AU2012282768B2 - Multi-zone screened frac system - Google Patents

Multi-zone screened frac system Download PDF

Info

Publication number
AU2012282768B2
AU2012282768B2 AU2012282768A AU2012282768A AU2012282768B2 AU 2012282768 B2 AU2012282768 B2 AU 2012282768B2 AU 2012282768 A AU2012282768 A AU 2012282768A AU 2012282768 A AU2012282768 A AU 2012282768A AU 2012282768 B2 AU2012282768 B2 AU 2012282768B2
Authority
AU
Australia
Prior art keywords
assembly
bore
flow
fluid
borehole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
AU2012282768A
Other versions
AU2012282768A1 (en
Inventor
Ronald Van Petegem
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Weatherford Technology Holdings LLC
Original Assignee
Weatherford Technology Holdings LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Weatherford Technology Holdings LLC filed Critical Weatherford Technology Holdings LLC
Publication of AU2012282768A1 publication Critical patent/AU2012282768A1/en
Assigned to WEATHERFORD TECHNOLOGY HOLDINGS, LLC reassignment WEATHERFORD TECHNOLOGY HOLDINGS, LLC Request for Assignment Assignors: WEATHERFORD/LAMB, INC.
Application granted granted Critical
Publication of AU2012282768B2 publication Critical patent/AU2012282768B2/en
Ceased legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/06Valve arrangements for boreholes or wells in wells
    • E21B34/14Valve arrangements for boreholes or wells in wells operated by movement of tools, e.g. sleeve valves operated by pistons or wire line tools
    • E21B34/142Valve arrangements for boreholes or wells in wells operated by movement of tools, e.g. sleeve valves operated by pistons or wire line tools unsupported or free-falling elements, e.g. balls, plugs, darts or pistons
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/02Subsoil filtering
    • E21B43/08Screens or liners
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/14Obtaining from a multiple-zone well
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • E21B43/267Methods for stimulating production by forming crevices or fractures reinforcing fractures by propping
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B2200/00Special features related to earth drilling for obtaining oil, gas or water
    • E21B2200/06Sleeve valves

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Filtration Of Liquid (AREA)
  • Separation Of Solids By Using Liquids Or Pneumatic Power (AREA)

Abstract

A multi-zone screened frac system combines screens with integrated check valves, frac valves, and optional shunt tubes for slurry dehydration. The system can also include fiber optic technology. In particular, the system uses sliding sleeves and flow devices for each section. The sliding sleeves open with dropped balls or a service tool, and the flow devices have screens and act as check valves. Dehydration tubes can also be used. The system does not require a crossover tool, and in some implementations, the system does not even require a complete service tool.

Description

WO 2013/009773 PCT/US2012/046106 Multi-Zone Screened Frac System CROSS-REFERENCE TO RELATED APPLICATIONS [0001] This is a non-provisional of U.S. Provisional Appl. 61/506,897, filed 12-JUL 2011, which is incorporated herein by reference and to which priority is claimed. BACKGROUND [0002] Many wells are fractured with a proppant (e.g., sand or the like) to treat a formation and improve production. In many cases, multiple fracs are performed in a single wellbore to treat various zones of interest in the formation. Systems exist in the art that allow operators to frac multiple zones in a single trip in the wellbore. Some systems even use a wellscreen to prevent proppant flowback during operations. [0003] Unfortunately, current systems that include a wellscreen use a service crossover tool for operation. The crossover tool crosses over the fluid flow path from a workstring to the annulus outside the wellscreen and vice versa. However, using the crossover tool has a number of disadvantages. [0004] The subject matter of the present disclosure is directed to overcoming, or at least reducing the effects of, one or more of the problems set forth above. SUMMARY OF THE DISCLOSURE [0005] A multi-zone frac assembly for a borehole has a tubular structure disposed in the borehole and defining a through-bore. A plurality of sections disposed on the tubular structure each has an isolation element, a flow valve, a screen, and a check valve. The isolation element, which can be a swellable packer, a hydraulically-set packer, or a mechanically-set packer, isolates a borehole annulus around the section from the other sections along the borehole. If desired, a flow tube can be disposed in the borehole annulus and can communicate through the isolation elements between one or more of the sections. [0006] The flow valve is selectively operable between opened and closed conditions. Thus, the flow valve in the opened condition permits fluid communication between the through-bore and the borehole annulus, but the flow valve in the closed condition prevents fluid communication between the through-bore and the borehole annulus. 1 WO 2013/009773 PCT/US2012/046106 [0007] The screen disposed on the tubular structure communicates with the borehole annulus, and the check valve is in fluid communication between the screen and the through-bore. The check valve permits fluid communication from the screen into the through-bore, but prevents fluid communication from the through-bore to the screen. [0008] In one arrangement, at least a portion of the tubular structure for a given one of the sections includes a basepipe having the through-bore and defining at least one pipe port communicating the through-bore outside the basepipe. Disposed on the basepipe, the check valve permits fluid communication from the screen to the at least one pipe port and prevents fluid communication from the at least one pipe port to the screen. [0009] In particular, the check valve can have a housing disposed on the basepipe, and the screen can have one end in fluid communication with the housing. The housing has at least one internal flow passage and has at least one check ball. The at least one internal flow passage communicates the screen with the at least one pipe port. To control flow, the at least one check ball is movable relative to the at least one internal flow passage. In one condition, the at least one check ball permits fluid communication through the at least one internal flow passage, while in another condition, the at least one check ball prevents fluid communication through the at least one internal flow passage. [0010] In one arrangement, the flow valve is a sliding sleeve having a housing and in insert movable therein. The housing has a flow port communicating the through-bore outside the housing, and the insert is movable in the housing between the closed condition preventing fluid communication through the flow port and the opened condition permitting fluid communication through the flow port. [0011] To move the seat, the insert has a seat disposed therein that seats a plug deployed in the tubular structure thereon and moves the insert from the closed condition to the opened condition in response to application of fluid pressure against the seated plug. [0012] In other arrangements, the insert can be moved by a shifting tool. In particular, the assembly can have a workstring disposing in the through-bore of the tubular structure. The workstring has an actuating tool and defines a fluid passageway therethrough. An outlet port communicates the fluid passageway outside the workstring. In the assembly, the workstring is operable to open and close the flow valve of each section with the actuating tool. The workstring is operable to seal inside the 2 WO 2013/009773 PCT/US2012/046106 assembly and place the outlet port in sealed fluid communication with the borehole annulus when the flow valve has the opened condition. [0013] If desired, the assembly can have a bypass tube for at least one of the sections. The bypass tube communicates a first portion of the through-bore on one side of a location of the workstring sealed inside the assembly to another side of the location. [0014] In a multi-zone frac method for a borehole, an assembly disposes in the borehole, and an annulus of the borehole around the assembly is isolated into a plurality of isolated zones. To isolate the annulus, for example, the method can involve engaging packing elements on the assembly against the borehole. [0015] Fluid communication from the annulus of the isolated zones is screened into a through-bore of the assembly with screens on the assembly, and fluid communication is prevented from the through-bore to the annulus of the isolated zones through the screens. For example, screening the fluid can involve allowing fluid communication from the screens through perforations in the assembly communicating with the through bore, and prevent fluid communication from the through-bore to the annulus can involve disposing a check valve in fluid communication between the screens and the perforations. [0016] In the method, treating each of the isolated zones with a treatment fluid is achieved by: selectively opening a port in the assembly at the each isolated zone, and flowing the treatment fluid down the through-bore to the each isolated zone through the opened port. For example, selectively opening the port in the assembly at the each isolated zone involves opening the port in the assembly by moving an insert in the assembly away from the port. Further, selectively closing the opened ports in the assembly can be achieved at each of the isolated zones. [0017] In moving the insert in the assembly away from the port, the method in one arrangement involves engaging a plug on the insert; and moving the insert away from the port with application of fluid pressure against the engaged plug. Then, to flow the treatment fluid down the through-bore to the each isolated zone through the opened port, the treatment fluid can flow through the opened port when the insert is moved away from the port. In this way, treating each of the isolated zones with the treatment fluid involves successively treating the isolated zones uphole on the assembly by successively engaging plugs and moving inserts uphole on the assembly for successive ones of the isolated zones. Once treatment is completed, the engaged plug can be remove, and the insert can be selectively closed over the opened port in the assembly. 3 WO 2013/009773 PCT/US2012/046106 [0018] In another arrangement to move the insert in the assembly away from the port, the insert can be engaged with a workstring disposed in the through-bore of the assembly, and the insert can be moved away from the port with movement of the engaged workstring. In this arrangement, flowing the treatment fluid down the through bore to the each isolated zone through the opened port involves flowing the treatment fluid through an outlet in the workstring and through the opened port when the insert is moved away from the port. In this way, treating each of the isolated zones with the treatment fluid involves successively closing a given one of the insert with the workstring after treatment, and successively opening another one of the inserts with the workstring before treatment. BRIEF DESCRIPTION OF THE DRAWINGS [0019] Fig. 1 illustrates a multi-zone screened frac system according to the present disclosure disposed in a cased borehole and having sections with frac valves and flow devices, which include wellscreens and check valve devices. [0020] Fig. 2A illustrates the multi-zone screened frac system of Fig. 1 having a dehydration tube. [0021] Fig. 2B illustrates the multi-zone screened frac system of Fig. 1 having an expandable liner. [0022] Fig. 3 illustrates a multi-zone screened frac system according to the present disclosure disposed in an open borehole and having sections with frac valves and flow devices, which include wellscreens and check valve devices. [0023] Fig. 4 illustrates a multi-zone screened frac system according to the present disclosure disposed in a cased borehole and using a workstring in conjunction with frac valves and flow devices, which include wellscreens and check valve devices. [0024] Fig. 5 illustrates the multi-zone screened frac system of Fig. 4 having flow tubes. [0025] Fig. 6A illustrates a partial cross-section of a flow device for the disclosed multi zone screened frac system. [0026] Fig. 6B illustrates a detailed view of an inflow control device for the flow device of Fig. 6A. [0027] Fig. 6C illustrates an isolated, partial cross-sectional view of the inflow flow control device of Fig. 6A. 4 WO 2013/009773 PCT/US2012/046106 [0028] Figs. 7A-7B illustrate partial cross-sections of a multi-select sliding sleeve for the disclosed multi-zone screen frac system in closed and opened states. [0029] Figs. 8A-8B illustrate shifting tools for use on a workstring for the disclosed system of Figs. 4-5. DETAILED DESCRIPTION [0030] Various embodiments of a multi-zone screened frac system are disclosed. The system does not require a crossover tool as required in the prior art. In some implementations, the system does not even require a complete service tool. To perform a frac operation on multiple zones in a cased or open borehole, the system combines: (1) wellscreens with integrated check valves, (2) frac valves, and (3) optional shunt tubes for slurry dehydration. The system can also include fiber optic technology. [0031] In a first embodiment according to the present disclosure, Figure 1 illustrates a multi-zone screened frac system 10 disposed in a cased borehole and having sections with frac valves and flow devices, which include wellscreens and check valve devices. The system 10 includes an upper completion or workstring 14 disposed in casing 12. This string 12 is engaged in an uphole end 24 of a production string 22 of a frac assembly 20 and can engage the casing 12 with an optional packer 16. [0032] Internally, the production string 22 of the frac assembly 20 has a through-bore 25 communicating along the length of the string 22 and communicating with the completion string 14. Externally, the frac assembly 20 has isolation devices 18, such as but not limited to a hydraulic, a mechanical, or a swellable packer, to seal the production string 22 in the casing 12. One of the isolation devices 18 is disposed at the string 22's uphole end 24, while other isolation devices 18 are disposed along the length of the production string 22. Separated by the isolation devices 18, the frac assembly 20 has various sections 28 disposed at various intervals or zones of interest in the surrounding formation. At its downhole end 26, the frac assembly 20 has a bottom seat 50 for engaging a setting ball 54 during frac operations. [0033] Each section 28 has a selective frac valve 30 and a flow device 40. Each of the selective frac valves 30 and flow devices 40 in a given section 28 is separated from other sections 28 by isolation elements 18, which isolate the borehole annulus 15 for the respective sections 28. As shown, the selective frac valves 30 are disposed uphole of the flow devices 40 in the various sections 28. As an alternative, the selective frac valves 30 can be disposed downhole of the flow devices 40 in each section 28. 5 WO 2013/009773 PCT/US2012/046106 [0034] The selective frac valves 30 have one or more ports 32 that can be selectively opened and closed during operation. In this arrangement and as discussed in more detail below, for example, each of the selective frac valves 30 can be opened to communicate their ports 32 with the surrounding annulus 15 by using frac plugs or balls 34 deployed downhole during frac operations. As treatment is performed in the well, these dropped plugs or balls 34 selectively open the frac valves 30 and isolate lower sections 28 so the selective frac valves 30 can successively divert frac treatment to adjacent zones of interest up the frac assembly 20. [0035] The flow device 40 for each section 28 is disposed adjacent or near perforations 13 in the casing 12. In this and other assemblies disclosed herein, the flow devices 40 use wellscreens 42 with integrated check valves 44 to control the flow of fluid through the devices 44. In particular, each flow device 40 exclusively screens fluid communication through a first flow path (i.e., flow from the borehole annulus 15 to the through-bore 25 of the assembly 20 through the flow device 40). At the same time, the flow device 40 exclusively prevents fluid communication from the through-bore 25 of the assembly 20 to the borehole annulus 15 along this first flow path. Thus, the wellscreen 42 screens fluid flow along the first flow path from the borehole annulus 15 to the through-bore 25. However, the flow device 40 does not permit fluid flow in the opposite direction along this same flow path, but in the opposite direction from the through-bore 25 to the borehole annulus 15. [0036] In particular, the flow devices 40 can each include a wellscreen 42 and an inflow control device 44, such as a FloReg T M Deploy-Assist (DA) Device available from Weatherford International. Preferably, the inflow control device 44 lacks nozzles and is used in the system primarily as a check valve, but nozzles can be used in other arrangements. Further details of a suitable flow device 40 having a wellscreen 42 and an inflow control device 44, such as the FloReg T M Deploy-Assist (DA) Device, are provided below in Figures 6A-6C. Moreover, details of a suitable inflow control device 44 used with a wellscreen 42 are also disclosed in U.S. Pat. Nos. 6,371,210 and 7,828,067, which are incorporated herein by reference in its entirety. [0037] In this and other assemblies disclosed herein, each selective frac valve 30 selectively permits and prevents fluid communication through a second flow path (i.e., between the through-bore 25 of the assembly 20 and the borehole annulus 15). In particular, the selective frac valves 30 can be sliding sleeves, such as a ZoneSelectTM MultiShift frac sliding sleeve available from Weatherford International. The selective frac 6 WO 2013/009773 PCT/US2012/046106 valve 30 is designed to open when a ball 34 lands on a landing seat (not shown) disposed in the selective frac valve 30 and tubing pressure is applied to shear the selective frac valve 30 open to expose the through-bore 25 to the surrounding annulus 15. The balls 34 are dropped from the surface once the appropriate amount of proppant is pumped into each zone 28. Further details of a suitable multi-shift sliding sleeve, such as the ZoneSelectTM MultiShift frac sliding sleeve, are provided below in Figures 7A-7B. [0038] In this and other assemblies 10 disclosed herein, a fracing operation uses the series of packers 18 and selective frac valves 30 to sequentially isolate the different zones or sections 28 of the downhole formation. Initially, the assembly 20 having the packers 18, selective frac valves 30, and flow devices 40 is run downhole and set up using known techniques. Eventually, a bottom plug or ball 54 is pumped downhole to close off the flow path through the assembly's bottom end 50. [0039] Next, operators set the packers 18 to create the multiple isolated sections 28 down the borehole annulus 15. How the packers 18 are set depends on the type of packers 18 used. For example, hydraulic pressure pumped down the assembly's through-bore 25 can be used to set the packers 18. The closed bottom end 50, the closed frac valves 30, and the integrated check valves 44 prevent fluid pressure in the assembly 20 from escaping to the annulus 15 during the setting procedures. Use of different types of packers 18 would require other known procedures. [0040] Once the packers 18 are set, operators apply a frac treatment successively to each of the isolated sections 28 by selectively opening the selective frac valves 30 and allowing the treatment fluid to interact with the adjacent zones of the formation through the opened ports 32. To open each frac valve 30, for example, operators drop specifically sized plugs or balls 34 into the assembly 20 and land them on corresponding seats (not shown) on the designated frac valves 30. Typically, the balls 34 increase in size up the borehole so that a smaller ball 34 can pass through all of the seats (not shown) on the uphole frac valves 30 before engaging its designated seat further downhole. For example, a range of plugs or balls 34 may allow fracturing up to 13, 19, and 21 sections in the borehole when 3-1/2 in., 4-1/2 in., and 5-1/2 in. frac valves 30 are used, respectively. An additional section can be added by using a toe sleeve (not shown). [0041] Once a dropped ball 34 is seated, the ball 34 closes off the lower section 28 just treated, and built up pressure on the seated ball 34 forces the frac valve 30 open so 7 WO 2013/009773 PCT/US2012/046106 frac fluid can interact with the adjacent zone of the formation through the open flow ports 32. Operators repeat this process up the assembly 20 to treat all of the sections 28 by successively dropping bigger balls 34 against bigger seats (not shown) in the frac valves 30. Once the frac treatment is complete, flow in the assembly 20 can float all the balls 34 to the surface, or operators can mill out the balls 34 and ball seats (not shown) from the frac valves 30. Finally, after fracing, the system 10 may need a clean-out trip in which a fluid wash is pumped down the assembly 10 to clear it of excess or residual proppant and frac fluid. [0042] The multi-zone frac system 10 of Figure 1 can achieve higher flow rates and can improve reservoir performance while only requiring one trip upper and lower completions, using standard packers, not requiring a crossover tool, and offering less risk. The system 10 can also have any suitable length and spacing between sections 28. A wet-connector is not required for using fiber optics, and the system 10 allows for monitoring while fracing using a fiber optic based sensor system. [0043] In a second embodiment according to the present disclosure, the multi-zone screened frac system 10 of Figure 2A is similar to that of Figure 1 so that similar components are shown with the same reference numerals. In contrast to the previous arrangement, however, this system 10 has a dehydration tube (i.e., slurry or flow tube) 60 disposed along the assembly 20 running from the optional packer 16 at the uphole end 24 to the lower most packer 18 near the downhole end 26. Although the de hydration tube 60 may be a barrier issue, this can be mitigated by running a production packer (not shown) uphole in the casing 12. [0044] The dehydration tube 60 communicates with the borehole annulus 15 of each of the sections 28 using flow ports (not shown) or the like. Additionally, the tube 60 passes through the packers 18 isolating the sections 28. Use of the tube 60 is beneficial when frac pack operations are performed, which involve fracing a zone of interest and then gravel packing the borehole annulus 15 around the wellscreen 42. In this way, use of the tube 60 in the system 10 allows dehydration of the annular gravel pack when performed. [0045] After fracing operations, the system 10 in Figure 2A may need a clean-out trip and may require 3-4 MM in lower tertiary. The multi-zone frac system 10 of Figure 2A can provide higher rates and improve reservoir performance while not requiring a crossover tool and offering less risk. The system 10 can be any length and spacing, 8 WO 2013/009773 PCT/US2012/046106 may eliminate the need for a wet-connector for fiber optic, and allows for monitoring while fracing. [0046] As noted above in Figures 1 and 2A, the system 10 can be used in cased borehole having casing 12 with perforations 13. Other completion arrangements can be used. For example, instead of the borehole having perforated casing 12, the borehole can have an expandable pre-slotted or pre-perforated liner 17a as in Figure 2B. As is customary, such an expandable liner 17a can be suspended from a liner hanger and packer assembly 17b disposed in casing 12. Below the liner hanger and packer assembly 17b, the expandable liner 17a extends into an open borehole section. The expandable liner 17a can have slots or perforations (not shown) in those zones of the formation to be produced. Although not shown, the expandable liner 17a can be constructed to suit the zones of the formation using modular components, including expandable liner or sand screen sections, blank pipe sections, and expandable zonal isolation joints, such as are available in Weatherford's Expandable Reservoir Completion systems. [0047] How the liner hanger and packer assembly 17b and the expandable liner 17a are installed in the borehole will be appreciated by one skilled in the art with the benefit of the present disclosure so that particular details are not provided here. Briefly though, the liner hanger and packer assembly 17b and expandable liner 17a are disposed downhole, and the hanger and packer assembly 17b is set by dropping a ball and applying pressure. Expansion of the liner 17a is then performed using liner expansion tools. Once the liner is set, frac operations can be performed by deploying the frac assembly 20 as described previously. [0048] Other than a cased or lined borehole as noted above, the multi-zone screened frac system 10 can also be used for open hole completions. In a third embodiment according to the present disclosure, for example, the multi-zone screened frac system 10 of Figure 3 is used for an open hole completion and has many of the same components as described previously so that like reference numeral are used for similar components. In contrast to the cased or lined hole arrangements of Figures 1 and 2A 2B, open hole packers 19 are used for this system 10 in Figure 3. These packers 19 can be swellable and/or hydraulic set packers for open holes. [0049] After fracing operations, the system 10 may need a clean-out operation. As before, the frac valves 30 are disposed uphole of the flow devices 40, but they could be 9 WO 2013/009773 PCT/US2012/046106 disposed downhole of the flow devices 40 in each section 28. As another alternative, slurry de-hydration tubes (not shown) could also be used along the assembly 10. [0050] The multi-zone frac system 10 of Figure 3 provides the highest rates and improved reservoir performance. The system 10 can be of any length and any spacing. The system 10 does not require perforating to be performed and offers the option to step down one casing size in its implementation, which can give significant savings potential. Finally, the system 10 does not need wet-connectors for using fiber optics, and the system 10 allows for monitoring while fracing. [0051] In a fourth embodiment according to the present disclosure, the multi-zone screened frac system 10 in Figure 4 is also used for openhole completions as with the embodiment of Figure 3. In contrast to previous arrangements, this system 10 has a workstring 70 that disposes in the frac assembly 20 to open the various frac valves 30 and treat portions of the formation. As shown, the workstring 70 has external seals 76 disposed near outlet ports 72 and a dropped ball 74 can seat in an distal seat of the workstring 70 to divert fluid flow down the workstring 70, out the outlet ports 72, and to the open ports 32 in the frac valve 30 to treat the surrounding formation. [0052] The frac operation for the system 10 of Figure 4 involves running the assembly 20 downhole and setting the packers 19 to create the multiple isolated sections 28 down the borehole annulus 15. Once the packers 19 are set, operators apply a frac treatment successively to each of the isolated sections 28 by selectively opening the selective frac valves 30 with a shifting tool 78 on the workstring 70 since dropped balls are not used. [0053] Details about opening the frac valves 30 are provided below with reference to Figures 7A-7B and 8A-8B. In general, the shifting tool 78 can be a "B" shifting tool for shifting an inner sleeve in the frac valve 30 relative to the valve's ports 32. Thus, opening a given frac valve 30 involves engaging the shifting tool 78 in an appropriate profile of the valve's inner sleeve and moving the inner sleeve with the workstring 70 to an opened condition so that the assembly's through-bore 25 communicates with the borehole annulus 15 via the now opened ports 32. [0054] Once a given frac valve 30 is opened, the seals 76 on the workstring 70 can engage and seal against inner seats 36, surfaces, seals, or the like in the frac valve 30 or elsewhere in the assembly 20 on both the uphole and downhole sides of the opened ports 32. The seals 76 can use elastomeric or other types of seals disposed on the inner workstring 70, and the seats 36 can be polished seats or surfaces inside the frac valve 30 or other part of the assembly 30 to engage the seals 76. Although shown with 10 WO 2013/009773 PCT/US2012/046106 this configuration, the reverse arrangement can be used with seals on the inside of the frac valve 30 or assembly 20 and with seats on the workstring 70. [0055] Once the workstring 70 is seated, treatment fluid is flowed down the through bore 75 of the workstring 70 to the sealed and opened ports 32 in the frac valve 30. The treatment fluid flows through the outlet ports 72 in the workstring 70 and through the opened ports 32 to the surrounding borehole annulus 15, which allows the treatment fluid to interact with the adjacent zone of the formation. [0056] Once treatment is completed for the given zone, operators manipulate the workstring 70 to engage the shifting tool 78 in the frac valve 30 to close the ports 32. For example, the shifting tool 78 can engage another suitable profile on an inner sleeve of the frac valve 30 to move the sleeve and close the ports 32. At this point, the workstring 70 can be moved in the assembly 20 to open another one of the frac valves 30 to perform treatment. Operators repeat this process up the assembly 20 to treat all of the sections 28. Once the frac treatment is complete, the system 10 may not need a clean-out trip. [0057] The multi-zone frac system 10 of Figure 4 can have higher rates compared to a conventional single trip multi-zone system and can improve reservoir performance. The system 10 can have any suitable length and spacing, offers the option to step down one casing size, does not require perforating, and does not require a clean-out trip. Consideration should be given to potential sticking the workstring 70 during operation and to annulus packing that can occur for a particular implementation. [0058] In a fifth embodiment of the multi-zone screened frac system 10 of Figure 5 also has a workstring 70, as with the previous embodiment of Figure 4. In addition to all of the same components, this system 10 has slurry dehydration tubes 80 disposed along the various sections 28. [0059] During a frac operation similar to that discussed above, the tubes 80 help dehydrate slurry intended to gravel pack the borehole annulus 15 of the sections 28 during a frac pack type of operation. In addition, the tubes 80 can act as a bypass for fluid returns during the operation. As treatment fluid flows from the workstring 70 seated in a frac valve 30, through the opened ports 32, and into the borehole annulus 15, the wellscreen 42 screens fluid returns from the annulus 15, and the fluid returns can flow into the assembly 20 downhole of the engagement of the workstring 70 in the assembly 20. The tubes 80 can, therefore, allow these fluid returns to flow from the downhole section of the assembly 20 to the micro-annulus between the workstring 70 11 WO 2013/009773 PCT/US2012/046106 and the inside of the assembly 20 uphole of the sealed engagement of the workstring 70 with the ports 32. From this point, the fluid returns can then flow to the surface. [0060] The multi-zone frac system 10 of Figure 5 can have higher rates compared to a conventional single trip multi-zone system 10 and can improve reservoir performance. Furthermore, the system 10 can have any length and spacing, offers the option to step down one casing size, does not require perforating, does not require a clean-out trip, and can give good annulus packing. Consideration should be given to potential sticking of the workstring 70 for a particular implementation. [0061] As noted above, the various embodiments of the multi-zone frac system 10 in Figures 1-5 use flow devices 40 disposed on the frac assembly 20, and the flow devices 40 includes wellscreens 42 and check valves 44. Turning now to Figures 6A-6B, a flow device 150 that can be used for the disclosed system 10 is shown in a partial cross sectional view and a detailed view, respectively. The flow device 150 is a screen joint having a screen jacket 160 (i.e., wellscreen) and an inflow control device 170 (i.e., check valve) disposed on a basepipe 152. (Figure 6C shows the inflow control device 170 in an isolated view without the basepipe and the screen jacket.) [0062] The flow device 150 is deployed on a completion string (22: Figs. 1-5) with the screen jacket 160 typically mounted upstream of the inflow control device 170, although this may not be strictly necessary. The basepipe 152 defines a through-bore 155 and has a coupling crossover 156 at one end for connecting to another joint or the like. The other 154 end can connect to a crossover (not shown) of another joint on the completion string (22). Inside the through-bore 155, the basepipe 152 defines pipe ports 158 where the inflow control device 170 is disposed. [0063] As noted above, the inflow control device 170 can be similar to a FloReg deploy-assist (DA) device available from Weatherford International. As best shown in Figure 6B, the inflow control device 170 has an outer sleeve 172 disposed about the basepipe 152 at the location of the pipe ports 158. A first end-ring 174 seals to the basepipe 152 with a seal element 175, and a second end-ring 176 attaches to the end of the screen jacket 160. Overall, the sleeve 172 defines an annular space around the basepipe 152 communicating the pipe ports 158 with the screen jacket 160. The second end-ring 176 has flow ports 180 that separate the sleeve's annular space into a first inner space 186 communicating with the screen 160 and second inner space 188 communicating with the pipe ports 158. 12 WO 2013/009773 PCT/US2012/046106 [0064] For its part, the screen jacket 160 is disposed around the outside of the basepipe 152. As shown, the screen jacket 160 can be a wire wrapped screen having rods or ribs 164 arranged longitudinally along the base pipe 152 with windings of wire 162 wrapped thereabout to form various slots. Fluid can pass from the surrounding borehole annulus to the annular gap between the screen jacket 160 and the basepipe 152. Although shown as a wire-wrapped screen, the screen jacket 160 can use any other form of screen assembly, including metal mesh screens, pre-packed screens, protective shell screens, expandable sand screens, or screens of other construction. [0065] Internally, the inflow control device 170 has a number (e.g., ten) flow ports 180. Rather than providing a predetermined pressure drop along the screen jacket 160 by using multiple open or closed nozzles (not shown), the inflow control device 170 as shown in Figures 6A-6C may lack the typically used restrictive nozzles and closing pins for the internal flow ports 180. Instead, the flow ports 180 may be relatively unrestricted flow passages and may lack the typical nozzles, although a given implementation may use such nozzles if a pressure drop is desired from screen jacket 160 to the basepipe 152. [0066] Internally, however, the inflow control device 170 does include port isolation balls 182, which allow the device 170 to operate as a check valve. Depending on the direction of flow or pressure differential between the inner spaces 186 and 188, the port isolation balls 182 can move to an open condition (to the right in Fig. 6B) permitting fluid communication from the screen's inner space 186 to the pipe's inner space 188 or to a closed condition (to the left in Fig. 6B against a seat end 184 of the flow port 180) preventing fluid communication from the pipe's inner space 188 to the screen's inner space 186. [0067] In general, the inflow control device 170 can facilitate fluid circulation during deployment and well cleanup and can be used in interventionless deployment and setting of openhole packers. In deployment, for example, the isolation balls 182 maximize fluid circulation through the completion shoe (50:Figs. 1-5) of the frac assembly (20) to aid efficient deployment of the completion string (22) and assembly (20). When the housing components (172, 174, 175, & 176) are disposed on the basepipe 150, the isolation balls 182 are retained in-place. During initial installation and production, the isolation balls 182 can prevent formation surging, thereby reducing damage to the formation. In some arrangements, the isolation balls 182 within the 13 WO 2013/009773 PCT/US2012/046106 device 170 can be configured to erode over a period of time, allowing access to the interval for workover activity such as stimulation. [0068] Should a pressure drop be desired from the screen jacket 160 to the basepipe 152, the flow ports 180 can include nozzles (not shown) that restrict flow of screened fluid (i.e., inflow) from the screen jacket 160 to the pipe's inner space 188. For example, the inflow control device 170 can have ten nozzles, although they all may not be open. Operators can set a number of these nozzles open at the surface to configure the device 170 for use downhole in a given implementation. Depending on the number of open nozzles, the device 170 can thereby produce a configurable pressure drop along the screen jacket 160. [0069] As noted above, the various embodiments of the multi-zone frac system 10 in Figures 1-5 use frac valves 30 disposed on the frac assembly 20 that can be opened and closed to communicate ports 32 with the borehole annulus 15. Turning now to Figures 7A-7B, a frac valve 210 for the disclosed multi-zone screen frac system 10 is shown in partial cross-section in a closed state (Fig. 7A) and an opened state (Fig. 7B). As noted above, the frac valve 210 can be a sliding sleeve similar to Weatherford's ZoneSelect MultiShift frac sliding sleeve and can be placed between isolation packers in the multi-zone completion. The sliding sleeve 210 includes a housing 220 with upper and lower subs 222 and 224. An inner sleeve or insert 230 movable within the housing 220 opens or closes fluid flow through the housing's flow ports 226 based on the inner sleeve 230's position. [0070] When initially run downhole, the inner sleeve 230 positions in the housing 220 in a closed state (Fig. 7A). In this state, a holder 234 holds the inner sleeve 230 toward the upper sub 222, and locking dogs 238 fit into an annular slot within the housing 220. Outer seals 236 on the inner sleeve 230 engage the housing 220's inner wall both above and below the flow ports 226 to seal them off. In addition, the flow ports 226 may be covered by a protective sheath 227 to prevent debris from entering into the sliding sleeve apparatus 210. Such a sheath 227 can be composed of a destructible material, such as a composite. [0071] As noted previously with respect to Figures 1-3, the sliding sleeve 210 is designed to open when a ball 34 lands on the landing seat 232 and tubing pressure is applied to move the inner sleeve 230 open. To open the sliding sleeve 210 in a frac operation, for example, operators drop an appropriately sized ball 34 downhole and pump the ball 34 until it reaches the landing seat 232 disposed in the inner sleeve 230 14 WO 2013/009773 PCT/US2012/046106 as shown in Figure 7B. The designated ball 34 for the landing seat 232 of this particular sleeve 210 is dropped from the surface once the appropriate amount of proppant has been pumped into the lower formation's zone. [0072] Once the ball 34 is seated, built up pressure forces against the inner sleeve 230 in the housing 220, thereby shearing any shear pins and freeing the dogs 238 from the housing's annular slot to the inner sleeve 230 can slide downward. As it slides, the inner sleeve 230 uncovers the flow ports 226. Preferably, as the inner sleeve 230 shifts past the flow ports 226, fracturing does not occur through the inner sleeve 230, which protects it from erosion. [0073] To mitigate potential damage to the sleeve 210 as the inner sleeve 230 moves downward, a shock absorber 240 can be connected to the inner sleeve 230's lower end. As shown in Figure 7A, this shock absorber 240 is initially connected in an extended position by shear pins 242 within the inner sleeve 230. As the inner sleeve 230 moves downward during opening, the absorber's distal lip 245 engages a shoulder 225 on the housing's lower sub 224, thereby breaking the downward energy of the moving inner sleeve 230. [0074] After the fracturing job, the well is typically flowed clean and the ball seat 232 and remaining ball 34 is milled out. The ball seat 232 can be constructed from cast iron to facilitate milling, and the balls can be composed of aluminum or non-metallic material. Once milling is complete, the inner sleeve 230 can be closed or opened with a standard "B" shifting tool on the tool profiles 234 and 236 in the inner sleeve 230 so the sliding sleeve 210 can then function like any conventional sliding sleeve shifting with a "B" tool. The ability to selectively open and close the sliding sleeve 210 with a "B" shifting tool after milling enables operators to isolate the particular section (28: Figs. 1-5) of the assembly (20). [0075] For those embodiments of the disclosed multi-zone screen frac system 10 that do not use a ball and seat arrangement, such as in Figures 4-5, the sliding sleeve 210 may lack a seat 232 altogether. Instead as noted above, the workstring (70: Figs. 4-5) has a shifting tool (78), such as a standard "B" shifting tool, that can engage on the tool profiles 234 and 236 in the inner sleeve 230 so workstring 70 can selectively move the inner sleeve 230 and open and close the ports 226. [0076] Turning now to Figures 8A-8B, details of shifting tools 78 for the workstring 70 of Figures 4-5 are discussed. As shown in Figure 8A, one shifting tool 78 includes upper and lower shifting tools 310 and 320 disposed on the workstring 70 with a 15 WO 2013/009773 PCT/US2012/046106 mandrel 302 disposed between upper and lower sections of the workstring 70. Because the mandrel 302 is part of the workstring 70, it has a bore (not shown) therethrough for flow of fluid. [0077] In the present example, the upper tool 310 is designed to be an closing tool for closing a sliding sleeves (e.g., 210:Figs. 7A-7B) by engaging the upper profile (234), jarring up of the workstring 70, and shifting the inner sleeve (230) upward in the sliding sleeve (210). Likewise in this example, the lower tool 320 is designed to be an opening tool for opening the sliding sleeves (210) by engaging the lower profile (236), jarring down with the workstring 70, and shifting the inner sleeve (230) downward in the sliding sleeve (210). A reverse arrangement could also be used. [0078] As detail of the closing shifting tool 310 shows a biased collet 312 that fits around the mandrel 302 and that connects at both ends to stops 314 and 316 on the mandrel 302. The collet 312 has B-profiles 318 that include an upward facing shoulder, an upper (shortened) cam, and a lower (extended) cam. As discussed above, the B profiles 318 enable the collet 312 to engage the recessed profile (234) in the sliding sleeve (210) in the up direction and bypass the recessed profiles (234 and 236) in the sliding sleeve (210) in the down direction. This type of shifting tool is typically referred to as a B shifting tool with a B-profile. [0079] Another arrangement of the shifting tool 78 uses a two-way shifting tool 330 as shown in Figure 8B. Here, the two-way shifting tool 330 a biased collet 332 that fits around the mandrel 302 and that connects at both ends to stops 334 and 336 on the mandrel 302. The collet 332 has dual B-profiles 328 having a downward-facing shoulder 340, an upper cam 342, an upward-facing shoulder 345, and a lower cam 347. Depending on the configuration of the sliding sleeve (210) and its profiles (234 and 236) and the direction the workstring 70 is being moved, the shifting tool 330 can open/close the sliding sleeve (210) by jarring down/up. [0080] The foregoing description of preferred and other embodiments is not intended to limit or restrict the scope or applicability of the inventive concepts conceived of by the Applicants. It will be appreciated with the benefit of the present disclosure that features described above in accordance with any embodiment or aspect of the disclosed subject matter can be utilized, either alone or in combination, with any other described feature, in any other embodiment or aspect of the disclosed subject matter. [0081] In exchange for disclosing the inventive concepts contained herein, the Applicants desire all patent rights afforded by the appended claims. Therefore, it is 16 intended that the appended claims include all modifications and alterations to the full extent that they come within the scope of the following claims or the equivalents thereof. [0082] In this specification, the terms "comprise", "comprises", "comprising" or similar terms are intended to mean a non-exclusive inclusion, such that a system, method or apparatus that comprises a list of elements does not include those elements solely, but may well include other elements not listed. [0083] The reference to any prior art in this specification is not, and should not be taken as, an acknowledgement or any form of suggestion that the prior art forms part of the common general knowledge 17

Claims (36)

1. A multi-zone frac assembly for a borehole, comprising: a tubular structure disposed in the borehole and defining a through-bore; and a plurality of sections disposed on the tubular structure, each of the sections comprising: an isolation element disposed on the tubular structure and isolating a zone of a borehole annulus around the section from the other sections, a flow valve disposed on the tubular structure and selectively operable between opened and closed conditions, the flow valve in the opened condition permitting fluid communication between the through-bore and the borehole annulus, the flow valve in the closed condition preventing fluid communication between the through-bore and the borehole annulus, a screen disposed on the tubular structure and communicating with the borehole annulus, and a check valve disposed on the tubular structure and in fluid communication between the screen and the through-bore, the check valve opening in response to an external pressure differential between the borehole annulus and the through-bore and permitting fluid communication from the screen into the through-bore, the check valve closing in response to an internal pressure differential between the through-bore and the borehole annulus and preventing fluid communication from the through-bore to the screen; wherein to facture a given one of the zones of the borehole annulus at a given one of the sections with treatment fluid, the given flow valve for the given section is operated to the opened condition to communicate the treatment fluid to the given zone, and the screen and the check valve of the given section are in fluid isolation in the through-bore. 18 2318432v1
2. The assembly of claim 1, wherein to facture the given zone at the given section, the flow valves of the other sections are in fluid isolation in the through-bore and/or are in the closed condition, and the check valves of the other sections are in fluid isolation in the through-bore and/or close in response to the internal pressure differential.
3. The assembly of claim 1 or 2, wherein the isolation element comprises a swellable packer, a hydraulically-set packer, or a mechanically-set packer.
4. The assembly of claim 1, 2, or 3, wherein at least a portion of the tubular structure for a given one of the sections comprises a basepipe having the through-bore and defining at least one pipe port communicating the through-bore outside the basepipe.
5. The assembly of any one of claims 1 to 4, wherein the check valve is disposed on the tubular structure adjacent at least one pipe port communicating the through-bore outside the tubular structure, the check valve permitting fluid communication from the screen to the at least one pipe port and preventing fluid communication from the at least one pipe port to the screen.
6. The assembly of claim 5, wherein the check valve comprises a housing disposed on the tubular structure, the housing having at least one internal flow passage and having at least one check ball, the at least one internal flow passage communicating the screen with the at least one pipe port, the at least one check ball movable to one condition permitting fluid communication through the at least one internal flow passage and movable to another condition preventing fluid communication through the at least one internal flow passage.
7. The assembly of claim 5 or 6, wherein the screen is disposed on the tubular structure and has one end in fluid communication with the check valve. 19 2318432v1
8. The assembly of any one of claims 1 to 7, further comprising a flow tube disposed in the borehole annulus and communicating through the isolation elements between one or more of the sections.
9. The system of any one of claims 1 to 8, wherein the flow valve comprises: a housing having a flow port communicating the through-bore outside the housing; and an insert movable in the housing between the closed condition preventing fluid communication through the flow port and the opened condition permitting fluid communication through the flow port.
10. The assembly of claim 9, wherein the insert comprises a seat disposed therein, the seat seating a plug deployed in the tubular structure thereon and moving the insert from the closed condition to the opened condition in response to application of fluid pressure against the seated plug.
11. The assembly of claim 10, wherein to facture the given zone at the given section with the treatment fluid, the seat having the plug isolates the screen and the check valve of the given section and isolates the other flow valves downhole on the tubular structure through the through-bore, the flow valves of the sections uphole on the tubular structure are in the closed condition, and the check valves of the sections uphole on the tubular structure close in response to the internal pressure differential.
12. The assembly of any one of claims 1 to 9, further comprising a workstring disposing in the through-bore of the tubular structure, the workstring operable to open and close the flow valve of each section and operable to seal inside the assembly and place an outlet port on the workstring in sealed communication with the borehole annulus when the flow valve has the opened condition.
13. The assembly of claim 12, wherein the workstring comprises an actuating tool operable to engage the flow valve in one direction and actuate the flow valve open and 20 2318432v1 operable to engage the flow valve in another direction and actuate the flow valve closed.
14. The assembly of claim 12 or 13, wherein the assembly comprises seats disposed in the through-bore on both uphole and downhole sides of a flow port in the flow valve, and wherein the workstring comprises seals disposed on both uphole and downhole sides of the outlet port, the seals configured to seal against the seats disposed in the through-bore.
15. The assembly of claim 12, 13, or 14, wherein to facture the given zone at the given section with the treatment fluid, the screen and the check valve of the given section are in fluid isolation in the through-bore, the flow valves of the other sections uphole and downhole on the tubular structure are in fluid isolation in the through-bore and/or are in the closed condition, and the check valves of the other sections uphole and downhole on the tubular structure are in fluid isolation in the through-bore and/or close in response to the internal pressure differential.
16. The assembly of any one of claims 12 to 15, further comprising a bypass tube for at least one of the sections, the bypass tube communicating a first portion of the through-bore on one side of a location of the workstring sealed inside the assembly to another side of the location.
17. A multi-zone frac assembly for a borehole, comprising: a tubular structure disposed in the borehole and defining a through-bore; and a plurality of sections disposed on the tubular structure, each of the sections comprising: means for isolating a zone of a borehole annulus around the section from the other sections, flow valve means for selectively permitting in an opened condition and preventing in a closed condition fluid communication between the through-bore and the borehole annulus through a first flow path, 21 2318432v1 screen means for screening fluid communication from the borehole annulus to the through-bore through a second flow path, and check valve means for permitting fluid communication from the screen means to the through-bore through the second fluid path in response to an external pressure differential between the borehole annulus and the through-bore, and for preventing fluid communication from the through-bore to the borehole annulus through the second flow path in response to an internal pressure differential between the through-bore and the borehole annulus, wherein to facture a given one of the zones of the borehole annulus at a given one of the sections with treatment fluid, the flow valve means for the given section is operated to the opened condition to communicate the treatment fluid, and the screen means and the check valve means of the given section are in fluid isolation in the through-bore.
18. The assembly of claim 17, wherein to facture the given zone at the given section, the flow valve means of the other sections are in fluid isolation in the through-bore and/or are in the closed condition while the check valve means of the other sections are in fluid isolation in the through-bore and/or prevent fluid communication in response to the internal pressure differential.
19. The assembly of claim 17 or 18, wherein the flow valve means for selectively permitting and preventing fluid communication between the through-bore and the borehole annulus through the first flow path comprises means for selectively opening and closing ports in the tubular structure.
20. A multi-zone frac method for a borehole, the method comprising: disposing an assembly in the borehole, the assembly having flow valves, screens, and check valves, each of check valves permitting fluid 22 2318432v1 communication from one of the screens into a through-bore of the assembly and preventing fluid communication from the through-bore to the one screen; isolating an annulus of the borehole around the assembly into a plurality of isolated zones, each of the isolated zones having one of the flow valves, one of the screens, and one of the check valves; and treating each of the isolated zones with a treatment fluid by: selectively opening the flow valve in the assembly at the each isolated zone, placing the screen and the check valve of the each isolated zone in fluid isolation in the through-bore, and flowing the treatment fluid to the each isolated zone through the opened flow valve. 23 2318432v1
21. The method of claim 20, wherein treating the each isolated zone comprises placing the other flow valves of the other isolated zones in fluid isolation in the through bore and/or in a selectively closed condition; and placing the check valves of the other isolated zones in fluid isolation in the through-bore and/or closed in response to an internal pressure differential on the check valves between the through-bore and the borehole annulus.
22. The method of claim 20 or 21, wherein disposing the assembly in the borehole comprises disposing the assembly in casing having perforations, in an expanded liner having slots, or in an open hole.
23. The method of claim 20, 21, or 22, wherein isolating the annulus of the borehole around the assembly into the isolated zones comprises engaging packing elements on the assembly against a wall of the casing, a wall of the expanded liner, or a wall of the open hole.
24. The method of any one of claims 20 to 23, wherein after treating, the method further comprises screening fluid communication from the annulus of the isolated zones into the through-bore of the assembly with the screens in response to external pressure differentials on the check valves between the borehole annulus and the through-bore.
25. The method of claim 24, wherein screening fluid from the annulus of the isolated zones into the through-bore of the assembly with the screens on the assembly comprises allowing fluid communication from the screens through perforations in the assembly communicating with the through-bore.
26. The method of any one of claims 20 to 25, wherein selectively opening the flow valve in the assembly at the each isolated zone comprises opening the flow valve in the assembly by moving an insert in the assembly away from a port. 24 2318432v1
27. The method of claim 26, further comprising selectively closing the opened ports in the assembly at each of the isolated zones.
28. The method of claim 26 or 27, wherein moving the insert in the assembly away from the port comprises: engaging a plug on the insert; and moving the insert away from the port with application of fluid pressure against the engaged plug.
29. The method of claim 28, wherein flowing the treatment fluid to the each isolated zone through the flow valve comprises flowing the treatment fluid through the opened port when the insert is moved away from the port.
30. The method of claim 27 or 28, wherein treating each of the isolated zones with the treatment fluid comprises: successively treating the isolated zones uphole on the assembly by successively engaging plugs and moving inserts uphole on the assembly for successive ones of the isolated zones.
31. The method of claim 27, 28, or 29, wherein treating each of the isolated zones comprises isolating in the through-bore the screen and the check valve of the zone and the other flow valves downhole on the assembly using the plugs engaged in the inserts, placing the other flow valves uphole on the assembly in the closed condition, and placing the other check valves uphole on the assembly closed in response to the internal pressure differential.
32. The method of claim 28, further comprising: removing the engaged plug; and selectively closing the insert over the opened port in the assembly. 25 2318432v1
33. The method of claim 26, wherein moving the insert in the assembly away from the port comprises: engaging the insert with a workstring disposed in the through-bore of the assembly; and moving the insert away from the port with movement of the engaged workstring.
34. The method of claim 33, wherein flowing the treatment fluid down the through bore to the each isolated zone through the opened port comprises flowing the treatment fluid through an outlet in the workstring and through the opened port when the insert is moved away from the port.
35. The method of claim 33 or 34, wherein treating each of the isolated zones comprising isolating in the through-bore the screen and the check valve of the zone using the workstring, placing the other flow valves uphole and downhole on the assembly in fluid isolation in the through-bore and/or in the closed condition, and placing the other check valves uphole and downhole on the assembly in fluid isolation in the through-bore and/or closed in response to the internal pressure differential.
36. The method of claim 33, 34, or 35, wherein treating each of the isolated zones with the treatment fluid comprises: successively closing a given one of the inserts with the workstring after treatment; and successively opening another one of the inserts with the workstring before treatment. 26 2318432v1
AU2012282768A 2011-07-12 2012-07-10 Multi-zone screened frac system Ceased AU2012282768B2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US201161506897P 2011-07-12 2011-07-12
US61/506,897 2011-07-12
PCT/US2012/046106 WO2013009773A1 (en) 2011-07-12 2012-07-10 Multi-zone screened frac system

Publications (2)

Publication Number Publication Date
AU2012282768A1 AU2012282768A1 (en) 2013-12-19
AU2012282768B2 true AU2012282768B2 (en) 2015-08-27

Family

ID=47506462

Family Applications (1)

Application Number Title Priority Date Filing Date
AU2012282768A Ceased AU2012282768B2 (en) 2011-07-12 2012-07-10 Multi-zone screened frac system

Country Status (9)

Country Link
US (1) US20130014953A1 (en)
EP (1) EP2732127A4 (en)
CN (1) CN103688016B (en)
AU (1) AU2012282768B2 (en)
BR (1) BR112014000745A8 (en)
CA (1) CA2838552C (en)
EA (1) EA201490255A1 (en)
MX (1) MX2014000428A (en)
WO (1) WO2013009773A1 (en)

Families Citing this family (44)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2412072C (en) 2001-11-19 2012-06-19 Packers Plus Energy Services Inc. Method and apparatus for wellbore fluid treatment
US8167047B2 (en) 2002-08-21 2012-05-01 Packers Plus Energy Services Inc. Method and apparatus for wellbore fluid treatment
US8757273B2 (en) 2008-04-29 2014-06-24 Packers Plus Energy Services Inc. Downhole sub with hydraulically actuable sleeve valve
US10082007B2 (en) 2010-10-28 2018-09-25 Weatherford Technology Holdings, Llc Assembly for toe-to-heel gravel packing and reverse circulating excess slurry
WO2012087431A1 (en) * 2010-12-20 2012-06-28 Exxonmobil Upstream Research Company Systems and methods for stimulating a subterranean formation
US9500064B2 (en) * 2011-03-16 2016-11-22 Peak Completion Technologies Flow bypass device and method
US10808497B2 (en) 2011-05-11 2020-10-20 Schlumberger Technology Corporation Methods of zonal isolation and treatment diversion
CN103917738A (en) * 2011-10-11 2014-07-09 帕克斯普拉斯能源服务有限公司 Wellbore actuators, treatment strings and methods
GB2500044B (en) * 2012-03-08 2018-01-17 Weatherford Tech Holdings Llc Selective fracturing system
US9359862B2 (en) * 2012-06-04 2016-06-07 Schlumberger Technology Corporation Wellbore isolation while placing valves on production
US9441454B2 (en) * 2012-10-26 2016-09-13 Weatherford Technology Holdings, Llc Gravel pack apparatus having actuated valves
CA2918791A1 (en) * 2013-07-25 2015-01-29 Schlumberger Canada Limited Sand control system and methodology
US20160177657A1 (en) * 2013-08-23 2016-06-23 Halliburton Energy Services, Inc. High-strength, low specific gravity, fracturing balls
NO3037552T3 (en) 2013-10-03 2018-09-22
US9534484B2 (en) * 2013-11-14 2017-01-03 Baker Hughes Incorporated Fracturing sequential operation method using signal responsive ported subs and packers
US20150136392A1 (en) * 2013-11-20 2015-05-21 Baker Hughes Incorporated Multi-zone Intelligent and Interventionless Single Trip Completion
US9695675B2 (en) * 2014-01-03 2017-07-04 Weatherford Technology Holdings, Llc High-rate injection screen assembly with checkable ports
US9771780B2 (en) * 2014-01-14 2017-09-26 Schlumberger Technology Corporation System and methodology for forming gravel packs
US20150218906A1 (en) * 2014-02-04 2015-08-06 Baker Hughes Incorporated Zone isolation system with integral annular flow control valve
US10100606B2 (en) 2014-04-28 2018-10-16 Schlumberger Technology Corporation System and method for gravel packing a wellbore
CN103982167B (en) * 2014-05-23 2016-10-05 湖南唯科拓石油科技服务有限公司 A kind of full-bore pitching sliding sleeve staged fracturing equipment
US10001613B2 (en) 2014-07-22 2018-06-19 Schlumberger Technology Corporation Methods and cables for use in fracturing zones in a well
US10738577B2 (en) 2014-07-22 2020-08-11 Schlumberger Technology Corporation Methods and cables for use in fracturing zones in a well
US20160138387A1 (en) * 2014-11-19 2016-05-19 Baker Hughes Incorporated Fluid flow location identification positioning system, method of detecting flow in a tubular and method of treating a formation
DK179717B1 (en) 2014-12-05 2019-04-10 Trican Completion Solutions Ltd Single trip through drill pipe proppant fracturing method for multiple cemented-in frac sleeves
CN104612627A (en) * 2015-01-19 2015-05-13 四川华宇石油钻采装备有限公司 Oil pipe hanger capable of closing and opening oil pipe passageway
WO2016182784A1 (en) * 2015-05-12 2016-11-17 Schlumberger Technology Corporation Methods and cables for use in fracturing zones in a well
US11248444B2 (en) 2016-01-20 2022-02-15 China Petroleum & Chemical Corporation Tool for opening sliding sleeve
US10233725B2 (en) 2016-03-04 2019-03-19 Baker Hughes, A Ge Company, Llc Downhole system having isolation flow valve and method
US20170275969A1 (en) * 2016-03-24 2017-09-28 Baker Hughes Incorporated Treatment Ported Sub and Method of Use
CN107461152B (en) * 2016-06-02 2019-10-11 中国石油化工股份有限公司 Multilateral Wells sidetracking device and Multilateral Wells sidetracking method
US10883344B2 (en) 2016-08-24 2021-01-05 Halliburton Energy Services, Inc. Systems and methods for opening screen joints
WO2018144669A1 (en) 2017-02-02 2018-08-09 Schlumberger Technology Corporation Downhole tool for gravel packing a wellbore
GB2559555B (en) * 2017-02-08 2019-11-27 Total E&P Danmark As Downhole operations
US10294754B2 (en) 2017-03-16 2019-05-21 Baker Hughes, A Ge Company, Llc Re-closable coil activated frack sleeve
WO2018187854A1 (en) * 2017-04-10 2018-10-18 Packers Plus Energy Services, Inc. Multi-zone single trip completion system
US11098568B2 (en) * 2017-09-22 2021-08-24 Statoil Gulf Services LLC Reservoir stimulation method and system
US10851618B2 (en) * 2017-11-27 2020-12-01 Conocophillips Company Method and apparatus for cementing and cleaning a reservoir liner
CA3104205C (en) 2018-09-06 2023-03-21 Halliburton Energy Services, Inc. A multi-functional sleeve completion system with return and reverse fluid path
MX2021005198A (en) * 2018-11-09 2021-07-15 Flowserve Man Co Fluid exchange devices and related systems, and methods.
CN109594962B (en) * 2018-11-18 2020-12-15 东北石油大学 Fracturing flowback sand prevention assembly, large-drift-diameter sand prevention release packer and sand prevention process
EP4077874A4 (en) 2019-12-20 2023-12-20 NCS Multistage Inc. Asynchronous frac-to-frac operations for hydrocarbon recovery and valve systems
US11261674B2 (en) 2020-01-29 2022-03-01 Halliburton Energy Services, Inc. Completion systems and methods to perform completion operations
US11333002B2 (en) 2020-01-29 2022-05-17 Halliburton Energy Services, Inc. Completion systems and methods to perform completion operations

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3963076A (en) * 1975-03-07 1976-06-15 Baker Oil Tools, Inc. Method and apparatus for gravel packing well bores
US5181569A (en) * 1992-03-23 1993-01-26 Otis Engineering Corporation Pressure operated valve
US20060060352A1 (en) * 2004-09-22 2006-03-23 Vidrine William L Sand control completion having smart well capability and method for use of same
US7147059B2 (en) * 2000-03-02 2006-12-12 Shell Oil Company Use of downhole high pressure gas in a gas-lift well and associated methods
US20070227727A1 (en) * 2006-03-30 2007-10-04 Schlumberger Technology Corporation Completion System Having a Sand Control Assembly, An Inductive Coupler, and a Sensor Proximate to the Sand Control Assembly
US7775284B2 (en) * 2007-09-28 2010-08-17 Halliburton Energy Services, Inc. Apparatus for adjustably controlling the inflow of production fluids from a subterranean well

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6978840B2 (en) * 2003-02-05 2005-12-27 Halliburton Energy Services, Inc. Well screen assembly and system with controllable variable flow area and method of using same for oil well fluid production
US7191828B2 (en) * 2004-05-18 2007-03-20 Welldynamics, Inc. Hydraulically set concentric packer with multiple umbilical bypass through the piston
US7191833B2 (en) * 2004-08-24 2007-03-20 Halliburton Energy Services, Inc. Sand control screen assembly having fluid loss control capability and method for use of same
US7562709B2 (en) * 2006-09-19 2009-07-21 Schlumberger Technology Corporation Gravel pack apparatus that includes a swellable element
US8196668B2 (en) * 2006-12-18 2012-06-12 Schlumberger Technology Corporation Method and apparatus for completing a well
US7918276B2 (en) * 2007-06-20 2011-04-05 Schlumberger Technology Corporation System and method for creating a gravel pack
US20090000787A1 (en) * 2007-06-27 2009-01-01 Schlumberger Technology Corporation Inflow control device
US8511380B2 (en) * 2007-10-10 2013-08-20 Schlumberger Technology Corporation Multi-zone gravel pack system with pipe coupling and integrated valve
US7934553B2 (en) * 2008-04-21 2011-05-03 Schlumberger Technology Corporation Method for controlling placement and flow at multiple gravel pack zones in a wellbore
US8267173B2 (en) * 2009-05-20 2012-09-18 Halliburton Energy Services, Inc. Open hole completion apparatus and method for use of same

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3963076A (en) * 1975-03-07 1976-06-15 Baker Oil Tools, Inc. Method and apparatus for gravel packing well bores
US5181569A (en) * 1992-03-23 1993-01-26 Otis Engineering Corporation Pressure operated valve
US7147059B2 (en) * 2000-03-02 2006-12-12 Shell Oil Company Use of downhole high pressure gas in a gas-lift well and associated methods
US20060060352A1 (en) * 2004-09-22 2006-03-23 Vidrine William L Sand control completion having smart well capability and method for use of same
US20070227727A1 (en) * 2006-03-30 2007-10-04 Schlumberger Technology Corporation Completion System Having a Sand Control Assembly, An Inductive Coupler, and a Sensor Proximate to the Sand Control Assembly
US7775284B2 (en) * 2007-09-28 2010-08-17 Halliburton Energy Services, Inc. Apparatus for adjustably controlling the inflow of production fluids from a subterranean well

Also Published As

Publication number Publication date
EA201490255A1 (en) 2014-12-30
BR112014000745A8 (en) 2017-07-11
WO2013009773A1 (en) 2013-01-17
US20130014953A1 (en) 2013-01-17
EP2732127A1 (en) 2014-05-21
CN103688016B (en) 2016-08-24
CN103688016A (en) 2014-03-26
MX2014000428A (en) 2014-04-14
CA2838552A1 (en) 2013-01-17
BR112014000745A2 (en) 2017-02-14
AU2012282768A1 (en) 2013-12-19
CA2838552C (en) 2016-05-03
EP2732127A4 (en) 2016-07-13

Similar Documents

Publication Publication Date Title
AU2012282768B2 (en) Multi-zone screened frac system
US20130062066A1 (en) Multi-Zone Screened Fracturing System
US7918276B2 (en) System and method for creating a gravel pack
CA2997105C (en) Apparatus, systems and methods for multi-stage stimulation
US6488082B2 (en) Remotely operated multi-zone packing system
US8127845B2 (en) Methods and systems for completing multi-zone openhole formations
US9062530B2 (en) Completion assembly
US6997263B2 (en) Multi zone isolation tool having fluid loss prevention capability and method for use of same
US10082007B2 (en) Assembly for toe-to-heel gravel packing and reverse circulating excess slurry
US20090095471A1 (en) Multi-zone gravel pack system with pipe coupling and integrated valve
US11125060B2 (en) Multi-zone single trip completion system
US20170138158A1 (en) Completion system for gravel packing with zonal isolation
EP2917469A2 (en) Multi-zone screened fracturing system
EP2957715B1 (en) Assembly for toe-to-heel gravel packing and reverse circulating excess slurry
RU2822384C2 (en) System and method of cementing and preventing sand ingress

Legal Events

Date Code Title Description
PC1 Assignment before grant (sect. 113)

Owner name: WEATHERFORD TECHNOLOGY HOLDINGS, LLC

Free format text: FORMER APPLICANT(S): WEATHERFORD/LAMB, INC.

FGA Letters patent sealed or granted (standard patent)
MK14 Patent ceased section 143(a) (annual fees not paid) or expired