AT409007B - PRODUCTION OF EXCAVATIONS AND THEIR FILLING UNDER THE SUBSTRATE FOR THE PURPOSE OF SOIL STABILIZATION - Google Patents

PRODUCTION OF EXCAVATIONS AND THEIR FILLING UNDER THE SUBSTRATE FOR THE PURPOSE OF SOIL STABILIZATION Download PDF

Info

Publication number
AT409007B
AT409007B AT181797A AT181797A AT409007B AT 409007 B AT409007 B AT 409007B AT 181797 A AT181797 A AT 181797A AT 181797 A AT181797 A AT 181797A AT 409007 B AT409007 B AT 409007B
Authority
AT
Austria
Prior art keywords
soil
erosion
nozzle
air cushion
air
Prior art date
Application number
AT181797A
Other languages
German (de)
Other versions
ATA181797A (en
Original Assignee
Keller Grundbau Gmbh
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Keller Grundbau Gmbh filed Critical Keller Grundbau Gmbh
Priority to AT181797A priority Critical patent/AT409007B/en
Priority to DE1998149786 priority patent/DE19849786B4/en
Publication of ATA181797A publication Critical patent/ATA181797A/en
Application granted granted Critical
Publication of AT409007B publication Critical patent/AT409007B/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/36Concrete or concrete-like piles cast in position ; Apparatus for making same making without use of mouldpipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Description

       

   <Desc/Clms Page number 1> 
 



   Die Erfindung betrifft ein Verfahren zur Herstellung von Bodenkorpern im Baugrund gemäss dem Oberbegriff des Anspruchs 1 Die Erfindung betnfft ausserdem eine Vorrichtung zur Durchfuhrung des Verfahrens gemass dem Oberbegriff des Anspruchs 5
Bei bekannten Verfahren wird mit Hilfe von Bohrungen, die bis auf die geplante Grundungssohle abgeteuft werden, uber ein mit seitlichen Dusenausgangen versehenes Bohr- und Spulgestange Wasser, Luft und Suspension verpresst Dabei wird der das Bohrloch umgebende Boden durch einen hochdruckgespannten Schneidstrahl erodiert, aufgeschnitten, d h ausgehohlt, und nachfolgend mit Suspension verfullt Die hierbei aus Boden, Wasser,

   Luft und beispielsweise Zementsuspension entstehende breiige Mischung fullt die entstandenen Hohlräume Der Mischungsüberschuss fliesst uber den offenen   Bohrlochnngraum   zutage Die Form der nachfolgend erhartenden Bodenkörper hangt von der Dusenstrahlbewegung ab Beispielsweise entstehen   saulenartige   Korper wenn das Gestange wahrend des Dusens rotiert und zugleich gezogen wird
Die Leistungsfähigkeit derartiger Verfahren ist im wesentlichen abhangig vom Wirkungsgrad der eingesetzten hydraulischen Energie, d h abhangig von der Pumpenleistung,

   den bodenmechanischen Eigenschaften der zu erodierenden Bodenschichten und dem gewählten Herstellungsparameter Dusenstrahlreichweite und Erosionsbreite sind Bewertungsmassstab fur die effektive Erosionsleistung der Dusenstrahlverfahren
Nach dem heutigen Stand der Technik arbeiten die oben erwähnten Verfahren unter der international gebrauchlichen Bezeichnung JET-GROUTING mit Düsenschneidstrahlen, die aus Wasser oder   Bindemittelsuspensionen   bestehen Die dabei aus Boden, Wasser bzw Suspension sich bildende Mischung schrankt die Wirtschaftlichkeit derartiger Verfahren ein, weil Reibungs- und Stromungsverluste einen Teil der eingesetzten Energie verbrauchen
Nachteilig und daher verbesserungsbedürftig sind bei den   bisherig   praktizierten Verfahren die bodenabhangigen und daher wechselnden, unbestimmbaren Erosionsleistungen,

   die   ungleichma-   ssige Bodenkorper mit den daraus resultierenden   Unzulänglichkeiten,   wie beispielsweise fehlerhafte Überschneidungen, zur Folge haben
Mit den heutigen Herstellungsbedingungen ist eine leistungsabhangige. kontrollierende Steuerung der Dusenstrahlen wahrend der Erosionsarbeit wegen des Fehlens geeigneter Messverfahren zur Zeit nicht moglich Daher werden empirische Herstellungsparameter eingesetzt, die von ausgewerteten Baustellenversuchen und Arbeitsausfuhrungen gewonnen und abgeleitet werden Die Feststellung der tatsachlichen Arbeitserfolge und die Kontrolle der erzielten Abmessungen der Erosionskorper ist zur Zeit nur mit grösserem zusätzlichen Aufwand durchfuhrbar. 



   Eine Analyse der angefuhrten Nachteile fuhrt zur Erkenntnis, dass schon bei der Zerstorung des Bodengefuges die Wirksamkeit des flussigen fallweise luftummantelten Schneidstrahles durch den sich bildenden Bodenmortel stark beeinträchtigt wird Auf Grund seiner unbestimmbaren, heterogenen Zusammensetzung und den wahrend der   Dusenarbet   herrschenden komplexen Stromungsvorgangen sind Versuche und Bemuhungen zur Erfassung relevanter Messdaten in diesem Milieu erfolglos geblieben
Aus der GB 361 966 ist ein o g GROUTING-Verfahren bekannt, wobei Pressluft oder ein anderes Gas intermittierend in die Bodenschicht eingeblasen wird Hierbei wird die Pressluft über andere Öffnungen als die zum Einbringen der Suspension verwendeten eingebracht Dies soll jedoch derart erfolgen, dass die Einbringung der Suspension nicht beeinflusst wird,

   sondern lediglich eine intensive Vermischung von Suspension und Boden erzielt wird
Die EP 0 202 438 A1 beschreibt ein Verfahren und eine Vorrichtung zum Verfestigen und/oder Abdichten eines vorgebbaren Bereichs im Erdboden, wobei ein erhartender, flüssiger Stoff unter gleichzeitiger Zugabe eines gasformigen Stoffes injiziert wird Der Gasstrahl wird dabei parallel beabstandet von einem Flussigkeitsstrahl geführt Die   Zielrichtung   ist hierbei, dass der Gasstrahl mittels seiner kinetischen Energie zusätzlich einen Flüssigkeitsstrahl beim Eindringen in das Erdreich unterstützt
Aus der US 4 624 606 ist eine Vorrichtung und ein Verfahren zum Herstellen von Bodenkorpern mittels Injektion bekannt Eine Injektionsstange weist zwei benachbart zueinander angeordnete Öffnungen auf, durch welche Flüssigkeit und Luft austreten Hierbei umschliesst die Öffnung,

   durch welche Luft austritt, nngformig die Öffnung, aus der die Flüssigkeit austntt. Hierbei ist die Zielrichtung, dass von einer Bohrspitze abgetragener Boden durch ein Loch im Gestänge angehoben wird 

 <Desc/Clms Page number 2> 

 
Die DE 35 14 522 A1 offenbart ein Verfahren und eine Vorrichtung zum Ausbilden von Bodenverfestigungskonstruktionen. Hierbei ist an einem führenden Ende einer Einsetzrohranordnung mit einer Bohrspitze ein Ultraschallsensor angeordnet. 



   Der Erfindung liegt daher die Aufgabe zugrunde, ein Verfahren sowie eine Vorrichtung zur Herstellung von Bodenkorpern im Baugrund zu schaffen, mit denen es auf einfache Weise möglich ist, steuerbare sowie kontrollierbare Erosionsarbeiten durchzuführen und mit Hilfe von Reichweitenmessungen den gegebenen Bodenverhältnissen anzupassen. 



   Diese Aufgabe wird bei dem Verfahren gemäss der Erfindung mit den Merkmalen des Anspruchs 1 und bei der zur Durchführung dieses Verfahrens vorgesehenen Vorrichtung gemass der Erfindung mit den Merkmalen des Anspruchs 5 gelost. 



   Vorteilhafte Ausgestaltungen hiervon sind in den jeweiligen Unteransprüchen angegeben
Der Erfindung liegt der wesentliche Gedanke zugrunde, im erweiterten Arbeitsbereich der Dusenstrahlen ein permanentes Luftkissen bzw Druckluftkissen zu erzeugen. In diesem Druckluftkissen konnen einzelne oder auch mehrere Düsenschneidstrahlen unproblematisch und reibungslos die Bodenstruktur auflosen, weil alle Stoffe mit einer höheren Dichte als die der Luft, also Wasser, Suspension und Boden, in den zuvor ausgehohlten Raum absinken und sedimentieren Auf diese Weise kann der Arbeitsprozess nahezu unter atmosphärischen Bedingungen ungestort ablaufen.

   wobei gleichzeitig höhere Erosionsleistungen möglich sind, die zudem über Reichweitenmessungen gesteuert werden konnen
Durch das gleichzeitige Einpressen von Luft und Schneidflussigkeit über die   Duseneinrichtung   wird die Erzeugung des permanenten Luftkissens gewährleistet
Durch die Erfindung wird somit auf vorteilhafte Weise die Herstellung von verfestigten,

   wasserundurchlässigen Bodenkorpern in Sediment- und Lockergestein ermöglicht Diese Bodenkorper konnen der Bodenstabilisierung dienen oder fur Grundungs- und Unterfangungsmassnahmen jedoch auch als Abdichtungs- und Abkapselungskörper zur Anwendung gelangen
Die Erfindung wird im folgenden anhand der Zeichnung näher erläutert Diese zeigt in der einzigen Figur eine bevorzugte Ausfuhrungsform einer erfindungsgemässen Vorrichtung zur   Erläute-   rung des Verfahrens gemass der Erfindung im Langsschnitt
In vorgegebenen Bodenschichten 1 wird eine Spulbohrung 2 mit einem an einem   Tnplex-Bohr-   gestange 3 befestigten Bohrmeissel hergestellt,

   wobei eine filterkuchenbildende Spulung verwendet wird Der betreffende Spülungsstrom 4 fliesst uber das Gestängeinnere zum Bohrmeissel und befordert das Bohrklein über einen Bohrlochnngraum 5 zutage
In demjenigen Bereich des Bohrgestanges 3, in dem sich eine Düsen Vorrichtung 6 befindet, ist ein koaxiales Tauchrohr 7 montiert, das nach dem pneumatischen Aufpumpen einer Gummimanschette 8 wie ein   Ringraumpreventer   (Ringraumpacker)

   wirkt und den Spulungsstrom 4 nur uber einen koaxialen Ringraum 9 zwischen Tauchrohr 7 und Bohrgestange 3 fliessen lasst
Nach dem Erreichen der planungsgemassen Bohrtiefe wird von der Arbeitsphase "Bohren" auf die Arbeitsphase "Dusen" umgestellt Diese wird durch das mit Hilfe eines Kompressors erfolgende Einpressen von Luft uber eine Luftzuleitung 10   eingeleitet  
Der fur das Verfahren erforderliche Luftbedarf ist von der Durchlässigkeit der vorliegenden Bodenschichten 1 abhangig Beispielsweise ergibt sich ein Luftbedarf von 3 m3/min Ansaugleistung des Kompressors bei einem Druck des Luftkissens 11 von 2 bar und einem Boden-Durchlassigkeitsbeiwert von 1 x 10-4 m/s Bei grösseren Luftverlusten können der Schneidflussigkeit filterkuchenbildende Stoffe zugemischt werden
Beim Einpressen der Luft uber die Zuleitung 10 zur Luftduse wird der an die Luftzuleitung 10 

  angeschlossene Ringraumpacker 8 in Funktion gesetzt Nach erfolgter Abdichtung des Bohrlochnngraums 5 im Bereich des Tauchrohres 7 baut die überschüssige Luft ein Luftkissen 11 auf Die Unterkante 7a des Tauchrohres 7 bestimmt die Hohe der Ausdehnung des Luftkissens 11 Uber den offenen Ringraum 9, gebildet aus Tauchrohr 7 und Bohrgestänge 3, sowie weiter aufsteigend uber den Ringraum 9, gebildet aus Bohrlochwand 19 und Bohrgestänge 3, gelangt der Luftuberschuss zutage
Nach hergestellter Umläufigkeit der eingepressten Luft wird mit den Erosionsarbeiten zur Herstellung des Verfestigungskorpers 22 begonnen Hierzu wird Wasser mit beisp 400 bar durch die Dusenvornchtung 6 verpresst, deren Duse einen Durchmesser von beispielsweise 2mm aufweist Der sich bildende Schneidstrahl 12 durchdringt den anstehenden Boden, beispielsweise Sand,

   und 

 <Desc/Clms Page number 3> 

 zerstort in seinem Arbeitsbereich die Bodenstruktur, wobei eine fliessfähige Mischung aus Wasser und Boden entsteht Die hohe   Rohwichte   der Mischung bewirkt deren Trennung von der gleichzeitig eingepressten Luft, so dass die entstandene Mischung über den offenen Ringraum 9 zutage gefordert wird Der hohe   Wasser-Einpressdruck   von 400 bar entsteht vor der Duse 6 und baut sich schnell auf den tiefenabhängigen hydrostatischen Druck ab Wird das Bohrgestänge 3 bei diesem Arbeitsprozess gezogen, entsteht die beabsichtigte Aushohlung 13 im Boden Diese wird zylinderformig, wenn das Bohrgestange 3 rotierend gezogen wird Die Aushohlung 13 bleibt so lange luftgefullt, wie es die Unterkante 7a des Tauchrohres 7 bestimmt Erreicht die Trennflachenzone 14 die Unterkante 7a des Tauchrohres 7,

   wird zu diesem Zeitpunkt mit dem Eindüsen von Zementsuspension 16 uber eine Zementsuspensions-Düse 20 begonnen.



   <Desc / Clms Page number 1>
 



   The invention relates to a method for producing soil bodies in the subsoil according to the preamble of claim 1. The invention also relates to a device for carrying out the method according to the preamble of claim 5
In known methods, water, air and suspension are pressed by means of bores which are sunk down to the planned foundation bed, via a boring and winding rod provided with lateral nozzle outlets. The floor surrounding the borehole is eroded, cut open, that is, by a high-pressure clamped cutting jet hollowed out, and subsequently filled with suspension. The soil, water,

   Air and, for example, cement suspension, a mushy mixture that forms fills the cavities. The excess of the mixture flows through the open borehole cavity. The shape of the soil body that subsequently hardens depends on the movement of the nozzle jet. For example, columnar bodies are formed when the rod rotates and is pulled while the nozzle is being taken
The efficiency of such processes is essentially dependent on the efficiency of the hydraulic energy used, i.e. on the pump output,

   The soil mechanical properties of the soil layers to be eroded and the selected manufacturing parameters nozzle jet range and erosion width are assessment criteria for the effective erosion performance of the nozzle jet process
According to the current state of the art, the above-mentioned processes work under the internationally used name JET-GROUTING with nozzle cutting jets, which consist of water or binder suspensions.The mixture formed from soil, water or suspension limits the economics of such processes because friction and Current losses consume part of the energy used
A disadvantage and therefore in need of improvement are the soil-dependent and therefore changing, undetermined erosion performances in the previously practiced processes,

   the uneven soil body with the resulting shortcomings, such as incorrect overlaps
With today's manufacturing conditions is a performance dependent. Controlling control of the nozzle jets during the erosion work is currently not possible due to the lack of suitable measuring methods.Therefore, empirical manufacturing parameters are used, which are obtained and derived from evaluated construction site tests and work executions.The determination of the actual work results and the control of the dimensions of the erosion bodies is currently only with major additional effort feasible.



   An analysis of the disadvantages mentioned leads to the realization that even when the soil structure is destroyed, the effectiveness of the liquid, occasionally air-coated cutting jet is severely impaired by the soil mortar that forms.Thanks to its indeterminate, heterogeneous composition and the complex flow processes prevailing in the nozzle structure, tests and efforts are necessary remained unsuccessful in this milieu for the acquisition of relevant measurement data
From GB 361 966 an above-mentioned GROUTING method is known, whereby compressed air or another gas is blown intermittently into the bottom layer. Here, the compressed air is introduced through openings other than those used for introducing the suspension.However, this should be done in such a way that the introduction of the Suspension is not affected,

   only an intensive mixing of suspension and soil is achieved
EP 0 202 438 A1 describes a method and a device for solidifying and / or sealing a predeterminable area in the ground, in which a hardening liquid substance is injected with the simultaneous addition of a gaseous substance. The gas jet is guided parallel to and spaced from a liquid jet is that the gas jet also uses its kinetic energy to support a liquid jet when it penetrates into the ground
From US 4 624 606 an apparatus and a method for producing floor bodies by means of injection is known. An injection rod has two openings arranged adjacent to one another, through which liquid and air exit.

   Through which air exits, the opening from which the liquid exits is narrow. The aim here is for soil removed from a drill bit to be lifted through a hole in the rod

 <Desc / Clms Page number 2>

 
DE 35 14 522 A1 discloses a method and a device for forming ground stabilization structures. Here, an ultrasonic sensor is arranged on a leading end of an insertion tube arrangement with a drill tip.



   The invention is therefore based on the object of providing a method and a device for producing soil bodies in the ground, with which it is possible in a simple manner to carry out controllable and controllable erosion work and to adapt it to the given soil conditions with the aid of range measurements.



   This object is achieved in the method according to the invention with the features of claim 1 and in the device provided for carrying out this method according to the invention with the features of claim 5.



   Advantageous refinements of this are specified in the respective subclaims
The invention is based on the essential idea of producing a permanent air cushion or compressed air cushion in the expanded working area of the nozzle jets. In this compressed air cushion, one or more nozzle cutting jets can easily and smoothly dissolve the floor structure, because all substances with a higher density than that of the air, i.e. water, suspension and soil, sink and sediment in the previously hollowed out space.This way, the work process can almost run undisturbed under atmospheric conditions.

   at the same time higher erosion capacities are possible, which can also be controlled via range measurements
The simultaneous injection of air and cutting fluid via the nozzle device ensures that the permanent air cushion is generated
The invention thus advantageously produces solidified,

   water-impermeable soil bodies in sediment and loose rock enables these soil bodies can serve to stabilize the soil or can also be used as sealing and encapsulation bodies for foundation and underpinning measures
The invention is explained in more detail below with reference to the drawing, which shows in the single figure a preferred embodiment of a device according to the invention for explaining the method according to the invention in longitudinal section
In the specified soil layers 1, a winding bore 2 is made with a drill bit attached to a Tnplex drill rod 3,

   whereby a filter cake-forming rinse is used. The relevant rinsing stream 4 flows over the interior of the rod to the drill bit and asks for the cuttings via a borehole space 5
In that area of the drill pipe 3, in which a nozzle device 6 is located, a coaxial immersion tube 7 is mounted, which after the pneumatic inflation of a rubber sleeve 8, like an annulus preventer (annulus packer)

   acts and allows the coil current 4 to flow only via a coaxial annular space 9 between the dip tube 7 and the drill rod 3
After the planned drilling depth has been reached, the "drilling" working phase is switched to the "nozzle" working phase. This is initiated by injecting air via an air supply line 10 using a compressor
The air requirement required for the method depends on the permeability of the existing soil layers 1. For example, there is an air requirement of 3 m3 / min suction power of the compressor at a pressure of the air cushion 11 of 2 bar and a soil permeability coefficient of 1 x 10-4 m / s In the event of greater air losses, filter cake-forming substances can be added to the cutting fluid
When the air is injected via the supply line 10 to the air nozzle, the air supply line 10

  Connected ring packer 8 put into operation After sealing the borehole space 5 in the area of the dip tube 7, the excess air builds up an air cushion 11. The lower edge 7a of the dip tube 7 determines the extent of the expansion of the air cushion 11 over the open annular space 9, formed from the dip tube 7 and The drill pipe 3, and ascending further over the annular space 9, formed from the borehole wall 19 and drill pipe 3, the excess air comes to light
After the circulating air has been produced, the erosion work for producing the solidification body 22 is started. For this purpose, water is pressed at 400 bar, for example, through the nozzle device 6, the nozzle of which has a diameter of, for example, 2 mm. The cutting jet 12 that forms penetrates the soil, for example sand,

   and

 <Desc / Clms Page number 3>

 Destroys the soil structure in his work area, creating a flowable mixture of water and soil The high gross weight of the mixture causes it to separate from the air injected at the same time, so that the resulting mixture is exposed through the open annular space 9 The high water injection pressure of 400 bar arises in front of the nozzle 6 and rapidly reduces to the depth-dependent hydrostatic pressure. If the drill pipe 3 is pulled during this work process, the intended excavation 13 is created in the ground.This becomes cylindrical when the drill pipe 3 is rotated. The excavation 13 remains air-filled for as long How the lower edge 7a of the dip tube 7 determines it. If the separating surface zone 14 reaches the lower edge 7a of the dip tube 7,

   At this point, cement suspension 16 is injected through a cement suspension nozzle 20.


    

Claims (8)

Die Ausbildung des Luftkissens 11 im Arbeitsbereich des Düsenschneidstrahles 12 bis zur Unterkante 7a des Tauchrohres 7 erlaubt nun auch vorteilhafterweise kontinuierliche oder diskontinu- ierliche Reichweitenmessungen Diese können in einer Ausfuhrungsform der Vorrichtung mit Ultraschallmessgeber 15, gesteuert durch Steuerungskabel 18, ausgeführt werden Uber eine Prozesssteuerungsemnchtung konnen nun auch die Herstellungsparameter, also Gestängeziehgeschwindigkeit, Dusenrotation und Suspensionsmenge, den unterschiedlichen bodenmechanischen Bodenschichten 1 angepasst werden Die erwunschten Reichweitenmessungen sind Distanzbestimmungen Sie konnen unter den vorteilhaften Luftkissenbedingungen auch mit anderen Messverfahren ausgeführt werden In die Vorrichtung sind ausserdem Druckmessdosen 17 eingebaut Diese dienen der Differenzdruckmessung im Ausspulungs- sowie im Verfüllungsbereich zur Kontrolle der erosionsabhangigen Rohdichte der sich bildenden Bodenmischungen Mit Hilfe eines Zusatzmittels, das der Schneidflussigkeit als Entschaumer zugesetzt wird wird eine Schaumbildung im Luftkissen 11 ausgeschlossen Die Grosse des permanent erzeugten Luftkissens 11 ist so bemessen, dass der Dusenschneldstrahl 12 durch schnelle Separation der Mischungsphasen, Luft und Bodensuspension, nicht behindert wird PATENTANSPRÜCHE:The formation of the air cushion 11 in the working area of the nozzle cutting jet 12 as far as the lower edge 7a of the dip tube 7 now advantageously also permits continuous or discontinuous range measurements. These can be carried out in one embodiment of the device with an ultrasonic measuring transducer 15, controlled by control cables 18. A process control device can now be used also the manufacturing parameters, i.e. the rod pulling speed, nozzle rotation and suspension quantity, can be adapted to the different soil mechanics soil layers 1. as well as in the backfill area to control the erosion-dependent bulk density of the soil mixtures that are formed Etching agent that is added to the cutting fluid as a defoamer prevents foam formation in the air cushion 11. The size of the permanently generated air cushion 11 is dimensioned in such a way that the jet nozzle jet 12 is not impeded by the rapid separation of the mixing phases, air and soil suspension. 1 Verfahren zur Herstellung von Bodenkorpern im Baugrund durch Bildung von Aushohlun- gen mittels Hochdruckbodenerosion und deren unmittelbar nachfolgender Verfullung mit einem beim Erodieren mittels Dusenschneidstrahlen gebildeten Boden-Bindemittelge- misch, das nach dem Erharten einen verfestigten, wassersperrenden Bodenkorper bildet dadurch gekennzeichnet, dass die Bodenerosionsarbeiten der Dusenschneidstrahlen (12) in einem permanent erzeugten Luftkissen (11) ausgefuhrt werden  1 Process for the production of soil cores in the subsoil by forming hollows by means of high pressure soil erosion and their subsequent filling with a soil-binder mixture formed during erosion by means of nozzle cutting jets, which after hardening forms a solidified, water-blocking soil body characterized in that the soil erosion work the nozzle cutting jets (12) are carried out in a permanently generated air cushion (11) 2 Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass das erzeugte Luftkissen (11) in radialer Erstreckung durch die Reichweite der Erosion begrenzt und in vertikaler Erstre- ckung grosser als 50 cm ausgebildet wird2. The method according to claim 1, characterized in that the air cushion (11) is limited in the radial extent by the range of the erosion and is formed in the vertical extent greater than 50 cm 3 Verfahren nach einem der vorstehenden Anspruche, dadurch gekennzeichnet, 3 Method according to one of the preceding claims, characterized in dass der Schneidflüssigkeit Zusatzstoffe zur Vermeidung von Luftverlusten und/oder Verstopfungs- mittel, wie beispielsweise Bentonit oder andere Quellstoffe, zugesetzt werden that the Cutting fluid additives to avoid air loss and / or clogging agents, such as bentonite or other swelling agents, are added 4 Verfahren nach einem der vorstehenden Anspruche, dadurch gekennzeichnet, dass der Schneidflüssigkeit Entschäumer zur Vermeidung einer Schaumbildung zugesetzt werden4 The method according to any one of the preceding claims, characterized in that the Cutting fluid defoamers are added to avoid foaming 5 Vorrichtung zur Durchführung des Verfahrens nach einem der Anspruche 1 bis 4, dadurch gekennzeichnet, dass sie aus einer koaxialen Rohrkombination besteht, die ein Spulge- stange (3), ein Tauchrohr (7) mit einem Ringraumpreventer (8) mit aufblahbarer Dich- tungsmanschette und eine Düseneinrichtung (6) aufweist. 5 Device for carrying out the method according to one of claims 1 to 4, characterized in that it consists of a coaxial tube combination comprising a spool rod (3), an immersion tube (7) with an annular space preventer (8) with an inflatable sealing sleeve and has a nozzle device (6). 6. Vorrichtung nach Anspruch 5, dadurch gekennzeichnet, dass zur Messung und Kontrolle der erzielten Reichweite wenigstens ein Distanzmessgeber (15) im Gestänge (3) derart in- tegriert ist, dass das Messergebnis während der Erosionsarbeiten über einen Steuermonitor anzeigbar, kontrollierbar und steuerbar ist.  6. The device according to claim 5, characterized in that for measuring and checking the range achieved, at least one distance sensor (15) is integrated in the linkage (3) in such a way that the measurement result can be displayed, checked and controlled via a control monitor during the erosion work , 7 Vorrichtung nach Anspruch 6, dadurch gekennzeichnet, dass die Distanzmessgeber (15) Echolote, Ultraschallmessgeräte, Infrarotentfernungsmesser, Lasergeräte und dgl. sind <Desc/Clms Page number 4> 7 Device according to claim 6, characterized in that the distance measuring device (15) Echosounders, ultrasound meters, infrared range finders, laser devices and the like  <Desc / Clms Page number 4> 8. Vorrichtung nach einem der Ansprüche 5 bis 7, dadurch gekennzeichnet, dass die kontinu- ierliche Messung und Kontrolle der erzielten Erosionsleistung über Differenzdruckmessun- gen mittels Druckmessdosen (17) erfolgt, die auf dem Spülgestänge (3) im Ausspülungs- und Verfüllungsbereich montiert sind und den Kontakt zum Bohrlochnngraum (9) sicher- stellen 8. Device according to one of claims 5 to 7, characterized in that the continuous measurement and control of the erosion performance achieved via differential pressure measurements by means of pressure cells (17) which are mounted on the rinsing linkage (3) in the rinsing and filling area and ensure contact with the borehole cavity (9)
AT181797A 1997-10-28 1997-10-28 PRODUCTION OF EXCAVATIONS AND THEIR FILLING UNDER THE SUBSTRATE FOR THE PURPOSE OF SOIL STABILIZATION AT409007B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
AT181797A AT409007B (en) 1997-10-28 1997-10-28 PRODUCTION OF EXCAVATIONS AND THEIR FILLING UNDER THE SUBSTRATE FOR THE PURPOSE OF SOIL STABILIZATION
DE1998149786 DE19849786B4 (en) 1997-10-28 1998-10-28 Method and device for the production of soil bodies in the ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
AT181797A AT409007B (en) 1997-10-28 1997-10-28 PRODUCTION OF EXCAVATIONS AND THEIR FILLING UNDER THE SUBSTRATE FOR THE PURPOSE OF SOIL STABILIZATION

Publications (2)

Publication Number Publication Date
ATA181797A ATA181797A (en) 2001-09-15
AT409007B true AT409007B (en) 2002-05-27

Family

ID=3521639

Family Applications (1)

Application Number Title Priority Date Filing Date
AT181797A AT409007B (en) 1997-10-28 1997-10-28 PRODUCTION OF EXCAVATIONS AND THEIR FILLING UNDER THE SUBSTRATE FOR THE PURPOSE OF SOIL STABILIZATION

Country Status (2)

Country Link
AT (1) AT409007B (en)
DE (1) DE19849786B4 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102005001251A1 (en) * 2004-11-12 2006-05-24 FITR-Gesellschaft für Innovation im Tief- und Rohrleitungsbau mbH Formation method e.g. for moisture impermeable vertical barrier layers, involves having vertical barrier layers within base of foundation walls and base stabilized by embankments, ditches, dams
DE102006002838B3 (en) * 2006-01-20 2007-09-13 Gud Geotechnik Und Dynamik Consult Gmbh Jet spray column producing and measuring device, has measuring device measuring diameter of jet spray column and partially integrated in drill and jet rods, where drill and jet rods produce bore hole
PL2535461T3 (en) 2011-06-16 2017-04-28 Keller Holding Gmbh Device and method for manufacturing ground elements
DE102013205319A1 (en) * 2013-03-26 2014-10-02 Gud Geotechnik Und Dynamik Consult Gmbh Drilling and jet blasting rods

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB361966A (en) * 1930-08-28 1931-11-30 Francois Cementation Co Ltd Improvements in or relating to the grouting of ground, soil, or other measures
DE3514522A1 (en) * 1984-05-09 1985-11-14 N.I.T. Co., Ltd., Machida, Tokio/Tokyo METHOD AND DEVICE FOR FORMING A GROUND FASTENING CONSTRUCTION
US4624606A (en) * 1985-03-12 1986-11-25 N.I.T. Co., Ltd. Foundation improvement process and apparatus thereof
EP0202438A1 (en) * 1985-05-09 1986-11-26 Bauer Spezialtiefbau GmbH Apparatus for consolidating and/or sealing a predetermined area in the soil

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2968407B2 (en) * 1992-09-24 1999-10-25 株式会社エヌ、アイ、テイ Ground improvement body construction method and equipment
DE4311917C2 (en) * 1992-12-29 1995-12-14 Keller Grundbau Gmbh Process for making hardening areas
JP2729749B2 (en) * 1993-06-22 1998-03-18 志朗 中嶋 Omnidirectional ground improvement body construction method and its device
DE19521639C2 (en) * 1995-06-14 1996-08-08 Bilfinger Berger Bau Procedure for monitoring an HDI procedure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB361966A (en) * 1930-08-28 1931-11-30 Francois Cementation Co Ltd Improvements in or relating to the grouting of ground, soil, or other measures
DE3514522A1 (en) * 1984-05-09 1985-11-14 N.I.T. Co., Ltd., Machida, Tokio/Tokyo METHOD AND DEVICE FOR FORMING A GROUND FASTENING CONSTRUCTION
US4624606A (en) * 1985-03-12 1986-11-25 N.I.T. Co., Ltd. Foundation improvement process and apparatus thereof
EP0202438A1 (en) * 1985-05-09 1986-11-26 Bauer Spezialtiefbau GmbH Apparatus for consolidating and/or sealing a predetermined area in the soil

Also Published As

Publication number Publication date
ATA181797A (en) 2001-09-15
DE19849786A1 (en) 1999-05-06
DE19849786B4 (en) 2005-03-10

Similar Documents

Publication Publication Date Title
DE602004011775T2 (en) METHOD FOR PRODUCING A NATURAL HEAT ENGINE
DE3416679C2 (en)
DE2423163A1 (en) METHOD OF ERECTING A WALL IN THE SOIL
AT409007B (en) PRODUCTION OF EXCAVATIONS AND THEIR FILLING UNDER THE SUBSTRATE FOR THE PURPOSE OF SOIL STABILIZATION
EP0483110A2 (en) Method and device for making a well
DE3108331A1 (en) Process and apparatus for producing groundwater wells and for lowering the groundwater level
DE4311917C2 (en) Process for making hardening areas
EP0481079A1 (en) Method and tool for producing a pile
DE3926787A1 (en) Pile driving and anchoring in ground - uses driven into ground, pile inserting into tube, tube removal, and anchoring substance injecting
DE1157162B (en) Drilling device for producing boreholes for in-situ concrete foundation piles as well as for drilling in horizontal and oblique directions without excavation
DE1946647A1 (en) Method and device for determining the bearing capacity of subterranean formations
EP3643872A1 (en) Method for reducing a hydraulically effective porosity of a porous solid matrix
DE3034746C2 (en) Method and device for producing groundwater passages in sealing walls
DE19543534C1 (en) Controlled gas explosion method to increase ground porosity
DE69002615T2 (en) METHOD FOR BUILDING CONCRETE CONSTRUCTIONS IN LOOSE MATERIAL FROM THE TERRAIN OF THE TERRAIN AND DEVICE FOR CARRYING OUT THIS METHOD.
DE19949393C1 (en) Support or wall in a borehole is formed by a jet at the drill rod which sprays a mixture of loose soil and concrete with a lower coil spring to monitor the edge of the mixture for a controlled wall thickness
DE4344946C2 (en) Drilling process to investigate contamination of the ground with high density fluids
DE3106662C2 (en)
DE4446028C2 (en) Method and installation for stabilizing a soil using injections
EP1600602B1 (en) Hydraulic drilling apparatus and method
DE4442475C2 (en) Production of a horizontal sealing screen against pressurized water
DE3543059A1 (en) Method of stabilising soil sections
DE3821823A1 (en) Method for determining the air permeability of water-conducting soils, and a system and devices for carrying it out
DE2402757A1 (en) Equipment for ultrasonic treatment of earth formations - has ultrasonic resonator in washing medium passage in drilling head
DE2137491A1 (en) MANUFACTURING AND FILLING OF DRILL HOLES WITH FLUSH DRILLING

Legal Events

Date Code Title Description
UEP Publication of translation of european patent specification
ELJ Ceased due to non-payment of the annual fee