AT516514B1 - Device for slope support - Google Patents

Device for slope support Download PDF

Info

Publication number
AT516514B1
AT516514B1 ATA50485/2015A AT504852015A AT516514B1 AT 516514 B1 AT516514 B1 AT 516514B1 AT 504852015 A AT504852015 A AT 504852015A AT 516514 B1 AT516514 B1 AT 516514B1
Authority
AT
Austria
Prior art keywords
wall
grid
support
profiles
slope
Prior art date
Application number
ATA50485/2015A
Other languages
German (de)
Other versions
AT516514A4 (en
Original Assignee
Swietelsky Baugesellschaft M B H
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Swietelsky Baugesellschaft M B H filed Critical Swietelsky Baugesellschaft M B H
Priority to ATA50485/2015A priority Critical patent/AT516514B1/en
Application granted granted Critical
Publication of AT516514A4 publication Critical patent/AT516514A4/en
Publication of AT516514B1 publication Critical patent/AT516514B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/202Securing of slopes or inclines with flexible securing means

Abstract

Es wird eine Vorrichtung zur Hangabstützung mit einer Gitterwand (2) und einer an der hangabgekehrten Wandseite vorgesehenen, mithilfe von Erdankern (9) abgestützten Wandhalterung beschrieben. Um vorteilhafte Konstruktionsbedingungen zu schaffen, wird vorgeschlagen, dass die Wandhalterung über die Länge der Gitterwand (2) verteilte, sich über die Wandhöhe erstreckende Stützprofile (6) aufweist, die mit das Gitter (3) der Gitterwand (2) durchsetzenden Dornen (8) versehen ist, und dass für das Gitter (3) der mit drainagefähigem Schüttgut (12) hinterfüllten Gitterwand (2) über die Wandhöhe verteilte, auf den Dornen (8) der Stützprofile (6) geführte und endseitig abgespannte Spannseile (7) vorgesehen sind.It is a device for slope support with a grid wall (2) and provided on the slope-side wall side, supported by ground anchors (9) wall bracket described. In order to provide advantageous construction conditions, it is proposed that the wall mount has distributed over the length of the grid wall (2), extending over the wall height supporting profiles (6), with the grid (3) of the grid wall (2) passing thorns (8). is provided, and that for the grid (3) with the drainagefähigem bulk material (12) back-filled grid wall (2) over the wall height distributed, on the spikes (8) of the support profiles (6) out and end-tensioned tensioning cables (7) are provided.

Description

Beschreibung [0001] Die Erfindung bezieht sich auf eine Vorrichtung zur Hangabstützung mit einer Gitterwand und einer an der hangabgekehrten Wandseite vorgesehenen, mithilfe von Erdankern abgestütz-ten Wandhalterung sowie auf ein Verfahren zur Errichtung einer solchen Vorrichtung.Description: The invention relates to a device for slope support with a grid wall and a wall bracket provided on the slope-remote wall side, supported by ground anchors, and to a method for constructing such a device.

[0002] Um die aufwendige Konstruktion von dem zu sichernden Hang vorgebauten und im Hang durch Erdanker verankerten Stützwänden aus einander lageweise überlappend angeordneten Balken zu vermeiden, ist es bekannt (AT 508 127 A4), die Wände zum Beispiel einer Baugrube durch eine Gitterwand zu sichern, deren Gitter mithilfe von an Erdankern vorgesehenen Ankerplatten unter einer Zugspannung an die Baugrubenwand angedrückt gehalten wird, sodass durch solche Gitterwände eine einfach zu errichtende Wandabstützung geschaffen werden kann. Diese bekannten Wandabsicherungen eignen sich allerdings nicht zum Ausgleich von unregelmäßigen Wandverläufen oder zur Aufnahme größerer Hangkräfte.In order to avoid the expensive construction of the secured slope to be secured and anchored in the slope by ground anchors support walls from one another overlapping layers arranged beams, it is known (AT 508 127 A4) to secure the walls, for example, a pit through a grid wall whose grid is held by means of anchors provided to ground anchors under a tensile stress on the excavation wall so that an easy-to-erect wall support can be created by such lattice walls. However, these known wall fuses are not suitable to compensate for irregular wall gradients or for receiving larger slopes.

[0003] Der Erfindung liegt somit die Aufgabe zugrunde, eine Vorrichtung zur Hangabstützung so auszugestalten, dass trotz eines vergleichsweise einfachen Aufbaus den üblichen Anforderungen an eine wirksame Hangabstützung vorteilhaft entsprochen werden kann.The invention is therefore based on the object, a device for slope support in such a way that, despite a relatively simple structure, the usual requirements for effective slope support can be advantageously met.

[0004] Ausgehend von einer Vorrichtung der eingangs geschilderten Art löst die Erfindung die gestellte Aufgabe dadurch, dass die Wandhalterung über die Länge der Gitterwand verteilte, sich über die Wandhöhe erstreckende Stützprofile aufweist, die mit das Gitter der Gitterwand durchsetzenden Dornen versehen ist, und dass für das Gitter der mit drainagefähigem Schüttgut hinterfüllten Gitterwand über die Wandhöhe verteilte, auf den Dornen der Stützprofile geführte und endseitig abgespannte Spannseile vorgesehen sind.Starting from a device of the type described, the invention solves the problem set by the fact that the wall bracket distributed over the length of the grid wall, extending over the wall height extending support profiles, which is provided with the grid of the grid wall passing thorns, and that for the grid of the backfilled with drainageable bulk material grid wall distributed over the wall height, run on the thorns of the support profiles and the end guyed tension cables are provided.

[0005] Aufgrund der die Gitterwand durchsetzenden Dorne der Stützprofile wird das üblicherweise zweilagige Gitter, das ein grobmaschiges und ein feinmaschiges Gitternetz umfasst, sowohl bei der Errichtung der Gitterwand als auch danach in seiner Lage gegenüber den Stützprofilen festgehalten. Durch die über die Gitterwandlänge quer zu den Stützprofilen verlaufenden Spannseile und die Stützprofile werden die auf die Gitterwand einwirkenden Hangkräfte aufgenommen und über die Stützprofile und die Abspannung der Spannseile mithilfe von Erdankern in den Hang abgetragen, sodass sich trotz einer Leichtbauweise eine gute Hangsicherung erreichen lässt. Die Führung der Spannseile erfolgt dabei auf den Dornen der Stützprofile, die somit auch den jeweiligen Spannseilverlauf sichern.Due to the grid wall passing through mandrels of the support profiles usually two-layer grid, which includes a coarse mesh and a fine mesh grid, both in the establishment of the grid wall and then held in position relative to the support profiles. By over the grid wall length extending transversely to the support profiles tensioning cables and the support profiles acting on the grid wall slope forces are absorbed and removed via the support profiles and the tension of the tension cables using ground anchors in the slope, so that a good slope protection can be achieved despite a lightweight construction. The leadership of the tensioning cables takes place on the thorns of the support profiles, which thus also secure the respective Spannseilverlauf.

[0006] Besonders einfache Konstruktionsverhältnisse ergeben sich, wenn die Stützprofile als Hutprofile ausgebildet sind, deren Längsrandflansche auf der offenen Profilseite die Dorne tragen. Die Hutprofile bringen bei einer leichten Bauweise ein ausreichendes Widerstandsmoment mit sich, um auch bei höheren Gitterwänden die auftretenden Biegemomente der über die Erdanker örtlich begrenzt abgestützten Stützprofile aufnehmen zu können. Beide Längsrandflansche bieten außerdem vorteilhafte Anschlussmöglichkeiten für die gegen die Gitterwand vorstehenden Dorne.Particularly simple construction conditions arise when the support profiles are designed as hat profiles whose Längsrandflansche wear the mandrels on the open profile side. The hat profiles bring with a lightweight design sufficient resistance moment with it, to accommodate even with higher lattice walls, the bending moments occurring over the ground anchors supported locally supporting profiles. Both longitudinal edge flanges also offer advantageous connection options for the protruding against the grid wall mandrels.

[0007] Zum Errichten einer erfindungsgemäßen Gitterwand können nach einer Vorbereitung der Aufstandsfläche für die Gitterwand zunächst die Erdanker mithilfe von Stützschablonen für die Spannseile gesetzt werden, bevor die Spannseile verlegt und das Gitter angebracht wird. Dann können die Stützschablonen durch die Stützprofile ersetzt werden, bevor nach einer Hinterfüllung des Gitters mit drainagefähigem Schüttgut die Spannseile gespannt und die Erdanker für die Stützprofile vorgespannt werden. Es zeigt sich somit, dass die erfindungsgemäße Gitterwand in einer wenig aufwendigen Weise dem zu sichernden Hang frei vorgebaut werden kann, bevor die notwendige Hinterfüllung des Gitters mit einem drainagefähigen Schüttgut vorgenommen wird, um dann die Spannseile über entsprechende Spanneinrichtungen zu spannen und die die Stützprofile durchsetzenden Erdanker zur Beaufschlagung der Stützprofile vorzuspannen.To build a grid wall according to the invention, after preparation of the footprint for the grid wall, the ground anchors can first be set by means of support templates for the tension cables before the tension cables are laid and the grid is attached. Then the support templates can be replaced by the support profiles before tensioned after a backfill of the grid with drainagefähigem bulk the tension cables and the ground anchor for the support profiles are biased. It thus appears that the grid wall according to the invention can be freely pre-assembled in a low-cost manner before the necessary backfill of the grid is made with a bulk material capable of drainage, in order then to tension the tensioning cables via corresponding tensioning devices and to penetrate the support profiles To prestress the ground anchor to act on the support profiles.

[0008] In der Zeichnung ist der Erfindungsgegenstand beispielsweise dargestellt. Es zeigen [0009] Fig. 1 eine erfindungsgemäße Vorrichtung zur Hangabstützung in einem schemati schen Querschnitt, [0010] Fig. 2 die Gitterwand nach Fig. 1 in einer Vorderansicht, [0011] Fig. 3 ein als Hutprofil ausgebildetes Stützprofil in einer Ansicht auf die offene Profil seite in einem größeren Maßstab und [0012] Fig. 4 einen Schnitt nach der Linie IV-IV der Fig. 3 in einem größeren Maßstab.In the drawing, the subject invention is shown, for example. 1 shows a device according to the invention for slope support in a schematic cross-section, [0010] FIG. 2 shows the grid wall according to FIG. 1 in a front view, [0011] FIG. 3 shows a support profile designed as a hat profile in a view the open profile side on a larger scale and Fig. 4 is a section along the line IV-IV of Fig. 3 on a larger scale.

[0013] Wie insbesondere der Fig.1 entnommen werden kann, wird zur Absicherung eines Hanges 1 eine Gitterwand 2 vorgesehen, deren Gitter 3 gemäß der Fig. 2 zweilagig aus einem grobmaschigen Gitternetz 4 und einem feinmaschigen Gitternetz 5 aufgebaut ist und durch Stützprofile 6 im Zusammenwirken mit Spannseilen 7 in seiner Lage gesichert wird. Die Stützprofile 6, die zur Halterung des Gitters 3 mit das Gitter 3 durchsetzenden Dornen 8 versehen sind, werden durch vorgespannte Erdanker 9 gegenüber dem Hang 1 abgestützt. Zu diesem Zweck durchsetzen die Erdanker 9 die Stützprofile 6 und beaufschlagen diese über Ankerplatten 10 durch auf den Erdankern 9 schraubverstellbar gehaltene Gewindemuttern.1, a grid wall 2 is provided to secure a slope 1, the grid 3 is constructed in two layers as shown in FIG. 2 of a coarse mesh 4 and a fine mesh grid 5 and support profiles 6 in the Cooperation with tension cables 7 is secured in position. The support profiles 6, which are provided for holding the grid 3 with the grid 3 passing thorns 8 are supported by prestressed ground anchor 9 against the slope 1. For this purpose, enforce the ground anchor 9, the support profiles 6 and act on these anchor plates 10 by threaded nuts held on the ground anchors 9 threaded adjustable.

[0014] Die Spannseile 7 sind endseitig ebenfalls über Erdanker 11 abgespannt, wie dies in der Fig. 2 angedeutet ist. Über nicht dargestellte Spanneinrichtungen für die Spannseile 7 kann die Gitterwand 2 nach ihrer Hinterfüllung mit einem drainagefähigen Schüttgut 12 entsprechend verspannt und durch die Stützprofile 6 abgestützt werden. Die zur Halterung des Gitters 3 vorgesehenen Dorne 8 der Stützprofile 6 dienen zugleich auch zur Führung der Spannseile 7, sodass deren Verlauf über die Länge der Gitterwand 2 durch die Stützprofile 6 und deren Dorne 8 konstruktiv festgelegt wird.The tensioning cables 7 are also end braced over ground anchor 11, as indicated in FIG. About not shown clamping devices for the tensioning cables 7, the grid wall 2 according to their backfilling with a drainageable bulk material 12 can be braced accordingly and supported by the support profiles 6. The provided for holding the grid 3 pins 8 of the support profiles 6 also serve to guide the tension cables 7, so that their course over the length of the grid wall 2 by the support sections 6 and their mandrels 8 is structurally determined.

[0015] Um eine vorteilhafte Leichtbauweise zu erzielen, können die Stützprofile 6 gemäß den Fig. 3 und 4 als Hutprofile 13 ausgebildet sein, die auf der offenen Profilseite die über die Länge der beiden Randflansche 14 verteilten Dorne 8 tragen.In order to achieve an advantageous lightweight construction, the support profiles 6 may be formed as shown in FIGS. 3 and 4 as hat profiles 13, which carry on the open profile side over the length of the two edge flanges 14 distributed mandrels 8.

[0016] Zum Errichten der erfindungsgemäßen Vorrichtung zur Hangabstützung wird zunächst eine Aufstandsfläche 15 für die Gitterwand 2 durch ein Aufschütten oder durch einen Aushub vorbereitet, bevor zum Setzen der Erdanker 9 später durch die Stützprofile 6 zu ersetzende Stützschablonen angeordnet werden, die mit entsprechenden Führungslöchern zum Bohren der Aufnahmelöcher für die Erdanker 9 versehen sind. Die durch die versetzten Erdanker 9 in ihrer Lage gehaltenen Stützschablonen dienen zum Verlegen der Spannseile 7, die endseitig über entsprechend gesetzte Erdanker 11 im Hang 1 verankert werden. Danach kann das Gitter 3 auf der dem Hang 1 zugekehrten Seite der Stützschablonen angebracht werden, bevor die einzelnen Stützschablonen nacheinander durch die Stützprofile 6 ersetzt werden. Mit der anschließenden Hinterfüllung des Gitters 3 durch ein drainagefähiges Schüttgut 12 sind die wesentlichen Errichtungsarbeiten durchgeführt. Es brauchen zur Fertigstellung der Gitterwand 2 lediglich die Spannseile 7 gespannt und die Stützprofile 6 durch das Vorspannen der Erdanker 9 entsprechend beaufschlagt zu werden, um den Bau der Vorrichtung zur Hangabstützung abzuschließen.To build the device according to the invention for slope support a footprint 15 is first prepared for the grid wall 2 by a dumping or excavation before 9 later to be replaced by the support sections 6 supporting templates for setting the ground anchor, with the corresponding guide holes for Drilling the receiving holes for the ground anchor 9 are provided. The support templates held in place by the offset ground anchors 9 serve for laying the tensioning cables 7, which are anchored in the slope 1 via appropriately set ground anchors 11. Thereafter, the grid 3 can be mounted on the slope 1 facing side of the support templates before the individual support templates are successively replaced by the support profiles 6. With the subsequent backfilling of the grid 3 by a drainable bulk material 12, the essential erection work is carried out. It need to complete the grid wall 2, only the tension cables 7 stretched and the support profiles 6 to be acted upon by biasing the ground anchor 9 accordingly to complete the construction of the device for slope support.

Claims (3)

Patentansprücheclaims 1. Vorrichtung zur Hangabstützung mit einer Gitterwand (2) und einer an der hangabgekehr-ten Wandseite vorgesehenen, mithilfe von Erdankern (9) abgestützten Wandhalterung, dadurch gekennzeichnet, dass die Wandhalterung über die Länge der Gitterwand (2) verteilte, sich über die Wandhöhe erstreckende Stützprofile (6) aufweist, die mit das Gitter (3) der Gitterwand (2) durchsetzenden Dornen (8) versehen ist, und dass für das Gitter (3) der mit drainagefähigem Schüttgut (12) hinterfüllten Gitterwand (2) über die Wandhöhe verteilte, auf den Dornen (8) der Stützprofile (6) geführte und endseitig abgespannte Spannseile (7) vorgesehen sind.1. A device for slope support with a grid wall (2) and provided on the slope-ten wall side, supported by ground anchors (9) supported wall bracket, characterized in that the wall bracket over the length of the grid wall (2) distributed over the wall height extending supporting profiles (6) which is provided with the grid (3) of the grid wall (2) passing thorns (8), and that for the grid (3) with the drainagefähigem bulk material (12) back-filled grid wall (2) over the wall height distributed, on the thorns (8) of the support profiles (6) guided and end-tensioned tension cables (7) are provided. 2. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass die Stützprofile (6) als Hutprofile (13) ausgebildet sind, deren Längsrandflansche (14) auf der offenen Profilseite die Dorne (8) tragen.2. Apparatus according to claim 1, characterized in that the support profiles (6) are designed as hat profiles (13) whose Längsrandflansche (14) on the open profile side, the mandrels (8) wear. 3. Verfahren zum Errichten einer Vorrichtung zur Hangabstützung nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass nach einer Vorbereitung der Aufstandsfläche (15) für die Gitterwand (2) zunächst die Erdanker (9) mithilfe von Stützschablonen für die Spannseile (7) gesetzt werden, bevor die Spannseile (7) verlegt und das Gitter (3) angebracht wird, und dass dann die Stützschablonen durch die Stützprofile (6) ersetzt werden, bevor nach einer Hinterfüllung des Gitters (3) mit drainagefähigem Schüttgut (12) die Spannseile (7) gespannt und die Erdanker (9) für die Stützprofile (6) vorgespannt werden. Hierzu 3 Blatt Zeichnungen3. A method for erecting a device for slope support according to claim 1 or 2, characterized in that after preparation of the footprint (15) for the grid wall (2) first the ground anchor (9) by means of supporting templates for the tension cables (7) are set before the tensioning cables (7) are laid and the grid (3) is attached, and then the support templates are replaced by the support profiles (6), before after a backfilling of the grid (3) with drainable bulk material (12) the tensioning cables (7 ) and the ground anchors (9) for the support profiles (6) are biased. For this 3 sheets of drawings
ATA50485/2015A 2015-06-15 2015-06-15 Device for slope support AT516514B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
ATA50485/2015A AT516514B1 (en) 2015-06-15 2015-06-15 Device for slope support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
ATA50485/2015A AT516514B1 (en) 2015-06-15 2015-06-15 Device for slope support

Publications (2)

Publication Number Publication Date
AT516514A4 AT516514A4 (en) 2016-06-15
AT516514B1 true AT516514B1 (en) 2016-06-15

Family

ID=56097376

Family Applications (1)

Application Number Title Priority Date Filing Date
ATA50485/2015A AT516514B1 (en) 2015-06-15 2015-06-15 Device for slope support

Country Status (1)

Country Link
AT (1) AT516514B1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3816271A1 (en) * 1987-05-22 1988-12-01 Steiner Peter Arrangement for securing embankments and slopes against surface instability or instability near the surface
AT7754U1 (en) * 2004-04-26 2005-08-25 Sgs Geotechnik Ges M B H Austr EROSION PROTECTION SYSTEM FOR BORROWINGS, FIRE AND THE SAME
WO2013005098A2 (en) * 2011-07-05 2013-01-10 Lega Rocciatori S.R.L. System for consolidating the cortical layer of loose terrains

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3816271A1 (en) * 1987-05-22 1988-12-01 Steiner Peter Arrangement for securing embankments and slopes against surface instability or instability near the surface
AT7754U1 (en) * 2004-04-26 2005-08-25 Sgs Geotechnik Ges M B H Austr EROSION PROTECTION SYSTEM FOR BORROWINGS, FIRE AND THE SAME
WO2013005098A2 (en) * 2011-07-05 2013-01-10 Lega Rocciatori S.R.L. System for consolidating the cortical layer of loose terrains

Also Published As

Publication number Publication date
AT516514A4 (en) 2016-06-15

Similar Documents

Publication Publication Date Title
EP2453062B1 (en) Method and system for bracing excavations
WO2011009542A2 (en) Security net on water or on the ground
EP2921338B1 (en) Mast for catenary assemblies for electric railway vehicles
DE2344178C2 (en) Countersink with fixed ballast
EP2213961A2 (en) Device for elevating solar modules
EP2253779A2 (en) Cladding system
DE2361133A1 (en) FRAMEWORK CRANE
EP2535463B1 (en) Modular pre-fabricated retaining wall, concrete retaining wall comprising same and method for erecting the retaining wall
DE3012613C2 (en) Anchor expansion for routes of underground mining, tunnels or the like.
AT516514B1 (en) Device for slope support
DE102007040744A1 (en) Temporary flood protection system, has partition provided between base side and base-fixed partition edges in support-free manner, where partition is textile inductile partition or double-walled partition
WO2019047997A1 (en) Reinforcement system for the concrete lining of the inner shell of a tunnel construction
DE202017105802U1 (en) Reinforcement system for the concrete lining of the inner shell of a tunnel building
DE102020109531B3 (en) Formwork system
DE102017125624B3 (en) Reinforcement system for the concrete lining of the inner shell of a tunnel building
DE102009037978A1 (en) Support frame for photovoltaic free-standing plant, has ground supports with end that lies on different levels, and horizontal carrier running below another horizontal carrier, and module rails running inclined towards south to ground base
EP3078778A1 (en) Foundation of a wind energy system
DE1609660C3 (en) Wallboard
DE202015100594U1 (en) Security system for building construction
EP3907330B1 (en) Rock fall obstruction
DE102010040332B4 (en) foundation element
DE202009014872U1 (en) Joint-type shuttering element
DE1926863A1 (en) Expansion for tunnel or mine routes
DE2714620A1 (en) REINFORCEMENT FOR COMPOSITE REMOVAL FROM STEEL REINFORCED CONCRETE, ESPECIALLY FROM SPRAY CONCRETE
EP3002393B1 (en) Canopy screen and erection method