ATE258300T1 - METHOD FOR DETERMINING THE HEIGHT OF THE BATH MIRROR OF AN ELECTRIC ARC FURNACE - Google Patents
METHOD FOR DETERMINING THE HEIGHT OF THE BATH MIRROR OF AN ELECTRIC ARC FURNACEInfo
- Publication number
- ATE258300T1 ATE258300T1 AT99115929T AT99115929T ATE258300T1 AT E258300 T1 ATE258300 T1 AT E258300T1 AT 99115929 T AT99115929 T AT 99115929T AT 99115929 T AT99115929 T AT 99115929T AT E258300 T1 ATE258300 T1 AT E258300T1
- Authority
- AT
- Austria
- Prior art keywords
- electric arc
- height
- determining
- bath mirror
- arc furnace
- Prior art date
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27B—FURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
- F27B3/00—Hearth-type furnaces, e.g. of reverberatory type; Tank furnaces
- F27B3/10—Details, accessories, or equipment peculiar to hearth-type furnaces
- F27B3/28—Arrangement of controlling, monitoring, alarm or the like devices
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27B—FURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
- F27B3/00—Hearth-type furnaces, e.g. of reverberatory type; Tank furnaces
- F27B3/08—Hearth-type furnaces, e.g. of reverberatory type; Tank furnaces heated electrically, with or without any other source of heat
- F27B3/085—Arc furnaces
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27D—DETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
- F27D21/00—Arrangements of monitoring devices; Arrangements of safety devices
- F27D21/0028—Devices for monitoring the level of the melt
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Vertical, Hearth, Or Arc Furnaces (AREA)
- Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
- Furnace Details (AREA)
- Refinement Of Pig-Iron, Manufacture Of Cast Iron, And Steel Manufacture Other Than In Revolving Furnaces (AREA)
Abstract
The height of the bath mirror (8) is determined using calculated connection of the linear dimensions. The liner dimensions are measured in part directly, indirectly and preferably outside of the high temperature range of the electric arc oven (1). In the process of determining the height of the bath mirror of an electric arc oven (1), the electric arc oven (1) has an oven tank (2) with a slag door (13) and a height adjustable electrode support are (5) for at least a graphite electrode (4).
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19836844A DE19836844C2 (en) | 1998-08-14 | 1998-08-14 | Method for determining the level of the bath of an electric arc furnace |
Publications (1)
Publication Number | Publication Date |
---|---|
ATE258300T1 true ATE258300T1 (en) | 2004-02-15 |
Family
ID=7877509
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
AT99115929T ATE258300T1 (en) | 1998-08-14 | 1999-08-13 | METHOD FOR DETERMINING THE HEIGHT OF THE BATH MIRROR OF AN ELECTRIC ARC FURNACE |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP0981034B1 (en) |
AT (1) | ATE258300T1 (en) |
DE (2) | DE19836844C2 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BR112012027312B1 (en) | 2010-04-26 | 2020-11-17 | Hatch Ltd | method of monitoring a layer of feed material in a metallurgical furnace |
CN114913225B (en) * | 2021-02-10 | 2024-04-09 | 上海梅山钢铁股份有限公司 | Converter liquid level real-time measurement method based on monocular vision |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2901828A (en) * | 1958-02-14 | 1959-09-01 | Vanadium Corp Of America | Apparatus for indicating the dip of an electrode in a submerged arc electric furnace |
US4843234A (en) * | 1988-04-05 | 1989-06-27 | The Babcock & Wilcox Company | Consumable electrode length monitor based on optical time domain reflectometry |
DE4402463C2 (en) * | 1994-01-28 | 1998-01-29 | Amepa Eng Gmbh | Device for discontinuous detection of the thickness of a layer on a molten metal |
US5708677A (en) * | 1995-04-21 | 1998-01-13 | Sandia Corporation | Arc voltage distribution skewness as an indicator of electrode gap during vacuum arc remelting |
-
1998
- 1998-08-14 DE DE19836844A patent/DE19836844C2/en not_active Expired - Fee Related
-
1999
- 1999-08-13 DE DE59908350T patent/DE59908350D1/en not_active Expired - Fee Related
- 1999-08-13 EP EP99115929A patent/EP0981034B1/en not_active Expired - Lifetime
- 1999-08-13 AT AT99115929T patent/ATE258300T1/en not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
DE19836844A1 (en) | 2000-02-24 |
DE19836844C2 (en) | 2001-07-05 |
DE59908350D1 (en) | 2004-02-26 |
EP0981034A1 (en) | 2000-02-23 |
EP0981034B1 (en) | 2004-01-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE3775443D1 (en) | METHOD AND DEVICE FOR MELTING METAL. | |
DE69613822T2 (en) | METHOD AND FOR VACUUM RUBBING, USE OF A DEVICE FOR VACUUM RUBBING AND CARBONED STEEL PRODUCTS | |
ATE258300T1 (en) | METHOD FOR DETERMINING THE HEIGHT OF THE BATH MIRROR OF AN ELECTRIC ARC FURNACE | |
DE3671961D1 (en) | METHOD AND DEVICE FOR COMPENSATING THE INFLUENCE OF THE WEIGHT OF A POWER SUPPLY PIPE ON A WEIGHT MEASURING DEVICE. | |
DE3672897D1 (en) | METHOD FOR OPERATING A DC-ARC FURNACE AND DEVICE FOR CARRYING OUT THE METHOD. | |
DE59607427D1 (en) | METHOD FOR THE DECOLARIZATION OF STEEL MELT | |
DE3882660D1 (en) | CHECKING THE LEVEL OF EXPOSURE OF AN ARC. | |
FR2591725B1 (en) | METHOD AND INSTALLATION FOR MAINTAINING THE COATING OF AN OVEN TANK | |
DE3579672D1 (en) | METHOD FOR OPERATING A BLAST FURNACE. | |
DK1114280T3 (en) | Method and apparatus for determining the soot content of a combustion chamber | |
EP1167548A3 (en) | Process and device for determining the cooling effect of a circulating gas atmosphere on workpieces | |
DE69116154D1 (en) | Method and device for melting a batch in an oven | |
RU2179287C2 (en) | Method for determination of position of electrode working and for consumable electrodes used in electric melting furnaces | |
ATE74114T1 (en) | BOTTOM OUTLET OF A GLASS MELTING FURNACE. | |
SE8603514D0 (en) | BACKGROUND FOR ELECTRODS | |
DE59606894D1 (en) | Method and device for controlling the electrical current density over a workpiece during heat treatment in plasma | |
FR2765684B1 (en) | CHECKING THE SEALING OF RADIANT TUBES IN INDUSTRIAL OVENS | |
ES2187863T3 (en) | PROCEDURE AND DEVICE FOR MONITORING THE STATE OF THE ESCORIA AND THE STABILITY OF THE ARC OF AN ARC OVEN. | |
NO162829C (en) | METALLSMELTEOVN. | |
SE9102280D0 (en) | PROCEDURES TO REPAIR EINES HEISSWIND LONGZEIT COUPOLOFENS | |
DE59509961D1 (en) | Furnace vessel for a DC arc furnace | |
NO307110B1 (en) | Method for estimating electrode tip position | |
MX9707215A (en) | Method and apparatus for heating vessels for molten metal baths. | |
GB1519609A (en) | Direct current arc furnace | |
Samborskij et al. | Monitoring technological process of steel making in arc furnace |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
REN | Ceased due to non-payment of the annual fee |