AT61723B - Reinforced concrete pilots placed on a wooden post. - Google Patents

Reinforced concrete pilots placed on a wooden post.

Info

Publication number
AT61723B
AT61723B AT61723DA AT61723B AT 61723 B AT61723 B AT 61723B AT 61723D A AT61723D A AT 61723DA AT 61723 B AT61723 B AT 61723B
Authority
AT
Austria
Prior art keywords
reinforced concrete
wooden
tube
pilots
wooden post
Prior art date
Application number
Other languages
German (de)
Inventor
Michael Heimbach
Original Assignee
Michael Heimbach
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Michael Heimbach filed Critical Michael Heimbach
Application granted granted Critical
Publication of AT61723B publication Critical patent/AT61723B/en

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Description

  

   <Desc/Clms Page number 1> 
 



  Auf   einen Holzpfahl aufgesetzte Eisenbetonpilote.   



   Der Ersatz von Holzpiloten durch Eisenbeton ist nur oberhalb des tiefsten Grundwasserstandes nötig. Es ist daher in vielen Fällen wirtschaftlicher, die Pilote aus zwei Teilen herzustellen, und zwar aus einer Holzpilote, die über den tiefsten Wasserspiegel nicht hinausragt und aus einer sich daran anschliessenden Eisenbetonpilote. Die bisherigen Ausführungen dieser Art zeigen jedoch eine recht mangelhafte Verbindung zwischen diesen beiden stofflich verschiedenen Teilen, indem man sich fast ausnahmslos mit einer satten 
 EMI1.1 
 



   Um auf der Holzpilote eine Betonierung unter dem Schutze einer Röhre vorzunehmen, welche die höheren Wasserstände beim Bau in die Röhre nicht eindringen   lässt   und die schlechten Einflüsse des umstehenden Grundwassers (Moorwasser) von dem noch frischen Beton fernhält, wird nun, im Sinne der vorliegenden Erfindung, zwischen der Holzpilote und der den Beton aufnehmenden Röhre von Haus aus eine so feste Verbindung hergestellt, dass es möglich ist, die Holzpilote mit samt dem Rohraufsatz in die Erde   hinein-   zurammen, um alsdann in diese trocken gehaltene Öffnung den Beton einzubringen. 



   In den Zeichnungen ist eine beispielsweise gewählte Ausführung der Erfindung veranschaulich, und zwar zeigen die Fig. 1 und 2 die Anordnung in zwei zueinander senkrechten Vertikalschnitten bzw. in Ansicht, Fig. 3 und 4 zeigen Einzelheiten der Verbindung in   Längs-und Querschnitt,   Fig. 5 veranschaulicht den Rohraufsatz vor dem   Überschieben   auf den   Pfahlkopf.   



   Gemäss der dargestellten Ausführungsform wird die das Wesen der Erfindung bildende feste Verbindung zwischen Holzpilote a und Röhre b dadurch erzielt, dass der   hölzerne   Pfahlkopf c die Form eines verkehrten Kegelstumpfes erhält, welcher in die Röhre b hineinragt. Nach dem Einrammen des Pfahles füllt der Pfahlkopf c zufolge der durch das Rammen bedingten Verbreiterung das Rohr vollständig aus. 



   Um das Aufpassen der Röhre b an den Pfahlkopf c zu erleichtern, empfiehlt es sich, das untere Ende der Röhre an seinem ganzen Umfange bis auf die Höhe des Kegelstumpfes mit symmetrisch angeordneten    Schlitzen. f   zu versehen. Nach dem Überschieben auf den Pfahlkopf werden die   Schlitze f geschlossen und verschweisst.   Zur Versicherung der Verbindung wird nach dem Aufpfropfen der Röhre b in der Regel ein zweiteiliger Eisenring d (Fig. 3 und 4) herumgelegt und hierauf zweckmässig mittels autogener Schweissung geschlossen. Dieser Eisenring d muss vom Holze soweit zurücksitzen, dass keine Kante entsteht. 



   Die etwaige Armierung des Betons kann entweder ebenfalls an der   Holzpilotf be-   festigt oder auch nachträglich eingebracht werden. Die Betonage geschieht, nachdem der Pfahl vollständig eingerammt ist. 



   Die beschriebene Ausführung gewährleistet eine durchaus verlässliche Verbindung zwischen Holzpfahl und Rohraufsatz. 



    P ATENT-ANSPR'OCHE :   
1. Auf einen Holzpfahl aufgesetzte Eisenbetonpilote, dadurch gekennzeichnet, dass die Holzpilote an ihrem oberen Ende mit einer den Beton aufnehmenden,   zweckmässig   aus Eisen bestehenden   Schutzröhre   unlösbar verbunden ist. 

**WARNUNG** Ende DESC Feld kannt Anfang CLMS uberlappen**.



   <Desc / Clms Page number 1>
 



  Reinforced concrete pilots placed on a wooden post.



   The replacement of wooden pilots with reinforced concrete is only necessary above the deepest groundwater level. It is therefore more economical in many cases to manufacture the pilots from two parts, namely from a wooden pilot that does not protrude above the deepest water level and from an adjoining reinforced concrete pilot. The previous explanations of this type, however, show a very poor connection between these two materially different parts, in that one almost invariably deals with a full one
 EMI1.1
 



   In order to carry out concreting on the wooden pilot under the protection of a pipe, which does not allow the higher water levels to penetrate the pipe during construction and which keeps the bad influences of the surrounding groundwater (bog water) away from the still fresh concrete, is now, within the meaning of the present invention , between the wooden pilot and the pipe holding the concrete, a connection that is so firm that it is possible to ram the wooden pilot with the pipe attachment into the ground in order to then bring the concrete into this dry opening.



   In the drawings, an embodiment of the invention selected by way of example is illustrated, namely, FIGS. 1 and 2 show the arrangement in two vertical sections perpendicular to one another or in a view, FIGS. 3 and 4 show details of the connection in longitudinal and cross-section, FIG. Figure 5 illustrates the pipe attachment before being pushed onto the pile head.



   According to the embodiment shown, the fixed connection between wooden pilot a and tube b, which forms the essence of the invention, is achieved in that the wooden pole head c is given the shape of an inverted truncated cone which protrudes into tube b. After the pile has been driven in, the pile head c completely fills the pipe due to the widening caused by the driving.



   In order to facilitate the fitting of the tube b to the pile head c, it is advisable to have the lower end of the tube around its entire circumference up to the level of the truncated cone with symmetrically arranged slots. f to be provided. After sliding it onto the pile head, the slots f are closed and welded. To insure the connection, after the tube b has been grafted on, a two-part iron ring d (FIGS. 3 and 4) is usually placed around it and then suitably closed by means of autogenous welding. This iron ring d must sit back from the wood so that no edge is formed.



   Any reinforcement of the concrete can either also be attached to the Holzpilotf or it can be added later. The concreting is done after the pile has been driven completely.



   The design described guarantees a reliable connection between the wooden post and the pipe attachment.



    P ATENT CONTEST:
1. Reinforced concrete pilots placed on a wooden pole, characterized in that the wooden pilots are inextricably connected at their upper end to a protective tube which is advantageously made of iron and which receives the concrete.

** WARNING ** End of DESC field may overlap beginning of CLMS **.

 

Claims (1)

2. Eisenbetonpilote nach Anspruch 1, dadurch gekennzeichnet, dass der hölzerne Pfahlkopf die Form eines umgekehrten Kegelstumpfes hat der in die Eisenröhre hinein ragt, so dass er zufolge der durch das Rammen bedingten Verbreiterung das untere Ende der Röhre vollständig ausfüllt. 2. Reinforced concrete pilot according to claim 1, characterized in that the wooden pile head has the shape of an inverted truncated cone which protrudes into the iron tube so that it completely fills the lower end of the tube due to the widening caused by the ramming. 3.. Eisenbetonpilote nach Anspruch 2, dadurch gekennzeichnet, dass der in seinem unterem Teile bis auf die Höhe des Kegelstumpfes mit Schlitzen versehene Rohraufsatz auf dem Pfahlkopf durch Schliessen und Verschweissen der Schlitze und durch einen herumgelegten Eisenring festgehalten ist. **WARNUNG** Ende CLMS Feld Kannt Anfang DESC uberlappen**. 3 .. Reinforced concrete pilot according to claim 2, characterized in that the tube attachment provided with slots in its lower part up to the level of the truncated cone is held on the pile head by closing and welding the slots and by an iron ring placed around it. ** WARNING ** End of CLMS field may overlap beginning of DESC **.
AT61723D 1912-03-09 1912-03-09 Reinforced concrete pilots placed on a wooden post. AT61723B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
AT61723T 1912-03-09

Publications (1)

Publication Number Publication Date
AT61723B true AT61723B (en) 1913-10-25

Family

ID=3583604

Family Applications (1)

Application Number Title Priority Date Filing Date
AT61723D AT61723B (en) 1912-03-09 1912-03-09 Reinforced concrete pilots placed on a wooden post.

Country Status (1)

Country Link
AT (1) AT61723B (en)

Similar Documents

Publication Publication Date Title
AT61723B (en) Reinforced concrete pilots placed on a wooden post.
DE730986C (en) Device for the production of concrete place posts with a thickened base
DE270119C (en)
AT86774B (en) Device for anchoring masts, posts or the like.
DE665210C (en) Wooden tower
AT63890B (en) Reinforced concrete attachment for wooden posts.
DE1222957B (en) Heart for switches and crossings
AT113892B (en) Wood connection.
DE2158991A1 (en) FLOATING DALBES
DE526459C (en) Driving pipe for the production of concrete piles from several conical pipe sections provided with reinforcement rings
AT68554B (en) Reinforced concrete attachment for wooden posts.
AT113769B (en) Method for anchoring fire box pipe walls and sealing iron boiler pipes in locomotive boilers.
AT94638B (en) Base frame for wooden masts u. like
AT166580B (en) Steel sheet pile
DE534086C (en) Process for the production of concrete or reinforced concrete pile foundations by means of driven piles of short lengths
DE905129C (en) Whirlpool wheel for washing machines to move the washing water
AT50956B (en) Ram core for internal ramming.
AT369161B (en) GROUND PLATE FOR GRENADE LAUNCHERS
AT85714B (en) Extendable driving point for the production of fresh concrete piles, wells or the like.
AT68569B (en) Device for attaching the shoe to reinforced concrete posts.
AT91665B (en) Reinforced concrete railroad tie.
DE7618316U1 (en) THRESHOLD
AT63760B (en) Bung socket lock.
DE329038C (en) Stockless ship anchor composed of several parts
AT122257B (en) Device for emptying the liquid from bidets.