AT258098B AT640265A AT640265A AT258098B AT 258098 B AT258098 B AT 258098B AT 640265 A AT640265 A AT 640265A AT 640265 A AT640265 A AT 640265A AT 258098 B AT258098 B AT 258098B
Authority
AT
Austria
Prior art keywords
wire
production
distance
metal articles
similar metal
Prior art date
Application number
AT640265A
Other languages
German (de)
Inventor
Josef Moessler
Original Assignee
Josef Moessler
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Josef Moessler filed Critical Josef Moessler
Priority to AT640265A priority Critical patent/AT258098B/en
Application granted granted Critical
Publication of AT258098B publication Critical patent/AT258098B/en

Links

Landscapes

  • Wire Processing (AREA)

Description

  

   <Desc/Clms Page number 1> 
 



  Verfahren zur Herstellung von   Mantelbeton-Abstandhaltern   u. ähnl. Metallartikeln 
 EMI1.1 
 

 <Desc/Clms Page number 2> 

 welche eine beispielsweise Ausführungsform der Erfindung schematisch veranschaulicht. 



   Zur Herstellung eines Mantelbeton-Abstandhalters, bestehend aus einem Längsdraht 1 und vier inQuerrichtung in diesem angeschweissten Querdrahtstücken 2, 3, 4 und 5, wird der Längsdraht 1 von einem Drahtbund mittels eines Vorschubapparates abgezogen und mittels eines Richtapparates gerade gerichtet. Der Vorschub erfolgt dabei jeweils um die Länge V. Die   vier Querdrahtstücke 2, 3, 4   und 5 werden gleichfalls von Drahtrollen abgezogen und durch vier Richtapparate gerade gerichtet der Schweissvorrichtung   zugeführt. Der Vorschub   erfolgt dabei um die notwendige Länge der Querdrahtstücke. 



  Der Abstand der mittleren Querdrahtstücke 3 und 4 bleibt dabei immer konstant und beträgt etwa 10 mm. Dagegen ist der Abstand der Querdrahtstücke 2 und 3 bzw. 4 und 5 veränderlich, um eine Anpassung an die Schalplattenstärke zu ermöglichen. Gegenwärtig sind Schalplatten in Stärken von 25, 35 und 50 mm in Verwendung. 



   Die in die Schweissvorrichtung   zugeführten Querdrahtstücke   werden nun auf den darunter liegenden Längsdraht 1 angeschweisst. Nach dem Schweissvorgang werden die Querdrahtstücke 2, 3, 4 und 5 an den Stellen 7 und gleichzeitig der Längsdraht 1 an der Stelle 7 abgeschnitten. Hierauf erfolgt der Vorschub des Längsdrahtes 1 wieder um die Strecke V zugleich mit den durch Punkt- 
 EMI2.1 
    verbundenen und abgeschnittenenQuerdrahtstücken 2, 3, 4 und 5. Mit einer geringen Ver-auf wird wieder ein Schweissvorgang an den Punkten   6 durchgeführt. Nun erfolgt der Schneidvorgang an den Stellen 7,   wobei bereits ein fertiger Abstandhalter anfällt. Das bei dem ersten Schneidvor-     gang abgetrennte Längsdrahtstück mit den Querdrahtstücken 4 und 5 im oberen Teil der Zeichnung    ist Abfall.

   Nach jedem derartigen Arbeitsspiel fällt immer ein kompletter Abstandhalter an. Jedes Arbeitsspiel benötigt dabei nur eine ganz geringe Zeit, wodurch die Leistung des erfindungsgemässen Verfahrens eine besonders hohe ist. 



    PATENTANSPRÜCHE :    
1. Verfahren zur Herstellung von Mantelbeton-Abstandhaltern und ähnlichen Metallartikeln, bestehend aus einem Längsdrahtstück und vorzugsweise vier in Querrichtung auf diesem angeschweissten Querdrahtstücken, dadurch gekennzeichnet, dass von einer Vorratsrolle, vorzugsweise durch einen Richtapparat, ein Längsdraht   (1)   intermittierend in eine Schweissstation vorgeschoben wird und dass eineAnzahlQuerdrähte (2-5) ebenfalls   von Vorratsrollen und vorzugsweise durchRichtapparate   quer zum Längsdraht intermittierend in die Schweissstation eingeführt wird, wobei die Vorschubschritte jeweils den gewünschten Längen des Längsstückes und der Querdrahtstücke entsprechen,

   wonach bei Stillstand aller Drähte die Verschweissung der Drähte an den Kreuzungspunkten und hienach ein Abtrennen aller angeschweissten Querdrahtstücke von ihren Strängen erfolgt, wobei gleichzeitig der Längsdraht durchtrennt wird, u. zw. zwischen zwei benachbarten angeschweissten Querdrahtstücken einer bereits vor dieser zuletzt befestigten Querdrahtschar angeschweissten Querdrahtschar, so dass bei jedem Schweissvorgang jeweils die hintere Hälfte des einen und die vordere Hälfte des folgenden Abstandhalters gebildet wird.



   <Desc / Clms Page number 1>
 



  Process for the production of clad concrete spacers u. similar Metal articles
 EMI1.1
 

 <Desc / Clms Page number 2>

 which schematically illustrates an example embodiment of the invention.



   To produce a clad concrete spacer, consisting of a longitudinal wire 1 and four transverse wire pieces 2, 3, 4 and 5 welded in this transverse direction, the longitudinal wire 1 is pulled from a wire bundle by means of a feed device and straightened by means of a straightening device. The feed takes place in each case by the length V. The four pieces of cross wire 2, 3, 4 and 5 are also pulled off the wire rolls and fed straight to the welding device by four straightening devices. The feed takes place by the necessary length of the cross wire pieces.



  The distance between the middle cross wire pieces 3 and 4 always remains constant and is about 10 mm. In contrast, the distance between the cross wire pieces 2 and 3 or 4 and 5 is variable in order to allow adaptation to the thickness of the formwork panels. Formwork panels in thicknesses of 25, 35 and 50 mm are currently in use.



   The cross wire pieces fed into the welding device are now welded onto the longitudinal wire 1 below. After the welding process, the transverse wire pieces 2, 3, 4 and 5 are cut off at points 7 and, at the same time, the longitudinal wire 1 is cut off at point 7. The line wire 1 is then fed back by the distance V at the same time as the point
 EMI2.1
    connected and cut cross-wire pieces 2, 3, 4 and 5. A welding process is carried out again at the points 6 with a small amount of interference. The cutting process now takes place at points 7, a finished spacer already being produced. The lengthwise wire piece separated in the first cutting process with the cross wire pieces 4 and 5 in the upper part of the drawing is waste.

   After each such work cycle, a complete spacer is always required. Each work cycle requires only a very short time, so that the performance of the method according to the invention is particularly high.



    PATENT CLAIMS:
1. A method for producing clad concrete spacers and similar metal articles, consisting of a longitudinal wire piece and preferably four transverse wire pieces welded onto this in the transverse direction, characterized in that a longitudinal wire (1) is intermittently advanced into a welding station from a supply roll, preferably by a straightening device and that a number of cross wires (2-5) are also fed into the welding station intermittently from supply rolls and preferably by straightening devices across the longitudinal wire, the feed steps corresponding in each case to the desired lengths of the longitudinal piece and the cross wire pieces,

   after which, when all wires are at a standstill, the wires are welded at the crossing points and then all welded cross-wire pieces are separated from their strands, the longitudinal wire being severed at the same time, u. between two adjacent welded cross wire pieces of a cross wire group already welded in front of this last attached cross wire group, so that with each welding process the rear half of one and the front half of the following spacer is formed.

 

Claims (1)

2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass der Abstand der heiden Querdrähte (3, 4), zwischen denen die Durchtrennung des Längsdrahtes (1) erfolgt, konstant beibehalten, hingegen der Abstand der übrigen Querdrähte (2, 5) durch Änderung des Abstandes ihrer Zuführung auf die Schalplattenstärke abgestimmt wird. 2. The method according to claim 1, characterized in that the distance between the two transverse wires (3, 4), between which the cutting of the longitudinal wire (1) takes place, maintained constant, whereas the distance between the other transverse wires (2, 5) by changing the The distance between their feed is matched to the panel thickness. 3. Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass der Abstand zwischen zwei auf einmal anzuschweissenden Querdrahtscharen zur Abstimmung auf die Mantelbetonkernstärke, durch Änderung der Vorschublängen des Längsdrahtes (1) variiert wird. 3. The method according to claim 1 or 2, characterized in that the distance between two cross wire groups to be welded at once to match the jacket concrete core thickness, by changing the feed lengths of the longitudinal wire (1) is varied.
AT640265A 1965-07-13 1965-07-13 Process for the production of clad concrete spacers u. similar Metal articles AT258098B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AT640265A AT258098B (en) 1965-07-13 1965-07-13 Process for the production of clad concrete spacers u. similar Metal articles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
AT640265A AT258098B (en) 1965-07-13 1965-07-13 Process for the production of clad concrete spacers u. similar Metal articles

Publications (1)

Publication Number Publication Date
AT258098B true AT258098B (en) 1967-11-10

Family

ID=3585944

Family Applications (1)

Application Number Title Priority Date Filing Date
AT640265A AT258098B (en) 1965-07-13 1965-07-13 Process for the production of clad concrete spacers u. similar Metal articles

Country Status (1)

Country Link
AT (1) AT258098B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0241449A1 (en) * 1986-04-02 1987-10-14 EVG Entwicklungs- u. Verwertungs- Gesellschaft m.b.H. Resistance multi-spot welding machine

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0241449A1 (en) * 1986-04-02 1987-10-14 EVG Entwicklungs- u. Verwertungs- Gesellschaft m.b.H. Resistance multi-spot welding machine

Similar Documents

Publication Publication Date Title
DE1035606B (en) Process for the manufacture of reinforcing steel with transversely grooved parts of its circumference
DE920362C (en) Process and system for the production of metal semi-finished products of various types (wires, bars, rods, plates, strips, sheets or the like)
AT258098B (en) Process for the production of clad concrete spacers u. similar Metal articles
DE651843C (en) Process for the production of coherent strips from U-shaped staples and similar objects made of wire
DE2613579A1 (en) METHOD FOR CREATING A LEVEL OR SPATIAL REINFORCEMENT STRUCTURE OR STRUCTURAL STRUCTURE AND DEVICE FOR CARRYING OUT THE PROCEDURE
DE3405641C2 (en)
DE2526392A1 (en) METHOD FOR MANUFACTURING ROLLED WIRE RINGS WITH MANY WEIGHTS OF A WIREBAR
AT214241B (en) Process and plant for the production of welded wire mesh
EP0981414B1 (en) Process and plant for manufacturing grates
DE724547C (en) Machine for the production of welded pipes
DE619990C (en) Process for the machine production of wire mesh
AT201402B (en) Machine for the production of ornamental wire mesh
AT523692B1 (en) Process and device for the production of welded reinforcement grids with high strength and elongation values
DE828134C (en) Process and electrode for electrical welding of sieves
DE1939090C3 (en) Process for the production of clad concrete spacers
DE1484091A1 (en) Reinforcement element and method of its manufacture
DE587885C (en) Process for the production of tight, unset double anchor chains, so-called cord chains
DE923363C (en) Process for the manufacture of flat heating elements and products manufactured therefrom
DE899081C (en) Cathode for electron tubes
DE380693C (en) Manufacture of triangular brake shafts
DE473563C (en) Method and machine for rolling pipe connectors
AT212672B (en) Process for the manufacture of turnbuckles
DE3115794C1 (en) Process for producing wire networks which are formed from welded, relatively thin longitudinal and transverse wires and have narrow divisions
DE2205118A1 (en) PROCESS FOR MANUFACTURING KNIFE BLADE BLADE
DE941664C (en) Process for the production of endless pipes, in particular cable jackets, on extrusion presses operating in sections