AU2015210487B2 - Method of integrating new built structural block and sponson with existing LNG carrier - Google Patents

Method of integrating new built structural block and sponson with existing LNG carrier Download PDF

Info

Publication number
AU2015210487B2
AU2015210487B2 AU2015210487A AU2015210487A AU2015210487B2 AU 2015210487 B2 AU2015210487 B2 AU 2015210487B2 AU 2015210487 A AU2015210487 A AU 2015210487A AU 2015210487 A AU2015210487 A AU 2015210487A AU 2015210487 B2 AU2015210487 B2 AU 2015210487B2
Authority
AU
Australia
Prior art keywords
lng carrier
structural block
existing
integrated
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
AU2015210487A
Other versions
AU2015210487A1 (en
Inventor
Asokkumar NEDUMARAN
Paik Huat SIM
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Seatrium Offshore and Marine Technology Centre Pte Ltd
Original Assignee
Keppel Offshore and Marine Technology Centre Pte Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Keppel Offshore and Marine Technology Centre Pte Ltd filed Critical Keppel Offshore and Marine Technology Centre Pte Ltd
Publication of AU2015210487A1 publication Critical patent/AU2015210487A1/en
Application granted granted Critical
Publication of AU2015210487B2 publication Critical patent/AU2015210487B2/en
Ceased legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B3/00Hulls characterised by their structure or component parts
    • B63B3/02Hulls assembled from prefabricated sub-units
    • B63B3/04Hulls assembled from prefabricated sub-units with permanently-connected sub-units
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B83/00Rebuilding or retrofitting vessels, e.g. retrofitting ballast water treatment systems
    • B63B83/20Rebuilding or retrofitting vessels, e.g. retrofitting ballast water treatment systems for conversion to a different use, e.g. for converting tankers into a FPSO-FLNG units
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/08Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
    • B63B2025/087Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid comprising self-contained tanks installed in the ship structure as separate units
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • B63B2035/448Floating hydrocarbon production vessels, e.g. Floating Production Storage and Offloading vessels [FPSO]
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B83/00Rebuilding or retrofitting vessels, e.g. retrofitting ballast water treatment systems
    • B63B83/10Rebuilding or retrofitting vessels, e.g. retrofitting ballast water treatment systems for increasing cargo capacity

Abstract

The present disclosure relates to creating additional LNG 252 storage space and deck space for gas process production/regasification mod ABRICATION OFWNW R K KRTUR AL ules, which is achieved by enlarging an existing LNG carrier by jumboisa CKtion technique with new built structural block and then by adding newly built sponsons which are proposed to be integrated with the existing LNG carrier to increase the value of the existing LNG carrier without needing to purchase or build an entirely new floater.

Description

METHOD OF INTEGRATING NEW BUILT STRUCTURAL BLOCK AND SPONSON WITH EXISTING LNG CARRIER
TECHNICAL FIELD
The present disclosure relates to an existing Liquefied Natural Gas (LNG) carrier that can be reconstructed or converted through a jumboisation technique by adding a new built structural block which contains a LNG storage tank facility/Liquefied Natural Gas process facility for liquefaction production/regasification modules on deck space. As liquefaction production modules require more deck space, additional deck space may be provided by adding one or more new built sponsons on either one or both sides of an existing LNG carrier hull.
BACKGROUND
When the charterer period of an existing LNG carrier comes to an end, the existing LNG carrier may be laid up or scrapped if a life extension program for continuous services as a LNG carrier or other purposes is not available. The availability of a life extension program depends on the condition of the LNG carrier. In one possible life extension program for an existing LNG carrier, a new lease of life for a floating LNG production/Regasification facility onboard is provided as an added asset to the existing LNG carrier to further extend the life period of the existing LNG carrier.
In order to enlarge a ship or increase the storage capacity of an existing crude oil tanker, cruise vessel or bulk carrier, jumboisation technique is adopted by adding an entire section to the ship or crude oil tanker, cruise vessel or bulk carrier. In addition, crude oil tanker vessels may be converted to Floating Production Storage and Offloading (FPSO) units, which are utilized by many operators around the world since there are markets for this kind of conversions. Similar to this· kind of conversion, the existing LNG carriers may also be converted into offshore or near
2015210487 22 Mar 2019
Ί shore gas process production/ regasification facilities for smaller gas process facilities.
However, on an existing LNG carrier, there is no sufficient deck space or required storage capacity to accommodate LNG production facility. Although some existing LNG carriers may accommodate a small scale Regasification facility, since all new built Floating storage and Regasification Units (FSRU) come with bigger storage capacities and regasification facilities, the existing LNG carriers cannot be utilized to accommodate a new built FSRU due to lack of enough storage capacity and sufficient deck space. Because of this reason, some existing LNG carriers are even scrapped. It is a great wastage of resources.
Current market requires a bigger storage capacity to accommodate Floating LNG production/ regasification facilities, either they go for a new built Floating LNG production facility (FLNG)/FSRU vessel or having an existing LNG carrier with a Floating Regasification facility with additional floating storage unit (FSU) vessel either at Jetty terminal or side by side mooring to compete with new built FSRU vessels, as these are conventionally carried out at the offshore or near shore terminals. Similarly new built Floating LNG production barge/vessel with additional FSU vessel at jetty terminal or side by side mooring to compete with new build FLNG vessels, as these are conventionally carried out at the offshore or near shore terminals.
Any discussion of documents, acts, materials, devices, articles or the like which has been included in the present specification is not to be taken as an admission that any or all of these matters form part of the prior art base or were common general knowledge in the field relevant to the present disclosure as it existed before the priority date of each of the appended claims.
Throughout this specification the word comprise, or variations such as comprises or comprising, will be understood to imply the inclusion of a stated 30 element, integer or step, or group of elements, integers or steps, but not the exclusion of any other element, integer or step, or group of elements, integers or steps.
2015210487 22 Mar 2019
SUMMARY
In accordance with one aspect, there is provided a method of constructing an FLNG or FSRU from an existing LNG carrier, the method comprising: (a) separating a first existing LNG carrier to form a forward section and an aft section; (b) fabricating a structural block prior to separating the first existing LNG carrier, the structural block including a gas process facility, the gas process facility including a regasification plant or a liquefaction plant; (c) placing the structural block into a space between the forward section and the aft section, the structural block having a front end and a rear end; (d) joining the forward section to the front end of the structural block and joining the aft section to the rear end of the structural block to form a new integrated vessel; and (e) placing at least one sponson on a side of the new integrated vessel. Alternatively, a sponson is placed on each side of the new integrated vessel. For ease of reference, each side of the vessel may be the left and right side of the vessel.
Preferably, the structural block and sponson include one or more LNG storage tanks. More preferably, the LNG storage tank is selected from a group consisting of a MOSS type spherical tank, a Gaztransport & Technigaz (GTT) membrane tank, a selfsupporting prismatic type B (SPB) tank, an independent type A tank and an independent type C tank.
Preferably, the structural block is fabricated at a first site, the sponsons are fabricated at a second site, and separating the first existing vessel is carried out at a third site, wherein the first, second and third sites are independently operable from each other. The structural block is fabricated at a site while the first existing vessel is absent from the site. The sponsons may be fabricated at a site while the first existing vessel is absent from the site.
Preferably, the structural block is a structure section of a second existing LNG carrier.
Prior to fabricating the structural block from the second existing LNG carrier, characteristics of the first existing LNG carrier for fabrication of the structural block are first determined.
The method preferably further comprises, prior to separating the first existing LNG carrier, determining characteristics of the first existing LNG carrier for fabrication of the 35 structural block.
2015210487 22 Mar 2019
Preferably, the sponsons may be the same size or of different sizes depending on the process facilities in them.
Preferably, the sponsons includes a ballast tank. Advantageously, a ballast tank may provide buoyancy.
Preferably, the structural block includes at least one LNG storage tank having a containment system different from that of the first existing LNG carrier.
In accordance with a further aspect, there is provided a method of constructing an FLNG or FSRU from an existing LNG carrier, the method comprising: (a) separating a first existing LNG carrier to form a forward section and an aft section; (b) fabricating a structural block prior to separating the first existing LNG carrier, the structural block including a gas process facility, the gas process facility including a regasification plant or a liquefaction plant; (c) joining the structural block with one of the forward section and the aft section to form a new integrated vessel; and (d) placing at least one sponson on each side of the new integrated vessel.
Preferably, the structural block and sponson include one or more LNG storage tanks. More preferably, the LNG storage tank is selected from a group consisting of a MOSS type spherical tank, a Gaztransport & Technigaz (GTT) membrane tank, a selfsupporting prismatic type B (SPB) tank, an independent type A tank and an independent type C tank.
Preferably, the structural block is fabricated at a first site, the sponsons are fabricated 25 at a second site, and separating the first existing vessel is carried out at a third site, wherein the first, second and third sites are independently operable from each other. The structural block is fabricated at a site while the first existing vessel is absent from the site. The structural block is a structure section of a second existing LNG carrier.
Preferably, the structural block includes a bow section of a second LNG carrier, the 30 forward section of the first existing LNG carrier is a bow of the first existing LNG carrier, the method comprising jointing the structural block to the aft section of the first LNG carrier to form the new integrated LNG carrier. The structural block further includes a turret built on the bow section.
Preferably, the structural block includes a stern section of a second LNG carrier, the 35 aft section of the first existing LNG carrier is a stern of the first existing LNG carrier,
2015210487 22 Mar 2019 the method comprising jointing the structural block to the forward section of the first LNG carrier to form the new integrated LNG carrier.
Preferably, the method further comprising, prior to separating the first existing LNG carrier, determining characteristics of the first existing LNG carrier for fabrication of the structural block.
The present disclosure is hence seeks to provide a service life extension program for an existing LNG carrier to both accommodate additional storage facilities and create more deck space for gas process production/regasification facilities.
The present disclosure relates to creating additional LNG storage space and deck space for gas process production/regasification modules, which is achieved by enlarging an existing LNG carrier by jumboisation technique and then by adding newly built sponsons which are proposed to be integrated with the existing LNG carrier to increase the value of the existing LNG carrier without needing to purchase or build an entirely new floater.
According to one embodiment of the invention, a newly built structural block is prefabricated with LNG storage space. The structural block may contain at least one LNG storage tank having a containment system which may be same as or different from that of the existing LNG carrier. Most of the existing LNG carriers are either MOSS type containment systems or membrane type containment systems, only few LNG carriers are built using other types of containment system. New additional space created for LNG storage can be either one of the two types of containment system and it depends on the gas process facilities. MOSS type containment system cannot be utilized because of spherical doom and we don't have deck space for gas process production facility. Membrane type tank, IHI SPB tank, Type C pressurized tank and other international approved new containment systems can be utilized for new LNG 30 storage space and deck space for gas process production/regasification facility.
Jumboisation technique requires re-engineering and integration of existing storage system to newly added system that offset safe flexibility and functionality asset. An
WO 2015/152825
PCT/SG2015/000110 existing LNG carrier is cut apart to form a forward section and an aft section which include existing cryogenic pipelines, electrical cables, bulkhead, stiffeners, longitudinal and transverse beam which need to be reinforced and hook up with new structural block and connect with new pipeline, electrical cables, etc. Necessary steps should be followed while integrating an existing storage system with a new built storage system.
After integration, the existing LNG carrier and new built storage space, deck space can be utilized for gas process production/regasification facility or machinery space for other uses. For bigger LNG production facilities which the deck space is still not enough to accommodate the production modules after jumboisation, a new built sponson(s) is provided to both sides of the integrated ship hull or one side of integrated ship hull. This sponson will provide additional deck space for gas process production/regasification facility, Type C LNG containment system or mechanical deck space for other uses.
Different cutting locations on an existing LNG carrier from fwd section until bow section have been proposed in this invention to integrate the existing LNG carrier with a new built LNG storage space and other existing hookup. In order to merge the shape of the newly added sponson(s) with the shape of the existing LNG carrier hull, proper steps need to be carried out. Since the existing LNG carrier may be cut at different locations, the size of the sponson(s) also changes accordingly, some places requiring at least one sponson on one side. One side of the sponson can be used as ballast tank for stability of the Integrated LNG carrier.
New built structural block fabrication can be done in-house for membrane tank, Keppel holds license to build such tank in Keppel yard. If new built structural block uses IHI (Ishikawajima-Harima Heavy Industries Prismatic IMO type B LNG tanks) SPB (self-supporting prismatic type B) tank then it will be fabricated in IHI yard, after completion of the complete structural block, it will be deployed to Keppel yard for integrating with the existing LNG carrier. During fabrication of the new built structural block, the existing LNG carrier does not need to be present at yard. This will allow the existing LNG carriers to continue to operate as LNG transportation vessel during the fabrication period of the new structural block. New built structural block may be fabricated based on optimized working schedule, construction sequence and coordination with the existing LNG carrier work process.
WO 2015/152825
PCT/SG2015/000110
Upon near completion of the new structural block, the existing LNG carrier will be dry-docked for cutting of the hull for vessel assembly. When the existing hull is separated into a forward and an aft section, either one or both sections are moved away from each other to form a space between them. The new structural block is then placed into the created space and joined to the forward and aft sections, by welding, to form an integrated storage space to the existing LNG carrier. This new structural block provides the new dimension to the existing LNG carrier by increasing the storage space and deck space for gas process production/regasification facility or other machinery space.
Newly built sponsons can serve several purposes based on user’s requirements; it can serve as type C LNG storage system, machinery space, deck space for gas process production/regasification facility, ballast tank, etc. Sponsons can be installed on both sides of the ship hull or one side of the ship hull. The new built sponsons may be in different size and shape based on deck space required and the cutting location.
The new built structural block contains a LNG storage space which may be merged with the ship hull of the existing LNG carrier or slightly extend the space on both sides of the new-built structural block to provide additional LNG storage space as well deck space. The new built sponson(s) should be built based on new built extended structural block. The extended new built structural block will be integrated with the new built sponson(s), accordingly some places are required for at least one sponson on one side of the ship hull.
Embodiments of the present disclosure can provide the following advantages:
• The new integration to an existing LNG carrier provide additional LNG storage spaces, create new additional deck space for process production/regasification facility & utilities, add new sponson(s) on both sides of the ship hull of the existing LNG carrier to provide additional space which can be utilized for other additional machinery space.
• The existing LNG carrier is only needed during vessel assembly period in the yard, which minimizes the period for the existing LNG carrier to be present in a yard. This will maximize the utilization of the existing LNG carrier.
WO 2015/152825
PCT/SG2015/000110 • The newly integrated LNG carrier can be utilized as gas process production/regasification facility.
• This integration will also provide a new lease of life for a floating LNG production/regasification platform or asset.
BRIEF DESCRIPTION OF THE DRAWINGS
These and other aspects of the present disclosure will be described in detail with reference to the accompanying drawings, in which:
Fig.lA is a partial cross sectional view of an existing LNG carrier;
Fig. 1B is a partial top view of the existing LNG carrier of Fig.lA;
Fig. 1C shows a method for integrating an existing LNG carrier according to one embodiment of the present disclosure;
Fig.2A is a partial cross sectional side view showing the integrating process of an integrated LNG carrier using an existing LNG carrier of Fig.lA and a new built structural block according to one embodiment of the present disclosure;
Fig.2B is a partial top view of the integrating process of an integrated LNG carrier of Fig.2A;
Fig.2C is a partial cross sectional side view of an integrated LNG carrier according to the process shown in Fig.2A and Fig,2B;
Fig.2D is a partial top view of an integrated LNG carrier according to the process shown in Fig.2A and Fig.2B;
Fig.2E is a partial cross sectional side view showing the process of integrating new built sponsons with the integrated LNG carrier of Fig.2C according to another embodiment of the present disclosure; ·
Fig.2F is a partial top view showing the process of integrating new built sponsons with the integrated LNG carrier of Fig.2E;
WO 2015/152825
PCT/SG2015/000110
Fig.2G is a partial cross sectional side view of an integrated LNG carrier according to the process shown in Fig. 2E and Fig. 2F;
Fig.2H is a partial top view of an integrated LNG carrier according to the process shown in Fig.2E and Fig.2F;
Fig.3A is a partial cross sectional side view showing the integrating process of an integrated LNG carrier using an existing LNG carrier of Fig.lA and a new built structural block according to an alternative embodiment of the present disclosure;
Fig.3B is a partial top view of the integrating process of an integrated LNG carrier of Fig.3A;
Fig.3C is a partial cross sectional side view of an integrated LNG carrier according to the process shown in Fig.3A and Fig.3B;
Fig.3D is a partial top view of an integrated LNG carrier according to the process shown in Fig.3A and Fig.3B;
Fig.3E is a partial cross sectional side view showing the process of integrating new built sponsons with the integrated LNG carrier of Fig.3C according to another embodiment of the present disclosure;
Fig.3F is a partial top view showing the process of integrating new built sponsons with the integrated LNG carrier of Fig.3E;
Fig.3G is a partial cross sectional side view of an integrated LNG carrier according to the process shown in Fig. 3E and Fig. 3F;
Fig.3H is a partial top view of an integrated LNG carrier according to the process shown in Fig. 3E and Fig. 3F;
Fig.4A is a partial cross sectional side view showing the integrating process of an integrated LNG carrier using an existing LNG carrier of Fig.lA and a new built structural block according to an alternative embodiment of the present disclosure;
Fig.4B is a partial top view of the integrating process of an integrated LNG carrier of
Fig.4A;
WO 2015/152825
PCT/SG2015/000110
Fig.4C is a partial cross sectional side view of an integrated LNG carrier according to the process shown in Fig.4A and Fig.4B;
Fig.4D is a partial top view of an integrated LNG carrier according to the process shown in Fig.4A and Fig.4B;
Fig.4E is a partial cross sectional side view showing the process of integrating new built sponsons with the integrated LNG carrier of Fig.4C according to another embodiment of the present disclosure;
Fig.4F is a partial top view showing the process of integrating new built sponsons with the integrated LNG carrier of Fig. 4E;
Fig.4G is a partial cross sectional side view of an integrated LNG carrier according to the process shown in Fig. 4E and Fig. 4F;
Fig.4H is a partial top view of an integrated LNG carrier according to the process shown in Fig. 4E and Fig. 4F;
Fig.5A is a partial cross sectional side view showing the integrating process of an integrated LNG carrier using an existing LNG carrier of Fig.lA and a new built structural block according to an alternative embodiment of the present disclosure;
Fig.5B is a partial top view showing the integrating process of an integrated LNG carrier of Fig.5A;
Fig.5C is a partial cross sectional side view of an integrated LNG carrier according to the process shown in Fig.5A and Fig.5B;
Fig.5D is a partial top view of the integrated LNG carrier according to the process shown in Fig.5A and Fig.5B;
Fig.5E is a partial cross sectional side view showing the process of integrating new built sponsons with the integrated LNG carrier of Fig.5C according to another embodiment of the present disclosure;
Fig.5F is a partial top view of showing the process of integrating new built sponsons with the integrated LNG carrier of Fig.5E;
io
WO 2015/152825
PCT/SG2015/000110
Fig.5G is a partial cross sectional side view of an integrated LNG carrier according to the process shown in Fig. 5E and Fig. 5F;
Fig.5H is a partial top view of the integrated LNG carrier of Fig.5G;
Fig.6A is a partial cross sectional side view showing the integrating process of an integrated LNG carrier using an existing LNG carrier of Fig.lA and a new built structural block according to an alternative embodiment of the present disclosure;
Fig.6B is a partial top view showing the integrating process of an integrated LNG carrier of Fig.6A;
Fig.6C is a partial cross sectional side view of an integrated LNG carrier according to the process shown in Fig.6A and Fig.6B;
Fig.6D is a partial top view of the integrated LNG carrier of Fig.6C;
Fig.6E is a partial cross sectional side view showing the process of integrating new built sponsons with the integrated LNG carrier of Fig.6C according to another embodiment of the present disclosure;
Fig.6F is a partial top view showing the process of integrating new built sponsons with the integrated LNG carrier of Fig.6E;
Fig.6G is a partial cross sectional side view of an integrated LNG carrier according to the process shown in Fig. 6E and Fig. 6F;
Fig.6H is a partial top view of the integrated LNG carrier of Fig.6G;
Fig.7A is a partial cross sectional side view showing the integrating process of an integrated LNG carrier using an existing LNG carrier of Fig.lA and a new built structural block according to an alternative embodiment of the present disclosure;
Fig.7B is a partial top view showing the integrating process of an integrated LNG carrier of Fig.7A;
Fig.7C is a partial cross sectional side view of an integrated LNG carrier according to the process shown in Fig.7A and Fig.7B;
Fig.7D is a partial top view of the integrated LNG carrier of Fig.70;
WO 2015/152825
PCT/SG2015/000110
Fig.7E is a partial cross sectional side view showing the process of integrating new built sponsons with the integrated LNG carrier of Fig.7C according to another embodiment of the present disclosure;
Fig.7F is a partial top view showing the process of integrating new built sponsons with the integrated LNG carrier of Fig.7E;
Fig.7G is a partial cross sectional side view of an integrated LNG carrier according to the process shown in Fig. 7E and Fig. 7F;
Fig.7H is a partial top view of the integrated LNG carrier of Fig.7G;
Fig.8A is a partial cross sectional side view showing the integrating process of an integrated LNG carrier using an existing LNG carrier of Fig.lA and a new built structural block according to an alternative embodiment of the present disclosure;
Fig.8B is a partial top view showing the integrating process of an integrated LNG carrier of Fig.7A;
Fig.8C is a partial cross sectional side view of an integrated LNG carrier according to the process shown in Fig.8A and Fig.8B;
Fig.8D is a partial top view of the integrated LNG carrier of Fig.8C;
f
Fig.8E is a partial cross sectional side view showing the process of integrating new built sponsons with the integrated LNG carrier of Fig.8C according to another embodiment of the present disclosure;
Fig.8F is a partial top view showing the process of integrating new built sponsons with the integrated LNG carrier of Fig.8E;
Fig.8G is a partial cross sectional side view of an integrated LNG carrier according to the process shown in Fig. 8E and Fig. 8F;
Fig.8H is a partial top view of the integrated LNG carrier of Fig.8G;
Fig.9A is a partial cross sectional side view showing the integrating process of an integrated LNG carrier using an existing LNG carrier of Fig.lA and a new built structural block according to an alternative embodiment of the present disclosure;
WO 2015/152825
PCT/SG2015/000110
Fig.9B is a partial top view showing the integrating process of an integrated LNG carrier of Fig.9A;
Fig.9C is a partial cross sectional side view of an integrated LNG carrier according to the process shown in Fig.9A and Fig.9B;
Fig.9D is a partial top view of the integrated LNG carrier of Fig.9C;
Fig.9E is a partial cross sectional side view showing the process of integrating new built sponsons with the integrated LNG carrier of Fig.9C according to another embodiment of the present disclosure;
Fig.9F is a partial top view showing the process of integrating new built sponsons with the integrated LNG carrier of Fig.9E;
Fig.9G is a partial cross sectional side view of an integrated LNG carrier according to the process shown in Fig. 9E and Fig. 9F;
Fig.9H is a partial top view of the integrated LNG carrier of Fig.9G;
Fig.lOA is a partial cross sectional side view showing the integrating process of an integrated LNG carrier using an existing LNG carrier of Fig.lA and a new built structural block according to an alternative embodiment of the present disclosure;
Fig. 10B is a partial top view showing the integrating process of an integrated LNG carrier of Fig.lOA;
Fig.lOC is a partial cross sectional side view of an integrated LNG carrier according to the process shown in Fig.lOA and Fig. 10B;
Fig.lOD is a partial top view of the integrated LNG carrier of Fig.lOC;
Fig.'lOE is a partial cross sectional side view showing the process of integrating new built sponsons with the integrated LNG carrier of Fig.lOC according to another embodiment of the present disclosure;
Fig.lOF is a partial top view showing the process of integrating new built sponsons with the integrated LNG carrier of Fig.'lOE;
Fig.10G is a partial cross sectional side view of an integrated LNG carrier according to the process shown in Fig. 10E and Fig. 10F;
WO 2015/152825
PCT/SG2015/000110
Fig. 10H is a partial top view of the integrated LNG carrier of Fig.10G;
Fig.11A is a partial cross sectional side view showing the integrating process of an integrated LNG carrier using an existing LNG carrier of Fig.lA and a new built structural block according to an alternative embodiment of the present disclosure;
Fig.11B is a partial top view showing the integrating process of an integrated LNG carrier of Fig. 11 A;
Fig. 11C is a partial cross sectional side view of an integrated LNG carrier according to the process shown in Fig.11Aand Fig.11B;
Fig.11D is a partial top view of the integrated LNG carrier of Fig.11C;
Fig.11E is a partial cross sectional side view showing the process of integrating new built sponsons with the integrated LNG carrier of Fig.11C according to another embodiment of the present disclosure;
Fig.11F is a partial top view showing the process of integrating new built sponsons with the integrated LNG carrier of Fig.11E;
Fig.11G is a partial cross sectional side view of an integrated LNG carrier according to the process shown in Fig. 11E and Fig. 11F;
Fig.11H is a partial top view of the integrated LNG carrier of Fig.11G;
Fig.12A is a partial cross sectional side view showing the integrating process of an integrated LNG carrier using an existing LNG carrier of Fig.lA and a new built structural block according to an alternative embodiment of the present disclosure;
Fig. 12B is a partial top view showing the integrating process of an integrated LNG carrier of Fig.12A;
Fig.12C is a partial cross sectional side view of an integrated LNG carrier according to the process shown in Fig.12A and Fig. 12B;
Fig.12D is a partial top view of the integrated LNG carrier of Fig.12C;
.- .* . ·
Fig.12E is a partial cross sectional side view showing the process of integrating new built sponsons with the integrated LNG carrier of Fig.12C according to another embodiment of the present disclosure;
WO 2015/152825 PCT/SG2015/000110
Fig. 12F is a partial top view showing the process of integrating new built sponsons with the integrated LNG carrier of Fig.12E;
Fig.12G is a partial cross sectional side view of an integrated LNG carrier according to the process shown in Fig. 12E and Fig. 12F;
Fig.12H is a partial top view of the integrated LNG carrier of Fig.12G;
Fig.13A is a partial cross sectional side view showing the integrating process of an integrated LNG carrier using an existing LNG carrier of Fig.lA and a new built structural block according to an alternative embodiment of the present disclosure;
Fig.13B is a partial top view showing the integrating process of an integrated LNG carrier of Fig.T3A;
Fig.13C is a partial cross sectional side view of an integrated LNG carrier according to the process shown in Fig.13A and Fig. 13B;
Fig. 13D is a partial top view of the integrated LNG carrier of Fig.13C;
Fig.13E is a partial cross sectional side view showing the process of integrating new built sponsons with the integrated LNG carrier of Fig.13C according to another embodiment of the present disclosure;
Fig. 13F is a partial top view showing the process of integrating new built sponsons with the integrated LNG carrier of Fig. 13E;
Fig.13G is a partial cross sectional side view of an integrated LNG carrier according to the process shown in Fig. 13E and Fig. 13F;
Fig.13H is a partial top view of the integrated LNG carrier of Fig.13G;
Fig.14A is a partial cross sectional side view showing the integrating process of an integrated LNG carrier using an existing LNG carrier of Fig.lA and a new built structural block according to an alternative embodiment of the present disclosure;
Fig.14B is a partial top view showing the integrating process of an integrated LNG carrier of Fig. 14A;
Fig.14C is a partial cross sectional side view of an integrated LNG carrier according to the process shown in Fig.14A and Fig.14B;
2015210487 22 Mar 2019
Fig.14D is a partial top view of the integrated LNG carrier of Fig.14C;
Fig.14E is a partial cross sectional side view showing the process of integrating new built sponsons with the integrated LNG carrier of Fig.14C according to another embodiment of the present disclosure;
Fig.14F is a partial top view showing the process of integrating new built sponsons with the integrated LNG carrier of Fig.14E;
Fig.14G is a partial cross sectional side view of an integrated LNG carrier according to the process shown in Fig. 14E and Fig. 14F;
Fig.14H is a partial top view of the integrated LNG carrier of Fig.14G;
Fig.15A is a partial cross sectional side view showing the integrating process of an integrated LNG carrier using an existing LNG carrier of Fig.lA and a new built structural block according to an alternative embodiment of the present disclosure;
Fig.15B is a partial top view showing the integrating process of an integrated LNG carrier of Fig.15A;
Fig.15C is a partial cross sectional side view of an integrated LNG carrier according to the process shown in Fig.15A and Fig.15B;
Fig.15D is a partial top view of the integrated LNG carrier of Fig.15C;
Fig.15E is a partial cross sectional side view showing the process of integrating new built sponsons with the integrated LNG carrier of Fig.15C according to another embodiment of the present disclosure;
Fig.15F is a partial top view showing the process of integrating new built sponsons with the integrated LNG carrier of Fig. 15E;
Fig.15G is a partial cross sectional side view of an integrated LNG carrier according to the process shown in Fig. 15E and Fig. 15F;
Fig.15H is a partial top view of the integrated LNG carrier of Fig.15G.
DETAILED DESCRIPTION
WO 2015/152825
PCT/SG2015/000110
In the following description, numerous specific details are set forth in order to provide a thorough understanding of various illustrative embodiments of the invention. It will be understood, however, to one skilled in the art, that embodiments of the invention may be practiced without some or all of these specific details. It is understood that the terminology used herein is for the purpose of describing particular embodiments only, and is not intended to limit the scope of the invention. In the drawings, like reference numerals refer to same or similar functionalities or features throughout the several views.
Before cutting an existing LNG carrier, some of the major procedures need to be followed on the existing LNG carrier. All systems which contain flammable or toxic vapours or inert gas should be gas-freed, and a gas-free certificate must be obtained from a competent person, before or immediately upon entry into a port for cutting. Before commencing any hot work, the yard would normally be expected to take its own precautions and arrange for the issue of certificates allowing hot work to be carried out.
All equipment on board should be checked internally for the presence of flammable or toxic vapours or inert gas and should be purged if necessary before work proceeds. It is usually necessary to gas-free deck storage tanks before hot work can be commenced in the vicinity, the following precaution should be observed:
• All pipe connections to the cargo system should be disconnected and securely blanked • Smoking and hot work should not be allowed in the restricted area • No work should be permitted on the tanks or their fittings • Tank pipework and fittings should be protected from mechanical damage particular care is necessary if cranes are being used nearby • All electrical connections should be totally shutdown • All electrical cable connections at cutting area need to be properly secured the ends • Any ventilation ducting connections at cutting area need to be properly secured at all time • Any lift craft on the deck at cutting area need to be relocated to a different location.
WO 2015/152825
PCT/SG2015/000110
Once the pre-check procedure is followed, an existing LNG carrier is brought into yard for cutting operation as elaborated below. Cutting an existing LNG carrier involves severing and splicing all the coordination system, including cables, cryogenic pipes and ducts; this job should not be underestimated. Once an existing LNG carrier is cut, the shortest portion will be moved away by using a heavy lifting crane. The forward section and aft section of an existing LNG carrier have many topside cryogenic pipelines carrying LNG at -163 degrees Celsuis if any leak in the pipelines, it will damage the structure of the existing LNG carrier. Once the existing LNG carrier is cut, it is needed to immediately blank the line on both forward and aft sections. All electrical cables, junction box terminal, ventilation ducting, etc. need to be properly secured at all times.
A new structural block will be fabricated based on the existing LNG carrier cutting dimension as well required LNG storage capacity, deck space requirement for gas processing production/regasification facility and utility. The longitudinal strength limits of the hull grider determine the elongation size. The increase in the longitudinal bending moment will require a corresponding amount of additional steel in order to maintain the required modulus.
The following steps are required for the ship hull and structural part of the conversion:
• The longitudinal strength of the existing LNG carrier has to be evaluated. The maximum allowable bending moment can become a showstopper if the ship hull is already designed to its optimum and cannot sustain any additional length.
• A damage stability study needs to be carried out in order to determine the location of the new structural block.
• The evacuation arrangements need to be sorted out when planning the new inserted structural block arrangement.
• The location of the vent mast needs to be considered in order to avoid disruption on the upper decks.
Jumboisation technique requires re-engineering, integration of an existing storage system to a newly added system that offsets safe flexibility and functionality asset. Outfitting is the process of installing parts and various subassemblies (e.g., piping
WO 2015/152825
PCT/SG2015/000110 systems, ventilation equipment, and electrical components) on the new built block prior to joining the new built block with the existing LNG carrier at the stage of erection of a LNG carrier. The existing LNG carrier’s power supply will need to be recalculated due to the increased load.
Once jumboisation is done, then the following necessary steps need to be carried out: necessary steps carried out to the existing cryogenic pipeline and the new cryogenic pipeline. In addition, the atmospheric pressure of the existing tank and new tank might differ, so proper necessary step may be taken while transferring LNG from the existing tank to a new storage tank. The pump capacity of the existing LNG storage tank might be affected while doing jumboisation as a new structural block increases its deck space and cryogenic line pipes, it needs to carry out reengineering work to size up the pump or having additional tank to make up the loss during LNG transfer. Similarly, re-engineering work needs to be carried out for machinery, electrical system, hull Structure, outfitting and required reinforcement.
The present jumboisation is not only a technical solution of using an existing LNG carrier for newly integrated additional storage space and increasing deck space for pas processing production/regasification facility, utility and machinery space for other uses but also financially feasible compared to the new built LNG production/regasification vessel. Through using the present disclosure, certain existing LNG carriers may widen their opportunity to serve as gas process production/regasification facility with additional LNG storage capacity and extend life of their service.
Turning to the Figures, Fig.lA and Fig.lB show an existing LNG carrier 10 based on which jumboisation method according to one embodiment of the present disclosure may be applied. Existing LNG carrier 10 includes a bow 101, a stern 110 and a midship between bow 101 and stern 110. The midship includes five segments 102, 104, 106,108 and 109. Each segment has a corresponding first, second, third & fourth LNG storage tank and wheel house 112, 114, 116, 118 and 120 built therein. Each individual LNG storage tank has its fixed storage capacity and hence the total storage and transportation capacity of the LNG carrier is the sum of capacity of all the individual LNG storage tanks.
WO 2015/152825 PCT/SG2015/000110
A method 250 for integrating an existing LNG carrier according to one embodiment of the present disclosure comprises the following steps, as shown in Fig. 1C:
In Step 252, a new built structural block will be fabricated or provided as a prefabrication unit from other sources. Then in Step 254, an existing LNG carrier is 5 cut apart into a forward section and an aft section. After that in Step 256, the new built structural block is placed into a space created between an existing LNG carrier cut apart forward and an aft section and, then in Step 258, the new built structural block is jumboized to the forward and an aft section to form an integrated LNG carrier. Besides the steps above, in Step 260, one or more new built sponsons may io be fabricated to be integrated with the integrated LNG carrier, as shown in Step 262.
Before proceeding to cut an existing LNG carrier, measurements and/or site inspections may be carried out to determine the characteristics of an existing LNG carrier, e.g. the dimensions of an existing LNG carrier width, longitudinal & 15 transverse beam location, stiffeners, and existing cryogenic & utility pipelines, cable tray, hookup points and connection interfaces, etc. such information will be used for the fabrication of the new built structural block to ensure compatibility.
Further details of this and other embodiments will be illustrated below in conjunction with the accompanying drawings.
As shown in Fig. 2A and Fig. 2B, a new built structural block 200 will be fabricated using either one of the containment systems, i.e. MOSS type containment system or membrane type containment system or provided as a prefabrication unit from other sources. When the fabrication of a new built structural block is completed, the existing LNG carrier 10 may be brought to the shipyard dry dock to undergo the 25 cutting. Once cutting is done, then either forward or aft section will be moved away to create space and then jumboize the new built structural block with the existing LNG carrier.
In the embodiment shown in Fig. 2A and Fig. 2B, cutting is performed between stern 110 and the fourth LNG storage tank 118, forming a forward section 201 30 which includes bow 101, first 112, second 114, third 116 & fourth LNG storage tank
118 and aft section 202 which includes stern 110 and wheel house 120. A newly created space 205 is formed between the forward section 201 and the aft section
WO 2015/152825
PCT/SG2015/000110
202. The new built structural block 200 is then placed in space 205 by floating or a heavy lift crane, with the forward section 201 jumboized to front end 203 of the new built structural block 200, the aft section 202 jumboized to rear end 204 of the new built structural block 200 . Upon jumboizing, the new built structural block 200 together with the forward section 201 and aft section 202, form an integrated LNG carrier 20 with the new built structural block 200 integrated to an existing LNG carrier, as shown in Fig.2C and Fig.2D
In the other embodiment shown in Fig 2E and Fig. 2F, new built sponsons in io different size configuration on both sides of ship hull will be fabricated. New built sponsons on port side 350 and starboard side 300 with different size configuration will be fabricated separately and integrated with the LNG carrier 20 to form a newly integrated LNG carrier 30, as shown in Fig 2G and Fig 2H.
The LNG storage tank of the new built structural block 200 may be same as or 15 different from that in the existing LNG carrier. LNG containment system of the LNG storage tank may be selected from a group consisting of a MOSS type spherical tank, a Gaztransport & Technigaz (GTT) membrane tank, IHI self-supporting prismatic type B SPB tank and an independent type A tank.
The present disclosure provides a newly integrated LNG carrier by a new built structural block and one or more new built sponsons which provide additional LNG storage, create deck space for gas process production/regasification facility, utilities and deck space for other machinery usage. This integration also provides new life extension to the existing LNG carrier to serve for current industrial demand with a much shorter delivery schedule than that of required to build new floater from sketch, and also reduces capital expenditure.
According to another embodiment, an existing LNG carrier may be cutting at different location into forward and aft sections, for integration of a new built 30 structural block there between. Later the integrated LNG carrier will again integrate with at least one new built sponson to form a newly Integrated LNG carrier.
As shown in Fig. 3A to 3H, an existing LNG carrier 10 is cut apart into forward section 206 and an aft section 207. Cutting is performed between a third LNG
WO 2015/152825
PCT/SG2015/000110 storage tank 116 and fourth LNG storage tank 118, hence the forward section 206 includes the bow 101, first, second and third LNG storage tank 112, 114 and 116. The aft section 207 includes stern 110, wheel house 120, and fourth LNG storage tank 118. A new built structural block 210 will be fabricated and then placed into the space 208 created between forward section 206 and aft section 207, and jumboized forward and aft section 206 & 207 to form an integrated LNG carrier 22 with the new built structural block 210 integrated to the existing LNG carrier 10, as shown in Fig. 3C and Fig. 3D.
In the other embodiment shown in Fig 3E and Fig. 3F, new built sponsons in different size configuration on both sides of the ship hull will be fabricated. New built sponsons on port side 350 and starboard side 300 with different size configuration will be fabricated separately and integrated with the integrated LNG carrier 22 to form a newly integrated LNG carrier 32, as shown in Fig 3G and Fig 3H.
Alternatively, as shown in respective Fig. 4A to 4H, 5A to 5H and 6A to 6H, an existing LNG carrier 10 may be cut apart into forward section 211, 216, 221 and an aft section 212, 217, 222. In Fig. 4A to 4H, cutting is performed between second LNG storage tank 114 and third LNG storage tank 116 at a mid-ship section. In Fig. 5A to 5H, cutting is performed between first LNG storage tank 112 and second LNG storage tank 114 at forward section. In Fig 6A to 6H, cutting is performed between bow 101 and first LNG storage tank 112 at forward bow section. A new built structural block 215, 220, 225 is fabricated and then placed at the space 213, 218, 223 formed by cutting of an existing LNG carrier 10, finally jumboized the cut-apart forward 211, 216, 221 and aft section 212, 217, 222 to form an integrated LNG carrier 24 (Fig. 4C, 4D), 26(Fig. 5C, 5D), 28 (Fig. 5C, 5D).ln the other embodiment shown in Fig 4E & Fig. 4F, Fig. 5E & Fig. 5F,and Fig. 6E & Fig. 6F, new built sponsons in different size configuration on both sides of the ship hull are fabricated. New built sponsons on port side 350 and starboard side 300 with different size configuration will be fabricated separately and integrated with the integrated LNG carrier 24, 26 & 28 to form a newly integrated LNG carrier 34, 36 & 38.
WO 2015/152825
PCT/SG2015/000110
In a further embodiment, as shown in Fig. 7A to 7H, a new built structural block 230 will be fabricated. An existing LNG carrier 10 is cut apart into forward section 226 and an aft section 227, creating a space 228 there between. Forward section includes first, second, third & fourth LNG storage tank 112,114,116 & 118, wheel house 120 and stern 110. An aft section includes a new bow section 600 which may or may not build with turret 700. Turret 700 provides a non-rotating platform for supporting the mooring lines and flexible risers dedicated for gas export/import and associated control/service lines. The new structural block 200 is then placed in the space 228 and jumboized forward section 226 and the new built aft bow section 600 to form an integrated LNG carrier 40, as shown in Fig, 7C & Fig. 7D.
In the other embodiment shown in Fig 7E and Fig. 7F, new built sponsons in different size configuration on both sides of ship hull will be fabricated. New built sponsons on port side 350 and starboard side 300 with different size configuration will be fabricated separately and integrated with the integrated LNG carrier 40 to form a newly integrated LNG carrier 50, as shown in Fig 7G and Fig 7H.
In another further embodiment, as shown in Fig. 8A to 8H, a new built structural block 235 will be fabricated. An existing LNG carrier 10 is cut apart into forward section 231 and an aft section 232, creating a space 233 there between. Forward section includes new stern 650 and aft section includes bow 101, first, second, third and fourth LNG storage tank 112, 114, 116 & 118 and wheel house 120. New stern 650 which can be fabricated along with new structural block and then joined with aft section 232. The new structural block 200 is then placed in the space 233 and jumboized forward section 231 and aft section 232 or new stern section 650 to form an integrated LNG carrier 42 as shown in Fig. 8C and Fig. 8D.
In the other embodiment shown in Fig 8E and Fig. 8F, new built sponsons in different size configuration on both sides of ship hull will be fabricated. New built sponsons on port side 350 and starboard s.ide 300 with different size configuration will be fabricated separately and integrated with the integrated LNG carrier 42 to form a newly integrated LNG carrier 52, as shown in Fig 8G and Fig 8H.
WO 2015/152825
PCT/SG2015/000110
As shown in Fig. 9A and Fig. 9B, a new built structural block 400 will be fabricated . using either one of the containment systems or provided as a prefabrication unit from other sources. The new built structural block has a similar design to the earlier ones but this structural block width is extended on both starboard and port side with same or different width from the ship hull. When the fabrication of a new built structural block 400 is completed, the existing LNG carrier 10 may be brought to the shipyard dry dock to undergo the cutting. Once cutting is done, then either forward or aft section will be moved away to create space and then jumboized the new built structural block 400 with an existing LNG carrier 10.
In the embodiment shown in Fig. 9A and Fig. 9B, cutting is performed between stern 110 and the fourth LNG storage tank 118, forming a forward section 201 which includes bow 101, first 112, second 114, third 116 & fourth LNG storage tank 118 and aft section 202 which includes stern 110 and wheel house 120. A newly created space 401 is formed between forward section 201 and an aft section 202. The new built structural block 400 is then placed in space 401 by floating or a heavy lift crane, with the forward section 201 jumboized to front end 403 of new built structural block 400, the aft section 202 jumboized to rear end 404 of the new built structural block 400. Upon jumboizing, the new built structural block 400 together with the forward section 201 and aft section 202 to form an integrated LNG carrier 44 with the new built structural block 400 integrated to an existing LNG carrier 10, as shown in Fig.9C and Fig.9D
In the other embodiment shown in Fig 9E and Fig. 9F, new built sponsons will be fabricated based on the existing LNG carrier 10 and new built structural block 400. New built sponsons may include more than one sponson on both starboard side 800 & 801 and port side 821 & 822 of ship hull in different size configuration which will be fabricated separately and integrated with the integrated LNG carrier 44 to form a newly integrated LNG carrier 54, as shown in Fig 9G and Fig 9H.
Alternatively, as shown in respective Fig. 10A to 10H, 11A to 11H, 12A to 12H and 13A to 13H, an existing LNG carrier 10 may be cut apart into forward section 206, 211, 216 and 221 and an aft section 207,412, 417 and 222. In Fig. lOA to 10H, cutting is performed between third LNG storage tank 116 and fourth LNG storage
WO 2015/152825
PCT/SG2015/000110 tank 118. In Fig. 11A to 11H, cutting is performed between second LNG storage tank 114 and third LNG storage tank 116 at amidship section. In Fig. 12A to 12H, cutting is performed between first LNG storage tank 112 and second LNG storage tank 114 at forward section. In Fig 13A to 13H, cutting is performed between bow 101 and first LNG storage tank 112 at forward bow section. A new built structural block 405, 410, 415 and 420 is then placed at the space 406, 411, 416 and 421 formed by cutting of an existing LNG carrier 10, jumboized the cut-apart forward section 206, 211, 216 and 221 and aft section 207, 212, 217 and 222 to form an integrated LNG carrier 46 (see Fig. 10C, 10D), 48 (see Fig. 11C, 11D), 62 (see Fig. 12C, 12D) & 64 (see Fig. 13C, 13D).
In the other embodiments shown in Fig. 10E & Fig, 10F, Fig. 11E & Fig. 11F, Fig. 12E & Fig. 12F and Fig. 13E & Fig. 13F, new built sponsons will be fabricated based on the existing LNG carrier 10 and new built structural block 405, 410, 415 & 420. New built sponsons may include more than one sponson on both starboard sides 803 & 804, 805 & 806, 807 & 808 and 810; port side 823 & 824, 825 & 826, 827 & 828and 830 of the ship hull in different size configuration which will be fabricated separately and integrated with the integrated LNG carrier 46, 48, 62 & 64 to form a newly integrated LNG carrier 56, 58, 72 & 74, as shown in Fig 10G & Fig 10H, Fig 11G & Fig 11H, Fig 12G&Fig 12H and Fig 13G&Fig 13H.
In a further embodiment, as shown in Fig. 14A to 14H, a new built structural block 425 will be fabricated. An existing LNG carrier 10 is cut apart into forward section 226 and an aft section 227, creating a space 426 there between. Forward section 226 includes first, second, third & fourth LNG storage tank 112,114,116 & 118, wheel house 120 and stern 110. The aft section 227 includes a new bow section 800 which may or may not build with turret 900. Turret 900 provides a non-rotating platform for supporting the mooring lines and flexible risers dedicated for gas export/import and associated control/service lines. The new structural block 425 is then placed in the space 426 and jumboized forward section 226 and new built aft bow section 800 to form an integrated LNG carrier 66, as shown in Fig. 14C & Fig. 14D.
In the other embodiment shown in Fig 14E and Fig. 14F, new built sponsons on both sides of the ship hull in different size configuration will be fabricated. New built
WO 2015/152825 PCT/SG2015/000110 sponsons on port side 815 and starboard side 835 with different size configuration will be fabricated separately and integrated with Integrated LNG carrier 66 to form a newly integrated LNG carrier 76, as shown in Fig 14G and Fig 14H.
In another further embodiment, as shown in Fig. 15A to 15H, a new built structural block 430 will be fabricated. An existing LNG carrier 10 is cut apart into forward section 231 and an aft section 232, creating a space 233 there between. Forward section 231 includes new stern 850 and aft section 232 includes bow 101, first, second, third and fourth LNG storage tank 112, 114, 116 & 118 and wheel house 120. New stern 850 which can be fabricated along with the new built structural block 430 and then joined with aft section 232. The new built structural block 430 is then placed in the space 431 and jumboized forward section 231 and aft section 232 or new built stern 850 to form an integrated LNG carrier 68, as shown in Fig. 15C and Fig. 15D.
In the other embodiment shown in Fig 15E and Fig. 15F, new built sponsons on both sides of the ship hull in different size configuration will be fabricated. New built sponsons on port side 820 and starboard side 840 with different size configuration will be fabricated separately and integrated with the integrated LNG carrier 68 to form a newly integrated LNG carrier 78, as shown in Fig 15G and Fig 15H.
Other embodiments will be apparent to those skilled in the art from consideration of the specification and practice of the invention. Furthermore, certain terminology has been used for the purposes of descriptive clarity, and not to limit the disclosed embodiments of the invention. The embodiments and features described above should be considered exemplary.

Claims (20)

1. A method of constructing an FLNG or FSRU from an existing LNG carrier, the method comprising:
(a) separating a first existing LNG carrier to form a forward section and an aft section;
(b) fabricating a structural block prior to separating the first existing LNG carrier, the structural block including a gas process facility, the gas process facility including a regasification plant or a liquefaction plant;
(c) placing the structural block into a space between the forward section and the aft section, the structural block having a front end and a rear end;
(d) joining the forward section to the front end of the structural block and joining the aft section to the rear end of the structural block to form a new integrated vessel; and (e) placing at least one sponson on a side of the new integrated vessel.
2. The method of claim 1, wherein a sponson is placed on each side of the new integrated vessel.
3. The method of claim 1 or 2 wherein the structural block is fabricated at a site while the first existing vessel is absent from the site.
4. The method of any one of claims 1 to 3, wherein the sponson is fabricated at a site while the existing vessel is absent from the site.
5. The method of any one of the preceding claims, wherein the structural block is a structure section of a second existing LNG carrier.
6. The method of claim 4 further comprising, prior to fabricating the structural block from the second existing LNG carrier, determining characteristics of the first existing LNG carrier for fabrication of the structural block.
7. The method of any one of the preceding claims, further comprising, prior to separating the first existing LNG carrier, determining characteristics of the first existing LNG carrier for fabrication of the structural block.
2015210487 22 Mar 2019
8. The method of any one of the preceding claims, wherein the sponsons are of different sizes.
9. The method of any one of the preceding claims, wherein one of the sponsons includes a ballast tank.
10. The method of any one of the preceding claims, wherein the structural block includes at least one LNG storage tank having a containment system different from that of the first existing LNG carrier.
11. A method of constructing an FLNG or FSRU from an existing LNG carrier, the method comprising:
(a) separating a first existing LNG carrier to form a forward section and an aft section;
(b) fabricating a structural block prior to separating the first existing LNG carrier, the structural block includes a gas process facility, the gas process facility includes a regasification plant or a liquefaction plant;
(c) joining the structural block with one of the forward section and the aft section to form a new integrated vessel; and (d) placing at least one sponson on each side of the new integrated vessel.
12. The method of any one of claims 1, 2 or 11, wherein the structural block and sponson include one or more LNG storage tanks.
13. The method of claim 12, wherein the LNG storage tank is selected from a group consisting of a MOSS type spherical tank, a Gaztransport & Technigaz (GTT) membrane tank, a self-supporting prismatic type B (SPB) tank, an independent type A tank and an independent type C tank.
14. The method of any one of claims 1, 2 or 11 to 13, wherein the structural block is fabricated at a first site, the sponsons are fabricated at a second site, and separating the first existing vessel is carried out at a third site, wherein the first, second and third sites are independently operable from each other.
2015210487 22 Mar 2019
15. The method of any one of claims 11 to 13, wherein the structural block is fabricated at a site while the first existing vessel is absent from the site.
16. The method of any one of claims 11 to 15, wherein the structural block is a structure section of a second existing LNG carrier.
17. The method of any one of claims 11 to 15, wherein the structural block includes a bow section of a second LNG carrier, the forward section of the first existing LNG carrier is a bow of the first existing LNG carrier, the method comprising joining the structural block to the aft section of the first LNG carrier to form the new integrated LNG carrier.
18. The method of claim 16 or 17, wherein the structural block further includes a turret built on the bow section.
19. The method of any one of claims 11 to 15, wherein the structural block includes a stern section of a second LNG carrier, the aft section of the first existing LNG carrier is completely removed and install with a stern of the second existing LNG carrier, the method comprising jointing the structural block to the forward section of the first LNG carrier to form the new integrated LNG carrier.
20. The method of any one of claims 11 to 19 further comprising, prior to separating the first existing LNG carrier, determining characteristics of the first existing LNG carrier for fabrication of the structural block.
AU2015210487A 2014-04-03 2015-04-02 Method of integrating new built structural block and sponson with existing LNG carrier Ceased AU2015210487B2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
SG10201401231S 2014-04-03
SG10201401231S 2014-04-03
PCT/SG2015/000110 WO2015152825A1 (en) 2014-04-03 2015-04-02 Method of integrating new built structural block and sponson with existing lng carrier

Publications (2)

Publication Number Publication Date
AU2015210487A1 AU2015210487A1 (en) 2015-10-22
AU2015210487B2 true AU2015210487B2 (en) 2019-04-18

Family

ID=54240972

Family Applications (1)

Application Number Title Priority Date Filing Date
AU2015210487A Ceased AU2015210487B2 (en) 2014-04-03 2015-04-02 Method of integrating new built structural block and sponson with existing LNG carrier

Country Status (5)

Country Link
EP (1) EP3131807B1 (en)
AU (1) AU2015210487B2 (en)
BR (1) BR112015023911A2 (en)
SG (1) SG11201506240YA (en)
WO (1) WO2015152825A1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112078758A (en) * 2020-08-03 2020-12-15 沪东中华造船(集团)有限公司 Method for converting LNG ship into FSRU
CN113460269A (en) * 2021-06-25 2021-10-01 沪东中华造船(集团)有限公司 Power station module structure and method for refitting LNG old ship into LNG-FSRU ship
WO2023102595A1 (en) * 2021-12-07 2023-06-15 Charlie Six Pty Ltd Liquified gas power vessel

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120238161A1 (en) * 2009-10-16 2012-09-20 Daewoo Shipbuilding & Marine Engineering Co., Ltd. Floating structure with fuel tank for gas fuel
US20130283825A1 (en) * 2010-11-30 2013-10-31 Adam Bernays Floating lng plant

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4936319B1 (en) * 1966-03-16 1974-09-28
JPS59176174A (en) * 1983-03-24 1984-10-05 Hitachi Zosen Corp Tank transfer method from old to new hull
US7823524B2 (en) * 2008-02-20 2010-11-02 Single Buoy Moorings, Inc. Construction of FPDSO vessel
NO331660B1 (en) * 2008-11-19 2012-02-20 Moss Maritime As Device for liquid production of LNG and method for converting an LNG ship to such device
EP2951083B1 (en) * 2013-01-29 2018-12-19 Keppel Offshore&Marine Technology Centre Pte Ltd Lng carrier construction method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120238161A1 (en) * 2009-10-16 2012-09-20 Daewoo Shipbuilding & Marine Engineering Co., Ltd. Floating structure with fuel tank for gas fuel
US20130283825A1 (en) * 2010-11-30 2013-10-31 Adam Bernays Floating lng plant

Also Published As

Publication number Publication date
EP3131807A1 (en) 2017-02-22
EP3131807A4 (en) 2017-11-15
AU2015210487A1 (en) 2015-10-22
WO2015152825A1 (en) 2015-10-08
BR112015023911A2 (en) 2017-07-18
EP3131807B1 (en) 2019-06-19
SG11201506240YA (en) 2015-11-27

Similar Documents

Publication Publication Date Title
EP2951083B1 (en) Lng carrier construction method
US9933119B2 (en) Floating LNG plant
US10359229B2 (en) Floating liquefied natural gas commissioning system and method
JP6067804B1 (en) Floating structure with liquefied gas storage facility and design method thereof
AU2015210487B2 (en) Method of integrating new built structural block and sponson with existing LNG carrier
AU2017207324B2 (en) Natural gas liquefaction vessel
JP2020033009A (en) Hull used as outer shell for floating body type carbohydrate storage plant and/or floating body type carbohydrate treatment plant, method for manufacturing hull, vessel including hull, and method for manufacturing vessel having hull
KR101307571B1 (en) Dual turret mooring system
KR20160001236U (en) Hanging type mono rail series connection apparatus and offshore structure having the connection apparatus
KR101300707B1 (en) Topside load support structure of floating ocean construct
WO2010069910A2 (en) Method for cooling a hydrocarbon stream and a floating vessel therefor
JP5863900B2 (en) Liquefied gas transport ship and design method of liquefied gas transport ship
Hoog et al. LNG transfer in harsh environments-introduction of a new concept
JP2011219049A (en) Floating body type liquefied natural gas production, storage and shipping facilities
KR101337272B1 (en) Topside load support structure of floating ocean construct
KR20140026002A (en) Topside module arrange structure in fpso
Hwang et al. Detailed design and construction of the hull of an FPSO (Floating, Production, Storage, and Off-loading Unit)
Le Cotty et al. New build generic large FPSO
KR101488940B1 (en) Floating ocean structure and method for constructing a floating ocean structure
Homann et al. OTC-19866-PP
CN115743429A (en) FLNG ship arrangement structure and buttress for supporting upper module
KR20110094068A (en) Method for cooling a hydrocarbon stream and a floating vessel therefor
Gervois et al. Floating LNG-A look at export and import terminals