AU2008299195B2 - Method of using pressure signatures to predict injection well anomalies - Google Patents

Method of using pressure signatures to predict injection well anomalies Download PDF

Info

Publication number
AU2008299195B2
AU2008299195B2 AU2008299195A AU2008299195A AU2008299195B2 AU 2008299195 B2 AU2008299195 B2 AU 2008299195B2 AU 2008299195 A AU2008299195 A AU 2008299195A AU 2008299195 A AU2008299195 A AU 2008299195A AU 2008299195 B2 AU2008299195 B2 AU 2008299195B2
Authority
AU
Australia
Prior art keywords
pressure
fracture
formation
signature
pressure signature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
AU2008299195A
Other languages
English (en)
Other versions
AU2008299195A1 (en
Inventor
Francisco Fragachan
Kenneth G. Nolte
Adriana P. Ovalle
Talgat A. Shokanov
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MI LLC
Original Assignee
MI LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MI LLC filed Critical MI LLC
Publication of AU2008299195A1 publication Critical patent/AU2008299195A1/en
Application granted granted Critical
Publication of AU2008299195B2 publication Critical patent/AU2008299195B2/en
Ceased legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/06Arrangements for treating drilling fluids outside the borehole
    • E21B21/063Arrangements for treating drilling fluids outside the borehole by separating components
    • E21B21/065Separating solids from drilling fluids
    • E21B21/066Separating solids from drilling fluids with further treatment of the solids, e.g. for disposal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/01Arrangements for handling drilling fluids or cuttings outside the borehole, e.g. mud boxes
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00
    • E21B41/005Waste disposal systems
    • E21B41/0057Disposal of a fluid by injection into a subterranean formation
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • E21B49/008Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells by injection test; by analysing pressure variations in an injection or production test, e.g. for estimating the skin factor

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Processing Of Solid Wastes (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Measuring Fluid Pressure (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
AU2008299195A 2007-09-13 2008-09-03 Method of using pressure signatures to predict injection well anomalies Ceased AU2008299195B2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US97209207P 2007-09-13 2007-09-13
US60/972,092 2007-09-13
PCT/US2008/075087 WO2009035884A1 (en) 2007-09-13 2008-09-03 Method of using pressure signatures to predict injection well anomalies

Publications (2)

Publication Number Publication Date
AU2008299195A1 AU2008299195A1 (en) 2009-03-19
AU2008299195B2 true AU2008299195B2 (en) 2012-08-23

Family

ID=40452407

Family Applications (1)

Application Number Title Priority Date Filing Date
AU2008299195A Ceased AU2008299195B2 (en) 2007-09-13 2008-09-03 Method of using pressure signatures to predict injection well anomalies

Country Status (12)

Country Link
US (1) US20100314104A1 (es)
EP (1) EP2198115B1 (es)
CN (2) CN101849080A (es)
AR (1) AR068426A1 (es)
AU (1) AU2008299195B2 (es)
BR (1) BRPI0816851A2 (es)
CA (1) CA2699503C (es)
CO (1) CO6270163A2 (es)
EA (1) EA021727B1 (es)
MX (1) MX343973B (es)
NO (1) NO2198115T3 (es)
WO (1) WO2009035884A1 (es)

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009105330A2 (en) * 2008-02-22 2009-08-27 M-I L.L.C. Method of estimating well disposal capacity
US8047284B2 (en) * 2009-02-27 2011-11-01 Halliburton Energy Services, Inc. Determining the use of stimulation treatments based on high process zone stress
WO2012178026A2 (en) * 2011-06-24 2012-12-27 Board Of Regents, The University Of Texas System Method for determining spacing of hydraulic fractures in a rock formation
PL408174A1 (pl) 2011-07-11 2014-12-22 Schlumberger Technology B.V. Układ i sposób przeprowadzania operacji stymulacji odwiertu
US20140231084A1 (en) * 2011-11-09 2014-08-21 Ramesh Varadaraj Drill Cuttings Re-Injection
US10578766B2 (en) 2013-08-05 2020-03-03 Advantek International Corp. Quantifying a reservoir volume and pump pressure limit
CA2937225C (en) 2013-12-18 2024-02-13 Conocophillips Company Method for determining hydraulic fracture orientation and dimension
CA2953727C (en) 2014-06-30 2021-02-23 Advantek International Corporation Slurrification and disposal of waste by pressure pumping into a subsurface formation
US10385670B2 (en) 2014-10-28 2019-08-20 Eog Resources, Inc. Completions index analysis
US10385686B2 (en) * 2014-10-28 2019-08-20 Eog Resources, Inc. Completions index analysis
WO2017039622A1 (en) * 2015-08-31 2017-03-09 Halliburton Energy Services Inc. Integrated workflow for feasibility study of cuttings reinjection based on 3-d geomechanics analysis
CN106371989A (zh) * 2016-05-06 2017-02-01 北京中电华大电子设计有限责任公司 一种采用批处理方式的高效安全攻击故障注入方法
GB2562752B (en) * 2017-05-24 2021-11-24 Geomec Eng Ltd Improvements in or relating to injection wells
MX2019015184A (es) 2017-06-16 2020-08-03 Advantek Waste Man Services Llc Optimizacion de eliminacion de lodo de desecho en operaciones de inyeccion fracturadas.
CA3099730A1 (en) 2018-05-09 2019-11-14 Conocophillips Company Measurement of poroelastic pressure response
CN108952700B (zh) * 2018-08-21 2022-03-25 西南石油大学 一种各向异性地层井壁破裂压力确定方法
CN112211622B (zh) * 2019-07-11 2023-02-07 中国石油天然气股份有限公司 油藏压力场划分的方法和装置
CA3160203A1 (en) * 2019-11-21 2021-05-27 Conocophillips Company Well annulus pressure monitoring
US11790320B2 (en) * 2020-06-25 2023-10-17 Schlumberger Technology Corporation Approaches to creating and evaluating multiple candidate well plans

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5050674A (en) * 1990-05-07 1991-09-24 Halliburton Company Method for determining fracture closure pressure and fracture volume of a subsurface formation
US6002063A (en) * 1996-09-13 1999-12-14 Terralog Technologies Inc. Apparatus and method for subterranean injection of slurried wastes
US6076046A (en) 1998-07-24 2000-06-13 Schlumberger Technology Corporation Post-closure analysis in hydraulic fracturing
US7440876B2 (en) * 2004-03-11 2008-10-21 M-I Llc Method and apparatus for drilling waste disposal engineering and operations using a probabilistic approach
US8091625B2 (en) * 2006-02-21 2012-01-10 World Energy Systems Incorporated Method for producing viscous hydrocarbon using steam and carbon dioxide
CA2823116A1 (en) * 2010-12-30 2012-07-05 Schlumberger Canada Limited System and method for performing downhole stimulation operations

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
GEEHAN THOMAS ET AL.: 'The cutting edge in drilling-waste management' OILFIELD REVIEW pages, Winter 2007/2008 *
WISHART,DEBONNE ET AL.: 'Hydraulic anisotropy chracterization of pneumatic-fractured sediments using azimuthal self potential gradient' JOURNAL OF CONTAMINANT HYDROLOGY vol. 103, 2009 *

Also Published As

Publication number Publication date
MX2010002779A (es) 2010-04-07
CO6270163A2 (es) 2011-04-20
EP2198115B1 (en) 2017-08-02
AU2008299195A1 (en) 2009-03-19
EP2198115A1 (en) 2010-06-23
EP2198115A4 (en) 2015-12-02
CA2699503C (en) 2015-05-05
CN104265211A (zh) 2015-01-07
CN101849080A (zh) 2010-09-29
CA2699503A1 (en) 2009-03-19
EA201070362A1 (ru) 2010-10-29
EA021727B1 (ru) 2015-08-31
US20100314104A1 (en) 2010-12-16
AR068426A1 (es) 2009-11-18
BRPI0816851A2 (pt) 2015-03-17
WO2009035884A1 (en) 2009-03-19
MX343973B (es) 2016-11-30
NO2198115T3 (es) 2017-12-30

Similar Documents

Publication Publication Date Title
AU2008299195B2 (en) Method of using pressure signatures to predict injection well anomalies
US9803467B2 (en) Well screen-out prediction and prevention
US8401795B2 (en) Methods of detecting, preventing, and remediating lost circulation
Dusseault et al. Towards a road map for mitigating the rates and occurrences of long-term wellbore leakage
Wang et al. The key to successfully applying today's lost circulation solutions
EP2718536B1 (en) Method for strengthening a wellbore of a well
CA2716018C (en) Method of estimating well disposal capacity
MX2014012049A (es) Metodos y sistemas para monitoreo y procesamiento en tiempo real de datos de barrenos de pozos.
GB2354852A (en) Borehole construction with real-time updating of earth model
Hafezi Real-time detection of drilling problems & issues during drilling by listing & using their signs both on the surface and downhole
Jayah et al. Integrated technology approach to explore carbonate reservoirs in Malaysia enhances PMCD potentials and enables successful prospect evaluations
EP3821107A1 (en) Systems and methods to identify and inhibit spider web borehole failure in hydrocarbon wells
US11519265B2 (en) Well system including a downhole particle measurement system
Guo et al. Increased assurance of drill cuttings reinjection: challenges, recent advances, and case studies
Abd Rahim et al. Overcoming subsurface and batch drilling challenges in a heavily faulted deepwater environment
Wang et al. Strengthening a wellbore with multiple fractures: further investigation of factors for strengthening a wellbore
Fragachan et al. Mitigating Risks from Waste Subsurface Pressure Injection and Decline Analysis
Mehtar et al. Feed to execution: first successful hydraulic fracture cuttings re-injection process offshore Abu Dhabi
Gaurina-Medjimurec The underground injection of drilling waste
Gaurina-Medjimurec et al. Lost circulation
Noah et al. Comprehensive Wellbore Instability Management by Determination of Safe Mud Weight Windows Using Mechanical Earth Model, Meleiha Field, Western Desert, Egypt
Shokanov et al. Waste Subsurface Injection: Pressure Injection and Decline Analysis
Oyeneyin Fundamental Principles of Management of Reservoirs with Sanding Problems
Adams A comprehensive review of wellbore breathing
Mohamed et al. Accurate Forecasts of Stress Accumulation During Slurry Injection Operations

Legal Events

Date Code Title Description
FGA Letters patent sealed or granted (standard patent)
MK14 Patent ceased section 143(a) (annual fees not paid) or expired