction and increase of the power use amount. To adjust a power generation amount includes to reduce and increase the power generation amount. In other words, in this embodiment, “to adjust a power amount” is at least one of to reduce a power use amount, to increase a power use amount, to reduce a power generation amount, and to increase a power generation amount.
[0016]
Aggregator 1 is a computer including communication circuit 11 which communicates with an external device, processor 12, and storage 13.
Aggregator 1 is located between power company 4 and gateway device 2.
Communication circuit 11 communicates with management device 41 and gateway device 2. When communication circuit 11 receives a power amount adjustment request from management device 41, processor 12 generates a demand response (DR) request for adjustment of a power amount to gateway 7 device 2 to which a power consumer is connected, and transmits the DR request to gateway device 2 through communication circuit 11. Communication circuit 11 is connected communicatively to gateway device 2.
[0017]
Storage 13 stores in advance information such as identifiers Bi, B2, . . . Bn of the plurality of device groups 3 and power use amounts. Processor 12 generates a DR request in response to a power amount adjustment request from power company 4. The DR request specifies1 a requested adjustment power amount indicating a requested power amount by which a current power amount is to be adjusted; a request target candidate which is device group 3 that is included in the plurality of device groups 3 and can be a target for a control request; and a requested period (temporal condition). Communication circuit 11 transmits the DR request generated by processor 12 to gateway device 2 in accordance with a first protocol. The first protocol is a communication protocol such as OpenADR.
[0018]
Gateway device 2 is a computer including first communication circuit 21, second communication circuit 22, processor 23, and storage 24. First communication circuit 21 receives the DR request specifying the requested adjustment power amount, the request target candidate, the requested period, etc. from aggregator 1 in accordance with the first protocol. First communication circuit 21 is connected communicatively to aggregator 1.
[0019]
Processor 23 includes conversion processor 231, learning processor 232, and condition determiner 233. Processor 23 includes, for example, a central processing unit (CPU). The respective elements of processor 23 are indicated as logical structures, and each of the elements may be configured with a 8 separate hardware item or all of them may be configured with an integrated hardware item.
[0020]
Conversion processor 231 generates a control request in accordance 5 with a second protocol to the plurality of device groups 3, based on the DR request in accordance with the first protocol received by first communication circuit 21, and thereby converts the communication in accordance with the first protocol to communication in accordance with the second protocol. Examples of protocols which can be employed as the second protocol include1 Smart 10 Energy Profile (SEP), ECHONETLite, BACnet, IEEE1888/FIAP (Facility Information Access Protocol). Other communication protocols having unique command systems can also be employed as the second protocol.
[0021]
Learning processor 232 performs processing for learning a strategy 15 relating to a control request generated by conversion processor 231 according to a response from the plurality of device groups 3 made in response to the control request. Condition determiner 233 determines each condition in the generation of the control request by conversion processor 231.
[0022] 20 Storage 24 stores message table 241, task table 242, strategy table 243, and register 244. Storage 24 is a storage device such as an auxiliary storage and a main storage. Each of the information items may be stored in a separate hardware item, or all of the information items may be stored in an integrated hardware item. 25 [0023]
Message table 241 is a record of each of DR requests received by first communication circuit 21 in accordance with the first protocol. As illustrated 9 in FIG. 2 for example, message table 241 includes information items which are sources, destinations, requested adjustment power amounts, request target candidates, etc. Here, “A” as a source means the identifier of aggregator 1 and “G” as a destination means the identifier of gateway device 2. Requested adjustment power amount means a requested power amount by which a current power amount is to be adjusted. A request target candidate means device group 3 which is included in the plurality of device groups 3 and can be a request target.
[0024]
For example, in an example illustrated in the first row of FIG. 2, the DR request transmitted from aggregator 1 means a message for requesting adjustment of a power use amount of 10 kW under control of at least one of six device groups 3 indicated by Βι-β.
[0025]
As illustrated in FIG. 3, task table 242 stores tasks that are currently being executed by processor 23 of gateway device 2. FIG. 3 corresponds to FIG. 2, and shows that each task according to a DR request transmitted from aggregator 1 is currently being executed.
[0026]
As illustrated in FIG. 4, strategy table 243 stores in advance a plurality of request patterns for respective predetermined priority ranks. In each request pattern, the following are associated with one another^ a request target candidate, a requested adjustment power amount, at least one request information item including a request target and a control command to the request target. The request target is device group 3 which is included in the plurality of device groups 3 and is a target for the control request.
[0027]
Register 244 is a processor register for storing information transmitted or received by gateway device 2. Register 244 may be also used as a temporary storage necessary for operation performed by processor 23.
[0028] 5 When first communication circuit 21 receives the DR request, conversion processor 231 searches strategy table 243 for request patterns that match the requested adjustment power amount and the request target candidate received by first communication circuit 21. Conversion processor 231 identifies the request pattern which has the highest priority rank in the 10 searched-out request patterns, and extracts a request information item from the identified request pattern. Conversion processor 231 generates, for each request information item extracted from the request pattern, a control request including the request information item.
[0029] 15 Second communication circuit 22 transmits a control request generated by conversion processor 231 to device group 3 which is a request target indicated by the request information item included in the control request in accordance with the second protocol. In addition, second communication circuit 22 receives a response to the transmitted control request from device 20 group 3 which is the request target. Second communication circuit 22 is connected communicatively to each of the plurality of devices 3.
[0030]
Learning processor 232 changes the priority rank of the request pattern included in strategy table 243 and identified by conversion processor 231, based 25 on the response from device group 3 made in response to the control request received by second communication circuit 22.
[0031]
Each of the plurality of device groups 3 includes controller 31 and a plurality of devices 32. Device group 3 is an energy management system (EMS) which manages power use amounts, power generation amounts, etc. of devices 32 using controller 31. Devices 32 include load devices such as a cooler and heater, a luminaire, a hot water supplier, etc. power sources such as a solar battery and an accumulator battery, and a smart meter, or the like.
[0032]
Each controller 31 receives a control request transmitted from gateway device 2. According to the received control request, controller 31 adjusts a power amount by controlling device 32 that controller 31 manages in a period indicated by a requested period. Each controller 31 transmits, to gateway device 2, a control response including a scheduled adjustment power amount which is a power amount by which a current power amount is to be adjusted as a response to the control request.
[0033] (Operations in demand response system)
Hereinafter, descriptions are given of examples of operations in the demand response system according to this embodiment, with reference to the flowchart of FIG. 5 and the sequence diagram of FIG. 6.
[0034]
First, processor 12 of aggregator 1 starts processing regarding setting of a DR request in Step Sll upon receiving a power amount adjustment request from management device 41 of power company 4. In Step S12, processor 12
activates a task relating to a demand response. Processor 12 generates a DR request specifying a requested adjustment power amount, a request target candidate, a requested period, etc., in response to the power amount adjustment request from management device 41. In Step S13, communication 12 circuit 11 transmits the DR request generated by processor 12 to gateway device 2 in accordance with a first protocol.
[0035]
In Step S201 in the example illustrated in FIG. 6, aggregator 1 5 transmits, to gateway device 2, the DR request which specifies identifier Al of aggregator 1 itself, identifiers Bi 3 of request target candidates, and a requested adjustment power amount of Δ2.
[0036]
In Step S201, first communication circuit 21 of gateway device 2 10 receives the DR request transmitted from aggregator 1 in accordance with the first protocol. In Step S202, processor 23 activates task GtoBi-3 relating to the demand response when first communication circuit 21 receives the DR request from aggregator 1.
[0037] 15 In Step S203, processor 23 identifies tasks which are currently being executed with reference to task table 242. In Step S204, conversion processor 231 searches for the request patterns corresponding to the task identified in Step S203 with reference to strategy table 243. In other words, conversion processor 231 searches for the request patterns which match the requested 20 adjustment power amount and the request target candidate specified in the DR request received by first communication circuit 21 in Step S201.
[0038]
In Step S205, conversion processor 231 identifies the request pattern which has the highest priority rank in the request patterns searched out in 25 Step S204, and extracts the request information item from the identified request pattern. Conversion processor 231 generates, for each request information item extracted from the request pattern, a control request 13 [0039]
For example, as illustrated in FIG. 6, conversion processor 231 searches for the request pattern which matches the requested adjustment power amount 5 of Δ2 and request target candidate Bi 3 specified in the DR request received by first communication circuit 21 in Step S201. In the case of strategy table 243 as illustrated in FIG. 8, in Step S205, conversion processor 231 obtains the request patterns in the second and third rows as matching request patterns obtained as a result of the search, and identifies the second-row request pattern 10 with the priority rank higher than the priority rank of the third-row request pattern. Conversion processor 231 generates, for each of request information items {Bi, corns) and {B2, coma) extracted from the identified request pattern, a control request including the request information items {Bi, corns) and {B2, corns). 15 [0040]
In Step S206, second communication circuit 22 transmits, in accordance with the second protocol, a control request generated by conversion processor 231 to device group 3 which is a request target indicated by the request information item included in the control request. Conversion processor 231 20 causes register 244 to store the control request which is transmitted by second communication circuit 22.
[0041]
For example, in Step S206 in the example illustrated in FIG. 6, second communication circuit 22 transmits, in accordance with second protocol P2, the 25 control request including request information items {Bi, coim) and {B2, coma) to device groups 3 each having identifier Bi or B2. It is to be noted that the control request includes an identifier (indicated as Bi 3 in Step S206 in FIG. 6) 14 [0042]
In Step S31, controller 31 of device group 3 receives the control request transmitted from gateway device 2. In Step S32, controller 31 automatically calculates a scheduled adjustment power amount in response to the received control request, and generates a control response including the scheduled adjustment power amount. In Step S33, controller 31 transmits the control response generated in Step S32 as a response to the control request to gateway device 2 in accordance with the second protocol. It is to be noted that the control response includes the identifier of the task included in the control request.
[0043]
In Step S207, second communication circuit 22 of gateway device 2 receives the control response to the transmitted control request from device group 3 which is the request target. In Step S208, conversion processor 231 identifies the task including the control request in response to which the control response received by second communication circuit 22 in Step S207 is made [0044]
In Step S209, learning processor 232 changes the priority rank of the request pattern included in strategy table 243 and identified in Step S205, based on the control response received in Step S207.
[0045]
In Step S210, processor 23 identifies whether or not to perform a process for re-transmitting the control request. For example, processor 23 determines that the re-transmission process is performed when a total scheduled adjustment power amount indicated by the control response received 15 in Step S207 is smaller than the requested adjustment power amount indicated by the control request. Processor 23 returns back to the process in Step S203 when determining that the re-transmission process is performed, and transitions to the process in Step S211 when determining that no re-transmission process is performed.
[0046]
In Step S211, first communication circuit 21 transmits a DR response which is a response to the DR request to aggregator 1 in accordance with the first protocol. The DR response includes information indicating the request target candidate and the total scheduled adjustment power amount included in the control response received in Step S207.
[0047]
In Step S14, communication circuit 11 of aggregator 1 receives the DR response to the transmitted DR request from gateway device 2 in accordance with the first protocol. In response to the received DR response, aggregator 1 transmits, to management device 41, a power amount adjustment response to the power amount adjustment request received from management device 41.
[0048]
For example, in the example illustrated in FIG. 6, device groups 3 each having identifier Bi or B2 transmits a control response including scheduled adjustment power amount W in Step S33 to gateway device 2. Each device group 3 assigns scheduled adjustment power amount W with resource names Res 1 and Res 2, and transmits the scheduled adjustment power amount W with resource names Res 1 and Res 2 to gateway device 2. In Step S211, first communication circuit 21 transmits a DR response including the total scheduled adjustment power amount W with resource names Res 1 and 2 (Res 1 and Res 2) to aggregator 1 in accordance with the first protocol. 16 [0049]
The resource names and the scheduled adjustment power amounts are described taking the block diagram of FIG. 7 as an example. As illustrated in FIG. 7, given device group 3 includes input and output (I/O) controller 32Ί, power meter 32-2, load 32-3, and power conditioner 32-4 as devices 32. Each of input and output controller 32-1, power meter 32-2, load 32-3, and power conditioner 32-4 may be a single device or may comprise a plurality of devices. Load 32-3 is, for example, a device which includes a cooler and heater, a luminaire, a hot water supplier, etc., and consumes power supplied from a system power source. Power conditioner 32-4 is connected to a solar power generator etc., converts direct-current power input from a power generator to alternating-current power, and outputs the alternating-current power to the power system.
[0050]
Input and output controller 32-1 controls, for example, a switch connected between the power system and load 32-3 and a switch connected between the power system and power conditioner 32-4, under timer control by controller 31. In this way, input and output controller 32Ί adjusts the amount of power used by load 32-3 and the amount of power generated by power conditioner 32-4. Alternatively, input and output controller 32-1 may directly control driving of load 32-3 and power conditioner 32-4. Power meter 32-2 detects power use amount W of load 32-3 and power generation amount W of power conditioner 32-4, and outputs them to controller 31.
[0051]
Controller 31 calculates scheduled adjustment power amounts corresponding to power use amount W1 of load 32-3 and power generation amount W2 of power conditioner 32-4, and assign them with corresponding 17 the control response with resource names Res 1 and Res 2 to gateway device 2. Gateway device 2 assigns total scheduled adjustment power amount W3 = W1 + (-W2) with resource names Res 1 and Res 2, and transmits the DR response with resource names Res 1 and Res 2 to aggregator 1.
[0052] (Regarding learning process)
Hereinafter, a description is given of an example of an operation by learning processor 232 in Step S209.
[0053]
For example, when total scheduled adjustment power amount W3 included in the control response received in Step S207 in the example illustrated in FIG. 6 is smaller than the requested adjustment power amount of Δ2, learning processor 232 lowers the priority rank of the request pattern identified by conversion processor 231 as illustrated in FIG. 9. In contrast, when total scheduled adjustment power amount W3 is larger than or equal to the requested adjustment power amount of Δ2, learning processor 232 updates strategy table 243 to raise the priority rank of the request pattern.
[0054]
In this way, learning processor 232 changes the priority rank of the request pattern included in strategy table 243 and identified by conversion processor 231, based on the control response to the control request. In this way, gateway device 2 can improve the strategy in transmitting the control request, and can reduce processing load for protocol conversion and communication traffic in a network.
[0055]
In addition, leaning processor 232 may change priority ranks in 18 strategy table 243 for each control response received in Step S207. For example, learning processor 232 calculates expected value E (ΔΒ) with respect to the scheduled adjustment power amount of each request target, compares calculated expected value E (ΔΒ) with the scheduled adjustment power amount, 5 and changes priority ranks based on the comparison result. Expected value E (ΔΒ) can be, for example, a proportional division of scheduled adjustment power amount Δ.
[0056]
Alternatively, as illustrated in FIG. 10, learning processor 232 may 10 calculate a control-request satisfied rate for each kind of control responses received in the past, and change priority ranks in strategy table 243, based on the calculated control-request satisfied rates. Each control-request satisfied rate can be calculated based on the number of satisfied control requests with respect to the number of transmissions of the control requests, and is calculated 15 for each kind of control requests. For example, learning processor 232 updates strategy table 243 in such a manner that higher priority ranks are given in descending order of request-satisfied rates corresponding to request information items associated respectively with requested adjustment power amounts Δ. 20 [0057]
Learning processor 232 may delete a request pattern from strategy table 243, based on the calculated request-satisfied rates. For example, learning processor 232 updates strategy table 243 to delete a request pattern whose calculated request-satisfied rate is smaller than or equal to a 25 predetermined threshold value. In this way, in addition to the reduction in occupied capacity of storage 24, processing load of conversion processor 231 is reduced.
The demand response system according to this embodiment introduces a control strategy in gateway device 2, thereby enabling reduction in processing load for protocol conversion and in communication traffic in a network, and increase in a DR-request satisfied rate.
[0059]
In addition, the demand response system according to this embodiment changes priority ranks in strategy table 243, based on a control response from device group 3. In this way, gateway device 2 can improve the strategy in transmitting the control request, and can further increase the DR-request satisfied rate.
[0060] (OTHER EMBODIMENTS)
While this embodiment has been described above, various alternative embodiments, examples, and operational techniques will be apparent to those skilled in the art from this disclosure.
[0061]
For example, in the above embodiment, storage 24 may store in advance a plurality of strategy tables 243 each defining power use conditions for the plurality of device groups 3. The power use conditions are, for example, temporal conditions such as a season, a day of a week, a time period, a weather forecast. In this case, when first communication circuit 21 receives a DR request which has been transmitted from aggregator 1 and in which power use conditions are specified, conversion processor 231 identifies strategy table 243 which defines matching power use conditions specified by the DR request. It is only necessary for conversion processor 231 to identify the request pattern based on the identified strategy table 243. 20
In addition, in the above-described embodiment, aggregator 1 may be included in power company 4 or may function as gateway device 2.
[0063]
In addition, in the above-described embodiment, each of the functions of gateway device 2 may be implemented as a program for causing a computer to perform the functions. In other words, the present disclosure covers the program for causing a computer to perform the functions of the demand response system according to this embodiment. The program may be read from a storage medium and installed in a computer, or may be transmitted through a network and installed in a computer.
REFERENCE MARKS IN THE DRAWINGS
[0064] 1 aggregator 2 gateway device 3 device group 21 first communication circuit 22 second communication circuit 24 storage 32 device 41 management device 231 conversion processor 232 learning processor 233 condition determiner 243 strategy table 21
9436941_1 (GHMatters) P106792.AU

Claims (6)

1. A gateway device which transmits a control request for control of devices to at least one of a plurality of device groups, in response to a demand response request for adjustment of a power amount, the demand response request being transmitted from an aggregator, the gateway device comprising: a first communication circuit which receives the demand response request from the aggregator in accordance with a first protocol, the demand response request specifying a requested adjustment power amount indicating a power amount by which a current power amount is to be adjusted and a request target candidate which is a device group included in the plurality of device groups and can be a target for the control request; a storage which stores, in advance, a strategy table which stores a plurality of request patterns in which the following are associated with one another for each of predetermined priority ranks: the request target candidate, the requested adjustment power amount, at least one request information item including a request target and a control command to the request target, the request target being a device group which is included in the plurality of device groups and is a target for the control request; a conversion processor which identifies a request pattern having a highest priority rank in the strategy table from among request patterns which match the requested adjustment power amount and the request target candidate specified by the demand response request received by the first communication circuit, and generates, for each of the at least one request information item extracted from the identified request pattern, the control request which includes the request information item; a second communication circuit which transmits the control request generated by the conversion processor to the request target indicated by the request information item included in the control request in accordance with a second protocol different from the first protocol, and receives a response to the control request from the request target; and a learning processor which changes a priority rank of a requested pattern included in the strategy table and identified by the conversion processor, based on the request target received by the second communication circuit.
2. The gateway device according to claim 1, wherein the learning processor calculates a control-request satisfied rate based on a response from the request target in the past, and changes priority ranks in the strategy table based on the control-request satisfied rate.
3. The gateway device according to claim 2, wherein the learning processor deletes the request pattern from the strategy table based on the control-request satisfied rate.
4. The gateway device according to any one of claims 1 to 3, wherein the first communication circuit receives the demand response request in which a temporal condition is specified, the storage stores a plurality of strategy tables each defining temporal conditions, and the conversion processor identifies the request pattern based on a strategy table which is included in a plurality of strategy tables stored in the storage and which matches the temporal condition specified in the demand response request.
5. A demand response system, comprising: the gateway device according to any one of claims 1 to 4; an aggregator; and a plurality of device groups.
6. A program for a gateway device including a computer which transmits a control request for control of devices to at least one of a plurality of device groups, in response to a demand response request for adjustment of a power amount, the demand response request being transmitted from an aggregator, the program causing the computer to function as the following: a first communication circuit which receives the demand response request from the aggregator in accordance with a first protocol, the demand response request specifying a requested adjustment power amount indicating a power amount by which a current power amount is to be adjusted and a request target candidate which is a device group included in the plurality of device groups and can be a target for the control request; a storage which stores, in advance, a strategy table which stores a plurality of request patterns in which the following are associated with one another for each of predetermined priority ranks: the request target candidate, the requested adjustment power amount, at least one request information item including a request target and a control command to the request target, the request target being a device group which is included in the plurality of device groups and is a target for the control request; a conversion processor which identifies a request pattern having a highest priority rank in the strategy table from among request patterns which match the requested adjustment power amount and the request target candidate specified by the demand response request received by the first communication circuit, and generates, for each of the at least one request information item extracted from the identified request pattern, the control request which includes the request information item; a second communication circuit which transmits the control request generated by the conversion processor to the request target indicated by the request information item included in the control request in accordance with a second protocol different from the first protocol, and receives a response to the control request from the request target; and a learning processor which changes a priority rank of a requested pattern included in the strategy table and identified by the conversion processor, based on the request target received by the second communication circuit.
AU2016241265A 2015-03-31 2016-01-27 Gateway device, demand response system, and program for gateway device Active AU2016241265B2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2015072794A JP2016192872A (en) 2015-03-31 2015-03-31 Gateway device, demand response system and program for gateway device
JP2015-072794 2015-03-31
PCT/JP2016/000383 WO2016157673A1 (en) 2015-03-31 2016-01-27 Gateway device, demand response system, and program for gateway device

Publications (2)

Publication Number Publication Date
AU2016241265A1 true AU2016241265A1 (en) 2017-09-21
AU2016241265B2 AU2016241265B2 (en) 2019-04-04

Family

ID=57006624

Family Applications (1)

Application Number Title Priority Date Filing Date
AU2016241265A Active AU2016241265B2 (en) 2015-03-31 2016-01-27 Gateway device, demand response system, and program for gateway device

Country Status (4)

Country Link
JP (1) JP2016192872A (en)
AU (1) AU2016241265B2 (en)
NZ (1) NZ735120A (en)
WO (1) WO2016157673A1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3534491A4 (en) * 2016-10-31 2020-04-29 Kyocera Corporation Power management method, power management server, local control device, and power management system
WO2018079814A1 (en) * 2016-10-31 2018-05-03 京セラ株式会社 Power management method, local control device, and power management system
JP2019091131A (en) * 2017-11-13 2019-06-13 株式会社日立製作所 Facility operation support device, and method and system thereof
WO2020004053A1 (en) 2018-06-28 2020-01-02 京セラ株式会社 Management server, management system, and management method

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4710982B2 (en) * 2009-01-26 2011-06-29 ダイキン工業株式会社 Demand control apparatus, demand control system, and demand control program
KR20110099542A (en) * 2010-03-02 2011-09-08 삼성전자주식회사 Demand response system
JP5668970B2 (en) * 2010-10-01 2015-02-12 清水建設株式会社 Operation management device, operation management method, and operation management program
JP2013051668A (en) * 2011-08-03 2013-03-14 Sharp Corp Communication device, power consumption control method, and program
JP5301702B2 (en) * 2011-09-02 2013-09-25 シャープ株式会社 Controller, power consumption control method, and program
JP5594397B1 (en) * 2013-05-31 2014-09-24 ダイキン工業株式会社 Demand response system

Also Published As

Publication number Publication date
AU2016241265B2 (en) 2019-04-04
JP2016192872A (en) 2016-11-10
WO2016157673A1 (en) 2016-10-06
NZ735120A (en) 2019-05-31

Similar Documents

Publication Publication Date Title
AU2016241265B2 (en) Gateway device, demand response system, and program for gateway device
US8880226B2 (en) System and method to predict optimized energy consumption
US8825217B2 (en) Energy consumption management
US9935459B2 (en) Power network system, and power adjustment apparatus and method
JP2015027257A (en) Power supply-demand control device and power supply-demand control method
JP7048740B2 (en) Management server, management system, and management method
JPWO2015019541A1 (en) Power system stabilization method, power system stabilization system, and power supply device
US20150255986A1 (en) Power interchange system, power transmitting/receiving device, power interchange method, and program
US11342751B2 (en) Power management system for customer connected to power network and having load apparatus and power storage apparatus
JPWO2016158899A1 (en) Control device, device control device and control system
US10600135B2 (en) Energy management system, method, and device for multi-site energy management
US11138679B2 (en) Management method and management apparatus
US11196294B2 (en) Power management method, power management server, local control apparatus, and power management system
CN104272548B (en) Electrical management device, electric power management system and electric power management method
EP3062412B1 (en) Control device, control method, and program
US10714940B2 (en) Power storage control apparatus and power storage control method
JP6363379B2 (en) Energy demand management device, energy demand management system, and energy demand management method
US20180358807A1 (en) Power supply system and power supply apparatus
Zhang et al. A two level feedback system design to provide regulation reserve
JP7326808B2 (en) Negawatt trading support device, negawatt trading system, and negawatt trading method
US20200313459A1 (en) Network management
JP2019075990A (en) Power storage control system, instruction control device, power storage control device, power storage control method and program
JP6625876B2 (en) Advance control determination device, advance control device, and advance control determination program
WO2017131094A1 (en) Power generation system, method for controlling power generation system, and power generation device
EP2940823B1 (en) Power demand adjustment system and power demand adjustment method

Legal Events

Date Code Title Description
FGA Letters patent sealed or granted (standard patent)