AT520946A2 - Arrangement and method for the automated generation of a recommendation for a material order for a construction project - Google Patents

Arrangement and method for the automated generation of a recommendation for a material order for a construction project Download PDF

Info

Publication number
AT520946A2
AT520946A2 ATA50149/2019A AT501492019A AT520946A2 AT 520946 A2 AT520946 A2 AT 520946A2 AT 501492019 A AT501492019 A AT 501492019A AT 520946 A2 AT520946 A2 AT 520946A2
Authority
AT
Austria
Prior art keywords
recommendation
information
functional elements
products
product
Prior art date
Application number
ATA50149/2019A
Other languages
German (de)
Original Assignee
Otto Fischer Ag
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Otto Fischer Ag filed Critical Otto Fischer Ag
Priority to ATGM8038/2022U priority Critical patent/AT17882U1/en
Publication of AT520946A2 publication Critical patent/AT520946A2/en

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders
    • G06Q10/0875Itemisation or classification of parts, supplies or services, e.g. bill of materials
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/0601Electronic shopping [e-shopping]
    • G06Q30/0631Item recommendations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/0601Electronic shopping [e-shopping]
    • G06Q30/0633Lists, e.g. purchase orders, compilation or processing
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Development Economics (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Educational Administration (AREA)
  • Geometry (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Computer Hardware Design (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

Eine Anordnung (10) und ein Verfahren zum automatisierten Generieren einer Empfehlung für eine Materialbestellung für ein Bauprojekt umfasst einen Verarbeitungsserver (11) mit einer Eingangsschnittstelle (12) zum Empfangen digitaler Plandaten des Objekts des Bauprojekts. Zur Ermöglichung eines durchgängigen Informationsflusses von der Planung bis zur Materialbestellung umfasst die Anordnung (10) einen Verarbeitungsserver (11) mit einer Eingangsschnittstelle (12) zum Empfangen digitaler Plandaten des Objekts des Bauprojekts, wobei die digitalen Plandaten mindestens Angaben zu Funktionselementen, zu Installationsorten, zu Materialien sowie zu Einsatzorten umfassen. Der Verarbeitungsserver (11) stellt eine Zuordnung mindestens eines der Funktionselemente zum Material her, an welchem das Funktionselement installiert werden soll. Die Anordnung (10) umfasst weiter eine Produktedatenbank (15) und einen Handelsserver (21), wobei der Verarbeitungsserver (11) Zugriff auf die Produktedatenbank (15) hat und anhand der Zuordnung des Materials zum Funktionselement gestützt auf die Produktedatenbank (15) die Empfehlung für das zu bestellende Produkt generiert und die Empfehlung vom Verarbeitungsserver (11) an den Handelsserver (21) übermittelt.An assembly (10) and method for automatically generating a recommendation for a material order for a construction project comprises a processing server (11) having an input interface (12) for receiving digital plan data of the object of the construction project. To enable a continuous flow of information from planning to ordering of materials, the arrangement (10) comprises a processing server (11) with an input interface (12) for receiving digital plan data of the object of the construction project, wherein the digital plan data at least information on functional elements, installation sites, to Include materials and locations. The processing server (11) establishes an association of at least one of the functional elements with the material on which the functional element is to be installed. The arrangement (10) further comprises a product database (15) and a trade server (21), wherein the processing server (11) has access to the product database (15) and based on the allocation of the material to the functional element based on the product database (15) the recommendation generated for the product to be ordered and the recommendation from the processing server (11) to the trading server (21) transmitted.

Description

ZusammenfassungSummary

Eine Anordnung (10) und ein Verfahren zum automatisierten Generieren einer Empfehlung für eine Materialbestellung für ein Bauprojekt umfasst einen Verarbeitungsserver (11) mit einer Eingangsschnittstelle (12) zum Empfangen digitaler Plandaten des Objekts des Bauprojekts. Zur Ermöglichung eines durchgängigen Informationsflusses von der Planung bis zur Materialbestellung umfasst die Anordnung (10) einen Verarbeitungsserver (11) mit einer Eingangsschnittstelle (12) zum Empfangen digitaler Plandaten des Objekts des Bauprojekts, wobei die digitalen Plandaten mindestens Angaben zu Funktionselementen, zu Installationsorten, zu Materialien sowie zu Einsatzorten umfassen. Der Verarbeitungsserver (11) stellt eine Zuordnung mindestens eines der Funktionselemente zum Material her, an welchem das Funktionselement installiert werden soll. Die Anordnung (10) umfasst weiter eine Produktedatenbank (15) und einen Handelsserver (21), wobei der Verarbeitungsserver (11) Zugriff auf die Produktedatenbank (15) hat und anhand der Zuordnung des Materials zum Funktionselement gestützt auf die Produktedatenbank (15) die Empfehlung für das zu bestellende Produkt generiert und die Empfehlung vom Verarbeitungsserver (11) an den Handelsserver (21) übermittelt.An arrangement (10) and a method for the automated generation of a recommendation for a material order for a construction project comprises a processing server (11) with an input interface (12) for receiving digital plan data of the object of the construction project. To enable a continuous flow of information from planning to ordering material, the arrangement (10) comprises a processing server (11) with an input interface (12) for receiving digital plan data of the object of the construction project, the digital plan data including at least information on functional elements, on installation locations Include materials and locations. The processing server (11) assigns at least one of the functional elements to the material on which the functional element is to be installed. The arrangement (10) further comprises a product database (15) and a trading server (21), the processing server (11) having access to the product database (15) and the recommendation based on the assignment of the material to the functional element based on the product database (15) generated for the product to be ordered and the recommendation from the processing server (11) to the trading server (21).

(Fig- 1)(Fig- 1)

1/291.29

Technisches GebietTechnical field

Die Erfindung betrifft eine Anordnung und ein Verfahren zum automatisierten Generieren einer Empfehlung für eine Materialbestellung für ein Bauprojekt.The invention relates to an arrangement and a method for the automated generation of a recommendation for a material order for a construction project.

Stand der TechnikState of the art

Bauprojekte, z. B. solche im Hochbau wie Gebäudeneubauten oder Komplettsanierungen von Gebäuden oder Gebäudeteilen, sind in der Regel komplex. Dies einerseits aufgrund der Vielzahl von Bauelementen, die in einer im Wesentlichen vorgegebenen Reihenfolge verarbeitet bzw. installiert werden müssen, andererseits aufgrund der vielen beteiligten Parteien, vom Bauherrn über Architekten, Ingenieure, Planer und Lieferanten bis zu den Handwerkern. Der Kommunikation und Koordination zwischen den einzelnen Parteien kommt eine grosse Bedeutung zu. Beispielsweise können aufgrund von falschen oder zum falschen Zeitpunkt gelieferten Bauelementen die Arbeiten am Objekt des Bauprojekts erheblich verzögert werden, was zu einem verspäteten Bauabschluss und Zusatzkosten führt. Es ist zumeist nicht möglich, die Wartezeit bis zum Eintreffen der richtigen Bauelemente anderweitig zu nutzen, weil Folgeschritte im Bauablauf von der Verarbeitung bzw. Installation der Elemente abhängig sind und weil die zeitliche Staffelung der Arbeiten verschiedener Leistungserbringer nicht kurzfristig geändert werden kann.Construction projects, e.g. B. those in building construction such as new buildings or complete renovations of buildings or parts of buildings are usually complex. This is due, on the one hand, to the large number of components that have to be processed or installed in an essentially predetermined sequence, and, on the other hand, to the many parties involved, from the building owner to architects, engineers, planners and suppliers to the craftsmen. Communication and coordination between the individual parties is of great importance. For example, work on the object of the construction project can be considerably delayed due to incorrect components or components delivered at the wrong time, which leads to late completion of the construction and additional costs. It is usually not possible to use the waiting time until the correct components have arrived because the subsequent steps in the construction process depend on the processing or installation of the elements and because the staggering of the work of various service providers cannot be changed at short notice.

Entsprechend kommen der umfassenden und korrekten Vorbereitung und Planung der Arbeiten am Objekt und der damit zusammenhängenden Lieferungen von Baumaterial eine hohe Bedeutung zu. Herkömmlich hat der Architekt (2-dimensionale) Baupläne erstellt, ggf. unter Zuhilfenahme von entsprechenden Softwareanwendungen. Diese Baupläne bildeten die Basis der Arbeiten am Objekt. Gestützt auf diese Pläne wurden u. A. Materiallisten generiert, und gestützt auf diese Materiallisten dann Bestellungen bei entsprechenden Lieferanten ausgelöst. Der Gesamtprozess war aufwendig und fehleranfällig.Accordingly, the comprehensive and correct preparation and planning of work on the property and the associated deliveries of building materials are of great importance. Traditionally, the architect has created (2-dimensional) blueprints, possibly with the help of appropriate software applications. These blueprints formed the basis of the work on the property. Based on these plans, A. Material lists are generated and orders based on these material lists are then placed with the relevant suppliers. The entire process was complex and prone to errors.

In letzter Zeit kommen immer häufiger integrierte Ansätze zur Anwendung, für welche sich die Bezeichnung Building Information Modeling (BIM) durchgesetzt hat. Das Objekt des Bauprojekts wird digital modelliert, wobei nebst den drei Raumdimensionen auch der zeitliche Ablauf, die Kosten, die Energienutzung und der Betrieb (inkl. Unterhalt und Wartung) modelliert werden können. Dies ermöglicht zum einen unmittelbar auch eine geometrische Visualisierung des Objekts, d. h. des Bauwerks. Zum anderen wird die Aktualisierung und Nachführung von Informationen zum Bauprojekt (z. B. was am Objekt zu verbauende bzw. verbaute Bauelemente anbelangt) vereinfacht. Grundsätzlich ermöglicht BIM die Abbildung des Bauprojekts praktisch in Echtzeit. Das BIM-System kann zudem auch nach / 29Recently, integrated approaches for which the term Building Information Modeling (BIM) has become established have been used increasingly. The object of the construction project is digitally modeled, whereby in addition to the three spatial dimensions, the time sequence, costs, energy use and operation (including maintenance and servicing) can also be modeled. On the one hand, this also enables a geometric visualization of the object, i. H. of the building. On the other hand, the updating and updating of information about the construction project (e.g. regarding the components to be installed or installed on the object) is simplified. Basically, BIM enables the construction project to be depicted practically in real time. The BIM system can also be used after / 29

Fertigstellung des Objekts weiter genutzt werden, z. B. für den Unterhalt und die Wartung des Bauwerks (Facility Management) und auch im Rahmen des Rückbaus.Completion of the object can continue to be used, e.g. B. for the maintenance and servicing of the building (facility management) and also in the context of dismantling.

Es ist ebenfalls bekannt, gestützt auf die BIM-Daten die Koordination der anstehenden Arbeiten zu unterstützen oder gar weitgehend zu automatisieren. Ebenfalls lassen sich aus den BIM-Daten Materiallisten vollautomatisch erzeugen, vorausgesetzt, die BIM-Daten umfassen bereits ausreichend präzise Angaben zu den einzusetzenden Produkten, z. B. Marke und Typ eines zu verbauenden Bauelements. Entsprechende Ansätze sind z. B. in der WO 2016/178453 A1 (Doalltech Co., Ltd.) beschrieben.It is also known, based on the BIM data, to support the coordination of the pending work or even to automate it to a large extent. Material lists can also be generated fully automatically from the BIM data, provided that the BIM data already contains sufficiently precise information on the products to be used, e.g. B. brand and type of a component to be installed. Appropriate approaches are e.g. B. in WO 2016/178453 A1 (Doalltech Co., Ltd.).

Derartige Ansätze stossen dann an ihre Grenzen, wenn die verfügbaren BIM-Daten, welche beispielsweise die Planung des Architekten repräsentieren, keine spezifischen Produkte umfassen, sondern lediglich Funktionselemente spezifizieren. Es fehlen also Informationen zum Anbieter und Typ eines verwendbaren Produkts. Dies ist beispielsweise oft im Bereich der Elektroinstallationen der Fall, wo der Plan des Architekten (ggf. ergänzt vom Elektroplaner) lediglich angibt, wo Lampen-Anschlussstellen, Steckdosen, Schalter oder weitere Funktionselemente zu platzieren sind. Eine Nennung eines konkreten Produkts unterbleibt in der Regel. Diese Spezifizierung wird in der Regel von einer nachgeordneten Stelle, in der Regel vom Elektroinstallateur, bei der eigentlichen Materialbestellung vorgenommen. Diese Vorgehensweise beschränkt sich aber nicht auf den Bereich der Elektroinstallationen, ein ähnlicher Ablauf findet - zumindest teilweise - auch auf anderen Gebieten, z. B. der Sanitär-, Klima-, Heiz- und Lüftungstechnik oder generell anderen haustechnischen Bereichen, statt.Such approaches reach their limits when the available BIM data, which for example represent the planning of the architect, does not include specific products, but only specifies functional elements. Information on the provider and type of a usable product is therefore missing. This is often the case, for example, in the area of electrical installations, where the architect's plan (possibly supplemented by the electrical planner) only specifies where lamp connection points, sockets, switches or other functional elements are to be placed. As a rule, no specific product is mentioned. This specification is usually made by a subordinate body, usually the electrical installer, when the material is actually ordered. However, this procedure is not limited to the area of electrical installations. A similar process also takes place - at least in part - in other areas, e.g. B. the sanitary, air conditioning, heating and ventilation technology or generally other building services, instead.

Die nachträgliche Spezifizierung der konkreten Produkte durch eine weitere Instanz verursacht einen Zusatzaufwand. Weil diese Spezifizierung weitgehend manuell erfolgt, d. h. durch eine Fachperson, welche wie bisher anhand der Baupläne des Architekten und der angegebenen Funktionselemente geeignete Produkte auswählt und eine entsprechende Materialliste generiert, ist der Ablauf aufwendig und störungsanfällig. Es ist zudem keine unmittelbare Verknüpfung der Materialliste mit den BIM-Daten vorhanden, d. h. die Materialliste entspricht dem Bauprojekt gemäss Planungsstand zum Zeitpunkt der Verarbeitung der BIM-Daten. Eine Nachführung der BIM-Daten hat keinen direkten Einfluss auf die Materialliste, und eine Aktualisierung der Materialliste aufgrund aktualisierter BIM-Daten ist erneut aufwendig und erfordert wiederum manuelle Arbeitsschritte.The subsequent specification of the specific products by another instance causes additional effort. Because this specification is largely manual, i. H. The process is complex and prone to failure by a specialist who, as before, selects suitable products based on the architect's blueprints and the specified functional elements and generates a corresponding material list. There is also no direct link between the material list and the BIM data. H. the material list corresponds to the construction project according to the planning status at the time of processing the BIM data. Updating the BIM data has no direct influence on the material list, and updating the material list on the basis of updated BIM data is again complex and in turn requires manual work steps.

Aus einem anderen Zusammenhang sind Ansätze zur automatischen Spezifizierung von Informationen zu elektrischen Funktionselementen bekannt: Die DE 197 45 385 A1 (Elektro Ebert) betrifft ein Verfahren zum Ausführen einer Elektroinstallation in einem Gebäude durch fachlich nicht geschultes Personal. Dabei wird ausgehend von einem Bauplan des Gebäudes ein Ausführungsplan mit Art und exakter Lage / 29 aller Installationspunkte sowie mit dem Verlauf und der Länge aller Leitungsabschnitte erstellt. Mit Hilfe des Ausführungsplans wird dann eine Stückliste für die Leitungsabschnitte und die an den Installationspunkten zu montierenden Bauteile erstellt, basierend auf dieser wird dann ein Bausatz zusammengestellt, welcher mit Steckverbindern vorkonfektionierte Leitungsabschnitte umfasst sowie individuell vorkonfektionierte Steckverbinderdosen. Es existiert nur ein einziger Typ von Steckverbinderdosen, die je nach Bedarf mit Funktionsmodulen versehen werden. Die Leitungen und die Steckverbinderdosen werden im Rahmen der Rohinstallation, die Funktionsmodule im Rahmen der Feininstallation montiert. Entsprechend werden die Elemente des Bausatzes in verschiedenen Schichten in einem Behälter bereitgestellt.Approaches for automatically specifying information on electrical functional elements are known from another context: DE 197 45 385 A1 (Elektro Ebert) relates to a method for carrying out an electrical installation in a building by technically untrained personnel. Based on a building plan of the building, an execution plan with the type and exact location / 29 of all installation points as well as with the course and length of all line sections is created. With the help of the execution plan, a parts list for the line sections and the components to be assembled at the installation points is then created, based on this a kit is then assembled, which includes pre-assembled line sections with connectors and individually pre-assembled connector sockets. There is only one type of connector socket, which can be equipped with function modules as required. The cables and connector sockets are installed as part of the raw installation, the function modules as part of the fine installation. The elements of the kit are accordingly provided in different layers in a container.

Diese Druckschrift soll es ermöglichen, dass Nicht-Fachleute Elektroinstallationen ausführen können. Um unmittelbar von einem Ausführungsplan mit der Angabe von Funktionselementen zu konkret zu installierenden Produkten zu kommen, wird pro Funktionselement nur ein standardisiertes Produkt eingesetzt. Es besteht somit ohne Weiteres eine eineindeutige Zuordnung zwischen Funktionselement und bereitzustellendem Produkt, wobei durch den Einsatz modularer Bauelemente der Lagerhaltungsaufwand zusätzlich minimiert werden kann. Allerdings schränkt dieser Ansatz die Flexibilität der Beteiligten (Bauherr, Architekt und Handwerker) erheblich ein. Es ist nicht möglich, Produkte zu wählen, die beispielsweise in Bezug auf ihr Qualitätsniveau oder ihr Design optimal zum Bauprojekt passen. Der Ansatz setzt zudem voraus, dass das ganze System aus einer Hand, von einem einzigen Anbieter, betrieben wird. Ebenfalls vorausgesetzt ist, dass die Funktionselemente im Ausführungsplan ausreichend spezifiziert sind, damit die 1:1-Zuordnung gemacht werden kann und das entsprechende Produkt mit Sicherheit die Anforderungen für eine Installation am vorgesehenen Ort erfüllt.This publication is intended to enable non-specialists to carry out electrical installations. In order to get directly from an execution plan with the specification of functional elements to concrete products to be installed, only one standardized product is used for each functional element. There is therefore no problem of a clear assignment between the functional element and the product to be provided, whereby the use of modular components can additionally minimize the storage effort. However, this approach significantly limits the flexibility of those involved (client, architect and craftsman). It is not possible to choose products that optimally match the construction project, for example in terms of their quality level or their design. The approach also assumes that the entire system is operated from a single source, by a single provider. It is also a prerequisite that the functional elements in the execution plan are sufficiently specified so that the 1: 1 assignment can be made and the corresponding product certainly meets the requirements for installation at the intended location.

Darstellung der ErfindungPresentation of the invention

Aufgabe der Erfindung ist es, eine dem eingangs genannten technischen Gebiet zugehörende Anordnung zum automatisierten Generieren einer Empfehlung für eine Materialbestellung für ein Bauprojekt zu schaffen, welche ausgehend von Plandaten des Objekts des Bauprojekts mit der Angabe von Funktionselementen die Identifikation verwendbarer Produkte ermöglicht und eine hohe Flexibilität aufweist.The object of the invention is to provide an arrangement belonging to the technical field mentioned at the outset for automatically generating a recommendation for a material order for a construction project, which, based on plan data of the object of the construction project with the specification of functional elements, enables the identification of usable products and a high degree of flexibility having.

Die Lösung der Aufgabe ist durch die Merkmale des Anspruchs 1 definiert. Gemäss der Erfindung umfasst die AnordnungThe solution to the problem is defined by the features of claim 1. According to the invention, the arrangement comprises

a) einen Verarbeitungsserver mit einer Eingangsschnittstelle zum Empfangen digitaler Plandaten des Objekts des Bauprojekts, wobei die digitalen Plandaten mindestens folgendes umfassen:a) a processing server with an input interface for receiving digital plan data of the object of the construction project, the digital plan data comprising at least the following:

/ 29/ 29

- Angaben zu Funktionselementen, welche im Rahmen des Bauprojekts zu installieren sind;- Information on functional elements to be installed as part of the construction project;

- Angaben zu Installationsorten, an welchen die Funktionselemente am Objekt zu installieren sind;- Information on installation locations at which the functional elements are to be installed on the property;

- Angaben zu Materialien, welche für Gebäude- und/oder Raumhüllen des Objekts zum Einsatz kommen sollen;- Information on materials that are to be used for building and / or room envelopes of the object;

- Angaben zu Einsatzorten, an welchen die Materialien zum Einsatz kommen sollen;- Information on locations where the materials are to be used;

und zum Herstellen einer Zuordnung mindestens eines der Funktionselemente zum Material, an welchem das Funktionselement installiert werden soll, anhand der Installationsorte der Funktionselemente und der Einsatzorte der Materialien;and for establishing an assignment of at least one of the functional elements to the material on which the functional element is to be installed, based on the installation locations of the functional elements and the locations of the materials;

b) eine Produktedatenbank, in welcher Informationen zu Produkten abgelegt sind, wobei die Informationen Angaben zu einer Eignung der Produkte als Funktionselement für eine Installation an einem Material umfassen;b) a product database in which information about products is stored, the information comprising information on the suitability of the products as a functional element for an installation on a material;

c) einen Handelsserver mit einer Ausgangsschnittstelle zum Ausgeben einer Empfehlung für ein zu bestellendes Produkt, wobei das empfohlene Produkt ein Funktionselement ist, welches für eine Installation an dem zugeordneten Material geeignet ist;c) a trading server with an output interface for issuing a recommendation for a product to be ordered, the recommended product being a functional element which is suitable for installation on the assigned material;

wobei der Verarbeitungsserver Zugriff auf die Produktedatenbank hat und anhand der Zuordnung des Materials zum Funktionselement gestützt auf die Produktedatenbank die Empfehlung für das zu bestellende Produkt generiert, und wobei die generierte Empfehlung vom Verarbeitungsserver an den Handelsserver übermittelt wird.wherein the processing server has access to the product database and generates the recommendation for the product to be ordered based on the assignment of the material to the functional element based on the product database, and wherein the generated recommendation is transmitted from the processing server to the trading server.

Ein entsprechendes erfindungsgemässes Verfahren zum automatisierten Generieren einer Empfehlung für eine Materialbestellung für ein Bauprojekt umfasst folgende Schritte:A corresponding method according to the invention for the automated generation of a recommendation for a material order for a construction project comprises the following steps:

a) Empfangen digitaler Plandaten des Objekts des Bauprojekts, wobei die digitalen Plandaten mindestens folgendes umfassen:a) receiving digital plan data of the object of the construction project, the digital plan data comprising at least the following:

- Angaben zu Funktionselementen, welche im Rahmen des Bauprojekts zu installieren sind;- Information on functional elements to be installed as part of the construction project;

- Angaben zu Installationsorten, an welchen die Funktionselemente am Objekt zu installieren sind;- Information on installation locations at which the functional elements are to be installed on the property;

- Angaben zu Materialien, welche für Gebäude- und/oder Raumhüllen des Objekts zum Einsatz kommen sollen;- Information on materials that are to be used for building and / or room envelopes of the object;

/ 29/ 29

- Angaben zu Einsatzorten, an welchen die Materialien zum Einsatz kommen sollen;- Information on locations where the materials are to be used;

b) anhand der Installationsorte der Funktionselemente und der Einsatzorte der Materialien Zuordnen mindestens eines der Funktionselemente zum Material, an welchem das Funktionselement installiert werden soll;b) on the basis of the installation locations of the functional elements and the locations of the materials, assigning at least one of the functional elements to the material on which the functional element is to be installed;

c) gestützt auf eine Produktedatenbank, anhand der Zuordnung des Materials zum Funktionselement Generieren einer Empfehlung für ein zu bestellendes Produkt, wobei das empfohlene Produkt ein Funktionselement ist, welches für eine Installation an dem zugeordneten Material geeignet ist.c) based on a product database, based on the assignment of the material to the functional element, generating a recommendation for a product to be ordered, the recommended product being a functional element which is suitable for installation on the assigned material.

Die Erfindung ist auf unterschiedliche Bauprojekte im Hochbau anwendbar, bei welchen Komponenten in Planunterlagen zumindest teilweise als Funktionselemente spezifiziert sind und bei welchen zumindest einige dieser Funktionselemente in Abhängigkeit eines Materials der Raum- und/oder Gebäudehülle durch unterschiedliche Produkte repräsentiert werden. So müssen für den Ein- oder Anbau in Beton, Backstein, Gips, Holz oder einem anderen Material möglicherweise unterschiedliche Produkte zur Bereitstellung eines vorgegebenen Funktionselements zum Einsatz kommen. Die Erfindung ist insbesondere auf Neubauprojekte von Gebäuden anwendbar sowie auf tiefgreifende Sanierungs-, Umbau- und Erweiterungsprojekte bestehender Gebäude.The invention is applicable to different building projects in building construction, in which components in planning documents are at least partially specified as functional elements and in which at least some of these functional elements are represented by different products depending on a material of the room and / or building envelope. For example, different products may have to be used to provide a given functional element for installation or attachment in concrete, brick, plaster, wood or another material. The invention is particularly applicable to new building projects as well as in-depth renovation, remodeling and expansion projects of existing buildings.

Der Begriff Server (Verarbeitungsserver, Handelsserver usw.) bezeichnet dabei eine Funktionsgruppe eines Datenverarbeitungssystems. Ein Server im Sinn der vorliegenden Unterlagen kann durch ein Datenverarbeitungsgerät oder mehrere miteinander verbundene Datenverarbeitungsgeräte realisiert sein; es ist auch möglich, mehrere Server durch dasselbe Gerät zu realisieren, z. B. durch Virtualisierung oder durch Vorsehen einzelner Softwaremodule. Generell kann die Aufgabe eines Servers im Sinn dieser Unterlagen durch ein entsprechendes Softwaremodul mit Ein- und Ausgangsschnittstellen wahrgenommen werden.The term server (processing server, trading server, etc.) denotes a functional group of a data processing system. A server in the sense of the present documents can be realized by a data processing device or several data processing devices connected to one another; it is also possible to implement multiple servers using the same device, e.g. B. by virtualization or by providing individual software modules. In general, the task of a server in the sense of these documents can be performed by a corresponding software module with input and output interfaces.

Bei den Plandaten handelt es sich insbesondere um BIM-Daten bzw. um zwei- oder dreidimensionale CAD-Plandaten, die das Bauprojekt repräsentieren. Die Plandaten umfassen insbesondere die geometrischen Angaben zum Bauprojekt, darunter z. B. die geometrische Anordnung der Gebäude- und Raumhüllen (Aussen- und Innenwände, Decken, Böden, Dächer usw.) inklusive Materialisierung. Die Materialisierung kann beispielsweise durch folgende Angaben charakterisiert sein (stark vereinfacht):The planning data are, in particular, BIM data or two- or three-dimensional CAD planning data that represent the construction project. The planning data include in particular the geometric information about the construction project, including e.g. B. the geometric arrangement of the building and room envelopes (outer and inner walls, ceilings, floors, roofs, etc.) including materialization. The materialization can, for example, be characterized by the following information (greatly simplified):

A A Wand wall A.1 A.1 Massivwand solid wall A.1.1 A.1.1 aus Mauerwerk from masonry A.1.2 A.1.2 aus Stahlbeton made of reinforced concrete

/ 29/ 29

A.1.3 A.1.3 aus Holz wooden A.2 A.2 Leichtbauwand lightweight wall A.2.1 A.2.1 basierend auf Holz based on wood A.2.1.1 A.2.1.1 Beplankung Gipskarton Plasterboard planking A.2.1.2 A.2.1.2 Beplankung Holzfaserplatte Planking of fibreboard A.2.2 A.2.2 basierend auf Metallprofilen based on metal profiles A.2.2.1 A.2.2.1 Beplankung Gipskarton Plasterboard planking A.2.2.2 A.2.2.2 Beplankung Holzfaserplatte Planking of fibreboard B B Decke blanket B.1 B.1 Stahlbeton reinforced concrete B.1.1 B.1.1 roh raw B.1.2 B.1.2 heruntergehängte Decke suspended ceiling B.1.3 B.1.3 verputzt plastered B.2 B.2 Holz Wood B.2.1 B.2.1 roh raw B.2.2 B.2.2 heruntergehängte Decke suspended ceiling B.2.3 B.2.3 verputzt plastered C C Boden ground C.1 C.1 Stahlbeton reinforced concrete C.1.1 C.1.1 roh raw C.1.2 C.1.2 Gussboden cast floor C.1.3 C.1.3 mit Bodenbelag with flooring

usw.etc.

Weitere Angaben können insbesondere das Dach, inkl. Dachhaut und Dachinnenverkleidung, betreffen.Further information can relate in particular to the roof, including the roof skin and roof lining.

Weiter umfassen die Plandaten die Funktionselemente und deren Positionierung. Nebst Funktionselementen können zusätzlich auch bestimmte Produkte konkret spezifiziert sein, z. B. wenn diese vom Bauherrn oder vom Architekten explizit so vorgegeben werden.The planning data also include the functional elements and their positioning. In addition to functional elements, certain products can also be specifically specified, e.g. B. if these are explicitly specified by the builder or the architect.

Die Angaben zu den Funktionselementen umfassen insbesondere die Funktion eines bestimmten Elements (z. B. Steckdose), sowie gewisse Anforderungen, die das Element erfüllen soll (z. B. Anzahl Steckplätze, zur Verfügung zu stellende Spannung, maximale Stromstärke, IP-Schutzklasse usw.). Eine Angabe des konkreten Anbieters und Typs ist nicht notwendig.The details of the functional elements include, in particular, the function of a certain element (e.g. socket), as well as certain requirements that the element should fulfill (e.g. number of slots, voltage to be made available, maximum current, IP protection class, etc .). It is not necessary to specify the specific provider and type.

/ 29/ 29

Die Angaben zu den Installationsorten der Funktionselemente ergeben sich in der Regel unmittelbar aus den Plandaten, in welchen jedem Element ein Ort zugeordnet ist. Die Erfindung zeichnet sich dadurch aus, dass nähere Angaben zur Installation (Einlegen in Betonwand / Einziehen in den Hohlraum einer Leichtbauwand usw.) der Funktionselemente nicht zwingend notwendig sind. Bevorzugt ergeben sich die Angaben zu den Installationsorten ausschliesslich aus den geometrischen Informationen der Plandaten.The information on the installation locations of the functional elements generally results directly from the planning data in which each element is assigned a location. The invention is characterized in that more detailed information on the installation (insertion in concrete wall / insertion into the cavity of a lightweight wall, etc.) of the functional elements is not absolutely necessary. The information on the installation locations preferably results exclusively from the geometric information of the plan data.

Die Angaben zu den Materialien, welche für Gebäude- und/oder Raumhüllen des Bauprojekts zum Einsatz kommen sollen, gehen wie vorstehend erwähnt, ebenfalls aus den Plandaten hervor. Dies gilt auch für die Einsatzorte dieser Materialien, welche sich wiederum aus den geometrischen Informationen der Plandaten ergeben.As mentioned above, the information on the materials that are to be used for building and / or room envelopes of the construction project also comes from the planning data. This also applies to the locations of these materials, which in turn result from the geometric information of the planning data.

In modernen CAD-Systemen sind die Informationen zu den Funktionselementen, zu deren Installationsorten, zu den Materialien der Gebäude- und/oder Raumhüllen sowie zu deren Geometrie in verschiedenen Schichten (Layers) abgespeichert. So wird ein Objekt, das Gegenstand eines Bauprojekts ist, in Stockwerke, Stockwerkbestandteile (Wohnungen, Büros etc.) gegliedert. Anschliessend werden an den vorgesehenen Orten Symbole hinzugefügt, welche die Funktionselemente repräsentieren. Die verschiedenartigen Angaben werden in verschiedenen Ebenen des CAD-Bauplans abgelegt.In modern CAD systems, the information about the functional elements, their installation locations, the materials of the building and / or room envelopes as well as their geometry are stored in different layers. For example, an object that is the subject of a construction project is divided into floors, parts of floors (apartments, offices, etc.). Then symbols are added at the intended locations, which represent the functional elements. The different types of information are stored in different levels of the CAD construction plan.

Der erfindungsgemässe Verarbeitungsserver ist nun so betreibbar, dass er anhand der Installationsorte der Funktionselemente und der Einsatzorte der Materialien eine Zuordnung mindestens eines der Funktionselemente zum Material, an welchem es installiert werden soll, vornimmt. Der Begriff an einem Material bedeutet im Rahmen der vorliegenden Unterlagen, dass ein Funktionselement auf dem Material (z. B. Aufputzmontage), im Material (z. B. Unterputzmontage), hinter dem Material (z. B. hinter einer Gipskartonfläche einer Hohlwand) oder in einer Kombination installiert wird. Eine Kombination liegt beispielsweise dann vor, wenn eine Steckdose Unterputz montiert wird: Der Einlasskasten ist in der Regel vollständig von der entsprechenden Fläche (z. B. von einer Wand) aufgenommen, während die Deckplatte mit den Anschlussöffnungen auf der Vorderseite der Wand angeordnet ist. Eine reine Unterputzmontage kann sich beispielsweise für reine Verteilerdosen ohne unmittelbaren Zugriff ergeben.The processing server according to the invention can now be operated such that it assigns at least one of the functional elements to the material on which it is to be installed on the basis of the installation locations of the functional elements and the locations of the materials. In the context of the available documents, the term on a material means that a functional element on the material (e.g. surface mounting), in the material (e.g. flush mounting), behind the material (e.g. behind a plasterboard surface of a cavity wall) or installed in a combination. A combination exists, for example, when a flush-mounted socket is installed: The inlet box is usually completely absorbed by the corresponding surface (e.g. from a wall), while the cover plate with the connection openings is arranged on the front of the wall. A purely flush mounting can result, for example, for pure junction boxes without direct access.

Die Zuordnung kann anhand eines Abgleichs der Installationsorte einerseits und der Einsatzorte andererseits erfolgen. Im Prinzip wird für jedes betroffene Funktionselement festgestellt, welches Material die Gebäude- und/oder Raumhülle am entsprechenden Ort aufweist.The assignment can be based on a comparison of the installation locations on the one hand and the locations of use on the other. In principle, it is determined for each functional element concerned which material the building and / or room envelope has at the corresponding location.

Bei der Empfehlung für das zu bestellende Produkt handelt es sich im einfachsten Fall um eine Liste mit Produkten und entsprechenden zu bestellenden Anzahlen. Gerade bei einem grossen Produkteangebot in der Produktedatenbank ist es aber möglich (und sogar wahrscheinlich), dass bei der ermittelten / 29In the simplest case, the recommendation for the product to be ordered is a list of products and the corresponding numbers to be ordered. Especially with a large range of products in the product database, it is possible (and even likely) that the / 29

Kombination aus Funktionselement und Material mehrere Produkte für das Funktionselement in Frage kommen. In diesem Fall kann die Empfehlung für einzelne (oder alle) Funktionselemente eine Liste mit verschiedenen passenden Produkten umfassen, aus welchen der Besteller in einem nachfolgenden Schritt auswählen kann. In Fällen, wo ein Funktionselement mehrfach benötigt wird, kann es auch möglich sein, verschiedene Produkte mit jeweils einer zu bestellenden Zahl auszuwählen. Sofern die Auswahl eines bestimmten Produkts für ein gewisses Funktionselement die Auswahl für andere Funktionselemente einschränkt, z. B. weil auf die Kompatibilität der Funktionselemente zu achten ist, können die betroffenen Listen für die weiteren Funktionselemente automatisch angepasst werden. Auch in Fällen, wo es üblicherweise gewünscht ist, dass alle Funktionselemente einer gewissen Klasse von demselben Anbieter stammen oder derselben Linie eines Anbieters angehören (z. B. zur Sicherstellung eines einheitlichen Designs), kann die erfindungsgemässe Anordnung vorsehen, dass nach Treffen einer Wahl für ein erstes Funktionselement einer gewissen Klasse diese Wahl für die weiteren Funktionselemente der Klasse übernommen wird. Auf diese Weise wird eine hohe Flexibilität bei minimalem Aufwand für den Besteller sichergestellt.Combination of functional element and material, several products can be considered for the functional element. In this case, the recommendation for individual (or all) functional elements can include a list with various suitable products from which the customer can choose in a subsequent step. In cases where a functional element is required several times, it may also be possible to select different products, each with a number to be ordered. If the selection of a certain product for a certain functional element restricts the selection for other functional elements, e.g. B. because the compatibility of the functional elements must be observed, the lists concerned can be automatically adapted for the other functional elements. Even in cases where it is usually desired that all functional elements of a certain class come from the same provider or belong to the same line of a provider (e.g. to ensure a uniform design), the arrangement according to the invention can provide that after making a choice for a first functional element of a certain class this choice is adopted for the other functional elements of the class. This ensures a high level of flexibility for the customer with minimal effort.

Um Auswahllisten zu vermeiden und/oder die angebotenen Produkte in der jeweiligen Auswahl zu priorisieren, können für die Auswahl eines einzigen Produkts oder die Rangierung der Produkte verschiedene Kriterien herangezogen werden, z. B. der Produktpreis, das Qualitätslevel des Produkts, eine Priorisierung der Produktanbieter o. ä.In order to avoid selection lists and / or to prioritize the offered products in the respective selection, different criteria can be used for the selection of a single product or the ranking of the products, e.g. B. the product price, the quality level of the product, a prioritization of the product providers or the like.

Die Übermittlung der Empfehlung vom Verarbeitungsserver zum Handelsserver kann vom Verarbeitungsserver (push) oder vom Handelsserver (pull) initiiert werden.The transmission of the recommendation from the processing server to the trading server can be initiated by the processing server (push) or by the trading server (pull).

Gestützt auf die Produktedatenbank, in welcher neben den üblichen Produkteinformationen zugeordnete Informationen zum Bauprozess hinterlegt sind, lässt sich trotz der abstrakten Natur der Plandaten automatisiert eine Materialliste generieren. Die erfindungsgemässe Anordnung und das erfindungsgemässe Verfahren ermöglichen so einen durchgängigen Informationsfluss von der Planung bis zur Materialbestellung, dies auch dann, wenn die Plandaten zunächst nur Angaben zu Funktionselementen aufweisen und nicht Verweise auf spezifische Produkte. Die Flexibilität hinsichtlich einsetzbarer Produkte bleibt gewahrt.Based on the product database, in which, in addition to the usual product information, assigned information about the construction process is stored, a material list can be generated automatically despite the abstract nature of the planning data. The arrangement according to the invention and the method according to the invention thus enable a continuous flow of information from planning to material ordering, even if the plan data initially only contain information about functional elements and not references to specific products. The flexibility regarding usable products is preserved.

Bevorzugt umfassen die Funktionselemente Komponenten, welche in oder an einer Wand, einer Decke und/oder einem Boden anbringbar sind, und die Angaben zu Materialien beziehen sich auf Wände, Decken und/oder Böden des Bauprojekts. Besonders bei Komponenten, die auf irgendeine Weise in eine Wand, eine Decke oder einen Boden integriert werden, ist die Art dieser Integration wesentlich vom Material der Wand, der Decke oder des Bodens abhängig. Je nach Material ergeben sich unterschiedliche / 29The functional elements preferably comprise components which can be attached in or on a wall, a ceiling and / or a floor, and the information relating to materials relates to walls, ceilings and / or floors of the construction project. Especially with components that are integrated in some way into a wall, ceiling or floor, the type of this integration depends largely on the material of the wall, ceiling or floor. Depending on the material, there are different / 29

Einbauweisen, und es werden unterschiedliche Komponenten oder unterschiedliches Montagezubehör für eine Komponente benötigt.Installation methods, and different components or different mounting accessories are required for one component.

Alternativ oder zusätzlich umfassen die Funktionselemente Komponenten, die an anderen Installationsorten installiert werden sollen, z. B. an Elementen wie Treppen, Geländern oder an fixen Einbauten oder Geräten (z. B. Einbaumöbel, Küchen-Grossgeräte, Waschmaschinen und Wäschetrockner, Heizanlagen, Klimaanlagen, Lüftungen usw.). Es ist dabei nicht zwingend, dass sämtliche von der erfindungsgemässen Anordnung bzw. dem erfindungsgemässen Verfahren erfassten Komponenten eine materialabhängige Produkteauswahl erfordern, sondern es können ohne Weiteres nebst den materialabhängigen auch materialunabhängige Funktionselemente mitverarbeitet werden.Alternatively or additionally, the functional elements include components that are to be installed at other installation locations, e.g. B. on elements such as stairs, railings or on fixed installations or devices (e.g. built-in furniture, large kitchen appliances, washing machines and tumble dryers, heating systems, air conditioning systems, ventilation, etc.). It is not imperative here that all of the components covered by the arrangement or method according to the invention require a material-dependent product selection, but it is also readily possible to process in addition to the material-dependent and material-independent functional elements.

Mit Vorteil umfassen die Funktionselemente Anschlussstellen einer Elektroinstallation. Dabei kann es sich namentlich um Steckdosen, Verbraucheranschlüsse (z. B. für Lampen, Geräte oder andere Verbraucher) und/oder Schalter handeln. Insbesondere bei der Planung von Elektroinstallationen werden sehr oft nur Funktionselemente vorgegeben, womit der Einsatz der erfindungsgemässen Anordnung bzw. des erfindungsgemässen Verfahrens eine erhebliche Effizienzsteigerung mit sich bringt. Weitere Funktionselemente einer Elektroinstallation betreffen insbesondere Leitungen, Leitungsrohre (inkl. Schutzrohre), Verteilerkästen, Stromzähler und gegebenenfalls Verbraucher. Einzelne Komponenten können bereits durch Angabe des konkreten Produkts in die Baupläne aufgenommen werden, während andere als Funktionselemente definiert sind und erst im Rahmen der erfindungsgemässen Anordnung bzw. des erfindungsgemässen Verfahrens eine Empfehlung für konkrete Produkte generiert wird.The functional elements advantageously include connection points of an electrical installation. These can be sockets, consumer connections (e.g. for lamps, devices or other consumers) and / or switches. Especially when planning electrical installations, very often only functional elements are specified, so that the use of the arrangement or method according to the invention brings about a considerable increase in efficiency. Other functional elements of an electrical installation relate in particular to lines, line pipes (including protective pipes), distribution boxes, electricity meters and, if applicable, consumers. Individual components can already be included in the construction plans by specifying the specific product, while others are defined as functional elements and a recommendation for specific products is only generated in the context of the arrangement or method according to the invention.

Die Erfindung ist auch auf andere in einem Bauprojekt verwendete Komponenten anwendbar, die in Abhängigkeit des Materials der Gebäude- und/oder Raumhülle durch unterschiedliche Produkte realisiert werden.The invention is also applicable to other components used in a construction project, which are implemented by different products depending on the material of the building and / or room envelope.

Vorzugsweise ist eine Empfehlung für eine Mehrzahl zu bestellender Produkte generierbar, insbesondere für alle zu bestellenden Produkte einer vorgegebenen Funktionselementklasse. Eine Funktionselementklasse umfasst beispielsweise alle Anschlussstellen (Steckdosen, Lampen- und weitere Verbraucheranschlüsse) einer Elektroinstallation, sie kann aber beispielsweise auch breiter gefasst sein und auch Schalter oder gar Leitungen mit umfassen. Es ist von Vorteil, wenn die zu bearbeitenden Funktionselemente nicht einzeln ausgewählt (bzw. nicht zu bearbeitende Funktionselemente einzeln abgewählt) werden müssen, sondern in Abhängigkeit der in den Plandaten erfassten Eigenschaften eine ganze Klasse aus- oder abgewählt werden kann. Die Aus- bzw. Abwahl kann auch automatisch im Verarbeitungsserver erfolgen, z. B. so dass nur Funktionselementklassen berücksichtigt werden, welche der Betreiber des Verarbeitungsservers bzw. der angeschlossene Lieferant anbietet. Ein / 29A recommendation can preferably be generated for a plurality of products to be ordered, in particular for all products of a given functional element class to be ordered. A functional element class includes, for example, all connection points (sockets, lamp and other consumer connections) of an electrical installation, but it can also be broader, for example, and also include switches or even cables. It is advantageous if the functional elements to be processed do not have to be selected individually (or functional elements not to be processed individually deselected), but an entire class can be selected or deselected depending on the properties recorded in the plan data. The selection or deselection can also take place automatically in the processing server, e.g. B. so that only functional element classes are taken into account that the operator of the processing server or the connected supplier offers. A / 29

Elektrogrosshändler wird beispielsweise nur diejenigen Funktionselemente berücksichtigen, die der Elektroinstallation zugehören, nicht beispielsweise auch Elemente der Sanitärinstallation.Electrical wholesalers, for example, will only consider those functional elements that belong to the electrical installation, not, for example, elements of the sanitary installation.

Mit Vorteil wird somit vom Nutzer und/oder im Rahmen der Verarbeitung eine Auswahl der zu berücksichtigenden Funktionselemente getroffen, und anschliessend wird eine Empfehlung für alle diese Funktionselemente generiert. In Ausnahmefällen - wenn beispielsweise die Produktedatenbank keine geeigneten Produkte umfasst oder ein Funktionselement mit einer falschen Funktionsklasse erfasst wurde - kann eine Empfehlung für ein bestimmtes Funktionselement eine leere Auswahl sein.The user and / or as part of the processing advantageously makes a selection of the functional elements to be taken into account, and then a recommendation is generated for all of these functional elements. In exceptional cases - for example, if the product database does not contain suitable products or a functional element with an incorrect functional class has been entered - a recommendation for a specific functional element can be an empty selection.

Bei einer vorteilhaften Ausführungsform der Erfindung können für verschiedene Funktionselementklassen verschiedene Materiallisten erstellt werden. Der Nutzer bzw. der Betreiber des Verarbeitungsservers kann diese dann an verschiedene Lieferanten (z. B. Elektro, Sanitär usw.) weitergeben.In an advantageous embodiment of the invention, different lists of materials can be created for different functional element classes. The user or operator of the processing server can then pass them on to various suppliers (e.g. electrical, sanitary, etc.).

Bevorzugt umfasst die erfindungsgemässe Anordnung eine Ablaufdatenbank, in welcher funktionselement- und/oder produktbezogene Informationen zu Installationsarbeiten abgelegt sind. Im Verarbeitungsserver können dann anhand der Informationen in der Ablaufdatenbank und basierend auf der Zuordnung der Materialien zu den Funktionselementen die zu bestellenden Produkte der Empfehlung einer von mehreren Bauphasen zugeordnet werden, wobei die zugeordnete Bauphase angibt, wann im Bauprozess das entsprechende Produkt zu installieren ist.The arrangement according to the invention preferably comprises an expiry database in which functional element and / or product-related information relating to installation work is stored. In the processing server, the products to be ordered can then be assigned to the recommendation of one of several construction phases based on the information in the process database and based on the assignment of the materials to the functional elements, the assigned construction phase indicating when the corresponding product is to be installed in the construction process.

Funktionselementbezogene Informationen gelten für alle Produkte, die ein bestimmtes Funktionselement darstellen. So erfordern beispielsweise alle Steckdosen eine Stromzuleitung. Produktbezogene Informationen gelten nur für bestimmte Produkte, die ein Funktionselement darstellen. So sind beispielsweise sowohl Schalter verfügbar, die drahtgebunden funktionieren und somit eine Zuleitung benötigen, als auch Schalter, die drahtlos funktionieren und entsprechend keiner Zuleitung bedürfen. Nebst der Notwendigkeit einer Zuleitung können sich die Informationen insbesondere auch auf den benötigten Aufnahmeraum (z. B. für Unterputz- im Gegensatz zu Aufputzinstallationen), benötigte Zusatzelemente (z. B. Schutzrohre) oder generell auf die Positionierung im Bauablauf (z. B. vor oder nach dem Aufbringen des Verputzes) beziehen. Da der Verarbeitungsserver sowohl über die Informationen zu den Funktionselementen als auch zu den (empfohlenen) Produkten verfügt, kann er jeder Komponente die entsprechenden Informationen zu Installationsarbeiten automatisch zuordnen.Functional element-related information applies to all products that represent a specific functional element. For example, all sockets require a power supply. Product-related information only applies to certain products that represent a functional element. For example, switches are available that work wired and therefore require a supply line, as well as switches that function wirelessly and accordingly do not require a supply line. In addition to the need for a supply line, the information can also relate in particular to the required receiving space (e.g. for flush-mounted as opposed to surface-mounted installations), required additional elements (e.g. protective pipes) or generally to the positioning in the construction process (e.g. before or after applying the plaster). Since the processing server has information about both the functional elements and the (recommended) products, it can automatically assign the relevant information for installation work to each component.

Basierend auf den Informationen der Ablaufdatenbank kann der Verarbeitungsserver dann ermitteln, zu welchem Zeitpunkt ein (empfohlenes) Produkt installiert werden muss. Daraus können durchaus mehrere Zeitpunkte (z. B. für einen Einlasskasten und für die darin aufgenommene Steckdose bzw. den darin / 29 aufgenommenen Schalter) resultieren. Der Zeitpunkt bzw. die Zeitpunkte werden dann dem empfohlenen Produkt zugeordnet.Based on the information in the expiration database, the processing server can then determine when a (recommended) product must be installed. This can certainly result in several points in time (e.g. for an inlet box and for the socket or switch contained therein / 29). The time or the times are then assigned to the recommended product.

Die Bauphasen lassen sich beispielsweise bei einem Stahlbeton-basierten Bauwerk wie folgt aufteilen:For example, the construction phases for a reinforced concrete-based structure can be divided as follows:

- Einlegen (Betonieren);- laying (concreting);

- Rohbau;- Shell;

- Endausbau.- Final expansion.

Es sind aber auch feinere Abstufungen möglich. Bei anderen Bauweisen ergeben sich andere Bauphasen.However, finer gradations are also possible. Other construction phases result in different construction phases.

Mit Vorteil ist für jede der mehreren Bauphasen eine gesonderte Empfehlung generierbar, wobei die entsprechende Empfehlung die der jeweiligen Bauphase zugeordneten Produkte umfasst. Der Nutzer erhält somit automatisch eine Zusammenstellung der empfohlenen Produkte, die nach Bauphase und damit nach Lieferzeitpunkt bzw. Lieferzeitraum aufgeschlüsselt ist. Werden verschiedene Gebäudeteile mit einer anders materialisierten Gebäude- bzw. Raumhülle ausgeführt, können die gleichen Produkte in den Empfehlungen für verschiedene Bauphasen vorhanden sein. (Dies gilt natürlich auch für Produkte, die generell bauphasenunabhängig bzw. in mehreren Bauphasen eingesetzt werden.)A separate recommendation can advantageously be generated for each of the several construction phases, the corresponding recommendation comprising the products assigned to the respective construction phase. The user thus automatically receives a compilation of the recommended products, which is broken down by construction phase and thus by delivery time or delivery period. If different parts of the building are constructed with a differently materialized building or room envelope, the same products may be present in the recommendations for different construction phases. (Of course, this also applies to products that are generally used independently of the construction phase or in several construction phases.)

Bevorzugt ist nach Empfang einer Zustimmung eines Bestellers zur generierten Empfehlung vom Handelsserver eine Bestellung der empfohlenen Produkte auslösbar. Der Nutzer kann somit auf Knopfdruck, gegebenenfalls nach manuellen Anpassungen bzw. einer manuellen Auswahl aus mehreren empfohlenen Produkten, die Bestellung der Produkte auslösen. Sind die Empfehlungen nach Bauphase gegliedert, kann die Bestellung mehrere entsprechende Lieferzeitpunkte umfassen.After receiving an approval from an orderer for the generated recommendation from the trading server, an order for the recommended products can preferably be triggered. The user can thus trigger the order of the products at the push of a button, if necessary after manual adjustments or a manual selection from several recommended products. If the recommendations are structured according to the construction phase, the order can include several corresponding delivery times.

Es ist in der Regel nicht erwünscht, dass Material für das Bauprojekt frühzeitig geliefert wird und dann am Bauplatz oder in Lagern des verarbeitenden Betriebs bis zur Nutzung gelagert werden muss. Aus diesem Grund ist es auch von Vorteil, wenn die Lieferungen zu einer Bestellung nach Bauphasen gegliedert werden können. Auch wenn dies nicht geschieht, wird die Lieferung in der Regel erst zu einem Zeitpunkt terminiert, in welchem die Produkte (frühestens) benötigt werden.It is generally not desirable for material for the construction project to be delivered early and then to be stored on the construction site or in the processing company's warehouses until use. For this reason, it is also advantageous if the deliveries for an order can be broken down into construction phases. Even if this does not happen, the delivery is usually only scheduled at a time when the products are needed (at the earliest).

Dies bedeutet, dass zwischen dem Bestellvorgang und der Lieferung (bzw. den einzelnen Lieferungen) einige Zeit vergeht, oft mehrere Monate. Dies hat zur Folge, dass bei Planänderungen die Bestellung und damit die Lieferung - nicht mehr dem neusten Planungsstand entspricht. Retouren und Nachlieferungen sind deshalb oft notwendig. Dies kann den Bauprozess verzögern, wenn erst zu einem späten Zeitpunkt bemerkt wird, dass benötigte Produkte fehlen. Im Rahmen der erfindungsgemässen Anordnung und des erfindungsgemässen Verfahrens kann es deshalb von Vorteil sein, wenn eine / 29 automatisierte Aktualisierung einer Bestellung anhand von geänderten Plandaten erfolgen kann. Dazu sind insbesondere folgende Ansätze geeignet:This means that some time passes between the ordering process and the delivery (or the individual deliveries), often several months. As a result, when the plan is changed, the order, and therefore the delivery, no longer corresponds to the latest planning status. Returns and subsequent deliveries are therefore often necessary. This can delay the construction process if it is noticed at a late stage that the required products are missing. In the context of the arrangement and method according to the invention, it can therefore be advantageous if an / 29 automated update of an order can take place on the basis of changed plan data. The following approaches are particularly suitable for this:

a) Bei einer Planänderung werden die geänderten Plandaten an den Verarbeitungsserver übertragen. Dieser vergleicht die geänderten Plandaten mit den ursprünglichen bzw. zuletzt erhaltenen Plandaten und ermittelt gestützt darauf, welche Funktionselemente zusätzlich benötigt werden und welche Funktionselemente nicht mehr benötigt werden. Die Produkte, welche in einer Bestellung nicht mehr benötigten Funktionselementen zugeordnet sind, werden aus dieser Bestellung entfernt. Für die zusätzlichen Funktionselemente wird - wie bei der Verarbeitung der ursprünglichen Plandaten - eine Empfehlung generiert. Dieser Ansatz minimiert den Verarbeitungsaufwand, hat aber zur Folge, dass beim Betreiber des Verarbeitungsservers jeweils die letzten verarbeiteten Plandaten vorgehalten werden müssen, was unerwünscht sein kann.a) If the plan is changed, the changed plan data is transferred to the processing server. This compares the changed plan data with the original or last received plan data and, based on this, determines which functional elements are additionally required and which functional elements are no longer required. The products that are assigned to functional elements that are no longer required in an order are removed from this order. As with the processing of the original plan data, a recommendation is generated for the additional functional elements. This approach minimizes the processing effort, but has the consequence that the operator of the processing server must keep the last processed plan data, which can be undesirable.

b) Bei einer Planänderung werden die geänderten Plandaten an den Verarbeitungsserver übertragen. Dieser erzeugt - wie bei der Verarbeitung der ursprünglichen Plandaten - eine Empfehlung für die zu bestellenden Produkte. Auswahlen des Bestellers beim ersten Vorgang können ggf. auf Produktestufe übernommen werden. Die neue Empfehlung wird mit der früheren Empfehlung verglichen, um festzustellen, welche Produkte zusätzlich benötigt werden bzw. welche Produkte nicht mehr benötigt werden, und die Bestellung wird entsprechend angepasst. Dieser Ansatz hat den Vorteil, dass die früheren Plandaten vom Verarbeitungsserver nicht mehr benötigt werden. Allerdings kann eine erneute Auswahl durch den Besteller ggf. auch bei Funktionselementen notwendig werden, denen bereits ein Produkt zugeordnet worden war.b) If the plan is changed, the changed plan data is transferred to the processing server. As with the processing of the original plan data, this generates a recommendation for the products to be ordered. Selections of the customer in the first process can be taken over at product level if necessary. The new recommendation is compared to the previous recommendation to determine which additional products are needed or which are no longer needed, and the order is adjusted accordingly. This approach has the advantage that the previous plan data is no longer required by the processing server. However, a new selection by the customer may also be necessary for functional elements to which a product had already been assigned.

c) Der Verarbeitungsserver hat dauernden Zugriff auf die Plandaten und prüft periodisch, ob Änderungen stattgefunden haben und ob diese zu einer Änderung der Bestellung führen könnten. Die Feststellung von Änderungen kann durch einen Vergleich mit vorgehaltenen Plandaten erfolgen, bevorzugt wird aber ein entsprechendes Änderungs- bzw. Hinzufügungsdatum ausgewertet, welches in der Regel bei digital vorgehaltenen Plandaten vorhanden ist. Die Feststellung, ob eine Änderung einer Bestellung notwendig ist, erfolgt dann gemäss einem der Ansätze nach Punkt a) oder b). Dieses Vorgehen hat den Vorteil, dass die Bestellungen stets aktuell sind und Fehllieferungen bzw. Retouren nach Möglichkeit vermieden werden. Es setzt allerdings voraus, dass der Besteller bereit ist, den andauernden Zugriff auf die Plandaten zu gewähren.c) The processing server has permanent access to the plan data and periodically checks whether changes have taken place and whether these could lead to a change in the order. Changes can be ascertained by comparing them with stored plan data, but preferably a corresponding change or addition date is evaluated, which is usually available for digitally kept plan data. The determination as to whether a change to an order is necessary is then made in accordance with one of the approaches under points a) or b). This procedure has the advantage that the orders are always up to date and incorrect deliveries or returns are avoided if possible. However, it presupposes that the customer is ready to grant permanent access to the plan data.

Aus der nachfolgenden Detailbeschreibung und der Gesamtheit der Patentansprüche ergeben sich weitere vorteilhafte Ausführungsformen und Merkmalskombinationen der Erfindung.From the following detailed description and the entirety of the claims, further advantageous embodiments and combinations of features of the invention result.

/ 29/ 29

Kurze Beschreibung der ZeichnungenBrief description of the drawings

Die zur Erläuterung des Ausführungsbeispiels verwendeten Zeichnungen zeigen:The drawings used to explain the exemplary embodiment show:

Fig. 1 eine schematische Darstellung einer erfindungsgemässen Anordnung zum automatisierten Generieren einer Empfehlung für eine Materialbestellung für ein Bauprojekt;1 shows a schematic illustration of an arrangement according to the invention for the automated generation of a recommendation for a material order for a construction project;

Fig. 2 eine Plandarstellung von Plandaten des Bauprojekts;2 shows a plan representation of plan data of the construction project;

Fig. 3 die Ebene der Geometriedaten der Plandarstellung;3 shows the plane of the geometry data of the plan representation;

Fig. 4 die Ebene der Materialdaten der Plandarstellung;4 shows the level of the material data of the plan display;

Fig. 5 die Ebene der Funktionselementdaten der Plandarstellung; und5 shows the level of the functional element data of the plan display; and

Fig. 6 ein Flussdiagramm eines erfindungsgemässen Verfahrens zum automatisierten6 shows a flowchart of an inventive method for automated

Generieren einer Empfehlung für eine Materialbestellung für ein Bauprojekt.Generate a recommendation for a material order for a construction project.

Grundsätzlich sind in den Figuren gleiche Teile mit gleichen Bezugszeichen versehen.In principle, the same parts are provided with the same reference symbols in the figures.

Wege zur Ausführung der ErfindungWays of Carrying Out the Invention

Die Figur 1 ist eine schematische Darstellung einer erfindungsgemässen Anordnung zum automatisierten Generieren einer Empfehlung für eine Materialbestellung für ein Bauprojekt. Die Anordnung 10 umfasst einen Verarbeitungsserver 11 mit einer Eingangsschnittstelle 12. Der Verarbeitungsserver 11 ist über die Eingangsschnittstelle 12 mit einem Endgerät 1 eines Benutzers gekoppelt und empfängt Plandaten, die von der Eingangsschnittstelle 12 bei Bedarf in ein vom Verarbeitungsserver 11 verarbeitbares Format konvertiert werden. Bei der Verbindung zwischen dem Endgerät 1 des Benutzers und dem Verarbeitungsserver 11 handelt es sich insbesondere um eine gesicherte Internetverbindung (TLS). Die Schnittstelle ist insbesondere als webbasierte Schnittstelle ausgebildet. Der Benutzer kann beispielsweise seine mit einem (CAD-)Planungsprogramm generierten Dateien hochladen, worauf diese von der Eingangsschnittstelle 12 geprüft und bei Bedarf konvertiert werden. Die Interaktion mit dem Benutzer erfolgt über ein Webinterface, wobei der Benutzer beim Betreiber des Verarbeitungsserver ein Konto besitzt und sich vor der Nutzung des Dienstes mit seinen Kontoangaben am Server anmeldet.FIG. 1 is a schematic illustration of an arrangement according to the invention for the automated generation of a recommendation for a material order for a construction project. The arrangement 10 comprises a processing server 11 with an input interface 12. The processing server 11 is coupled via the input interface 12 to a terminal 1 of a user and receives plan data which are converted by the input interface 12 into a format which can be processed by the processing server 11 if required. The connection between the user's terminal 1 and the processing server 11 is, in particular, a secure Internet connection (TLS). The interface is designed in particular as a web-based interface. For example, the user can upload his files generated with a (CAD) planning program, whereupon they are checked by the input interface 12 and converted if necessary. The interaction with the user takes place via a web interface, the user having an account with the operator of the processing server and logging on to the server with his account details before using the service.

Die Plandaten werden dann - soweit sie für das erfindungsgemässe Verfahren benötigt werden strukturiert auf dem Verarbeitungsserver 11 abgelegt. Namentlich werden sie gemäss der Struktur des / 29The plan data are then stored in a structured manner on the processing server 11 insofar as they are required for the method according to the invention. They are named according to the structure of / 29

Objekts (Gebäude, Etagen, Räume) abgelegt, welches von den Plandaten beschrieben wird. Wie weiter unten näher beschrieben, umfassen die auf dem Server abgelegten Plandaten mehrere Ebenen, insbesondere mit Angaben zur Geometrie des Objekts, zur Materialisierung von Gebäude- und Raumhüllen sowie zu Funktionselementen und deren Platzierung im Objekt. Bei Bedarf hat der Benutzer die Möglichkeit, den Umfang der zu bearbeitenden Plandaten, z. B. hinsichtlich der Funktionselementklasse und/oder den zu berücksichtigenden Teilen des Objekts, über das Webinterface zu spezifizieren.Object (building, floors, rooms), which is described by the planning data. As described in more detail below, the planning data stored on the server comprise several levels, in particular with information on the geometry of the object, on the materialization of building and spatial envelopes and on functional elements and their placement in the object. If necessary, the user has the option of changing the scope of the plan data to be processed, e.g. B. with regard to the functional element class and / or the parts of the object to be taken into account, via the web interface.

Der Verarbeitungsserver 11 hat Zugriff auf eine Produktedatenbank 15 und eine Ablaufdatenbank 16. Eine oder beide Datenbanken 15, 16 können lokal, am Serverort, angeordnet sein, oder der Zugriff erfolgt über ein lokales Netz (LAN) oder ein Weitverkehrsnetz (WAN), z. B. basierend auf dem Internet.The processing server 11 has access to a product database 15 and an expiration database 16. One or both databases 15, 16 can be arranged locally, at the server location, or the access takes place via a local area network (LAN) or a wide area network (WAN), e.g. B. based on the Internet.

Die Produktedatenbank 15 umfasst Informationen zu Produkten, die im Rahmen von Bauprojekten eingesetzt werden können. Nebst den üblichen Produkteinformationen (Hersteller, Typ, Preis, charakterisierende Grössen wie Dimensionen, Anschlusswerte usw.) enthält die Produktedatenbank 15 für jedes Produkt auch die Angabe, welches Funktionselement es repräsentiert (z. B. Schalter, Schalter/Steckdosenkombination, Verteilkasten usw.), auf einer Stufe, die dem Detaillierungsgrad der üblichen Plandaten entspricht. Ebenfalls jedem Produkt zugeordnet sind in der Produktedatenbank 15 mögliche Verlegungsarten (z. B. Unterputz, Aufputz, Deckenmontage, Bodenmontage usw.). Die zusätzlichen Daten zur Funktion und zu den Verlegungsarten können in derselben Datenbank abgelegt sein wie die üblichen Produktedaten oder sie sind in einer separaten Datenbank abgelegt und mit den üblichen Produktedaten verknüpft.The product database 15 includes information on products that can be used in the context of construction projects. In addition to the usual product information (manufacturer, type, price, characterizing variables such as dimensions, connection values, etc.), the product database 15 also contains the information for each product which functional element it represents (e.g. switches, switches / socket combinations, distribution boxes, etc.) , at a level that corresponds to the level of detail of the usual planning data. Each product is also assigned 15 possible types of installation in the product database (e.g. flush-mounting, surface-mounting, ceiling mounting, floor mounting, etc.). The additional data on the function and the types of installation can be stored in the same database as the usual product data or they are stored in a separate database and linked to the usual product data.

Der Verarbeitungsserver 11 kommuniziert weiter mit einem Handelsserver 21. Dieser interagiert über eine Ausgangsschnittstelle 22 mit dem Endgerät 1 des Benutzers. Der Handelsserver 21 kann von demselben Dienstleister betrieben werden wie der Verarbeitungsserver oder von einem Dritten, namentlich von einem Händler, welcher geeignete Produkte anbietet. Es ist möglich, dass der Verarbeitungsserver 11 mit mehreren Handelsservern kommuniziert, um z. B. Produkte verschiedener Funktionselementklassen (z. B. Elektroinstallation, Sanitärinstallation, HLK usw.) und/oder verschiedener Anbieter bzw. Hersteller verfügbar zu machenThe processing server 11 continues to communicate with a trading server 21. This interacts with the end device 1 of the user via an output interface 22. The trading server 21 can be operated by the same service provider as the processing server or by a third party, namely a dealer who offers suitable products. It is possible for the processing server 11 to communicate with a number of trade servers in order to e.g. B. To make products of different functional element classes (e.g. electrical installation, sanitary installation, HVAC, etc.) and / or different providers or manufacturers available

Die Figur 2 ist eine Plandarstellung von Plandaten des Bauprojekts. Zugunsten einer verbesserten Übersicht ist die Darstellung gegenüber einem realen Beispiel in Bezug auf die Anzahl und den Detaillierungsgrad der gezeigten Elemente vereinfacht. Die Plandarstellung zeigt einen im Wesentlichen quadratischen Grundriss eines Gebäudegeschosses mit einer umlaufenden Aussenmauer 30, die mehrfach durch Fenster 31.1...31.8 durchbrochen ist. Von der Aussenmauer 30 umschlossen und an diese / 29 anschliessend verlaufen mehrere Innenwände 35.1...35.6. Zwischen zwei der Innenwände 35.1, 35.2 ist eine Treppe 36 aus einem unteren Stockwerk angeordnet. Zwischen den zwei Innenwänden 35.2, 35.3 ist ein erster Raum 37.1 ausgebildet, zwischen den Innenwänden 35.3, 35.4 ein zweiter Raum 37.2, zwischen den Innenwänden 35.4, 35.5 ein dritter Raum 37.3 und zwischen den Innenwänden 35.6, 35.1 ein vierter Raum 37.4. Eine Abstellkammer 37.5 ist zudem zwischen den Innenwänden 35.5, 35.6 ausgebildet.FIG. 2 is a plan representation of plan data of the construction project. In favor of an improved overview, the representation is simplified compared to a real example in terms of the number and the level of detail of the elements shown. The plan view shows an essentially square floor plan of a building floor with a circumferential outer wall 30 which is repeatedly broken through by windows 31.1 ... 31.8. Surrounded by the outer wall 30 and adjoining this / 29, several inner walls 35.1 ... 35.6 run. A staircase 36 from a lower floor is arranged between two of the inner walls 35.1, 35.2. A first space 37.1 is formed between the two inner walls 35.2, 35.3, a second space 37.2 between the inner walls 35.3, 35.4, a third space 37.3 between the inner walls 35.4, 35.5 and a fourth space 37.4 between the inner walls 35.6, 35.1. A storage chamber 37.5 is also formed between the inner walls 35.5, 35.6.

Die Treppe 36 und die vier Räume 37.1...4 sowie die Abstellkammer 37.5 werden durch einen Flur 38 miteinander verbunden; dieser wird im Wesentlichen durch zwei Innenwände 35.2, 35.5 begrenzt. Drei der Räume 37.2, 37.3, 37.4 weisen in das Rauminnere öffnende Türen auf, der erste Raum 37.1 schliesst sich ohne Türe an den Flur 38 an.The stairs 36 and the four rooms 37.1 ... 4 and the storage room 37.5 are connected by a hallway 38; this is essentially delimited by two inner walls 35.2, 35.5. Three of the rooms 37.2, 37.3, 37.4 have doors opening into the interior of the room, the first room 37.1 adjoins the hallway 38 without a door.

Im vierten Raum 37.4 ist entlang der Innenwand 35.1 zudem eine Vorwand 39 angeordnet.In the fourth room 37.4, a front wall 39 is also arranged along the inner wall 35.1.

Die bisher beschriebenen Elemente sind in einer Ebene Geometriedaten der Plandaten abgelegt. Die Figur 3 zeigt eine Plandarstellung, in welcher nur die Geometriedaten gezeigt sind.The elements described so far are stored on one level in the geometric data of the plan data. FIG. 3 shows a plan view in which only the geometry data are shown.

Ebenfalls in den Plandaten ist die Ebene Materialdaten enthalten. Diese sind in der Figur 4 dargestellt und auch aus der Gesamtübersicht der Figur 2 ersichtlich. Aus den Materialdaten geht hervor, dass es sich bei der Aussenwand 30 um eine Stahlbetonwand handelt (eng schraffiert), dass es sich bei den Innenwänden 35.1.6 um Leichtbauwände, gebildet aus Metallständern mit Gipskartonbeplankungen, handelt (weit schraffiert) und dass die Vorwand 39 durch eine Holzkonstruktion mit Holzbeplankung gebildet ist (horizontal gestrichelt). Ebenfalls in den Materialdaten ist enthalten, dass es sich bei der Decke um eine Stahlbetondecke handelt.The material data level is also included in the plan data. These are shown in FIG. 4 and can also be seen from the overall overview in FIG. 2. From the material data it can be seen that the outer wall 30 is a reinforced concrete wall (hatched), that the inner walls 35.1.6 are lightweight walls, formed from metal stands with plasterboard planking (widely hatched), and that the front wall 39 is formed by a wooden structure with wooden planking (dashed horizontally). Also included in the material data is that the ceiling is a reinforced concrete ceiling.

Weiter ist in den Plandaten die Ebene Funktionselemente enthalten. Die entsprechenden Funktionselemente sind in der Gesamtansicht gemäss Figur 2 dargestellt sowie in der Ebenenansicht gemäss Figur 5 (wobei zur Orientierung die Umrisse der Aussenwand und der Innenwände, welche nicht zur Ebene Funktionselemente gehören, gestrichelt dargestellt sind). Die Funktionselemente umfassen eine Reihe von Schalter-/Steckdosenkombinationen 41.1.41.5, die jeweils neben einer Tür bzw. einem Eingang in einen der Räume 37.1.5 an der jeweiligen Innenwand 35.1.35.6 angeordnet sind. Eine weitere Schalter-/Steckdosenkombination 41.6 ist an der Aussenwand 30 im Raum 37.1 angeordnet. Weiter umfassen die Funktionselemente eine Reihe von Steckdosen 42.1.42.8, die z. T. an Innenwänden 35.3, 35.5, z. T. an der Aussenwand 30 und z. T. an der Vorwand 39 angeordnet sind. Weiter sind Lampenanschlüsse 43.1.43.4 in der Decke (Stahlbeton) angeordnet. Schliesslich sind ein Bewegungsmelder 44 an der Decke des Flurs 38 und eine Deckenanschlussdose 45 im Bereich der Vorwand 39 angeordnet.The functional elements level is also included in the planning data. The corresponding functional elements are shown in the overall view in accordance with FIG. 2 and in the plane view in accordance with FIG. 5 (the outlines of the outer wall and the inner walls which do not belong to the functional elements level being shown in dashed lines for orientation). The functional elements comprise a series of switch / socket combinations 41.1.41.5, which are each arranged next to a door or an entrance to one of the rooms 37.1.5 on the respective inner wall 35.1.35.6. Another switch / socket combination 41.6 is arranged on the outer wall 30 in room 37.1. Furthermore, the functional elements include a number of sockets 42.1.42.8, the z. T. on inner walls 35.3, 35.5, z. T. on the outer wall 30 and z. T. are arranged on the pretext 39. Lamp connections 43.1.43.4 are also arranged in the ceiling (reinforced concrete). Finally, a motion detector 44 is arranged on the ceiling of the hallway 38 and a ceiling connection box 45 in the area of the front wall 39.

/ 29/ 29

Über die spezifisch zu verwendenden Produkte sagt die Ebene Funktionselemente nichts aus. Die Funktionselemente geben lediglich an, welche Funktion an einem bestimmten Ort gewünscht ist.The functional elements level says nothing about the specific products to be used. The functional elements merely indicate which function is desired at a particular location.

Schliesslich ist in den Plandaten die Ebene Produkte enthalten. Diese umfasst im dargestellten vereinfachten Beispiel nur gerade die Waschmaschine 51. Sie ist deshalb nicht in einer gesonderten Abbildung dargestellt, sondern nur in der Übersichtsdarstellung gemäss Figur 2 abgebildet.Finally, the Products level is included in the planning data. In the simplified example shown, this only includes the washing machine 51. It is therefore not shown in a separate illustration, but only in the overview shown in FIG. 2.

Die Figur 6 ist ein Flussdiagramm eines erfindungsgemässen Verfahrens zum automatisierten Generieren einer Empfehlung für eine Materialbestellung für ein Bauprojekt.FIG. 6 is a flow chart of a method according to the invention for the automated generation of a recommendation for a material order for a construction project.

Zunächst werden vom Verarbeitungsserver die Plandaten empfangen (Schritt 101). Dies erfolgt insbesondere über eine Webschnittstelle, an welche der Verarbeitungsserver angebunden ist, und auf welche der Benutzer Zugriff hat. Der Zugriff ist passwortgeschützt, und die Verbindung zwischen dem Benutzer und der Webschnittstelle ist gesichert (z. B. mittels TLS). Die Plandaten werden gegebenenfalls konvertiert und dann (temporär) auf dem Verarbeitungsserver gespeichert. Der Benutzer hat die Möglichkeit, über die Webschnittstelle ergänzende Informationen einzugeben. Falls die Daten nicht gelesen werden können oder unvollständig sind, wird dem Benutzer eine entsprechende Meldung angezeigt, so dass fehlende Informationen nachgeliefert oder die Daten in einem lesbaren Format hochgeladen werden können.First, the plan data is received from the processing server (step 101). This is done in particular via a web interface to which the processing server is connected and to which the user has access. Access is password protected and the connection between the user and the web interface is secured (e.g. using TLS). If necessary, the plan data is converted and then (temporarily) saved on the processing server. The user has the option of entering additional information via the web interface. If the data cannot be read or is incomplete, a corresponding message is displayed to the user so that missing information can be supplied or the data can be uploaded in a readable format.

Als Nächstes erfolgt im Verarbeitungsserver die Zuordnung zwischen den Funktionselementen und dem Material, auf, an oder in welchem sie zu installieren sind. Dazu werden die Informationen der Ebenen Funktionselemente und Materialdaten miteinander verknüpft. Konkret wird für jedes in der Ebene Funktionselemente enthaltene Funktionselement anhand von dessen Position die Zuordnung zu dem in der Ebene Materialdaten angegebenen Material hergestellt (Schritt 102). Im dargestellten Ausführungsbeispiel ergibt sich folgende Zuordnung:The next step in the processing server is the assignment between the functional elements and the material, on or on which they are to be installed. For this purpose, the information on the functional element and material data levels is linked. Specifically, the assignment to the material specified in the material data level is made for each functional element contained in the functional elements level based on its position (step 102). The following assignment results in the exemplary embodiment shown:

Ebene Funktionselement Functional element level Ebene Materialdaten Material data level Funktionselement functional element Art kind Bauelement module Material material 41.1 41.1 Schalter/Steckdose Switch / socket Innenwand 35.2 Inner wall 35.2 Leichtbau lightweight 41.2 41.2 Schalter/Steckdose Switch / socket Innenwand 35.3 Inner wall 35.3 Leichtbau lightweight 41.3 41.3 Schalter/Steckdose Switch / socket Innenwand 35.5 Inner wall 35.5 Leichtbau lightweight 41.4 41.4 Schalter/Steckdose Switch / socket Innenwand 35.6 Inner wall 35.6 Leichtbau lightweight 41.5 41.5 Schalter/Steckdose Switch / socket Innenwand 35.6 Inner wall 35.6 Leichtbau lightweight 41.6 41.6 Schalter/Steckdose Switch / socket Aussenwand 30 Outer wall 30 Stahlbeton reinforced concrete 42.1 42.1 Steckdose socket Aussenwand 30 Outer wall 30 Stahlbeton reinforced concrete

/ 29/ 29

42.2 42.2 Steckdose socket Aussenwand 30 Outer wall 30 Stahlbeton reinforced concrete 42.3 42.3 Steckdose socket Innenwand 35.3 Inner wall 35.3 Leichtbau lightweight 42.4 42.4 Steckdose socket Innenwand 35.3 Inner wall 35.3 Leichtbau lightweight 42.5 42.5 Steckdose socket Aussenwand 30 Outer wall 30 Stahlbeton reinforced concrete 42.6 42.6 Steckdose socket Innenwand 35.5 Inner wall 35.5 Leichtbau lightweight 42.7 42.7 Steckdose socket Aussenwand 30 Outer wall 30 Stahlbeton reinforced concrete 42.8 42.8 Steckdose socket Vorwand 39 Excuse 39 Holzkonstruktion wood construction 43.1 43.1 Lampenanschluss lamp connection Decke blanket Stahlbeton reinforced concrete 43.2 43.2 Lampenanschluss lamp connection Decke blanket Stahlbeton reinforced concrete 43.3 43.3 Lampenanschluss lamp connection Decke blanket Stahlbeton reinforced concrete 43.4 43.4 Lampenanschluss lamp connection Decke blanket Stahlbeton reinforced concrete 44 44 Bewegungsmelder motion detector Decke blanket Stahlbeton reinforced concrete 45 45 Deckenanschlussdose Ceiling junction box Decke blanket Stahlbeton reinforced concrete

Als nächstes erfolgt für das erste identifizierte Funktionselement 41.1 eine Abfrage in der Produktedatenbank (Schritt 103). Daraus ergibt sich eine Liste an entsprechenden Produkten (Schalter/Steckdose), die für die Montage am entsprechenden Material (Leichtbauwand wie oben beschrieben) geeignet sind. Sollten die Materialdaten in Bezug auf die Materialangabe an einem bestimmten Installationsort uneindeutig sein, werden alle Produkte aufgelistet, welche für beliebige, an diesem Ort in Frage kommende, Installationsarten geeignet sind.Next, the first identified functional element 41.1 is queried in the product database (step 103). This results in a list of corresponding products (switches / sockets) that are suitable for mounting on the appropriate material (lightweight wall as described above). If the material data in relation to the material specification at a particular installation location is ambiguous, all products are listed which are suitable for any installation type that is possible at that location.

Es wird nun geprüft, ob die Liste leer ist, einen einzigen Eintrag oder mehrere Einträge umfasst (Entscheidung 104). Ist die Liste leer, wird für das entsprechende Funktionselement 41.1 vermerkt, dass kein entsprechendes Produkt verfügbar ist. Umfasst die Liste mehrere Einträge, wird eine Rangierung nach vorgegebenen Kriterien (z. B. Preis aufsteigend, Qualitätsstufe, Hersteller, bereits getroffene Auswahlen durch den Benutzer) vorgenommen (Schritt 105), anschliessend erfolgt über die Webschnittstelle eine Auswahlabfrage beim Benutzer. Dieser kann aus der rangierten Liste das gewünschte Produkt auswählen (Schritt 106). Er kann auch bereits wählen, dass für entsprechende zukünftige Abfragen (identische Kombination aus Funktionselement und Material) automatisch dieselbe Auswahl getroffen werden soll.A check is now made as to whether the list is empty, comprises a single entry or comprises several entries (decision 104). If the list is empty, it is noted for the corresponding functional element 41.1 that no corresponding product is available. If the list includes several entries, a ranking is carried out according to predetermined criteria (e.g. price ascending, quality level, manufacturer, selections already made by the user) (step 105), then a selection query is made to the user via the web interface. The latter can select the desired product from the ranked list (step 106). He can also choose to automatically make the same selection for corresponding future queries (identical combination of functional element and material).

Falls die Liste nur einen Eintrag umfasst bzw. nach Auswahl eines Produkts wird diesem Produkt anhand der Ablaufdatenbank eine Bauphase zugeordnet (Schritt 107). Bei der Schalter-/Steckdosenkombination 41.1, die in eine Leichtbauwand eingebaut werden soll, ist dies der Endausbau.If the list contains only one entry or after selection of a product, a construction phase is assigned to this product using the expiry database (step 107). With the switch / socket combination 41.1, which is to be installed in a lightweight wall, this is the final stage.

/ 29/ 29

Das Produkt und die Bauphase bzw. die Information, dass kein Produkt verfügbar ist, wird dann in eine Materialliste gespeichert (Schritt 109).The product and the construction phase or the information that no product is available is then stored in a material list (step 109).

Als nächstes wird geprüft, ob noch weitere Funktionselemente zu bearbeiten sind (Entscheidung 110). Ist dies der Fall wird das Verfahren für das nächste Funktionselement ab Schritt 103 fortgesetzt.The next step is to check whether further functional elements are to be processed (decision 110). If this is the case, the method for the next functional element is continued from step 103.

Sind keine weiteren Funktionselemente zu bearbeiten, wird aus der Materialliste die definitive Materialliste erzeugt (Schritt 111). Insbesondere werden mehrere Produkte, die in derselben Bauphase benötigt werden, zusammengefasst.If no further functional elements are to be processed, the definitive material list is generated from the material list (step 111). In particular, several products that are required in the same construction phase are combined.

Produkte, die bereits in den Plandaten spezifiziert sind (z. B. die Waschmaschine 51) können automatisch in die Materialliste übernommen werden, falls sie den berücksichtigten Funktionselementklassen entsprechen.Products that are already specified in the planning data (e.g. the washing machine 51) can be automatically added to the material list if they correspond to the functional element classes taken into account.

Die Materialliste wird dann nach Bauphasen sortiert und angezeigt (Schritt 112) und der Benutzer wird angefragt, ob eine entsprechende Bestellung ausgelöst werden soll (Schritt 113). An dieser Stelle hat der Benutzer die Möglichkeit, die Materialliste von Hand zu ergänzen, Produkte von einer Bauphase in eine andere zu verschieben oder gewünschte Lieferdaten unmittelbar einzugeben. Zu diesem Zweck kann die Materialliste in verschiedenen Ansichten angezeigt, gefiltert und sortiert werden. Falls der Benutzer eine Bestellung auslöst (Entscheidung 114) wird diese an den Handelsserver weitergeleitet (Schritt 115). Falls nicht, wird die Materialliste temporär gespeichert, so dass sie der Benutzer zu einem späteren Zeitpunkt wieder abrufen kann.The material list is then sorted and displayed according to construction phases (step 112) and the user is asked whether a corresponding order should be triggered (step 113). At this point, the user has the option of manually completing the material list, moving products from one construction phase to another, or entering the desired delivery dates directly. For this purpose, the material list can be displayed, filtered and sorted in different views. If the user places an order (decision 114), it is forwarded to the trading server (step 115). If not, the material list is saved temporarily so that the user can call it up again at a later time.

Die Materiallisten und/oder die definitiven Bestellungen mit den entsprechenden Produkteinformationen lassen sich über eine Schnittstelle an den Benutzer zurückspeisen. Sie können somit in die Plandaten aufgenommen werden. Ebenfalls können die Plandaten (soweit notwendig) und die produktbezogenen Informationen auf dem Verarbeitungsserver bzw. einer angeschlossenen Datenbank vorgehalten werden. Muss zu einem späteren Zeitpunkt ein Ersatzteil für ein defektes oder verschlissenes Teil beschafft werden, kann der Benutzer durch eine einfache Angabe des Installationsorts (und ggf. des Funktionselementtyps) die Bestellung des gleichen Artikels auslösen, wonach der Verarbeitungsserver auf die installationsortabhängig gespeicherten Produkteinformationen zurückgreift.The material lists and / or the definitive orders with the corresponding product information can be fed back to the user via an interface. They can therefore be included in the planning data. The planning data (if necessary) and the product-related information can also be kept on the processing server or a connected database. If a replacement part for a defective or worn part has to be procured at a later time, the user can trigger the order for the same item by simply specifying the installation location (and, if applicable, the type of functional element), after which the processing server uses the product information stored depending on the installation location.

Die Materiallisten bzw. ausgelösten Bestellungen lassen sich mit einer bauseitigen Projektdatenbank verknüpfen, in welcher eine Timeline hinterlegt ist, die laufend mit dem Baufortschritt und den geplanten Arbeiten aktualisiert wird. Bei einer zeitlichen Verschiebung einer Arbeit wird automatisch der Liefertermin für die damit verknüpften Produkte angepasst, so dass die benötigten Bauelemente zum richtigen Zeitpunkt auf den Bauplatz geliefert werden.The material lists or triggered orders can be linked to an on-site project database, in which a timeline is stored, which is continuously updated with the construction progress and the planned work. If a work is postponed, the delivery date for the associated products is automatically adjusted so that the required components are delivered to the site at the right time.

/ 29/ 29

Die Erfindung ist nicht auf das dargestellte Ausführungsbeispiel beschränkt. Sie lässt sich ohne Weiteres auch zur Bestellung weiterer Elemente, z. B. für Leitungen, einsetzen. Sie ist auch nicht nur auf Bauelemente für die Elektroinstallation einsetzbar, sondern eignet sich für diverse Bauelemente, die materialabhängig verlegt werden.The invention is not restricted to the exemplary embodiment shown. It can also be used to order other elements, e.g. B. for lines. It can not only be used on components for electrical installation, but is also suitable for various components that are installed depending on the material.

Die Verarbeitung und Benutzerführung können auf eine andere Weise erfolgen. Statt den Benutzer bei jeder mehrwertigen Produkteliste zu einer Auswahl aufzufordern, kann zunächst die gesamte Materialliste zusammengestellt werden (wobei einige Punkte als Auswahlpunkte ausgestaltet sind). Erst einem nächsten Schritt werden dann vom Benutzer im Rahmen der gesamten Materialliste die nötigen Auswahlen durchgeführt.Processing and user guidance can be done in a different way. Instead of asking the user to make a selection for each multi-value product list, the entire material list can first be compiled (some points being designed as selection points). Only in a next step will the user make the necessary selections within the entire material list.

Statt die Bestellung(en) gestützt auf die - allenfalls angepasste - Materialliste direkt auszulösen, kann beispielsweise auch eine Warenkorblösung zum Einsatz kommen. Die gesamte Materialliste, die Teilliste für eine Bauphase und/oder einzelne Produkte können dann vom Benutzer über eine Webschnittstelle, insbesondere des Handelsservers, in den Warenkorb gelegt werden.Instead of directly triggering the order (s) based on the - if necessary adjusted - material list, a shopping basket solution can also be used. The entire material list, the partial list for a construction phase and / or individual products can then be placed in the shopping cart by the user via a web interface, in particular the trading server.

Zusammenfassend ist festzustellen, dass die Erfindung eine Anordnung zum automatisierten Generieren einer Empfehlung für eine Materialbestellung für ein Bauprojekt schafft, welche ausgehend von Plandaten des Objekts des Bauprojekts mit der Angabe von Funktionselementen die Identifikation verwendbarer Produkte ermöglicht und eine hohe Flexibilität aufweist.In summary, it can be stated that the invention provides an arrangement for the automated generation of a recommendation for a material order for a construction project, which, based on plan data of the object of the construction project with the specification of functional elements, enables the identification of usable products and is highly flexible.

Claims (14)

1. Anordnung (10) zum automatisierten Generieren einer Empfehlung für eine Materialbestellung für ein Bauprojekt, umfassend1. Arrangement (10) for the automated generation of a recommendation for a material order for a construction project, comprising a) einen Verarbeitungsserver (11) mit einer Eingangsschnittstelle (12) zum Empfangen digitaler Plandaten des Objekts des Bauprojekts, wobei die digitalen Plandaten mindestens folgendes umfassen:a) a processing server (11) with an input interface (12) for receiving digital plan data of the object of the construction project, the digital plan data comprising at least the following: - Angaben zu Funktionselementen, welche im Rahmen des Bauprojekts zu installieren sind;- Information on functional elements to be installed as part of the construction project; - Angaben zu Installationsorten, an welchen die Funktionselemente am Objekt zu installieren sind;- Information on installation locations at which the functional elements are to be installed on the property; - Angaben zu Materialien, welche für Gebäude- und/oder Raumhüllen des Objekts zum Einsatz kommen sollen;- Information on materials that are to be used for building and / or room envelopes of the object; - Angaben zu Einsatzorten, an welchen die Materialien zum Einsatz kommen sollen;- Information on locations where the materials are to be used; und zum Herstellen einer Zuordnung mindestens eines der Funktionselemente zum Material, an welchem das Funktionselement installiert werden soll, anhand der Installationsorte der Funktionselemente und der Einsatzorte der Materialien;and for establishing an assignment of at least one of the functional elements to the material on which the functional element is to be installed, based on the installation locations of the functional elements and the locations of the materials; b) eine Produktedatenbank (15), in welcher Informationen zu Produkten abgelegt sind, wobei die Informationen Angaben zu einer Eignung der Produkte als Funktionselement für eine Installation an einem Material umfassen;b) a product database (15) in which information about products is stored, the information including information on the suitability of the products as a functional element for an installation on a material; c) einen Handelsserver (21) mit einer Ausgangsschnittstelle (22) zum Ausgeben einer Empfehlung für ein zu bestellendes Produkt, wobei das empfohlene Produkt ein Funktionselement ist, welches für eine Installation an dem zugeordneten Material geeignet ist;c) a trading server (21) with an output interface (22) for issuing a recommendation for a product to be ordered, the recommended product being a functional element which is suitable for installation on the assigned material; wobei der Verarbeitungsserver (11) Zugriff auf die Produktedatenbank (15) hat und anhand der Zuordnung des Materials zum Funktionselement gestützt auf die Produktedatenbank (15) die Empfehlung für das zu bestellende Produkt generiert, und wobei die generierte Empfehlung vom Verarbeitungsserver (11) an den Handelsserver (21) übermittelt wird.wherein the processing server (11) has access to the product database (15) and generates the recommendation for the product to be ordered based on the assignment of the material to the functional element based on the product database (15), and wherein the generated recommendation from the processing server (11) to the Trade server (21) is transmitted. 2. Anordnung (10) nach Anspruch 1, dadurch gekennzeichnet, dass die Funktionselemente Komponenten umfassen, welche in oder an einer Wand, einer Decke und/oder einem Boden anbringbar sind und dass sich die Angaben zu Materialien auf Wände, Decken und/oder Böden des Objekts beziehen.2. Arrangement (10) according to claim 1, characterized in that the functional elements comprise components which can be attached in or on a wall, a ceiling and / or a floor and that the information about materials on walls, ceilings and / or floors of the object. 21 / 2921/29 3. Anordnung (10) nach Anspruch 2, dadurch gekennzeichnet, dass die Funktionselemente Anschlussstellen, insbesondere Steckdosen, Lampen- und weitere Verbraucheranschlüsse, und/oder Schalter einer Elektroinstallation umfassen.3. Arrangement (10) according to claim 2, characterized in that the functional elements include connection points, in particular sockets, lamp and other consumer connections, and / or switches of an electrical installation. 4. Anordnung (10) nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, dass im Verarbeitungsserver (11) eine Empfehlung für eine Mehrzahl zu bestellender Produkte generierbar ist, insbesondere für alle zu bestellenden Produkte einer vorgegebenen Funktionselementklasse.4. Arrangement (10) according to one of claims 1 to 3, characterized in that a recommendation for a plurality of products to be ordered can be generated in the processing server (11), in particular for all products to be ordered of a given functional element class. 5. Anordnung (10) nach Anspruch 4, gekennzeichnet durch eine Ablaufdatenbank (16), in welcher funktionselement- und/oder produktbezogene Informationen zu Installationsarbeiten abgelegt sind, wobei im Verarbeitungsserver (11) anhand der Informationen in der Ablaufdatenbank (16) und basierend auf der Zuordnung der Materialien zu den Funktionselementen die zu bestellenden Produkte der Empfehlung einer von mehreren Bauphasen zuordenbar sind, wobei die zugeordnete Bauphase angibt, wann im Bauprozess das entsprechende Produkt zu installieren ist.5. Arrangement (10) according to claim 4, characterized by an expiration database (16), in which functional element and / or product-related information about installation work is stored, the processing server (11) being based on the information in the expiration database (16) and the assignment of the materials to the functional elements, the products to be ordered can be assigned to the recommendation of one of several construction phases, the assigned construction phase indicating when the corresponding product is to be installed in the construction process. 6. Anordnung (10) nach Anspruch 5, dadurch gekennzeichnet, dass für jede der mehreren Bauphasen eine gesonderte Empfehlung generierbar ist, wobei die entsprechende Empfehlung die der jeweiligen Bauphase zugeordneten Produkte umfasst.6. The arrangement (10) according to claim 5, characterized in that a separate recommendation can be generated for each of the several construction phases, the corresponding recommendation comprising the products assigned to the respective construction phase. 7. Anordnung (10) nach einem der Ansprüche 1 bis 6, dadurch gekennzeichnet, dass nach Empfang einer Zustimmung eines Bestellers zur generierten Empfehlung vom Handelsserver (21) eine Bestellung der empfohlenen Produkte auslösbar ist.7. Arrangement (10) according to any one of claims 1 to 6, characterized in that an order of the recommended products can be triggered after receipt of an approval from an orderer for the generated recommendation from the trading server (21). 8. Verfahren zum automatisierten Generieren einer Empfehlung für eine Materialbestellung für ein Bauprojekt, umfassend folgende Schritte8. A method for the automated generation of a recommendation for a material order for a construction project, comprising the following steps a) Empfangen digitaler Plandaten des Objekts des Bauprojekts, wobei die digitalen Plandaten mindestens folgendes umfassen:a) receiving digital plan data of the object of the construction project, the digital plan data comprising at least the following: - Angaben zu Funktionselementen, welche im Rahmen des Bauprojekts zu installieren sind;- Information on functional elements to be installed as part of the construction project; - Angaben zu Installationsorten, an welchen die Funktionselemente am Objekt zu installieren sind;- Information on installation locations at which the functional elements are to be installed on the property; - Angaben zu Materialien, welche für Gebäude- und/oder Raumhüllen des Objekts zum Einsatz kommen sollen;- Information on materials that are to be used for building and / or room envelopes of the object; - Angaben zu Einsatzorten, an welchen die Materialien zum Einsatz kommen sollen;- Information on locations where the materials are to be used; 22 / 2922/29 b) anhand der Installationsorte der Funktionselemente und der Einsatzorte der Materialien Zuordnen mindestens eines der Funktionselemente zum Material, an welchem das Funktionselement installiert werden soll;b) on the basis of the installation locations of the functional elements and the locations of the materials, assigning at least one of the functional elements to the material on which the functional element is to be installed; c) gestützt auf eine Produktedatenbank (15), anhand der Zuordnung des Materials zum Funktionselement Generieren einer Empfehlung für ein zu bestellendes Produkt, wobei das empfohlene Produkt ein Funktionselement ist, welches für eine Installation an dem zugeordneten Material geeignet ist.c) based on a product database (15), based on the assignment of the material to the functional element, generating a recommendation for a product to be ordered, the recommended product being a functional element which is suitable for installation on the assigned material. 9. Verfahren nach Anspruch 8, dadurch gekennzeichnet, dass die Funktionselemente Komponenten umfassen, welche in oder an einer Wand, einer Decke und/oder einem Boden anbringbar sind und dass sich die Angaben zu Materialien auf Wände, Decken und/oder Böden des Objekts beziehen.9. The method according to claim 8, characterized in that the functional elements comprise components which can be attached in or on a wall, a ceiling and / or a floor and that the information about materials relates to walls, ceilings and / or floors of the object , 10. Verfahren nach Anspruch 9, dadurch gekennzeichnet, dass die Funktionselemente Anschlussstellen (Steckdosen, Lampen- und weitere Verbraucheranschlüsse) und/oder Schalter einer10. The method according to claim 9, characterized in that the functional elements connection points (sockets, lamp and other consumer connections) and / or switches one Elektroinstallation umfassen.Electrical installation include. 11. Verfahren nach einem der Ansprüche 8 bis 10, dadurch gekennzeichnet, dass eine Empfehlung für eine Mehrzahl zu bestellender Produkte generiert wird, insbesondere für alle zu bestellenden Produkte einer vorgegebenen Funktionselementklasse.11. The method according to any one of claims 8 to 10, characterized in that a recommendation is generated for a plurality of products to be ordered, in particular for all products to be ordered of a given functional element class. 12. Verfahren nach Anspruch 11, dadurch gekennzeichnet, dass basierend auf der Zuordnung der Materialien zu den Funktionselementen die zu bestellenden Produkte der Empfehlung einer von mehreren Bauphasen zugeordnet werden, wobei die zugeordnete Bauphase angibt, wann im Bauprozess das entsprechende Produkt zu installieren ist.12. The method according to claim 11, characterized in that based on the assignment of the materials to the functional elements, the products to be ordered are assigned to the recommendation of one of several construction phases, the assigned construction phase indicating when the corresponding product is to be installed in the construction process. 13. Verfahren nach Anspruch 12, dadurch gekennzeichnet, dass für jede der mehreren Bauphasen eine gesonderte Empfehlung generiert wird, wobei die entsprechende Empfehlung die der jeweiligen Bauphase zugeordneten Produkte umfasst.13. The method according to claim 12, characterized in that a separate recommendation is generated for each of the plurality of construction phases, the corresponding recommendation comprising the products assigned to the respective construction phase. 14. Verfahren nach einem der Ansprüche 8 bis 13, gekennzeichnet durch den weiteren Schritt der Auslösung einer Bestellung nach Empfang einer Zustimmung eines Bestellers zur generierten Empfehlung.14. The method according to any one of claims 8 to 13, characterized by the further step of triggering an order after receipt of approval from an orderer for the generated recommendation.
ATA50149/2019A 2018-03-01 2019-02-26 Arrangement and method for the automated generation of a recommendation for a material order for a construction project AT520946A2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
ATGM8038/2022U AT17882U1 (en) 2018-03-01 2019-02-26 Arrangement and method for automatically generating a recommendation for a material order for a construction project

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH00250/18A CH714707B1 (en) 2018-03-01 2018-03-01 Arrangement for the automated generation of a recommendation for a material order for a construction project.

Publications (1)

Publication Number Publication Date
AT520946A2 true AT520946A2 (en) 2019-09-15

Family

ID=67622898

Family Applications (2)

Application Number Title Priority Date Filing Date
ATA50149/2019A AT520946A2 (en) 2018-03-01 2019-02-26 Arrangement and method for the automated generation of a recommendation for a material order for a construction project
ATGM8038/2022U AT17882U1 (en) 2018-03-01 2019-02-26 Arrangement and method for automatically generating a recommendation for a material order for a construction project

Family Applications After (1)

Application Number Title Priority Date Filing Date
ATGM8038/2022U AT17882U1 (en) 2018-03-01 2019-02-26 Arrangement and method for automatically generating a recommendation for a material order for a construction project

Country Status (4)

Country Link
AT (2) AT520946A2 (en)
CH (1) CH714707B1 (en)
DE (1) DE102019001164A1 (en)
FR (1) FR3078578A1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11383276B2 (en) 2019-09-13 2022-07-12 Rdbj, Llc Lumber use designation system and method
AU2022225580A1 (en) * 2021-02-24 2023-09-07 Dormakaba Deutschland Gmbh Method for installing a plurality of door components
EP4050545A1 (en) * 2021-02-24 2022-08-31 dormakaba Deutschland GmbH Method for the installation of multiple door components
BE1030514B1 (en) * 2022-05-12 2023-12-11 Rippin Gmbh Computer program and method for a structural measurement

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19745385A1 (en) 1997-10-14 1999-07-29 Elektro Ebert Gmbh Assembly method of electrical installation e.g. for floor plan of flat
US6493679B1 (en) * 1999-05-26 2002-12-10 Wireless Valley Communications, Inc. Method and system for managing a real time bill of materials
US7668761B2 (en) * 2000-10-27 2010-02-23 Jda Software Group System and method for ensuring order fulfillment
WO2002089011A1 (en) * 2000-12-12 2002-11-07 Databuilt, Inc. Method and system for assimilation, integration and deployment of architectural, engineering and construction information technology
WO2007084826A2 (en) * 2006-01-11 2007-07-26 The Gannon Technologies Group Program managed design for complex construction projects
US20120066019A1 (en) * 2010-07-07 2012-03-15 Dunmow Systems Corporation Construction control system
US9811612B2 (en) * 2013-02-26 2017-11-07 On Center Software, Inc. Multi condition takeoff in construction project software programs
KR101595243B1 (en) 2015-05-04 2016-02-19 주식회사 두올테크 Automatic modeling system for facility in field based building information modeling and method thereof

Also Published As

Publication number Publication date
AT17882U1 (en) 2023-06-15
CH714707B1 (en) 2020-09-15
CH714707A1 (en) 2019-09-13
DE102019001164A1 (en) 2019-09-05
FR3078578A1 (en) 2019-09-06
CH714707A8 (en) 2019-11-29

Similar Documents

Publication Publication Date Title
AT520946A2 (en) Arrangement and method for the automated generation of a recommendation for a material order for a construction project
US20220092226A1 (en) Smart plans
EP4168918A1 (en) Method and system for the production of a building
EP2506096B1 (en) Method for logically connecting sensors and actuators when starting up an installation system
Fox et al. Constructability rules: guidelines for successful application to bespoke buildings
CN106663295B (en) Virtual space division method using partition wall
JP4420703B2 (en) Process management system
Wu Use BIM and prefabrication to reduce construction waste
WO2020144288A1 (en) Efficient creation of a building configuration
EP3483520B1 (en) Module for a heating and/or hot water supply system and method for constructing such a system
EP0953084B1 (en) Construction method
Kemmer et al. Understanding production management of refurbishment projects of a housing association–an exploratory case study
DE112020003893T5 (en) Collaborative multi-person operation of the same model for comprehensive in-depth planning of BIM management
DE112016002659T5 (en) WORKING PLAN PRODUCTION SUPPORT DEVICE AND WORKING PLAN GENERATION DEVICE
JPH07175850A (en) Generating system for data on execution of piping installation
Ritter et al. Evaluation of Existing Layout Improvement and Creation Algorithms for Use in the Offsite Construction Industry
DE20320135U1 (en) Modular laboratory comprises container modules with equipment and a container half-module
EP3355138B1 (en) Method for determining the geometric position of a room controller
DE19814191A1 (en) Method for remote ordering and configuring of prefabricated goods
DE102008019905A1 (en) Design generating and optimizing method for building industry, involves drawing remaining, mutated and/or merged design as valid design when terminating process and output of design, and renewing running of process
DE102023105890A1 (en) Craftsman system
EP1416404A2 (en) Effective implementation of Open Building
EP0989504A1 (en) Apparatus and method for generating flexible appartment floorplans
EP2014059B1 (en) Method for installing a wirelessly communicating installation system from sensors and actuators
Poppe Using critical chain project management methodologies to build a production schedule

Legal Events

Date Code Title Description
UW Change of intellectual property right

Effective date: 20221215