AT17882U1 - Arrangement and method for automatically generating a recommendation for a material order for a construction project - Google Patents

Arrangement and method for automatically generating a recommendation for a material order for a construction project Download PDF

Info

Publication number
AT17882U1
AT17882U1 ATGM8038/2022U AT80382022U AT17882U1 AT 17882 U1 AT17882 U1 AT 17882U1 AT 80382022 U AT80382022 U AT 80382022U AT 17882 U1 AT17882 U1 AT 17882U1
Authority
AT
Austria
Prior art keywords
recommendation
information
functional elements
products
construction
Prior art date
Application number
ATGM8038/2022U
Other languages
German (de)
Original Assignee
Otto Fischer Ag
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Otto Fischer Ag filed Critical Otto Fischer Ag
Publication of AT17882U1 publication Critical patent/AT17882U1/en

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders
    • G06Q10/0875Itemisation or classification of parts, supplies or services, e.g. bill of materials
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/0601Electronic shopping [e-shopping]
    • G06Q30/0631Item recommendations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/0601Electronic shopping [e-shopping]
    • G06Q30/0633Lists, e.g. purchase orders, compilation or processing

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Development Economics (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Educational Administration (AREA)
  • Geometry (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Computer Hardware Design (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

Eine Anordnung (10) und ein Verfahren zum automatisierten Generieren einer Empfehlung für eine Materialbestellung für ein Bauprojekt umfasst einen Verarbeitungsserver (11) mit einer Eingangsschnittstelle (12) zum Empfangen digitaler Plandaten des Objekts des Bauprojekts. Zur Ermöglichung eines durchgängigen Informationsflusses von der Planung bis zur Materialbestellung umfasst die Anordnung (10) einen Verarbeitungsserver (11) mit einer Eingangsschnittstelle (12) zum Empfangen digitaler Plandaten des Objekts des Bauprojekts, wobei die digitalen Plandaten mindestens Angaben zu Funktionselementen, zu Installationsorten, zu Materialien sowie zu Einsatzorten umfassen. Der Verarbeitungsserver (11) stellt eine Zuordnung mindestens eines der Funktionselemente zum Material her, an welchem das Funktionselement installiert werden soll. Die Anordnung (10) umfasst weiter eine Produktedatenbank (15) und einen Handelsserver (21), wobei der Verarbeitungsserver (11) Zugriff auf die Produktedatenbank (15) hat und anhand der Zuordnung des Materials zum Funktionselement gestützt auf die Produktedatenbank (15) die Empfehlung für das zu bestellende Produkt generiert und die Empfehlung vom Verarbeitungsserver (11) an den Handelsserver (21) übermittelt.An arrangement (10) and a method for automatically generating a recommendation for ordering materials for a construction project comprises a processing server (11) with an input interface (12) for receiving digital planning data for the object of the construction project. To enable a continuous flow of information from planning to material ordering, the arrangement (10) comprises a processing server (11) with an input interface (12) for receiving digital plan data of the object of the construction project, the digital plan data containing at least information on functional elements, on installation locations, materials and locations. The processing server (11) assigns at least one of the functional elements to the material on which the functional element is to be installed. The arrangement (10) further comprises a product database (15) and a trading server (21), the processing server (11) having access to the product database (15) and based on the assignment of the material to the functional element based on the product database (15) the recommendation generated for the product to be ordered and the recommendation is transmitted from the processing server (11) to the trading server (21).

Description

BeschreibungDescription

TECHNISCHES GEBIET TECHNICAL AREA

[0001] Die Erfindung betrifft eine Anordnung und ein Verfahren zum automatisierten Generieren einer Empfehlung für eine Materialbestellung für ein Bauprojekt. The invention relates to an arrangement and a method for automatically generating a recommendation for ordering materials for a construction project.

STAND DER TECHNIK STATE OF THE ART

[0002] Bauprojekte, z. B. solche im Hochbau wie Gebäudeneubauten oder Komplettsanierungen von Gebäuden oder Gebäudeteilen, sind in der Regel komplex. Dies einerseits aufgrund der Vielzahl von Bauelementen, die in einer im Wesentlichen vorgegebenen Reihenfolge verarbeitet bzw. installiert werden müssen, andererseits aufgrund der vielen beteiligten Parteien, vom Bauherrn über Architekten, Ingenieure, Planer und Lieferanten bis zu den Handwerkern. Der Kommunikation und Koordination zwischen den einzelnen Parteien kommt eine große Bedeutung zu. Beispielsweise können aufgrund von falschen oder zum falschen Zeitpunkt gelieferten Bauelementen die Arbeiten am Objekt des Bauprojekts erheblich verzögert werden, was zu einem verspäteten Bauabschluss und Zusatzkosten führt. Es ist zumeist nicht möglich, die Wartezeit bis zum Eintreffen der richtigen Bauelemente anderweitig zu nutzen, weil Folgeschritte im Bauablauf von der Verarbeitung bzw. Installation der Elemente abhängig sind und weil die zeitliche Staffelung der Arbeiten verschiedener Leistungserbringer nicht kurzfristig geändert werden kann. Construction projects, e.g. B. those in building construction such as new buildings or complete renovations of buildings or parts of buildings are usually complex. On the one hand, this is due to the large number of components that have to be processed and installed in an essentially predetermined order, and on the other hand, due to the many parties involved, from the client to architects, engineers, planners and suppliers to the craftsmen. Communication and coordination between the individual parties is of great importance. For example, work on the object of the construction project can be significantly delayed due to incorrect or untimely delivered building elements, which leads to delayed construction completion and additional costs. In most cases, it is not possible to use the waiting time until the right components arrive for other purposes, because subsequent steps in the construction process depend on the processing or installation of the elements and because the staggering of the work by different service providers cannot be changed at short notice.

[0003] Entsprechend kommen der umfassenden und korrekten Vorbereitung und Planung der Arbeiten am Objekt und der damit zusammenhängenden Lieferungen von Baumaterial eine hohe Bedeutung zu. Herkömmlich hat der Architekt (2-dimensionale) Baupläne erstellt, ggf. unter Zuhilfenahme von entsprechenden Softwareanwendungen. Diese Baupläne bildeten die Basis der Arbeiten am Objekt. Gestützt auf diese Pläne wurden u. A. Materiallisten generiert, und gestützt auf diese Materiallisten dann Bestellungen bei entsprechenden Lieferanten ausgelöst. Der Gesamtprozess war aufwendig und fehleranfällig. Accordingly, the comprehensive and correct preparation and planning of the work on the object and the related deliveries of building material are of great importance. Traditionally, the architect created (2-dimensional) building plans, possibly with the help of appropriate software applications. These construction plans formed the basis for the work on the object. Based on these plans, material lists were generated, among other things, and based on these material lists, orders were then placed with the relevant suppliers. The entire process was complex and error-prone.

[0004] In letzter Zeit kommen immer häufiger integrierte Ansätze zur Anwendung, für welche sich die Bezeichnung Building Information Modeling (BIM) durchgesetzt hat. Das Objekt des Bauprojekts wird digital modelliert, wobei nebst den drei Raumdimensionen auch der zeitliche Ablauf, die Kosten, die Energienutzung und der Betrieb (inkl. Unterhalt und Wartung) modelliert werden können. Dies ermöglicht zum einen unmittelbar auch eine geometrische Visualisierung des Objekts, d. h. des Bauwerks. Zum anderen wird die Aktualisierung und Nachführung von Informationen zum Bauprojekt (z. B. was am Objekt zu verbauende bzw. verbaute Bauelemente anbelangt) vereinfacht. Grundsätzlich ermöglicht BIM die Abbildung des Bauprojekts praktisch in Echtzeit. Das BIM-System kann zudem auch nach Fertigstellung des Objekts weiter genutzt werden, z. B. für den Unterhalt und die Wartung des Bauwerks (Facility Management) und auch im Rahmen des Rückbaus. [0004] Recently, integrated approaches have been used more and more frequently, for which the term Building Information Modeling (BIM) has prevailed. The object of the construction project is modeled digitally, whereby in addition to the three spatial dimensions, the timing, costs, energy use and operation (including maintenance and servicing) can also be modeled. On the one hand, this also enables a direct geometric visualization of the object, i. H. of the building. On the other hand, the updating and updating of information on the construction project (e.g. regarding components to be installed or installed on the object) is simplified. In principle, BIM enables the construction project to be mapped practically in real time. The BIM system can also continue to be used after the object has been completed, e.g. B. for the upkeep and maintenance of the structure (facility management) and also as part of the demolition.

[0005] Es ist ebenfalls bekannt, gestützt auf die BIM-Daten die Koordination der anstehenden Arbeiten zu unterstützen oder gar weitgehend zu automatisieren. Ebenfalls lassen sich aus den BIM-Daten Materiallisten vollautomatisch erzeugen, vorausgesetzt, die BIM-Daten umfassen bereits ausreichend präzise Angaben zu den einzusetzenden Produkten, z. B. Marke und Typ eines zu verbauenden Bauelements. Entsprechende Ansätze sind z. B. in der WO 2016/178453 A1 (Doalltech Co., Ltd.) beschrieben. It is also known to support the coordination of the upcoming work based on the BIM data or even to automate it to a large extent. Material lists can also be generated fully automatically from the BIM data, provided that the BIM data already contain sufficiently precise information on the products to be used, e.g. B. Brand and type of a component to be installed. Appropriate approaches are e.g. B. described in WO 2016/178453 A1 (Doalltech Co., Ltd.).

[0006] Derartige Ansätze stoßen dann an ihre Grenzen, wenn die verfügbaren BIM-Daten, welche beispielsweise die Planung des Architekten repräsentieren, keine spezifischen Produkte umfassen, sondern lediglich Funktionselemente spezifizieren. Es fehlen also Informationen zum Anbieter und Typ eines verwendbaren Produkts. Dies ist beispielsweise oft im Bereich der Elektroinstallationen der Fall, wo der Plan des Architekten (ggf. ergänzt vom Elektroplaner) lediglich angibt, wo Lampen-Anschlussstellen, Steckdosen, Schalter oder weitere Funktionselemente zu platzieren sind. Eine Nennung eines konkreten Produkts unterbleibt in der Regel. Diese Spezifizierung wird in der Regel von einer nachgeordneten Stelle, in der Regel vom Elektroinstallateur, [0006] Approaches of this type reach their limits when the available BIM data, which represent the architect's plans, for example, do not include any specific products, but only specify functional elements. There is therefore a lack of information on the provider and type of a usable product. This is often the case, for example, in the area of electrical installations, where the architect's plan (possibly supplemented by the electrical planner) only indicates where lamp connection points, sockets, switches or other functional elements are to be placed. As a rule, no specific product is mentioned. This specification is usually made by a subordinate body, usually the electrician,

bei der eigentlichen Materialbestellung vorgenommen. Diese Vorgehensweise beschränkt sich aber nicht auf den Bereich der Elektroinstallationen, ein ähnlicher Ablauf findet - zumindest teilweise - auch auf anderen Gebieten, z. B. der Sanitär-, Klima-, Heiz- und Lüftungstechnik oder generell anderen haustechnischen Bereichen, statt. made when actually ordering the material. However, this procedure is not limited to the area of electrical installations; a similar process takes place - at least in part - in other areas, e.g. B. the sanitary, air conditioning, heating and ventilation technology or generally other building services areas.

[0007] Die nachträgliche Spezifizierung der konkreten Produkte durch eine weitere Instanz verursacht einen Zusatzaufwand. Weil diese Spezifizierung weitgehend "manuell" erfolgt, d. h. durch eine Fachperson, welche wie bisher anhand der Baupläne des Architekten und der angegebenen Funktionselemente geeignete Produkte auswählt und eine entsprechende Materialliste generiert, ist der Ablauf aufwendig und störungsanfällig. Es ist zudem keine unmittelbare Verknüpfung der Materialliste mit den BIM-Daten vorhanden, d. h. die Materialliste entspricht dem Bauprojekt gemäß Planungsstand zum Zeitpunkt der Verarbeitung der BIM-Daten. Eine Nachführung der BIMDaten hat keinen direkten Einfluss auf die Materialliste, und eine Aktualisierung der Materialliste aufgrund aktualisierter BIM-Daten ist erneut aufwendig und erfordert wiederum manuelle Arbeitsschritte. [0007] Subsequent specification of the concrete products by a further instance causes additional work. Because this specification is largely "manual", i. H. by a specialist who, as before, selects suitable products on the basis of the architect's construction plans and the specified functional elements and generates a corresponding list of materials, the process is complex and prone to failure. In addition, there is no direct link between the material list and the BIM data, i. H. the list of materials corresponds to the construction project according to the planning status at the time the BIM data is processed. Updating the BIM data has no direct impact on the material list, and updating the material list based on updated BIM data is again time-consuming and again requires manual work steps.

[0008] Aus einem anderen Zusammenhang sind Ansätze zur automatischen Spezifizierung von Informationen zu elektrischen Funktionselementen bekannt: Die DE 197 45 385 A1 (Elektro Ebert) betrifft ein Verfahren zum Ausführen einer Elektroinstallation in einem Gebäude durch fachlich nicht geschultes Personal. Dabei wird ausgehend von einem Bauplan des Gebäudes ein Ausführungsplan mit Art und exakter Lage aller Installationspunkte sowie mit dem Verlauf und der Länge aller Leitungsabschnitte erstellt. Mit Hilfe des Ausführungsplans wird dann eine Stückliste für die Leitungsabschnitte und die an den Installationspunkten zu montierenden Bauteile erstellt, basierend auf dieser wird dann ein Bausatz zusammengestellt, welcher mit Steckverbindern vorkonfektionierte Leitungsabschnitte umfasst sowie individuell vorkonfektionierte Steckverbinderdosen. Es existiert nur ein einziger Typ von Steckverbinderdosen, die je nach Bedarf mit Funktionsmodulen versehen werden. Die Leitungen und die Steckverbinderdosen werden im Rahmen der Rohinstallation, die Funktionsmodule im Rahmen der Feininstallation montiert. Entsprechend werden die Elemente des Bausatzes in verschiedenen Schichten in einem Behälter bereitgestellt. Approaches for the automatic specification of information on electrical functional elements are known from another context: DE 197 45 385 A1 (Elektro Ebert) relates to a method for carrying out an electrical installation in a building by personnel who have not been technically trained. Based on a construction plan of the building, an implementation plan is created with the type and exact location of all installation points as well as with the course and length of all line sections. With the help of the execution plan, a parts list for the line sections and the components to be assembled at the installation points is then created, based on this a kit is then put together, which includes pre-assembled line sections with connectors and individually pre-assembled connector sockets. There is only one type of connector socket, which is provided with function modules as required. The cables and the connector sockets are installed as part of the raw installation, the function modules as part of the fine installation. Correspondingly, the elements of the kit are provided in different layers in a container.

[0009] Diese Druckschrift soll es ermöglichen, dass Nicht-Fachleute Elektroinstallationen ausführen können. Um unmittelbar von einem Ausführungsplan mit der Angabe von Funktionselementen zu konkret zu installierenden Produkten zu kommen, wird pro Funktionselement nur ein standardisiertes Produkt eingesetzt. Es besteht somit ohne Weiteres eine eineindeutige Zuordnung zwischen Funktionselement und bereitzustellendem Produkt, wobei durch den Einsatz modularer Bauelemente der Lagerhaltungsaufwand zusätzlich minimiert werden kann. Allerdings schränkt dieser Ansatz die Flexibilität der Beteiligten (Bauherr, Architekt und Handwerker) erheblich ein. Es ist nicht möglich, Produkte zu wählen, die beispielsweise in Bezug auf ihr Qualitätsniveau oder ihr Design optimal zum Bauprojekt passen. Der Ansatz setzt zudem voraus, dass das ganze System aus einer Hand, von einem einzigen Anbieter, betrieben wird. Ebenfalls vorausgesetzt ist, dass die Funktionselemente im Ausführungsplan ausreichend spezifiziert sind, damit die 1:1-Zuordnung gemacht werden kann und das entsprechende Produkt mit Sicherheit die Anforderungen für eine Installation am vorgesehenen Ort erfüllt. This publication is intended to enable non-professionals to carry out electrical installations. Only one standardized product is used for each functional element in order to get directly from an execution plan with the specification of functional elements to the specific products to be installed. There is thus easily a one-to-one association between the functional element and the product to be provided, with the storage effort being additionally able to be minimized through the use of modular components. However, this approach severely limits the flexibility of those involved (owner, architect and craftsman). It is not possible to choose products that are optimally suited to the construction project, for example in terms of their level of quality or design. The approach also requires that the entire system is operated from a single source, by a single provider. It is also assumed that the functional elements are sufficiently specified in the execution plan so that the 1:1 assignment can be made and the corresponding product definitely meets the requirements for installation at the intended location.

[0010] Aus US 2003/200062 A1 sind Zeichenprogramme bekannt, in welchen physische Gegenstände in mehreren Phasen durch dasselbe Objekt repräsentiert werden können. Die Phasen können die Vorplanung, die Standortanalyse, die eigentliche Planung, die Dokumentierung des Bauprozesses bzw. des Bauobjekts und/oder die Gebäudeverwaltung betreffen. Das genannte Objekt kann sich in den verschiedenen Phasen von einem einfachen Platzhalter zu einem detaillierten digitalen Zwilling wandeln. Die Eignung bestimmter Komponenten kann anhand einer Datenbank mit Komponenteninformationen geprüft werden. [0010] Drawing programs are known from US 2003/200062 A1, in which physical objects can be represented in several phases by the same object. The phases can relate to the preliminary planning, the site analysis, the actual planning, the documentation of the construction process or the construction object and/or the building management. The object mentioned can change from a simple placeholder to a detailed digital twin in the various phases. The suitability of certain components can be checked against a database of component information.

[0011] US 5,189,606 betrifft ein System für die Offertstellung in Bauprojekten, welches auch die Folgekosten im ganzen Lebenszyklus eines Gebäudes abschätzen soll. Das System soll in der Lage sein, automatisch die Kosten für die verschiedenen Aspekte des Bauprozesses zu ermitteln und detaillierte Material-, Arbeits- und Ausrüstungslisten zu erstellen. [0011] US Pat. No. 5,189,606 relates to a system for submitting offers in construction projects, which is also intended to estimate the follow-up costs over the entire life cycle of a building. The system should be able to automatically calculate the costs for the various aspects of the construction process and generate detailed lists of materials, labor and equipment.

[0012] US 2005/131659 betrifft die Modellierung und Verwaltung von 3D-Modellen physischer Objekte. Die Modelle basieren auf architektonischen, technischen und bautechnischen Informationen zum Objekt sowie auf Komponentenmodellen bezüglich Geometrie, Positionierung, Beleuchtung und Akustik. US 2005/131659 relates to modeling and management of 3D models of physical objects. The models are based on architectural, technical and structural information about the object as well as component models regarding geometry, positioning, lighting and acoustics.

DARSTELLUNG DER ERFINDUNG PRESENTATION OF THE INVENTION

[0013] Aufgabe der Erfindung ist es, eine dem eingangs genannten technischen Gebiet zugehörende Anordnung zum automatisierten Generieren einer Empfehlung für eine Materialbestellung für ein Bauprojekt zu schaffen, welche ausgehend von Plandaten des Objekts des Bauprojekts mit der Angabe von Funktionselementen die Identifikation verwendbarer Produkte ermöglicht und eine hohe Flexibilität aufweist. The object of the invention is to create an arrangement belonging to the technical field mentioned at the outset for automatically generating a recommendation for ordering materials for a construction project, which, based on plan data for the object of the construction project with the specification of functional elements, enables usable products to be identified and has high flexibility.

[0014] Die Lösung der Aufgabe ist durch die Merkmale des Anspruchs 1 definiert. Gemäß der Erfindung umfasst die Anordnung The solution to the problem is defined by the features of claim 1. According to the invention the arrangement comprises

a) einen Verarbeitungsserver mit einer Eingangsschnittstelle zum Empfangen digitaler Plandaten des Objekts des Bauprojekts, wobei die digitalen Plandaten mindestens folgendes umfassen: a) a processing server with an input interface for receiving digital plan data of the object of the construction project, the digital plan data comprising at least the following:

- Angaben zu Funktionselementen, welche im Rahmen des Bauprojekts zu installieren sind; - Information on functional elements to be installed as part of the construction project;

- Angaben zu Installationsorten, an welchen die Funktionselemente am Objekt zu installieren sind; - Information on the installation locations at which the functional elements are to be installed on the property;

- Angaben zu Materialien, welche für Gebäude- und/oder Raumhüllen des Objekts zum Einsatz kommen sollen; - Information on materials that are to be used for the building and/or room envelopes of the property;

- Angaben zu Einsatzorten, an welchen die Materialien zum Einsatz kommen sollen; - Information on the locations where the materials are to be used;

und zum Herstellen einer Zuordnung mindestens eines der Funktionselemente zum Material, an welchem das Funktionselement installiert werden soll, anhand der Installationsorte der Funktionselemente und der Einsatzorte der Materialien; and for establishing an assignment of at least one of the functional elements to the material on which the functional element is to be installed, based on the installation locations of the functional elements and the locations of use of the materials;

b) eine Produktedatenbank, in welcher Informationen zu Produkten abgelegt sind, wobei die Informationen Angaben zu einer Eignung der Produkte als Funktionselement für eine Installation an einem Material umfassen; b) a product database in which information about products is stored, the information including information about the suitability of the products as a functional element for an installation on a material;

c) einen Handelsserver mit einer Ausgangsschnittstelle zum Ausgeben einer Empfehlung für ein zu bestellendes Produkt, wobei das empfohlene Produkt ein Funktionselement ist, welches für eine Installation an dem zugeordneten Material geeignet ist; c) a trade server having an exit interface for issuing a recommendation for a product to be ordered, the recommended product being a functional element suitable for installation on the associated material;

wobei der Verarbeitungsserver Zugriff auf die Produktedatenbank hat und anhand der Zuordnung des Materials zum Funktionselement gestützt auf die Produktedatenbank die Empfehlung für das zu bestellende Produkt generiert, und wobei die generierte Empfehlung vom Verarbeitungsserver an den Handelsserver übermittelt wird. wherein the processing server has access to the product database and based on the assignment of the material to the functional element generates the recommendation for the product to be ordered based on the product database, and the generated recommendation is transmitted from the processing server to the trading server.

[0015] Ein entsprechendes erfindungsgemäßes Verfahren zum automatisierten Generieren einer Empfehlung für eine Materialbestellung für ein Bauprojekt umfasst folgende Schritte: A corresponding method according to the invention for automatically generating a recommendation for ordering materials for a construction project comprises the following steps:

a) Empfangen digitaler Plandaten des Objekts des Bauprojekts, wobei die digitalen Plandaten mindestens folgendes umfassen: a) Receiving digital plan data of the object of the construction project, the digital plan data comprising at least the following:

- Angaben zu Funktionselementen, welche im Rahmen des Bauprojekts zu installieren sind; - Information on functional elements to be installed as part of the construction project;

- Angaben zu Installationsorten, an welchen die Funktionselemente am Objekt zu installieren sind; - Information on the installation locations at which the functional elements are to be installed on the property;

- Angaben zu Materialien, welche für Gebäude- und/oder Raumhüllen des Objekts zum Einsatz kommen sollen; - Information on materials that are to be used for the building and/or room envelopes of the property;

- Angaben zu Einsatzorten, an welchen die Materialien zum Einsatz kommen sollen; - Information on the locations where the materials are to be used;

b) anhand der Installationsorte der Funktionselemente und der Einsatzorte der Materialien Zuordnen mindestens eines der Funktionselemente zum Material, an welchem das Funktionselement installiert werden soll; b) based on the installation locations of the functional elements and the locations of use of the materials, assigning at least one of the functional elements to the material on which the functional element is to be installed;

c) gestützt auf eine Produktedatenbank, anhand der Zuordnung des Materials zum Funktionselement Generieren einer Empfehlung für ein zu bestellendes Produkt, wobei das empfohlene Produkt ein Funktionselement ist, welches für eine Installation an dem zugeordneten Material geeignet ist. c) based on a product database, based on the assignment of the material to the functional element, generating a recommendation for a product to be ordered, the recommended product being a functional element which is suitable for installation on the assigned material.

[0016] Die Erfindung ist auf unterschiedliche Bauprojekte im Hochbau anwendbar, bei welchen Komponenten in Planunterlagen zumindest teilweise als Funktionselemente spezifiziert sind und bei welchen zumindest einige dieser Funktionselemente in Abhängigkeit eines Materials der Raum- und/oder Gebäudehülle durch unterschiedliche Produkte repräsentiert werden. So müssen für den Ein- oder Anbau in Beton, Backstein, Gips, Holz oder einem anderen Material möglicherweise unterschiedliche Produkte zur Bereitstellung eines vorgegebenen Funktionselements zum Einsatz kommen. Die Erfindung ist insbesondere auf Neubauprojekte von Gebäuden anwendbar sowie auf tiefgreifende Sanierungs-, Umbau- und Erweiterungsprojekte bestehender Gebäude. The invention can be applied to different construction projects in building construction, in which components are at least partially specified as functional elements in planning documents and in which at least some of these functional elements are represented by different products depending on a material of the room and/or building envelope. For example, different products may have to be used to provide a given functional element for installation or attachment in concrete, brick, plaster, wood or another material. The invention can be applied in particular to new building projects and to extensive renovation, conversion and extension projects for existing buildings.

[0017] Der Begriff Server (Verarbeitungsserver, Handelsserver usw.) bezeichnet dabei eine Funktionsgruppe eines Datenverarbeitungssystems. Ein "Server" im Sinn der vorliegenden Unterlagen kann durch ein Datenverarbeitungsgerät oder mehrere miteinander verbundene Datenverarbeitungsgeräte realisiert sein; es ist auch möglich, mehrere Server durch dasselbe Gerät zu realisieren, z. B. durch Virtualisierung oder durch Vorsehen einzelner Softwaremodule. Generell kann die Aufgabe eines Servers im Sinn dieser Unterlagen durch ein entsprechendes Softwaremodul mit Ein- und Ausgangsschnittstellen wahrgenommen werden. The term server (processing server, trading server, etc.) designates a functional group of a data processing system. A "server" in the sense of the present documents can be realized by a data processing device or several data processing devices connected to one another; it is also possible to implement several servers through the same device, e.g. B. by virtualization or by providing individual software modules. In general, the task of a server in the sense of these documents can be performed by a corresponding software module with input and output interfaces.

[0018] Bei den Plandaten handelt es sich insbesondere um BIM-Daten bzw. um zwei- oder dreidimensionale CAD-Plandaten, die das Bauprojekt repräsentieren. Die Plandaten umfassen insbesondere die geometrischen Angaben zum Bauprojekt, darunter z. B. die geometrische Anordnung der Gebäude- und Raumhüllen (Außen- und Innenwände, Decken, Böden, Dächer usw.) inklusive Materialisierung. Die Materialisierung kann beispielsweise durch folgende Angaben charakterisiert sein (stark vereinfacht): [0018] The planning data is in particular BIM data or two-dimensional or three-dimensional CAD planning data that represent the construction project. The planning data includes in particular the geometric information on the construction project, including e.g. B. the geometric arrangement of the building and room envelopes (outer and inner walls, ceilings, floors, roofs, etc.) including materialization. The materialization can be characterized, for example, by the following information (greatly simplified):

A Wand A wall

A.1 Massivwand A.1 Solid wall

A. 1.1 aus Mauerwerk A. 1.1 of masonry

A.1.2 aus Stahlbeton A.1.2 made of reinforced concrete

A. 1.3 aus Holz A. 1.3 made of wood

A.2 Leichtbauwand A.2 Flexible wall

A.2.1 basierend auf Holz A.2.1 based on wood

A.2.1.1 Beplankung Gipskarton A.2.1.2 Beplankung Holzfaserplatte A.2.2 basierend auf Metallprofilen A.2.2.1 Beplankung Gipskarton A.2.2.2 Beplankung Holzfaserplatte B Decke A.2.1.1 Plasterboard planking A.2.1.2 Fibreboard planking A.2.2 based on metal profiles A.2.2.1 Plasterboard planking A.2.2.2 Fibreboard planking B ceiling

B.1 Stahlbeton B.1 Reinforced concrete

B.1.1 roh B.1.1 raw

B.1.2 heruntergehängte Decke B.1.3 verputzt B.1.2 suspended ceiling B.1.3 plastered

B.2 Holz B.2 Wood

B.2.1 roh B.2.1 raw

B.2.2 heruntergehängte Decke B.2.3 verputzt B.2.2 suspended ceiling B.2.3 plastered

C Boden C floor

C.1 Stahlbeton C.1 Reinforced concrete

C.1.1 roh C.1.1 raw

C.1.2 Gussboden C.1.2 cast floor

C.1.3 mit Bodenbelag C.1.3 with floor covering

USW. ETC.

[0019] Weitere Angaben können insbesondere das Dach, inkl. Dachhaut und Dachinnenverkleidung, betreffen. [0019] Further information can relate in particular to the roof, including the roof skin and roof lining.

[0020] Weiter umfassen die Plandaten die Funktionselemente und deren Positionierung. Nebst Funktionselementen können zusätzlich auch bestimmte Produkte konkret spezifiziert sein, z. B. wenn diese vom Bauherrn oder vom Architekten explizit so vorgegeben werden. [0020] The plan data also includes the functional elements and their positioning. In addition to functional elements, certain products can also be specifically specified, e.g. B. if these are explicitly specified by the client or the architect.

[0021] Die Angaben zu den Funktionselementen umfassen insbesondere die Funktion eines bestimmten Elements (z. B. Steckdose), sowie gewisse Anforderungen, die das Element erfüllen soll (z. B. Anzahl Steckplätze, zur Verfügung zu stellende Spannung, maximale Stromstärke, IPSchutzklasse usw.). Eine Angabe des konkreten Anbieters und Typs ist nicht notwendig. The information on the functional elements includes in particular the function of a specific element (e.g. socket outlet) and certain requirements that the element should meet (e.g. number of slots, voltage to be made available, maximum current, IP protection class etc.). It is not necessary to specify the specific provider and type.

[0022] Die Angaben zu den Installationsorten der Funktionselemente ergeben sich in der Regel unmittelbar aus den Plandaten, in welchen jedem Element ein Ort zugeordnet ist. Die Erfindung zeichnet sich dadurch aus, dass nähere Angaben zur Installation (Einlegen in Betonwand / Einziehen in den Hohlraum einer Leichtbauwand usw.) der Funktionselemente nicht zwingend notwendig sind. Bevorzugt ergeben sich die Angaben zu den Installationsorten ausschließlich aus den geometrischen Informationen der Plandaten. The information on the installation locations of the functional elements usually result directly from the planning data, in which each element is assigned a location. The invention is distinguished by the fact that detailed information on the installation (inserting into a concrete wall/moving into the cavity of a lightweight wall, etc.) of the functional elements is not absolutely necessary. The information on the installation sites is preferably obtained exclusively from the geometric information in the planning data.

[0023] Die Angaben zu den Materialien, welche für Gebäude- und/oder Raumhüllen des Bauprojekts zum Einsatz kommen sollen, gehen wie vorstehend erwähnt, ebenfalls aus den Plandaten hervor. Dies gilt auch für die Einsatzorte dieser Materialien, welche sich wiederum aus den geometrischen Informationen der Plandaten ergeben. [0023] The information on the materials that are to be used for the building and/or room shells of the construction project are, as mentioned above, also evident from the plan data. This also applies to the places where these materials are used, which in turn result from the geometric information in the planning data.

[0024] In modernen CAD-Systemen sind die Informationen zu den Funktionselementen, zu deren Installationsorten, zu den Materialien der Gebäude- und/oder Raumhüllen sowie zu deren Geometrie in verschiedenen Schichten (Layers) abgespeichert. So wird ein Objekt, das Gegenstand eines Bauprojekts ist, in Stockwerke, Stockwerkbestandteile (Wohnungen, Büros etc.) gegliedert. Anschließend werden an den vorgesehenen Orten Symbole hinzugefügt, welche die Funktionselemente repräsentieren. Die verschiedenartigen Angaben werden in verschiedenen Ebenen des CAD-Bauplans abgelegt. In modern CAD systems, the information about the functional elements, their installation locations, the materials of the building and/or room envelopes and their geometry are stored in different layers. An object that is the subject of a construction project is divided into floors and floor components (apartments, offices, etc.). Symbols representing the functional elements are then added at the intended locations. The different types of information are stored in different levels of the CAD construction plan.

[0025] Der erfindungsgemäße Verarbeitungsserver ist nun so betreibbar, dass er anhand der Installationsorte der Funktionselemente und der Einsatzorte der Materialien eine Zuordnung mindestens eines der Funktionselemente zum Material, an welchem es installiert werden soll, vornimmt. Der Begriff "an einem Material" bedeutet im Rahmen der vorliegenden Unterlagen, dass ein Funktionselement auf dem Material (z. B. Aufputzmontage), im Material (z. B. Unterputzmon-The processing server according to the invention can now be operated in such a way that it assigns at least one of the functional elements to the material on which it is to be installed based on the installation locations of the functional elements and the locations of use of the materials. In the context of the present documents, the term "on a material" means that a functional element is attached to the material (e.g. surface mounting), in the material (e.g. flush mounting

tage), hinter dem Material (z. B. hinter einer Gipskartonfläche einer Hohlwand) oder in einer Kombination installiert wird. Eine Kombination liegt beispielsweise dann vor, wenn eine Steckdose Unterputz montiert wird: Der Einlasskasten ist in der Regel vollständig von der entsprechenden Fläche (z. B. von einer Wand) aufgenommen, während die Deckplatte mit den Anschlussöffnungen auf der Vorderseite der Wand angeordnet ist. Eine reine Unterputzmontage kann sich beispielsweise für reine Verteilerdosen ohne unmittelbaren Zugriff ergeben. days), installed behind the material (e.g. behind a plasterboard surface of a cavity wall) or in a combination. A combination is present, for example, when a socket is flush-mounted: the inlet box is usually completely absorbed by the corresponding surface (e.g. by a wall), while the cover plate with the connection openings is arranged on the front of the wall. A pure flush-mounted installation can result, for example, for pure junction boxes without direct access.

[0026] Die Zuordnung kann anhand eines Abgleichs der Installationsorte einerseits und der Einsatzorte andererseits erfolgen. Im Prinzip wird für jedes betroffene Funktionselement festgestellt, welches Material die Gebäude- und/oder Raumhülle am entsprechenden Ort aufweist. The assignment can be based on a comparison of the installation sites on the one hand and the places of use on the other hand. In principle, it is determined for each affected functional element which material the building and/or room envelope has at the corresponding location.

[0027] Bei der Empfehlung für das zu bestellende Produkt handelt es sich im einfachsten Fall um eine Liste mit Produkten und entsprechenden zu bestellenden Anzahlen. Gerade bei einem großen Produkteangebot in der Produktedatenbank ist es aber möglich (und sogar wahrscheinlich), dass bei der ermittelten Kombination aus Funktionselement und Material mehrere Produkte für das Funktionselement in Frage kommen. In diesem Fall kann die Empfehlung für einzelne (oder alle) Funktionselemente eine Liste mit verschiedenen passenden Produkten umfassen, aus welchen der Besteller in einem nachfolgenden Schritt auswählen kann. In Fällen, wo ein Funktionselement mehrfach benötigt wird, kann es auch möglich sein, verschiedene Produkte mit jeweils einer zu bestellenden Zahl auszuwählen. Sofern die Auswahl eines bestimmten Produkts für ein gewisses Funktionselement die Auswahl für andere Funktionselemente einschränkt, z. B. weil auf die Kompatibilität der Funktionselemente zu achten ist, können die betroffenen Listen für die weiteren Funktionselemente automatisch angepasst werden. Auch in Fällen, wo es üblicherweise gewünscht ist, dass alle Funktionselemente einer gewissen Klasse von demselben Anbieter stammen oder derselben Linie eines Anbieters angehören (z. B. zur Sicherstellung eines einheitlichen Designs), kann die erfindungsgemäße Anordnung vorsehen, dass nach Treffen einer Wahl für ein erstes Funktionselement einer gewissen Klasse diese Wahl für die weiteren Funktionselemente der Klasse übernommen wird. Auf diese Weise wird eine hohe Flexibilität bei minimalem Aufwand für den Besteller sichergestellt. In the simplest case, the recommendation for the product to be ordered is a list of products and corresponding quantities to be ordered. However, especially with a large range of products in the product database, it is possible (and even probable) that several products can be considered for the functional element in the determined combination of functional element and material. In this case, the recommendation for individual (or all) functional elements can include a list of various suitable products, from which the customer can select in a subsequent step. In cases where a functional element is required more than once, it may also be possible to select different products, each with a number to be ordered. If the selection of a specific product for a certain functional element restricts the selection for other functional elements, e.g. B. because the compatibility of the function elements must be taken into account, the affected lists can be automatically adjusted for the other function elements. Even in cases where it is usually desired that all functional elements of a certain class come from the same provider or belong to the same line of a provider (e.g. to ensure a uniform design), the inventive arrangement can provide that after making a choice for a first functional element of a certain class, this choice is adopted for the further functional elements of the class. This ensures a high level of flexibility with minimal effort for the customer.

[0028] Um Auswahllisten zu vermeiden und/oder die angebotenen Produkte in der jeweiligen Auswahl zu priorisieren, können für die Auswahl eines einzigen Produkts oder die Rangierung der Produkte verschiedene Kriterien herangezogen werden, z. B. der Produktpreis, das Qualitätslevel des Produkts, eine Priorisierung der Produktanbieter 0. ä. In order to avoid selection lists and/or to prioritize the products offered in the respective selection, various criteria can be used for the selection of a single product or the ranking of the products, e.g. B. the product price, the quality level of the product, a prioritization of the product provider 0. Ä.

[0029] Die Übermittlung der Empfehlung vom Verarbeitungsserver zum Handelsserver kann vom Verarbeitungsserver (push) oder vom Handelsserver (pull) initiiert werden. The transmission of the recommendation from the processing server to the trading server can be initiated by the processing server (push) or by the trading server (pull).

[0030] Gestützt auf die Produktedatenbank, in welcher neben den üblichen Produkteinformationen zugeordnete Informationen zum Bauprozess hinterlegt sind, lässt sich trotz der abstrakten Natur der Plandaten automatisiert eine Materialliste generieren. Die erfindungsgemäße Anordnung und das erfindungsgemäße Verfahren ermöglichen so einen durchgängigen Informationsfluss von der Planung bis zur Materialbestellung, dies auch dann, wenn die Plandaten zunächst nur Angaben zu Funktionselementen aufweisen und nicht Verweise auf spezifische Produkte. Die Flexibilität hinsichtlich einsetzbarer Produkte bleibt gewahrt. Based on the product database, in which associated information about the construction process is stored in addition to the usual product information, a list of materials can be automatically generated despite the abstract nature of the planning data. The arrangement according to the invention and the method according to the invention thus enable a continuous flow of information from planning to material ordering, even if the planning data initially only contain information on functional elements and not references to specific products. The flexibility with regard to the products that can be used is maintained.

[0031] Bevorzugt umfassen die Funktionselemente Komponenten, welche in oder an einer Wand, einer Decke und/oder einem Boden anbringbar sind, und die Angaben zu Materialien beziehen sich auf Wände, Decken und/oder Böden des Bauprojekts. Besonders bei Komponenten, die auf irgendeine Weise in eine Wand, eine Decke oder einen Boden integriert werden, ist die Art dieser Integration wesentlich vom Material der Wand, der Decke oder des Bodens abhängig. Je nach Material ergeben sich unterschiedliche Einbauweisen, und es werden unterschiedliche Komponenten oder unterschiedliches Montagezubehör für eine Komponente benötigt. The functional elements preferably include components which can be attached in or on a wall, a ceiling and/or a floor, and the information on materials relates to walls, ceilings and/or floors of the construction project. Especially with components that are somehow integrated into a wall, ceiling, or floor, the type of integration depends largely on the material of the wall, ceiling, or floor. Depending on the material, there are different installation methods and different components or different mounting accessories are required for one component.

[0032] Alternativ oder zusätzlich umfassen die Funktionselemente Komponenten, die an anderen Installationsorten installiert werden sollen, z. B. an Elementen wie Treppen, Geländern oder an fixen Einbauten oder Geräten (z. B. Einbaumöbel, Küchen-Großgeräte, Waschmaschinen und Wäschetrockner, Heizanlagen, Klimaanlagen, Lüftungen usw.). Es ist dabei nicht zwingend, dass Alternatively or additionally, the functional elements include components to be installed at other installation sites, e.g. B. on elements such as stairs, railings or fixed installations or devices (e.g. built-in furniture, large kitchen appliances, washing machines and tumble dryers, heating systems, air conditioning systems, ventilation systems, etc.). It is not mandatory that

sämtliche von der erfindungsgemäßen Anordnung bzw. dem erfindungsgemäßen Verfahren erfassten Komponenten eine materialabhängige Produkteauswahl erfordern, sondern es können ohne Weiteres nebst den materialabhängigen auch materialunabhängige Funktionselemente mitverarbeitet werden. all components covered by the arrangement according to the invention or the method according to the invention require a material-dependent product selection, but material-independent functional elements can also be processed without further ado in addition to the material-dependent ones.

[0033] Mit Vorteil umfassen die Funktionselemente Anschlussstellen einer Elektroinstallation. Dabei kann es sich namentlich um Steckdosen, Verbraucheranschlüsse (z. B. für Lampen, Geräte oder andere Verbraucher) und/oder Schalter handeln. Insbesondere bei der Planung von Elektroinstallationen werden sehr oft nur Funktionselemente vorgegeben, womit der Einsatz der erfindungsgemäßen Anordnung bzw. des erfindungsgemäßen Verfahrens eine erhebliche Effizienzsteigerung mit sich bringt. Weitere Funktionselemente einer Elektroinstallation betreffen insbesondere Leitungen, Leitungsrohre (inkl. Schutzrohre), Verteilerkästen, Stromzähler und gegebenenfalls Verbraucher. Einzelne Komponenten können bereits durch Angabe des konkreten Produkts in die Baupläne aufgenommen werden, während andere als Funktionselemente definiert sind und erst im Rahmen der erfindungsgemäßen Anordnung bzw. des erfindungsgemäßen Verfahrens eine Empfehlung für konkrete Produkte generiert wird. The functional elements advantageously include connection points of an electrical installation. These can be sockets, consumer connections (e.g. for lamps, devices or other consumers) and/or switches. In particular when planning electrical installations, very often only functional elements are specified, which means that the use of the arrangement according to the invention or the method according to the invention entails a considerable increase in efficiency. Other functional elements of an electrical installation relate in particular to cables, conduits (including protective tubes), distribution boxes, electricity meters and, if applicable, consumers. Individual components can already be included in the blueprints by specifying the specific product, while others are defined as functional elements and a recommendation for specific products is only generated as part of the arrangement or method according to the invention.

[0034] Die Erfindung ist auch auf andere in einem Bauprojekt verwendete Komponenten anwendbar, die in Abhängigkeit des Materials der Gebäude- und/oder Raumhülle durch unterschiedliche Produkte realisiert werden. The invention is also applicable to other components used in a construction project, which are realized by different products depending on the material of the building and/or room envelope.

[0035] Vorzugsweise ist eine Empfehlung für eine Mehrzahl zu bestellender Produkte generierbar, insbesondere für alle zu bestellenden Produkte einer vorgegebenen Funktionselementklasse. Eine Funktionselementklasse umfasst beispielsweise alle Anschlussstellen (Steckdosen, Lampen- und weitere Verbraucheranschlüsse) einer Elektroinstallation, sie kann aber beispielsweise auch breiter gefasst sein und auch Schalter oder gar Leitungen mit umfassen. Es ist von Vorteil, wenn die zu bearbeitenden Funktionselemente nicht einzeln ausgewählt (bzw. nicht zu bearbeitende Funktionselemente einzeln abgewählt) werden müssen, sondern in Abhängigkeit der in den Plandaten erfassten Eigenschaften eine ganze Klasse aus- oder abgewählt werden kann. Die Aus- bzw. Abwahl kann auch automatisch im Verarbeitungsserver erfolgen, z. B. so dass nur Funktionselementklassen berücksichtigt werden, welche der Betreiber des Verarbeitungsservers bzw. der angeschlossene Lieferant anbietet. Ein Elektrogroßhändler wird beispielsweise nur diejenigen Funktionselemente berücksichtigen, die der Elektroinstallation zugehören, nicht beispielsweise auch Elemente der Sanitärinstallation. [0035]Preferably, a recommendation can be generated for a plurality of products to be ordered, in particular for all products to be ordered of a predetermined functional element class. A functional element class includes, for example, all connection points (sockets, lamp and other consumer connections) of an electrical installation, but it can also be defined more broadly and also include switches or even lines. It is advantageous if the function elements to be processed do not have to be selected individually (or function elements that are not to be processed individually deselected), but rather an entire class can be selected or deselected depending on the properties recorded in the plan data. The selection or deselection can also take place automatically in the processing server, e.g. B. so that only functional element classes are considered, which the operator of the processing server or the connected supplier offers. An electrical wholesaler, for example, will only consider those functional elements that belong to the electrical installation, not elements of the sanitary installation, for example.

[0036] Mit Vorteil wird somit vom Nutzer und/oder im Rahmen der Verarbeitung eine Auswahl der zu berücksichtigenden Funktionselemente getroffen, und anschließend wird eine Empfehlung für alle diese Funktionselemente generiert. In Ausnahmefällen - wenn beispielsweise die Produktedatenbank keine geeigneten Produkte umfasst oder ein Funktionselement mit einer falschen Funktionsklasse erfasst wurde - kann eine Empfehlung für ein bestimmtes Funktionselement eine leere Auswahl sein. [0036] A selection of the functional elements to be taken into account is thus advantageously made by the user and/or as part of the processing, and a recommendation is then generated for all of these functional elements. In exceptional cases - for example, if the product database does not contain any suitable products or a functional element with an incorrect functional class was recorded - a recommendation for a specific functional element can be an empty selection.

[0037] Bei einer vorteilhaften Ausführungsform der Erfindung können für verschiedene Funktionselementklassen verschiedene Materiallisten erstellt werden. Der Nutzer bzw. der Betreiber des Verarbeitungsservers kann diese dann an verschiedene Lieferanten (z. B. Elektro, Sanitär usw.) weitergeben. In an advantageous embodiment of the invention, different material lists can be created for different functional element classes. The user or the operator of the processing server can then pass this on to various suppliers (e.g. electrical, plumbing, etc.).

[0038] Bevorzugt umfasst die erfindungsgemäße Anordnung eine Ablaufdatenbank, in welcher funktionselement- und/oder produktbezogene Informationen zu Installationsarbeiten abgelegt sind. Im Verarbeitungsserver können dann anhand der Informationen in der Ablaufdatenbank und basierend auf der Zuordnung der Materialien zu den Funktionselementen die zu bestellenden Produkte der Empfehlung einer von mehreren Bauphasen zugeordnet werden, wobei die zugeordnete Bauphase angibt, wann im Bauprozess das entsprechende Produkt zu installieren ist. The arrangement according to the invention preferably comprises a sequence database in which functional element and/or product-related information on installation work is stored. In the processing server, the products to be ordered can then be assigned to the recommendation of one of several construction phases using the information in the process database and based on the assignment of the materials to the functional elements, with the assigned construction phase indicating when the corresponding product is to be installed in the construction process.

[0039] Funktionselementbezogene Informationen gelten für alle Produkte, die ein bestimmtes Funktionselement darstellen. So erfordern beispielsweise alle Steckdosen eine Stromzuleitung. Produktbezogene Informationen gelten nur für bestimmte Produkte, die ein Funktionselement darstellen. So sind beispielsweise sowohl Schalter verfügbar, die drahtgebunden funktionieren Functional element-related information applies to all products that represent a specific functional element. For example, all sockets require a power supply line. Product-related information applies only to specific products that represent a functional element. For example, both switches that work wired are available

und somit eine Zuleitung benötigen, als auch Schalter, die drahtlos funktionieren und entsprechend keiner Zuleitung bedürfen. Nebst der Notwendigkeit einer Zuleitung können sich die Informationen insbesondere auch auf den benötigten Aufnahmeraum (z. B. für Unterputz- im Gegensatz zu Aufputzinstallationen), benötigte Zusatzelemente (z. B. Schutzrohre) oder generell auf die Positionierung im Bauablauf (z. B. vor oder nach dem Aufbringen des Verputzes) beziehen. Da der Verarbeitungsserver sowohl über die Informationen zu den Funktionselementen als auch zu den (empfohlenen) Produkten verfügt, kann er jeder Komponente die entsprechenden Informationen zu Installationsarbeiten automatisch zuordnen. and therefore require a supply line, as well as switches that work wirelessly and therefore do not require a supply line. In addition to the need for a supply line, the information can also relate in particular to the space required (e.g. for flush-mounted as opposed to surface-mounted installations), additional elements required (e.g. protective tubes) or generally to the positioning in the construction process (e.g. before or after applying the plaster). Since the processing server has both the information about the functional elements and the (recommended) products, it can automatically assign the appropriate information about installation work to each component.

[0040] Basierend auf den Informationen der Ablaufdatenbank kann der Verarbeitungsserver dann ermitteln, zu welchem Zeitpunkt ein (empfohlenes) Produkt installiert werden muss. Daraus können durchaus mehrere Zeitpunkte (z. B. für einen Einlasskasten und für die darin aufgenommene Steckdose bzw. den darin aufgenommenen Schalter) resultieren. Der Zeitpunkt bzw. die Zeitpunkte werden dann dem empfohlenen Produkt zugeordnet. Based on the information in the process database, the processing server can then determine when a (recommended) product needs to be installed. This can certainly result in several points in time (e.g. for an inlet box and for the socket outlet accommodated therein or the switch accommodated therein). The point in time or points in time are then assigned to the recommended product.

[0041] Die Bauphasen lassen sich beispielsweise bei einem Stahlbeton-basierten Bauwerk wie folgt aufteilen: The construction phases can be divided, for example, in a reinforced concrete-based structure as follows:

- Einlegen (Betonieren); - Rohbau; - Endausbau. - Laying (concreting); - Shell; - final construction.

[0042] Es sind aber auch feinere Abstufungen möglich. Bei anderen Bauweisen ergeben sich andere Bauphasen. However, finer gradations are also possible. Different construction methods result in different construction phases.

[0043] Mit Vorteil ist für jede der mehreren Bauphasen eine gesonderte Empfehlung generierbar, wobei die entsprechende Empfehlung die der jeweiligen Bauphase zugeordneten Produkte umfasst. Der Nutzer erhält somit automatisch eine Zusammenstellung der empfohlenen Produkte, die nach Bauphase und damit nach Lieferzeitpunkt bzw. Lieferzeitraum aufgeschlüsselt ist. Werden verschiedene Gebäudeteile mit einer anders materialisierten Gebäude- bzw. Raumhülle ausgeführt, können die gleichen Produkte in den Empfehlungen für verschiedene Bauphasen vorhanden sein. (Dies gilt natürlich auch für Produkte, die generell bauphasenunabhängig bzw. in mehreren Bauphasen eingesetzt werden.) A separate recommendation can advantageously be generated for each of the several construction phases, with the corresponding recommendation comprising the products assigned to the respective construction phase. The user thus automatically receives a compilation of the recommended products, which is broken down by construction phase and thus by delivery time or delivery period. If different parts of the building are designed with a building or room envelope that is made of different materials, the same products can be included in the recommendations for different construction phases. (Of course, this also applies to products that are generally used regardless of the construction phase or in several construction phases.)

[0044] Bevorzugt ist nach Empfang einer Zustimmung eines Bestellers zur generierten Empfehlung vom Handelsserver eine Bestellung der empfohlenen Produkte auslösbar. Der Nutzer kann somit auf Knopfdruck, gegebenenfalls nach manuellen Anpassungen bzw. einer manuellen Auswahl aus mehreren empfohlenen Produkten, die Bestellung der Produkte auslösen. Sind die Empfehlungen nach Bauphase gegliedert, kann die Bestellung mehrere entsprechende Lieferzeitpunkte umfassen. [0044]Preferably, an order for the recommended products can be triggered by the trade server after the receipt of an orderer's approval of the generated recommendation. The user can thus trigger the ordering of the products at the push of a button, possibly after manual adjustments or a manual selection from several recommended products. If the recommendations are broken down by construction phase, the order can include several corresponding delivery dates.

[0045] Es ist in der Regel nicht erwünscht, dass Material für das Bauprojekt frühzeitig geliefert wird und dann am Bauplatz oder in Lagern des verarbeitenden Betriebs bis zur Nutzung gelagert werden muss. Aus diesem Grund ist es auch von Vorteil, wenn die Lieferungen zu einer Bestellung nach Bauphasen gegliedert werden können. Auch wenn dies nicht geschieht, wird die Lieferung in der Regel erst zu einem Zeitpunkt terminiert, in welchem die Produkte (frühestens) benötigt werden. It is not usually desirable that material for the construction project is delivered early and then has to be stored on the construction site or in warehouses of the processing company until it is used. For this reason, it is also an advantage if the deliveries for an order can be broken down according to construction phases. Even if this does not happen, the delivery is usually only scheduled at a point in time when the products are required (at the earliest).

[0046] Dies bedeutet, dass zwischen dem Bestellvorgang und der Lieferung (bzw. den einzelnen Lieferungen) einige Zeit vergeht, oft mehrere Monate. Dies hat zur Folge, dass bei Planänderungen die Bestellung - und damit die Lieferung - nicht mehr dem neusten Planungsstand entspricht. Retouren und Nachlieferungen sind deshalb oft notwendig. Dies kann den Bauprozess verzögern, wenn erst zu einem späten Zeitpunkt bemerkt wird, dass benötigte Produkte fehlen. Im Rahmen der erfindungsgemäßen Anordnung und des erfindungsgemäßen Verfahrens kann es deshalb von Vorteil sein, wenn eine automatisierte Aktualisierung einer Bestellung anhand von geänderten Plandaten erfolgen kann. Dazu sind insbesondere folgende Ansätze geeignet: This means that some time, often several months, elapses between the ordering process and the delivery (or the individual deliveries). The consequence of this is that if there are changes to the plan, the order - and thus the delivery - no longer corresponds to the latest planning status. Returns and subsequent deliveries are therefore often necessary. This can delay the construction process if it is not noticed until a late point in time that required products are missing. Within the scope of the arrangement according to the invention and the method according to the invention, it can therefore be advantageous if an order can be updated automatically using changed planning data. The following approaches are particularly suitable for this:

a) Bei einer Planänderung werden die geänderten Plandaten an den Verarbeitungsserver übertragen. Dieser vergleicht die geänderten Plandaten mit den ursprünglichen bzw. zuletzt er-a) In the event of a plan change, the changed plan data is transmitted to the processing server. This compares the changed planning data with the original or last

haltenen Plandaten und ermittelt gestützt darauf, welche Funktionselemente zusätzlich benötigt werden und welche Funktionselemente nicht mehr benötigt werden. Die Produkte, welche in einer Bestellung nicht mehr benötigten Funktionselementen zugeordnet sind, werden aus dieser Bestellung entfernt. Für die zusätzlichen Funktionselemente wird - wie bei der Verarbeitung der ursprünglichen Plandaten - eine Empfehlung generiert. Dieser Ansatz minimiert den Verarbeitungsaufwand, hat aber zur Folge, dass beim Betreiber des Verarbeitungsservers jeweils die letzten verarbeiteten Plandaten vorgehalten werden müssen, was unerwünscht sein kann. plan data and, based on this, determines which functional elements are additionally required and which functional elements are no longer required. The products that are assigned to function elements that are no longer required in an order are removed from this order. As with the processing of the original plan data, a recommendation is generated for the additional functional elements. This approach minimizes the processing effort, but has the consequence that the operator of the processing server has to keep the plan data last processed, which can be undesirable.

b) Bei einer Planänderung werden die geänderten Plandaten an den Verarbeitungsserver übertragen. Dieser erzeugt - wie bei der Verarbeitung der ursprünglichen Plandaten - eine Empfehlung für die zu bestellenden Produkte. Auswahlen des Bestellers beim ersten Vorgang können ggf. auf Produktestufe übernommen werden. Die neue Empfehlung wird mit der früheren Empfehlung verglichen, um festzustellen, welche Produkte zusätzlich benötigt werden bzw. welche Produkte nicht mehr benötigt werden, und die Bestellung wird entsprechend angepasst. Dieser Ansatz hat den Vorteil, dass die früheren Plandaten vom Verarbeitungsserver nicht mehr benötigt werden. Allerdings kann eine erneute Auswahl durch den Besteller ggf. auch bei Funktionselementen notwendig werden, denen bereits ein Produkt zugeordnet worden war. b) In the event of a plan change, the changed plan data is transmitted to the processing server. As with the processing of the original planning data, this creates a recommendation for the products to be ordered. Selections made by the customer in the first process can be adopted at the product level if necessary. The new recommendation is compared to the previous recommendation to determine which products are required in addition and which products are no longer required, and the order is adjusted accordingly. This approach has the advantage that the previous plan data is no longer required by the processing server. However, a new selection by the customer may also be necessary for functional elements to which a product has already been assigned.

c) Der Verarbeitungsserver hat dauernden Zugriff auf die Plandaten und prüft periodisch, ob Anderungen stattgefunden haben und ob diese zu einer Anderung der Bestellung führen könnten. Die Feststellung von Anderungen kann durch einen Vergleich mit vorgehaltenen Plandaten erfolgen, bevorzugt wird aber ein entsprechendes Anderungs- bzw. Hinzufügungsdatum ausgewertet, welches in der Regel bei digital vorgehaltenen Plandaten vorhanden ist. Die Feststellung, ob eine Anderung einer Bestellung notwendig ist, erfolgt dann gemäss einem der Ansätze nach Punkt a) oder b). Dieses Vorgehen hat den Vorteil, dass die Bestellungen stets aktuell sind und Fehllieferungen bzw. Retouren nach Möglichkeit vermieden werden. Es setzt allerdings voraus, dass der Besteller bereit ist, den andauernden Zugriff auf die Plandaten zu gewähren. c) The processing server has permanent access to the planning data and periodically checks whether changes have taken place and whether these could lead to a change in the order. Changes can be determined by a comparison with available plan data, but a corresponding change or addition date is preferably evaluated, which is generally available in the case of digitally available plan data. The determination of whether a change to an order is necessary is then made according to one of the approaches according to point a) or b). This procedure has the advantage that the orders are always up-to-date and incorrect deliveries or returns are avoided as far as possible. However, it presupposes that the customer is willing to grant ongoing access to the planning data.

KURZE BESCHREIBUNG DER ZEICHNUNGEN BRIEF DESCRIPTION OF THE DRAWINGS

[0047] Die zur Erläuterung des Ausführungsbeispiels verwendeten Zeichnungen zeigen: The drawings used to explain the embodiment show:

[0048] Fig. 1 eine schematische Darstellung einer erfindungsgemäßen Anordnung zum automatisierten Generieren einer Empfehlung für eine Materialbestellung für ein Bauprojekt; 1 shows a schematic representation of an arrangement according to the invention for automatically generating a recommendation for ordering materials for a construction project;

[0049] Fig. 2 eine Plandarstellung von Plandaten des Bauprojekts; [0049] FIG. 2 shows a plan representation of plan data of the construction project;

[0050] Fig. 3 die Ebene der Geometriedaten der Plandarstellung; [0050] FIG. 3 shows the plane of the geometric data of the plan representation;

[0051] Fig. 4 die Ebene der Materialdaten der Plandarstellung; [0051] FIG. 4 shows the level of the material data of the plan representation;

[0052] Fig. 5 die Ebene der Funktionselementdaten der Plandarstellung; und Fig. 5 shows the functional element data level of the plan representation; and

[0053] Fig. 6 ein Flussdiagramm eines erfindungsgemäßen Verfahrens zum automatisierten Generieren einer Empfehlung für eine Materialbestellung für ein Bauprojekt. 6 shows a flow chart of a method according to the invention for automatically generating a recommendation for ordering materials for a construction project.

[0054] Grundsätzlich sind in den Figuren gleiche Teile mit gleichen Bezugszeichen versehen. In principle, the same parts are provided with the same reference symbols in the figures.

WEGE ZUR AUSFÜHRUNG DER ERFINDUNG WAYS TO CARRY OUT THE INVENTION

[0055] Die Figur 1 ist eine schematische Darstellung einer erfindungsgemäßen Anordnung zum automatisierten Generieren einer Empfehlung für eine Materialbestellung für ein Bauprojekt. Die Anordnung 10 umfasst einen Verarbeitungsserver 11 mit einer Eingangsschnittstelle 12. Der Verarbeitungsserver 11 ist über die Eingangsschnittstelle 12 mit einem Endgerät 1 eines Benutzers gekoppelt und empfängt Plandaten, die von der Eingangsschnittstelle 12 bei Bedarf in ein vom Verarbeitungsserver 11 verarbeitbares Format konvertiert werden. Bei der Verbindung zwischen dem Endgerät 1 des Benutzers und dem Verarbeitungsserver 11 handelt es sich insbesondere [0055] FIG. 1 is a schematic representation of an arrangement according to the invention for the automated generation of a recommendation for ordering materials for a construction project. The arrangement 10 comprises a processing server 11 with an input interface 12. The processing server 11 is coupled via the input interface 12 to a user's terminal 1 and receives plan data which are converted by the input interface 12 into a format that can be processed by the processing server 11 if necessary. The connection between the user's terminal 1 and the processing server 11 is in particular

um eine gesicherte Internetverbindung (TLS). Die Schnittstelle ist insbesondere als webbasierte Schnittstelle ausgebildet. Der Benutzer kann beispielsweise seine mit einem (CAD-)Planungsprogramm generierten Dateien hochladen, worauf diese von der Eingangsschnittstelle 12 geprüft und bei Bedarf konvertiert werden. Die Interaktion mit dem Benutzer erfolgt über ein Webinterface, wobei der Benutzer beim Betreiber des Verarbeitungsserver ein Konto besitzt und sich vor der Nutzung des Dienstes mit seinen Kontoangaben am Server anmeldet. a secure internet connection (TLS). The interface is designed in particular as a web-based interface. For example, the user can upload his files generated with a (CAD) planning program, whereupon these are checked by the input interface 12 and, if necessary, converted. The interaction with the user takes place via a web interface, whereby the user has an account with the operator of the processing server and logs in to the server with his account details before using the service.

[0056] Die Plandaten werden dann - soweit sie für das erfindungsgemäße Verfahren benötigt werden - strukturiert auf dem Verarbeitungsserver 11 abgelegt. Namentlich werden sie gemäß der Struktur des Objekts (Gebäude, Etagen, Räume) abgelegt, welches von den Plandaten beschrieben wird. Wie weiter unten näher beschrieben, umfassen die auf dem Server abgelegten Plandaten mehrere Ebenen, insbesondere mit Angaben zur Geometrie des Objekts, zur Materialisterung von Gebäude- und Raumhüllen sowie zu Funktionselementen und deren Platzierung im Objekt. Bei Bedarf hat der Benutzer die Möglichkeit, den Umfang der zu bearbeitenden Plandaten, z. B. hinsichtlich der Funktionselementklasse und/oder den zu berücksichtigenden Teilen des Objekts, über das Webinterface zu spezifizieren. The plan data are then stored on the processing server 11 in a structured manner--insofar as they are required for the method according to the invention. Namely, they are filed according to the structure of the object (building, floors, rooms), which is described by the planning data. As described in more detail below, the planning data stored on the server includes several levels, in particular with information on the geometry of the object, the materialization of building and room envelopes and functional elements and their placement in the object. If required, the user has the option to limit the scope of the plan data to be processed, e.g. B. with regard to the functional element class and/or the parts of the object to be considered, to be specified via the web interface.

[0057] Der Verarbeitungsserver 11 hat Zugriff auf eine Produktedatenbank 15 und eine Ablaufdatenbank 16. Eine oder beide Datenbanken 15, 16 können lokal, am Serverort, angeordnet sein, oder der Zugriff erfolgt über ein lokales Netz (LAN) oder ein Weitverkehrsnetz (WAN), z. B. basierend auf dem Internet. The processing server 11 has access to a products database 15 and a process database 16. One or both of the databases 15, 16 may be local, at the server site, or accessed over a local area network (LAN) or a wide area network (WAN). , e.g. B. based on the Internet.

[0058] Die Produktedatenbank 15 umfasst Informationen zu Produkten, die im Rahmen von Bauprojekten eingesetzt werden können. Nebst den üblichen Produkteinformationen (Hersteller, Typ, Preis, charakterisierende Größen wie Dimensionen, Anschlusswerte usw.) enthält die Produktedatenbank 15 für jedes Produkt auch die Angabe, welches Funktionselement es repräsentiert (z. B. "Schalter", "Schalter- /Steckdosenkombination", "Verteilkasten" usw.), auf einer Stufe, die dem Detaillierungsgrad der üblichen Plandaten entspricht. Ebenfalls jedem Produkt zugeordnet sind in der Produktedatenbank 15 mögliche Verlegungsarten (z. B. Unterputz, Aufputz, Deckenmontage, Bodenmontage usw.). Die zusätzlichen Daten zur Funktion und zu den Verlegungsarten können in derselben Datenbank abgelegt sein wie die üblichen Produktedaten oder sie sind in einer separaten Datenbank abgelegt und mit den üblichen Produktedaten verknüpft. The product database 15 includes information about products that can be used in construction projects. In addition to the usual product information (manufacturer, type, price, characterizing variables such as dimensions, connection values, etc.), the product database 15 also contains information about which functional element it represents for each product (e.g. "switch", "switch/socket combination"). , "distribution box", etc.), at a level that corresponds to the level of detail of the usual plan data. Also assigned to each product in the product database are 15 possible installation types (e.g. flush-mounted, surface-mounted, ceiling mounting, floor mounting, etc.). The additional data on the function and on the routing types can be stored in the same database as the usual product data or they are stored in a separate database and linked to the usual product data.

[0059] Der Verarbeitungsserver 11 kommuniziert weiter mit einem Handelsserver 21. Dieser interagiert über eine Ausgangsschnittstelle 22 mit dem Endgerät 1 des Benutzers. Der Handelsserver 21 kann von demselben Dienstleister betrieben werden wie der Verarbeitungsserver oder von einem Dritten, namentlich von einem Händler, welcher geeignete Produkte anbietet. Es ist möglich, dass der Verarbeitungsserver 11 mit mehreren Handelsservern kommuniziert, um z. B. Produkte verschiedener Funktionselementklassen (z. B. Elektroinstallation, Sanitärinstallation, HLK usw.) und/oder verschiedener Anbieter bzw. Hersteller verfügbar zu machen. The processing server 11 further communicates with a trading server 21. This interacts via an output interface 22 with the terminal 1 of the user. The trading server 21 can be operated by the same service provider as the processing server or by a third party, namely by a dealer who offers suitable products. It is possible for the processing server 11 to communicate with several trading servers, e.g. B. to make products of different functional element classes (e.g. electrical installation, plumbing installation, HVAC, etc.) and/or different suppliers or manufacturers available.

[0060] Die Figur 2 ist eine Plandarstellung von Plandaten des Bauprojekts. Zugunsten einer verbesserten Übersicht ist die Darstellung gegenüber einem realen Beispiel in Bezug auf die Anzahl und den Detaillierungsgrad der gezeigten Elemente vereinfacht. Die Plandarstellung zeigt einen im Wesentlichen quadratischen Grundriss eines Gebäudegeschosses mit einer umlaufenden AuBenmauer 30, die mehrfach durch Fenster 31.1...31.8 durchbrochen ist. Von der Außenmauer 30 umschlossen und an diese anschließend verlaufen mehrere Innenwände 35.1.35.6. Zwischen zwei der Innenwände 35.1...35.2 ist eine Treppe 36 aus einem unteren Stockwerk angeordnet. Zwischen den zwei Innenwänden 35.2, 35.3 ist ein erster Raum 37.1 ausgebildet, zwischen den Innenwänden 35.3, 35.4 ein zweiter Raum 37.2, zwischen den Innenwänden 35.4, 35.5 ein dritter Raum 37.3 und zwischen den Innenwänden 35.6, 35.1 ein vierter Raum 37.4. Eine Abstellkammer 37.5 ist zudem zwischen den Innenwänden 35.5, 35.6 ausgebildet. [0060] FIG. 2 is a plan representation of plan data for the construction project. For the sake of a better overview, the representation is simplified compared to a real example with regard to the number and the level of detail of the elements shown. The plan shows an essentially square floor plan of a building storey with a surrounding outer wall 30, which is broken through several times by windows 31.1...31.8. Enclosed by the outer wall 30 and adjoining it, several inner walls 35.1.35.6 run. A staircase 36 from a lower floor is arranged between two of the inner walls 35.1...35.2. A first space 37.1 is formed between the two inner walls 35.2, 35.3, a second space 37.2 between the inner walls 35.3, 35.4, a third space 37.3 between the inner walls 35.4, 35.5 and a fourth space 37.4 between the inner walls 35.6, 35.1. A storage chamber 37.5 is also formed between the inner walls 35.5, 35.6.

[0061] Die Treppe 36 und die vier Räume 37.1...4 sowie die Abstellkammer 37.5 werden durch einen Flur 38 miteinander verbunden; dieser wird im Wesentlichen durch zwei Innenwände 35.2, 35.5 begrenzt. Drei der Räume 37.2, 37.3, 37.4 weisen in das Rauminnere öffnende Türen auf, der erste Raum 37.1 schließt sich ohne Türe an den Flur 38 an. The stairs 36 and the four rooms 37.1 ... 4 and the storage room 37.5 are connected by a corridor 38; this is essentially delimited by two inner walls 35.2, 35.5. Three of the rooms 37.2, 37.3, 37.4 have doors opening into the interior of the room, the first room 37.1 adjoins the corridor 38 without a door.

[0062] Im vierten Raum 37.4 ist entlang der Innenwand 35.1 zudem eine Vorwand 39 angeordnet. In the fourth room 37.4, a front wall 39 is also arranged along the inner wall 35.1.

[0063] Die bisher beschriebenen Elemente sind in einer Ebene "Geometriedaten" der Plandaten abgelegt. Die Figur 3 zeigt eine Plandarstellung, in welcher nur die Geometriedaten gezeigt sind. The elements described so far are stored in a "geometry data" level of the plan data. FIG. 3 shows a plan representation in which only the geometric data are shown.

[0064] Ebenfalls in den Plandaten ist die Ebene "Materialdaten" enthalten. Diese sind in der Figur 4 dargestellt und auch aus der Gesamtübersicht der Figur 2 ersichtlich. Aus den Materialdaten geht hervor, dass es sich bei der Außenwand 30 um eine Stahlbetonwand handelt (eng schraffiert), dass es sich bei den Innenwänden 35.1.6 um Leichtbauwände, gebildet aus Metallständern mit Gipskartonbeplankungen, handelt (weit schraffiert) und dass die Vorwand 39 durch eine Holzkonstruktion mit Holzbeplankung gebildet ist (horizontal gestrichelt). Ebenfalls in den Materialdaten ist enthalten, dass es sich bei der Decke um eine Stahlbetondecke handelt. The “material data” level is also contained in the plan data. These are shown in FIG. 4 and can also be seen from the general overview in FIG. The material data shows that the outer wall 30 is a reinforced concrete wall (narrow hatching), that the inner walls 35.1.6 are lightweight walls made of metal studs with plasterboard planking (broad hatching) and that the front wall 39 is formed by a wooden construction with wooden planking (horizontally dashed). The material data also includes the fact that the ceiling is a reinforced concrete ceiling.

[0065] Weiter ist in den Plandaten die Ebene "Funktionselemente" enthalten. Die entsprechenden Funktionselemente sind in der Gesamtansicht gemäß Figur 2 dargestellt sowie in der Ebenenansicht gemäß Figur 5 (wobei zur Orientierung die Umrisse der Außenwand und der Innenwände, welche nicht zur Ebene "Funktionselemente" gehören, gestrichelt dargestellt sind). Die Funktionselemente umfassen eine Reihe von Schalter-/Steckdosenkombinationen 41.1...41.5, die jeweils neben einer Tür bzw. einem Eingang in einen der Räume 37.1...5 an der jeweiligen Innenwand 35.1...35.6 angeordnet sind. Eine weitere Schalter-/Steckdosenkombination 41.6 ist an der Außenwand 30 im Raum 37.1 angeordnet. Weiter umfassen die Funktionselemente eine Reihe von Steckdosen 42.1...42.8, die z. T. an Innenwänden 35.3, 35.5, z. T. an der Außenwand 30 und z. T. an der Vorwand 39 angeordnet sind. Weiter sind Lampenanschlüsse 43.1...43.4 in der Decke (Stahlbeton) angeordnet. Schließlich sind ein Bewegungsmelder 44 an der Decke des Flurs 38 und eine Deckenanschlussdose 45 im Bereich der Vorwand 39 angeordnet. The "functional elements" level is also contained in the plan data. The corresponding functional elements are shown in the overall view according to FIG. 2 as well as in the plane view according to FIG. The functional elements include a number of switch/socket combinations 41.1...41.5, which are each arranged next to a door or an entrance into one of the rooms 37.1...5 on the respective inner wall 35.1...35.6. Another switch/socket combination 41.6 is arranged on the outer wall 30 in room 37.1. Next, the functional elements include a number of sockets 42.1 ... 42.8 z. T. on inner walls 35.3, 35.5, z. T. on the outer wall 30 and z. T. on the pretext 39 are arranged. Lamp connections 43.1...43.4 are also arranged in the ceiling (reinforced concrete). Finally, a motion detector 44 is arranged on the ceiling of the corridor 38 and a ceiling socket 45 in the area of the front wall 39 .

[0066] Über die spezifisch zu verwendenden Produkte sagt die Ebene "Funktionselemente" nichts aus. Die Funktionselemente geben lediglich an, welche Funktion an einem bestimmten Ort gewünscht ist. The "functional elements" level says nothing about the specific products to be used. The functional elements only indicate which function is desired at a specific location.

[0067] Schließlich ist in den Plandaten die Ebene "Produkte" enthalten. Diese umfasst im dargestellten vereinfachten Beispiel nur gerade die Waschmaschine 51. Sie ist deshalb nicht in einer gesonderten Abbildung dargestellt, sondern nur in der Übersichtsdarstellung gemäß Figur 2 abgebildet. Finally, the "Products" level is contained in the planning data. In the simplified example shown, this includes only the washing machine 51. It is therefore not shown in a separate figure, but only shown in the overview according to FIG.

[0068] Die Figur 6 ist ein Flussdiagramm eines erfindungsgemäßen Verfahrens zum automatisierten Generieren einer Empfehlung für eine Materialbestellung für ein Bauprojekt. FIG. 6 is a flowchart of a method according to the invention for automatically generating a recommendation for ordering materials for a construction project.

[0069] Zunächst werden vom Verarbeitungsserver die Plandaten empfangen (Schritt 101). Dies erfolgt insbesondere über eine Webschnittstelle, an welche der Verarbeitungsserver angebunden ist, und auf welche der Benutzer Zugriff hat. Der Zugriff ist passwortgeschützt, und die Verbindung zwischen dem Benutzer und der Webschnittstelle ist gesichert (z. B. mittels TLS). Die Plandaten werden gegebenenfalls konvertiert und dann (temporär) auf dem Verarbeitungsserver gespeichert. Der Benutzer hat die Möglichkeit, über die Webschnittstelle ergänzende Informationen einzugeben. Falls die Daten nicht gelesen werden können oder unvollständig sind, wird dem Benutzer eine entsprechende Meldung angezeigt, so dass fehlende Informationen nachgeliefert oder die Daten in einem lesbaren Format hochgeladen werden können. First, the schedule data is received from the processing server (step 101). This is done in particular via a web interface to which the processing server is connected and to which the user has access. Access is password protected and the connection between the user and the web interface is secured (e.g. using TLS). The plan data is converted if necessary and then stored (temporarily) on the processing server. The user has the option to enter additional information via the web interface. If the data cannot be read or is incomplete, a corresponding message is displayed to the user so that missing information can be supplied later or the data can be uploaded in a readable format.

[0070] Als Nächstes erfolgt im Verarbeitungsserver die Zuordnung zwischen den Funktionselementen und dem Material, auf, an oder in welchem sie zu installieren sind. Dazu werden die Informationen der Ebenen "Funktionselemente" und "Materialdaten" miteinander verknüpft. Konkret wird für jedes in der Ebene "Funktionselemente" enthaltene Funktionselement anhand von dessen Position die Zuordnung zu dem in der Ebene "Materialdaten" angegebenen Material hergestellt (Schritt 102). Im dargestellten Ausführungsbeispiel ergibt sich folgende Zuordnung: Next, in the processing server, there is an association between the functional elements and the material on, on, or in which they are to be installed. To do this, the information from the "Functional elements" and "Material data" levels is linked to one another. Specifically, for each functional element contained in the "functional elements" level, the association with the material specified in the "material data" level is established based on its position (step 102). The following assignment results in the exemplary embodiment shown:

Ebene "Funktionselement" Ebene "Materialdaten" Funktionselement | Art Bauelement | Material 41.1 | Schalter/Steckdose Innenwand 35.2 | Leichtbau 41.2 | Schalter/Steckdose Innenwand 35.3 | Leichtbau 41.3 | Schalter/Steckdose Innenwand 35.5 | Leichtbau 41.4 | Schalter/Steckdose Innenwand 35.6 | Leichtbau 41.5 | Schalter/Steckdose Innenwand 35.6 | Leichtbau 41.6 | Schalter/Steckdose Außenwand 30 | Stahlbeton 42.1 | Steckdose Außenwand 30 | Stahlbeton 42.2 | Steckdose Außenwand 30 | Stahlbeton 42.3 | Steckdose Innenwand 35.3 | Leichtbau 42.4 | Steckdose Innenwand 35.3 | Leichtbau 42.5 | Steckdose Außenwand 30 | Stahlbeton 42.6 | Steckdose Innenwand 35.5 | Leichtbau 42.7 | Steckdose Außenwand 30 | Stahlbeton 42.8 | Steckdose Vorwand 39 | Holzkonstruktion 43.1 | Lampenanschluss Decke | Stahlbeton 43.2 | Lampenanschluss Decke | Stahlbeton 43.3 | Lampenanschluss Decke | Stahlbeton 43.4 | Lampenanschluss Decke | Stahlbeton 44 | Bewegungsmelder Decke | Stahlbeton 45 | Deckenanschluss- Decke | Stahlbeton dose "Functional element" level "Material data" level Functional element | Kind of building element | Material 41.1 | Switch/socket interior wall 35.2 | Lightweight 41.2 | Switch/socket interior wall 35.3 | Lightweight 41.3 | Switch/socket inside wall 35.5 | Lightweight 41.4 | Switch/socket inside wall 35.6 | Lightweight 41.5 | Switch/socket inside wall 35.6 | Lightweight 41.6 | Switch/socket outside wall 30 | Reinforced concrete 42.1 | Socket outer wall 30 | Reinforced concrete 42.2 | Socket outer wall 30 | Reinforced concrete 42.3 | Socket inner wall 35.3 | Lightweight 42.4 | Socket inner wall 35.3 | Lightweight 42.5 | Socket outer wall 30 | Reinforced concrete 42.6 | Socket inner wall 35.5 | Lightweight 42.7 | Socket outer wall 30 | Reinforced concrete 42.8 | Socket pretext 39 | Wooden construction 43.1 | Lamp connection ceiling | Reinforced concrete 43.2 | Lamp connection ceiling | Reinforced concrete 43.3 | Lamp connection ceiling | Reinforced concrete 43.4 | Lamp connection ceiling | reinforced concrete 44 | Motion detector ceiling | reinforced concrete 45 | Ceiling connection ceiling | reinforced concrete box

[0071] Als nächstes erfolgt für das erste identifizierte Funktionselement 41.1 eine Abfrage in der Produktedatenbank (Schritt 103). Daraus ergibt sich eine Liste an entsprechenden Produkten (Schalter/Steckdose), die für die Montage am entsprechenden Material (Leichtbauwand wie oben beschrieben) geeignet sind. Sollten die Materialdaten in Bezug auf die Materialangabe an einem bestimmten Installationsort uneindeutig sein, werden alle Produkte aufgelistet, welche für beliebige, an diesem Ort in Frage kommende, Installationsarten geeignet sind. Next, a query is made in the product database (step 103) for the first identified functional element 41.1. This results in a list of corresponding products (switch/socket) that are suitable for installation on the corresponding material (lightweight wall as described above). If the material data is ambiguous in relation to the material specification at a specific installation location, all products are listed which are suitable for any type of installation that can be considered at that location.

[0072] Es wird nun geprüft, ob die Liste leer ist, einen einzigen Eintrag oder mehrere Einträge umfasst (Entscheidung 104). Ist die Liste leer, wird für das entsprechende Funktionselement 41.1 vermerkt, dass kein entsprechendes Produkt verfügbar ist. Umfasst die Liste mehrere Einträge, wird eine Rangierung nach vorgegebenen Kriterien (z. B. Preis aufsteigend, Qualitätsstufe, Hersteller, bereits getroffene Auswahlen durch den Benutzer) vorgenommen (Schritt 105), anschließend erfolgt über die Webschnittstelle eine Auswahlabfrage beim Benutzer. Dieser kann aus der rangierten Liste das gewünschte Produkt auswählen (Schritt 106). Er kann auch bereits wählen, dass für entsprechende zukünftige Abfragen (identische Kombination aus Funktionselement und Material) automatisch dieselbe Auswahl getroffen werden soll. It is now checked whether the list is empty, contains a single entry or multiple entries (decision 104). If the list is empty, it is noted for the corresponding functional element 41.1 that no corresponding product is available. If the list includes several entries, a ranking according to predetermined criteria (e.g. increasing price, quality level, manufacturer, selections already made by the user) is carried out (step 105), and the user is then asked to make a selection via the web interface. The latter can select the desired product from the ranked list (step 106). He can also already choose that the same selection should be made automatically for corresponding future queries (identical combination of functional element and material).

[0073] Falls die Liste nur einen Eintrag umfasst bzw. nach Auswahl eines Produkts wird diesem Produkt anhand der Ablaufdatenbank eine Bauphase zugeordnet (Schritt 107). Bei der Schalter/Steckdosenkombination 41.1, die in eine Leichtbauwand eingebaut werden soll, ist dies der Endausbau. If the list includes only one entry or after a product has been selected, a construction phase is assigned to this product using the process database (step 107). In the case of the switch/socket combination 41.1, which is to be installed in a lightweight wall, this is the final configuration.

[0074] Das Produkt und die Bauphase bzw. die Information, dass kein Produkt verfügbar ist, wird The product and the construction phase or the information that no product is available is

dann in eine Materialliste gespeichert (Schritt 109). then saved to a bill of materials (step 109).

[0075] Als nächstes wird geprüft, ob noch weitere Funktionselemente zu bearbeiten sind (Entscheidung 110). Ist dies der Fall wird das Verfahren für das nächste Funktionselement ab Schritt 103 fortgesetzt. Next, it is checked whether there are other functional elements to be processed (decision 110). If this is the case, the method is continued from step 103 for the next functional element.

[0076] Sind keine weiteren Funktionselemente zu bearbeiten, wird aus der Materialliste die definitive Materialliste erzeugt (Schritt 111). Insbesondere werden mehrere Produkte, die in derselben Bauphase benötigt werden, zusammengefasst. [0076] If no further functional elements are to be processed, the definitive material list is generated from the material list (step 111). In particular, several products that are required in the same construction phase are grouped together.

[0077] Produkte, die bereits in den Plandaten spezifiziert sind (z. B. die Waschmaschine 51) können automatisch in die Materialliste übernommen werden, falls sie den berücksichtigten Funktionselementklassen entsprechen. Products that are already specified in the planning data (e.g. the washing machine 51) can be automatically included in the material list if they correspond to the functional element classes taken into account.

[0078] Die Materialliste wird dann nach Bauphasen sortiert und angezeigt (Schritt 112) und der Benutzer wird angefragt, ob eine entsprechende Bestellung ausgelöst werden soll (Schritt 113). An dieser Stelle hat der Benutzer die Möglichkeit, die Materialliste von Hand zu ergänzen, Produkte von einer Bauphase in eine andere zu verschieben oder gewünschte Lieferdaten unmittelbar einzugeben. Zu diesem Zweck kann die Materialliste in verschiedenen Ansichten angezeigt, gefiltert und sortiert werden. Falls der Benutzer eine Bestellung auslöst (Entscheidung 114) wird diese an den Handelsserver weitergeleitet (Schritt 115). Falls nicht, wird die Materialliste temporär gespeichert, so dass sie der Benutzer zu einem späteren Zeitpunkt wieder abrufen kann. The list of materials is then sorted and displayed according to construction phases (step 112) and the user is asked whether a corresponding order should be triggered (step 113). At this point, the user has the option of adding to the list of materials manually, moving products from one construction phase to another, or directly entering desired delivery dates. For this purpose, the material list can be displayed, filtered and sorted in different views. If the user initiates an order (decision 114), this is forwarded to the trade server (step 115). If not, the bill of materials is saved temporarily so that the user can retrieve it at a later time.

[0079] Die Materiallisten und/oder die definitiven Bestellungen mit den entsprechenden Produkteinformationen lassen sich über eine Schnittstelle an den Benutzer zurückspeisen. Sie können somit in die Plandaten aufgenommen werden. Ebenfalls können die Plandaten (soweit notwendig) und die produktbezogenen Informationen auf dem Verarbeitungsserver bzw. einer angeschlossenen Datenbank vorgehalten werden. Muss zu einem späteren Zeitpunkt ein Ersatzteil für ein defektes oder verschlissenes Teil beschafft werden, kann der Benutzer durch eine einfache Angabe des Installationsorts (und ggf. des Funktionselementtyps) die Bestellung des gleichen Artikels auslösen, wonach der Verarbeitungsserver auf die installationsortabhängig gespeicherten Produkteinformationen zurückgreift. The material lists and/or the definitive orders with the corresponding product information can be fed back to the user via an interface. They can thus be included in the planning data. The planning data (if necessary) and the product-related information can also be kept on the processing server or a connected database. If a spare part for a defective or worn part has to be procured at a later point in time, the user can trigger the order of the same item by simply specifying the installation location (and possibly the functional element type), after which the processing server accesses the product information stored depending on the installation location.

[0080] Die Materiallisten bzw. ausgelösten Bestellungen lassen sich mit einer bauseitigen Projektdatenbank verknüpfen, in welcher eine Timeline hinterlegt ist, die laufend mit dem Baufortschritt und den geplanten Arbeiten aktualisiert wird. Bei einer zeitlichen Verschiebung einer Arbeit wird automatisch der Liefertermin für die damit verknüpften Produkte angepasst, so dass die benötigten Bauelemente zum richtigen Zeitpunkt auf den Bauplatz geliefert werden. The material lists or orders triggered can be linked to an on-site project database in which a timeline is stored, which is continuously updated with the construction progress and the planned work. If a job is postponed, the delivery date for the associated products is automatically adjusted so that the required components are delivered to the construction site at the right time.

[0081] Die Erfindung ist nicht auf das dargestellte Ausführungsbeispiel beschränkt. Sie lässt sich ohne Weiteres auch zur Bestellung weiterer Elemente, z. B. für Leitungen, einsetzen. Sie ist auch nicht nur auf Bauelemente für die Elektroinstallation einsetzbar, sondern eignet sich für diverse Bauelemente, die materialabhängig verlegt werden. The invention is not limited to the illustrated embodiment. It can also be easily used to order additional elements, e.g. B. for lines use. It can not only be used on components for electrical installation, but is also suitable for various components that are laid depending on the material.

[0082] Die Verarbeitung und Benutzerführung können auf eine andere Weise erfolgen. Statt den Benutzer bei jeder mehrwertigen Produkteliste zu einer Auswahl aufzufordern, kann zunächst die gesamte Materialliste zusammengestellt werden (wobei einige Punkte als Auswahlpunkte ausgestaltet sind). Erst einem nächsten Schritt werden dann vom Benutzer im Rahmen der gesamten Materialliste die nötigen Auswahlen durchgeführt. The processing and user guidance can be done in a different way. Instead of prompting the user for a choice for each multi-value product list, the entire bill of materials can be compiled first (with some items designed as choices). Only in the next step are the necessary selections made by the user within the framework of the entire material list.

[0083] Statt die Bestellung(en) gestützt auf die - allenfalls angepasste - Materialliste direkt auszulösen, kann beispielsweise auch eine Warenkorblösung zum Einsatz kommen. Die gesamte Materialliste, die Teilliste für eine Bauphase und/oder einzelne Produkte können dann vom Benutzer über eine Webschnittstelle, insbesondere des Handelsservers, in den Warenkorb gelegt werden. Instead of triggering the order(s) directly based on the—possibly adapted—material list, a shopping cart solution can also be used, for example. The entire list of materials, the partial list for a construction phase and/or individual products can then be placed in the shopping cart by the user via a web interface, in particular the trading server.

[0084] Zusammenfassend ist festzustellen, dass die Erfindung eine Anordnung zum automatisierten Generieren einer Empfehlung für eine Materialbestellung für ein Bauprojekt schafft, welche ausgehend von Plandaten des Objekts des Bauprojekts mit der Angabe von Funktionselementen die Identifikation verwendbarer Produkte ermöglicht und eine hohe Flexibilität aufweist. In summary, it can be stated that the invention creates an arrangement for automatically generating a recommendation for ordering materials for a construction project, which, starting from plan data of the object of the construction project with the specification of functional elements, enables usable products to be identified and has a high degree of flexibility.

Claims (14)

AnsprücheExpectations 1. Anordnung (10) zum automatisierten Generieren einer Empfehlung für eine Materialbestellung für ein Bauprojekt, umfassend Claims 1. Arrangement (10) for automatically generating a recommendation for ordering materials for a construction project, comprising a) einen Verarbeitungsserver (11) mit einer Eingangsschnittstelle (12) zum Empfangen digitaler Plandaten des Objekts des Bauprojekts, wobei die digitalen Plandaten mindestens folgendes umfassen: a) a processing server (11) with an input interface (12) for receiving digital plan data of the object of the construction project, the digital plan data comprising at least the following: - Angaben zu Funktionselementen, welche im Rahmen des Bauprojekts zu installieren sind; - Information on functional elements to be installed as part of the construction project; - Angaben zu Installationsorten, an welchen die Funktionselemente am Objekt zu installieren sind; - Information on the installation locations at which the functional elements are to be installed on the property; - Angaben zu Materialien, welche für Gebäude- und/oder Raumhüllen des Objekts zum Einsatz kommen sollen; - Information on materials that are to be used for the building and/or room envelopes of the property; - Angaben zu Einsatzorten, an welchen die Materialien zum Einsatz kommen sollen; - Information on the locations where the materials are to be used; und zum Herstellen einer Zuordnung mindestens eines der Funktionselemente zum Ma-and for establishing an assignment of at least one of the functional elements to the machine terial, an welchem das Funktionselement installiert werden soll, anhand der Installation-material on which the functional element is to be installed, based on the installation sorte der Funktionselemente und der Einsatzorte der Materialien; type of functional elements and places of use of materials; b) eine Produktedatenbank (15), in welcher Informationen zu Produkten abgelegt sind, wobei die Informationen Angaben zu einer Eignung der Produkte als Funktionselement für eine Installation an einem Material umfassen; b) a product database (15) in which information about products is stored, the information including information about the suitability of the products as a functional element for installation on a material; c) einen Handelsserver (21) mit einer Ausgangsschnittstelle (22) zum Ausgeben einer Empfehlung für ein zu bestellendes Produkt, wobei das empfohlene Produkt ein Funktionselement ist, welches für eine Installation an dem zugeordneten Material geeignet ist; c) a trade server (21) having an exit interface (22) for issuing a recommendation for a product to be ordered, the recommended product being a functional element suitable for installation on the associated material; wobei der Verarbeitungsserver (11) Zugriff auf die Produktedatenbank (15) hat und anhand wherein the processing server (11) has access to the product database (15) and based on der Zuordnung des Materials zum Funktionselement gestützt auf die Produktedatenbank the assignment of the material to the functional element based on the product database (15) die Empfehlung für das zu bestellende Produkt generiert, und wobei (15) generates the recommendation for the product to be ordered, and where die generierte Empfehlung vom Verarbeitungsserver (11) an den Handelsserver (21) über-the generated recommendation from the processing server (11) to the trading server (21) mittelt wird. is averaged. 2. Anordnung (10) nach Anspruch 1, dadurch gekennzeichnet, dass die Funktionselemente Komponenten umfassen, welche in oder an einer Wand, einer Decke und/oder einem Boden anbringbar sind und dass sich die Angaben zu Materialien auf Wände, Decken und/oder Böden des Objekts beziehen. 2. Arrangement (10) according to claim 1, characterized in that the functional elements comprise components which can be attached in or on a wall, a ceiling and/or a floor and that the information on materials relates to walls, ceilings and/or floors of the object. 3. Anordnung (10) nach Anspruch 2, dadurch gekennzeichnet, dass die Funktionselemente Anschlussstellen, insbesondere Steckdosen, Lampen- und weitere Verbraucheranschlüsse, und/oder Schalter einer Elektroinstallation umfassen. 3. Arrangement (10) according to claim 2, characterized in that the functional elements comprise connection points, in particular sockets, lamp and other load connections, and/or switches of an electrical installation. 4. Anordnung (10) nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, dass im Verarbeitungsserver (11) eine Empfehlung für eine Mehrzahl zu bestellender Produkte generierbar ist, insbesondere für alle zu bestellenden Produkte einer vorgegebenen Funktionselementklasse. 4. Arrangement (10) according to one of claims 1 to 3, characterized in that a recommendation for a plurality of products to be ordered can be generated in the processing server (11), in particular for all products to be ordered of a predetermined functional element class. 5. Anordnung (10) nach Anspruch 4, gekennzeichnet durch eine Ablaufdatenbank (16), in welcher funktionselement- und/oder produktbezogene Informationen zu Installationsarbeiten abgelegt sind, wobei im Verarbeitungsserver (11) anhand der Informationen in der Ablaufdatenbank (16) und basierend auf der Zuordnung der Materialien zu den Funktionselementen die zu bestellenden Produkte der Empfehlung einer von mehreren Bauphasen zuordenbar sind, wobei die zugeordnete Bauphase angibt, wann im Bauprozess das entsprechende Produkt zu installieren ist. 5. Arrangement (10) according to claim 4, characterized by a process database (16) in which functional element and / or product-related information on installation work is stored, wherein in the processing server (11) using the information in the process database (16) and based on the assignment of the materials to the functional elements, the products to be ordered, the recommendation, can be assigned to one of several construction phases, the assigned construction phase indicating when the corresponding product is to be installed in the construction process. 6. Anordnung (10) nach Anspruch 5, dadurch gekennzeichnet, dass für jede der mehreren Bauphasen eine gesonderte Empfehlung generierbar ist, wobei die entsprechende Empfehlung die der jeweiligen Bauphase zugeordneten Produkte umfasst. 6. Arrangement (10) according to claim 5, characterized in that a separate recommendation can be generated for each of the several construction phases, the corresponding recommendation comprising the products assigned to the respective construction phase. 7. Anordnung (10) nach einem der Ansprüche 1 bis 6, dadurch gekennzeichnet, dass nach Empfang einer Zustimmung eines Bestellers zur generierten Empfehlung vom Handelsserver (21) eine Bestellung der empfohlenen Produkte auslösbar ist. 7. Arrangement (10) according to one of claims 1 to 6, characterized in that an order of the recommended products can be triggered after receipt of an orderer's consent to the generated recommendation from the trade server (21). 8. Verfahren zum automatisierten Generieren einer Empfehlung für eine Materialbestellung für ein Bauprojekt, umfassend folgende Schritte 8. A method for automatically generating a recommendation for a material order for a construction project, comprising the following steps a) Empfangen digitaler Plandaten des Objekts des Bauprojekts durch einen Verarbeitungsservers (11) mit einer Eingangsschnittstelle (12), wobei die digitalen Plandaten mindestens folgendes umfassen: a) Receiving digital plan data of the object of the construction project by a processing server (11) with an input interface (12), the digital plan data comprising at least the following: - Angaben zu Funktionselementen, welche im Rahmen des Bauprojekts zu installieren sind; - Information on functional elements to be installed as part of the construction project; - Angaben zu Installationsorten, an welchen die Funktionselemente am Objekt zu installieren sind; - Information on the installation locations at which the functional elements are to be installed on the object; - Angaben zu Materialien, welche für Gebäude- und/oder Raumhüllen des Objekts zum Einsatz kommen sollen; - Information on materials that are to be used for the building and/or room envelopes of the property; - Angaben zu Einsatzorten, an welchen die Materialien zum Einsatz kommen sollen; - Information on the locations where the materials are to be used; b) anhand der Installationsorte der Funktionselemente und der Einsatzorte der Materialien Zuordnen mindestens eines der Funktionselemente zum Material, an welchem das Funktionselement installiert werden soll, durch den Verarbeitungsserver (11); b) the processing server (11) assigning at least one of the functional elements to the material on which the functional element is to be installed on the basis of the installation locations of the functional elements and the locations of use of the materials; c) gestützt auf eine Produktedatenbank (15), anhand der Zuordnung des Materials zum Funktionselement Generieren einer Empfehlung für ein zu bestellendes Produkt durch den Verarbeitungsserver (11), wobei die Empfehlung vom Verarbeitungsserver (11) an einen Handelsserver (21) mit einer Ausgangsschnittstelle (22) übermittelt wird, wobei das empfohlene Produkt ein Funktionselement ist, welches für eine Installation an dem zugeordneten Material geeignet ist. c) based on a product database (15), based on the assignment of the material to the functional element, the processing server (11) generates a recommendation for a product to be ordered, the recommendation from the processing server (11) to a trading server (21) with an output interface ( 22) is transmitted, whereby the recommended product is a functional element suitable for installation on the assigned material. 9. Verfahren nach Anspruch 8, dadurch gekennzeichnet, dass die Funktionselemente Komponenten umfassen, welche in oder an einer Wand, einer Decke und/oder einem Boden anbringbar sind und dass sich die Angaben zu Materialien auf Wände, Decken und/oder Böden des Objekts beziehen. 9. The method according to claim 8, characterized in that the functional elements include components which can be attached in or on a wall, a ceiling and/or a floor and that the information on materials relates to the walls, ceilings and/or floors of the object . 10. Verfahren nach Anspruch 9, dadurch gekennzeichnet, dass die Funktionselemente Anschlussstellen (Steckdosen, Lampen- und weitere Verbraucheranschlüsse) und/oder Schalter einer Elektroinstallation umfassen. 10. The method according to claim 9, characterized in that the functional elements include connection points (sockets, lamp and other load connections) and/or switches of an electrical installation. 11. Verfahren nach einem der Ansprüche 8 bis 10, dadurch gekennzeichnet, dass eine Empfehlung für eine Mehrzahl zu bestellender Produkte generiert wird, insbesondere für alle zu bestellenden Produkte einer vorgegebenen Funktionselementklasse. 11. The method according to any one of claims 8 to 10, characterized in that a recommendation for a plurality of products to be ordered is generated, in particular for all products to be ordered of a predetermined functional element class. 12. Verfahren nach Anspruch 11, dadurch gekennzeichnet, dass basierend auf der Zuordnung der Materialien zu den Funktionselementen die zu bestellenden Produkte der Empfehlung einer von mehreren Bauphasen zugeordnet werden, wobei die zugeordnete Bauphase angibt, wann im Bauprozess das entsprechende Produkt zu installieren ist. 12. The method according to claim 11, characterized in that based on the assignment of the materials to the functional elements, the products to be ordered are assigned to the recommendation of one of several construction phases, the assigned construction phase indicating when the corresponding product is to be installed in the construction process. 13. Verfahren nach Anspruch 12, dadurch gekennzeichnet, dass für jede der mehreren Bauphasen eine gesonderte Empfehlung generiert wird, wobei die entsprechende Empfehlung die der jeweiligen Bauphase zugeordneten Produkte umfasst. 13. The method as claimed in claim 12, characterized in that a separate recommendation is generated for each of the multiple construction phases, the corresponding recommendation comprising the products assigned to the respective construction phase. 14. Verfahren nach einem der Ansprüche 8 bis 13, gekennzeichnet durch den weiteren Schritt der Auslösung einer Bestellung nach Empfang einer Zustimmung eines Bestellers zur generierten Empfehlung. 14. The method according to any one of claims 8 to 13, characterized by the further step of initiating an order after receipt of an orderer's approval of the generated recommendation. Hierzu 6 Blatt Zeichnungen 6 sheets of drawings
ATGM8038/2022U 2018-03-01 2019-02-26 Arrangement and method for automatically generating a recommendation for a material order for a construction project AT17882U1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CH00250/18A CH714707B1 (en) 2018-03-01 2018-03-01 Arrangement for the automated generation of a recommendation for a material order for a construction project.
ATA50149/2019A AT520946A2 (en) 2018-03-01 2019-02-26 Arrangement and method for the automated generation of a recommendation for a material order for a construction project

Publications (1)

Publication Number Publication Date
AT17882U1 true AT17882U1 (en) 2023-06-15

Family

ID=67622898

Family Applications (2)

Application Number Title Priority Date Filing Date
ATA50149/2019A AT520946A2 (en) 2018-03-01 2019-02-26 Arrangement and method for the automated generation of a recommendation for a material order for a construction project
ATGM8038/2022U AT17882U1 (en) 2018-03-01 2019-02-26 Arrangement and method for automatically generating a recommendation for a material order for a construction project

Family Applications Before (1)

Application Number Title Priority Date Filing Date
ATA50149/2019A AT520946A2 (en) 2018-03-01 2019-02-26 Arrangement and method for the automated generation of a recommendation for a material order for a construction project

Country Status (4)

Country Link
AT (2) AT520946A2 (en)
CH (1) CH714707B1 (en)
DE (1) DE102019001164A1 (en)
FR (1) FR3078578A1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11383276B2 (en) 2019-09-13 2022-07-12 Rdbj, Llc Lumber use designation system and method
AU2022225580A1 (en) * 2021-02-24 2023-09-07 Dormakaba Deutschland Gmbh Method for installing a plurality of door components
EP4050545A1 (en) * 2021-02-24 2022-08-31 dormakaba Deutschland GmbH Method for the installation of multiple door components
BE1030514B1 (en) * 2022-05-12 2023-12-11 Rippin Gmbh Computer program and method for a structural measurement

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19745385A1 (en) 1997-10-14 1999-07-29 Elektro Ebert Gmbh Assembly method of electrical installation e.g. for floor plan of flat
US6493679B1 (en) * 1999-05-26 2002-12-10 Wireless Valley Communications, Inc. Method and system for managing a real time bill of materials
US7668761B2 (en) * 2000-10-27 2010-02-23 Jda Software Group System and method for ensuring order fulfillment
WO2002089011A1 (en) * 2000-12-12 2002-11-07 Databuilt, Inc. Method and system for assimilation, integration and deployment of architectural, engineering and construction information technology
WO2007084826A2 (en) * 2006-01-11 2007-07-26 The Gannon Technologies Group Program managed design for complex construction projects
US20120066019A1 (en) * 2010-07-07 2012-03-15 Dunmow Systems Corporation Construction control system
US9811612B2 (en) * 2013-02-26 2017-11-07 On Center Software, Inc. Multi condition takeoff in construction project software programs
KR101595243B1 (en) 2015-05-04 2016-02-19 주식회사 두올테크 Automatic modeling system for facility in field based building information modeling and method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Client–server model. [online]. Wikipedia, 16.02.2018 [ermittelt am 23.11.2022]. Ermittelt im Internet <URL: http://pamt.at/wajt> *

Also Published As

Publication number Publication date
CH714707B1 (en) 2020-09-15
CH714707A1 (en) 2019-09-13
DE102019001164A1 (en) 2019-09-05
FR3078578A1 (en) 2019-09-06
AT520946A2 (en) 2019-09-15
CH714707A8 (en) 2019-11-29

Similar Documents

Publication Publication Date Title
AT17882U1 (en) Arrangement and method for automatically generating a recommendation for a material order for a construction project
US11907620B2 (en) Smart plans
EP4168918A1 (en) Method and system for the production of a building
Fox et al. Constructability rules: guidelines for successful application to bespoke buildings
JPH0589211A (en) Integrated production managing system for building
CN114718307B (en) Method, apparatus, device, medium and program product for constructing fabricated building
JP4420703B2 (en) Process management system
Wu Use BIM and prefabrication to reduce construction waste
Kemmer et al. Understanding production management of refurbishment projects of a housing association–an exploratory case study
KR101976514B1 (en) Providing method of building cost estimate
DE102019100453A1 (en) Efficient creation of a building configuration
Ritter et al. Evaluation of Existing Layout Improvement and Creation Algorithms for Use in the Offsite Construction Industry
EP0953084B1 (en) Construction method
JP2004086788A (en) Construction drawing-less design method and building production method using the design method
JPH07175850A (en) Generating system for data on execution of piping installation
Brandt et al. Basics Tendering
Jovanovic Buildings’ Site Management and Supervision: Cost Analysis of Labor Positions
Popov Implementation of BIM in construction project
EP3355138B1 (en) Method for determining the geometric position of a room controller
DE19814191A1 (en) Method for remote ordering and configuring of prefabricated goods
DE102008019905A1 (en) Design generating and optimizing method for building industry, involves drawing remaining, mutated and/or merged design as valid design when terminating process and output of design, and renewing running of process
DE102023105890A1 (en) Craftsman system
Dekker Transformation of an existing hospital building to a hospice: Open Building as strategy for process and product
Stubbe Applicability of a platform-based approach to design and construction of new buildings
Poppe Using critical chain project management methodologies to build a production schedule