AU2007343372B2 - Method for determining the specific power requirement of a belt conveyor system for bulk materials in operation with nonconstant loading - Google Patents

Method for determining the specific power requirement of a belt conveyor system for bulk materials in operation with nonconstant loading Download PDF

Info

Publication number
AU2007343372B2
AU2007343372B2 AU2007343372A AU2007343372A AU2007343372B2 AU 2007343372 B2 AU2007343372 B2 AU 2007343372B2 AU 2007343372 A AU2007343372 A AU 2007343372A AU 2007343372 A AU2007343372 A AU 2007343372A AU 2007343372 B2 AU2007343372 B2 AU 2007343372B2
Authority
AU
Australia
Prior art keywords
belt
power requirement
belt conveyor
conveyor system
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
AU2007343372A
Other versions
AU2007343372A1 (en
Inventor
Manfred Ziegler
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
RWE Power AG
Original Assignee
RWE Power AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by RWE Power AG filed Critical RWE Power AG
Publication of AU2007343372A1 publication Critical patent/AU2007343372A1/en
Application granted granted Critical
Publication of AU2007343372B2 publication Critical patent/AU2007343372B2/en
Ceased legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01GWEIGHING
    • G01G11/00Apparatus for weighing a continuous stream of material during flow; Conveyor belt weighers
    • G01G11/003Details; specially adapted accessories
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G43/00Control devices, e.g. for safety, warning or fault-correcting
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G43/00Control devices, e.g. for safety, warning or fault-correcting
    • B65G43/08Control devices operated by article or material being fed, conveyed or discharged

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Control Of Conveyors (AREA)
  • Structure Of Belt Conveyors (AREA)

Abstract

The invention relates to a method for determining the specific power requirement of a belt web conveyor system for bulk goods in operation with nonconstant loading. The invention comprises the assignment of a measured mass flow to individual segments of a belt system and to the measured drive power, a continuous determination of a segment load of the belt web for n segments of the same length, the calculation of a load-dependent resistance to movement for each of the n segments initially by utilizing an estimated specific resistance to movement, the calculation of power required per segment, and the calculation of the overall power requirement of the belt web conveyor system by means of adding up the segment power requirements. The calculated overall power requirement is compared to the measured electric power requirement, and from the comparison a specific resistance to movement is determined for the belt web system. Inferences can be made about the condition of the system by utilizing the specific resistance to movement of the belt web system.

Description

METHOD FOR DETERMINING THE SPECIFIC POWER REQUIREMENT OF A BELT CONVEYOR SYSTEM FOR BULK MATERIALS IN OPERATION UNDER VARIABLE LOADING 5 The invention relates to a method for determining the specific power requirement of a belt conveyor system for bulk materials in operation under variable loading. In the simplest case, belt conveyor systems comprise an 10 elastomeric belt that is deflected around two drums and circulates endlessly. At least one of the two drums is electrically driven and drives the thus circulating -belt. Between the drums, which are generally denoted as head station and rear station, the belt is supported by 15 rotatable support rollers that are taken up by support roller frames. The support rollers serve t6 support and align the belt between the deflecting stations, and moreover determine the troughing of the belt. As already mentioned, the energy required. to drive the 20 belt is introduced into the drums of the belt conveyor by electric drives. The power requirement of the belt conveyor is, on the one hand, dependent on the mass flow fed to the belt conveyor, while on the other hand it is dependent on the different movement resistances 25 of the belt conveyor, which exhibit a different appearance as a function of the state of alignment of the belt, of the contamination state of the latter, or of the state of maintenance of the rollers, etc. 30 It is customary to calculate the theoretical power requirement of a belt system in order to design the latter. According to this process, the different movement resistances (primary, secondary, climbing and special resistances) are determined individually. The 35 power requirement is calculated from the sum of these movement resistances multiplied by the belt speed. The largest portion of the movement resistance in a belt system belongs to the primary resistance, which is determined in a way similar to the determination of the 40 frictional resistance of a block pulled on an inclined - 2 plane. In this case, the specific movement resistance used hereby corresponds to a fictional coefficient of friction that can vary in dependence on the state of alignment of the belt system, diameter of the support 5 rollers, belt pretensioning, etc. This fictional coefficient of friction is usually estimated in order to determine the primary resistance of the belt system. During operation of the belt system, this specific value can undergo creeping deterioration, for example 10 owing to increasing contamination in the lower run but, in the case of shiftable belt systems, chiefly owing to change in the state of alignment of the belt supporting frames (underscouring by rain, displacement owing to inattentiveness during cleaning of the lower run by 15 means of an auxiliary unit). For this reason, the state of alignment and thus the specific energy consumption of the belt systems are frequently higher than necessary and cause substantial, avoidable energy costs. 20 It could now be assumed that the specific movement resistance of a belt system can be determined empirically simply by measuring power at a belt system that is operating. This would, for example, be 25 desirable in order to be able to draw conclusions therefrom in relation to the state of maintenance of the belt system, and/or in order to be able to check the effectiveness and the influence of the one or other maintenance measure with regard to the power 30 consumption of the belt system. However, in practice, it has proved to be difficult to specify a specific movement resistance or fictional coefficient of friction, since the mass flow fed to the conveying belt is not constant, as a rule, but fluctuates. This means 35 that the belt has different load cross sections over its length. It is possible to measure only the drive power of the motors as well as the current mass flow via a belt weigher possibly provided. In order to be able to draw conclusions in relation to the state of -3 maintenance of the belt system, the mass flow would need to be eliminated from consideration, it having emerged in experiments that it is impossible to derive any unique functional relationship between the drive power and the belt 5 load, and so the specification of a fictional coefficient of friction or specific movement resistance is subject to great uncertainty. Therefore, a need exists to provide a method of the type io mentioned in the beginning for the purpose of determining the specific power requirement of a belt conveyor system for bulk materials in operation under variable loading that is so reliable that it permits conclusions to be drawn in relation to the sate of the belt system. 15 According to an aspect of the present disclosure, a method for determining the specific power requirement of a belt conveyor system for bulk materials in operation under variable loading is proposed that comprises the following 20 steps: - continuous determination of a segment related loading of the belt conveyor for n segments of the same length; - calculating a load dependent movement resistance for 25 each of the n segments, initially with the aid of an estimated specific movement resistance; - calculating power required per segment; - calculating the total power requirement of the belt conveyor system; and determining a specific movement 30 resistance by comparing the calculated total power requirement with a measured electric power requirement. The inventive method proceeds in this case from the finding 35 that different loading distributions of the belt are possible in principle in conjunction with the same average loading of a belt system. Depending on the -4 load distribution, the power requirement of the belt system can be different although the mean value for the average load is the same. This gives rise in principle to the difficulty of deriving a functional relationship between 5 drive power and belt load. According to another aspect of the present disclosure, account is taken of this by determining different segment related loadings for n segments of the belt, that are of the 1o same length. For each of the n segments, this results in different primary movement resistances that are also dependent on the gradient of the belt profile in the relevant segment referred to a horizontal. It is possible in this way to determine a total power requirement of the 15 belt conveyor system that does justice to the different load cross section over the length of the belt. By continuously comparing the calculated theoretical total power requirement with a measured electric power requirement, it is possible to determine iteratively the specific movement resistance on 20 the basis of which conclusions can be drawn directly in relation to the state of maintenance of the belt system. The iterative determination of the specific movement resistance is preferably performed by minimizing the spring 25 squares sum from the comparison between calculated and measured power. A specific movement resistance which directly supplies information relating to the state of the belt system with regard to power consumption can in this way be determined individually for each belt system in 30 operation. Thus, the effectiveness of specific maintenance measures or other changes relevant with regard to the power consumption of the system can be directly determined during operation of the belt system and be identified by being eliminated from the influences of uneven loading. 35 With particular preference, the segment related loading is determined by means of a belt weigher during the -5 belt circulation, the clock cycle of the mass flow measurement being synchronized with the belt speed, such that the temporally varied loading can be assigned to the segments of the belt system, which differ with 5 reference to their power requirement. In order to be able to assign the measured mass flows to the individual segments of the belt system, the lengths of said segments are adapted to the clock cycle of the mass flow measurement. For example, if a belt weigher 10 supplies every two seconds a measured value that should constitute the mean value of the load over two seconds, and if the belt speed is 7.5 m/s, the belt system should be subdivided into segments 15 m long, and in each case the average gradient of the belt profile of 15 this segment should be determined for the purpose of calculating the movement resistance of the relevant segment. Expediently, the respective theoretical power 20 requirement is determined in each clock cycle At for all n segments of the belt system, and a theoretical total power requirement is determined in each clock cycle from the theoretical power requirement values determined in segment related fashion. 25 The minimization of the errors square sum of the deviations between theoretical and measured power requirements over all time increments is expediently performed over a time period that is representative of 30 all occurring load fluctuations. The invention will be explained below with the aid of an example and with reference to the attached drawing of the figure. The figure illustrates in a relatively 35 simple schematic way a belt conveyor system having two different load distributions in conjunction with the same average loading of a belt system with four segments. By way of example for a belt conveyor as applied in modern open cast brown coal mines, the belt -6 width is approximately 2800mm. The mass flow or flow of bulk materials can fluctuate between 0 and 35000t/h. As already mentioned initially, the figure illustrates two 5 different loading states of a belt system. It is evident that - despite the same average loading - the power requirement in the lower case is substantially higher than in the upper case, specifically particularly because the profile of the belt system is not horizontal, and so the io movement resistances in the individual segments are different. The climbing resistance for a vertical interval of one meter is approximately of the same value as the resistance for a horizontal transportation path of 45m. In the case shown in the figure, for which the mass is distribution is respectively illustrated in the form of four loading blocks, in the upper case the largest mass fraction is transported downhill, whereas in the lower case the largest mass fraction is transported uphill. 20 Up to date, a sliding mean for the average load of the complete belt system under consideration has been formed from the signal of the belt weigher. However, as likewise already mentioned it is not possible to produce a unique functional relationship between the mass flow and the drive 25 power. According to another aspect of the present disclosure, the procedure now is such that the temporally variable load is assigned to the segments of the belt system that differ with 30 reference to power requirement. The case adapted here in this case is one in which the discharged mass flow is continuously measured via a belt weigher on the belt feeding the belt to be considered. The electric power is measured at the belt to be considered via the power consumption of 35 the motors. Of course, the belt weigher can also be provided on the belt to be considered.
- 7 Every two seconds, the belt weigher supplies a measured value that is intended to constitute a mean value of the load over 2 seconds. The belt speed of all the belts is v=7.5 m/s. In order to be able to assign the 5 measured mass flows m'L,i to the individual segments of the band system, the band system is subdivided into segments i of length 15 m, in addition to which the mean gradient 8i of the belt profile is determined in each case. 10 The measured values of the mass flows must be synchronized with the segments, that is to say for each segment i there belong in relation to the drive power Po measured at the instant to the mass flows m'L,i with that 15 time offset which is required by the load in order to cover the distance between belt weigher and the corresponding segment i. In each clock cycle At, the theoretical power 20 requirement is determined for all segments of the belt system with the currently associated load fractions, and is summed to form a theoretical total power requirement. 25 This first calculation clearly first of all requires the assumption of an estimated fictional coefficient of friction or specific belt resistance f. By making a comparison with the actual measured drive power and variation, it is possible to optimize the specific 30 resistance of the belt system (fictional coefficient of friction) to the effect that the deviations are minimized. This optimization is performed over a representative time period that covers the greatest portion of the occurring load fluctuation. The target 35 function is the errors square sum of the deviations between measured and calculated power over all time increments. The value range for the fictional coefficient of - 8 friction or specific movement resistance fluctuates between 0.010 for very well aligned systems and 0.040 for poorly aligned belt systems. 5 The initially estimated specific resistance is used to calculate the primary resistance FH,i of each subsegment of the n subsegments of the belt system, specifically in the following way: 10 F,i=li-fi-g- [m'R,i + (m'G + m'L,i) -cOSS] li denoting the length of the segment, fi the specific movement resistance, g the acceleration due to gravity, m'R,i the mass of the belt rollers of the relevant 15 segment, m'G the mass of the belt itself, m'L,i the mass of the load, and 8 the mean gradient of the belt profile. The power required per segment is calculated thus: 20 P=v- (FH+FN+FB+FST+Fs) /71 FN denoting the secondary resistances, FE the acceleration resistances, FST the cimbing resistances, 25 and Fs the special resistances, and also q the efficiency of the drive or drives. The acceleration resistance FB occurs only in the region of the transfer, and is calculated as 30 FB = v-m'L/dt and the climbing resistance FST is calculated as 35 FST = g-m'L-sin( 6 ). Secondary resistances FN occur generally only as chute friction in the region of rear station and head station, specifically only above a limit load - 9 determined by design. The best theoretical approach so far to describing the chute friction runs as follows FN = 0 for m'L < =m'limit or 5 FN = k (M'L-m' limit) for m'L > m'iimit The limit value of the load starting from which chute friction occurs is approximately 18000 t/h in the case of the B2.800er belt systems (2800 mm width) . The load 10 independent portion of the primary resistance - that is to say 1-f-g (m'R+m'G*COS(S)) - can be combined over all subsegments and corresponds (when multiplied by v/Tn) to the no load power Pleer. 15 The load dependent portion of the primary resistance and the likewise load dependent climbing resistance can be combined for each segment i to form the following term Fi: 20 Fi=m'L,i'g' (f'cos(Si)+sin(Si)) The total theoretical drive power is therefore Pges= [EFi+F+FN,head+FN, rear] 'v/Tl+Pieer 25 The above-mentioned parameters via which the optimization is performed are as follows: 1. f fictional coefficient of friction 30 2. Pleer No load power 3 m'limit, head Limit load from which chute friction occurs in the head segment 4 head Proportionality factor for the relationship between load and chute 35 friction at the head above the limit load 5 m'limit, rear Limit load from which chute friction occurs in the rear segment 6 krear Proportionality factor for the - 10 relationship between load and chute friction at the rear above the limit load. 5 The f value and the no load power have by far the greatest influence, the no load power mostly being the movement resistance of the dead masses (belt, support rollers) and thus also dependent on the f value. The factors 3 to 6 once again improve the quality of the 10 simulation, but can be neglected if appropriate. The inventive method has the aim of being able to accurately represent the parameters influencing the power requirement via the assignment of the measured 15 mass flow to the individual segments of a belt system and the measured drive power. To this end, the theoretical power requirement is calculated for each individual segment at each instant for which a pair of measured values from drive power and mass flow are 20 present, specifically initially with the aid of estimated values for these parameters. The sum of these theoretical segment powers gives for each instant the theoretical drive power that can be compared with the measured drive power. The sum of the errors squares is 25 a measure of the quality of the estimated values, and is used for an iterative optimization of these estimated values.

Claims (5)

1. A method for determining the specific power requirement of a belt conveyor system for bulk materials in operation under variable loading, comprising the following 5 steps: continuously determining a segment related loading of the belt conveyor for n segments of the same length; calculating a load dependent movement resistance for each of the n segments of the belt conveyor system, initially with the aid of an estimated specific movement 1o resistance; calculating power required per segment; calculating the total power requirement of the belt conveyor system; and determining a specific movement resistance by comparing the calculated total power requirement with a measured electric power requirement, is wherein an iterative determination of the specific movement resistance being performed by minimizing the errors square sum from the comparison between calculated and measured power, in order to be able to draw conclusions therefrom in relation to the state of maintenance of the belt conveyor system. 20
2. The method as claimed in claim 1, wherein the segment related loading is performed by means of a belt weigher during the belt circulation, the clock cycle of the mass flow measurement being synchronized with the belt speed.
3. The method as claimed in either of claims 1 and 2, wherein the respective 25 theoretical power requirement is determined in each clock cycle At for all n segments of the belt conveyor system, and wherein a theoretical total power requirement is determined in each clock cycle from the power requirement values determined in each segment.
4. The method as claimed in any one of claims 1 to 3, wherein the minimization of 30 the errors square sum of the deviation between theoretical and measured power requirements is performed over all time increments of a time period that is representative of all occurring load fluctuations. 12
5. A method for determining the specific power requirement of a belt conveyor system for bulk materials in operation under variable loading, the method being substantially as herein before described with reference to any one of the embodiments, as that embodiment is shown in the accompanying drawings. 5 DATED this Seventh Day of February, 2012 RWE Power Aktiengesellschaft Patent Attorneys for the Applicant SPRUSON & FERGUSON 10
AU2007343372A 2007-01-08 2007-12-12 Method for determining the specific power requirement of a belt conveyor system for bulk materials in operation with nonconstant loading Ceased AU2007343372B2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
DE200710002015 DE102007002015A1 (en) 2007-01-08 2007-01-08 Method for determining the specific power requirement of an in-service belt conveyor system for bulk material at non-constant loading
DE102007002015.7 2007-01-08
PCT/EP2007/010864 WO2008083809A1 (en) 2007-01-08 2007-12-12 Method for determining the specific power requirement of a belt web conveyor system for bulk goods in operation with nonconstant loading

Publications (2)

Publication Number Publication Date
AU2007343372A1 AU2007343372A1 (en) 2008-07-17
AU2007343372B2 true AU2007343372B2 (en) 2012-03-29

Family

ID=39284113

Family Applications (1)

Application Number Title Priority Date Filing Date
AU2007343372A Ceased AU2007343372B2 (en) 2007-01-08 2007-12-12 Method for determining the specific power requirement of a belt conveyor system for bulk materials in operation with nonconstant loading

Country Status (6)

Country Link
EP (1) EP2099701B1 (en)
CN (1) CN101583548B (en)
AU (1) AU2007343372B2 (en)
DE (1) DE102007002015A1 (en)
WO (1) WO2008083809A1 (en)
ZA (1) ZA200904443B (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103596828B (en) 2011-06-28 2017-10-17 舍弗勒技术股份两合公司 Hybrid drive train with active torsional vibration damping and method for carrying out active torsional vibration damping
DE102015212267A1 (en) * 2015-07-01 2017-01-05 Voith Patent Gmbh Method and apparatus for determining specific energy consumption of belt conveyors
DE102017130104A1 (en) 2017-12-15 2019-06-19 Voith Patent Gmbh Device for detecting alignment errors of a belt conveyor
CA3092899A1 (en) * 2018-03-02 2019-09-06 Voith Patent Gmbh Determination of the energy efficiency of a belt conveyor
DE102018104792B4 (en) * 2018-03-02 2021-04-22 Voith Patent Gmbh Determination of the energy efficiency of a belt conveyor
DE102020130132A1 (en) 2020-11-16 2022-05-19 Thyssenkrupp Ag Belt conveyor system and method for determining a section-related running friction resistance of the belt conveyor system
WO2022101104A1 (en) 2020-11-16 2022-05-19 Thyssenkrupp Industrial Solutions Ag Method for identifying a distance-related running frictional resistance of a belt conveyor system
BE1028799B1 (en) 2020-11-16 2022-06-13 Thyssenkrupp Ag Belt conveyor system and method for determining a distance-related running friction resistance of the belt conveyor system
CN113526015B (en) * 2021-07-17 2023-04-14 欧普瑞泰环境科技有限公司 Control method of air cushion conveyor
CN113884167B (en) * 2021-09-15 2024-03-01 湖南库特智能科技有限公司 Working capacity metering method and system for mobile crusher
DE102022115883A1 (en) * 2022-06-27 2023-12-28 Voith Patent Gmbh Efficient belt conveyor system with error diagnosis
CN116674957A (en) * 2023-06-06 2023-09-01 华能国际电力江苏能源开发有限公司 Optimization method and system for coal conveying belt drive

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19911642A1 (en) * 1999-03-16 2000-09-28 Lausitzer Braunkohle Ag Diagnosing conveyor belt bearer roller damage states involves deriving peripheral force on bearer rollers from sensor signals as empty or loaded belt passes over bearer rollers

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4579218A (en) * 1983-10-11 1986-04-01 David B. Park Conveyor drive mechanism
SU1485023A1 (en) * 1987-07-06 1989-06-07 Kuban Vnii Zerna Produktov Ego Method for measuring of initial weight flow rate of loose material
CN1180407A (en) * 1995-02-15 1998-04-29 哈特穆特·拉布施伊斯 Device for generating continuous stream of bulk material and determining delivery rate or batching quantity thereof
US6868310B2 (en) * 2001-04-06 2005-03-15 Eni Technology, Inc. Predictive failure scheme for industrial thin films processing power delivery system

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19911642A1 (en) * 1999-03-16 2000-09-28 Lausitzer Braunkohle Ag Diagnosing conveyor belt bearer roller damage states involves deriving peripheral force on bearer rollers from sensor signals as empty or loaded belt passes over bearer rollers

Also Published As

Publication number Publication date
WO2008083809A1 (en) 2008-07-17
CN101583548B (en) 2011-08-10
DE102007002015A1 (en) 2008-07-10
CN101583548A (en) 2009-11-18
AU2007343372A1 (en) 2008-07-17
ZA200904443B (en) 2010-08-25
EP2099701B1 (en) 2014-09-10
EP2099701A1 (en) 2009-09-16

Similar Documents

Publication Publication Date Title
AU2007343372B2 (en) Method for determining the specific power requirement of a belt conveyor system for bulk materials in operation with nonconstant loading
CN107850481B (en) Method and device for determining the specific energy consumption of a belt conveyor
CN106628843B (en) Sealing chain belt transfer conveyor
US7698839B1 (en) Material conveyor system container
US11220403B2 (en) Determination of the energy efficiency of a belt conveyor
CA2333560C (en) Chain conveyor
US10495195B2 (en) Method for operating a chain drive and assembly having a chain drive
JP4173805B2 (en) Chain conveyor in the form of a scale
EA019435B1 (en) Method of quantifying objects on a conveyor belt and conveyor assembly
CN109941698B (en) Belt conveyor speed adjusting method considering fatigue damage
US20230021955A1 (en) Energy-efficient control of a device for continuously conveying material
KR101337355B1 (en) Automatic meat cutting device in correct amounts and that method
CN109250597A (en) Elevator car loading device antidote
AU2018214111B1 (en) Train load-out arrangement
CN201472980U (en) Dynamic weighing belt feeding machine
US2077188A (en) Roller conveyer
CN204624510U (en) Belt automatic positioning equipment
Antoniak Resistances to the motion in mining belt conveyors
CN205825932U (en) Adhesive tape wear extent on-line measurement device
CN203903307U (en) Mechanism for preventing deviation of middle of bearing surface of flat belt conveyor
RU2802263C1 (en) Energy efficient control of the device for continuous material transportation
Katterfeld et al. Reducing the energy consumption of belt conveyors by the use of intelligent garlands
CN218230980U (en) Powder conveyer
CN207908026U (en) Transporting coal belted electronic balance arrangement
O'Shea et al. The effect of large diameter idler rollers on the indentation rolling resistance of belt conveying systems

Legal Events

Date Code Title Description
FGA Letters patent sealed or granted (standard patent)
MK14 Patent ceased section 143(a) (annual fees not paid) or expired