AT215128B - Process for the production of double-shell ceilings u. like structures - Google Patents

Process for the production of double-shell ceilings u. like structures

Info

Publication number
AT215128B
AT215128B AT94158A AT94158A AT215128B AT 215128 B AT215128 B AT 215128B AT 94158 A AT94158 A AT 94158A AT 94158 A AT94158 A AT 94158A AT 215128 B AT215128 B AT 215128B
Authority
AT
Austria
Prior art keywords
soffit
shell
ceilings
webs
ceiling
Prior art date
Application number
AT94158A
Other languages
German (de)
Inventor
Ladislaus Ing Zdrahal
Original Assignee
Ladislaus Ing Zdrahal
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ladislaus Ing Zdrahal filed Critical Ladislaus Ing Zdrahal
Priority to AT94158A priority Critical patent/AT215128B/en
Application granted granted Critical
Publication of AT215128B publication Critical patent/AT215128B/en

Links

Description

  

   <Desc/Clms Page number 1> 
 



  Verfahren zur Herstellung von zweischaligen Decken u. dgl. Tragwerken 
Bei den heute üblichen Deckensystemen aus Stahlbeton, insbesondere unter Verwendung von vorfabrizierten Teilen, können zwei Hauptgruppen unterschieden werden, u.   zw. :  
A. Einschalige Decken mit ebener Untersicht. 



   B. Zweischalige Massivdecken. 



   Zur Gruppe A gehören Stahlbetonplattendecken sowie   Hohlstein-und   Hohlkörperdecken, wobei es gleichgültig ist, ob der verlegte Hohlstein bzw. der Hohlkörper aus einem Stück vorfabriziert oder aus zwei oder mehreren Schalen zusammengesetzt ist. 



   Die zweischaligen Massivdecken bestehen in der Regel aus Stahlbeton-Rippendecken, die als zweite Schale eine von der Tragkonstruktion weitgehend unabhängige, wärmedämmende Putzschale erhalten. Diese untere Deckenschale soll aus Stoffen mit guten schalldämmenden Eigenschaften bestehen. Als solche Stoffe kommen   Leichtbausioffe   wie Holzwolleplatten, Schilfmatten und Platten aus Fasermaterial sowie aus Holz in Betracht.-
Um die untere Deckenschale besonders schallschluckend auszugestalten, ist es notwendig, die zweite Schale nur lose über einzelne Rippen, Träger oder Stege mit der Tragkonstruktion zu verbinden. 



   Es können aber auch Hohlsteine bzw. Hohlkörperdecken der Gruppe A durch Ausstattung mit einer unteren Deckenschale aus den oben genannten Baustoffen zu zweischaligen Decken ausgestaltet werden. 



   Wesentlich ist, dass man nach der bisherigen Praxis die zweite Deckenschale nachträglich an der bereits fertigen Tragkonstruktion in einem weiteren Arbeitsgang von unten her angebracht hat. 



   Vorstehende Erfindung offenbart den Gedanken, den bis heute üblichen Weg der Herstellung einer   zweischaligenDecke inumgekehrter Reihenfolge zu gehen, u. zw. in der Form, dass auf die   ebene Untersicht die eigentliche Tragkonstruktion nachträglich aufgebaut wird. 



   Die Untersichtplatten sollen dabei aus leichten,   wärme-und schalldämmenden   Stoffen   (Schilfplatten,   
 EMI1.1 
    dgl.dermontagelastea   zu   tragen vermögen.   Um mit einem Minimum an Widerstandsmoment der tragenden Untersichtelemente das Auslangen zu finden, werden diese bei den im Hochbau üblichen Spannweiten von 4 bis 6 m mit einer provisorischen Unterstellung in der Mitte gestützt. 



   Die Untersichtelemente sind handelsübliche Bauplatten,   der : n   Breite dem   gewählten Rippenabstand   der Tragkonstruktion entspricht. Mit diesen Platten sind zwei vertikale, in Plattenlängsrichtung laufende Stege verbunden, so dass sich trogförmige nach oben offene, tragende Körper ergeben, wobei jeder Steg vom benachbarten Plattenrand einen Abstand aufweist, der der halben Rippenbreite der Tragkonstruktion entspricht. Diese Stege verleihen den Untersichtplatten die erforderliche Steifigkeit. 



   Die vorgefertigten Untersichtelemente werden auf der Baustelle nebeneinander, Mann an Mann verlegt, so dass sich zwischen je zwei Untersichtelementen eine Rinne bildet, die für spätere Aufnahme der Bewehrung und des Betons der Tragkonstruktion bestimmt ist. Die trogartigen Zwischenräume, gebildet aus Untersichtplatte und den beiden Stegen je eines Elementes, werden durch vorgefertigte Deckensteine schalungslos überdeckt und bilden ihrerseits einen Teil der   Drukzone   der späteren Tragkonstruktion.

   Die übrig bleibenden Rinnen, gebildet aus den vorstehenden   Plattenenden   und den Stegen zweier   benachbar-   ter Untersichtelemente sowie der seitlichen Begrenzung der darauf ruhenden Deckensteine werden bewehrt und mit Beton od. dgl. vergossen, wobei der   Vergussbeton   (Ortbeton) im oberen Bereich den restlichen Teil der Druckzone, im unteren Bereich die Rippe der Tragkonstruktion bildet. 

 <Desc/Clms Page number 2> 

 



   Bei den Deckensteinen ist vorzugsweise an die Ausführung gemäss der österr. Patentschrift Nr. 163015 gedacht, wobei durch die besondere Form der in diesem Patent beschriebenen gewölbten Deckensteine gemeinsam mit den Untersichtstegen und dem Rinnenboden für   denVergussbeton (Oitbeton) T-förmige   Querschnitte gebildet werden, die eine gute Verbindung des Ortbetons mit den Deckensteinen infolge der ausserordentlich grossen Haftfläche gewährleisten. 



   Es ist jedoch auch möglich, durch eine andere, z. B. eine flache Form der Deckensteine bei Anwendung entsprechender Verzahnungen den gleichen Effekt zu erzielen. 



   Der Erfindungsgegenstand ist beispielsweise in den Fig.   1 - 3   der Zeichnung veranschaulicht. Fig. 1 zeigt ein Untersichtelement in schaubildlicher Darstellung, die Fig. 2 und 3 zeigen Beispiele von Decken im Querschnitt. 



   In Fig. 1 bezeichnet   1   die Untersichtplatte aus leichtem, wärme-und schalldämmenden Baustoff, z. 



  B.   Schilfplatte.   Jede Platte ist mit zwei vertikalen, in der Längsrichtung der Platte laufenden Stegen 2 und 3 versehen. 



   Diese Stege können aus hochkant gestellten Brettern gebildet sein, die mit der Platte 1 bei 4 vernagelt und   durchquerrepeii   5 in Abstand gehalten sind, die gleichfalls aus   Holzbrettem   bestehen können und mit den Stegen 2 und 3 bei 6 vernagelt sind. 



   Fig. 2 zeigt den Querschnitt durch eine Decke, bei der die   Umersichtelemente   mit den Platten 1 und den Stegen 2 und 3 Mann an Mann verlegt sind. Der trogartige Zwischenraum 7 ist mit   DeckensteineI1   8 gemäss der österr. Patentschrift Nr. 163015   schalungslos   abgedeckt, wobei sich zwischen den Stegen 2 und 3 und den vorstehenden Plattenenden 9 zweier benachbarter Untersichtelemente und der Begrenzung der auf letzteren ruhenden Deckensteine 8 T-förmige Rinnen 10 für die Aufnahme des Ortbetons und der Bewehrung 11 bilden. Um das Herausfallen der Untersichtelemente zu verhindern, sind deren Stege 2, 3 leicht nach aussen geneigt, so dass die Untersichtelemente in der später hergestellten Tragkonstruktion nach Entfernung der allenfalls nötigen provisorischen Unterstellungen schwalbenschwanzförmig verankert sind. 



   Bei der Ausführungsform gemäss Fig. 3 sind die Tröge 7 mit andern, z. B. plattenförmigen, Deckensteinen 12 abgedeckt, die an den Seiten bei 13 zur besseren Verbindung mit dem Ortbeton eine Verzahnung 15 aufweisen. 



   Das erfindungsgemässe Verfahren verbilligt die Herstellung einer zweischaligen Decke durch Einsparung eines Arbeitsganges, da das Befestigen der zweiten Schale entfällt. Überdies entfällt die Notwendig-   keit,   die Untersichtelemente auf eine vorbereitete Schalung zu verlegen. Im Rahmen des Herstellungsverfahrens gemäss der Erfindung kommen Untersichtelemente zur Verlegung, die aus zwei oder mehreren schalltechnisch lose aneinandergefügten Teilen bestehen und auch eine lose Verbindung zwischen Putzschale und Tragkonstruktion gewährleisten, wie dies bisher nur bei   nachträglich angebrachten Untersichtea   erreicht werden konnte. 



   Gegenüber der bereits bekannten Verwendung von Hohlkörpern z. B. aus   zemeI1tgebundeI1er   Holzwolle in Rohr- oder Kastenform als   verloreI1e Schalung für RíppendeckeI1   besteht der Vorteil der einfacheren Herstellung der trogförmigen Untersichtelemente bei erheblicher Materialersparnis und eines niedrigeren Gewichtes und Preises. 



   Einen weiteren Vorteil gegenüber Decken mit ebener Untersicht (einschaligen Decken) einschliesslich der im vorangehenden Absatz erwähnten Hohlkörper ergibt die Möglichkeit, jede Art von Installationen vor Fertigstellung der Decke ohne jede Beschädigung der Untersicht (der Tragkonstruktion) und ohne jede Stemmarbeit usw. in die oben offenen Tröge der verlegten Untersicht-Elemente von oben her ohne ein. 



  Hilfsgerät zu montieren. Hiezu sieht man zweckmässig in den Querstegen 5   (Fig. l)   Schlitze 20 vor. 



    PATENTANSPRÜCHE :    
1. Verfahren zur Herstellung von zweischaligen Decken u. dgl. Tragwerken, die. eine aus vorgefertigten Deckensteinen und Ortbeton gebildete Stahlbeton-Tragkonstruktion und eine mit ihr nur lose verbundene Putzschale aus Leichtbaustoffen umfassen, dadurch gekennzeichnet, dass zuerst die aus Leichtbauplatten   (1)   und zwei beiderseits derselben längslaufenden mit diesen lose   verbundenen Stegen (2, 3)   beste-   henden Untersichtelemente als selbsttragende   Hilfskonstruktion verlegt, dann auf die Stege der Untersichtplatten die vorgefertigten, Mann an Mann verlegten, vorzugsweise gewölbten Betondeckensteine (8) abgestützt und schliesslich in die so gebildete Schalung in an sich bekannter Weise die Bewehrung (11) und der Ortbeton (10) eingebracht werden.



   <Desc / Clms Page number 1>
 



  Process for the production of double-shell ceilings u. like structures
In the case of the reinforced concrete ceiling systems commonly used today, especially using prefabricated parts, two main groups can be distinguished, u. between:
A. Single-leaf ceilings with a level soffit.



   B. Double-shell solid ceilings.



   Group A includes reinforced concrete slab ceilings and hollow stone and hollow body ceilings, it being irrelevant whether the laid hollow stone or hollow body is prefabricated from one piece or is composed of two or more shells.



   The double-shell solid ceilings usually consist of reinforced concrete ribbed ceilings, the second shell of which is a heat-insulating plaster shell that is largely independent of the supporting structure. This lower ceiling shell should consist of materials with good sound-insulating properties. Lightweight construction materials such as wood wool panels, reed mats and panels made of fiber material as well as wood come into consideration as such materials.
In order to make the lower ceiling shell particularly sound-absorbing, it is necessary to only loosely connect the second shell to the supporting structure via individual ribs, beams or webs.



   However, hollow bricks or hollow body ceilings of group A can also be configured to double-shell ceilings by equipping them with a lower ceiling shell made of the building materials mentioned above.



   It is essential that, according to previous practice, the second ceiling shell is subsequently attached to the already finished supporting structure in a further operation from below.



   The above invention discloses the idea of following the usual way of producing a double-shell ceiling in the reverse order, u. in the form that the actual supporting structure is subsequently built on the flat soffit.



   The soffit panels should be made of light, heat-insulating and sound-insulating materials (reed panels,
 EMI1.1
    Like.dermontagelastea able to carry. In order to get by with a minimum of the moment of resistance of the load-bearing soffit elements, they are supported with a provisional support in the middle for the span widths of 4 to 6 m that are common in building construction.



   The soffit elements are commercially available building boards, which: n width corresponds to the selected rib spacing of the supporting structure. Two vertical webs running in the longitudinal direction of the board are connected to these plates, so that trough-shaped, upwardly open, load-bearing bodies result, with each web being at a distance from the adjacent plate edge that corresponds to half the rib width of the supporting structure. These webs give the soffit panels the required rigidity.



   The prefabricated soffit elements are laid side by side on the construction site, man to man, so that a channel is formed between every two soffit elements, which is intended for the later support of the reinforcement and the concrete of the supporting structure. The trough-like spaces, formed from the soffit plate and the two webs of one element each, are covered by prefabricated ceiling stones without formwork and in turn form part of the pressure zone of the later supporting structure.

   The remaining channels, formed from the protruding slab ends and the webs of two neighboring soffit elements as well as the lateral boundary of the ceiling stones resting on them, are reinforced and poured with concrete or the like, with the grouting concrete (in-situ concrete) in the upper area making up the remaining part of the Pressure zone, which forms the rib of the supporting structure in the lower area.

 <Desc / Clms Page number 2>

 



   In the case of the ceiling stones, the design according to Austrian patent specification no. 163015 is preferably intended, whereby the special shape of the arched ceiling stones described in this patent together with the soffit webs and the channel floor for the cast concrete (Oitbeton) create T-shaped cross-sections that ensure a good connection of the in-situ concrete with the ceiling stones due to the extraordinarily large adhesive surface.



   However, it is also possible by another, for. B. a flat shape of the ceiling stones when using appropriate toothing to achieve the same effect.



   The subject matter of the invention is illustrated, for example, in FIGS. 1-3 of the drawing. 1 shows a perspective view of a soffit element, and FIGS. 2 and 3 show examples of ceilings in cross section.



   In Fig. 1, 1 denotes the soffit plate made of light, heat-insulating and sound-insulating building material, e.g.



  B. reed board. Each plate is provided with two vertical webs 2 and 3 running in the longitudinal direction of the plate.



   These webs can be formed from boards placed on edge, which are nailed to the plate 1 at 4 and held at a distance throughquerrepeii 5, which can also consist of wooden boards and are nailed to the webs 2 and 3 at 6.



   Fig. 2 shows the cross section through a ceiling in which the Umersichtelemente with the plates 1 and the webs 2 and 3 are laid man to man. The trough-like space 7 is covered with ceiling stones I1 8 according to Austrian Patent No. 163015 without formwork, with T-shaped channels 10 for between the webs 2 and 3 and the protruding plate ends 9 of two adjacent soffit elements and the boundary of the ceiling stones 8 resting on the latter the inclusion of the in-situ concrete and the reinforcement 11 form. In order to prevent the soffit elements from falling out, their webs 2, 3 are slightly inclined outwards so that the soffit elements are anchored in a dovetail shape in the supporting structure produced later after removal of any necessary temporary supports.



   In the embodiment according to FIG. 3, the troughs 7 with other, z. B. plate-shaped, ceiling stones 12 are covered, which have a toothing 15 on the sides at 13 for better connection with the in-situ concrete.



   The method according to the invention makes the production of a double-shell ceiling cheaper by saving one work step, since there is no need to attach the second shell. In addition, there is no need to lay the soffit elements on prepared formwork. As part of the manufacturing process according to the invention, soffit elements are laid that consist of two or more parts that are loosely joined together in terms of acoustics and also ensure a loose connection between the plaster shell and the supporting structure, as could previously only be achieved with subsequently attached soffits.



   Compared to the already known use of hollow bodies z. B. from zemeI1tgebundeI1er wood wool in pipe or box shape as lost formwork for ribbed ceilingI1 there is the advantage of simpler production of the trough-shaped soffit elements with considerable material savings and a lower weight and price.



   Another advantage over ceilings with a level soffit (single-shell ceilings) including the hollow bodies mentioned in the previous paragraph is the possibility of any type of installation before the ceiling is completed without any damage to the soffit (the supporting structure) and without any chiseling work etc. in the open top Trough the installed soffit elements from above without entering.



  Mount auxiliary device. To this end, slots 20 are expediently provided in the transverse webs 5 (FIG. 1).



    PATENT CLAIMS:
1. Process for the production of double-shell ceilings u. Like. Structures that. comprise a reinforced concrete support structure formed from prefabricated ceiling stones and in-situ concrete and a plaster shell made of lightweight building materials only loosely connected to it, characterized in that first the webs (2, 3) which run longitudinally on both sides of the same are loosely connected to them. The existing soffit elements are laid as a self-supporting auxiliary structure, then the prefabricated, man-to-man laid, preferably arched concrete ceiling stones (8) are supported on the webs of the soffit panels and finally the reinforcement (11) and the in-situ concrete (10) in the formwork thus formed in a manner known per se ) are introduced.

 

Claims (1)

2. Decken od. dgl. Tragwerke nach Anspruch l, dadurch gekennzeichnet, dass die Stege (2,3) der Untersichtplatten (1) eine geringe Neigung nach aussen aufweisen, so dass die Untersichtelemente in der <Desc/Clms Page number 3> später hergestellten Tragkonstruktion schwalbenschwanzförmig verankert sind. 2. Ceilings or the like. Structures according to claim l, characterized in that the webs (2,3) of the soffit panels (1) have a slight outward inclination, so that the soffit elements in the <Desc / Clms Page number 3> support structure made later are anchored in a dovetail shape. 3. Decke nach Anspruch 2, dadurch gekennzeichnet, dass die beiden Stege (2, 3) der Untersichtelemente voneinander durch Querrippen (5) in Abstand gehalten und gegeneinander ausgesteift sind, die gegebenenfalls zur leichteren Verlegung von Installationen mit Schlitzen (20) od. dgl. ausgestattet sind. 3. Ceiling according to claim 2, characterized in that the two webs (2, 3) of the soffit elements are held at a distance from one another by transverse ribs (5) and stiffened against one another, which, if necessary, for easier installation of installations with slots (20) or the like . are equipped.
AT94158A 1958-02-10 1958-02-10 Process for the production of double-shell ceilings u. like structures AT215128B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AT94158A AT215128B (en) 1958-02-10 1958-02-10 Process for the production of double-shell ceilings u. like structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
AT94158A AT215128B (en) 1958-02-10 1958-02-10 Process for the production of double-shell ceilings u. like structures

Publications (1)

Publication Number Publication Date
AT215128B true AT215128B (en) 1961-05-10

Family

ID=3503354

Family Applications (1)

Application Number Title Priority Date Filing Date
AT94158A AT215128B (en) 1958-02-10 1958-02-10 Process for the production of double-shell ceilings u. like structures

Country Status (1)

Country Link
AT (1) AT215128B (en)

Similar Documents

Publication Publication Date Title
DE102018001689A1 (en) Module and method for manufacturing a module, a building wall and a building
DE2436515A1 (en) Prefabricated concrete ceiling or roof support element - embedded in beam of styropor concrete or other light material
EP0745169B1 (en) Reinforcing member for a ribbed poured concrete ceiling
CH662849A5 (en) METHOD FOR PRODUCING A BUILDING AND A BUILDING PRODUCED BY THIS METHOD.
DE60011415T2 (en) CONSTRUCTION ELEMENT FOR BUILDINGS AND STEERING PLATE FOR SUCH ELEMENT
AT215128B (en) Process for the production of double-shell ceilings u. like structures
DE3318431A1 (en) Ceiling element
DE19706666C2 (en) Subfloor or screed for floors in buildings
DE10350082B4 (en) Prestressed flat ceiling with hollow ceiling slabs
DE2014558A1 (en) Prefabricated ceiling part and process for the production of a reinforced concrete solid ceiling
AT166299B (en) Building element for pitched roofs
DE102017114619A1 (en) Prefabricated wall element
DE3545707A1 (en) Lightweight loam structural element
DE910721C (en) Ceiling composed of prefabricated reinforced concrete beams, in-situ concrete and fill stones
DE821403C (en) Prefabricated component and method for assembling such components
DE812596C (en) Ceiling construction
DE2406852A1 (en) PROCESS FOR THE PRODUCTION OF BUILDINGS WITH ROCK CONCRETE WALLS AND REINFORCED CONCRETE SOLID SLABS
DE826499C (en) Reinforced concrete rib ceiling made of finished hollow beams and slabs and a concrete core attached to the construction site
DE1459969A1 (en) Reinforced ceiling slab which, as a prefabricated component of a floor slab, also serves as a formwork sheet
DE859220C (en) Prefabricated reinforced concrete ceiling beams
DE2649132A1 (en) Noise screening wall slab - has reinforced concrete perforated panel inset in load bearing rear frame with edge ribs
AT352958B (en) PREFABRICATED CEILING ELEMENT
DE927172C (en) Reinforced concrete beam ceiling made of reinforced concrete beams lying next to one another
DE2035372A1 (en) Method and form for forming a shell of construction or structural parts made of concrete or reinforced concrete
DE2310508A1 (en) PROCESS FOR PRODUCING A BUILDING CEILING AND COMPONENT FOR CARRYING OUT THE PROCESS