ATE200557T1 - METHOD FOR EXPLORING PLANNED TUNNEL ROUTES - Google Patents

METHOD FOR EXPLORING PLANNED TUNNEL ROUTES

Info

Publication number
ATE200557T1
ATE200557T1 AT96112725T AT96112725T ATE200557T1 AT E200557 T1 ATE200557 T1 AT E200557T1 AT 96112725 T AT96112725 T AT 96112725T AT 96112725 T AT96112725 T AT 96112725T AT E200557 T1 ATE200557 T1 AT E200557T1
Authority
AT
Austria
Prior art keywords
bore
pilot
planned tunnel
exploring
geo
Prior art date
Application number
AT96112725T
Other languages
German (de)
Inventor
Hans-Joachim Dr Bayer
Original Assignee
Flowtex Technologie Gmbh & Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Flowtex Technologie Gmbh & Co filed Critical Flowtex Technologie Gmbh & Co
Application granted granted Critical
Publication of ATE200557T1 publication Critical patent/ATE200557T1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling
    • E21B7/046Directional drilling horizontal drilling

Abstract

A through pilot bore is produced with a bore head guided in the bore path along the planned tunnel course. Samples are removed from the pilot bore for geo-physical examination. The pilot bore is produced along the centre line of the planned tunnel course. In the production of the pilot bore, bore advance parameters are highlighted, which can then be related to the bore hole investigation. One or more of the following bore advance parameters are established: bore pressure, advance speed, abrasion of the bore head. Samples are taken from the flushing back flow of the pilot boring. Pre-investigation is enacted by geo-physical depth probing of the surface.
AT96112725T 1995-09-04 1996-08-07 METHOD FOR EXPLORING PLANNED TUNNEL ROUTES ATE200557T1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19532605A DE19532605A1 (en) 1995-09-04 1995-09-04 Procedure for exploring planned tunnel routes

Publications (1)

Publication Number Publication Date
ATE200557T1 true ATE200557T1 (en) 2001-04-15

Family

ID=7771223

Family Applications (1)

Application Number Title Priority Date Filing Date
AT96112725T ATE200557T1 (en) 1995-09-04 1996-08-07 METHOD FOR EXPLORING PLANNED TUNNEL ROUTES

Country Status (4)

Country Link
EP (1) EP0760419B1 (en)
AT (1) ATE200557T1 (en)
DE (2) DE19532605A1 (en)
ES (1) ES2157377T3 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102007021399A1 (en) * 2007-05-18 2008-11-20 Kopp, Thomas Geoelectrical parameter determining method for measuring device for e.g. gas exploration, involves utilizing shield and measuring electrodes for frequency-dependent determination based on analysis of measuring circuit resistances
FI124169B (en) 2011-06-14 2014-04-15 Sandvik Mining & Constr Oy Procedure for setting up a drilling plan
FI124168B (en) 2011-06-14 2014-04-15 Sandvik Mining & Constr Oy Procedure for setting up a charging plan
CN114718446B (en) * 2022-04-18 2023-06-09 中铁二院工程集团有限责任公司 Mountain railway tunnel drilling arrangement method and deep hole drilling method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0677013B2 (en) * 1984-10-31 1994-09-28 大成建設株式会社 Geological survey method
US5314267A (en) * 1992-08-27 1994-05-24 Mark Osadchuk Horizontal pipeline boring apparatus and method
FR2716233A1 (en) * 1994-02-16 1995-08-18 Geodesign Sa Material structure determination method for gallery boring machine

Also Published As

Publication number Publication date
EP0760419A2 (en) 1997-03-05
ES2157377T3 (en) 2001-08-16
DE19532605A1 (en) 1997-03-06
EP0760419A3 (en) 1998-06-03
DE59606745D1 (en) 2001-05-17
EP0760419B1 (en) 2001-04-11

Similar Documents

Publication Publication Date Title
ATE166426T1 (en) APPARATUS AND METHOD FOR DRILLING AND EQUIPING A VARIETY OF DRILL HOLES
DE69305541D1 (en) Method and device for measuring boreholes near the drill while drilling
ATE254715T1 (en) AUTOMATED DRILLING PLANNING METHOD AND APPARATUS FOR HORIZONTAL DIRECTIONAL DRILLING
BR9708044A (en) Rock drill bit and rock drill tool
ATE63147T1 (en) DEVICE FOR GENTLE DRIVING A PIPE THROUGH DELICATE SOIL OR DELICATE STRUCTURES.
SE8205978L (en) SET AND DEVICE FOR BORING IN BERG
ATE133234T1 (en) TUNNEL DRILLING APPARATUS AND METHOD FOR CLEARING DRILLING WASTE
ATE200557T1 (en) METHOD FOR EXPLORING PLANNED TUNNEL ROUTES
CN106404916A (en) Experimental method for monitoring natural hard rock hydraulic fracturing by acoustic emission system
ATE63608T1 (en) METHOD AND DEVICE FOR DRIVING A TUNNEL.
GB2362221A (en) A method for use in sampling and/or measuring in reservoir fluid
DE3685809D1 (en) METHOD FOR DRILLING A HOLE.
DE3861236D1 (en) METHOD AND DEVICE FOR PRODUCING BORE HOLES IN THE GROUND.
SE8200910L (en) METHOD AND APPARATUS FOR MOUNTAIN ANALYSIS
DE502004002206D1 (en) METHOD FOR THERMALLY DRILLING HOLES IN ICE AND DEVICE FOR CARRYING OUT THE METHOD
ATA255086A (en) DEVICE FOR DRILLING LONG OR DEEP DRILL HOLE
SU798287A1 (en) Device for drilling parallel conjugated wells
SU1293336A1 (en) Method of monitoring the condition of mine workings
DE3228261A1 (en) METHOD AND DEVICE FOR CHANGING THE DIRECTION OF A HOLE
SU1634803A1 (en) Method for determining boundaries of the zone of joints communicating with the worked space
SU876977A1 (en) Method of determining rock properties in the course of drilling
SU1460213A1 (en) Method of determining the density of drill mud in planned well
ATE172516T1 (en) METHOD FOR MEASURING FORMATION FLUID IN DRILLING FLUID
SU1551806A1 (en) Method of splitting a level
JPS56134111A (en) Boring apparatus for structural shape steel

Legal Events

Date Code Title Description
REN Ceased due to non-payment of the annual fee