AT23844B - Process for the production of load-bearing concrete piles. - Google Patents

Process for the production of load-bearing concrete piles.

Info

Publication number
AT23844B
AT23844B AT23844DA AT23844B AT 23844 B AT23844 B AT 23844B AT 23844D A AT23844D A AT 23844DA AT 23844 B AT23844 B AT 23844B
Authority
AT
Austria
Prior art keywords
concrete
load
production
concrete piles
piles
Prior art date
Application number
Other languages
German (de)
Inventor
Anton Strauss
Original Assignee
Anton Strauss
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anton Strauss filed Critical Anton Strauss
Application granted granted Critical
Publication of AT23844B publication Critical patent/AT23844B/en

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Piles And Underground Anchors (AREA)

Description

  

   <Desc/Clms Page number 1> 
 



  Verfahren zur Herstellung tragfähiger   Betonpfähle.   



   Die vorliegende Erfindung betrifft ein Verfahren   zut herstellung   eines festen Baugrundes durch   Betonpfähle,   die in vorher hergestellten Löchern erzeugt worden. Die für diesen Zweck bisher bekannt gewordenen Mittel waren höchst unzulänglicher Art, einmal konnten die Löcher zur Herstellung der Pfähle nur bis zu einer geringen Tiefe geführt werden, da dieselben entweder durch Einrammen eines Pfahles oder Senken eines Zylinders mit folgendem Ausheben der Erde erzeugt wurden, und ferner war die Gestalt der auf diese Weise erzielten Pfähle eine zylindrisehe, welche gewöhnlich dem inneren Durchmesser des Futterrohres entsprach oder nur wenig grösser war.

   Die vorliegende Erfindung betrifft nun ein Verfahren zur Herstellung eines festen Baugrundes mit Hilfe   solcher Betonpfahle,   jedoch in der Weise, dass in die durch Bohren bis zur   gewünschten Tiefe niedorgeführten   undmitFutterrohrenverschenenLöcherinbekannterWeiseBetonmasseeingebrachtwird, welche durch   kräftiges     stumpfen   unter zeitweisem Heben der Futterrohre in die umgebenden   Erdschichten eingepresst wird, so   dass   Betonpfabie entstehen,   welche fest in den Erdboden 
 EMI1.1 
 jedoch stets grösseren Durchmesser als die Futterrohre besitzen, welche Betonpfähle infolge Anwendung des an sich bekannten Bohrverfahrens füden vorliegenden Zweck bis zur gewünschten Tiefe niedergefülhrt werden können.

   Da mithin diese   Hetonpfähle   nicht wie diejenigen bekannter Art nur mit den unteren Flächen, sondern mit ihrer gesamten im 
 EMI1.2 
 eines Pfahles nach vorliegender Erfindung ganz erheblich grösser, als dies bisher der Fall war. 



     Das Vorfahren wird   in folgender Weise   ausgeführt   :
Zur Herstellung eines   Betonpfahlcs   wird zunächst ein Bohrloch bis zu einer tragfähigen   bodenschicht     abgeteuft und mit einem   eisernen Austutterungsrohre versehen, dessen   Durchmesser   ebenso wie jener des Bohrloches selbst von der Beschaffenheit des Bau- 
 EMI1.3 
   hesit/t, eine gewisse Menge Heton, dessen Zusammensetzung von   der Beschaffenheit des   Baugrundes   abhängt, auf den Grund des   Bohrioches gebracht,   wo man die Vorrichtung, die irgendeine bekanute Konstrucktion haben kann,

   mittels eines Seiles durch Herabklappen 
 EMI1.4 
 Infolge dieses Feststampfens wird der Beton am unteren Ende des Futterrohres herausund in den   Boden hineingepresst. Das Feststampfen wird so   lange fortgesetzt, bis der Beton 
 EMI1.5 
 

 <Desc/Clms Page number 2> 

 
 EMI2.1 
 wird. Der Durchmesser dos dadurch entstehenden Betonpfahles ist also etwas grösser als derjenige des Futterrohres, und zwar wird der Pfahl an denjenigen Stellen, wo weniger widerstandsfähige Bodenschichten vorhanden sind, Verdickungen und Ausbauchungen erhalten. Bei der Herstellung derartiger Pfähle ist natürlich darauf zu achten, dass das jedesmalige Hochziehen der Futterrohre nicht so weit erfolgt, dass von dem äusseren Baugrund Wasser in das Innere der Rohre eindringen kann.

   Vielmehr muss unter allen Umständen eine gewisse Menge Beton im Futterrohre selbst vorhanden sein, weicher das untere Ende des Futterrohres abschliesst. Die auf die beschriebene Art hergestellten Pfähle können von 
 EMI2.2 




   <Desc / Clms Page number 1>
 



  Process for the production of load-bearing concrete piles.



   The present invention relates to a method for producing a solid foundation by means of concrete piles which have been produced in previously made holes. The means hitherto known for this purpose were extremely inadequate, once the holes for making the piles could only be made to a shallow depth, since they were made either by driving a pile or lowering a cylinder followed by excavation of the earth furthermore, the shape of the piles obtained in this way was close to a cylinder, which usually corresponded to the inner diameter of the casing or was only slightly larger.

   The present invention now relates to a method for producing a solid foundation with the help of such concrete piles, but in such a way that in the known way concrete mass is introduced into the holes made by drilling to the desired depth and provided with casing pipes, which is pressed into the surrounding soil layers by vigorously blunting the casing pipes with temporary lifting, so that concrete pfabie arise, which are firmly in the ground
 EMI1.1
 but always have a larger diameter than the casing, which concrete piles can be lowered to the desired depth as a result of the use of the drilling method known per se for the present purpose.

   Since these stakes are not only with the lower surfaces like those of the known type, but with their entire inside
 EMI1.2
 of a pile according to the present invention is considerably larger than was previously the case.



     The ancestor is carried out in the following way:
To create a concrete pile, a borehole is first sunk to a stable soil layer and provided with an iron lining pipe, the diameter of which, like that of the borehole itself, depends on the nature of the building.
 EMI1.3
   hesit / t, a certain amount of Heton, the composition of which depends on the nature of the subsoil, brought to the bottom of the borehole, where one can have the device, which can have any known construction,

   by means of a rope by folding down
 EMI1.4
 As a result of this ramming, the concrete is pressed out and into the ground at the lower end of the casing. The tamping continues until the concrete
 EMI1.5
 

 <Desc / Clms Page number 2>

 
 EMI2.1
 becomes. The diameter of the resulting concrete pile is therefore somewhat larger than that of the casing, and the pile will have thickenings and bulges in those places where there are less resistant layers of soil. When making piles of this type, care must of course be taken that the casing pipes are not pulled up so far each time that water can penetrate the inside of the pipes from the outer subsoil.

   Rather, a certain amount of concrete must be present in the casing itself under all circumstances, which closes the lower end of the casing. The piles manufactured in the manner described can be used by
 EMI2.2


 

Claims (1)

PATENT-ANSPRUCH : Verfahren zur Herstellung tragfähiger Betonpfähle, dadurch gekennzeichnet, dass in die durch Bohren bis zur gewünschten Tiefe niedergeftlhrten und mit Futterrohren versehenen Löcher in bekannter Weise Betonmasse eingebracht wird, welche durch kräftiges Stampfen unter zeitweisem Heben der Futterrohre in die umgebenden Erdschichten eingepresst wird, derart, dass nach Massgabe der Nachgiebigkeit des Baugrundes Verdickungen (Wulste) an den Betonpfählen entstehen. PATENT CLAIM: Process for the production of load-bearing concrete piles, characterized in that concrete mass is introduced in a known manner into the holes drilled to the desired depth and provided with casing pipes, which concrete mass is pressed into the surrounding earth layers by vigorous tamping while temporarily lifting the casing pipes, in such a way that Depending on the flexibility of the subsoil, thickenings (bulges) arise on the concrete piles.
AT23844D 1904-12-03 1904-12-03 Process for the production of load-bearing concrete piles. AT23844B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
AT23844T 1904-12-03

Publications (1)

Publication Number Publication Date
AT23844B true AT23844B (en) 1906-04-10

Family

ID=3533379

Family Applications (1)

Application Number Title Priority Date Filing Date
AT23844D AT23844B (en) 1904-12-03 1904-12-03 Process for the production of load-bearing concrete piles.

Country Status (1)

Country Link
AT (1) AT23844B (en)

Similar Documents

Publication Publication Date Title
DE2233732A1 (en) PROCEDURE FOR SOLIDIZING LOOSE EARTH AND PROCESSING FASTENING PILES
EP0580098A1 (en) Method and device for pile foundation
EP2702209A2 (en) Foundation pile and method for producing a foundation for a structure in water
EP2925934B1 (en) Method for manufacturing a pile
AT23844B (en) Process for the production of load-bearing concrete piles.
DE2351713A1 (en) METHOD AND DEVICE FOR CONSOLIDATING FOUNDATION SOIL
DE2838363A1 (en) LIQUID AND PERMEABLE WALL AND METHOD OF MANUFACTURING THE SAME
DE102005029364B4 (en) Precast pile and associated method for building foundation
DE189182C (en)
DE19740032C2 (en) Device for anchoring a rebar and method for anchoring a sealing base
DE78529C (en) Process for the production of cement ground anchors
EP2728070B1 (en) Method for driving and anchoring a driven pile in the ground and driven pile
DE1910556A1 (en) Process for the production of foundation piles from in-situ concrete with extensions of the pile shaft and the pile base, as well as internal formwork for carrying out the process
DE102021116487B3 (en) Geotextile covered liquid soil columns
DE2052184A1 (en) Method for producing a deep foundation body
EP3789469B1 (en) Method for producing a base module
AT65619B (en) Process for the production of foundations and other building structures made of concrete or masonry in any building material in water-containing soil in flowing or standing water.
AT84445B (en) Process for the artificial reinforcement of the subsoil or for the watertight closure of the piles against groundwater.
DE1928471A1 (en) Process and device for compacting and draining soil
EP3542000A1 (en) Method for dismantling offshore foundation structures
CH670669A5 (en) Concrete foundation constructing method - uses hollow perforated drill to inject binder into sloping holes to form anchorage cores for lining blocks
DE557509C (en) Process for the production of wells and shafts within sheet piling
AT69455B (en) Method of making well bores and pile holes.
AT34538B (en) Foundation method for water-bearing or submerged soil.
DE883956C (en) Hydraulic press in the form of a bag to be expanded, in particular for prestressing components or structures